BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample

Size: px
Start display at page:

Download "BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample"

Transcription

1 BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS Project Name: Address: Owner: Phone/Fax/ Architect / General Contractor Name: : BID DEADLINE DATE: SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID Alarm/Security: Appliances: (State whether installation is included in the price. Have all finishes been detailed? Has the correct electrical, gas, and mechanical work been detailed? Include tax and delivery?) Asbestos Abatement: Asphalt/Paving/Roadway Contractors:

2 (Verify whether price includes header boards, grubbing, weed and seed eradication, base rock, excavation, soil export, base compaction, and seal coat. Are striping and curbs included or required?) Building Supplies (including framing lumber and hardware): (Verify how long price will be held by supplier. Has sales tax been included?) Cabinets: (Note whether installation, cabinet staining and finishing, and hardware have been included. Does installer carry worker's compensation insurance covering field installations?) Carpets/Vinyl/Hardwood Floors/Wallpaper/Window Coverings: (Note whether demolition and removal of existing floor coverings, floor patching, preparatory work, pad, underlayment, and installation is included in price above. Will doors have to be cut down? Touch-up painting required after new floor covering installed? Does the quoted price include tax and any applicable freight charges?) Concrete Contractors: (Verify whether backfill and finish grading have been included. Apply welded wire mesh and or rebar? Joints?)

3 Concrete Demolition/Concrete Cutting Contractors: (Is removal of concrete included in price?) Concrete Pumping: Concrete Suppliers (no labor just delivery: (Does the quoted price include all sales tax? Any "short-load" extra charges?) Doors and Millwork: (Is all baseboard, door, glazing, and window casing, specialty trim, closet poles, shelves, door hardware, specified? Include all sales tax? Identify stain-grade vs. paint-grade vs. preprimed materials.) Garage Door/Roll-up Door: (Verify whether installation, number of door operators, and sales tax are included in quoted price. If paint-grade, are doors primed?)

4 Shower Door/Mirror Contractors: (Verify finish of metal and thickness of glass. Sales tax included?) Drywall: (Verify texture. Will subcontractor remove overspray texture from areas not to be textured? Extent of clean-up.) Electrical Sub: (Have all fixtures been included? Cost of setting all finish fixtures included in price above? Verify that cost of hooking up any temporary power has been included. Does electrician (or HVAC sub) supply exhaust fans?) Excavation/Demolition: Comments/Special Terms/Exclusions (Have hauling dirt spoils/debris and dump fees been included? Fire Sprinklers: (Verify that work from riser to street has been bid. Verify the type of finish trim.)

5 Formica/Corian: Framing Contractors: (Verify that all backing/blocking/openings required for all other trades and for railings and accessories have been included.) Insulation: Landscape and hardscape: Masonry and CMU: Mechanical:

6 (Verify that all gas and electrical for new mechanical equipment has been bid. Who supplies cutting, blocking, and roof patching for mechanical ducting and roof penetrations? Does electrician (or HVAC sub?) supply exhaust fans? Who supplies condensate drains? Plumber or HVAC sub? Who supplies foundation and attic vents? Lumber supplier or HVAC sub?) HVAC: Painting: (Is the work bid per a written specification? If not, have painter provide a written specification of the labor and materials he has bid. In order to not void warranty on exterior doors, verify whether exterior wood doors and wood windows need to be primed immediately upon installation and before the rest of the exterior paint work is performed.) Plumbing: (Verify whether all fixtures have been included. Cost of setting all finish fixtures included in price above?) Rental Equipment Suppliers: Roofing and Gutters:

7 (Verify if roofer supplies and installs sheet metal on roof, roof jacks, and counter flashing. If specialty type of roof, should exterior be painted prior to installation of roofing materials?) Portable Sanitation: Scaffolding Stairs & Handrails: (Note whether installation/finishing/priming is included in price above.) Structural Steel: (Note whether installation is included in price above. Is steel primed? Special equipment required to install steel or unload steel?) Stucco Contractors:

