1 for Storm Water Management RUN OFF CONTROLS Porous Parking & Vehicle Access Cellular Confinement Systems (CCS) A Cellular Confinement System (CCS) is an engineered, expandable, polyethylene, honeycomb-like cellular structure. CCS cells and panels are available various sizes. CCS cells and panels are available various heights. 8 Small Cell 6 Medium Cell Large Cell 4 3 Width - 10 Cells Width - 8 Cells Width - 5 Cells CCS Cell Properties: Perforated Cell Walls. CCS Cell Properties: Perforated Cell Walls. INTERLOCK BETWEEN PARTICLES AT EACH PERFORATION 10 mm DIAMETER HOLES (TYPICAL) 10 mm DIAMETER HOLES (TYPICAL) PERFORATED CELL WALL ENHANCED LOAD TRANSFER BETWEEN CELL WALL AND INFILL PERFORATED CELL WALL CROSS CELL FLOW OF WATER AND NUTRIANTS 1
2 CCS Cell Properties: Perforated Cell Walls. CCS Cell Properties: Textured Surface A A OPTIMUM CELL WALL / INFILL INTERFACE FRICTION 10 mm DIAMETER HOLES (TYPICAL) CROSS CELL GRASS ROOT LOCK-UP SECTION A-A TEXTURED CELL WALL SURFACE TEXTURED CELL WALL PERFORATED CELL WALL Palletized CCS is delivered to project sites. The CCS is expanded and then installed. Cellular Confinement Systems (CCS) Components Tendons Kevlar High Strength Polyester Polypropylene Special devices CCS Components Anchors 2
3 CCS Components: Staples & Stapling devices Infill options for the Topsoil Infill CCS include free draining soil, sand, stone, concrete or mixtures of soil with sand and/or stone. Geosynthetics: ECBs & TRMs / Geotextiles / Grids / Geomembranes The CCS structure will enhance the performance of any infill materials. CCS Applications Load Support Shear Surface CCS Load Distribution A CCS in a load support application is a multi-component, engineered system consisting of: Virtually all manufacturers offer basic design guidance, some offer preliminary evaluations. A specifically sized geocell (cell area and depth). A geosynthetic separation layer between the in-situ soils and the structural infill materials when those materials are different from each other (this layer is not needed when the underlying soil type and the infill material are the same). A structural infill material which is placed and compacted in the cell. 3
4 Virtually all manufacturers offer basic design guidance, some offer preliminary evaluations. Virtually all manufacturers offer basic design guidance, some offer preliminary evaluations. Virtually all manufacturers offer basic design guidance, some offer preliminary evaluations. CCS Gravel parking: Site is prepared. CCS panels are expanded and stapled. Infill is placed onto expanded CCS. 4
5 Infill is spread and compacted into CCS. Completed CCS Gravel parking Application. Comparison of CCS gravel parking area vs conventional gravel lot during a rain event. Steep Access Road / Surface Stability Application / April 2003 Unexpanded, palletized CCS panels on site. Grade surface and cut termination trenches. Pa. American Water Co. / West Decatur, PA Water Tank 5
6 Finish grade road / install geotextile fabric Pre-attach panels before expanding into place Expand panels and anchor in place. Filling cells with a 2A stone w/ 2 wearing surface Some hand work may be needed to finishgrade surface. Finished installation 6
7 Steel Structures Industrial Yard Rutting of unconfined gravel caused costly maintenance problems for both the yard and equipment AGGREGATE BASE SUBGRADE UNCONFINED GRANULAR PAVEMENT SYSTEM The engineered solution called for a combination of Cellular Confinement and Geotextile a specific section was designed based on loads, numbers of passes, etc SURFACE CCS SECTION INFILL SUBBASE GEOTEXTILE SUBGRADE Subgrade Cellular Confinement panel is held open with sand bags. Geotextile Sub-base CCS Panels stapled together and ready for in-fill 7
8 Panels are easily fit around protrusions. In-filling Cellular Confinement with stone. More panels are staged as construction continues CCS stone infill is compacted with standard equipment. Large section of stone filled Cellular Confinement. Section completed adjacent to curb 8
