SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM

Size: px
Start display at page:

Download "SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM"

Transcription

1 SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM PART 1: GENERAL 1.01 Scope Work includes furnishing all materials, labor, equipment, and supervision to install a Stonebridge segmental retaining wall system to the lines and grades designated on the construction drawings and as specified herein Reference Standards A. Segmental Retaining Wall Units ASTM C Sampling and Testing Concrete Masonry Units ASTM C 1372 Standard Specification for Dry-Cast Segmental Retaining Wall Units B. Geosynthetic Reinforcement C. Soils ASTM D 4595 Standard Test Method for Tensile Properties of Geotextiles by the Wide- Width Strip Method ASTM D 5262 Standard Test Method for Evaluating the Unconfined Tension Creep and Creep Rupture Behavior of Geosynthetics ASTM D 5321 Standard Test Method For Determining the Coefficient of Soil and Geosynthetic or Geosynthetic and Geosynthetic by Direct Shear Method ASTM D Standard Practice for Exposure and Retrieval of Samples to Evaluate Installation Damage of Geosynthetics ASTM D 6637 Standard Test Method for Determining Tensile Properties of Geogrids by the Single or Multi-Rip Tensile Method ASTM D 6706 Standard Test Method for Measuring Geosynthetic Pullout Resistance in Soil ASTM D 6992 Standard Test Method for Accelerated Tensile Creep and Creep-Rupture of Geosynthetic Materials Based on Time-Temperature Superposition Using Stepped Isothermal Method ASTM D 422 Standard Test Method for Particle-Size Analysis of Soils ASTM D 698 Standard Test Method for Laboratory Compaction Characteristics of Soil Using Standard Effort ASTM D 2487 Standard Practice for Classification of Soils for Engineering Purposes ASTM D 4318 Standard Test Method for Liquid Limit, Plastic Limit and Plasticity Index of Soils ASTM D 6913 Standard Test Methods for Patricle-Size Distribution (Gradation) of Soils Using Seive Analysis

2 ASTM D 6938 Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth) ASTM G 51 Standard Test Method for Measuring ph of Soil for Use in Corrosion Testing D. Drainage Pipe ASTM F 405 Standard Specification for Corrugated Polyethylene (PE) Pipe and Fittings ASTM F 758 Standard Specification for Smooth-Wall Polyvinyl Chloride (PVC) Plastic Underdrain Systems for Highway, Airport or Similar Drainage E. Engineering Design NCMA Design Manual for Segmental Retaining Walls, Third Edition ASTM D 6638 Standard Test Method for Determining the Connection Strength Between Geosynthetics Reinforcement and Segmental Concrete Units ASTM D 6916 Standard Test Method for Determining the Shear Strength Between Segmental Concrete Units F. Where specifications and reference documents conflict, the Wall Design Engineer shall make the final determination of applicable document Submittals A. The Contractor shall submit manufacturer's certifications stating that the Stonebridge units, geosynthetic reinforcement, reinforced backfill, and stone fill meet the requirements of Part 2.0 of this specification. The certifications shall be provided 30 days prior to the start of the work. B. The Wall Installer shall provide a list of successful projects with references showing that they are qualified and have a record of successful performance installing segmental block walls. C. The Professional Engineer responsible for the wall design shall submit a set of stamped construction drawings and design calculations for the Stonebridge retaining wall system. The Professional Engineer must be experienced in segmental retaining wall design and registered in the State where the wall is to be built. The design shall clearly state the material properties, design methodology, and factors of safety or load and resistance factors used. The design shall consider wall stability, including bearing capacity, global or slope stability, and settlement. The design shall address both internal and external drainage of the wall Delivery, Storage, and Handling A. The Contractor shall inspect the materials upon delivery to assure that proper type and grade of material and color of Stonebridge units has been received. B. The Contractor shall store and handle materials in accordance with manufacturer's recommendations and in a manner to prevent deterioration or damage due to moisture, temperature changes, contaminants, corrosion, breaking, chipping or other causes. C. The Contractor shall prevent excessive mud, wet cement and like materials from coming in contact with the Stonebridge units. D. The Contractor shall protect geosynthetic material from direct sunlight or UV exposure. Any protective covering on geosynthetic material shall remain until immediately before installation. E. The Contractor shall protect the materials from damage. Damaged material shall not be incorporated into the Stonebridge retaining wall. SECTION