8 (Note whether this is a 2-coat or 3-coat stucco job. Is scaffolding required? If so, who supplies it?) Swimming Pool/Pool Deck: Tile/Granite/Marble/Slate Contractors: Truss Suppliers: (Note whether crane is required for loading trusses. Included?) Wallpaper Contractors: (Note whether all areas to receive wallpaper are properly prepared to receive it. If not, who does prep work?) Window and Skylight Suppliers:

9 (Note whether specialty interior and exterior trim for uniquely shaped windows is included. Note whether jamb extensions are included for wood windows. Note lead time for windows. Does the quoted price include all sales tax? Verify finish of windows.) Woodstove & Spa Suppliers: (Note whether installation is included in price above. Has gas or electrical been bid for these items? Does the quoted price include all sales tax? Is all work required for outside combustion air included?) Other: Other: Other: Other:

Davis Frame Co., Inc. Construction Budget Considerations

Davis Frame Co., Inc. Construction Budget Considerations Davis Frame Co., Inc. Construction Budget Considerations ITEM BID 1 BID 2 BID 3 MISCELLANEOUS COSTS Surveying Building Permit Engineering Fees Interest on Construction Loan Property Taxes Hazard & Liability

More information

Construction Summary

Construction Summary Construction Summary Project Name Item of Work Base Building Add-ons Total Cost Code Site Development $ 18,150.00 $ - $ 18,150.00 Landscaping $ 500.00 $ - $ 500.00 Cast-in-place Concrete $ 7,806.00 $ -

More information

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5 Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey 01-2320 sqft.spf] Page 1 of 5 PREPARATION PRELIM PERMITS & FEES Building Permit 1 each 2200.00 _ 2200.00

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the

More information

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. FEMA 50% RULE - SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT/DAMAGE Z101-0410 NOTICE TO PROPERTY OWNERS Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information

More information

BUREAU Joe Iuviene, AIA January 20, 2017

BUREAU Joe Iuviene, AIA January 20, 2017 architectural BUREAU Joe Iuviene, AIA January 20, 2017 Alterations & Additions NEW TOWN HALL for TOWN OF AUSTERLITZ 816 State Route 203, Spencertown, New York 12165 ADDENDUM NO. 1 This addendum amends

More information

OWNER S REPONSIBILITIES AND PREPARATION INSTRUCTIONS. Schedule "C"

OWNER S REPONSIBILITIES AND PREPARATION INSTRUCTIONS. Schedule C OWNER S REPONSIBILITIES AND PREPARATION INSTRUCTIONS Schedule "C" Building Code All Ready To Move (RTM) Homes are built according to the Alberta Building Code and National Building Code. Please note that

More information

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements 700 Paris Ave. PO Drawer 9 Port Royal, SC 29935 Application for Permit - P O Drawer 9, Port Royal South Carolina Permit

More information

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #154 Douthit Hills Student Community, Clemson University Project Tony Greene

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #154 Douthit Hills Student Community, Clemson University Project Tony Greene January 19, 2018 Page 1 CURRENT CONSTRUCTION ACTIVITIES WEST ZONE Completed Carpet & Base in B6 Corridor. Completed 1 ST Coat of Paint in B4 Corridor. Completed 2 ND Coat of Paint in C3 Units Completed

More information

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will

More information

One and Two Family Additions

One and Two Family Additions One and Two Family Additions An addition to a house, duplex, garage, or an accessory structure requires a building permit prior to performing any construction. Building Department & Permit Office Mon-Fri

More information

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #160 Douthit Hills Student Community, Clemson University Project Tony Greene

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #160 Douthit Hills Student Community, Clemson University Project Tony Greene March 2, 2018 Page 1 CURRENT CONSTRUCTION ACTIVITIES WEST ZONE Completed Final Paint in B6 Corridors. Completed Final Clean in CL1 Units. Continued Signing Off Punch List Items in the West Zone. Continued

More information

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ 08014 856-467-3626--- FAX 856-467-9260 Application for Certificate of Occupancy for Change of Occupancy Pursuant to Chapter 119 of the Township

More information

CAREERS. in the Construction TRADES

CAREERS. in the Construction TRADES CAREERS in the Construction TRADES Electrical Modern life would not be possible without electricians. If you like to know how electric currents make things work, then this is the trade for you. Qualified