9 Field testing completed CCS application. Field testing completed CCS application. Field testing completed CCS application. Field testing completed CCS application. SURFACE GEOWEB SECTION AGGREGATE SUBBASE SUBGRADE THE GEOWEB GRANULAR PAVEMENT SYSTEM CCS filled with stone can provide a cost effective and easy to construct pervious roadside treatment. MPSS WQI USD GCLs PP&VA WMPP PPPS CCS SC EP SS Filling CCS with stone and soil mixture will facilitate final turf surface. < Home 9
10 Filling CCS with stone and soil mixture will facilitate final turf surface. CCS Pavement Base Rehabilitation CCS Load Distribution Stream Crossing Heavy duty industrial use facility Heavy duty industrial use facility CCS Load Distribution: Road over Soft Soils. 10
11 CCS LS Applications and Concepts Supported CCS Load Distribution: Temporary Road over Soft Soils. The CCS as a load support system can be used in a wide variety of applications: Load support systems over non-supportive soils, Surface stabilization of unstable aggregates areas (parking lots and roadsides), Stabilization of road bases to reduce site disturbance and provide greater pavement life, Vegetated load support systems (parking and emergency access areas). CCS LS Applications and Concepts Supported A CCS can support the non-structural and structural BMPs listed below: Protect/utilize natural flow pathways in overall stormwater planning and design Minimize soil compaction in disturbed areas Reduce Impervious Cover Reduce Street Imperviousness Reduce parking Imperviousness Runoff Volume / Infiltration based Vegetative and soil based Vegetated Filter Strips Porous pavement with infiltration beds CCS Key Benefits The CCS provides the following benefits: In-filled can be stone or soil for permeable paving/parking applications Reduction in depth of engineered base requirements leading to reduced site disturbance The CCS can be rapidly placed to provide immediate load support. H Key Design Elements The CCS for load support uses the following elements: a geosynthetic separation layer, may be: *non-woven geotextile for soil type separation, *woven geotextile for reinforcement and soil type separation, an appropriately sized geocell section: *small or medium cell size *4, 6, 8, 9.5 inch depth cell infill materials(s), may be: *aggregate *aggregate / topsoil blend H H Key Design Considerations Key design considerations in determining which of proper selection of, and design with, the components will be as follows: Stone versus vegetated infill. If a vegetated solution is desired access time and sustainability of turf have to be considered (traffic may have to be kept off the CCS to facilitate healthy establishment of the vegetated infill). Vehicle loads and frequency of will play a significant role in proper selection and design of a CCS load support project. H 11
12 Preconstruction checklist (site walk-through check list) Prior to construction, check: Post construction inspection checklist During and after construction, check: Site grading plan Presence of CCS materials Geotextile separation layer if required Geocell materials Infill, if other than from site excavations Presence of installation tools Presence of installation instructions Presence of qualified manufacturers representative if required Is grade and elevation as specified Has the separation layer been placed Are the geocell sections expanded correctly infilled with the specified infill is infill compacted to specification If vegetated, are the appropriate seed and nutrients applied H H 12
GEOWEB load support OVERVIEW
SOIL STABILIZATION GEOWEB load support OVERVIEW THE GEOWEB SYSTEM LOW-COST LOAD SUPPORT SOLUTIONS The Presto GEOWEB load support system is a highly effective, economical solution to road, parking, and
More informationSolving Slope Protection Problems Geoweb Cellular Confinement System
Solving Slope Protection Problems Geoweb Cellular Confinement System Leaders In Advanced Geotechnology TM Slope Protection An Engineered Framework for Slope Protection The Presto Geoweb Cellular Confinement
More informationApplications. 5 reasons why you should choose Hebden X Grid cellular paving
