1 Rainwater Management Performane of Newly Construted Residential Building Enlosures During August and September 2004 Prepared for the Home Builders Assoiation of Metro Orlando and the Florida Home Builders Assoiation By: Joseph William Lstiburek, Ph.D., P.Eng. Building Siene Corporation 70 Main Street Westford, MA January 11, 2005

2 Table of Contents Table of Contents 1 Exeutive Summary 2 Bakground and Approah 6 Performane of Stuo Claddings 7 Events of August and September Performane Issues With Water Resistant Barriers 13 Reverse Flashing Problems 21 Performane of Windows and Doors 27 Performane of Servie Penetrations 33 Performane of Soffit Vent Assemblies 39 Paint and Coating Performane 43 Review of Florida Building Code 61 Reommendations 64 Referenes 65 Page 1 of 66 Building Siene Corporation 1

3 Exeutive Summary Building Siene Corporation was engaged by the Home Builders Assoiation of Metro Orlando and the Florida Home Builders Assoiation to review the performane of residential assemblies in the entral Florida (Orlando) area during the three hurrianes in August and September The speifi fous of the review was on the water management details assoiated with stuo laddings. Two types of stuo laddings were reviewed: traditional three oat hard oat stuo and ementitious deorative finishes. Both are renderings applied to substrates and the fundamental physis apply to both equally. Stuo laddings leak (as do all laddings). When stuo laddings leak the penetrating water is traditionally managed in two fundamental ways: the water is direted to a water resistant barrier (WRB) and direted downwards and out of the building assembly; or the water is absorbed in a non water sensitive material, redistributed and released to the interior and exterior in a ontrolled way The first method is used with frame wall assemblies and the traditional WRB is building paper. The seond method is used with masonry blok onstrution. Both methods are ommon in the entral Florida (Orlando) area. The first method is typially limited to the seond floor and gable roof assemblies. The seond method is the standard first floor wall onstrution of the majority of homes onstruted in the region. The seond floor assemblies are drained assemblies and drain into the first floor assemblies. The first floor assemblies are mass assemblies where penetrating rainwater is stored in the mass of the onrete blok until it is released to both the interior and exterior during drying periods. The performane of a mass assembly is based on a rate-storage relationship. When the rate of wetting exeeds the rate of drying aumulation ours. Aumulation of water an our until the quantity of aumulated moisture exeeds the moisture storage apaity of the assembly. The moisture storage apaity is time, temperature and material speifi. Under normal onditions the amount of penetrating rainwater through stuo into a masonry blok wall is minor and easily absorbed, redistributed and released to both the interior and exterior. August and September 2004 was not a normal time. The mass assemblies were overwhelmed due to the extraordinary weather events. The mass assemblies were not able store the quantity of penetrating water and not able to dry rapidly enough between wetting events and in many situations water entered past the interior lining. The seond floor frame assemblies provided mixed performane. In many ases the seond floor assemblies were also overwhelmed prinipally for two reasons: drainage was poor due to the failure of plasti housewraps and other WRB systems to provide drainage and water holdout drained rainwater was not expelled to the exterior at the base of the seond floor frame assemblies The performane of the seond floor frame assemblies is also based on a rate-storage relationship. However, unlike the mass assemblies, very little moisture storage apaity is available. As suh for the seond floor frame assemblies the rate of drying must math or exeed the rate of wetting. The key drying method in the seond floor frame assemblies is drainage. This drainage depends on the provision of a drainage spae between the stuo rendering and WRB and the water repelleny of the WRB. Additionally, the drainage depends on the draining water being expelled to the exterior at the base of the frame assembly. Page 2 of 66 Building Siene Corporation 2

4 In the mass assemblies water penetrated the stuo via miro raks (as the water also did in the frame assemblies). Typial paint finishes are unable to span miro raks. Under normal onditions this is not an issue for the reasons previously mentioned (the huge moisture storage apaity of masonry blok assemblies). As stuo buildings age and are suessively repainted the water entry is redued after eah layer of paint is added. In general this is why many older buildings onstruted with mass walls performed somewhat better. In the seond floor frame assemblies water also penetrated the stuo via miro raks. Again, as previously mentioned, typial paint finishes are unable to span miro raks. In frame wall assemblies it is expeted that this penetrating water will be drained bak to the exterior. However, in many ases the penetrating rainwater was not drained to the exterior due to adhesion between WRB s and the stuo renderings preventing drainage between the stuo renderings and WRB s, a loss of water repelleny of the WRB s and the lak of effetive flashing at the base of the drained assemblies. There appear to be signifiant performane issues with WRB s relating to manufature, testing and approval. All plasti housewraps and some building papers tend to bond to stuo renderings thereby negating drainage. Additionally, many plasti housewraps loose their water repelleny when in ontat with sheathing and stuo renderings. The Florida Building Code in Setion sets out the requirements for WRB s and stuo renderings applied over wood sheathing. Setion reads as follows: Moisture Barrier. Wood shall be overed with 15-1b roofing felt, or other approved equally moisture-resisting layer, and metal reinforement as set forth herein. Unfortunately, equally moisture-resisting is not expliitly defined in the ode by referene to any ASTM standards. In fat, some of the problems identified in our review are not urrently addressed in any existing ASTM standard, partiularly the water hold out of WRB s under the influene of surfatants, or the loss of water repelleny due to adhesion, or the drainage harateristis of stuo renderings applied over WRB s. There are signifiant ode enforement issues regarding the onstrution of flashing at the base of the seond floor frame assemblies. Code offiials are enforing a provision of ASTM C1063 (Standard Speifiation for Installation of Lathing and Furring to Reeive Interior and Exterior Portland Cement-Based Plaster) that is not intended to apply where seond floor frame assemblies interset first floor mass assemblies. For reasons that are not expliable or defensible reverse flashing is mandated rather than drainage to the exterior at this loation. The water management of penetrations and openings in stuo laddings were also reviewed partiularly window and door openings, and servie penetrations. With respet to window and door openings it is instrutive to realize that windows and doors installed in residential buildings in Florida are rated for water holdout at 15 perent of the design wind load and no lower than 140 Pa or approximately 35 mph. These servie limits were learly exeeded many times during August and September Windows and doors are expeted to leak during hurrianes; they are not expeted to blow out. However, our testing indiates that many windows leaked at onditions well below their rated value i.e. under no wind ondition. In a similar vein wind driven rain also entered dryer vent openings, eletrial servie panels, and bathroom fan vent openings. But, again, our testing indiates that many servie penetrations leaked in the absene of wind pressures. The method of testing windows is speified in ANSI/AAMA 101 speifially ASTM E 547. The ASTM standard learly views leakage at orners to onstitute failure, however, it is our ontention that the mounting frames used by many window testing groups in the testing of windows for ompliane to the ASTM standard obsure the view of orners and subsequently many windows are listed as passing this test when in fat they fail. Additionally, many windows are sold as mulled or double windows or omposite windows. However, they are tested as single units. Every mulled window unit tested leaked with no applied wind load. Page 3 of 66 Building Siene Corporation 3

5 Finally, with respet to windows and doors, it is our ontention that the installation instrutions regarding window and door installation are inadequate with respet to water management. The windows and doors themselves under the Florida Building Code are subjet to an ASTM standard. The interfae between the window and door and the wall assembly is urrently not. Servie penetrations suh as dryer vents, eletrial panel boxes, eletrial boxes, vent fan hoods, and roof vents are urrently not rated or designed for wind driven rain. Anedotal evidene indiates that a signifiant amount of rainwater entered soffit vent assemblies. This is onsistent with the physis of the applied wind loads and the geometry of the soffit assemblies. Soffit geometries are urrently not designed to address extreme wind driven rain exposures. Additionally, unvented roof designs whih an address this mode of rainwater entry are urrently not expliitly allowed in the Florida Building Code although they are allowed in the International Residential Code. The use of paint as a water management tehnique for stuo renderings applied to mass assemblies was also examined. As the mil thikness of paint inreases, the ability of some paints to span miro raks also inreases. However, this applies primarily to mostly smooth surfaes. Highly textured surfaes are almost impossible to oat in a manner to seal miro raks. As the mil thikness of paint oatings inreases, the water vapor permeability of these oatings dereases leading to problems with blistering and re-emulsifiation of some stuo renderings. The appropriate mil thikness and water vapor permeability relationship is urrently unknown. Finally, as part of our review of the water management provisions of the Florida Building Code we identified a provision relating to roof membranes, Setion , that appears to make no sense: If the underlayment is a selfadhering membrane, the membrane shall be applied over a mehanially attahed anhor sheet, attahed in ompliane with This provision enourages roof membrane blow off by requiring a bond break between the selfadhering membrane and the strutural roof dek. This negates the entire reason to use a self-adhering membrane. The requirement for a mehanially attahed anhor sheet under a self-adhering membrane has no basis in physis or logi and prevents the onstrution of highly water resistant roof assemblies that an provide a high degree of seondary protetion during extreme wind driven rain events. The following reommendations are offered: The moisture storage apaity of mass walls be inreased by providing a seat at the base of these assemblies. A bond break be provided between primary drainage planes and stuo renderings in drained assemblies. In simple terms this will require two layers of building paper or a layer of building paper over a plasti housewrap. The speifiation, rating and testing of WRB s be onsistent with their installed exposure i.e. tested and rated as part of a stuo assembly. Appropriate performane speifiations need to be developed for WRB s used with stuo renderings and the Florida Building Code altered to require them. Code offiials be instruted regarding the orret interpretation of ASTM C1063 and the Florida Building Code be expliitly altered to require drainage where drained assemblies interset mass assemblies. Windows and doors be orretly rated and tested aording to ANSI/AAMA 101. Mulled window units, double windows or omposite windows be tested and held to the same requirements as single units. Water managed window and door installation requirements be developed and the Florida Building Code altered to require them. Page 4 of 66 Building Siene Corporation 4