More information

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #139 Douthit Hills Student Community, Clemson University Project Tony Greene

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #139 Douthit Hills Student Community, Clemson University Project Tony Greene October 6, 2017 Page 1 CURRENT CONSTRUCTION ACTIVITIES EAST ZONE & SITE Completed Hardscapes East of Building C. Completed Building D Dumpster Pad. Completed Brick on Site Wall North of Building D. Completed

More information

PeachStone Capital, Inc. Atlanta s Hard Money Lender When timing is everything, we close! Hard Money Loan Property Worksheet Checklist

PeachStone Capital, Inc. Atlanta s Hard Money Lender When timing is everything, we close! Hard Money Loan Property Worksheet Checklist Hard Money Loan Property Worksheet Checklist Please complete ALL requested information. Incomplete applications will NOT be reviewed! Fully executed purchase and sale agreement including all exhibits,

More information

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT 1 East Franklin Street Phone: 301-790-4163 Third Floor Hagerstown, MD 21740 Fax: 301-791-2650 BUILDING PERMIT APPLICATION FOR RESIDENTIAL ACCESSORY

More information

Homes at Pine Ridge - NEW CONSTRUCTION SPECS

Homes at Pine Ridge - NEW CONSTRUCTION SPECS 1) STYLE: Custom design as per blueprints in attached hereto. Final agreed upon working blueprints shall be signed, dated and witnessed by both Buyer and Seller. 2) FOUNDATION: Footing and walls 3000 psi

More information

Successful Home Contracting

Successful Home Contracting Successful Home Contracting How to save thousands of dollars and get a better quality home by acting as your own contractor. Return to Home-Building-Answers.com Lesson Two An Overview of the Home Building

More information

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270) CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY 42141 Phone: (270) 651-3921 Fax: (270) 651-9553 Permit # Filing Date: Total Fee: Property Property Owner: Subdivision: Lot #

More information

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE: HENDRY COUNTY BUILDING, LICENSING & CODE ENFORCEMENT POST OFFICE BOX 2340 * 640 SOUTH MAIN STREET * LABELLE, FLORIDA 33975 * (863) 675-5245 * FAX: (863) 674-4194 1100 OLYMPIA ST CLEWISTON, FLORIDA 33440

More information

Budget Estimate Basic Tenant Improvement

Budget Estimate Basic Tenant Improvement Building work rules, conditions and insurance: 1. Review the work rules. If they are not available no budget should be provided. 2. Hours available for construction 3. Insurance requirements 4. Entities

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

Project Information Session / Meet and Greet # 3

Project Information Session / Meet and Greet # 3 ATL WEST DECK COMPONENT Project Information Session / Meet and Greet # 3 Holder-Austin-Moody-Bryson, a Joint Venture October 10 th, 2017 Agenda 1. HAMB, a JV Company Overview 2. ATL West Deck Project Description

More information

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS **************************************************************************

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** USACE / NAVFAC / AFCEC / NASA UFGS-02 42 91 (May 2010) ------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS SECTION TABLE

More information

Estimate Form for Bathroom Design and Installation

Estimate Form for Bathroom Design and Installation Estimate Form for Bathroom Design and Installation Name: Home Address: City: State: Phone (Home): Phone (Office): Phone (Office): Phone (Office): Phone (Jobsite): Jobsite Address: City: State: By: Hereafter

More information

Qualifying Process for Handyman Online Qualifying Questions. Name: Street Address: City: State: Zip Code. Home Phone: Cell Phone: Address:

Qualifying Process for Handyman Online Qualifying Questions. Name: Street Address: City: State: Zip Code. Home Phone: Cell Phone:  Address: Qualifying Process for Handyman Online Qualifying Questions Please type in your answers and email to info@pittsburghsbestremodeling.com or print out this form and write in your answers and fax to 412-829-1664

More information

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION Permit No. 175 Beaver Drive, P.O. Box 486 DuBois, PA 15801 Phone: 814-375-1111 Fax: 814-375-1117 Toll Free: 855-PENNSAF LOCATION OF PROPOSED