5 reasons why you should choose Hebden X Grid cellular paving The British-made Hebden X Grid cellular paving system can be filled with grass or gravel, then driven over, parked on and walked on whilst
More informationPRODUCT SPECIFICATION CSI FORMAT Slope and Channel Grid Systems April 2009
PRODUCT SPECIFICATION CSI FORMAT Slope and Channel Grid Systems April 2009 Cell-Tek Geosynthetics LLC 2431 Crofton Lane, Suite 9 Crofton, MD 21114 USA Toll Free (888) 851-0051 Phone (410) 721-4844 Fax
More informationPlastic Permeable Paving
03 Landscaping Products solutions Plastic Permeable Paving Product Range Creating Green Infrastructure Plastic Permeable Paving Product Range Introduction Page 3 FlowBlock 4-5 SlimBlock 6-7 GS Pro 8-9
More informationSection Soil Erosion Protection Tender No. [ ] Page 1
Tender No. [ ] Page 1 1.0 GENREAL 1.1 [REFERENCES].1 Provide soil erosion protection in accordance with the following standards (latest revision) except where specified otherwise..2 American Society for
More informationDesign and Installation Guidelines for Retaining Walls. 1 P age. Geo Products, LLC 8615 Golden Spike Lane Houston, TX Phone:
Design and Installation Guidelines for Retaining Walls 1 P age Geo Products, LLC 8615 Golden Spike Lane Houston, TX 77086 Phone: 281.820.5493 2011 Geo Products, Fax: 281.820.5499 LLC www.geoproducts.org
More informationPERMEABLE INTERLOCKING PAVERS
PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement
More informationCATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE
3.33' 3.0' 2.0' 4.33' 4.0' 3.0' 1.00' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3067-V OR AS NOTED ON PLANS. "INFA-SHIELD" SEAL OR EQUAL. RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR).
More informationPART 1 GENERAL REQUIREMENTS
PART 1 GENERAL REQUIREMENTS Contract Closeout Plan 110 Arrow diagram for project close-out...3 Erosion Control 121 Straw bale barrier... 5 122 Silt fence... 7 123 Diversion dike... 9 124 Inlet protection...
More informationSPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular
More informationPERVIOUS PAVEMENT. Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers
4.1-a PERVIOUS PAVEMENT Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers DESCRIPTION Pervious pavement is any system comprised of a load bearing surface that allows for movement of
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain
More informationLAYING IBSTOCK CLAY PAVERS FOR PERMEABLE PAVEMENTS
PERMEABLE PAVEMENTS (SUDS) This leaflet highlights the basic requirements for laying Ibstock clay pavers to form a permeable pavement. Ibstock clay pavers are intended for domestic use only i.e. patios
More informationOhio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 2 SPECIAL BENCHING AND SIDEHILL EMBANKMENT FILLS Geotechnical Bulletin GB2
More informationSECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT
SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating
More informationAt least 2 feet above the seasonal high water table Overflow path or structure provided
General Conditions Map of proposed subwatershed to each subbasin, including total area and CN Design Flow or Design Volume to each STF, as appropriate Operation and Maintenance instructions for each STF
More informationRhode Island Stormwater Design and Installation Standards Manual
Rhode Island Stormwater Design and Installation Standards Manual Public Workshop Infiltration (Including Permeable Paving) March 24, 2011 Infiltration Section 5.3: Appendix F.3 & H.1 Approved WQ BMPs Infiltration
More informationStorm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain
More informationTYPE "A" CATCH BASIN
27" 1.67' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3250-BV OR APPROVED EQUAL. "INFI SHIELD" SEAL OR APPROVED EQUAL RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR). PLASTER OUTSIDE,
More informationInfiltration Guidelines
Appendix E Infiltration Guidelines As a stormwater management method, infiltration means retaining or detaining water within soils to reduce runoff. Infiltration can be a cost-effective method to manage