6 Pressure relieved/baffled soffit assemblies be developed for vented roof assemblies and the Florida Building Code altered to require them. The Florida Building Code be altered to ome into ompliane with the International Residential Code to expliitly allow for the onstrution of unvented roof assemblies. Water managed details for dryer vents, eletrial panel boxes, eletrial boxes, vent fan hoods be developed and the Florida Building Code Altered to require them. It is unlikely that a pratial paint speifiation an be developed in the short term to address miro-raking stuo issues as the relationships among water vapor permeability, mil thikness and elastiity are not known. It is reommended that these relationships be explored and that until these relationships are understood the Florida Building Code not be altered to require elastomeri paints on stuo renderings. Repeal of Setion of the Florida Building Code requiring a mehanially attahed anhor sheet between a self-adhering membrane and roof sheathing. Page 5 of 66 Building Siene Corporation 5

7 Bakground and Approah Building Siene Corporation was engaged by the Home Builders Assoiation of Metro Orlando and the Florida Home Builders Assoiation to review the performane of residential assemblies in the entral Florida (Orlando) area during the three hurrianes in August and September The speifi fous of the review was on the water management details assoiated with stuo laddings. The performane of stuo laddings was alled into question after the events of August and September 2004, speifially the effet of rain from hurrianes Charley, Franes and Jeanne. The review was onduted through field investigation, field testing and experimentation, mok-up testing and experimentation, benh top testing, review of literature, review of odes and standards, and interviews with builders, ontrators, materials suppliers, manufaturers, and ode offiials. Page 6 of 66 Building Siene Corporation 6

8 Performane of Stuo Claddings The speifi fous of the review is on the water management details assoiated with stuo laddings. Two types of stuo laddings were reviewed: traditional three oat hard oat stuo and ementitious deorative finishes. Both are renderings applied to substrates and the fundamental physis apply to both equally. Stuo laddings leak (as do all laddings). ASTM C a Standard Speifiation for Appliation of Portland Cement-Based Plaster reognizes this: Resistane to rain penetration is improved where plaster has been adequately densified during appliation and properly ured. Plaster shall not, however, be onsidered to be waterproof. When stuo laddings leak the penetrating water is traditionally managed in two fundamental ways: the water is direted to a water resistant barrier (WRB) and direted downwards and out of the building assembly; or the water is absorbed in a non water sensitive material, redistributed and released to the interior and exterior in a ontrolled way The first method is used with frame wall assemblies and the traditional WRB is building paper (Figure 1). The seond method is used with masonry blok onstrution (Figure 2). Both methods are ommon in the entral Florida (Orlando) area. The first method is typially limited to the seond floor and gable roof assemblies (Photograph 1). The seond method is the standard first floor wall onstrution of the majority of homes onstruted in the region. The seond floor assemblies are drained assemblies and drain into the first floor assemblies (Figure 3). The first floor assemblies are mass assemblies where penetrating rainwater is stored in the mass of the onrete blok until it is released to both the interior and exterior during drying periods. The performane of a mass assembly is based on a rate-storage relationship. When the rate of wetting exeeds the rate of drying aumulation ours. Aumulation of water an our until the quantity of aumulated moisture exeeds the moisture storage apaity of the assembly. The moisture storage apaity is time, temperature and material speifi. Under normal onditions the amount of penetrating rainwater through stuo into a masonry blok wall is minor and easily absorbed, redistributed and released to both the interior and exterior. Page 7 of 66 Building Siene Corporation 7

9 Figure 1: Drained Assembly Figure 2: Mass Assembly Page 8 of 66 Building Siene Corporation 8

10 Figure 3: Seond Floor Drained Assembly Drains Into First Floor Mass Assembly buildingsiene.om Photograph 1: Typial Constrution buildingsiene.om e.omm Page 9 of 66 Building Siene Corporation 9

11 Events of August and September 2004 August and September 2004 was not a normal time. Four hurrianes hit the State of Florida, and three of the hurrianes hit the Orlando region (Figure 4, Figure 5, Figure 6 and Figure 7). Unpreedented quantities of rain fell during high wind events. The mass assemblies were overwhelmed due to the extraordinary weather events. The mass assemblies were not able store the quantity of penetrating water and not able to dry rapidly enough between wetting events and in many situations water entered past the interior lining (Figure 8). The seond floor frame assemblies provided mixed performane. In many ases the seond floor assemblies were also overwhelmed (Photograph 2) prinipally for two reasons: drainage was poor due to the failure of plasti housewraps and other WRB systems to provide drainage and water holdout drained rainwater was not expelled to the exterior at the base of the seond floor frame assemblies The performane of the seond floor frame assemblies is also based on a rate-storage relationship. However, unlike the mass assemblies, very little moisture storage apaity is available. As suh for the seond floor frame assemblies the rate of drying must math or exeed the rate of wetting. The key drying method in the seond floor frame assemblies is drainage. This drainage depends on the provision of a drainage spae between the stuo rendering and WRB and the water repelleny of the WRB. Additionally, the drainage depends on the draining water being expelled to the exterior at the base of the frame assembly. In the mass assemblies water penetrated the stuo via miro raks (as the water also did in the frame assemblies). Typial paint finishes are unable to span miro raks. Under normal onditions this is not an issue for the reasons previously mentioned (the huge moisture storage apaity of masonry blok assemblies). As stuo buildings age and are suessively repainted the water entry is redued after eah layer of paint is added. In general this is why many older buildings onstruted with mass walls performed somewhat better. In the seond floor frame assemblies water also penetrated the stuo via miro raks. Again, as previously mentioned, typial paint finishes are unable to span miro raks. In frame wall assemblies it is expeted that this penetrating water will be drained bak to the exterior. However, in many ases the penetrating rainwater was not drained to the exterior due to adhesion between WRB s and the stuo renderings preventing drainage between the stuo renderings and WRB s, a loss of water repelleny of the WRB s and the lak of effetive flashing at the base of the drained assemblies. Page 10 of 66 Building Siene Corporation 10

12 Figure 4: Hurriane Charley (Aug 9-14, 2004) Figure 5: Hurriane Franes (Aug 25-Sept 25, 2004) buildings siene.om Figure 6: Hurriane Ivan (Sept 2-24, 2004) Figure 7: Hurriane Jeanne (Sept 13-28, 2004) buildings siene.om Page 11 of 66 Building Siene Corporation 11

13 Figure 8: Rainwater Entry into Mass Assembly buildingsiene..om Photograph 2: Rainwater Entry into Seond Floor Frame Assembly buildingsiene.om Page 12 of 66 Building Siene Corporation 12

14 Performane Issues With Water Resistant Barriers There appear to be signifiant performane issues with WRB s relating to manufature, testing and approval. All plasti housewraps and some building papers tend to bond to stuo renderings thereby negating drainage (Photograph 3). Additionally, many plasti housewraps loose their water repelleny (Figure 9) when in ontat with sheathing and stuo renderings (Photograph 4). The Florida Building Code in Setion sets out the requirements for WRB s and stuo renderings applied over wood sheathing. Setion reads as follows: Moisture Barrier. Wood shall be overed with 15-1b roofing felt, or other approved equally moisture-resisting layer, and metal reinforement as set forth herein. Unfortunately, equally moisture-resisting is not expliitly defined in the ode by referene to any ASTM standards. In fat, some of the problems identified in our review are not urrently addressed in any existing ASTM standard, partiularly the water hold out of WRB s under the influene of surfatants, or the loss of water repelleny due to adhesion, or the drainage harateristis of stuo renderings applied over WRB s. All perforated plasti housewraps fail a simple test for water repelleny and water holdout (Photograph 5 and Photograph 6). Many non perforated housewraps fail a similar test when exposed to surfatants (Photograph 7, Photograph 8 and Photograph 9). The problem of adhesion of stuo renderings to plasti housewraps and to building papers an be address by installing a bond break (Figure 10). Tests showed that a thin layer of asphalt saturated felt ats as an effetive bond break for both building papers (Photograph 10) and plasti housewraps (Photograph 11). The felt used is similar to the baking on paper baked lath (Photograph 12). The tehnique of using two layers of building paper is typial in other regions in the United States and signifiant trade literature exists delineating the pratie (Figure 11). Drainage between the bond break and primary drainage plane is signifiantly enhaned when a drainage spae is provided suh as through the use of a textured or profiled drainage plane (Photograph 13). A test for drainage should be developed and performane requirements established. Page 13 of 66 Building Siene Corporation 13

15 Figure 9: Water Repelleny buildingsiene.om Photograph 3: Stuo Rendering Bonding to Building Paper buildingsiene.om Page 14 of 66 Building Siene Corporation 14

16 Photograph 4: Stuo Rendering Bonding to Plasti Housewrap buildingsiene.o gsiene.omm Photograph 5: Water Drop Test For Water Repelleny buildingsiene..om Page 15 of 66 Building Siene Corporation 15

17 Photograph 6: Plasti Housewrap Failing Water Drop Test buildingsiene. ingsiene.om Photograph 7: Absorptive Surfae For Water Drop Test buildingsiene e.om Page 16 of 66 Building Siene Corporation 16

18 Photograph 8: Plasti Housewrap Undergoing Water Drop Test buildingsiene.om Photograph 9: Extensive Failure of Plasti Housewrap During Water Drop Test buildingsiene iene.om Page 17 of 66 Building Siene Corporation 17

19 Figure 10: Bond Break Best Pratie For Stuo Renderings Applied Over Frame Wall Assemblies m o. e n e i ings d l i u b Photograph 10: Asphalt Saturated Felt As Bond Break Over Building Paper m o. iene s g n i d l i u b Building Siene Corporation 18 Page 18 of 66

20 Photograph 11: Asphalt Saturated Felt As Bond Break Over Plasti Housewrap buildingsiene.om m Photograph 12: Paper Baked Lath As A Bond Break buildingsiene. e.om Page 19 of 66 Building Siene Corporation 19

21 Figure 11: Trade Literature Delineating Two Layers of Building Paper m o. e n e i ings d l i u b Photograph 13: Enhaned Drainage With A Profiled Plasti Housewrap m o. iene s g n i d l i u b Building Siene Corporation 20 Page 20 of 66