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco

More information

Building Permit Submittal Requirements

Building Permit Submittal Requirements CITY OF MONTE SERENO 18041 Saratoga-Los Gatos Road Monte Sereno, CA 95030 Phone (408) 354-7635 Fax (408) 395-7653 www.cityofmontesereno.org Building Permit Submittal Requirements NOTE: Submit three (3)

More information

CHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION

CHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION Chapter 1: Overview of Energy Efficient Construction 1 CHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION Chapter 1 is a quick reference guide that discusses the key components and features of energy

More information

Manufacturing Facilities Proposal

Manufacturing Facilities Proposal Manufacturing Facilities Proposal Construction proposal To assist business owners with expansion projects, Wisconsin Public Service has compiled information and renderings of common building types in business

More information

Feasibility Report. Property Inspection Engineers, Inc. (248) Property Address. 405 Fairgrove Royal Oak, MI.

Feasibility Report. Property Inspection Engineers, Inc. (248) Property Address. 405 Fairgrove Royal Oak, MI. Feasibility Report Property Inspection Engineers, Inc. (248) 644-8798 Inspection ate: 10/27/2010 Consultant's Job No: Consultant: Christopher J. aggy Applicant ark Beard Property Address 405 Fairgrove

More information

DATE: December 15, 2009 BID NO.: FWC 09/ CALENDAR OF EVENTS-BID OPENING DATE CHAGED FROM DECEMBER 18, 2009 to DECEMBER 22, 2009 AT 3:00 PM

DATE: December 15, 2009 BID NO.: FWC 09/ CALENDAR OF EVENTS-BID OPENING DATE CHAGED FROM DECEMBER 18, 2009 to DECEMBER 22, 2009 AT 3:00 PM DATE: December 15, 2009 ADDENDUM NO.: 1 BID NO.: FWC 09/10-48 BID TITLE: CHANGE: ADD: RENOVATION OF THE PRAIRIE LAKES FIELD OFFICE AT THE THREE LAKES WMA CALENDAR OF EVENTS-BID OPENING DATE CHAGED FROM

More information

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com Edouard Modern Living Made Easy uichomes.com - new construction - 3 stories + full basement - 4 bedrooms - 2.5 baths - 2,380 s.f. call 314.881.2333 or e-mail sales@uicstl.com PLAN NTS DECK 13' 0" X 12'-0"

More information

District of Barriere A GUIDE TO BUILDING PERMITS

District of Barriere A GUIDE TO BUILDING PERMITS District of Barriere A GUIDE TO BUILDING PERMITS THIS BROCHURE EXPLAINS: When a Building Permit is required Building Application Procedure District of Barriere Review of the Permit Application Additional

More information

Exhibit D Construction Budget Template

Exhibit D Construction Budget Template Exhibit D Construction Budget Template Please see attached Construction Budget Template Microsoft Excel file. Page 6 of 52 Momentum for Mental Health 202 W. Arbor Avenue Division 1 General Requirements

More information

THE CONSTRUCTION SUPERVISOR

THE CONSTRUCTION SUPERVISOR City of Aurora Building Inspections 15151 E Alameda Pkwy Aurora, CO 80012 (303) 739-7420 THE CONSTRUCTION SUPERVISOR When a building permit has been issued for any construction within the City, the Supervisor

More information

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc. Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc. Franklin County Septic & Zoning permit application: A septic and zoning permit is required for residential or commercial

More information

Each proposed project will be reviewed for compliance with the following codes as applicable.

Each proposed project will be reviewed for compliance with the following codes as applicable. VILLAGE OF PALATINE DEPARTMENT OF BUILDING AND INSPECTION SERVICES 200 EAST WOOD STREET PALATINE, IL 60067-5339 Telephone (847)359-9042 Obtaining a Residential Building Permit: Submittal Requirements The

More information

BUILDING CODES & DESIGN CRITERIA

BUILDING CODES & DESIGN CRITERIA BUILDING CODES & DESIGN CRITERIA Adopted Building Codes: 2006 International Building Code (IBC) 2006 International Residential Code (IRC) 2006 International Mechanical Code (IMC) 2006 International Plumbing

