TENANT CRITERIA MANUAL INSERT PHOTO HERE

Size: px
Start display at page:

Download "TENANT CRITERIA MANUAL INSERT PHOTO HERE"

Transcription

1 G TENANT CRITERIA MANUAL GREENWOOD MALL INSERT PHOTO HERE General Growth Properties, Inc. 110 N. Wacker Drive Chicago, IL (312)

2

3

4

5

6

7

8

9

10

11 Tenant shall supply and install an electrical meter within their demised premises.

12

13

14

15

16

17

18

19

20 ARCHITECTURAL DETAILS STOREFRONT ELEVATION 17 GREENWOOD MALL

21 ARCHITECTURAL DETAILS NEUTRAL PIER PLAN DETAIL GREENWOOD MALL 18

22 ARCHITECTURAL DETAIL TENANT HALO SIGN SECTION DIAGRAM 19 GREENWOOD MALL

23 ARCHITECTURAL DETAIL TYPICAL DEMISING PARTITION GREENWOOD MALL 20

24 ARCHITECTURAL DETAIL TENANT S REAR ALCOVE SECTION PLAN 21 GREENWOOD MALL

25 ARCHITECTURAL DETAIL TYPICAL SOUND DEMISING PARTITION GREENWOOD MALL 22

26 ARCHITECTURAL DETAIL TYPICAL FLOOR TRANSITION METAL TRANSITION FLUSH FLOOR TRANSITION Note: Vinyl and rubber transition strips are not allowed on the sales area. 23 GREENWOOD MALL

27 FOOD COURT LEASE PLAN GREENWOOD MALL 24

28 ARCHITECTURAL DESIGN CRITERIA FOOD COURT TENANTS FOOD COURT DESIGN CRITERIA Tenants are encouraged to develop a unique and innovated design and not a traditional franchise look. It is Landlord s intent that food court tenants convey an open market atmosphere and therefore it is important that Tenant s design shall be compatible with neighboring tenants. Note: All food court tenants must comply with all health regulations and applicable ordinances of Local Jurisdiction. DESIGN CONTROL ZONE CRITERIA The front service area from the food court lease line has been designated as a control zone area. All food court tenants must comply with this criteria. Countertop: The front counter shall be constructed of solid core surfacing material. Recesses in the top counter surfaces for cash registers, food trays, drink dispensers etc. must be set back a minimum of 8 from the front edge of the counter. Beverage machines and all other miscellaneous equipment on the front counter are subject to design review. Equipment must be screened and recessed into the countertop, not to exceed 4-0 in height. Sneeze guards, shall be architecturally compatible with counter design and in accordance with code. Provide concealed lighting, in counter designs where appropriate. Countertop Materials: Brushed stainless steel. Natural stone (i.e., marble, granite, slate). Glazed ceramic tile. Solid surface (i.e., Corian, Avonite). Wood with clear finish. Laminate countertops are not acceptable. Ceiling: Tenant shall provide a nonporous washable ceiling. Painted gypsum board, metal or a sealed wood ceiling shall be used in the control zone area. Lay-in ceilings are not acceptable in the control zone area. Lighting: Provide accent lighting at the countertop using recessed incandescent or pendent type fixtures. Provide recessed incandescent fixtures and concealed sprinkler heads within the control zone. Fluorescent lighting is not acceptable in the control zone. 25 GREENWOOD MALL

29 ARCHITECTURAL DESIGN CRITERIA FOOD COURT TENANTS Flooring: Provide a ceramic or quarry tile floor and cove tile base within the control zone area. Walls: All wall materials shall be washable and nonporous (i.e., epoxy paint, ceramic tile, stainless steel). Provide a food preparation screen wall with service door separating the service and food preparation areas. Service door shall be self-closing to shield the back room from public view. Mirrored walls are not acceptable within control zone area. Menu Board: Menu boards shall be integrated into the overall store design. Menu boards shall be recessed or surface mounted onto the preparation screen wall. Menu Board must be illuminated either internally or externally whichever is best in keeping with the design theme of the store, at Landlord s sole discretion. STORE INTERIOR DESIGN CRITERIA The use of quality materials for flooring, walls, ceiling and lighting is required and are subject to Landlord s approval. Ceiling: Tenant shall provide a nonporous washable ceiling. Open ceilings are not acceptable Lay-in tile and grid per Landlord and Health Department approval. Lighting: Fluorescent type lighting is acceptable. Floors: All materials shall be of a washable nonporous surface. Ceramic or quarry tile floor and cove tile base in food preparation area. Second floor tenants to provide a waterproof protective membrane turned up to base height throughout entire space. Walls: All wall materials shall be washable and nonporous (i.e., epoxy paint, ceramic tile, fiber reinforced plastic, stainless steel). All walls below overhead hood shall be covered from base to hood with stainless steel over cement board over required wall construction). GREENWOOD MALL 26