More informationTHE EVOLUTION OF EROSION CONTROL TECHNOLOGY. Welcome! Pete Hanrahan, CPESC E. J. Prescott, Inc. Gardiner, Maine
THE EVOLUTION OF EROSION CONTROL TECHNOLOGY Welcome! Pete Hanrahan, CPESC E. J. Prescott, Inc. Gardiner, Maine pete.hanrahan@ejprescott.com EROSION CONTROL HAS BEEN PRACTICED FOR THOUSANDS OF YEARS CLEAN
More informationSYNTHETIC GRASS INDOOR SURFACE SPECIFICATIONS: K9GRASS LITE
SYNTHETIC GRASS INDOOR SURFACE SPECIFICATIONS: K9GRASS LITE 1.01! DESCRIPTION OF WORK: The contractor shall provide all labor, materials, equipment and tools necessary for the complete installation of
More informationGREEN BUILDING CREDITS GEOBLOCK, GEOPAVE & GEOWEB SYSTEMS CONTRIBUTE TO LEED CERTIFICATION POINTS
EARN LEED GREEN BUILDING CREDITS GEOBLOCK, GEOPAVE & GEOWEB SYSTEMS CONTRIBUTE TO LEED CERTIFICATION POINTS our commitment: providing the highest quality products/solutions creating sustainable environments
More informationStormTech Construction Guide
A division of StormTech solid end caps and pre-cored end caps StormTech chambers StormTech manifolds and fittings Acceptable fill materials per Table 1 Woven and non-woven geotextiles 80-7 DC REQUIRED
More informationSECTION TRENCHING & BACKFILLING
SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications
More informationStormwaterWise Landscapes: Pervious Surfaces Specifications
StormwaterWise Landscapes: Pervious Surfaces Specifications Purpose & Benefits Stormwater runoff reduction High pollutant removal Control localized drainage problems Attractive alternative for walkways
More informationMACHINE-LAY Installation Manual
MACHINE-LAY Installation Manual PaveDrain Installation Manual Table of Contents Section 1: Base Preparation (pages 3 6) Section 2: Machine-Lay PaveDrain Blocks (pages 8 11) Section 3: Edge Restraints (pages
More informationStorm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
More informationPresentation to the 60 th Annual NJ Asphalt Paving Conference March 14, 2017 Ewing, NJ
Presentation to the 60 th Annual NJ Asphalt Paving Conference March 14, 2017 Ewing, NJ James J. Purcell, PE, PMP Technical Director, New Jersey Asphalt Pavement Association Reduce impervious surface Recharge
More informationDATE: December 10, 2012 REPORT NO. PW CHAIR AND MEMBERS COMMITTEE OF THE WHOLE OPERATIONS AND ADMINISTRATION
PUBLIC WORKS COMMISSION DATE: December 10, 2012 REPORT NO. PW2012-073 TO: FROM: CHAIR AND MEMBERS COMMITTEE OF THE WHOLE OPERATIONS AND ADMINISTRATION GEOFF RAE, MBA, P.ENG. GENERAL MANAGER, PUBLIC WORKS
More informationApplication of Geotextiles in Pavement Drainage Systems
International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 4 (2014), pp. 385-390 Research India Publications http://www.ripublication.com/ijcer.htm Application of Geotextiles
More informationPART 1 - GENERAL 1.01 General Provisions A. The Conditions of the Contract and all Sections of Division 1 are hereby made a part of this Section.
Specification Sheet Grass Paver TECHNICAL SPECIFICATION - Grass Covered Flexible Porous Paver with 92% Void Space and Soil Conditioner/Fertilizer Mixture CSI Master Format 32 12 43 Flexible Porous Pavement
More informationTown of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects
2.0 ROADWAYS 2.1 Road Classification 2.1.1 Standard Drawing Classification All Road Widths and Road Allowances shall be designed in accordance with the most recent Town of New Tecumseth Standards: TNT.SD
More informationRedi Rock Specification and Installation Manual
Redi Rock Specification and Installation Manual 1.0 General Scope This Specification covers the Design, Materials and Installation of Redi Rock modular block Retaining and Freestanding Wall systems as
More informationStandards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition
STANDARD FOR SLOPE PROTECTION STRUCTURES Definition Structures to safely conduct surface runoff from the top of a slope to the bottom of the slope. Purpose The purpose of this practice is to convey storm
More informationPERMEABLE PAVERS PHYSICAL AND GEOMETRICAL CHARACTERISTICS - PAVERS DRIVEWAYS, PERMEABLE DRIVEWAYS & PATIOS CHARACTERISTICS CSA A231.