More information

AVID Intelligent Home Plans

AVID Intelligent Home Plans Home Builder Rental Equipment Landscaping, Sprinklers Gutters & Downspouts Insulation, Rough electrical, lighting, appliances Engineered lumber, Joist Trusses, Sheathing Plywood, Lumber Roofing, siding,

More information

Hansen Pole Buildings Planning Guide. Toll Free / Toll Free FAX

Hansen Pole Buildings Planning Guide. Toll Free / Toll Free FAX Hansen Pole Buildings Planning Guide Toll Free 866-200-9657 / Toll Free FAX 866-200-9658 While we strive to earn your business, whether you purchase from us or not, we would hope you would utilize this

More information

CONSTRUCTION CODE PERMIT INFORMATION

CONSTRUCTION CODE PERMIT INFORMATION CONSTRUCTION CODE PERMIT INFORMATION INTRODUCTION The Lebanon County Planning Department is a Pennsylvania Certified 3 rd Party Inspection Agency. The Lebanon County Planning Department is under contract

More information

3D Home Improvement and Inspection Services, Inc

3D Home Improvement and Inspection Services, Inc Property Inspection Report Cover Page ABC Disney Lane, Winter Garden FL, 34787 Inspection prepared for: John Doe Inspection Date: 7/15/2010 Time: 11:00 am Age: 6 Years Size: 3,378 LSF / 4,427 TSF Weather:

More information

Home Building Planner

Home Building Planner Home Building Planner Created by PHO For YOU! Please accept this guide with our compliments. We have developed this planner based upon prior projects we have completed. While every situation will have

More information

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING WWW.STOPWASTE.ORG New Addition Consider the following green remodeling options in a new addition.

More information

Arbor Heights Elementary School. Concrete for South Building Foundation Stem Walls

Arbor Heights Elementary School. Concrete for South Building Foundation Stem Walls Arbor Heights Elementary School Concrete for South Building Foundation Stem Walls Arbor Heights Elementary School Workers Placing Concrete for South Building Foundation Stem Walls Arbor Heights Elementary

More information

CHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC

CHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC CHARTRES COURT 713-868 - 7226 5023 Washington Avenue Houston, Texas 77007 ChartresCourtHouston.com CHARTRES COURT LLC Features Open floor concept living/dining with spacious island kitchen Great master

More information

WORK PROCESSES SCHEDULE ACOUSTICAL CARPENTER SPECIALIST O*NET/SOC CODE: RAIS CODE: 0861

WORK PROCESSES SCHEDULE ACOUSTICAL CARPENTER SPECIALIST O*NET/SOC CODE: RAIS CODE: 0861 WORK PROCESSES SCHEDULE ACOUSTICAL CARPENTER SPECIALIST O*NET/SOC CODE: 47-2081.01 RAIS CODE: 0861 The following schedule is an example of work experience (OJT) and training considered necessary to develop

More information

Kelly Village Apartments 3118 Green Houston, Texas 77020

Kelly Village Apartments 3118 Green Houston, Texas 77020 Kelly Village Apartments 3118 Green Houston, Texas 77020 Houston Housing Authority J. Allen Management Managing Agent Scope for Kelly Village Unit #1125 Overall Scope: Demolition, Renovation, and Restoration

More information

THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE

THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE Reimbursement estimates are component by component assessments of the value of completed repairs. They are produced through the use of Xactimate assessment

More information

SUBSTANTIAL IMPROVEMENT

SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT General Discussion The following discussion addresses several of the issues surrounding the NFIP regulations concerning substantial improvement and substantial damage. The attached

More information

APPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST

APPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST City of North Royalton Mayor Robert A. Stefanik Community Development, Building Division Dan Kulchytsky Building Commissioner 11545 Royalton Road, North Royalton, OH 44133 Phone: 440-582-3000 Fax: 440-582-3089

More information

PREP + INSULATION. DISCLAIMER: These tools are for illustrative purposes only and

