Morehouse School of Medicine

Size: px
Start display at page:

Download "Morehouse School of Medicine"

Transcription

1 /0/00 Print /0/00 00 Campus General Building ID Built Renovated Gross Square Feet Building Type Current Replace Value 00 - ACADEMIC FALITIES $ FC/QI (%) > Electrical Lighting upgrades/retrofits as per Sodexo energy audit dated //009 00,90 Building automation system upgrades/retrofits as per Sodexo energy audit dated //009 9,86 Install variable speed drive retrofits on cooling towers as per Sodexo energy audit dated //009 9, Building Total $90, Building Total $0 Building CR Total $0 Building Total $90, Percent Of Building Value (F) 0.00 % Page ()

2 /0/00 Print /0/00 00 Campus Grounds Building ID Built Renovated Gross Square Feet Building Type Current Replace Value 00 - ACADEMIC FALITIES $ FC/QI (%) > Site Improvements Repair stamped concrete courtyard at Lee St entrance,000 Site Improvements Parking Lot, Asphalt, " Thick (maintenance lot), SY,90 Site Improvements Powerwash, repair, repoint and seal brick amphitheater 8,00 Site Improvements Parking Lot, Asphalt, " Thick (rear of Harris Bldg) 70 SY,00 Building Total $8,90 Building Total $8,90 Building CR Total $0 Building Total $0 Percent Of Building Value (F) >00.00 % Page ()

3 /0/00 Print /0/00 00 Connector Bridge Building ID Built Renovated Gross Square Feet Building Type Current Replace Value, SUPPORTING FALITIES $,000 FC/QI (%) 8.9 Exterior Enclosure Repair window seals on bridge as per Tremco report dated /0/09,0 Building Total $,0 Building Total $,0 Building CR Total $0 Building Total $0 Percent Of Building Value (F) 8.9 % Page ()

4 /0/00 Print /0/00 00 Harris Building Building ID Built Renovated Gross Square Feet Building Type Current Replace Value, 00 - ACADEMIC FALITIES $,69,800 FC/QI (%).88 8,000 8,000 Exterior Enclosure Panic Hardware installation on exit doors,000 Reinsulate pipe in mechanical room,0 Exterior Enclosure Powerwash, repair and repaint bottom 6' of brick exterior wall plus several other wall areas 0,000 Building automation system upgrades/retrofits as per Sodexo energy audit dated //009 (see campus general for costs) Page ()

5 /0/00 Print /0/00 00 Harris Building 8,000 Electrical Upgrade existing lighting fixtures to energy efficient fixtures as per Sodexo energy audit dated //009 (see campus general for cost) Install Fire Suppression System, Wet Pipe, SF/BLDG 8,89 8,000 8,000 Replace Carrier AHUs as recommended in Sodexo energy audit dated //09,000 Building Total $7, Building Total $9,0 Building CR Total $6,000 Building Total $,89 Percent Of Building Value (F) 0. % Page ()

6 /0/00 Print /0/00 00 Hugh M Gloster Building Building ID Built Renovated Gross Square Feet Building Type Current Replace Value 77, ACADEMIC FALITIES $9,,770 FC/QI (%).8,000 Roofing Repair roof leaks as per Tremco report dated /0/09 8,00 Install fire alarm horn/strobe devices in restrooms 8,000,000 Reinsulate pipes in basement mechanical room. 0,000 Replace pipe insulation to rooftop units,00 Install Intellidyne boiler controls as recommended in Sodexo energy audit dated //09,6 Page 6()

7 /0/00 Print /0/00 00 Hugh M Gloster Building,000 Install variable speed drive retrofits on cooloing towers as per Sodexo energy audit dated //009 (see campus general for cost) Building automation system upgrades/retrofits as per Sodexo energy audit dated //009 (see campus general for costs) Roofing Replace flat roof.(include removing/reinstalling rooftop equipment),70 SF 8,6 Electrical Replace emergency generator KW 9,8 Electrical Upgrade existing lighting fixtures to energy efficient fixtures as per Sodexo energy audit dated //009 (see campus general for cost),000,000 Install Fire Suppression System, Wet Pipe (greater than 0,000 SF) (basement has sprinklers) 7,00 SF/BLDG 8,87 Electrical Upgrade building's electrical distribution system, including panels switches, outlets and wiring 77,97 SF/BLDG 66,76 Page 7()

8 /0/00 Print /0/00 00 Hugh M Gloster Building Upgrade heating system form steam to hot water as recommended in Sodexo energy audit dated //09 77,97 SF/BLDG 779,70 Building Total $,76,97 Building Total $,0 Building CR Total $,90,8 Building Total $6,0 Percent Of Building Value (F).69 % Page 8()