30 ARCHITECTURAL DESIGN CRITERIA FOOD COURT TENANTS SIGNAGE DESIGN CRITERIA Signage is a major visual element to be provided by the Tenant. Particular attention should be given to signage and graphics as they are an important part of the over all design theme. All signage is subject to Landlord approval. Landlord reserves the right to disapprove any signage that does not comply with Landlord s criteria. Signage Requirements: All wiring conduit, cabinets, transformers, etc. must be concealed. One major sign and one blade sign per storefront elevation. Limited to the tenant s trade name as defined in the lease. Letter height shall 16 maximum. All signage must be installed as per code. Signage shall be time clock controlled and illuminated during center hours. Signage shall be supported from structure and be independent of the bulkhead framing. Acceptable Major Signs: All major tenant signs are to be hung from above and designed in an Open Style per page 28. Blade Signs: Tenant shall provide unique non-illuminated blade sign. Signs are encouraged to take the shape of the Tenant s trademark or logo. Blade signs with min 60% open area may be up to 15sf with max width of 6 and max. height of 30. Blade signs with min 0% open area may be up to 8sf with max width of 4 and max. height of 24. Blade signs are to be provided by the tenant and are to be hung from the mall armature. Neon Requirements: PK Housings required with neon. If exposed neon, paint end of PK to match adjacent surface. Provide clear standoffs. Use no double backs if possible. If double backs are required, keep to a minimum quantity: paint out to match adjacent surface. Exposed neon shall be on a rheostat dimmer. All exposed neon shall be mid-point grounded at each transformer. Unacceptable Sign Types: Animated. Vacuum formed luminous letters. Can signs. Box signs. Foam core. Note: Exposed conduits, uncovered raceways, ballast boxes, electrical transformers and sign company names are not permitted. 27 GREENWOOD MALL

31 FOOD COURT DETAIL STOREFRONT OPEN STYLE SIGN DETAIL GREENWOOD MALL 28

32 FOOD COURT DETAIL STOREFRONT ELEVATION 29 GREENWOOD MALL

33 FOOD COURT DETAIL SPACES F1-F4 ROOFTOP LIMIT ZONE GREENWOOD MALL 30

34 FOOD COURT DETAIL SPACES F1-F4 SECTION 31 GREENWOOD MALL

35 FOOD COURT DETAIL SPACES F5-F8 SECTION GREENWOOD MALL 32

36 FOOD COURT DETAIL NEUTRAL PIER PLAN DETAIL 33 GREENWOOD MALL

37 FOOD COURT DETAIL NEUTRAL PIER R.C.P. DETAIL GREENWOOD MALL 34

38 FOOD COURT DETAIL LOWER NEUTRAL PIER DIAGRAM 35 GREENWOOD MALL

39 FOOD COURT DETAIL UPPER NEUTRAL PIER DIAGRAM GREENWOOD MALL 36

40

41

42

43

44

45 All new and remodeling tenants must provide and install an electrical meter that monitors all electrical consumption. Most tenants at Greenwood Mall are provided with electrical power from a roof mounted cable bus distribution system at 277/480 volts, 3 phase, 4 wire.

46

47

48

49

50

51

52

53

54

55

56 MECHANICAL / ELECTRICAL DATA TABULATION SPACE NO.: NAME OF TENANT: MALL:: GROSS LEASED AREA IN SQ. FT.: MECHANICAL CALCULATED DESIGN HEATING LOAD CALCULATED DESIGN COOLING LOAD LANDLORD ALLOCATED AIR SUPPLY CALCULATED AIR SUPPLY MAKE-UP AIR SYSTEMS (S) (IF APPLICABLE) TOTAL AIR SUPPLY TOILET EXHAUST SPECIAL EXHAUST TOTAL EXHAUST NEGATIVE / POSITIVE PRESSURE (AIR SUPPLY--EXHAUST) VARIABLE AIR VOLUME TERMINAL UNITS AIR CFM MAX. QUANTITY CALCULATED LOSS IN DUCTWORK CALCULATED S.P. LOSS IN VAV UNIT (S) TOTAL S.P. IN W.C. MBH MBH CFM CFM CFM CFM+ CFM CFM+ CFM+ CFM+ ELECTRICAL LOAD BREAKDOWN WATTS APPLIANCES (HEAT PRODUCING) WATTS RECEPTACLES WATTS EQUIPMENT WATTS H.W. HEATER WATTS SPACE HEATER WATTS MISCELLANEOUS WATTS SUBTOTAL WATTS SIGN WATTS WATTS/ SQ. FT. LIGHTING WATTS WATTS/ SQ. FT. GRAND TOTAL WATTS WATTS/ SQ. FT. DOMESTIC H.W. HEATER STORAGE NUMBER OF W.C. FIXTURE NUMBER OF LAVATORIES NUMBER OF COMMERCIAL SINKS OTHER EQUIPMENT USAGE Note: This sheet must be included in final plans PLUMBING GALLONS GFM DOCUMENT1 09/21/2001

57

TENANT DESIGN MANUAL UPDATED JULY 2015

TENANT DESIGN MANUAL UPDATED JULY 2015 TENANT DESIGN MANUAL UPDATED JULY 2015 PROJECT OVERVIEW Woodland Hills Mall is located at the intersection of East 71st Street South and South Memorial Drive, near I-64 in Tulsa. The center opened in 1976

