ADDENDUM. Project: BYU-I Smith Building Chiller Replacement Project No.: Addendum No.: 1

Size: px
Start display at page:

Download "ADDENDUM. Project: BYU-I Smith Building Chiller Replacement Project No.: Addendum No.: 1"

Transcription

1 ADDENDUM Project: BYU-I Smith Building Chiller Replacement Project No.: Addendum No.: 1 Project Address: BYU-Idaho Operations Building Rm. #213, Rexburg, Idaho Date: 2/18/16 Owner: BYU-Idaho From (Architect): Engineered Systems Assoc., Inc., 1355 E. Center St., Pocatello, ID Instructions to Prospective Bidders: This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents and/or prior Addenda as noted below. All conditions, requirements, materials and workmanship are to be as described in the Contract Documents unless specifically stated otherwise. This Addendum consists of 2 page(s), and 6 attached items dated February 18, Changes to Conditions of Contract: a. See revised Invitation to Bid as submitted through E-Builder. 2. Changes to Specifications: a. See attached New Bid Form with Alternate Bid- All Contractors shall use this Bid Form to submit bids. b. See attached Section 0768 Steam Supply and Condensate Return Piping Insulation. c. See attached Section Steam and Condensate Piping. d. See attached Section Condensate Pump. e. See attached Section Steam and Condensate Specialties. 3. Changes to Drawings: a. See attached Sketch to rebuild steam pressure reducing station. This will be Bid Alternate #1. b. Sheet M1.1: i. Reference Note 12. In addition to relocating the two heating water expansion tanks, Contractor shall also relocate the heating water glycol feed tank next to the expansion tanks. Extend all piping as required and reconnect. See picture below. CON-MIS-0044-US Rev. B 13 November 2002 Page 1 of 2

2 ii. See attached revised floor plan for additional work under Base Bid (Note 12) and new work to be bid as Alternate Bid #1 (Note 16). iii. See also attached Steam Piping Diagram and Condensate Pump Schedule (Alternate #1). a. Sheet E1.1: i. Provide a 20A., 2P breaker in new panel PP for duplexed condensate pumps. Install a 3/4"c., 3-#12 + gnd to pump control panel and make all required connections. See Mechanical Item 3a above. ii. Mechanical Contractor to relocate heat glycol fill pump. See Item 3b above. Electrical Contractor shall disconnect power and extend conduit and wiring as required for new location. Field verify conduit and wire size. End of Addendum #1 CON-MIS-0044-US Rev. B 13 November 2002 Page 2 of 2

3

4

5

6

7

8 BYU-I Smith Chiller Replacement January STEAM SUPPLY AND CONDENSATE RETURN PIPING INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings, General Provisions of Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, and Section apply to this Section. 1.2 SUMMARY A. Furnish and install insulation on piping mains, branches, risers, fittings, and valves, pump bodies and flanges as described in Contract Documents. PART 2 - PRODUCTS 2.1 MATERIAL A. 6 lb./cu.ft. heavy density fiberglass with fire retardant vapor barrier jacket with self sealing laps. Thickness shall be 1-1/2 inches on heating supply and return lines. B. Approved Manufacturers: 1. Owens-Corning Fiberglass heavy density with ASJ-SSL jacket 2. Equals by Johns-Manville or CTM. 3. Zeston covers for valves and fittings. PART 3 - EXECUTION 3.1 INSTALLATION A. Pipes: 1. Install in accordance with manufacturer's directions on clean dry pipes. 2. Butt joints firmly together. 3. Seal vapor barrier longitudinal seam overlap with vapor barrier adhesive. 4. Wrap butt joints with four inch strip of vapor barrier jacket material cemented with vapor barrier adhesive. 5. Wrap all steam and condensate piping with metal jacketing. 6. Finish with bands applied at mid-section and at each end of insulation. B. Valves & Fittings: 1. Insulate and finish by one of following methods - 2. With hydraulic setting insulating cement, or equal, to thickness equal to adjoining pipe insulation. 3. With segments of molded insulation securely wired in place. 4. With prefabricated covers made from molded pipe insulation finished with vapor barrier adhesive. 5. With Zeston covers and factory supplied insulation diapers. 6. Finish fittings and valves with four ounce canvas and coat with vapor barrier adhesive or Zeston covers. END OF SECTION STEAM SUPPLY AND CONDENSATE RETURN PIPING INSULATION