9 /0/00 Print /0/00 00 Main Guard House Building ID Built Renovated Gross Square Feet Building Type Current Replace Value SUPPORTING FALITIES $,000 FC/QI (%).7 Replace. ton heat pump system. Installation performed by in-house facilities team. 0,000 /8/ ,0 Install fire alarm system,000 Building Total $,000 Building Total $0,000 Building CR Total $0 Building Total $,000 Percent Of Building Value (F).9 % Page 9()

10 /0/00 Print /0/00 00 Maintenance Bldg Building ID Built Renovated Gross Square Feet Building Type Current Replace Value 7, SUPPORTING FALITIES $99,0 FC/QI (%). Install Fire/Smoke Alarm System 7, SF/BLDG 6,660 Exterior Enclosure Steel Single Door, Frame and Hardware (to office area),000 Electrical Upgrade lighting fixtures from T to T8 flouresent tubes (X8 fixtures) 8 6,000 Exterior Enclosure Steel Double Door, Frame and Hardware 7,0 Exterior Enclosure Repair damaged metal siding in various areas around building,000 Electrical Install Lightstats as recommended in Sodexo energy audit dated //09,76 Install Fire Suppression System, Wet Pipe (less than 0,000 SF) 7, SF/BLDG,6 Page 0()

11 /0/00 Print /0/00 00 Maintenance Bldg Building Total $00,79 Building Total $,0 Building CR Total $0 Building Total $88,66 Percent Of Building Value (F).0 % Page ()

12 /0/00 Print /0/00 00 Medical Education Building Building ID Built Renovated Gross Square Feet Building Type Current Replace Value 66, ACADEMIC FALITIES $6,07,0 FC/QI (%).9,000 Install Fire Suppression System, Wet Pipe 66,78 SF/BLDG 6,789 Install fire alarm horn/strobe devices in restrooms 6,000 Emergency Exit Light (with circuitry) (various locations) 8,896,000,000 ADA /,000 Page ()

13 /0/00 Print /0/00 00 Medical Education Building Install variable speed drive retrofits on cooling towers as per Sodexo energy audit dated //009 (see campus general for cost) Building automation system upgrades/retrofits as per Sodexo energy audit dated //009 (see campus general for costs) Electrical Upgrade existing lighting fixtures to energy efficient fixtures as per Sodexo energy audit dated //009 (see campus general for cost) Install Intellidyne boiler controls as recommended in Sodexo energy audit dated //09,6 Carpet, Roll Goods (library),000 SF 6,000,000,000 Roofing Replace flat roof 8,00 SF 8,0 Upgrade/Replace AHU- as recommended in Sodexo energy audit dated //09,000 Page ()

14 /0/00 Print /0/00 00 Medical Education Building Building Total $,00 Building Total $,000 Building CR Total $9,0 Building Total $8,80 Percent Of Building Value (F) 0.07 % Page ()

15 /0/00 Print /0/00 00 Multi-Disciplinary Center Building ID Built Renovated Gross Square Feet Building Type Current Replace Value 66, ACADEMIC FALITIES $,08,960 FC/QI (%) 0.8 0,000 Emergency Exit Light (with circuitry) (SW corner stairwell), Roofing Repair roof leaks as per Tremco report dated /0/09,0 0,000 0,000 Building automation system upgrades/retrofits as per Sodexo energy audit dated //009 (see campus general for costs) Page ()

16 /0/00 Print /0/00 00 Multi-Disciplinary Center Install Intellidyne boiler controls as recommended in Sodexo energy audit dated //09,6 0,000 0,000 Building Total $67,7 Building Total $,0 Building CR Total $0,000 Building Total $,87 Percent Of Building Value (F) 0.8 % Page 6()

17 /0/00 Print /0/00 00 National Center for Primary Care Building ID Built Renovated Gross Square Feet Building Type Current Replace Value, ACADEMIC FALITIES $,,70 FC/QI (%) 0.9 Emergency Exit Light (with circuitry) (upper side exits in auditorium)), Emergency Egress Light (with circuitry) (auditorium),09 Exterior Enclosure Repair exterior cracked brick near front entrance),00 Exterior Enclosure Repair building envelope leaks as per Tremco report dated /0/09. 60,900 //00 //00 60,900 0 Exterior Enclosure Perform a detailed facade inspection as per Tremco report dated /0/09. 0,80 Exterior Enclosure Repair wall leaks into VP's office as per Tremco report dated 0/0/09,60 Replace carpet in various locations,000 Page 7()