More information

KIOSK DESIGN CRITERIA

KIOSK DESIGN CRITERIA KIOSK DESIGN CRITERIA ADDENDUM LOG July, 2008 Full Update September, 2011 Content update (image replacements and content additions) November, 2011 Grammar corrections, minor cleanup. (5, 11) January, 2012

More information

Chandler Fashion Center 3111 West Chandler Blvd., Chandler, AZ 85226

Chandler Fashion Center 3111 West Chandler Blvd., Chandler, AZ 85226 ADDENDUM LOG June, 2009 TCM Generated July, 2009 Toe kick not updated. November, 2012 Added Automatic Gas Shut-off Valve language (pg. fc19) February, 2014 Waterproof membrane language updated (fc10, fc16)

More information

Superstition Springs Center 6555 E. Southern Ave., Mesa, AZ 85206

Superstition Springs Center 6555 E. Southern Ave., Mesa, AZ 85206 ADDENDUM LOG September, 2009 Full update to current layout February, 2014 Waterproof membrane language updated (fc10, fc16) April, 2014 Carbon monoxide sensor language added (fc19) November, 2014 Drink

More information

Deptford Mall 1750 Deptford Center Rd., Deptford, NJ 08096

Deptford Mall 1750 Deptford Center Rd., Deptford, NJ 08096 ADDENDUM LOG July, 2009 Revision August, 2009 VP changes made March, 2012 Revisions per TC (fc11) October, 2012 Revised Flooring requirements (fc11) June, 2013 Revised Flooring requirements per TC (fc11-fc12)

More information

TENANT DESIGN MANUAL UPDATED JUNE 2015

TENANT DESIGN MANUAL UPDATED JUNE 2015 TENANT DESIGN MANUAL UPDATED JUNE 2015 PROJECT OVERVIEW The Fashion Mall at Keystone is located at the intersection of 86th Street and Keystone Avenue (SR 431), directly adjacent to I-465. It serves all

More information

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) Construction Criteria The unit costs for the Physical Fitness Center (Exercise Room) space type are based on the construction quality and design features in

More information

Arden Fair Mall 1689 Arden Way, Sacramento, CA 95815

Arden Fair Mall 1689 Arden Way, Sacramento, CA 95815 ADDENDUM LOG September, 2009 Update to current layout October, 2009 Updated FC content per SDM June, 2012 Updated per TC review November, 2012 Added Automatic Gas Shut-off Valve language (pg. fc20) February,

More information

Retail Tenant Criteria. San Diego International Airport San Diego County Regional Airport Authority San Diego, California

Retail Tenant Criteria. San Diego International Airport San Diego County Regional Airport Authority San Diego, California Prepared by: 400 Clifton Avenue South Minneapolis, MN 55403 Telephone: (612) 871-5703 Fax: (612) 871-7212 San Diego International Airport San Diego County Regional Airport Authority San Diego, California

More information

Updated: August 2016

Updated: August 2016 Updated: August 2016 General Submission Requirements Prior to the preparation of Tenant s Plans, Tenant shall visit the premises to verify existing conditions and construction to ensure that none of Tenant

More information

Budget Estimate Basic Tenant Improvement

Budget Estimate Basic Tenant Improvement Building work rules, conditions and insurance: 1. Review the work rules. If they are not available no budget should be provided. 2. Hours available for construction 3. Insurance requirements 4. Entities

More information

Element Z General Design Requirements Room Standards

Element Z General Design Requirements Room Standards Toilet Room Guidelines PART 1 - GENERAL 1.01 OVERVIEW A. This document provides design and construction criteria for public/patient, and staff toilet rooms at (Owner). PART 2 - DESIGN CRITERIA 2.01 GENERAL

More information

DESIGN CRITERIA INLINE RETAIL. 444 Chicago Ridge Mall Chicago Ridge IL 60415

DESIGN CRITERIA INLINE RETAIL. 444 Chicago Ridge Mall Chicago Ridge IL 60415 DESIGN CRITERIA INLINE RETAIL 444 Chicago Ridge Mall Chicago Ridge IL 60415 December 2013 It is our mission at Starwood Retail Partners to distinguish ourselves through superior performance in retail development

More information

Building Inspection Report

Building Inspection Report Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941

More information

General. Page 2 of 15

General. Page 2 of 15 General Submission Requirements Prior to the preparation of Tenant s plans, Tenant shall visit the premises to verify existing conditions and construction to ensure that none of Tenant s work shall be

More information

standard features Power Exhaust Fans w/light - Both Baths GFCI Receptacles Upgrade Light Fixture - Bath 1 Vanity - Per Lav GFCI Receptacles

standard features Power Exhaust Fans w/light - Both Baths GFCI Receptacles Upgrade Light Fixture - Bath 1 Vanity - Per Lav GFCI Receptacles 2017 standard features INTERIOR Cornice w / Full Length Drapes Panels-Main Living Areas only Shaw Moxie Carpet with Pad and Tack Designer Select Congoleum No Wax Vinyl Flooring 8 Flat Ceilings Throughout

More information

Updated: Kiosk

Updated: Kiosk Kiosk Updated: 5.31.07 KIOSK DESIGN CRITERIA MANUAL Kiosks occupy prominent locations throughout the mall common area and have a significant impact on customer perception. The goal of this manual is to