3 PART 2: MATERIALS 2.01 Wall Units A. Wall units shall be Stonebridge as produced by a licensed manufacturer. B. Wall units shall meet the requirements of ASTM C1372, except that the minimum required net average compressive strength shall be 4000 psi (27.6 MPa). C. Exterior block dimensions shall be uniform and consistent. Maximum dimensional deviations shall be 1/8 inch (3 mm) excluding the architectural surface Geosynthetic Reinforcements Geosynthetic reinforcement shall consist of high-tenacity PET geogrids or geotextiles manufactured for soil reinforcement applications. The type, strength and placement of the geosynthetic reinforcement shall be as specified by Wall Design Engineer in the construction drawings and specifications. Only geosynthetic reinforcements which have been tested with Stonebridge units according to ASTM D6638 and ASTM D 6916 shall be considered for use Drainage Pipe A. The drainage collection pipe shall be a perforated or slotted PVC or corrugated HDPE pipe. The pipe may be wrapped with a geotextile that will function as a filter. B. Drainage pipe shall be manufactured in accordance with ASTM F 405 or ASTM F Leveling Pad Leveling Pad material shall consist of a compacted, open-graded or dense-graded crushed stone or non-reinforced concrete as shown on the construction drawings Stone Fill A. Stone fill shall be angular, clean stone meeting the gradation requirements of ASTM No. 57 Stone, as defined in ASTM C33 and determined in accordance with ASTM D422: Sieve Size 1 ½ inch inch ½ inch No No Percent Passing B. Stone fill shall be used in the cores, between, and at least 12 inches (300 mm) behind Stonebridge units Reinforced Backfill A. Material used as backfill in the reinforced soil zone shall meet the requirements detailed in the construction drawings and specifications prepared by the Professional Engineer responsible for the wall design. B. The Plasticity Index of the backfill material shall be less than 6. Organic soils and frost susceptible soils shall not be used. C. The ph of the backfill material shall be between 3 and 9 when tested in accordance with ASTM G 51. D. The Contractor shall submit a sample of any imported backfill to the Owner s Geotechnical Engineer for pre-approval. SECTION

4 2.07 Geotextile Filter Fabric Geotextile filter fabric shall nonwoven, needle-punched, polypropylene material with a minimum normal weight of 4 oz/sq. yd. PART 3: CONSTRUCTION OF WALL SYSTEM 3.01 Construction Observation A. The Owner or Owner's Engineer should verify the materials supplied by the Contractor meet all the requirements of the specification. This includes all submittals and proper installation of the system. B. The Contractor's field construction supervisor shall have demonstrated experience and be qualified to direct all work at the site Excavation A. The Contractor shall verify location of existing structures and utilities prior to excavation, and shall take appropriate measures to insure they are adequately protected before starting any wall excavation. B. The Contractor shall excavate to the lines and grades shown on the construction documents. The Contractor shall take precautions to minimize over-excavation. Excavation support, if required, shall be designed by the Contractor Foundation Soil Preparation A. Native foundation soil shall be compacted to 95% of Standard Proctor as determined by ASTM D-698 prior to placement of the Leveling Pad material. B. In-situ foundation soil shall be examined by the Owner s Geotechnical Engineer to ensure that the actual foundation soil strength meets or exceeds assumed design strength. Soil not meeting the required strength shall be removed and replaced with acceptable, compacted material. C. Over-excavation and replacement of unsuitable foundation soils shall be at the direction of the Owner s Geotechnical Engineer. Any additional compensation for over-excavation, which falls outside of the contract limits, must be pre-approved in a written change order signed by the Contractor, Engineer, and Owner or Owner s Representative Leveling Pad Preparation A. Leveling pad shall be placed as shown on the construction drawings. The leveling pad shall be constructed to the proper elevation shown on the plans. The leveling pad shall have minimum depth of at least 6 inches (150 mm), and should extend laterally at least 6 inches (150 mm) in front and 12 inches (300 mm) behind the bottom Stonebridge unit. B. If the construction drawings require a crushed stone leveling pad, the stone shall be placed in uniform loose lifts a maximum of 6 inches (150 mm) thick and consolidated with a minimum of three passes with a 24 inch (600 mm) wide, walk-behind, vibrating plate compactor. The compactor shall be capable of delivering a minimum of 2000 lb (9 kn) centrifugal force. C. If the construction drawings require a concrete leveling pad, the pad shall be allowed to cure to the minimum strength specified in the construction documents prior to placement of the bottom course of Stonebridge units. D. Leveling pad shall provide a firm, smooth, and level surface on which to place the Stonebridge units. There shall be full contact of the Stonebridge units on the leveling pad. SECTION

5 3.05 Stonebridge Unit Placement A. Properly mark the location of the retaining wall. Use a string line or offset stakes to establish horizontal and vertical alignment. B. For the bottom course of Stonebridge units, remove the bottom lip from the back edge of the blocks with a hammer and chisel so the blocks will lie flat on the leveling pad. C. Place a complete row of blocks on the prepared leveling pad. Blocks should be placed tight together. Check all blocks for level from front to back and side to side as they are placed. D. Place and compact stone fill in the cores of the units, between the units, and at least 12 (300 mm) behind the wall. E. Place reinforced or retained soil between the stone and the back of the excavation. F. Following backfill, re-check all units for level and alignment and sweep the top of each course of blocks clean before starting construction of the next course. G. Place the next course of Stonebridge units on top of the previous course. Stonebridge units should be placed to establish a running bond, where the block straddles and is centered on the two blocks below it. Cut blocks as needed to maintain a running bond. Partial units shall be at least 6" (150 mm) long and shall not be placed directly on top of each other. Partial units shall be adhered in place with a concrete adhesive specifically formulated for segmental concrete block wall construction. H. Push the Stonebridge blocks forward until the lip on the back of the block comes in full contact with the blocks below. I. Broken, chipped, stained or otherwise damaged units shall not be placed in the wall Geosynthetic Reinforcement Placement A. All materials shall be installed at the proper elevation and orientation as shown in the wall details on the construction drawings. The geosynthetic reinforcement shall be installed in general accordance with the manufacturer's recommendations. B. Install geosynthetic material with the strong direction (roll direction) into the reinforced soil zone. The geosynthetic must be placed in a continuous sheet throughout its length from the connection at the Stonebridge units to the back of the reinforced zone. Overlap or splice connections of the geosynthetic material are not permitted. Adjacent sections of geosynthetic material shall be placed in a manner to assure that the horizontal coverage shown on the plans is provided. C. Place geosynthetic material on top of a course of Stonebridge units at the elevations shown on the construction drawings. Secure the front end of the geosynthetic material with the next course of blocks. Make sure the geosynthetic material is as close as possible to the front face of the wall without being visible. Pull the geosynthetic material taut to eliminate any folds. Use pins, staples, or other methods recommended by the manufacturer to maintain tension on the geosynthetic while placing the reinforced fill Backfill Placement A. The reinforced backfill shall be placed as shown in construction plans. The maximum loose lift thickness shall not exceed 8 inches (200 mm). Wet or dry the backfill material as needed to place the material within 2% of the optimum moisture content. Compact the backfill material to a minimum 95% of Standard Proctor as determined by ASTM D-698. Backfill shall be placed, spread and compacted in such a manner that minimizes the development of wrinkles or movement of the geosynthetic reinforcement and the wall facing units. SECTION