DRIVEWAYS, DRIVEWAYS & PATIOS PHYSICAL AND GEOMETRICAL CHARACTERISTICS - CHARACTERISTICS CSA A231.2 TECHO-BLOC Compressive strength 50 MPa [7200 psi] min. 50 MPa [7200 psi] min. Absorption - 5 % max. Freeze-thaw
More informationDIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012
2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19-1 19-1.01 Exploratory Excavation... 19-1 19-1.02 Trench... 19-1 19-1.02.AStorm Drain Pipe...
More informationVERTI-BLOCK - DESIGN MANUAL
Company Information General Information Verti-Block is the latest innovative forming system from Verti-Crete, LLC. Recognized worldwide for outstanding aesthetics and performance, Verti-Crete s proprietary
More informationMECHANICALLY STABILIZED EARTH (MSE) WALL SYSTEMS
DRAINAGE SOLUTIONS SINCE 1908 MECHANICALLY STABILIZED EARTH (MSE) WALL SYSTEMS PERMANENT AND TEMPORARY ENGINEERED WALL SOLUTIONS ECONOMICAL DURABLE VERSATILE ARMTEC.COM MSE RETAINING WALLS Armtec Mechanically
More informationBIG O HDPE TUBING HDPE CORRUGATED TUBING FOR AGRICULTURAL, RESIDENTIAL AND HIGHWAY DRAINAGE INCREASE CROP YIELDS LOWER PRODUCTION COSTS
DRAINAGE SOLUTIONS SINCE 1908 BIG O HDPE TUBING HDPE CORRUGATED TUBING FOR AGRICULTURAL, RESIDENTIAL AND HIGHWAY DRAINAGE INCREASE CROP YIELDS LOWER PRODUCTION COSTS PROTECT FOUNDATIONS IMPROVE HIGHWAY
More informationHydraPressed Slabs. Yorkstone Tan. Wherefunctionmeetsstyle
HydraPressed Slabs Yorkstone Tan Wherefunctionmeetsstyle Texada This series is named after the rugged and beautiful Gulf Islands of the Pacific Northwest. Texada HydraPressed Slabs have a light shot-blast
More informationSUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields
4.1-d SUBSURFACE INFILTRATION SYSTEM Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields BMP DESIGN APPROACH Pollutant Source Control Hydrologic Source Control Stormwater
More informationSECTION RIPRAP, BOULDERS, AND BEDDING
SECTION 31 37 00 RIPRAP, BOULDERS, AND BEDDING PART 1 GENERAL 1.01 SECTION INCLUDES A. The WORK includes excavation, grading, and installation of riprap, boulders, soil riprap, void-filled riprap, and
More informationProviding proper drainage system
Environment Friendly and Cost Effective Alternative to Conventional Graded Filters Providing proper drainage system for structures such as earth retaining structures, pavements, water front structures,
More informationJames River Pulp Mill, Marathon, Ontario Geocell Case History
James River Pulp Mill, Marathon, Ontario Geocell Case History Jamie Walls, Colin Alston, David J. Devroy Introduction geotextile separates the concrete infilled New provincial and federal guidelines geocell
More informationBMP #: Infiltration Basin
Structural BMP Criteria BMP #: Infiltration Basin An Infiltration Basin is a shallow impoundment that stores and infiltrates runoff over a level, subtle, uncompacted, (preferably undisturbed area) with
More informationR-TANK SPECIFICATIONS
TECHNICAL STORMWATER MANAGEMENT R-TANK SPECIFICATIONS PART 1 GENERAL 1.01 Related Documents A. Drawings, technical specification and general provisions of the Contract as modified herein apply to this
More informationGEOPAVE POROUS PAVEMENT SYSTEM
GEOPAVE POROUS PAVEMENT SYSTEM PRESTO GEOSYSTEMS 670 N PERKINS STREET, APPLETON, WISCONSIN, USA 54914 Ph: 920-738-1328 or 800-548-3424 Fax: 920-738-1222 e-mail: INFO@PRESTOGEO.COM GP-001 SEPTEMBER 2017
More informationBASED ON DFD MASTER SPECIFICATION DATED 2/24/2014
1 0 1 0 1 0 1 SECTION 1. TRENCHING BASED ON DFD MASTER SPECIFICATION DATED // P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all work, materials, labor, equipment,
More informationCharacterizing Engineering Properties of Foundry Sands
Characterizing Engineering Properties of Foundry Sands Craig H. Benson, PhD, PE Recycled Materials Resource Center University of Washington chbenson@u.washington.edu www.recycledmaterials.org Recycled
More informationMunicipality of Waterville Public Sidewalk Repair Policy
Municipality of Waterville Public Sidewalk Repair Policy Purpose - The purpose of this policy is to protect the public health, safety and welfare of the citizens and inhabitants of the Municipality by