More information

MODULAR BUILDING SPECIFICATIONS

MODULAR BUILDING SPECIFICATIONS Use Group A - Assembly B Business E Education I - Institutional Construction Type Type II Non Combustible Type V - Wood Floor 12 Outrigger Frame with Cross members Frame: 12 Perimeter Steel Main Beams

More information

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards Laboratory Standards These criteria include general planning guidelines. They are intended for use of Designers during the design phases of the project. Planning Assumptions Overview In order to maximize

More information

Division 09 FINISHES TABLE OF CONTENTS

Division 09 FINISHES TABLE OF CONTENTS Division 09 FINISHES TABLE OF CONTENTS 09 1000 GENERAL... 3 A. RELATED SECTIONS... 3 B. MAINTENANCE OF FINISHES... 3 C. PUBLIC AREAS... 3 D. CUTTING AND PATCHING... 3 E. CLEANING... 3 F. RECOMMENDED FLOORING

More information

MASTER SIGN PLAN BRADFORD

MASTER SIGN PLAN BRADFORD MASTER SIGN PLAN 14-MSP-001 BRADFORD Unless exempt from regulation per Cary s Land Development Ordinance (LDO), a sign permit is required prior to the installation of all wall and ground signs. MSP identifier:

More information

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com Edouard Modern Living Made Easy uichomes.com - new construction - 3 stories + full basement - 4 bedrooms - 2.5 baths - 2,380 s.f. call 314.881.2333 or e-mail sales@uicstl.com PLAN NTS DECK 13' 0" X 12'-0"

More information

PATTAYA POSH. A chance to own the best location in North Pattaya. North Pattaya Road, Pattaya, Thailand

PATTAYA POSH. A chance to own the best location in North Pattaya. North Pattaya Road, Pattaya, Thailand PATTAYA POSH A chance to own the best location in North Pattaya North Pattaya Road, Pattaya, Thailand Pattaya Posh is a prestigious high-rise condominium development, occupying the best location in the

More information

EVENT 29: November 15, 2017 THE DO-DOs AND DON Ts OF TOILET ROOM DESIGN

EVENT 29: November 15, 2017 THE DO-DOs AND DON Ts OF TOILET ROOM DESIGN EVENT 29: November 15, 2017 THE DO-DOs AND DON Ts OF TOILET ROOM DESIGN THE DO-DOs AND DON Ts OF TOILET ROOM DESIGN - CREDIT(S) EARNED ON COMPLETION OF THIS COURSE WILL BE REPORTED TO AIA CES FOR AIA MEMBERS.

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

CENTRAL GREAT PLAINS SERIES

CENTRAL GREAT PLAINS SERIES CENTRAL GREAT PLAINS SERIES 1 2 MADE FOR LIVING A heritage of excellence. Atlantic Homes has been providing families with quality homes for generations. With a unique combination of state-of-the-art manufacturing

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

1. Unified Facilities Criteria - Design: General Building Requirements (UFC ).

1. Unified Facilities Criteria - Design: General Building Requirements (UFC ). 1. GENERAL GUIDANCE REGARDING DESIGN A. Commissary facilities are Department of Defense (DoD) projects, and as such must be constructed in accordance with the following criteria, codes, and standards.

More information

Demolition Plan A1 A3. Scale: 3/32" = 1'-0" Arch. Men N.I.C. Elev. Lobby. Stairs N.I.C. N.I.C. Women N.I.C. Issued for Tender.

Demolition Plan A1 A3. Scale: 3/32 = 1'-0 Arch. Men N.I.C. Elev. Lobby. Stairs N.I.C. N.I.C. Women N.I.C. Issued for Tender. inc. 400-7 avenue edmonton, alberta, canada tr y t: (780) 48 47 f: (780) 48 00 e: lesnider@shaw.ca 4 door to North Common Corridor doors to door to F. H. C. Men Women ELEC/TEL UP Stairs DN F. H. C. DN

More information

Timber Trail Plan LOT BEDROOMS 4.5 BATHROOMS 2,974 FT 2 Land/Home Package OFFERED BY: SUNRIVER REALTY LINDA DORR, BROKER

Timber Trail Plan LOT BEDROOMS 4.5 BATHROOMS 2,974 FT 2 Land/Home Package OFFERED BY: SUNRIVER REALTY LINDA DORR, BROKER LOT 308 Timber Trail Plan 4 BEDROOMS 4.5 BATHROOMS 2,974 FT 2 Land/Home Package OFFERED BY: SUNRIVER REALTY 541-593-3000 LINDA DORR, BROKER LICENSED IN THE STATE OF OREGON WWW.CALDERASPRINGS.COM BUILT

More information

FLOORPLAN /ELEVATION SQ.FT. BDRM BATHS GARAGE BASE PRICE

FLOORPLAN /ELEVATION SQ.FT. BDRM BATHS GARAGE BASE PRICE FLOORPLAN /ELEVATION SQ.FT. BDRM BATHS GARAGE BASE PRICE PROVIDENCE Prairie 1713 2 + Den 2 2 $341,400 Country Cottage 1713 2 + Den 2 2 $343,400 Craftsman 1713 2 + Den 2 2 $349,400 2 bedrooms + den or optional