PREP + INSULATION. DISCLAIMER: These tools are for illustrative purposes only and PREP + INSULATION HOME ENERGY UPGRADES What every contractor needs to know. Copyright 2012 Advanced Energy. All Rights Reserved 103 HOME ENERGY UPGRADES Prep + Insulation Contents Air sealing is a challenging

More information

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection Slab on Grade & Basements: A capillary break is installed on top of all footings Slab / Pre-Drywall / Thermal Inspection A minimum of 4" of clean or washed gravel (0.5" diameter or greater) is placed over

More information

CODE COMPLIANCE PLAN REVIEW PROCEDURES

CODE COMPLIANCE PLAN REVIEW PROCEDURES CODE COMPLIANCE PLAN REVIEW PROCEDURES 1. All construction for state agencies on state-owned or state leased-purchased properties or facilities are to submit design documents for code compliance plan reviews

More information

Residential New Home Requirements 200 South Main Blue Ridge, Texas

Residential New Home Requirements 200 South Main Blue Ridge, Texas Residential New Home Requirements This document is not meant to modify any Federal or State laws or City Ordinances. It is intended to be informative and to be used as a guideline. Where circumstances

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Division 09 FINISHES TABLE OF CONTENTS

Division 09 FINISHES TABLE OF CONTENTS Division 09 FINISHES TABLE OF CONTENTS 09 1000 GENERAL... 3 A. RELATED SECTIONS... 3 B. MAINTENANCE OF FINISHES... 3 C. PUBLIC AREAS... 3 D. CUTTING AND PATCHING... 3 E. CLEANING... 3 F. RECOMMENDED FLOORING

More information

CHECKLIST Inspecting a Garage

CHECKLIST Inspecting a Garage CHECKLIST Inspecting a Garage By Ben Gromicko This section deals with the details of the garage or carport inspection that may be performed. At the end of this section, you shall be able to: describe the

More information

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies MasterFormat LEVEL TWO NUMBERS AND TITLES Introductory Information 00001 Project Title Page 00005 Certifications Page 00007 Seals Page 00010 Table of Contents 00015 List of Drawings 00020 List of Schedules

More information

RSMeans Contractor s Pricing Guide Residential Repair & Remodeling Costs 2015

RSMeans Contractor s Pricing Guide Residential Repair & Remodeling Costs 2015 Reliable 2015 construction cost information for the home repair and remodeling contractor Improve planning and budgeting with this comprehensive cost guide specifically designed for home improvement and

More information

CSI MASTER FORMAT 2012 SAMPLE COST CODES

CSI MASTER FORMAT 2012 SAMPLE COST CODES CSI MASTER FORMAT 2012 SAMPLE COST CODES CSI MASTER FORMAT 2012 SAMPLE COST CODES 1. This document is intended to serve as a general guideline for Standard Cost Code setup for a small to mid size General

More information

MATERIAL ALLOWANCES AND UNIT PRICES

MATERIAL ALLOWANCES AND UNIT PRICES PART 1 - GENERAL 1.1 SECTION INCLUDES ADDITIONS AND RENOVATIONS TO WEST YORK AREA HIGH SCHOOL - #1231 SECTION 012200 MATERIAL ALLOWANCES AND UNIT PRICES A. Measurement and payment criteria applicable to

More information

Interior Painting Artesi II & III Day Care Facilities at 777 & 333 W. Matthews Road

Interior Painting Artesi II & III Day Care Facilities at 777 & 333 W. Matthews Road Interior Painting Artesi II & III Day Care Facilities at 777 & 333 W. Matthews Road Introduction: The HACSJ is seeking quotes from licensed and bonded C-33 Interior/Exterior Painting Contractors to provide

More information

Training Certification Categories

Training Certification Categories Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and

More information

How to estimate the cost of new air conditioning system to an existing storage warehouse.