More informationCITY OF FARGO SPECIFICATIONS AGGREGATE BASES
AGGREGATE BASES PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, accessories, and equipment necessary
More information02632 Segmental Concrete Retaining Wall System Page - 1
02632 Segmental Concrete Retaining Wall System Page - 1 (Last Revised 8/23/13) 02632 SEGMENTAL CONCRETE RETAINING WALL SYSTEM SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Part 1 General Clean Up
More informationMC-3500 and MC-4500 Design Manual
MC-3500 / MC-4500 MC-3500 and MC-4500 Design Manual StormTech Chamber Systems for Stormwater Management Table of Contents 1.0 Product Information...2 2.0 Foundations for Chambers...8 3.0 Required Materials/Row
More informationFilter Tube Barriers (Instream)
Filter Tube Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo
More informationUNHSC Bioretention Soil Specification February, SOIL PREPARATION (PERFORMANCE SPECIFICATION) for Bioretention Systems
SOIL PREPARATION (PERFORMANCE SPECIFICATION) for Bioretention Systems PART 1 - GENERAL 1.1 SUMMARY A. Section includes soil media for the bioretention systems and rain gardens specified according to performance
More informationSPECIFICATION FOR PIPE CULVERT CONSTRUCTION
SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.
More informationCurlex II EROSION CONTROL BLANKET SPECIFICATION
Curlex II EROSION CONTROL BLANKET SPECIFICATION PART I - GENERAL 1.01 Summary A. The erosion control blanket contains excelsior wood fiber for the purpose of erosion control and revegetation as described
More informationMOA Project # Golden View Drive Intersection & Safety Upgrades
Appropriate transitions can include extending the insulation beyond the roadway improvements, reducing the insulation thickness, or angling the insulation downward. Use of a frost tolerant section, an
More informationSECTION FOUNDATION DRAINAGE
SECTION 33 41 13 SPEC WRITER NOTES: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section
More informationAppendix B: Green Infrastructure Typical Details and Specifications
Appendix B: Green Infrastructure Typical Details and Specifications Typical Details for Site-Specific Design 2 Specifications and Design Guidelines 101 September 2016 Version - Updates and errata will
More informationLANDSCAPE RETAINING WALLS
SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9070 - Landscape Retaining Walls LANDSCAPE RETAINING WALLS PART - GENERAL.0 SECTION INCLUDES A. Modular Block Retaining Walls
More informationUnderstanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)
Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department
More informationHOW TO BUILD Garden Walls Frestanding & Landscape Walls
HOW TO BUILD Garden Walls Frestanding & Landscape Walls 10 Cambridge Wall Book Garden walls This layout depicts a common application of landscape and freestanding designs together in one wall with Columns
More informationStream Channelization, Before and After ACB Installation
An information series from the national authority on concrete masonry technology ARTICULATING CONCRETE BLOCK FOR EROSION CONTROL TEK 11-09B Articulating Concrete Blocks (ACBs) (2011) INTRODUCTION An articulating
More informationAEC Premier Straw Double Net Quick Mow EROSION CONTROL BLANKET SPECIFICATION
AEC Premier Straw Double Net Quick Mow EROSION CONTROL BLANKET SPECIFICATION PART I - GENERAL 1.01 Summary A. The erosion control blanket contains agricultural straw fibers for the purpose of erosion control
More informationITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS
ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing
More informationSection 25 Aggregate Subbase
Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION A. GRANULAR
More informationE. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17
S&L Gravel, Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $6,425.00 $6,425.00 $6,425.00 $10,000.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 25.00 $25.00 $625.00
More informationConcrete Waste Management
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