More information

Mount Vernon Elementary School Grades PK 5

Mount Vernon Elementary School Grades PK 5 Barbour County Schools Comprehensive Educational Facilities Plan 2010-2020 Mount Vernon Elementary School Grades PK 5 Blackwood Associates, Inc. / MSES consultants, Inc. / Roy Blizzard and Associates Mount

More information

New Beautifully Designed Office Condominium Complex. Heading

New Beautifully Designed Office Condominium Complex. Heading FOR SALE DOYLESTOWN EXECUTIVE QUARTERS COMMERCIAL INDUSTRIAL INVESTMENT 2003 Lower State Road Doylestown, Bucks County, PA New Beautifully Designed Office Condominium Complex Heading PRESENTED BY: Kurt

More information

The Ultimate Home Value with Quality,

The Ultimate Home Value with Quality, The Ultimate Home Value with Quality, Durability & Flexibility in Design Chesapeake Bay Limited Series Homes 21 S. Groffdale Road Leola, PA 17540 (800) 406-1062 or (717) 656-2381 Fax (717) 656-0316 www.eagleriverhomes.net

More information

SOLANO TOWN CENTER MALL TENANT DESIGN & CONSTRUCTION CRITERIA PROPERTY SPECIFIC REQUIREMENTS

SOLANO TOWN CENTER MALL TENANT DESIGN & CONSTRUCTION CRITERIA PROPERTY SPECIFIC REQUIREMENTS SOLANO TOWN CENTER MALL TENANT DESIGN & CONSTRUCTION CRITERIA PROPERTY SPECIFIC REQUIREMENTS TABLE OF CONTENTS 1.0 PROPERTY INTRODUCTION...2 1.1 Base Building Information 1.2 Contact Information 1.3 Vicinity

More information

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property 2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical

More information

Bureau of Indian Affairs

Bureau of Indian Affairs Bureau of Indian Affairs Office of Facilities Management and Construction JUSTICE / DETENTION FACILITIES SPACE TEMPLATES Table of Contents BUREAU OF INDIAN AFFAIRS JUSTICE DETENTION FACILITIES SPACE TEMPLATES

More information

New Homes Starting at $124,900

New Homes Starting at $124,900 Chicora New Homes Starting at $124,900 New Homes - The Best Locations - The Right Price Sales & Marketing By: Keller Williams New Homes Division www.newhomesatmyrtlebeach.com Chicora C & R Builders, with

More information

THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE

THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE Reimbursement estimates are component by component assessments of the value of completed repairs. They are produced through the use of Xactimate assessment

More information

CHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC

CHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC CHARTRES COURT 713-868 - 7226 5023 Washington Avenue Houston, Texas 77007 ChartresCourtHouston.com CHARTRES COURT LLC Features Open floor concept living/dining with spacious island kitchen Great master

More information

TRADITION. Master Sign Program

TRADITION. Master Sign Program TRADITION Master Sign Program Developer:, LLC Tradition Station 10521 SW Village Center Drive Suite 201 Port St. Lucie, FL 34987 1-772-340-3500 Contact: John Gallagher Consultant: Lucido & Associates 701

More information

Seasons Business Center New Construction!

Seasons Business Center New Construction! Seasons Business Center New Construction!...Seasons Business Center Stow, Ohio 114,188 SF of High Bay Space 32 Clear Height 80 480 ESFR Sprinklers Tax Abatement Available 8 Reinforced Concrete Floor 271

More information

DIVISION 11 - EQUIPMENT FOOD SERVICE EQUIPMENT LABORATORY FUME HOODS. A. Design Considerations

DIVISION 11 - EQUIPMENT FOOD SERVICE EQUIPMENT LABORATORY FUME HOODS. A. Design Considerations DIVISION 11 - EQUIPMENT 11400 FOOD SERVICE EQUIPMENT A. Design Considerations 1. The A/E shall use the services of a food service equipment specialist in preparation of kitchen areas and other food preparation

More information

Wall Signs. Appearance Code and Design Guidelines

Wall Signs. Appearance Code and Design Guidelines Wall Signs Appearance Code and Design Guidelines Wall Sign Regulations and Approval Process Intent Signs can: Enhance the appearance of a business property Serve as effective business identification Help

More information

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW 27 September 2007 prepared by: J. CHRIS EVANS ARCHITECT 3220 E. Terra Alta Blvd. No. 9 Tucson, Arizona 85716 520.319.8835 evansarch@hotmail.com

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS USACE / NAVFAC / AFCEC / NASA UFGS-09 06 00 (May 2009) Change 1-11/13 ----------------------------- Preparing Activity: USACE Superseding UFGS-09 06 90 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

e a s t 2303 Dulles Station Blvd., Herndon, VA BASE BUILDING SPECS

e a s t 2303 Dulles Station Blvd., Herndon, VA BASE BUILDING SPECS DULLES STATION EST. e a s t 2000 2303 Dulles Station Blvd., Herndon, VA BASE BUILDING SPECS Narrative: 2303 Dulles Station Blvd (Dulles Station East) is a modern six story office building located in the