9 BYU-I Smith Chiller Replacement January 2016 SECTION STEAM AND CONDENSATE PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings, General Provisions of Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, and Section apply to this Section. 1.2 SUMMARY A. Furnish and install steam and condensate piping as described in Contract Documents. 1.3 QUALITY ASSURANCE A. Cleaning System: 1. Thoroughly clean equipment, piping, and other material under this contract. 2. Remove rust, scale, and other dirt before painting or covering. 3. Remove rust, scale, and other dirt before operating the system. B. Operate heating system at 10 psi for at least 6 hours, then - 1. Fill boiler to the top with water to wash any film, oil or grease over the top. 2. Drain boiler and refill to proper level with fresh water. 3. Use 1 pound tri-sodium phosphate for every 100 gallons of water during cleaning operation. C. Tests: 1. No piping systems shall be covered or concealed until hydraulically tested at 50 psi in excess of maximum working pressure (100 psi minimum) and inspected and approved by Architect and any local inspector having jurisdiction. 2. When directed by Architect or Engineer, Contractor shall conduct an operating test on any piece of equipment to demonstrate its capacity and operating characteristics. PART 2 - PRODUCTS 2.1 MANUFACTURED UNITS A. Steam Supply Piping 1. Schedule 40-A-120 black steel piping. 2. Pipe ends shall be reamed out before being made up into fittings. 3. Use graphite and oil applied to male threads only in making pipe joint fittings. 4. Fittings shall be standard weight 150 lb. malleable iron screwed pattern up to 2 1/2 inches. 5. Piping over 2 1/2 inches shall be welded with full weld fittings. B. Condensate Piping: 1. Schedule 80 black steel piping. 2. Pipe ends shall be reamed out before being made up into fittings. 3. Use graphite and oil applied to male threads only in making up pipe joint fittings. 4. Fittings shall be standard weight 300 lb. malleable iron screwed pattern up to 2 1/2 inches. 5. Piping over 2 1/2 inches shall be welded with full weld fittings. STEAM AND CONDENSATE PIPING

10 BYU-I Smith Chiller Replacement January 2016 PART 3 - EXECUTION 3.1 INSTALLATION A. Heating piping shall run generally as indicated on the Drawings. B. Pipe ends shall be reamed and burrs removed. C. Unions shall be installed where necessary and on both sides of equipment and drip traps. D. Install float and thermostatic drip traps in sizes shown on drawings. 1. Install at ends of steam mains. 2. Install on raises in steam mains. 3. Install dirt strainer and gate valve ahead of each drip trap. E. Runs of main piping shall start as high as possible. F. Keep as close to the ceiling as possible. G. Make sufficient allowance for grade and branches to be taken off top at 45 degree angles. H. Steam and return mains shall be graded downward in direction of flow 1 inch in 20 feet. I. Runouts and branches that grade back against flow of steam shall be graded 1/4 inch per foot. END OF SECTION STEAM AND CONDENSATE PIPING

11 BYU-I Smith Chiller Replacement January 2016 SECTION CONDENSATE RETURN PUMP PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings, General Provisions of Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, and Section apply to this Section. 1.2 SUMMARY A. Furnish and install a condensate return pump as described in Contract Documents. PART 2 - PRODUCTS 2.1 MANUFACTURED UNITS A. Simplex packaged unit with duplex heavy cast iron receiver with supports and two pumps all piped on one base. B. Each pump shall have a capacity as shown and shall be operated from float switches, magnetic starter, and alternator provided with the pump and mounted on pump assembly. C. Approved Manufacturers: 1. Ship Co 2. Or Approved Equal PART 3 - EXECUTION 3.1 INSTALLATION A. Install check valve and gate valve on pump discharge. B. Run vent line from receivers and terminate to exterior of building. END OF SECTION CONDENSATE RETURN PUMP