More informationSECTION AGGREGATES
SECTION 32 05 00 AGGREGATES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Aggregate base 2. Engineered fill 3. Backfill 4. Fine filter aggregate (non-frost susceptible fill) 5. Riprap 6. Recreational
More informationSECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO)
SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO) This guide specification for U.S. applications describes construction of bio-infiltration bump outs (or bioretention ) systems. From the surface down to the
More information4.2 Permeable Pavement Systems
4.2 Permeable Pavement Systems Permeable Pavement provides the structural support of conventional pavement, but allows stormwater to drain directly through the surface into the underlying stone base and
More informationBRADLEY UNIVERSITY. The Performance and Sustainability of Permeable Pavement Progress Report on the Work Performed Under IAPA Scholarship
BRADLEY UNIVERSITY The Performance and Sustainability of Permeable Pavement Progress Report on the Work Performed Under IAPA Scholarship Anne Riemann 12/19/2016 1 INTRODUCTION Permeable pavement is an
More informationCurlex High Velocity EROSION CONTROL BLANKET SPECIFICATION
Curlex High Velocity EROSION CONTROL BLANKET SPECIFICATION PART I - GENERAL 1.01 Summary A. The erosion control blanket contains excelsior wood fiber for the purpose of erosion control and revegetation
More informationBASE CONSTRUCTION MATERIALS A Aggregate
BASE CONSTRUCTION 2211 AGGREGATE BASE 2211.1 DESCRIPTION This work consists of placing aggregate base. 2211.2 MATERIALS A Aggregate... 3138 Provide the class of aggregate as required by the contract. 2211.3
More informationNOTES ON CORRUGATED PLASTIC PIPE SUBSOIL DRAIN CONSTRUCTION SPECIFICATION
TNZ F/5 Notes: 2000 NOTES ON CORRUGATED PLASTIC PIPE SUBSOIL DRAIN CONSTRUCTION SPECIFICATION These notes are for guidance and must not be included in the Contract Documents In general subdivision numbers
More informationDesign Manual: Gravity Wall. Section 1
Design Manual: Gravity Wall Section 1 A Design Manual: Gravity Wall General Information Company Information Verti-Block is the latest innovative forming system from Verti-Crete, LLC. Recognized worldwide
More informationAttachment D-1: Civil/Structural Scope of Work
Attachment D-1: Civil/Structural Scope of Work Project: Location: Targa Sound Renewable Fuels Project Tacoma, WA Prepared by: NORWEST ENGINEERING Consulting Engineers 4110 N.E. 122 nd Avenue, Portland,
More informationDetermination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities
Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission
More informationAustin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000
Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000 610S.1 This item shall govern the proper care and treatment of all trees and other vegetation
More informationDRAINAGE DESIGN AND RUTTING PERFORMANACE GUIDELINES FOR PERMEABLE PAVEMENT
DRAINAGE DESIGN AND RUTTING PERFORMANACE GUIDELINES FOR PERMEABLE PAVEMENT by Su Ling Cao Daryl Poduska Graduate Assistants Dan G. Zollinger Associate Professor Sponsored by The Uni-Group U.S.A. The Department
More informationIn preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER
CHAPTER 3 Site Preparation In preparation for constructing buildings on a property, the builder must consider a number of factors related to code requirements. The buildings must be located according to
More informationTopic: Site Formation
Topic: Site Formation Presentation prepared by Raymond Wong February 2006 Purpose of site formation is to prepare a piece of land in order to: Accommodate building/s or other facilities which will be placed
More informationChatham Park Stormwater Manual
Chatham Park Stormwater Manual Table of Contents A. Introduction... 2 B. Calculation Methods... 2 C. BMP Design Standards... 3 D. Compliance Points... 3 E. Critical Environmental Resources... 3 F. Submittal
More informationSECTION 20 INDEX PAVING FABRIC 1. SCOPE OF WORK MATERIAL REQUIREMENTS CONSTRUCTION AND INSTALLATION REQUIREMENTS...