More information

GRAND CENTRAL TERMINAL ARCHITECTURAL DESIGN GUIDELINES RETAIL STORES

GRAND CENTRAL TERMINAL ARCHITECTURAL DESIGN GUIDELINES RETAIL STORES GRAND CENTRAL TERMINAL ARCHITECTURAL DESIGN GUIDELINES RETAIL STORES (INCLUDES: BALCONY RESTAURANTS & TAKE-OUT FOOD STORE AREAS) 07/20/10 1 Grand Central Terminal Retail Development: TABLE OF CONTENTS

More information

GRAND CENTRAL TERMINAL ARCHITECTURAL DESIGN GUIDELINES DINING CONCOURSE

GRAND CENTRAL TERMINAL ARCHITECTURAL DESIGN GUIDELINES DINING CONCOURSE GRAND CENTRAL TERMINAL ARCHITECTURAL DESIGN GUIDELINES DINING CONCOURSE 05/27/11 ISSUED: 05/27/10 1 Grand Central Terminal Dining Concourse: TABLE OF CONTENTS TABLE OF CONTENTS I. Introduction II. Technical

More information

TERMINAL BUILDING EVALUATION

TERMINAL BUILDING EVALUATION TERMINAL BUILDING EVALUATION 1.0 INTRODUCTION This report evaluates the existing Terminal Building at Frederick Municipal Airport (FDK) to determine the suitability of the building for continued use as

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072

More information

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING WWW.STOPWASTE.ORG New Addition Consider the following green remodeling options in a new addition.

More information

ELEMENTS COLLECTION 1

ELEMENTS COLLECTION 1 ELEMENTS COLLECTION 1 2 MADE FOR LIVING A heritage of excellence. Atlantic Homes has been providing families with quality homes for generations. With a unique combination of state-of-the-art manufacturing

More information

INTERIOR ENVIRONMENT

INTERIOR ENVIRONMENT CHAPTER 12 INTERIOR ENVIRONMENT > SECTION 1201 GENERAL 1201.1 Scope. The provisions of this chapter shall govern ventilation, temperature control, lighting, yards and courts, sound transmission, room dimensions,

More information

The Oaks at Powers Ferry. A Townhome Community

The Oaks at Powers Ferry. A Townhome Community The Oaks at Powers Ferry One visit to The Oaks at Powers Ferry and you ll understand why it has been ranked as one of the top ten townhome community locations in metro Atlanta. Positioned in prestigious

More information

Total Building Area: 1964 Construction 30,140 square feet 1976 Construction 36,787 square feet 66,927 square feet

Total Building Area: 1964 Construction 30,140 square feet 1976 Construction 36,787 square feet 66,927 square feet FLANDERS ELEMENTARY SCHOOL Located at 167 Boston Post Road, East Lyme, Connecticut the school s original structure was built in 1964 and replaced the Central Office Building as the elementary school. Two

More information

Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS

Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS STANDARD FEATURES LIST Foundation Concrete walls 4 concrete floor slab Interior basement unfinished Standard nine foot foundation walls

More information

A. Submit the following in addition to the standard requirements.

A. Submit the following in addition to the standard requirements. SECTION [13120] OMNIFLEX 300 MODULAR WALL SYSTEM SECTION 1 GENERAL 1.01 SECTION INCLUDES A. This Section specifies all requirements necessary to furnish and install a complete modular wall system including,

More information

Seal Harbor Development 1 Nagog Park Acton, MA 01720

Seal Harbor Development 1 Nagog Park Acton, MA 01720 Seal Harbor Development 1 Nagog Park Acton, MA 01720 Specifications for Ocean Mist Villages Foundation and Concrete Floors Footings All footings are constructed and poured with 3000 lb mix, continuous

More information

Building Codes and Ordinances ARC 227

Building Codes and Ordinances ARC 227 Building Codes and Ordinances ARC 227 Week 6 Fire Resistive Construction 03.02.10 Instructor: Rick Staub, AIA Email: staub@pointonearchitects.com Phone: 860-434-7707 Fire Resistive Construction Passive

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

Feasibility Report. Property Inspection Engineers, Inc. (248) Property Address. 405 Fairgrove Royal Oak, MI.

Feasibility Report. Property Inspection Engineers, Inc. (248) Property Address. 405 Fairgrove Royal Oak, MI. Feasibility Report Property Inspection Engineers, Inc. (248) 644-8798 Inspection ate: 10/27/2010 Consultant's Job No: Consultant: Christopher J. aggy Applicant ark Beard Property Address 405 Fairgrove

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

Wellington Manor Series

Wellington Manor Series Wellington Manor Series Single-Section Homes titanhomesny.com 2 titanhomesny.com About us A home should say something about the people who live inside it. From contemporary to traditional, our homes will

More information

Homes at Pine Ridge - NEW CONSTRUCTION SPECS

Homes at Pine Ridge - NEW CONSTRUCTION SPECS 1) STYLE: Custom design as per blueprints in attached hereto. Final agreed upon working blueprints shall be signed, dated and witnessed by both Buyer and Seller. 2) FOUNDATION: Footing and walls 3000 psi

More information

6 Bears and a Goat Brewery - Phase I

6 Bears and a Goat Brewery - Phase I Abbreviations 417 William Street Project Address 1140 International Parkway, Virginia 22406 Agency with Jurisdiction Stafford County, VA Tenant Area 9,975 SF- gross Vicinity Map Code Data Applicable Code