12 BYU-I Smith Chiller Replacement January 2016 SECTION STEAM AND STEAM CONDENSATE SPECIALTIES PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install steam and condensate specialties described in Contract Documents. B. Related Requirements: 1. Section : Common HVAC Requirements. 2. Sections Under Heading: Boilers. PART 2 - PRODUCTS 2.1 ACCESSORIES A. Manufacturers: 1. Manufacturer Contact List: a. Armstrong, Three Rivers, MI b. Barnes & Jones Inc, Randolph, MA c. Hoffman Controls Corp, Dallas, TX d. Industrial Steam, Oak Brook, IL e. Penn Separator Inc, Brookville, PA f. Shipco Pumps, Shippensburg, PA g. Spirax Sarco Inc, Allentown, PA h. Weben-Jarco Inc, Dallas, TX i. Wessels Co, Greenwood, IN B. Materials 1. Float And Thermostatic Traps: a. Suitable for 100 psig (989 kpa) steam working pressure. Install in ends of steam mains, at points where steam main rises, and at all other points where shown or required for proper operation of system. b. Materials shall be as follows: 1) Float: Copper alloy. 2) Float Valve And Seat: Monel metal or stainless steel. 3) Body: Renewable gray cast-iron, covers removable without disturbing piping connections. c. Capacities of traps shall be with 5 psig (34.5 kpa) pressure at trap inlet and differential pressure across trap of 2 psig (13.8 kpa) unless otherwise noted. d. Category Four Approved Products. See Section for definitions of Categories. 1) Spirax / Sarco: Model FTI ) Or Approved Equal. 2. Drip Pan Elbow: a. Cast iron. b. Suitable for working pressure of 125 psig (862 kpa) steam. 3. Flash Tank: a. Welded steel construction. b. ASME code labeled for 125 psig (862 kpa) working pressure. c. Category Four Approved Products. See Section for definitions of Categories. 1) Weben-Jarco. 2) Wessels Co. 3) Or Approved Equal. STEAM AND STEAM CONDENSATE SPECIALTIES

13 BYU-I Smith Chiller Replacement January 2016 C. Fabrication: 1. Flash Tank: Clean tank and paint with one coat of zinc chromate primer. PART 3 - EXECUTION: Not Used END OF SECTION STEAM AND STEAM CONDENSATE SPECIALTIES

14 1 2 C D E

15

SECTION MECHANICAL INSULATION. A. Types of insulation specified in this section include the following:

SECTION MECHANICAL INSULATION. A. Types of insulation specified in this section include the following: SECTION 15250 PART I - GENERAL 1.01 WORK INCLUDED A. Types of insulation specified in this section include the following: 1. Piping System Insulation: a. Domestic Cold Water b. Domestic Hot water c. Heating

More information

SECTION HVAC PIPING INSULATION

SECTION HVAC PIPING INSULATION SECTION 23 0719 HVAC PIPING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install insulation on above ground refrigerant piping and fittings as described in Contract

More information

This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin

This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin PART 1: GENERAL 1.01 Purpose: This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin 1.02 Scope: A. Extent of mechanical insulation

More information

B. Refer to Section : Air Distribution for lined ductwork requirements.

B. Refer to Section : Air Distribution for lined ductwork requirements. SECTION 230700 MECHANICAL INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

D. Provide UL-approved assemblies for pipes and ducts passing through fire-rated floors, walls, or partitions as required.

D. Provide UL-approved assemblies for pipes and ducts passing through fire-rated floors, walls, or partitions as required. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

A. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials

A. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SECTION MECHANICAL INSULATION

SECTION MECHANICAL INSULATION SECTION 15250 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work

More information

University of Delaware

University of Delaware University Contact: Energy & Engineering Group (302) 831-1744 SECTION 23 07 00_ HVAC INSULATION PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Piping system insulation. 2. Equipment insulation. 3.

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SECTION PROJECTED SCHEDULE

SECTION PROJECTED SCHEDULE Addendum No: One (1) Project: Architect s Project No: Burton Memorial Coliseum HVAC Upgrades & Improvements Bid # DB-2017-FM-138 MA1701 Date: January 10, 2018 To: All Plan Holders Introduction The following

More information

1. Division 23 Section "Hangers and Supports for HVAC Piping and Equipment" for pipe insulation shields and protection saddles.

1. Division 23 Section Hangers and Supports for HVAC Piping and Equipment for pipe insulation shields and protection saddles. SECTION 23 07 19 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION HYDRONIC PIPING

SECTION HYDRONIC PIPING PART 1 GENERAL 1.1 REFERENCES SECTION 15510 HYDRONIC PIPING A. ANSI/ASME SEC 9: Welding and Brazing Qualifications. B. ANSI/ASME B16.3: Malleable Iron Threaded Fittings Class 150 and 300. C. ANSI/ASME

More information

SECTION HYDRONIC PIPING

SECTION HYDRONIC PIPING PART 1 GENERAL 1.1 REFERENCES SECTION 23 21 13 HYDRONIC PIPING A. ANSI/ASME SEC 9: Welding and Brazing Qualifications B. ANSI/ASME B16.3: Malleable Iron Threaded Fittings Class 150 and 300 C. ANSI/ASME

More information

Design and Construction Standards SECTION HYDRONIC PIPING

Design and Construction Standards SECTION HYDRONIC PIPING SECTION 15510 HYDRONIC PIPING PART 1 GENERAL 1.1 REFERENCES A. ANSI/ASME SEC 9: Welding and Brazing Qualifications. B. ANSI/ASME B16.3: Malleable Iron Threaded Fittings Class 150 and 300. C. ANSI/ASME

More information

SECTION PIPING INSULATION

SECTION PIPING INSULATION SECTION 23 07 19 PIPING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Piping insulation for refrigerant piping within building envelope. 2. Furnishing and installation of insulation.