22 Reverse Flashing Problems There are signifiant ode enforement issues regarding the onstrution of flashing at the base of the seond floor frame assemblies. Code offiials are enforing a provision of ASTM C1063 (Standard Speifiation for Installation of Lathing and Furring to Reeive Interior and Exterior Portland Cement-Based Plaster) that is not intended to apply where seond floor frame assemblies interset first floor mass assemblies. For reasons that are not expliable or defensible reverse flashing is mandated rather than drainage to the exterior at this loation. The typial method of installation is to extend the building paper downwards over the joint between the frame assembly and the mass assembly (Photograph 14). The building paper ats as a bridge flashing between the two assemblies. Control joint aessories are not typially designed as water shedding devies i.e. flashings (Photograph 15). They are designed in most ases to be installed over the top of building paper rather than being tuked behind building paper in a shingle or water shedding fashion. Standard appliation has these ontrol joint aessories installed over the top to the building paper bridge flashing (Photograph 16). This reates a dam and water is direted inwards. This pratie results in leaks during wind driven rain events (Photograph 17) as the moisture storage apaity of the frame wall assembly is easily overwhelmed in the absene of drainage. The seond floor frame assembly, whih is a drained assembly is effetively unable to drain anywhere exept to the interior. The appropriate pratie is to use a flashing between floors that effetively drains the water to the exterior (Figure 12). This detail is desribed in detail in Photograph 18, Photograph 19, Photograph 20, Photograph 21 and Photograph 22. Page 21 of 66 Building Siene Corporation 21

23 Photograph 14: Building Paper As Bridge Flashing buildingsiene dingsiene.om Photograph 15: Control Joint Aessories Installed Over Top of Drainage Plane buildingsiene e.om Page 22 of 66 Building Siene Corporation 22

24 Photograph 16: Reverse Flashing Between Floors buildingsiene dingsiene.om Photograph 17: Water Entry Between Floors buildingsiene.om Page 23 of 66 Building Siene Corporation 23

25 Figure 12: Best Pratie Drained and Flashed Control Joint buildingsiene..om Photograph 18: Flashing/Control Joint - Weep Sreed Flashing buildingsiene.o om Page 24 of 66 Building Siene Corporation 24

26 Photograph 19: Self Adhering Membrane Bridge Flashing buildingsiene dingsiene.om Photograph 20: Primary Drainage Plane Lapped Over Control Joint Flashing buildingsiene e.om Page 25 of 66 Building Siene Corporation 25

27 Photograph 21: Paper Baked Lath Bond Break Over Primary Drainage Plane buildingsiene dingsiene.om Photograph 22: Stuo Rendering Applied At Draining Control Joint buildingsiene e.om Page 26 of 66 Building Siene Corporation 26

28 Performane of Windows and Doors The water management of penetrations and openings in stuo laddings were also reviewed partiularly window and door openings. With respet to window and door openings it is instrutive to realize that windows and doors installed in residential buildings in Florida are rated for water holdout at 15 perent of the design wind load and no lower than 140 Pa or approximately 35 mph. These servie limits were learly exeeded many times during August and September Windows and doors are expeted to leak during hurrianes; they are not expeted to blow out. However, our testing indiates that many windows leaked at onditions well below their rated value i.e. under no wind ondition (Photograph 24 and Photograph 25). The method of testing windows is speified in ANSI/AAMA 101 speifially ASTM E 547. The ASTM standard learly views leakage at orners to onstitute failure, however, it is our ontention that the mounting frames used by many window testing groups in the testing of windows for ompliane to the ASTM standard obsure the view of orners and subsequently many windows are listed as passing this test when in fat they fail. Additionally, many windows are sold as mulled or double windows or omposite windows. However, they are tested as single units. Every mulled window unit tested leaked with no applied wind load (Photograph 26). Visual observations of hundreds of window units in the field and the disassembly of a dozen indiate a problem with the window sill to window jamb onnetion. It is our belief that quality ontrol problems exist with the manufaturing of window units prior to delivery to the site. The joint geometry is problemati in general the joint design an be signifiantly improved. The typial design makes it a very diffiult joint to seal, diffiult to inspet and results in an unneessarily high failure rate. Finally, with respet to windows and doors, it is our ontention that the installation instrutions regarding window and door installation are inadequate with respet to water management. The windows and doors themselves under the Florida Building Code are subjet to an ASTM standard. The interfae between the window and door and the wall assembly is urrently not. Many mass wall assembly window openings are onstruted with preast sill units that have a raised rib attahment that direts window water leakage inwards rather than outwards (Photograph 27, Photograph 28, and Figure 13). Figure 14 illustrates a preast sill profile that direts window water leakage outward. A similar approah is reommended for window openings in frame wall assemblies (Photograph 29). Door leakage an also be address in a similar fashion a seat is ast into the slab edge that ats as a pan flashing (Photograph 30). Page 27 of 66 Building Siene Corporation 27

29 Photograph 23: Window Openings buildingsiene. ngsiene.omm Photograph 24: Window Corner Leakage buildingsiene. e.om Page 28 of 66 Building Siene Corporation 28

30 Photograph 25: Window Unit Leaking Inboard of Preast Attahment Rib m o. e n e i ings d l i u b Photograph 26: Mulled Window Unit Leakage Paths m o. iene s g n i d l i u b Building Siene Corporation 29 Page 29 of 66

31 Photograph 27: Preast Sill With Illogial Attahment Rib buildingsiene.o om Photograph 28: Preast Sill That Channels Window Leakage Inward buildingsiene e.om Page 30 of 66 Building Siene Corporation 30

32 Figure 13: Current Pratie That Direts Window Leakage Inward buildingsiene. ingsiene.om Figure 14: Reommended Pratie That Direts Window Leakage Outward buildingsien e.om Page 31 of 66 Building Siene Corporation 31

33 Photograph 29: Frame Assembly Opening Reommended Pratie buildingsiene.om m Photograph 30: Sliding Door Unit In Seat in Slab Direting Door Leakage Outward buildingsiene.om Page 32 of 66 Building Siene Corporation 32

34 Performane of Servie Penetrations In a similar vein wind driven rain also entered dryer vent openings, eletrial servie panels, and bathroom fan vent openings. But, again, our testing indiates that many servie penetrations leaked in the absene of wind pressures. Servie penetrations suh as dryer vents, eletrial panel boxes, eletrial boxes, vent fan hoods, and roof vents are urrently not rated or designed for wind driven rain. Eletrial panel boxes are typially installed without water protetion behind them (Photograph 31). This is typially not a major issue as these panel boxes are loated on garage walls. However, it is reommended that the stuo rendering be applied prior to the installation of the eletrial panel box. Most openings rely on the appliation of sealant rather than a flashing approah to ontrol rain entry (Photograph 32, Photograph 33 and Photograph 34). Sealants require maintenane. Using a flashing approah to address servie penetrations will provide improved performane (Photograph 35). Photograph 36 and Photograph 37 illustrate the use of flashing for eletrial boxes a premanufatured unit provides water holdout during wind driven rain events. Photograph 38, Photograph 39 and Photograph 40 illustrate effetive kik out flashing onstrution. Page 33 of 66 Building Siene Corporation 33

35 Photograph 31: Eletrial Servie Panel No Water Control Behind Panel buildingsiene.om Photograph 32: Typial Maintenane Intensive Servie Opening buildingsiene e.om Page 34 of 66 Building Siene Corporation 34

36 Photograph 33: Maintenane Intensive Servie Opening buildingsiene.om Photograph 34: Dryer Vent Opening buildingsiene iene.om Page 35 of 66 Building Siene Corporation 35

37 Photograph 35: Reommended Pratie For Dryer Vent Opening m o. e n e i ings d l i u b Photograph 36: Flashed Eletrial Box m o. iene s g n i d l i u b Building Siene Corporation 36 Page 36 of 66

38 Photograph 37: Eletrial Box Flashing Unit buildingsiene.omm Photograph 38: Reommended KikOut Flashing Detail buildingsiene. ne.om Page 37 of 66 Building Siene Corporation 37

39 Photograph 39: Kik Out Flashing buildingsiene.omm Photograph 40: Masti Adhered Kik Out Flashing On Mass Assembly buildingsiene. ingsiene.om Page 38 of 66 Building Siene Corporation 38

40 Performane of Soffit Vent Assemblies Anedotal evidene indiates that a signifiant amount of rainwater entered soffit vent assemblies. This is onsistent with the physis of the applied wind loads and the geometry of the soffit assemblies. Soffit geometries are urrently not designed to address extreme wind driven rain exposures. Additionally, unvented roof designs whih an address this mode of rainwater entry are urrently not expliitly allowed in the Florida Building Code although they are allowed in the International Residential Code. Figure 15 illustrates rainwater entry during wind driven rain events. Figure 16 illustrates the use of baffles to redue air pressure driving fores and failitate the use of air pressure hanges to deposit rain in soffit assemblies rather than in atti spaes. Photograph 41, Figure 17, Figure 18 and Figure 19 illustrate unvented onditioned atti onstrution. This tehnology has signifiant advantages in the Florida limate with respet to rainwater ontrol, energy onservation, moisture, and humidity ontrol, wind uplift and fire performane over standard vented atti roof tehnology. Page 39 of 66 Building Siene Corporation 39

41 Figure 15: Wind Driven Rain Entry In Vented Soffit Assembly buildingsiene.om Figure 16: Pressure Relieved Baffled Soffit Assembly buildingsiene.om Page 40 of 66 Building Siene Corporation 40

42 Photograph 41: Spray Foam Insulation In Unvented Conditioned Atti Assembly buildings iene.om Figure 17: Typial Vented Atti With Dutwork Outside of Conditioned Spae buildingsiene.om Page 41 of 66 Building Siene Corporation 41

43 Figure 18: Negative Pressure Indued Via Dut Leakage m o. e n e i ings d l i u b Figure 19: Conditioned Unvented Atti Assembly m o. iene s g n i d l i u b Building Siene Corporation 42 Page 42 of 66