6 B. Only hand-operated compaction equipment shall be allowed within 3 feet (1 meter) of the front of the wall face. All compaction equipment should be large enough to achieve desired compaction, but not so large as to move the wall blocks. Monitor the wall blocks for movement during compaction and reset them if required prior to proceeding. C. Construction equipment shall not be operated directly on the geosynthetic reinforcement. A minimum backfill thickness of 6 inches (150 mm) is required prior to operation of tracked vehicles over the geosynthetic reinforcement. Turning of tracked vehicles should be kept to a minimum to prevent displacing the fill and damaging or moving the geosynthetic reinforcement. D. Place retained soil immediately between the reinforced soil zone and the back of the excavation. Material should be placed in loose lifts of 8 inches (200 mm) maximum and compacted to 95% of Standard Proctor as determined by ASTM D-698. Bring the reinforced and retained soil up to grade at the same time. At no time should the elevation of the reinforced soil be more than 1 Stonebridge unit higher than the retained soil. E. At the end of each day's operation, the wall contractor shall slope the last level of backfill away from the wall facing to direct runoff of rainwater away from the wall face. The general contractor is responsible for ensuring surface runoff from adjacent areas is not allowed to enter the wall construction area Stone fill and Drain Placement A. Stone fill shall be placed to the minimum finished thickness and widths shown on the construction drawings. B. Place the stone in uniform loose lifts a maximum of 8 inches (200 mm) thick. Consolidate the stone with a minimum of three passes with a 24 inch (600 mm) wide, walk-behind, vibrating plate compactor capable of delivering a minimum of 2000 lb (9 kn) centrifugal force. C. Drainage collection pipes shall be installed to maintain gravity flow of water outside of the reinforced soil zone. The pipe should daylight at the ends and/or through the face of the wall to allow for drainage. Connection to a catch basin or active storm sewer should only be made under the direction of the Professional Engineer responsible for the wall design. D. All drain pipes shall be placed as shown in the construction drawings. E. Secondary collection drain pipes should be sloped a minimum of two percent to provide gravity flow into the main collection drain pipe. Drainage laterals shall be spaced at a maximum of 50 feet (15 meters) along the wall face Cap Block Placement The cap block and/or top Stonebridge unit shall be bonded to the Stonebridge units below using concrete adhesive specifically formulated for segmental block wall construction. The block shall be dry and swept clean prior to adhesive placement Construction Tolerances A. Vertical alignment shall be within ± 1.25 inches (32 mm) over any 10 feet (3 m). B. Horizontal alignment shall be within ± 1.25 inches (32 mm) over any 10 feet (3 m). C. Rotation alignment shall be within ± 2 degrees of design batter. PART 4: MEASUREMENT AND PAYMENT 4.01 Measurement SECTION

7 The unit of measurement for furnishing the Stonebridge retaining wall system shall be the vertical square foot of wall surface from the top of the leveling pad to the top of the wall, including coping. The quantity to be paid shall include all costs to supply and install the Stonebridge retaining wall system as shown in the construction drawings and specificaitons. Excavation of unsuitable materials and replacement with select fill must be pre-approved in a written change order and shall be paid for under separate pay item(s) Payment A. Payment shall be made under: Pay Item Stonebridge Reinforced SRW Pay Unit Sq. Ft (Square Meter) PART 5: AVAILABILITY Rosetta Hardscapes, LLC South US-31, Charlevoix, MI Updated 06/06/11 SECTION

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8, Classic 6 and Legend unit segmental

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

MODULAR CONCRETE RETAINING WALL

MODULAR CONCRETE RETAINING WALL MODULAR CONCRETE RETAINING WALL PART 1: GENERAL 1.01 Description A. Work shall consist of furnishing and construction of a KEYSTONE Retaining Wall System or equal in accordance with these specifications

More information

SEGMENTAL BLOCK RETAINING WALLS. Comply with Division 1 - General Provisions and Covenants, as well as the following:

SEGMENTAL BLOCK RETAINING WALLS. Comply with Division 1 - General Provisions and Covenants, as well as the following: SEGMENTAL BLOCK RETAINING WALLS PART 1 - GENERAL 1.01 SECTION INCLUDES Segmental Block Retaining Walls 1.02 DESCRIPTION OF WORK Constructing segmental block retaining walls. 1.03 SUBMITTALS Comply with

More information

LANDSCAPE RETAINING WALLS

LANDSCAPE RETAINING WALLS SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9070 - Landscape Retaining Walls LANDSCAPE RETAINING WALLS PART - GENERAL.0 SECTION INCLUDES A. Modular Block Retaining Walls

More information

VERTI-BLOCK - DESIGN MANUAL

VERTI-BLOCK - DESIGN MANUAL Company Information General Information Verti-Block is the latest innovative forming system from Verti-Crete, LLC. Recognized worldwide for outstanding aesthetics and performance, Verti-Crete s proprietary

More information

Design Manual: Gravity Wall. Section 1

Design Manual: Gravity Wall. Section 1 Design Manual: Gravity Wall Section 1 A Design Manual: Gravity Wall General Information Company Information Verti-Block is the latest innovative forming system from Verti-Crete, LLC. Recognized worldwide

More information

Redi Rock Specification and Installation Manual

Redi Rock Specification and Installation Manual Redi Rock Specification and Installation Manual 1.0 General Scope This Specification covers the Design, Materials and Installation of Redi Rock modular block Retaining and Freestanding Wall systems as

More information

ICC-ES Evaluation Report Issued July 1, 2011 This report is subject to renewal in one year.

ICC-ES Evaluation Report Issued July 1, 2011 This report is subject to renewal in one year. ICC-ES Evaluation Report ESR-1959 Issued July 1, 2011 This report is subject to renewal in one year. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council DIVISION:

More information

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating

More information

INSPECTION GUIDE FOR SEGMENTAL RETAINING WALLS TEK 18-11B

INSPECTION GUIDE FOR SEGMENTAL RETAINING WALLS TEK 18-11B An information series from the national authority on concrete masonry technology INSPECTION GUIDE FOR SEGMENTAL RETAINING WALLS TEK 18-11B Quality Assurance and Testing (2012) INTRODUCTION Segmental retaining

More information

Uwall UNIVERSAL CONSTRUCTION MANUAL

Uwall UNIVERSAL CONSTRUCTION MANUAL Uwall UNIVERSAL Retaining Wall System CONSTRUCTION MANUAL TM President s Letter CSI is a leader in its industry supplying precast infrastructure products throughout New England and beyond since 1972, developing

More information

02632 Segmental Concrete Retaining Wall System Page - 1

02632 Segmental Concrete Retaining Wall System Page - 1 02632 Segmental Concrete Retaining Wall System Page - 1 (Last Revised 8/23/13) 02632 SEGMENTAL CONCRETE RETAINING WALL SYSTEM SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Part 1 General Clean Up

More information

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Specification Guidelines: Allan Block Modular Retaining Wall Systems Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's

More information

Wall Modular Block Mechanically Stabilized Earth, Item S.

Wall Modular Block Mechanically Stabilized Earth, Item S. Wall Modular Block Mechanically Stabilized Earth, Item 532.0300.S. A Description (1) This special provision describes designing, furnishing materials and erecting a permanent earth retention system in

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 863 REINFORCED SOIL SLOPES. October 19, 2012

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 863 REINFORCED SOIL SLOPES. October 19, 2012 STATE OF OHIO DEPARTMENT OF TRANSPORTATION 863.01 Description 863.02 Materials 863.03 Construction 863.04 Method of Measurement 863.05 Basis of Payment SUPPLEMENTAL SPECIFICATION 863 REINFORCED SOIL SLOPES

More information

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,

More information

Construction Procedures

Construction Procedures Construction Procedures 2014 Rev. 1.6 1 Introduction This manual presents the methods and procedures necessary for the proper erection of a LOCK+LOAD retaining wall. problems later during the service life

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems Anchorplex retaining wall construction guide Building Anchorplex Retaining Wall Systems Table of Contents and ow to Use This Guide table of contents ow to Use This Guide. 2 About the Anchorplex System.

More information

PERMEABLE INTERLOCKING PAVERS

PERMEABLE INTERLOCKING PAVERS PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement

More information

2011 INSTALLATION MANUAL

2011 INSTALLATION MANUAL Redi-Rock International 2 PRE-CONSTRUCTION CHECKLIST... Before you start construction of a Redi-Rock wall, take the time to complete necessary planning and preparation. This process will help ensure a

More information

DESIGN CONSIDERATIONS FOR NSWS NATURAL STONE RETAINING AND FREE-STANDING WALL SYSTEMS

DESIGN CONSIDERATIONS FOR NSWS NATURAL STONE RETAINING AND FREE-STANDING WALL SYSTEMS DESIGN CONSIDERATIONS FOR NSWS NATURAL STONE RETAINING AND FREE-STANDING WALL SYSTEMS Natural Stone Wall Solutions, Inc (NSWS ) 2352 Main Street, Suite 103 Concord, MA 01742 (978) 461-1777 Concept and

More information

R-TANK SPECIFICATIONS

R-TANK SPECIFICATIONS TECHNICAL STORMWATER MANAGEMENT R-TANK SPECIFICATIONS PART 1 GENERAL 1.01 Related Documents A. Drawings, technical specification and general provisions of the Contract as modified herein apply to this