More information

City of Richmond Zoning Ordinance Page 12-1

City of Richmond Zoning Ordinance Page 12-1 ARTICLE 12 BUILDING DESIGN AND COMPOSITION Section 12.01 Purpose. High quality architectural design and building composition are important elements in reinforcing a comfortable, human-scale environment,

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

TILE TILE

TILE TILE 09300 - TILE 09300-1 PART ONE: GENERAL 1.1 Description TILE 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance with the requirements

More information

High Piled Combustible Storage Guideline

High Piled Combustible Storage Guideline Moreno Valley High Piled Combustible Storage Approved and Authorized By: Adria Reinertson, Fire Marshal Issued: May 5, 2017 Rev: 7-28-16 City of Moreno Valley Fire Department Page 1 of 19 High Piled Storage

More information

Additions and Renovations to Saint Robert Bellarmine Parish Center and Narthex 9/16/14 Outline Design Development Specification

Additions and Renovations to Saint Robert Bellarmine Parish Center and Narthex 9/16/14 Outline Design Development Specification Additions and Renovations to Saint Robert Bellarmine Parish Center and Narthex 9/16/14 Outline Design Development Specification Division 1 Division 2 Division 3 Construction Type Type III B, Not suppressed,

More information

COLONIAL PLANS. 708 North Street US Highway Route 1 Houlton, Maine (207)532,2444

COLONIAL PLANS. 708 North Street US Highway Route 1 Houlton, Maine (207)532,2444 COLONIAL PLANS 8US Highway Route 1 Hancock, Maine 04640 1(877)767 0664*(207)667 0664 708 North Street US Highway Route 1 Houlton, Maine 04730 (207)532,2444 DEXTER COLONIAL 28 X 34 1904 SQ. FT. DEXTER COLONIAL

More information

HISTORIC LANDMARK COMMISSION STAFF REPORT

HISTORIC LANDMARK COMMISSION STAFF REPORT HISTORIC LANDMARK COMMISSION STAFF REPORT Orange Theory Fitness Sign-Trolley Square PLNHLC2014-00496 602 E 500 South Meeting Date: January 15, 2015 Applicant: Impact Signs, representing Orange Theory Fitness

More information

HIGH PILED COMBUSTIBLE STORAGE CITY OF NOVI SUBMITTAL CHECKLIST In Accordance with Chapter 23 of the 2006 International Fire Code

HIGH PILED COMBUSTIBLE STORAGE CITY OF NOVI SUBMITTAL CHECKLIST In Accordance with Chapter 23 of the 2006 International Fire Code Project Name/Tenant: HIGH PILED COMBUSTIBLE STORAGE CITY OF NOVI SUBMITTAL CHECKLIST In Accordance with Chapter 23 of the 2006 International Fire Code Site Address: Applicant: Phone: Bldg/Unit/Suite: A

More information

GRAND CENTRAL TERMINAL ARCHITECTURAL DESIGN GUIDELINES GRAND CENTRAL MARKET

GRAND CENTRAL TERMINAL ARCHITECTURAL DESIGN GUIDELINES GRAND CENTRAL MARKET GRAND CENTRAL TERMINAL ARCHITECTURAL DESIGN GUIDELINES GRAND CENTRAL MARKET 07/20/10 1 Grand Central Market: TABLE OF CONTENTS TABLE OF CONTENTS I. Introduction II. Technical Information for All Tenants

More information

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco

More information

Power Zone Center. Your solution for power distribution and control systems

Power Zone Center. Your solution for power distribution and control systems Power Zone Center Your solution for power distribution and control systems The Strength of One Powerful When you need to install a new power distribution center in your facility, you need it done in fastest

More information

Fairfax County, Virginia

Fairfax County, Virginia Fairfax County, Virginia Typical Finished Basement Details Based on the 2009 International Residential Code CONTENTS General Requirements... 2 Emergency Escape and Rescue... 2 Wall Construction... 3 Floor/ceiling

More information

New Homes Forestbrook Road. Yes, it s INCLUDED!

New Homes Forestbrook Road. Yes, it s INCLUDED! Sugar Mill is a Covenant Restricted Community. New Homes Forestbrook Road Yes, it s INCLUDED! Granite Countertops Ceramic Tile Kitchen Floors Front Brick Accents Upgraded Kitchen Cabinets Ceramic Tile

More information

CALGARY INTERNATIONAL AIRPORT TENANT DESIGN STANDARDS & GUIDELINES

CALGARY INTERNATIONAL AIRPORT TENANT DESIGN STANDARDS & GUIDELINES CALGARY INTERNATIONAL AIRPORT TENANT DESIGN STANDARDS & GUIDELINES April 2009 Calgary International Airport Tenant Design Standards & Guidelines 1.0 INTRODUCTION 1.1 Tenant Development Process... 1 1.2

More information

Typical Finished Basement Details

Typical Finished Basement Details Albemarle County, Virginia Typical Finished Basement Details Based on the 2012 Virginia Residential Code Finished basements must be constructed in conformance with these details. For requirements, details