SECTION 20 INDEX PAVING FABRIC 1. SCOPE OF WORK... 20-2 2. MATERIAL REQUIREMENTS... 20-2 3. CONSTRUCTION AND INSTALLATION REQUIREMENTS... 20-2 4. METHOD OF MEASUREMENT... 20-5 20-1 SECTION 20 PAVING FABRIC
More informationA.2.a Random Riprap... Table
3601 RIPRAP MATERIAL 3601.1 SCOPE Provide stone and filter layer material for use in random or hand-placed riprap, gabion, and revet mattress construction. 3601.2 REQUIREMENTS A Stones A.1 Quality Provide
More informationRETAINING WALL SYSTEM. ViaWall. ViaWall A. ViaWall B. ViaBlock
RETAINING WALL SYSTEM ViaWall ViaWall A ViaWall B ViaBlock Table of contents Introduction page 1 ViaWall type A Elements of the system 1. Reinforced concrete panel 2. Reinforcing meshes 3. U-bolts Additional
More informationAppendix C. Soil Compost Amendment
Appendix C. Soil Compost Amendment C.1 Description Soil restoration is a practice applied after construction, to deeply till compacted soils and restore their porosity by amending them with compost. These
More informationPUBLIC WORKS DEPARTMENT SERVICE DES TRAVAUX PUBLICS. Engineering Division Division de l ingénierie
PUBLIC WORKS DEPARTMENT SERVICE DES TRAVAUX PUBLICS Engineering Division Division de l ingénierie December 18, 2006 Page 1 of 6 REVISION SUMMARY Table of Contents Division 4 Specifications Surface Works
More informationVA DEQ STORMWATER DESIGN SPECIFICATION NO. 7 PERMEABLE PAVEMENT. VERSION 1.8 March 1, 2011 SECTION 1: DESCRIPTION
VIRGINIA DEQ STORMWATER DESIGN SPECIFICATION No. 7 VERSION 1.8 March 1, 2011 SECTION 1: DESCRIPTION Permeable pavements are alternative paving surfaces that allow stormwater runoff to filter through voids
More informationAdvanced Enviro-Septic TM Basic Design and Installation Manual
Advanced Enviro-Septic TM Basic Design and Installation Manual New Zealand Distributors Environment Technology Ltd 14 Onekaka Iron Works Rd Takaka 7182 (03) 9707 979 www.et.nz info@et.nz Technical support
More informationDESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General
DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and
More informationLecture 7 BALLAST & SUBGRADE. Dr. Charisma Choudhury. April 2011
Transportation Engineering II: Highway Design & Railways Lecture 7 BALLAST & SUBGRADE Dr. Charisma Choudhury April 2011 Ballast Functions Provide a hard and level bed for sleepers Hold sleepers in place
More informationCHAPTER 7: TREE PROTECTION DURING CONSTRUCTION 7.1 TREE PROTECTION AREAS
CHAPTER 7: TREE PROTECTION DURING CONSTRUCTION Urban trees need to be protected from damage to maximize their health, safety, benefits and functionality. Mature, young and newly transplanted trees need
More information[Rev - 1] 06/
WVU DESIGN GUIDELINES & CONSTRUCTION STANDARDS DIVISION 33 UTILITIES SECTION 334100 STORMWATER MANAGEMENT PART 1 GENERAL 1.1. Any deviances from the following instructions must be approved during design
More informationA. Product Data: Submit manufacturer s product data, with complete general and specific installation instructions, recommendations, and limitations.
SECTION 071700 - BENTONITE WATERPROOFING PART 1 - GENERAL 1.1 WORK SUMMARY A. The work of this section includes, but is not limited to the furnishing and installing the following materials, per project