More information

NOVEMBER 2016 MAGNUMSTONE. retaining walls installation manual

NOVEMBER 2016 MAGNUMSTONE. retaining walls installation manual NOVEMBER 2016 MAGNUMSTONE retaining walls installation manual AUSTRAL MASONRY CONTENTS Magnumstone Installation Guide 04 Overview 07 Unit Specifications 08 Installation 08 Gravity MagnumStone Wall 16 Geogrid

More information

BIO-AQUIFER STORM SYSTEM

BIO-AQUIFER STORM SYSTEM BIO-AQUIFER STORM SYSTEM Specifications for Construction PART 1 GENERAL 1.01 SECTION INCLUDES A. Providing labor, materials, tools and equipment to furnish and install a permeable concrete paving stone

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

cambridgewallsupport.com cambridgepavers.com

cambridgewallsupport.com cambridgepavers.com cambridgewallsupport.com cambridgepavers.com INDEX Inside This Guide Page Introduction to Sigma Wall Systems 3 Sigma Stones 4 Building a Wall 6 Foundation 7 Installation 9 Projects 19 Installing Sigma

More information

SECTION FOUNDATION DRAINAGE

SECTION FOUNDATION DRAINAGE SECTION 33 41 13 SPEC WRITER NOTES: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

SECTION UTILITY MANHOLES AND STRUCTURES

SECTION UTILITY MANHOLES AND STRUCTURES SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition

More information

LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION

LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION A. Section Includes B. References C. Quality Assurance D. Submittals E. Delivery, Storage and Handling F. Environmental Conditions G. Summary H. Concrete

More information

HYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS

HYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS HYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS PART 1 - GENERAL WORK INCLUDED A. Provide all equipment and materials, and do all work necessary to construct a HydroGrid subsurface irrigated fastdry

More information

ENGINEERING DIRECTIVE

ENGINEERING DIRECTIVE Number: E-95-001 Date: 2/2/95 ENGINEERING DIRECTIVE Ross B. Dindio (Signature on Original) CHIEF ENGINEER The purpose of this engineering directive is to formally notify ALL Department engineering personnel

More information

StormTech Construction Guide

StormTech Construction Guide A division of StormTech solid end caps and pre-cored end caps StormTech chambers StormTech manifolds and fittings Acceptable fill materials per Table 1 Woven and non-woven geotextiles 80-7 DC REQUIRED

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

Design and Installation Guidelines for Retaining Walls. 1 P age. Geo Products, LLC 8615 Golden Spike Lane Houston, TX Phone:

Design and Installation Guidelines for Retaining Walls. 1 P age. Geo Products, LLC 8615 Golden Spike Lane Houston, TX Phone: Design and Installation Guidelines for Retaining Walls 1 P age Geo Products, LLC 8615 Golden Spike Lane Houston, TX 77086 Phone: 281.820.5493 2011 Geo Products, Fax: 281.820.5499 LLC www.geoproducts.org

More information

Trusted ICC ES. Conformity! Evaluation. ICC-ES Evaluation

Trusted ICC ES. Conformity! Evaluation. ICC-ES Evaluation 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.orgg ESR 2113 Reissued 08/2017 This report is subject to renewal 08/2019. DIVISION: 32 00

More information

DIVISION: EXTERIOR IMPROVEMENTS SECTION: RETAINING WALLS SECTION: SEGMENTAL RETAINING WALLS REPORT HOLDER:

DIVISION: EXTERIOR IMPROVEMENTS SECTION: RETAINING WALLS SECTION: SEGMENTAL RETAINING WALLS REPORT HOLDER: 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 3073 Reissued 07/2017 This report is subject to renewal 07/2018. DIVISION: 32 00

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

A. Product Data: Submit manufacturer s product data, with complete general and specific installation instructions, recommendations, and limitations.

A. Product Data: Submit manufacturer s product data, with complete general and specific installation instructions, recommendations, and limitations. SECTION 071700 - BENTONITE WATERPROOFING PART 1 - GENERAL 1.1 WORK SUMMARY A. The work of this section includes, but is not limited to the furnishing and installing the following materials, per project

More information

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.

More information

A.2.a Random Riprap... Table

A.2.a Random Riprap... Table 3601 RIPRAP MATERIAL 3601.1 SCOPE Provide stone and filter layer material for use in random or hand-placed riprap, gabion, and revet mattress construction. 3601.2 REQUIREMENTS A Stones A.1 Quality Provide

More information

PAVING SLABS ON A CONCRETE BASE

PAVING SLABS ON A CONCRETE BASE SECTION 32 14 13.16 PAVING SLABS ON A CONCRETE BASE (1995 MasterFormat Section 02784) Note: This guide specification for the U.S. is for paving slabs on a sand bed over concrete for pedestrian applications.