More information

HOT, CHILLED, AND CONDENSING WATER PIPING SPECIALTIES (HVAC)

HOT, CHILLED, AND CONDENSING WATER PIPING SPECIALTIES (HVAC) SECTION 15432 HOT, CHILLED, AND CONDENSING WATER PIPING SPECIALTIES (HVAC) PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 15047 - Identification. 2. 15433 - HVAC Pumps. 3. 15555 - Horizontal Fire

More information

A. Deliver material to job site in original, nonbroken, factory packaging, labeled with manufacturer's density and thickness.

A. Deliver material to job site in original, nonbroken, factory packaging, labeled with manufacturer's density and thickness. SECTION 15250 PIPING AND EQUIPMENT INSULATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract including General and Supplementary Conditions, Division 1 Specification

More information

SECTION PLUMBING PIPING SYSTEMS

SECTION PLUMBING PIPING SYSTEMS SECTION 15300 PLUMBING PIPING SYSTEMS PART 1 - GENERAL 1.01 SPECIAL NOTICE A. Each contractor shall read all relevant documents, become familiar with the job, the scope of work, type of general construction,

More information

A. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building Materials

A. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building Materials PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

HVAC INSULATION. A. General Requirements for Flexible Elastomeric Insulation: 3. Use pre-molded roll on pipe sizes 3.5" and below.

HVAC INSULATION. A. General Requirements for Flexible Elastomeric Insulation: 3. Use pre-molded roll on pipe sizes 3.5 and below. 230700 HVAC INSULATION PART 1: GENERAL 1.01 RELATED SECTIONS A. Section 232300 Refrigeration B. Section 233100 Air Distribution 1.02 INSULATION A. General Requirements for Flexible Insulation: 1. Use is

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section PIPE AND EQUIPMENT INSULATION

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section PIPE AND EQUIPMENT INSULATION PART 1 GENERAL 1.01 SUMMARY Section 15145 This Section includes insulation for piping and equipment as called out on the Plans. 1.02 MEASUREMENT AND PAYMENT No separate payment will be provided for the

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION SECTION 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 - GENERAL 1.1 SUMMARY A. This section supplements all sections in this division, including pipe, fittings, valves, and connections for sprinkler

More information

September 6, 2016 Page 1 of 5

September 6, 2016 Page 1 of 5 September 6, 2016 Page 1 of 5 1. SECTION 16100 Drawing E4.3, Note #39: Reference to the radio fire alarm panel and the fire station alerting master panel does not relate to the building fire alarm system.

More information

DIVISION 22 PLUMBING SECTION INTERIOR SANITARY WASTE AND VENT PIPING SYSTEM

DIVISION 22 PLUMBING SECTION INTERIOR SANITARY WASTE AND VENT PIPING SYSTEM DIVISION 22 PLUMBING PART 1 GENERAL 1.01 DESCRIPTION A. Provide a complete system of soil, waste, and vent piping to fixtures and equipment, including traps, floor drains and cleanouts, extending to a

More information

SECTION HYDRONIC PIPING

SECTION HYDRONIC PIPING PART 1 GENERAL 1.1 REFERENCES SECTION 23 21 13 HYDRONIC PIPING A. ASME BPVC Section IX - Welding and Brazing Qualifications B. ASME B16.3 - Malleable Iron Threaded Fittings Classes 150 and 300 C. ASME

More information

SECTION MECHANICAL INSULATION

SECTION MECHANICAL INSULATION SECTION 15250 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work

More information

A. Section Fire Procection, HVAC & Plumbing Penetration Firestopping. B. Section Interior Painting: Painting insulation jacket.