44 Paint and Coating Performane The use of paint as a water management tehnique for stuo renderings applied to mass assemblies was also examined. As the mil thikness of paint inreases, the ability of some paints to span miro raks also inreases. However, this applies primarily to mostly smooth surfaes. Highly textured surfaes are almost impossible to oat in a manner to seal miro raks. As the mil thikness of paint oatings inreases, the water vapor permeability of these oatings dereases leading to problems with blistering and re-emulsifiation of some stuo renderings. The appropriate mil thikness and water vapor permeability relationship is urrently unknown. Water leakage testing of stuo renderings was onduted using numerous methods. These methods are memorialized in Photograph 42, Photograph 43, Photograph 44, Photograph 45, Photograph 46, Photograph 47, Photograph 48 and Photograph 49. The most useful method proved to be the use of a amera probe and a portable spray rak without the appliation of a pressure differene either air or hydrostati. Test assemblies were onstruted and baseline values were established. Stuo renderings, both painted and unpainted were tested to determine water hold out (Photograph 50, Photograph 51, Photograph 52, Photograph 53, Photograph 54, Photograph 55, Photograph 56 and Photograph 57). Three-hour water spray tests on unpainted walls systems rendered with stuo did not leak in the absene of raks. To state the obvious, stuo without raks does not leak paint or no paint (Photograph 58 and Photograph 59). However, the presene of raks (Photograph 60 and Photograph 61) aused all mass wall assemblies to pass water. The type of rak shown in Photograph 60 is indiative of typial and expeted stuo rendering rakage. Workmanship, quality ontrol and ure impat the number and extent of shrinkage raking. Soil onditions, the nature of the materials, geometry and aspet ratio of mass wall assemblies impat the number and extent of settlement raking. However, the nature of stuo appliation, materials and substrates make it impossible to onstrut rak free monolithi stuo renderings in other words shrinkage raks and settlement raks are to be expeted. These shrinkage raks and settlement raks traditionally are handled through ongoing maintenane. At present, tehnology offers no other pratial approah. Based on the field observations it is our belief that it is not possible to onstrut stuo assemblies without raks. It is also our belief that paint oating systems even the high build oatings - are unable to span the typial stuo raks enountered, both from initial drying and from subsequent settlement. Inreasing the moisture storage apaity of mass assemblies an partially address this issue. One approah is to onstrut a seat in the perimeter slab foundation to provide a reservoir for penetrating rainwater and to diret this rainwater to the exterior (Figure 20, Figure 21 and Photograph 62). The experiene with high build paint systems suh as elastomeri paints an lead to blistering (Photograph 63) and re-emulsifiation of additives. The use of suh oatings should remain a speialty tehnique speified and supervised by professionals. The inward migration of moisture an also be moderated by the use of non water sensitive insulation systems (Figure 22, Photograph 64 and Photograph 65). Page 43 of 66 Building Siene Corporation 43

45 Low build and high build paint system on both smooth and textured surfaes were arefully examined (Photograph 66, Photograph 67 and Photograph 68) and it is our onlusion that almost no oating or painting system is able to span settlement raks (Photograph 69). Only small hairline raks on relatively smooth, and relatively untextured surfaes are there likely to be signifiant performane benefits of high build systems. A more promising approah appears to lie with fiber reinforement to ontrol raking and premium polymer modified and polymer based ementitious renderings (Photograph 70). Most shrinkage raking ours over the first few weeks and most settlement raking happens over the first year. In other words the majority of the movement resulting in stuo raks happens within the first year. After the building and building systems have equilibrated standard paint finishes are often able to seal small raks as subsequent movement is typially minor. However, the larger settlement raks require flexible sealants typially brushed into the rak. After buildings are repainted and settlement raks are addressed in the normal ourse of home maintenane stuo leakage is typially redued signifiantly. Page 44 of 66 Building Siene Corporation 44

46 Photograph 42: Magnifying Glass Examination buildingsiene. e..om Photograph 43: Rilem Tube Hydrostati Head Test buildingsiene.om Page 45 of 66 Building Siene Corporation 45

47 Photograph 44: Infrared Camera Leak Detetion buildingsiene.om Photograph 45: Camera Probe Leak Detetion buildingsiene.om Page 46 of 66 Building Siene Corporation 46

48 Photograph 46: View Sreen On Camera Probe buildingsiene.om Photograph 47: Aess Openings In Mass Wall Camera Probe Leak Detetion buildingsiene.om Page 47 of 66 Building Siene Corporation 47

49 Photograph 48: Water Spray Rak On Masonry Mass Assembly m o. e n e i ings d l i u b Photograph 49: Power Washer Simulating Wind Driven Rain m o. iene s g n i d l i u b Building Siene Corporation 48 Page 48 of 66

50 Photograph 50: Test Wall Establishing Baselines buildingsiene.o om Photograph 51: Garages Used As Test Walls Varying Configurations buildingsien e.om Page 49 of 66 Building Siene Corporation 49

51 Photograph 52: Unpainted Stuo Rendering Test Wall buildingsiene.om Photograph 53: Painted Stuo Rendering Test Wall buildingsiene iene.om Page 50 of 66 Building Siene Corporation 50

52 Photograph 54: Spray Rak Without Indued Pressure Differene buildingsiene.o om Photograph 55: Visual Indiation of Water Entry At Base of Assembly buildingsiene e.om Page 51 of 66 Building Siene Corporation 51

53 Photograph 56: Water Entry Pattern of Saturated Mass Assembly buildingsiene.om Photograph 57: Spray Rak Unpainted Stuo Rendering buildingsiene iene.om Page 52 of 66 Building Siene Corporation 52

54 Photograph 58: Three Hour Water Test Unpainted Stuo Rendering buildings iene.om Photograph 59: Water Testing Control Joints buildingsiene.om Page 53 of 66 Building Siene Corporation 53

55 Photograph 60: Typial Crak In Stuo Rendering m o. e n e i ings d l i u b Photograph 61: Water Entry Assoiated With Typial Crak In Stuo Rendering m o. iene s g n i d l i u b Building Siene Corporation 54 Page 54 of 66

56 Figure 20: Mass Assembly With Inreased Moisture Tollerane buildingsiene.om Figure 21: Seat In Foundation Inreasing Moisture Storage Capaity buildingsiene.om Page 55 of 66 Building Siene Corporation 55

57 Figure 22: Vapor Semi Permeable Non Water Sensitive Rigid Insulation buildingsiene.om Photograph 62: Seat In Conrete Slab Foundation Inreasing Moisture Storage Capaity buildingsiene dingsiene.ooom Page 56 of 66 Building Siene Corporation 56

58 Photograph 63: Blistering of Elastomeri Paint Coating buildingsiene.o om Photograph 64: Rigid Foam Interior Lining Proteting Interior Surfaes buildingsiene. ne.om Page 57 of 66 Building Siene Corporation 57

59 Photograph 65: Rigid Insulation Extends Past Interior Framing buildings iene.om Photograph 66: Paint Coating Over Rough Surfae buildingsiene.om Page 58 of 66 Building Siene Corporation 58

60 Photograph 67: Paint Coating 3 Mil Thikness buildingsiene.om Photograph 68: Paint Coating 10 Mil Thikness buildingsiene.om Page 59 of 66 Building Siene Corporation 59

61 Photograph 69: Settlement Craks buildingsiene.o om Photograph 70: Fiber Reinfored Stuo Rendering to Control Craking buildingsiene.om Page 60 of 66 Building Siene Corporation 60

62 Review of Florida Building Code As part of our review of the water management provisions of the Florida Building Code we identified a provision relating to roof membranes, Setion , that appears to make no sense: If the underlayment is a self-adhering membrane, the membrane shall be applied over a mehanially attahed anhor sheet, attahed in ompliane with This provision enourages roof membrane blow off by requiring a bond break between the selfadhering membrane and the strutural roof dek. This negates the entire reason to use a self-adhering membrane. The requirement for a mehanially attahed anhor sheet under a self-adhering membrane has no basis in physis or logi and prevents the onstrution of highly water resistant roof assemblies that an provide a high degree of seondary protetion during extreme wind driven rain events. Self-adhering membranes that are diretly adhered to strutural deks suh as plywood and OSB sheathing are a proven tehnology in all limate zones in the United States (Photograph 71, Photograph 72, Photograph 73 and Photograph 74). Page 61 of 66 Building Siene Corporation 61

63 Photograph 71: Self Adhering Membrane buildingsiene.om Photograph 72: Diret Applied Self Adhering Membrane buildingsiene iene.om Page 62 of 66 Building Siene Corporation 62

64 Photograph 73: Large Institutional Roof Diret Applied Self Adhering Membrane m o. e n e i ings d l i u b Photograph 74: Complex Roof Geometry Diret Applied Self Adhering Membrane m o. iene s g n i d l i u b Building Siene Corporation 63 Page 63 of 66

65 Reommendations Based on our investigation, testing, review and analysis, the following reommendations are offered: The moisture storage apaity of mass walls be inreased by providing a seat at the base of these assemblies. A bond break be provided between primary drainage planes and stuo renderings in drained assemblies. In simple terms this will require two layers of building paper or a layer of building paper over a plasti housewrap. The speifiation, rating and testing of WRB s be onsistent with their installed exposure i.e. tested and rated as part of a stuo assembly. Appropriate performane speifiations need to be developed for WRB s used with stuo renderings and the Florida Building Code altered to require them. Code offiials be instruted regarding the orret interpretation of ASTM C1063 and the Florida Building Code be expliitly altered to require drainage where drained assemblies interset mass assemblies. Windows and doors be orretly rated and tested aording to ANSI/AAMA 101. Mulled window units, double windows or omposite windows be tested and held to the same requirements as single units. Water managed window and door installation requirements be developed and the Florida Building Code altered to require them. Pressure relieved/baffled soffit assemblies be developed for vented roof assemblies and the Florida Building Code altered to require them. The Florida Building Code be altered to ome into ompliane with the International Residential Code to expliitly allow for the onstrution of unvented roof assemblies. Water managed details for dryer vents, eletrial panel boxes, eletrial boxes, vent fan hoods be developed and the Florida Building Code Altered to require them. It is unlikely that a pratial paint speifiation an be developed in the short term to address miro-raking stuo issues as the relationships among water vapor permeability, mil thikness and elastiity are not known. It is reommended that these relationships be explored and that until these relationships are understood the Florida Building Code not be altered to require elastomeri paints on stuo renderings. Repeal of Setion of the Florida Building Code requiring a mehanially attahed anhor sheet between a self-adhering membrane and roof sheathing. Page 64 of 66 Building Siene Corporation 64