More information

SECTION AGGREGATES

SECTION AGGREGATES SECTION 32 05 00 AGGREGATES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Aggregate base 2. Engineered fill 3. Backfill 4. Fine filter aggregate (non-frost susceptible fill) 5. Riprap 6. Recreational

More information

ODOT Design & Construction Requirements for MSE Walls

ODOT Design & Construction Requirements for MSE Walls ODOT Design & Construction Requirements for MSE Walls Peter Narsavage, P.E. Foundation Engineering Coordinator Ohio Department of Transportation Office of Structural Engineering 2006 Ohio Transportation

More information

Master Specification SECTION 02621

Master Specification SECTION 02621 Master Specification 02621-1 PART 1 - GENERAL 1.01 SUMMARY SECTION 02621 FOUNDATION DRAINAGE SYSTEMS Date: 07/01/99 A. Section includes: Subdrainage system material at vertical ** waterproofed walls **

More information

BENTOMAT CL GEOSYNTHETIC CLAY LINER SPECIFICATION GUIDELINES

BENTOMAT CL GEOSYNTHETIC CLAY LINER SPECIFICATION GUIDELINES BENTOMAT CL GEOSYNTHETIC CLAY LINER SPECIFICATION GUIDELINES This specification is intended for use as a GENERAL GUIDELINE for developing a specification for a specific project. It is NOT intended as a

More information

Retaining Wall Systems

Retaining Wall Systems Retaining Wall Systems A family of Retaining Wall Products The versatile Allan Block product line allows easy design and construction of retaining walls to meet specific engineering and site requirements.

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain

More information

***************************************************************************************************************

*************************************************************************************************************** 02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************

More information

DESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM

DESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM Istanbul Bridge Conference August 11-13, 2014 Istanbul, Turkey DESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM T. C. NEEL and K.BOZKURT ABSTRACT This work shall consist of the design, manufacture

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19-1 19-1.01 Exploratory Excavation... 19-1 19-1.02 Trench... 19-1 19-1.02.AStorm Drain Pipe...

More information

PERMEABLE PAVERS PHYSICAL AND GEOMETRICAL CHARACTERISTICS - PAVERS DRIVEWAYS, PERMEABLE DRIVEWAYS & PATIOS CHARACTERISTICS CSA A231.

PERMEABLE PAVERS PHYSICAL AND GEOMETRICAL CHARACTERISTICS - PAVERS DRIVEWAYS, PERMEABLE DRIVEWAYS & PATIOS CHARACTERISTICS CSA A231. DRIVEWAYS, DRIVEWAYS & PATIOS PHYSICAL AND GEOMETRICAL CHARACTERISTICS - CHARACTERISTICS CSA A231.2 TECHO-BLOC Compressive strength 50 MPa [7200 psi] min. 50 MPa [7200 psi] min. Absorption - 5 % max. Freeze-thaw

More information

Construction Specification for Concrete Unit Pavers

Construction Specification for Concrete Unit Pavers Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS

More information

SECTION INTERLOCKING CONCRETE PAVERS

SECTION INTERLOCKING CONCRETE PAVERS SECTION 23 14 13 INTERLOCKING CONCRETE PAVERS (1995 MasterFormat Section 02780) Note: This guide specification for concrete paver applications in the U.S. for concrete pavers and bedding sand over a compacted

More information

SPECIFICATION FOR PREFABRICATED VERTICAL DRAINS

SPECIFICATION FOR PREFABRICATED VERTICAL DRAINS SPECIFICATION FOR PREFABRICATED VERTICAL DRAINS 1.0 GENERAL The work covered under this specification includes the installation of prefabricated vertical drains at the locations shown on the plans and

More information

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage. DELTA -DRAIN Section 07 10 00 Dampproofing and Waterproofing PART 1 GENERAL 1.1 SECTION INCLUDES A. Below grade drainage sheets. B. Plaza deck and planter drainage sheets. 1.2 RELATED SECTIONS A. Section

More information

TensarTech TW1 Wall System Earth Retaining Structures

TensarTech TW1 Wall System Earth Retaining Structures Tensar model specification MS/TW1S_1 Issue date 28 February 2014 TensarTech TW1 Wall System Earth Retaining Structures This document is intended to form a basis for Tender documents where the following

More information

BAYFILTER SPECIFICATIONS

BAYFILTER SPECIFICATIONS PART 1.00 GENERAL 1.1 DESCRIPTION BAYFILTER SPECIFICATIONS A. The BayFilter system s internal components manufacturer selected by the Contractor and approved by the Engineer, shall furnish all labor, materials,

More information

SECTION RIPRAP, BOULDERS, AND BEDDING

SECTION RIPRAP, BOULDERS, AND BEDDING SECTION 31 37 00 RIPRAP, BOULDERS, AND BEDDING PART 1 GENERAL 1.01 SECTION INCLUDES A. The WORK includes excavation, grading, and installation of riprap, boulders, soil riprap, void-filled riprap, and

More information

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1 ADDENDUM No. 6 ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1 Due: June 9, 2016 at 2:00 p.m. (local time) The following changes, additions, and/or deletions

More information

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES AGGREGATE BASES PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, accessories, and equipment necessary

More information

SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO)

SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO) SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO) This guide specification for U.S. applications describes construction of bio-infiltration bump outs (or bioretention ) systems. From the surface down to the

More information

MACHINE-LAY Installation Manual

MACHINE-LAY Installation Manual MACHINE-LAY Installation Manual PaveDrain Installation Manual Table of Contents Section 1: Base Preparation (pages 3 6) Section 2: Machine-Lay PaveDrain Blocks (pages 8 11) Section 3: Edge Restraints (pages