A. Section Fire Procection, HVAC & Plumbing Penetration Firestopping. B. Section Interior Painting: Painting insulation jacket. SECTION 230719 - HVAC PIPING INSULATION PART 1 GENERAL 1.1 SECTION INCLUDES A. Piping insulation. B. Jackets and accessories. 1.2 RELATED REQUIREMENTS A. Section 07813 - Fire Procection, HVAC & Plumbing

More information

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT PART 1 GENERAL SECTION 22 0553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 1.01 SECTION INCLUDES A. Pipe markers. 1.02 REFERENCE STANDARDS A. ASME A13.1 - Scheme for the Identification of Piping

More information

State of Alaska Section State Office Building HVAC Fan Replacement MECHANICAL INSULATION

State of Alaska Section State Office Building HVAC Fan Replacement MECHANICAL INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Specific requirements, products and methods of execution which relate to the insulation of ductwork, piping, valves and fittings. B. Related Sections:

More information

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION SECTION 230713 DUCT INSULATION PART 1 GENERAL 1.1 SUMMARY A. Related Sections: 1. 233113 Ductwork and Accessories 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): 1. E84-96a Test Method

More information

ADDENDUM NUMBER 1 PARTICULARS 1.01 DATE: APRIL 6, 2018

ADDENDUM NUMBER 1 PARTICULARS 1.01 DATE: APRIL 6, 2018 PARTICULARS 1.01 DATE: APRIL 6, 2018 ADDENDUM NUMBER 1 1.02 PROJECT: MIDLANDS TECHNICAL COLLEGE NE CAMPUS - CET CHILLER REPLACEMENT 1.03 OWNER'S PROJECT NUMBER: H59-N991-FW 1.04 ENGINEER: GMK ASSOCIATES

More information

UBC Technical Guidelines Section Edition Thermal Insulation for Piping Page 1 of 5

UBC Technical Guidelines Section Edition Thermal Insulation for Piping Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Related UBC Guidelines.1 Refer to Division 33 and Division 23 - Underground Steam and Condensate Piping.2 Refer to Division 23 - Steam and Condensate Piping Above Grade 1.2

More information

A. Product Data: Identify thermal conductivity, thickness, and jackets (both factory and field applied, if any), for each type of product indicated.

A. Product Data: Identify thermal conductivity, thickness, and jackets (both factory and field applied, if any), for each type of product indicated. SECTION 23 07 13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

FIRE STATION 55 June 14, 2010

FIRE STATION 55 June 14, 2010 SECTION 15250 MECHANICAL INSULATION PART 1 - GENERAL 1.01 DESCRIPTION A. Work Includes 1. Insulation of Domestic Water Piping. 2. Pipe Insulation of refrigerant piping. 3. Insulation of ductwork. 4. Aluminum

More information

Student Services & Classroom Addition. A. This Section includes the following sanitary drainage piping specialties:

Student Services & Classroom Addition. A. This Section includes the following sanitary drainage piping specialties: SECTION 221319 - SANITARY WASTE PIPING SPECIALTIES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following sanitary drainage piping specialties: 1. Cleanouts. 2. Floor drains. 3. Roof flashing

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey. A. This Section includes the following sanitary drainage piping specialties:

Union County Vocational - Technical Schools Scotch Plains, New Jersey. A. This Section includes the following sanitary drainage piping specialties: SECTION 221319 - SANITARY WASTE PIPING SPECIALTIES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following sanitary drainage piping specialties: 1. Cleanouts. 2. Floor drains. 3. Roof flashing

More information

PLUMBING BUILDING SCOPE OF WORK

PLUMBING BUILDING SCOPE OF WORK PLUMBING BUILDING SCOPE OF WORK 1. The Contractor shall furnish all supervision, materials, labor, equipment, tools, supplies, incidental items, including construction cleanup, etc for accomplishing the

More information

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700 SECTION 22 0700 - PLUMBING INSULATION PART 1 - GENERAL 1.1 DESCRIPTION OF WORK: A. All work covered in this section consists of furnishing all labor, equipment, materials and accessories, and performing

More information

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION HVAC PIPES AND TUBES

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION HVAC PIPES AND TUBES SECTION 23 20 00 - HVAC PIPES AND TUBES PART 1 - GENERAL 1.1 SUMMARY: A. Section includes pipe and pipe fittings for: heating water, chilled water, steam and steam condensate, condenser water, glycol,

More information

PROJ. NO SECTION HVAC DUCT INSULATION

PROJ. NO SECTION HVAC DUCT INSULATION SECTION 23 07 13 HVAC DUCT INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION FACILITY POTABLE WATER DISTIBUTION

SECTION FACILITY POTABLE WATER DISTIBUTION PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 22 11 00 FACILITY POTABLE WATER DISTIBUTION A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification

More information

SECTION HVAC INSULATION

SECTION HVAC INSULATION PART 1 GENERAL 1.1 SUMMARY SECTION 23 07 00 HVAC INSULATION A. Section Includes: 1. Ductwork insulation. 2. Duct liner. 3. Insulation jackets. 4. Equipment insulation 5. Piping system insulation. 6. Insulation

More information

SECTION (15194) - FACILITY NATURAL-GAS PIPING

SECTION (15194) - FACILITY NATURAL-GAS PIPING PART 1 GENERAL 1.01 SUMMARY SECTION 23 11 23 (15194) - FACILITY NATURAL-GAS PIPING A. Section Includes: 1. Pipe, Fittings and Joining Materials. 2. Protective Coating. 3. Piping Specialties. 4. Valves.

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION Page 210500-1 SECTION 210500 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION (15194) - FACILITY NATURAL-GAS PIPING

SECTION (15194) - FACILITY NATURAL-GAS PIPING SECTION 23 11 23 (15194) - FACILITY NATURAL-GAS PIPING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Pipe, Fittings and Joining Materials. 2. Protective Coating. 3. Piping Specialties. 4. Valves.

More information

University of Houston Master Construction Specifications Insert Project Name

University of Houston Master Construction Specifications Insert Project Name SECTION 23 07 00 - SYSTEM INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01 00, "Mechanical

More information

Design and Construction Standards SECTION POTABLE WATER SYSTEMS

Design and Construction Standards SECTION POTABLE WATER SYSTEMS SECTION 15410 POTABLE WATER SYSTEMS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections,

More information

SECTION STEAM AND CONDENSATE HEATING PIPING

SECTION STEAM AND CONDENSATE HEATING PIPING PART 1 GENERAL 1.01 SECTION INCLUDES A. Pipe and pipe fittings. B. Pipe hangers and supports. C. Valves. D. Steam piping system. E. Steam condensate piping system. 1.02 RELATED REQUIREMENTS A. Section

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 1319 - SANITARY WASTE PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Steel pipe hangers and supports. 2. Metal framing systems. 3. Thermal-hanger shield inserts. 4. Fastener systems.

More information

NCCER Progress Blvd, Alachua, Florida Tel: (888)

NCCER Progress Blvd, Alachua, Florida Tel: (888) NCCER 13614 Progress Blvd, Alachua, Florida 32615 Tel: (888) 622-3720 E-mail: info@nccer.org INSULATING Competencies / Objectives Level One MODULE 19101 - ORIENTATION 1. Explain what insulation is and

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 1316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

Gate City Elementary HVAC Table of Contents Division 22 /1

Gate City Elementary HVAC Table of Contents Division 22 /1 DIVISION 22: PLUMBING 22 0000 PLUMBING 22 0501 COMMON PLUMBING REQUIREMENTS 22 0502 DEMOLITION AND REPAIR 22 0503 PIPE, PIPE FITTINGS, PIPE HANGERS & VALVES 22 0710 POTABLE WATER PIPE INSULATION 22 0800

More information

DUKE UNIVERSITY CONSTRUCTION & DESIGN STANDARDS

DUKE UNIVERSITY CONSTRUCTION & DESIGN STANDARDS 1 33 63 00 - Underground Steam and Condensate Distribution System 1. Introduction A. Steam is distributed to University and Medical Center buildings through an underground piping system year-round at a

More information

10.1 APPLICATION 1 A. HOT PIPING 1 B. ANTI SWEAT PIPING 1 C. COLD PIPING FINISHES 2

10.1 APPLICATION 1 A. HOT PIPING 1 B. ANTI SWEAT PIPING 1 C. COLD PIPING FINISHES 2 SECTION 10: 10.1 APPLICATION 1 A. HOT PIPING 1 B. ANTI SWEAT PIPING 1 C. COLD PIPING 2 10.2 FINISHES 2 10.3 PIPING FORMAT 3 A. PIPE INSULATION 3 B. PIPE INSULATION 3 C. INSULATION ATTACHMENT 3 D. INSULATION

More information

A. This Section includes duct and plenum insulation; accessories and attachments; and sealing compounds.

A. This Section includes duct and plenum insulation; accessories and attachments; and sealing compounds. SECTION 230713 DUCT INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION PLUMBING EQUIPMENT AND SPECIALTIES

SECTION PLUMBING EQUIPMENT AND SPECIALTIES FULTON H3 PLUMBING EQ. AND SPECIALTIES 221114-1 SECTION 221114 PLUMBING EQUIPMENT AND SPECIALTIES 1.PART I - GENERAL 1. 01 All plumbing equipment included in this Specification shall be furnished and installed,