18 /0/00 Print /0/00 00 National Center for Primary Care,000 Interior Construction Improvement/ Functionality / Install safety cage on vertical ladder to roof.,00 Interior Construction Panic Hardware installation on exit doors center stairwell-, kitchen-),000,000 Replace carpet in various locations,000 Replace carpet in various locations,000 Install Metlink Intelli-Hood variablespeed control device to improve dining facility efficiency. 7,6 Install variable speed drive retrofits on cooloing towers as per Sodexo energy audit dated //009 (see campus general for cost) Building automation system upgrades/retrofits as per Sodexo energy audit dated //009 (see campus general for costs) ADA /,000 Page 8()

19 /0/00 Print /0/00 00 National Center for Primary Care,000 Replace carpet in various locations,000 Replace carpet in various locations,000,000 Building Total $,880 Building Total $8,690 Building CR Total $6,000 Building Total $,90 Percent Of Building Value (F) 0.6 % Page 9()

20 /0/00 Print /0/00 00 Parking Deck Building ID Built Renovated Gross Square Feet Building Type Current Replace Value 66, SUPPORTING FALITIES $,88,0 FC/QI (%) 0.67 Install horn/strobe device in each restroom,000 Exterior Decking Evaluate the condition of the parking deck and make recommendations for repair and maintenance (LAS quote dated 8/0/09) 0,0 Exterior Decking Clean out and recaulk all deck joints and make various repairs generated by engineer's report 7,000 Electrical Upgrade existing lighting fixtures to energy efficient fixtures as per Sodexo energy audit dated //009 (see campus general for cost) Install Fire Suppression System, Wet Pipe (less than 0,000 SF)(weight room & security office),600 SF 9,0 Building Total $96,96 Building Total $8,0 Building CR Total $0 Building Total $, Percent Of Building Value (F) 0.9 % Page 0()

21 /0/00 Print /0/00 00 Parking Deck Guard House Building ID Built Renovated Gross Square Feet Building Type Current Replace Value SUPPORTING FALITIES $8,000 FC/QI (%). Install fire alarm system,000 Building Total $,000 Building Total $0 Building CR Total $0 Building Total $,000 Percent Of Building Value (F) 0.00 % Page ()

22 /0/00 Print /0/00 00 Research Wing Building ID Built Renovated Gross Square Feet Building Type Current Replace Value 9, ACADEMIC FALITIES $,6,660 FC/QI (%) 0.7,000,000 Roofing Repair building envelope as per Tremco report dated /0/09 7,0 Building automation system upgrades/retrofits as per Sodexo energy audit dated //009 (see campus general for costs),000 Install Intellidyne boiler controls as recommended in Sodexo energy audit dated //09,6 Page ()

23 /0/00 Print /0/00 00 Research Wing,000,000 Plumbing Replace hot water boiler as recommended in Sodexo energy audit dated //09,000 Building Total $9,8 Building Total $9,0 Building CR Total $6,000 Building Total $,6 Percent Of Building Value (F) 0. % Page ()

LASALLE - BACKUS EDUCATION CAMPUS

LASALLE - BACKUS EDUCATION CAMPUS INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Building Inspection Report

Building Inspection Report Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941

More information

2 Main School Building BLDG-124A Building Purpose Building Area Administrative, Classrooms, Cafeteria and Gymnasium 61,905 SF Inspection Date June 28-

2 Main School Building BLDG-124A Building Purpose Building Area Administrative, Classrooms, Cafeteria and Gymnasium 61,905 SF Inspection Date June 28- 1 Metz Elementary School Site Summary Address 84 Robert Martinez Jr. Austin, TX 78702 Number of Permanent Campus Facilities 1 Original Year of Construction 1993 Total Campus Building Area (combined) 61,905

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

Cheldelin Middle School

Cheldelin Middle School Facility Information Address: 987 NE Conifer Blvd Corvallis Site Size: Building Area: Construction Date: Improved Parking: Grade Levels Served: Regular Classrooms: Portable Classrooms: Sept. 2007 Enrollment:

More information

TEXAS A&M ENGINEERING

TEXAS A&M ENGINEERING TEXAS A&M ENGINEERING 312 Jack K. Williams Administration Building I 3126 TAMU I College Station, Texas 77843-3126 M. Katherine Banks, Ph.D., P.E. Vice Chancellor and Dean of Engineering Director, Texas