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

Cement Stabilized Soil (CSS) (Portland cement)

Cement Stabilized Soil (CSS) (Portland cement) Cement Stabilized Soil (CSS) (Portland cement) 1.0 DESCRIPTION. This specification shall govern the process known as Cement Stabilized Soil (CSS). CSS consists of mixing the existing base, subbase and

More information

Bureau of Materials Materials Approval Procedures

Bureau of Materials Materials Approval Procedures Bureau of Materials Materials Approval Procedures MAP Number: 116-15 Effective Date: April 1, 2015 Approved By: Eileen Sheehy PROCEDURE FOR APPROVAL OF MECHANICALLY STABILIZED EARTH (MSE) RETAINING WALL

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 02630 - STORM DRAINAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

1.0 Introduction. 2.0 Retaining Wall Principles. 3.0 Retaining Wall Installation. 4.0 Installation Details. 5.0 Installation Tables

1.0 Introduction. 2.0 Retaining Wall Principles. 3.0 Retaining Wall Installation. 4.0 Installation Details. 5.0 Installation Tables 1.0 Introduction 1.1 Welcome 01 1.2 System Components 02 1.3 Tools & Equipment 03 1.4 Starting Your Project 04 1.5 Technical Support 05 2.0 Retaining Wall Principles 2.1 Wall Types 06 3.0 Retaining Wall

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

ITEM 458 WATERPROOFING FOR STRUCTURES

ITEM 458 WATERPROOFING FOR STRUCTURES ITEM 458 WATERPROOFING FOR STRUCTURES 458.1. Description. This Item shall govern for the furnishing and placing of waterproofing on concrete and steel bridge decks of railroad structures and on other structures

More information

INTERLOCKING CONCRETE PAVERS SECTION 02780

INTERLOCKING CONCRETE PAVERS SECTION 02780 INTERLOCKING CONCRETE PAVERS SECTION 02780 NOTE: This is a guide specification for the construction of Tremron Interlocking Concrete Pavers and bedding sand over a dense-graded, compacted aggregate base.

More information

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with

More information

Specifications for Concrete Embedment Liner

Specifications for Concrete Embedment Liner Specifications for Concrete Embedment Liner Part 1: GENERAL 1.01 SECTION INCLUDES A. Specifications and guidelines for MANUFACTURING high-density polyethylene embedment liners. 1.02 REFERENCES A. American

More information

AEC Premier Straw Double Net Quick Mow EROSION CONTROL BLANKET SPECIFICATION

AEC Premier Straw Double Net Quick Mow EROSION CONTROL BLANKET SPECIFICATION AEC Premier Straw Double Net Quick Mow EROSION CONTROL BLANKET SPECIFICATION PART I - GENERAL 1.01 Summary A. The erosion control blanket contains agricultural straw fibers for the purpose of erosion control

More information

Tasman Retaining Wall System

Tasman Retaining Wall System Tasman Retaining Wall System The Tasman Retaining Wall System incorporates purpose made corners and capping units to provide classical reconstructed stone retaining walls for any landscape situation. From

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

BELGARD.COM. Tandem Wall Segmental Retaining Wall System BELGARD.COM 1

BELGARD.COM. Tandem Wall Segmental Retaining Wall System BELGARD.COM 1 BELGARD.COM Tandem Wall Segmental Retaining Wall System BELGARD.COM 1 2 For more information visit Belgard.com Table of Contents Tandem Wall System...4 Features & Benefits...5 Installation Instructions...6

More information

MSE WALLS CASE STUDIES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

MSE WALLS CASE STUDIES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch MSE WALLS CASE STUDIES by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch COMMON RETAINING WALL TYPES CONCRETE BLOCK MSE TEMPORARY EARTH SPREAD FOOTING Gabions Drilled Shaft Soil Nail Tiedback

More information

A-2000 PVC Pipe for Storm Sewers and Drainage

A-2000 PVC Pipe for Storm Sewers and Drainage ENGINEERED SOLUTIONS A-2000 PVC Pipe for Storm Sewers and Drainage A-2000 Drainage Pipe Drainage systems are required to meet multiple criteria. The choice of a particular material depends upon a number

More information

DETERMINATION OF THE LONG-TERM PROPERTIES FOR MIRAGRID XT GEOGRIDS

DETERMINATION OF THE LONG-TERM PROPERTIES FOR MIRAGRID XT GEOGRIDS DETERMINATION OF THE LONG-TERM PROPERTIES FOR MIRAGRID XT GEOGRIDS Prepared by: TenCate Geosynthetics Americas 365 South Holland Drive Pendergrass, GA 30567 Tel 706 693 2226 Fax 706 693 4400 www.tencate.com

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

SECTION ECO-CITYLOCK PERMEABLE INTERLOCKING CONCRETE UNIT PAVING

SECTION ECO-CITYLOCK PERMEABLE INTERLOCKING CONCRETE UNIT PAVING SECTION 32 14 13.19 ECO-CITYLOCK PERMEABLE INTERLOCKING CONCRETE UNIT PAVING 1-800-245-PAVE http://www.pavestone.com ATLANTA, GA: (770) 306-9691 AUSTIN/SAN ANTONIO, TX: (512) 558-7283 BOSTON, MA: (508)