More information

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems Pipe and Equipment Insulations Zeston PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems Zeston PVC Insulated Fitting Covers Installation Instructions for Hot,

More information

SECTION STORM DRAINAGE PIPING SPECIALTIES PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION STORM DRAINAGE PIPING SPECIALTIES PART 1 - GENERAL 1.01 RELATED DOCUMENTS SECTION 22 14 23 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Daytona Beach Pier Building Renovation Jun 2010

Daytona Beach Pier Building Renovation Jun 2010 SECTION 15060 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

MECHANICAL INSULATION

MECHANICAL INSULATION MECHANICAL INSULATION GENERAL INFORMATION 1.1 Comply with more stringent of following latest edition of Energy Conservation and Construction Code of New York City, ASHRAE and this Guideline. DESIGN REQUIREMENTS

More information

SECTION CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION

SECTION CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION SECTION 22 11 16.13 CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION PART 1: GENERAL 1.01 SUMMARY A. This Section includes water-distribution backflow prevention products and installation specifications.

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS P00000000 0000 DOCUMENTS ARCHITECTURE ENGINEERING AND CONSTRUCTION ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION DIVISION

More information

. SECTION HANGERS AND SUPPORTS

. SECTION HANGERS AND SUPPORTS . SECTION 230529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division I Specification

More information

Student Services & Classroom Addition. A. This Section includes the following domestic water piping specialties:

Student Services & Classroom Addition. A. This Section includes the following domestic water piping specialties: SECTION 221119 - DOMESTIC WATER PIPING SPECIALTIES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following domestic water piping specialties: 1. Vacuum breakers. 2. Backflow preventers. 3.

More information

A. This section is intended to provide design guidelines for Utility Direct Buried Piping and Conduit Systems.

A. This section is intended to provide design guidelines for Utility Direct Buried Piping and Conduit Systems. Date Description of Change Pages / Sections Modified ID 6/15/16 Entire document - mgl44 PART 1 - INTRODUCTION 1.1 PURPOSE A. This section is intended to provide design guidelines for Utility Direct Buried

More information

SECTION PLUMBING PIPING SYSTEM

SECTION PLUMBING PIPING SYSTEM SECTION 15410 - PLUMBING PIPING SYSTEM PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Basic Requirements: Provisions of Section 15010, BASIC MECHANICAL REQUIREMENTS, are a part of this Section. 1.02 SUMMARY

More information

A. This Section includes the following sanitary drainage piping specialties:

A. This Section includes the following sanitary drainage piping specialties: Page 221319-1 SECTION 221319 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 13686.00 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 230529-1 SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 1.1 SUMMARY A. Section Includes: 1. Metal pipe hangers and supports.

More information

SUPERIOR CAL-SHIELDS Features & Benefits FAST

SUPERIOR CAL-SHIELDS Features & Benefits FAST SUPERIOR CAL-SHIELDS Features & Benefits FAST One-piece hinged construction Insulation, vapor barrier and G-90 galvanized steel shield in one unit. Butt-and-go Insulation extends beyond the steel shield

More information

University of Delaware

University of Delaware University Contact: Energy & Engineering Group (302) 831-1744 SECTION 22 13 00 _SANITARY SEWER PIPING SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Sanitary sewer piping buried 2. Sanitary

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment

More information

SECTION PIPING SPECIALTIES FOR STEAM UTILITY DISTRIBUTION

SECTION PIPING SPECIALTIES FOR STEAM UTILITY DISTRIBUTION PAGE 336315-1 SECTION 336315 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION FACILITY STORM DRAINAGE PIPING

SECTION FACILITY STORM DRAINAGE PIPING SECTION 22 1413 FACILITY STORM DRAINAGE PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION HANGERS AND SUPPORTS FOR PLUMBING SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING. A. This Section includes the following storm drainage piping specialties:

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING. A. This Section includes the following storm drainage piping specialties: SECTION 221423 - STORM DRAINAGE PIPING SPECIALTIES PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following storm drainage piping specialties: 1. Backwater valves. 2. Cleanouts. 3. Roof drains.