How to estimate the cost of new air conditioning system to an existing storage warehouse. How to estimate the cost of new air conditioning system to an existing storage warehouse. 1 How to estimate the cost of new air conditioning system to an existing storage warehouse. Table of Contents Section

More information

InterNACHI Home Inspection Report Checklist

InterNACHI Home Inspection Report Checklist Client name: Inspected property address: Date and time of the inspection: Weather conditions: Approximate outdoor air temperature: People present at the time of the inspection: Estimated year built: Type

More information

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST This list is provided as a guide to help you understand the information that must be contained on the construction drawings. This list is not all-inclusive of all building codes but is used as a general

More information

Residential Building Permit Application

Residential Building Permit Application City of Twin Falls Building Department 324 Hansen Street East P.O. Box 1907 Twin Falls, ID 83303-1907 208-735-7238 208-736-2256 www.tfid.org PROJECT INFORMATION Project Residential Building Permit Application

More information

Standard Home Inspection Report

Standard Home Inspection Report Standard Home Inspection Report Subject Property Subject Property File Number: 05-15-011 Status of Property: Type of Property: Square Footage: occupied Single Family Home 3300± Total SF (not verified)

More information

Continuing Certificate of Occupancy Pre-Inspection Checklist

Continuing Certificate of Occupancy Pre-Inspection Checklist Pre-Inspection Checklist INTRODUCTION: This pre-inspection checklist has been produced to assist you in preparing for a Continuing Certificate of Occupancy (CCO) inspection. The inspection criteria and

More information

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

RESIDENTIAL CONSTRUCTION New Dwellings and Additions How to Obtain a Building Permit For RESIDENTIAL CONSTRUCTION New Dwellings and Additions MIAMI COUNTY, KANSAS CODE SERVICES DEPARTMENT 201 South Pearl Street, Suite 201 Paola, Kansas 66071-1777 Phone:

More information

BUILDING SCOPE OF WORK

BUILDING SCOPE OF WORK BUILDING SCOPE OF WORK 1. The Contractor shall furnish all supervision, materials, labor, equipment, tools, supplies, incidental items, etc, (unless noted otherwise) to complete all sections of the Building

More information

Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS

Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS STANDARD FEATURES LIST Foundation Concrete walls 4 concrete floor slab Interior basement unfinished Standard nine foot foundation walls

More information

Boulder City NV Prepared by (Print Name) Signature Date

Boulder City NV Prepared by (Print Name) Signature Date City of Boulder City Community Development Department Building & Safety Division 401 California Avenue Boulder City, NV 89005-2600 702-293-9282 (Main Line) 702-293-9392 (Fax) 2009 International Energy

More information

Seasons Business Center New Construction!

Seasons Business Center New Construction! Seasons Business Center New Construction!...Seasons Business Center Stow, Ohio 114,188 SF of High Bay Space 32 Clear Height 80 480 ESFR Sprinklers Tax Abatement Available 8 Reinforced Concrete Floor 271

More information

Timber Trail Plan LOT BEDROOMS 4.5 BATHROOMS 2,974 FT 2 Land/Home Package OFFERED BY: SUNRIVER REALTY LINDA DORR, BROKER

Timber Trail Plan LOT BEDROOMS 4.5 BATHROOMS 2,974 FT 2 Land/Home Package OFFERED BY: SUNRIVER REALTY LINDA DORR, BROKER LOT 308 Timber Trail Plan 4 BEDROOMS 4.5 BATHROOMS 2,974 FT 2 Land/Home Package OFFERED BY: SUNRIVER REALTY 541-593-3000 LINDA DORR, BROKER LICENSED IN THE STATE OF OREGON WWW.CALDERASPRINGS.COM BUILT

More information

SECTION ALTERNATES

SECTION ALTERNATES SECTION 01 23 00 - ALTERNATES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210)

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210) Quality Inspection 8618 London Heights San Antonio, TX 78254 Phone: (210) 240-0476 PRE DRYWALL INSPECTION REPORT Prepared For: DELETED (Name of Client) Concerning: DELETED, San Antonio, TX 78258 (Address

More information

START RIGHT A G U I D E T O L + I S E R V I C E S

START RIGHT A G U I D E T O L + I S E R V I C E S START RIGHT A G U I D E T O L + I S E R V I C E S BUSINESS OWNERS Protect your project with L+I The Department of Licenses and Inspections (L+I) is the most indispensable resource for developers, contractors,

More information

i. --==1 ~-=~ I... ~~~=-I .L._ -==dl F=..