66 Referenes AAMA 101/I.S.2/NAFS-02, Voluntary Performane Speifiations for Windows, Skylights and Glass Doors, Amerian Arhitetural Manufaturers Assoiation, 1827 Walden Offie Square, Suite 550, Shaumburg, IL, ASTM E Standard Test Method for Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform Stati Air Pressure Differene, Amerian Soiety for Testing and Materials, 100 Barr Harbor Drive, PO Box C700, West Conshohoken, PA, ASTM E Standard Test Method for Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Walls by Cyli Stati Air Pressure Differene, Amerian Soiety for Testing and Materials, 100 Barr Harbor Drive, PO Box C700, West Conshohoken, PA, ASTM C Standard Terminology Relating to Gypsum and Related Building Materials and Systems, Amerian Soiety for Testing and Materials, 100 Barr Harbor Drive, PO Box C700, West Conshohoken, PA, ASTM C a Standard Speifiation for Appliation of Portland Cement-Based Plaster, Amerian Soiety for Testing and Materials, 100 Barr Harbor Drive, PO Box C700, West Conshohoken, PA, ASTM C Standard Speifiation for Installation of Lathing and Furring to Reeive Interior and Exterior Portland Cement-Based Plaster, Amerian Soiety for Testing and Materials, 100 Barr Harbor Drive, PO Box C700, West Conshohoken, PA, AC38 Aeptane Criteria for Water-Resistive Barriers, ICC Evaluation Servies, In., Approved June 2004, 5360 Workman Mill Road, Whittier, CA, AC 132 Aeptane Criteria for Atti Vents, ICC Evaluation Servies, In., Approved January 2001, 5360 Workman Mill Road, Whittier, CA, Florida Building Code, State of Florida, May, 2001 Page 65 of 66 Building Siene Corporation 65

EXPERIMENTAL INVESTIGATION OF ECCENTRIC REINFORCED CONCRETE BEAM-COLUMN-SLAB CONNECTIONS UNDER EARTHQUAKE LOADING

EXPERIMENTAL INVESTIGATION OF ECCENTRIC REINFORCED CONCRETE BEAM-COLUMN-SLAB CONNECTIONS UNDER EARTHQUAKE LOADING 13 th World Conferene on Earthquake Engineering Vanouver, B.C., Canada August 1-6, 24 Paper No. 215 EXPERIMENTAL INVESTIGATION OF ECCENTRIC REINFORCED CONCRETE BEAM-COLUMN-SLAB CONNECTIONS UNDER EARTHQUAKE

More information

Composite Steel Floor Deck-Slabs

Composite Steel Floor Deck-Slabs AMERICAN NATIONAL STANDARDS / STEEL DECK C - 2017 Standard for Composite Steel Floor Dek-Slabs opyright 2017 steel dek institute 1. General AMERICAN NATIONAL STANDARDS / STEEL DECK 1.1 Sope: A. This Standard

More information

Prediction of Temperature and Aging Effects on the Properties of Concrete

Prediction of Temperature and Aging Effects on the Properties of Concrete Predition of Temperature and Aging Effets on the Properties of Conrete Jin-Keun Kim 1* and Inyeop Chu 1 1 KAIST, Republi of Korea * E-mail: kimjinkeun@kaist.a.kr ABSTRACT For the sustainable onrete strutures,

More information

Camber Variability in Prestressed Concrete Bridge Beams

Camber Variability in Prestressed Concrete Bridge Beams CONCRETE BRIDGE TECHNOLOGY Camber Variability in Prestressed Conrete Bridge Beams by Dr. Maher Tadros, econstrut Beams ast with extra amber in storage yard at Conrete Tehnology Corporation; amber shown

More information

Perimeter Relief and Control Joints in Fire-Rated Gypsum Board

Perimeter Relief and Control Joints in Fire-Rated Gypsum Board Perimeter Relief and Control Joints in Fire-Rated Gypsum Board In multi-family residential construction, involving fire-rated assemblies stress relief in the firerated assemblies is important, but often

More information

The fracture of a Al bicycle crank arm.

The fracture of a Al bicycle crank arm. The frature of a Al biyle rank arm. Failure In hapters 6 and 7 we examined the elasti and plasti behaviour of materials. We learned how the motion of disloations makes it possible for the material to deform.

More information

Post-Tensioned Two-Way Slab

Post-Tensioned Two-Way Slab The Medial Oie Building Malvern, PA 13 Post-Tensioned Two-Way Slab Introdution The Filigree beam system reates a thin lightweight loor system that leaves plenty o open plenum spae or mehanial and eletrial

More information

SEISMIC RETROFIT USING CONTINUOUS FIBER SHEETS

SEISMIC RETROFIT USING CONTINUOUS FIBER SHEETS SEISMIC RETROFIT USING CONTINUOUS FIER SHEETS Yasuhiro MATSUZAKI 1, Katsuhiko NAKANO, Shigeru FUJII 3 And Hiroshi FUKUYAMA 4 SUMMARY The researh on seismi retrofit of RC members using ontinuous fiber sheets

More information

PERFORMANCE OF DOUBLE-T PRESTRESSED CONCRETE BEAMS STRENGTHENED WITH STEEL REINFORCED POLYMER ABSTRACT

PERFORMANCE OF DOUBLE-T PRESTRESSED CONCRETE BEAMS STRENGTHENED WITH STEEL REINFORCED POLYMER ABSTRACT PERFORMANCE OF DOUBLE-T PRESTRESSED CONCRETE BEAMS STRENGTHENED WITH STEEL REINFORCED POLYMER Paolo Casadei 1, Antonio Nanni 2, Tarek Alkhrdaji 3 and Jay Thomas 4 ABSTRACT In the fall of 2002, a two-storey

More information

Flood and Hurricane Resistant Buildings by Joseph Lstiburek

Flood and Hurricane Resistant Buildings by Joseph Lstiburek building science.com 2006 Building Science Press All rights of reproduction in any form reserved. Building Science Digest 111 Flood and Hurricane Resistant Buildings 2006-10-26 by Joseph Lstiburek Abstract:

More information

Steel. Members. in medium to. composite. provisions for. the available. b) strength of. design,

Steel. Members. in medium to. composite. provisions for. the available. b) strength of. design, Chapter 13 Steel Conrete Composite Strutural Members 13.1 General Provisions for Steel Conrete Composite Strutural Members This setion states the sope of the speifiation, summarizess referened speifiations,

More information

GROUND WATER/SURFACE WATER INTERACTIONS AWRA SUMMER SPECULLTP CONF~NCR CZ-I PDG- ANALYSIS OF INFILTRATED STREAM WATER TO A PUMPING WELL

GROUND WATER/SURFACE WATER INTERACTIONS AWRA SUMMER SPECULLTP CONF~NCR CZ-I PDG- ANALYSIS OF INFILTRATED STREAM WATER TO A PUMPING WELL JULY 1-3 GROUND WATER/SURFACE WATER NTERACTONS AWRA SUMMER SPECULLTP CONF~NCR 22 32 CZ- PDG- ANALYSS OF NFLTRATED STREAM WATER TO A PUMPNG WELL Xunhong Chen' and Xi Chen' ABSTRACT: Pumping of groundwater

More information

Managing Rainwater at the Window-Wall Interface

Managing Rainwater at the Window-Wall Interface Managing Rainwater at the Window-Wall Interface Prepared by : Silvio Plescia (CMHC) and Michael Lacasse (NRC) ANHWP, Edmonton and Calgary, 23-24 September 2009 CMHC SCHL Introduction The problems you know

More information

Rainscreen Gaps in Exterior Walls

Rainscreen Gaps in Exterior Walls PHRC Webinar Series Tuesday, September 13 @ 1pm Rainscreen Gaps in Exterior Walls Brian Wolfgang Housing Systems Specialist Pennsylvania Housing Research Center 219 Sackett Building University Park, PA

More information

How do you install yours?

How do you install yours? How do you install yours? Darrell Paul Qualistat Building Performance Consultants CSA 440 Just about adding Peel & Stick? 1 Window and door problems Photos / videos Video available for viewing at INSTAGRAM

More information

Strengthening of Reinforced Concrete Slab-Column Connection Subjected to Punching Shear with FRP Systems

Strengthening of Reinforced Concrete Slab-Column Connection Subjected to Punching Shear with FRP Systems IACSIT International Journal o Engineering and Tehnology, Vol. 5, No., Deember 2013 Strengning o Reinored Conrete Slab-Column Connetion Subjeted to Punhing Shear with FRP Systems G. I. Khaleel, I. G. Shaaban,

More information

Fundamentals of Door Installation START

Fundamentals of Door Installation START Fundamentals of Door Installation START Course Description This program provides a general overview of best-practice installation procedures for wood and clad/wood doors, including a discussion on opening

More information

Repair and strengthening of masonry walls with openings using FRP laminates

Repair and strengthening of masonry walls with openings using FRP laminates Repair and strengthening of masonry walls with openings using FRP laminates A Moussa*, Helwan University, gypt A M Aly, Helwan University, gypt 26th Conferene on OUR WORLD COCRT & STRUCTURS: 27-28 August

More information

Comparison Study of Connector and Tubing Blow-Off Line

Comparison Study of Connector and Tubing Blow-Off Line PROCEEDINGS Comparison Study of Connetor and Tubing Blow-Off Line Pressures Jerry D. Leaf, Charles Dyson, Robert Emerson UCLA Medial Center, Department of Surgery, Division of Thorai Surgery Abstrat The

More information

Moisture Considerations for Insulated Building Assemblies

Moisture Considerations for Insulated Building Assemblies PHRC Webinar Series Tuesday, November 10, 2015 @ 1pm Description Moisture Considerations for Insulated Building Assemblies Brian Wolfgang Housing Systems Specialist One critical design consideration in

More information

breathability to prevent the potential for moisture condensation within exterior walls...

breathability to prevent the potential for moisture condensation within exterior walls... Provides Part of a Complete Moisture Control System Jumbo Tex is part of a complete Moisture Control System for walls engineered by the Fortifiber Building Systems Group, which has been chosen by builders

More information

COCCUS Farm 75 kw Small Biogas Plant for Livestock Farmers

COCCUS Farm 75 kw Small Biogas Plant for Livestock Farmers COCCUS Farm 75 kw Small Biogas Plant for Livestok Farmers Plant tehnology Fig. similar COCCUS Farm 75 kw The COCCUS Farm 75 kw plant allows even small farms to reate a seondary soure of inome. COCCUS Farm

More information

Perhaps you ve never worried about what s underneath your shingles and siding.