More information

CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE

CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE 1.0 GENERAL 1.1 Scope A. This specification guideline covers the technical requirements for furnishing all labor, materials, equipment, and incidentals

More information

Curlex High Velocity EROSION CONTROL BLANKET SPECIFICATION

Curlex High Velocity EROSION CONTROL BLANKET SPECIFICATION Curlex High Velocity EROSION CONTROL BLANKET SPECIFICATION PART I - GENERAL 1.01 Summary A. The erosion control blanket contains excelsior wood fiber for the purpose of erosion control and revegetation

More information

Innovation in Joint Restraint Systems for PVC Pressure Pipe and Fittings. Clean & Safe Drinking Water Workshop. Wednesday, March 25, 2015

Innovation in Joint Restraint Systems for PVC Pressure Pipe and Fittings. Clean & Safe Drinking Water Workshop. Wednesday, March 25, 2015 Innovation in Joint Restraint Systems for PVC Pressure Pipe and Fittings Clean & Safe Drinking Water Workshop Wednesday, March 25, 2015 Thrust forces Gasketed joints are made to seal and not to restrain,

More information

PRODUCT SPECIFICATION CSI FORMAT Slope and Channel Grid Systems April 2009

PRODUCT SPECIFICATION CSI FORMAT Slope and Channel Grid Systems April 2009 PRODUCT SPECIFICATION CSI FORMAT Slope and Channel Grid Systems April 2009 Cell-Tek Geosynthetics LLC 2431 Crofton Lane, Suite 9 Crofton, MD 21114 USA Toll Free (888) 851-0051 Phone (410) 721-4844 Fax

More information

Narrow Modular Pavers (NMP) for Sand-Set Installations

Narrow Modular Pavers (NMP) for Sand-Set Installations The following specification refers to the Stepstone, Inc. product known as: Narrow Modular Pavers (NMP) for Sand-Set Installations Narrow Modular Pavers are part of the California Architectural Paver line

More information

PERMEABLE ARTICULATING CONCRETE BLOCK (P-ACB) SPECIFICATION FOR PARKING LOTS, DRIVEWAYS, ALLEYS AND ROADWAYS

PERMEABLE ARTICULATING CONCRETE BLOCK (P-ACB) SPECIFICATION FOR PARKING LOTS, DRIVEWAYS, ALLEYS AND ROADWAYS PERMEABLE ARTICULATING CONCRETE BLOCK (P-ACB) SPECIFICATION FOR PARKING LOTS, DRIVEWAYS, ALLEYS AND ROADWAYS PART 1: GENERAL A. Definitions Contract Documents the Contract Documents establish the rights

More information

AUGUST 2017 HASTINGS. retaining walls installation guide

AUGUST 2017 HASTINGS. retaining walls installation guide AUGUST 2017 HASTINGS retaining walls installation guide RETAINING WALL INSTALLATION GUIDE RETAINING WALL information Austral Masonry retaining wall blocks are an ideal choice for retaining walls in gardens,

More information

PRODUCT DATA SHEET SikaProof Bentonite

PRODUCT DATA SHEET SikaProof Bentonite PRODUCT DATA SHEET NATURAL SODIUM BENTONITE BELOW GROUND WATERPROOFING SYSTEM (ONLY TO BE APPLIED BY A SIKA APPROVED CONTRACTOR) PRODUCT DESCRIPTION SikaProof Bentonite is a needle punched thermally locked

More information

TensarTech TW3 Wall System Earth Retaining Structures

TensarTech TW3 Wall System Earth Retaining Structures Tensar model specification MS/TW3 Issue date 28 February 2014 TensarTech TW3 Wall System Earth Retaining Structures This document is intended to form a basis for Tender documents where the following Reinforced

More information

Curlex II EROSION CONTROL BLANKET SPECIFICATION

Curlex II EROSION CONTROL BLANKET SPECIFICATION Curlex II EROSION CONTROL BLANKET SPECIFICATION PART I - GENERAL 1.01 Summary A. The erosion control blanket contains excelsior wood fiber for the purpose of erosion control and revegetation as described

More information

SECTION 20 INDEX PAVING FABRIC 1. SCOPE OF WORK MATERIAL REQUIREMENTS CONSTRUCTION AND INSTALLATION REQUIREMENTS...

SECTION 20 INDEX PAVING FABRIC 1. SCOPE OF WORK MATERIAL REQUIREMENTS CONSTRUCTION AND INSTALLATION REQUIREMENTS... SECTION 20 INDEX PAVING FABRIC 1. SCOPE OF WORK... 20-2 2. MATERIAL REQUIREMENTS... 20-2 3. CONSTRUCTION AND INSTALLATION REQUIREMENTS... 20-2 4. METHOD OF MEASUREMENT... 20-5 20-1 SECTION 20 PAVING FABRIC

More information

MAGIC BLOCK DESIGN RESOURCES

MAGIC BLOCK DESIGN RESOURCES MAGIC BLOCK DESIGN RESOURCES MAGIC BLOCK FREESTANDING HOLLOW CORE Magic Block Resources Table of Contents 3 Block Library 4 Design Details 5 Typical Cantilever Wall Section 6 F-HC Freestanding Block Coping

More information

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 2 SPECIAL BENCHING AND SIDEHILL EMBANKMENT FILLS Geotechnical Bulletin GB2

More information