i. --==1 ~-=~ I... ~~~=-I .L._ -==dl F=.. i. --==1 I... ~~~=-I ~-=~.L._ -==dl F=.. 1 ) r I / ~ I~~!}. / '" \ \ I \ I < \ I \ \ \ \.. ~... \... -J ~, I /' I '-.- 120.43' - - PHILIP STREET

More information

National Utility Contractors Association 2016 Member Activation Form Specialty Contractor Companies

National Utility Contractors Association 2016 Member Activation Form Specialty Contractor Companies Join By June 15 Become an Official Founding Member Don t miss out on this special recognition for your company! National Utility Contractors Association 2016 Member Activation Form Specialty Contractor

More information

Detached Garages and Building Permits. 1 and 2 Family Dwellings

Detached Garages and Building Permits. 1 and 2 Family Dwellings Detached Garages and Building Permits 1 and 2 Family Dwellings Why do I need a permit? The City of Minneapolis adopts the State of Minnesota Building Code (MNSBC) and its associated state statutes and

More information

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit: TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be

More information

BUILDING PERMIT APPLICATION

BUILDING PERMIT APPLICATION TOWN OF LEICESTER 132 Main Street Post Office Box 197 Leicester, New York 14481 Phone: (585) 382-3231 FAX: (585) 382-9766 BUILDING PERMIT APPLICATION All Town of Leicester property owners are required

More information

Administrative Changes

Administrative Changes Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings

More information

Sri Ganesha Temple HTNT Construction Update (June, 2016) Copyright All Rights Reserved.

Sri Ganesha Temple HTNT Construction Update (June, 2016) Copyright All Rights Reserved. Sri Ganesha Temple HTNT Construction Update (June, 2016) With Lord Ganesha s Blessing We start everything Architect View of the Ganesha Temple at Finish Sri Ganesha Temple HTNT Construction Milestones

More information

TELEPHONE: (215) Addendum No. 1

TELEPHONE: (215) Addendum No. 1 THE SCHOOL DISTRICT OF PHILADLPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor - Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 1 Subject:

More information

HOLDER CONSTRUCTION COMPANY Superintendents Weekly Activity Report #92 Douthit Hills Student Community, Clemson University Project Joe Jett

HOLDER CONSTRUCTION COMPANY Superintendents Weekly Activity Report #92 Douthit Hills Student Community, Clemson University Project Joe Jett SAFETY» Total Man Hours Worked This Week: 19935» Total Man Hours on Project: 689727» Crafts On Project This Week: 24» OSHA Recordable Rate: 0 November 13, 2016 Page 1 CURRENT CONSTRUCTION ACTIVITIES East

More information

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO SECTION 01010 - SCOPE OF WORK PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General provisions of Contract, General Conditions and Technical Specification Sections, apply to this Section. 1.02 PROJECT DESCRIPTION

More information

Collier Home Inspections, LLC

Collier Home Inspections, LLC Cover Page Collier Home Inspections, LLC Property Inspection Report, 33912 Inspection prepared for: Report Sampe Agent: Ronald Monald - Collier Home Inspections, LLC Inspection Date: 8/19/2010 Time: 12:30

More information

The Inspection Process. Waxhaw N.C.

The Inspection Process. Waxhaw N.C. The Inspection Process In Waxhaw N.C. This information is provided by the Waxhaw Enforcement Division to assist you in the progression of your project. Nothing in this document should be considered "Code"

More information

10/23/2011. Plan Examination. Plan ExaminationPurpose. Catch problems in advance of construction.

10/23/2011. Plan Examination. Plan ExaminationPurpose. Catch problems in advance of construction. Plan Examination 1 Plan ExaminationPurpose 2 Catch problems in advance of construction. 3 1 Discovery of problems in the field results in higher cost. 4 Can a good plan review eliminate all problems in

More information

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT Building Permit Application Instructions NOTICE: Keep these instructions for your records. Please read and understand these instructions completely prior to completing and submitting your building permit

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS USACE / NAVFAC / AFCEC / NASA UFGS-09 06 00 (May 2009) Change 1-11/13 ----------------------------- Preparing Activity: USACE Superseding UFGS-09 06 90 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information