Perhaps you ve never worried about what s underneath your shingles and siding. Perhaps you ve never worried about what s underneath your shingles and siding. We think you never should. That s because ZIP System roof and wall sheathing can give your home a second line of defense.

More information

Henry Blueskin VP160 Air Barrier System Installation Manual

Henry Blueskin VP160 Air Barrier System Installation Manual Henry Blueskin VP160 Air Barrier System Installation Manual Building Envelope Systems 1 Effective 09/28/2017 US Supersedes all previous versions Table of contents 1. Introduction...3 1.01 Air barrier considerations...3

More information

Suspended ceiling with visible T-sections

Suspended ceiling with visible T-sections Suspended eiling with visible T-setions a E E E max. 300 mm a m Hanger spaing 1 Hanging system: Rihter System 11.2 D 2 E C 26 C Main setion spaing E A Suspended eiling with visible T-setions Produts Table

More information

General. Moisture. Secondary Water-Resistive Barrier. Storage. Gaps & Sealants. Stud Spacing. Flashing, Windows, Doors & Openings

General. Moisture. Secondary Water-Resistive Barrier. Storage. Gaps & Sealants. Stud Spacing. Flashing, Windows, Doors & Openings application instructions STRAND SUBSTRATE 38, 76 AND 190 SERIES PRIMED PANEL SIDING INCLUDING SILVERTECH & SMARTFINISH General At the time of manufacture, siding meets or exceeds the performance standards

More information

Senergy Platinum CI Stucco Typical details for an impact resistant cement plaster stucco system featuring Neopor GPS Plus Rigid Insulation Board

Senergy Platinum CI Stucco Typical details for an impact resistant cement plaster stucco system featuring Neopor GPS Plus Rigid Insulation Board Senergy Platinum CI Stucco Typical details for an impact resistant cement plaster stucco system featuring Neopor GPS Plus Rigid Insulation Board NOTES Senergy Platinum CI Stucco Typical details for an

More information

Strength of Glass from Hertzian Line Contact

Strength of Glass from Hertzian Line Contact Strength of Glass from Hertzian Line Contat Wenrui Cai, Brian Cuerden, Robert E. Parks, James H. Burge College of Optial Sienes, University of Arizona, Tuson, AZ USA 85721 Phone: 52-626-486, 52-621-8182

More information

Field Determination of Water Penetration of Windows using Blowerdoor and Infrared Camera

Field Determination of Water Penetration of Windows using Blowerdoor and Infrared Camera Field Determination of Water Penetration of Windows using Blowerdoor and Infrared Camera Walter Sebastian BMT Building Enviroment Consultants Ltd., Doktor Neergaards Vej 15, DK-2970 Hoersholm, Denmark

More information

Finestone Stucco Ultra Wall System

Finestone Stucco Ultra Wall System Finestone Stucco Ultra Wall System Premium impact and puncture resistant, rain screen design cement plaster stucco system with enhanced water management Typical Details BLANK PAGE Finestone Stucco Ultra

More information

Energy Saving Opportunities through Heat Recovery from Cement Processing Kilns: A Case Study

Energy Saving Opportunities through Heat Recovery from Cement Processing Kilns: A Case Study Energy Saving Opportunities through Heat Reovery from Cement Proessing Kilns: A Case Study I. I. AL-HINTI a, A. AL-GHANDOOR b, A. AL-NAJI, M. ABU-KHASHABEH, M. JOUDEH, M. AL-HATTAB a Department of Mehanial

More information

Paint Failure Blues 2017, Jeffrey C. May

Paint Failure Blues 2017, Jeffrey C. May 1 Paint Failure Blues 2017, Jeffrey C. May Indoor air quality (IAQ) problems occur inside a building for a number of reasons that include the presence of mold as well as a food chain, with mites at the

More information

Article publié par le Laboratoire de Construction en Béton de l'epfl. Paper published by the Structural Concrete Laboratory of EPFL

Article publié par le Laboratoire de Construction en Béton de l'epfl. Paper published by the Structural Concrete Laboratory of EPFL Artile publié par le Laboratoire de Constrution en Béton de l'epfl Paper published by the Strutural Conrete Laboratory of EPFL Title: Effet of load distribution and variable depth on shear resistane of

More information

PROPERTIES OF SRP COMPOSITES AND THEIR EFFECT ON DESIGN PROCEDURES

PROPERTIES OF SRP COMPOSITES AND THEIR EFFECT ON DESIGN PROCEDURES PROPERTIES OF SRP COMPOSITES AND THEIR EFFECT ON DESIGN PROCEDURES Rafał Krzywoń PhD MsC Silesian University of Tehnology, Poland rafal.krzywon@polsl.pl Summary Desribed in the paper omposites are based

More information

FMA_AAMA_WDMA Installation Committee Update FMA Conference May 8, Naples, FL. Jim Katsaros FMA_AAMA_WDMA Installation Committee

FMA_AAMA_WDMA Installation Committee Update FMA Conference May 8, Naples, FL. Jim Katsaros FMA_AAMA_WDMA Installation Committee FMA_AAMA_WDMA Installation Committee Update FMA Conference May 8, 2013 - Naples, FL Jim Katsaros FMA_AAMA_WDMA Installation Committee Representing the FMA/AAMA/WDMA Installation Coordination Committee:

More information

Crawl Space Moisture Control

Crawl Space Moisture Control Crawl Space Moisture Control Crawl space foundations are found in many homes. Typically, these foundation types are equipped with operable vents designed to provide ventilation for moisture control. Unfortunately,

More information

LP SmartSide Perfection Shingle

LP SmartSide Perfection Shingle Application Instructions Fiber Substrate Lap Siding A A - Lap Siding ON SITE STORAGE Store off the ground well supported, on a flat well-drained surface. (Diagram 1a) Additional support may be required

More information

Margaret Batts Tobin Laboratory

Margaret Batts Tobin Laboratory Roof Evaluation of Margaret Batts Tobin Laboratory The University of Texas At San Antonio Performed for UTSA Zero/Six Consulting, LLC 8423 Stewart Road Galveston, Texas 77554 409 740 0090 voice Table of

More information

Building Envelope Systems Exam Learning Objectives

Building Envelope Systems Exam Learning Objectives Building Envelope Systems Exam Learning Objectives Roofing Nomenclature 1. Define the following roofing terms: low, flat, sloped, conventional, protected/inverted, hybrid, BUR, modified bitumen, PVC, TPO,

More information

SURESILL WATER MANAGEMENT GUIDE

SURESILL WATER MANAGEMENT GUIDE THE SURE LEVEL OF PROTECTION SURESILL WATER MANAGEMENT GUIDE FOR WINDOWS AND DOORS *1 SLOPED SILL PAN ASSEMBLY Cut the channel plate ¼ smaller than the rough opening. Check the fit with end caps before

More information

STORAGE AND TRANSPORTION

STORAGE AND TRANSPORTION Content 1. General & Notes 2. Substrate Processing 3. Panel Layout 4. Tools 5. Screws 6. Installation instructions 7. Cleaning 8. FAQS 8. MSDS General & Notes In comparison to natural or cast stone, Questone

More information

KE double wall transport anchors

KE double wall transport anchors for better solutions... KE double wall transport anhors The safe transport anhor for double walls KE Ttransport anhors - Transport double walls seurely www.h-bau.de Contat Oslo Helsinki Mosow London Warsaw

More information

Smart Vapor Retarders

Smart Vapor Retarders CertainTeed Smart Vapor Retarders Insulation B UILDING S CIENCE SMART VAPOR RETARDERS: A TECHNOLOGY PRIMER For years, builders have relied on a dual climate-zone classification for the placement of vapor

More information

THE ENERGY DISSIPATION EFFECTS OF REDUNDANT MEMBERS IN SILOS UNDER EARTHQUAKES

THE ENERGY DISSIPATION EFFECTS OF REDUNDANT MEMBERS IN SILOS UNDER EARTHQUAKES 269 THE ENEGY DISSIPATION EFFECTS OF EDUNDANT MEMBES IN SILOS UNDE EATHQUAKES Li Zhiming 1 and Geng Shujiang 1 SUMMAY An analytial study is made the response to strong base motion reinfored onrete silo

More information

Bridge Element Deterioration Rates

Bridge Element Deterioration Rates TRANSPORTATION RESEARCH RECORD 149 9 Bridge Element Deterioration Rates lmad J. ABED-AL-RAHIM AND DAVID W. JOHNSTON Prediting the deterioration rates of bridge elements is an important?ponent of any ridge

More information

Closed-Cell Spray Foam Insulation. Performance in Residential and Commercial Buildings During Adverse Weather

Closed-Cell Spray Foam Insulation. Performance in Residential and Commercial Buildings During Adverse Weather Closed-Cell Spray Foam Insulation Performance in Residential and Commercial Buildings During Adverse Weather July, 2006 Although all statements and information contained herein are believed to be accurate

More information

European Regulations For Multilayer Food Contact Materials. Dr. Hermann Onusseit Henkel KGaA Düsseldorf, Germany ABSTRACT

European Regulations For Multilayer Food Contact Materials. Dr. Hermann Onusseit Henkel KGaA Düsseldorf, Germany ABSTRACT European Regulations For Multilayer Food Contat Materials Dr. Hermann Onusseit Henkel KGaA Düsseldorf, Germany ABSTRACT Artiles and failities whih ome into ontat with food are subjet to speial demands.