More information

TDC46M Carbon Steel Thermodynamic Steam Trap with Maintainable Seat

TDC46M Carbon Steel Thermodynamic Steam Trap with Maintainable Seat 2 3 4 7 6 5 8 9 1 Optional extra V1 integral blowdown valve See spare parts for details on how to order; Alternatively please specify at the time of order placement. escription The TC46M is a carbon steel,

More information

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS Dyplast Products Copyright 2014 1 Rev 0414 DYPLAST PRODUCTS INSTALLATION GUIDELINES ISO-C1 POLYISOCYANURATE

More information

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS Dyplast Products Copyright 2018 1 Rev 0618 DYPLAST PRODUCTS INSTALLATION GUIDELINES ISO-C1 POLYISOCYANURATE

More information

SECTION CONCRETE ABOVE GROUND FUEL STORAGE

SECTION CONCRETE ABOVE GROUND FUEL STORAGE SECTION 23 13 23 CONCRETE ABOVE GROUND FUEL STORAGE SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or

More information

Series Sump and Sewage Systems

Series Sump and Sewage Systems Series 000 Sump and Sewage Systems file no: 0. date: may 17, 13 supersedes: 0. date: march 29, 13 Series 000 Sump Series 0 & 2 Armstrong offers a complete range of high performance, easily maintained Column

More information

Essex County College - West Essex Campus Addition And Renovations Dib # / SECTION DOMESTIC WATER PIPING SPECIALTIES

Essex County College - West Essex Campus Addition And Renovations Dib # / SECTION DOMESTIC WATER PIPING SPECIALTIES Essex County College - West Essex Campus Addition And Renovations Dib # 54292 / 11-14 SECTION 221119 - DOMESTIC WATER PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions

More information

HVAC INSULATION

HVAC INSULATION PART 1 GENERAL 1.01 DESCRIPTION A. The requirements of this section apply to the insulation of mechanical equipment specified elsewhere in these specifications. B. Related Work: The requirements of Section

More information

SECTION B. Product Data: Provide manufacturer's standard details and installation instructions.

SECTION B. Product Data: Provide manufacturer's standard details and installation instructions. SECTION 07710 MANUFACTURED ROOF SPECIALTIES PART 1 GENERAL 1.1 SECTION INCLUDES A. Roof drains for new roofing. B. Roof drains for reroofing. C. Roof drains for retrofitting into existing roof drains.

More information

TRICON DOUBLE-CON PLUS

TRICON DOUBLE-CON PLUS TRICON DOUBLE-CON PLUS System Specifications Iron Pipe Size Steel Conduit O.D. Steel Conduit Wall Outer Insulation (IN)* Alum./Stainless/Galv. Jacket O.D. (IN) Metal Jacket Wall Thickness 1 4.50.120 1.75

More information

SECTION PLUMBING SPECIALTIES

SECTION PLUMBING SPECIALTIES PART 1 GENERAL 1.1 SCOPE SECTION 22 20 00 PLUMBING SPECIALTIES A. Work consists of all plumbing work indicated on drawings and specified herein. B. Also included are all fees and permits for installation

More information

SECTION HIGH-PERFORMANCE COATINGS

SECTION HIGH-PERFORMANCE COATINGS SECTION 099600 - HIGH-PERFORMANCE COATINGS PART 1 - GENERAL 1.1 SUMMARY A. Section includes surface preparation and the application of high-performance coating systems on the following substrates: 1. Exterior

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF MODULAR GALVANIZED SYSTEM PART

More information

MUSC Psychiatric Hospital CRI Air-Cooled Chiller Replacement Project

MUSC Psychiatric Hospital CRI Air-Cooled Chiller Replacement Project MUSC Psychiatric Hospital CRI Air-Cooled Chiller Replacement Project H51-9832-FW-A ADDENDUM NO. 01 The following items shall take precedence over the drawings and specifications for the above named project

More information

BID PACKAGES 3-21, Addendum No. 02

BID PACKAGES 3-21, Addendum No. 02 WEBER MURPHY FOX Addendum Date: January 19, 2018 Bid Due Date: January 26, 2018 BID PACKAGES 3-21, Addendum No. 02 to the Plans and Specifications for Cuyahoga Community College West Science and IT Labs

More information

SECTION PLUMBING INSULATION

SECTION PLUMBING INSULATION SECTION 22 07 00 PLUMBING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Section includes equipment insulation, covering, and thermal insulation for piping systems including vapor retarders, jackets and accessories.

More information

This specification describes the minimum requirements for industrial thermal insulation.

This specification describes the minimum requirements for industrial thermal insulation. 016/09/7 1/7 1.0 PURPOSE This specification describes the minimum requirements for industrial thermal insulation. Read it in conjunction with the applicable insulation and insulation finish specifications

More information