More information

r e s i d e n t i a l o u t s i d e v i l l a g e c e n t e r

r e s i d e n t i a l o u t s i d e v i l l a g e c e n t e r N e w A l b a n y, O h i o r e s i d e n t i a l o u t s i d e v i l l a g e c e n t e r D e s i g n G u i d e l i n e s & R e q u i r e m e n t s s e c t i o n 5 I. Overview This section applies to all

More information

Features & Amenities. EXTERIOR FINISHES COMMUNITY FEATURES

Features & Amenities.  EXTERIOR FINISHES COMMUNITY FEATURES Features & Amenities COMMUNITY FEATURES EXTERIOR FINISHES WARRANTY COVERAGE Located in the heart of Troy along the east side of Rochester Road, between Wattles and Long Lake Roads Easy access to I-75 and

More information

your portal to paradise

your portal to paradise your portal to paradise Broward County Aviation Department TENANT DESIGN GUIDELINES MANUAL Revision 1 2017 Leigh Fisher in conjunction with Tenant Design Guidelines February 2017 Page 1 of 43 BROWARD COUNTY

More information

Design Guidelines To Enhance the Downtown Historical District. Developed by the Van Wert Community Main Street Design Committee June 26, 2007

Design Guidelines To Enhance the Downtown Historical District. Developed by the Van Wert Community Main Street Design Committee June 26, 2007 Design Guidelines To Enhance the Downtown Historical District Developed by the Van Wert Community Main Street Design Committee June 26, 2007 Contents Page 1 Introduction 2 Intent and purpose 3 Applicability

More information

Applying the Building Code During Design

Applying the Building Code During Design Applying the Building Code During Design A Step-By-Step Process AIA Learning Units The Salt Lake City CSI Chapter is a Registered Provider with The American Institute of Architects Continuing Education

More information

Highland Park. Exceptional Interiors (cont.) Green Technology. Designer Kitchen Features. Distinctive Exterior Features

Highland Park.  Exceptional Interiors (cont.) Green Technology. Designer Kitchen Features. Distinctive Exterior Features unit 2 HOMES 650 Mill Valley Parkway 2332 Sq.Ft. 3-Car 4/3 $542,800 6 Mt. Shasta Views 643 Mill Valley Parkway 2332 Sq.Ft. 3-Car 4/3 $552,800 8 Mt. Shasta Views Under construction 945 Rollingview Raised

More information

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will

More information

The facility is approximately 439,350 square feet, located on a acre parcel on Wood Dale Road in Wood Dale, Illinois. 439,350 Square Feet

The facility is approximately 439,350 square feet, located on a acre parcel on Wood Dale Road in Wood Dale, Illinois. 439,350 Square Feet 1.0 DESIGN SPECIFICATIONS 1.1 Size of Building and Tract: The facility is approximately 439,350 square feet, located on a 21.86-acre parcel on Wood Dale Road in Wood Dale, Illinois. 1.2 Size of Building

More information

Fashion Outlets of Niagara Falls 1900 Military Road, Niagara Falls, NY 14304

Fashion Outlets of Niagara Falls 1900 Military Road, Niagara Falls, NY 14304 ADDENDUM LOG November, 2011 Updated to current layout April, 2012 Updated per TC September, 2013 Added Storefront Requirements images (a6-a17) Updated Floor Tile Finish language (a18) Added Neutral Pier

More information

KITCHEN REMODELS CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA (949)

KITCHEN REMODELS CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA (949) CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA 92691 (949) 470-3054 KITCHEN REMODELS A permit is required for kitchen remodels that include removal and replacement

More information

B. Provide fire-rated access doors where indicated or scheduled.

B. Provide fire-rated access doors where indicated or scheduled. SECTION 08305 ACCESS DOORS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

RESIDENTIAL BUILDING REQUIREMENTS

RESIDENTIAL BUILDING REQUIREMENTS RESIDENTIAL BUILDING REQUIREMENTS Residential Building Requirements This is an informational booklet with some of the general residential construction requirements taken from the codes adopted by Campbell

More information

School Without Walls

School Without Walls INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

BUILDING PERMIT APPLICATION

BUILDING PERMIT APPLICATION TOWN OF LEICESTER 132 Main Street Post Office Box 197 Leicester, New York 14481 Phone: (585) 382-3231 FAX: (585) 382-9766 BUILDING PERMIT APPLICATION All Town of Leicester property owners are required

More information

SECTION CERAMIC TILE

SECTION CERAMIC TILE SECTION 09300 CERAMIC TILE PART 1 GENERAL 1.1 SCOPE A. Drawings and general provisions of the Contract, including General and Supplementary General Conditions, Division 00 & 01 Specification Sections,

More information

Cheldelin Middle School

Cheldelin Middle School Facility Information Address: 987 NE Conifer Blvd Corvallis Site Size: Building Area: Construction Date: Improved Parking: Grade Levels Served: Regular Classrooms: Portable Classrooms: Sept. 2007 Enrollment:

More information

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good. EAST LYME HIGH SCHOOL Located at 30 Chester Field Road, East Lyme, Connecticut 06333, the High School s original structure was built in 1967. An addition and alterations occurred in 1973. The building

More information