More information

SAVANNAH TRIMS st STREET N., SUITE 4 LAKE PARK, FLORIDA

SAVANNAH TRIMS st STREET N., SUITE 4 LAKE PARK, FLORIDA M.O. R.O. F.S. A.F.F. STL ALUM HORIZ VERT ELEV. N.T.S. G.. ARH. P.S.F. REQ'D TYP. ABBREVIATIONS MASONRY OPENING ROUGH OPENING FRAME SIZE DAYLIGHT OPENING ABOVE FINISHED FLOOR STEEL ALUMINUM HORIZONTAL

More information

Optimizing the Allocation of Marketing Promotional Contacts

Optimizing the Allocation of Marketing Promotional Contacts Optimizing the Alloation of Marketing Promotional Contats Keith Hermiz, Ph.D., IBM Helene Miller, IBM Dhanesh Padmanabhan, Marketis Tehnologies Abstrat The typial marketing environment in the business-to-business

More information

INSULATION OWENS CORNING INSULATION PRODUCTS IN THIS SECTION:

INSULATION OWENS CORNING INSULATION PRODUCTS IN THIS SECTION: OWENS CORNING PRODUCTS What exactly is an insulating system? The answer starts with the role insulation plays in your home. All insulating products are based on a single basic principle: heat moves from

More information

Pella 250 Series. Wood Frame Construction with Vinyl Siding... V250-ID-888 Wood Frame Construction with Brick Veneer...

Pella 250 Series. Wood Frame Construction with Vinyl Siding... V250-ID-888 Wood Frame Construction with Brick Veneer... SECTION DIRECTORY General Information Introduction... V250-ID-886 Installation Accessories and Applications... V250-ID-886 Typical Sealant Placement Details... V250-ID-887 Fin Installation Details Wood

More information

DuPont RainVent Batten Installation Guidelines

DuPont RainVent Batten Installation Guidelines DuPont RainVent Batten Installation Guidelines Purpose: To improve the ventilation and draining space behind a cladding system or 3-coat stucco system in residential construction. The DuPont RainVent Batten

More information

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco

More information

Architecture of an ERP System Supporting Project-Oriented Management

Architecture of an ERP System Supporting Project-Oriented Management Arhiteture of an ERP System Supporting Projet-Oriented Management Willy Piard and Grzegorz Wojiehowski Department of Information Tehnology The Poznań University of Eonomis ul. Mansfelda 4 60-854 Poznań,

More information

Keywords: Greenhouse; Thermal performance; Water pipes heating; Infrared radiation; Energy balance; Heating efficiency

Keywords: Greenhouse; Thermal performance; Water pipes heating; Infrared radiation; Energy balance; Heating efficiency International Symposium Greensys 7 "High Tehnology for Greenhouse system Management" Naples Italy, 4-6 Otober 7 Investigation of the Potential of Infrared-radiation (IR) to Redue Energy Consumption in

More information

SPECIFICATION GUIDELINE

SPECIFICATION GUIDELINE SPECIFICATION GUIDELINE Environmental Stoneworks Corporate Office 6300 East Stapleton Drive South Denver, CO 80216 Phone (303) 309-3040 Fax (303) 309-3059 www.estoneworks.com Environmental Stoneworks specification

More information

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A.M. Uhrmacher, eds

Proceedings of the 2012 Winter Simulation Conference C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, and A.M. Uhrmacher, eds Proeedings of the 2012 Winter Simulation Conferene C. Laroque, J. Himmelspah, R. Pasupathy, O. Rose, and A.M. Uhrmaher, eds INDUSTRIAL IMPLEMENTATION OF A DYNAMIC SAMPLING ALGORITHM IN SEMICONDUCTOR MANUFACTURING:

More information

Installation Guidelines for Adhered Concrete Masonry Veneer

Installation Guidelines for Adhered Concrete Masonry Veneer Installation Guidelines for Adhered Concrete Masonry Veneer Installation Guidelines for Adhered Concrete Masonry Veneer Page 1 Contents Definitions 3 Abbreviations 3 References 4 Summary Table 5 Workmanship

More information

Insight. Drainage, Holes and Moderation. By Joseph W. Lstiburek, Ph.D., P.Eng., Fellow ASHRAE

Insight. Drainage, Holes and Moderation. By Joseph W. Lstiburek, Ph.D., P.Eng., Fellow ASHRAE Drainage, Holes and Moderation Insight Drainage, Holes and Moderation An edited version of this Insight first appeared in the ASHRAE Journal. cup. But lo and behold, even though some raindrops enter the

More information

Accepted Manuscript. Factors affecting moment redistribution at ultimate in continuous beams prestressed with external CFRP tendons

Accepted Manuscript. Factors affecting moment redistribution at ultimate in continuous beams prestressed with external CFRP tendons Aepted Manusript Fators affeting moment redistribution at ultimate in ontinuous beams prestressed with external CFRP tendons Tiejiong Lou, Sergio M.R. Lopes, Adelino V. Lopes PII: S1359-8368(14)00205-4

More information

NCMA TEK TEK 19-5A FLASHING DETAILS FOR CONCRETE MASONRY WALLS

NCMA TEK TEK 19-5A FLASHING DETAILS FOR CONCRETE MASONRY WALLS NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology FLASHING DETAILS FOR CONCRETE MASONRY WALLS TEK 19-5A Water Penetration Resistance

More information

Slab edge insulation is one of

Slab edge insulation is one of How to Properly Insulate a Slab Presented by: Mike Turns, Associate Director, PHRC Tuesday, April 10, 2012 1:00 PM www.enrg.psu.edu/phrc 4 Slab edge insulation is one of the most abused details in construction.

More information

ESR-2072 Reissued September 1, 2013 This report is subject to renewal September 1, 2015.

ESR-2072 Reissued September 1, 2013 This report is subject to renewal September 1, 2015. ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-2072 Reissued September 1, 2013 This report is subject to renewal September 1, 2015. A Subsidiary of the International Code Council

More information

Water Intrusion Into Buildings Forensic Investigations

Water Intrusion Into Buildings Forensic Investigations Water Intrusion Into Buildings Forensic Investigations How does water flow? Let me count the ways. Major building structural and operational failures are caused by three problems: water, water, and water.

More information

Technical Notes 28 - Anchored Brick Veneer, Wood Frame Construction Rev August 2002

Technical Notes 28 - Anchored Brick Veneer, Wood Frame Construction Rev August 2002 Technical Notes 28 - Anchored Brick Veneer, Wood Frame Construction Rev August 2002 Abstract: This Technical Notes deals with the prescriptive design of brick veneer with wood frame construction in buildings

More information

WATERPROOFING TAMKOWATERPROOFING.COM

WATERPROOFING TAMKOWATERPROOFING.COM WATERPROOFING TAMKOWATERPROOFING.COM DIVISION 7 Powerful Water Control Using the same SBS-modified technology we pioneered in the 1970s, TAMKO continues to raise the standard in waterproofing to help you

More information

Beam-Column Connections. Joint shear strength - code-conforming joints - Joint damage in previous eq. φ = Force demands on joint

Beam-Column Connections. Joint shear strength - code-conforming joints - Joint damage in previous eq. φ = Force demands on joint Beam-Column Connetions Fore demands on joint T s1 = 1.2A s f y C 2 = T s2 V b1 V b2 Dawn Lehman John Stanton and Laura Lowes Uniersity of Washington, Seattle Jak Uniersity of California, Berkeley l M pr

More information

Roofing Underlayment Systems

Roofing Underlayment Systems Roofing Underlayment Systems New Construction, Additions and Repairs Commercial, Residential or Institutional Applications Self-Adhering and Self-Sealing Overall Weather and Waterproofing Secondary Water

More information

REPORT HOLDER: COREV AMERICA BRITTMOORE PARK DRIVE HOUSTON, TEXAS EVALUATION SUBJECT:

REPORT HOLDER: COREV AMERICA BRITTMOORE PARK DRIVE HOUSTON, TEXAS EVALUATION SUBJECT: 0 Most Widely Accepted and Trusted ICC ES Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 2000 Reissued 02/2017 This report is subject to renewal 02/2019. DIVISION: 07 00 00 THERMAL

More information

TESTING APPLICATION STANDARD (TAS) No TEST PROCEDURE FOR WIND AND WIND DRIVEN RAIN RESISTANCE OF DISCONTINUOUS ROOF SYSTEMS

TESTING APPLICATION STANDARD (TAS) No TEST PROCEDURE FOR WIND AND WIND DRIVEN RAIN RESISTANCE OF DISCONTINUOUS ROOF SYSTEMS TESTING APPLICATION STANDARD (TAS) No. 100-95 TEST PROCEDURE FOR WIND AND WIND DRIVEN RAIN RESISTANCE OF DISCONTINUOUS ROOF SYSTEMS 1. 2. Scope 1.1 This Protocol covers the determination of the water infiltration

More information

BBR VT CONA CMI BT. Internal Post-tensioning System with 02 to 61 Strands. European Technical Approval ETA 09/0286

BBR VT CONA CMI BT. Internal Post-tensioning System with 02 to 61 Strands. European Technical Approval ETA 09/0286 BBR VT with 02 to 61 Strands European Tehnial Approval ETA 09/0286 0432 BBR VT with 02 to 61 Strands BBR VT International Ltd Bahnstrasse 23, 8603 Shwerzenbah (Switzerland) www.bbrnetwork.om S P E C I

More information

Integrated Air & Water Barrier Systems

Integrated Air & Water Barrier Systems Integrated Air & Water Barrier Systems Presented by [ Jeff Presenter s Key, Georgia-Pacific Name ] Wood Products AIA Course: GP-FF-WRBAB Credit Designation: LU HSW Please add relevant logo here Disclaimer:

More information

Finestone Stucco System

Finestone Stucco System Typical Details Finestone Stucco System Cement Plaster Stucco 1. Typical Finestone Stucco System with Steel Framing 2. Typical Finestone Stucco System with Wood Framing 3. Typical Finestone Stucco System

More information

Magnum Board Section Digicon Information Inc. Page 1

Magnum Board Section Digicon Information Inc. Page 1 Digicon Information Inc. Page 1 This section includes sheathing for exterior walls for use in a potentially damp or wet exterior cladding environment. This sheathing section forms an exterior flat plane

More information

2013 COMMERCIAL PRODUCTS

2013 COMMERCIAL PRODUCTS 2013 COMMERCIAL PRODUCTS EXPLORE GEOMETRY AND SPACE WITHOUT COMPROMISING BUILDING ENVELOPE PERFORMANCE Commercial design considerations come with very specific challenges that can t be addressed with just

More information

Acceptable Floor Substrates: Concrete, cured mortar bed, plywood, and backer board.

Acceptable Floor Substrates: Concrete, cured mortar bed, plywood, and backer board. SECTION 093000 - SHEET MEMBRANE WATERPROOFING PART 1 - GENERAL This specification includes the sheet membrane used as waterproofing and vapor retarder, in conjunction with tile and dimension stone installations.

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION SECTION: WATER-RESISTIVE BARRIERS/WEATHER BARRIERS

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION SECTION: WATER-RESISTIVE BARRIERS/WEATHER BARRIERS 0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-1504 Reissued 03/2017 This report is subject to renewal 03/2018. DIVISION: 07 00

More information

Differences between EnCon Insulated Precast and EIFS

Differences between EnCon Insulated Precast and EIFS Differences between EnCon Cover Differences between EnCon EnCon produces a number of different insulated precast concrete products. They range from Insulated Wall panels, Styrocore Insulated Wall Panels,

More information

DENSIFICATION OF SELECTIVE LASER SINTERED METAL PARTS BY HOT ISOSTATIC PRESSING ABSTRACT INTRODUCTION

DENSIFICATION OF SELECTIVE LASER SINTERED METAL PARTS BY HOT ISOSTATIC PRESSING ABSTRACT INTRODUCTION DENSIFICATION OF SELECTIVE LASER SINTERED METAL PARTS BY HOT ISOSTATIC PRESSING Mukesh K. Agarwala, and David L. Bourell, Center for Materials Siene and Engineering, Joseph J. Beaman, Department ofmehanial

More information

MULTI-FAMILY USER S BULLETIN FOR INSTALLATION OF DUPONT WEATHERIZATION SYSTEMS PRODUCTS

MULTI-FAMILY USER S BULLETIN FOR INSTALLATION OF DUPONT WEATHERIZATION SYSTEMS PRODUCTS USER S BULLETIN MULTI-FAMILY USER S BULLETIN FOR INSTALLATION OF DUPONT WEATHERIZATION SYSTEMS PRODUCTS CONTENTS Introduction...1 Use of this Residential Multi-Family User s Bulletin...1 DuPont Multi-Family

More information

Engineering Properties of Manganese-Treated Asphalt Mixtures

Engineering Properties of Manganese-Treated Asphalt Mixtures 56 Transportation Researh Reord 134 Engineering Properties of Manganese-Treated Asphalt Mixtures THOMAS W. KENNEDY and JON EPPS ABSTRACT An experimental program as onduted to evaluate the engineering properties

More information

Exterior Stucco and Siding Installation

Exterior Stucco and Siding Installation Exterior Stucco and Siding Installation CITY OF NEWARK, CALIFORNIA BUILDING INSPECTION DIVISION 37101 Newark Boulevard, Newark, CA 94560-3796 510-578-4261 Fax 510-578-4307 e-mail: building.inspection@newark.org

More information

NEXT GENERATION HIGH PERFORMANCE WALLS

NEXT GENERATION HIGH PERFORMANCE WALLS CONSTRUCTION GUIDE NEXT GENERATION HIGH PERFORMANCE WALLS CLIMATE ZONES 3-5 PART 2: 2X4 Walls with 1" 1.5" Exterior Insulative Sheathing V. Kochkin and J. Wiehagen Home Innovation Research Labs June 2017

More information

ELEVATION FOR DETAIL REFERENCE ONLY

ELEVATION FOR DETAIL REFERENCE ONLY 6 7 8 10 OUTSIDE CORNER 19 20 4 5 11 21 22 15 16 13 12 OPENING 14 SOFFIT 18 END WALL 17 INSIDE CORNER 9 6 7 8 ELEVATION FOR DETAIL REFERENCE ONLY CCV-01 CCV-02 CCV-03 CCV-04 CCV-05 CCV-06 CCV-07 CCV-08

More information

Mechanical properties of zirconia-titanium composites

Mechanical properties of zirconia-titanium composites International Journal of Materials Siene and Appliations 24; 3(5): 26-267 Published online September 3, 24 (http://www.sienepublishinggroup.om/j/ijmsa) doi:.648/j.ijmsa.2435.28 ISSN: 2327-2635 (Print);

More information

1 Exam Prep Prov Module: Thermal and Moisture Protection Questions and Answers

1 Exam Prep Prov Module: Thermal and Moisture Protection Questions and Answers 1 Exam Prep Prov Module: 27203-13 Thermal and Moisture Protection Questions and Answers 1. The R-value is a measure of the ability of a material to. A. Resist the passage of moisture B. Resist heat conduction

More information

WAER QUALITY CAPTURE VOLUME FOR STORMWATER BMP and LID DESIGNS

WAER QUALITY CAPTURE VOLUME FOR STORMWATER BMP and LID DESIGNS Guo, James C. Y. Urbonas, B. and MaKenzie K. (2012) Water Quality Capture Volume for LID and BMP Designs, HEENG- 1539, aepted for publiation on ASCE J of Hydrologi Engineering, Ot, 2012 WAER QUALITY CAPTURE

More information

Background. BSC Website Builder Resources. Building America Innovations

Background. BSC Website Builder Resources. Building America Innovations Building America Innovations 1. Advanced Technologies & Practices 2. House as a System Business Case 3. Effective Guidance and Tools 4. Infrastructure Development Kohta Ueno Internal Insulation of Masonry

More information

Avoiding Air Barrier Pitfalls When sub-trade activities are not in sync with air barrier requirements, installation can go poorly.

Avoiding Air Barrier Pitfalls When sub-trade activities are not in sync with air barrier requirements, installation can go poorly. 48 D+D NOVEMBER 2013 Building Envelope Avoiding Air Barrier Pitfalls When sub-trade activities are not in sync with air barrier requirements, installation can go poorly. By Brian H. Neely, AIA, CDT, CBST,

More information

Tapper Concrete Scew Anchor Type 410 & 304 Stainless Steel

Tapper Concrete Scew Anchor Type 410 & 304 Stainless Steel Conrete Sew Type 4 & 304 PRODUCT DESCRIPTION The fastening system is a family of srew anhors for light to meium uty appliations in onrete, masonry blok an brik base materials. The is fast an easy to install

More information

Chapter 2 Understanding The Problem

Chapter 2 Understanding The Problem Chapter 2 Understanding The Problem What Causes Most Of The Problems With Stucco? EIFS was originally intended to seal and insulate the exterior of the home from the elements. Problems occur when poorly

More information

CRITERIA FOR TESTING IMPACT & NON IMPACT RESISTANT BUILDING ENVELOPE COMPONENTS USING UNIFORM STATIC AIR PRESSURE

CRITERIA FOR TESTING IMPACT & NON IMPACT RESISTANT BUILDING ENVELOPE COMPONENTS USING UNIFORM STATIC AIR PRESSURE TESTING APPLICATION STANDARD (TAS) 202-94 CRITERIA FOR TESTING IMPACT & NON IMPACT RESISTANT BUILDING ENVELOPE COMPONENTS USING UNIFORM STATIC AIR PRESSURE 1. Scope 1.1 This protocol covers procedures

More information

Finite Element Modeling of Cyclic Behavior of Shear Wall Structure Retrofitted using GFRP

Finite Element Modeling of Cyclic Behavior of Shear Wall Structure Retrofitted using GFRP SP-230 74 Finite Element Modeling of Cyli Behavior of Shear Wall Struture Retrofitted using GFRP by Z.J. Li, T. Balendra, K.H. Tan, and K.H. Kong Synopsis: In this paper, a non-linear 3-D finite element

More information

Throughout the balance of this paper the terms attic and roof will and can be used interchangeably.

Throughout the balance of this paper the terms attic and roof will and can be used interchangeably. Understanding Attic Ventilation Attics or roofs can be designed and constructed to be either vented or unvented in any hygro-thermal zone (Map 1). The choice of venting or not venting is a design and construction

More information

20 questions on genetically modified foods

20 questions on genetically modified foods Page 1 of 6 Searh All WHO This site only Home About WHO Countries Health topis Publiations Data and statistis Programmes and projets Food Safety Zoonoses Mirobiologial risks Chemial risks Biotehnology

More information

BUILDINGS & PHOTOVOLTAICS GRID-CONNECTED PV-SYSTEMS

BUILDINGS & PHOTOVOLTAICS GRID-CONNECTED PV-SYSTEMS Bekaert ECD Solar Systems LLC R BUILDINGS & PHOTOVOLTAICS GRID-CONNECTED PV-SYSTEMS Unique Photovoltai Tehnology based on: Shingles Metal Roofing Framed Power Modules UNI-SOLAR ROOFING SYSTEMS The leader

More information

ENGINEERED DESIGN OF SIP PANELS USING NTA LISTING REPORT DATA

ENGINEERED DESIGN OF SIP PANELS USING NTA LISTING REPORT DATA ENGINEERED DESIGN OF SI ANELS USING NTA LISTING REORT DATA 1. SCOE 1.1. GENERAL This doument applies to strutural insulated panels (SIs), whih shall be deined as a strutural aing material with a oam ore.

More information

2018 British Columbia Building Code Public Review of Proposed Changes

2018 British Columbia Building Code Public Review of Proposed Changes 2018 British Columbia Building Code Public Review of Proposed Changes PROPOSED CHANGE: Asbestos CHANGE NUMBER: 2018-BCBC-03-Asbestos CODE REFERENCE: 2015 National Building Code Division B Various Articles

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: WATER RESISTIVE BARRIERS/WEATHER BARRIERS SECTION: AIR BARRIERS

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: WATER RESISTIVE BARRIERS/WEATHER BARRIERS SECTION: AIR BARRIERS 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 2375 Reissued 10/2017 This report is subject to renewal 10/2018. DIVISION: 07 00