More information

School Without Walls

School Without Walls INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

CITY OF NOVI. Police Department

CITY OF NOVI. Police Department CITY OF NOVI Police Department Indoor Gun Range and Training Facility Assessment Analysis with Master Plan for Novi Police Department at Community Build Out Field Services Complex Facility Needs Master

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

LEWIS ELEMENTARY SCHOOL

LEWIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 49,500 SF CURRENT PROGRAM CAPACITY 550 ENROLLMENT 2008 288 WARD 1 PROPOSED PROGRAM CAPACITY 450 Site Plan LEWIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072

More information

CENTENNIAL SCHOOL DISTRICT

CENTENNIAL SCHOOL DISTRICT CENTENNIAL SCHOOL DISTRICT Middle School Feasibility Study Project PLANNING STUDY PRESENTATION 24 May 2016 Middle School Master Planning Process 1. Familiarized team with existing middle schools and sites

More information

TERMINAL BUILDING EVALUATION

TERMINAL BUILDING EVALUATION TERMINAL BUILDING EVALUATION 1.0 INTRODUCTION This report evaluates the existing Terminal Building at Frederick Municipal Airport (FDK) to determine the suitability of the building for continued use as

More information

Facility Improvements

Facility Improvements CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation

More information

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW 27 September 2007 prepared by: J. CHRIS EVANS ARCHITECT 3220 E. Terra Alta Blvd. No. 9 Tucson, Arizona 85716 520.319.8835 evansarch@hotmail.com

More information

Paul Laurence Dunbar Career Academy High School 3000 S King Dr Chicago, IL 60616

Paul Laurence Dunbar Career Academy High School 3000 S King Dr Chicago, IL 60616 Facility Assessment Report This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation

More information

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619

John T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619 E 8th St Chicago, IL 19 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) 2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

LECKIE ELEMENTARY SCHOOL

LECKIE ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Energy Reduction Strategy Through 2020

Energy Reduction Strategy Through 2020 Through 2020 Revised: August 2017 Executive Summary Auburn University is a land, sea and space grant university established in 1856. The university consists of 11,629,000 square feet on 1,840 acres and

More information

Velma F Thomas Early Childhood Center

Velma F Thomas Early Childhood Center Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) Code Requirements for Existing Buildings R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS) was established in 1945 and currently

More information

Revised RESERVE STUDY UPDATE Park Tower Condominium Association Chicago, Illinois Inspected June 1, 2016 Revised July 25, 2016

Revised RESERVE STUDY UPDATE Park Tower Condominium Association Chicago, Illinois Inspected June 1, 2016 Revised July 25, 2016 Revised RESERVE STUDY UPDATE Park Tower Condominium Association Chicago, Illinois Inspected June 1, 2016 Revised July 25, 2016 This Report contains intellectual property developed by Reserve Advisors,

More information

Division 09 FINISHES TABLE OF CONTENTS

Division 09 FINISHES TABLE OF CONTENTS Division 09 FINISHES TABLE OF CONTENTS 09 1000 GENERAL... 3 A. RELATED SECTIONS... 3 B. MAINTENANCE OF FINISHES... 3 C. PUBLIC AREAS... 3 D. CUTTING AND PATCHING... 3 E. CLEANING... 3 F. RECOMMENDED FLOORING

More information

City of Des Moines. Permit and Development Center 602 Robert D Ray Drive Des Moines, IA Phone: Fax:

City of Des Moines. Permit and Development Center 602 Robert D Ray Drive Des Moines, IA Phone: Fax: City of Des Moines Permit and Development Center 602 Robert D Ray Drive Des Moines, IA 50309 Phone: 515-283-4200 Fax: 515-283-4270 This Code Analysis Form must be completed and returned with the Building

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information Anderson Central 100B, PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G

More information

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application DATE: / / PERMIT # REQUEST FOR: NEW BUILDING ADDITION REMODEL PLUMBING ONLY ELECTRIC ONLY

More information

Building Codes and Ordinances ARC 227

Building Codes and Ordinances ARC 227 Building Codes and Ordinances ARC 227 Week 6 Fire Resistive Construction 03.02.10 Instructor: Rick Staub, AIA Email: staub@pointonearchitects.com Phone: 860-434-7707 Fire Resistive Construction Passive

More information

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the

More information

October 26, 2017 Ref.: Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6

October 26, 2017 Ref.: Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6 October 26, 2017 Ref.: 351-1 Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6 Attention: Mr. Jim Sinnott Director of Facilities & Custodial Management Dear Sir:

More information

Appendix A. Facilities Condition Assessment

Appendix A. Facilities Condition Assessment Appendix A Facilities Assessment Facilities Assessment Facilities Assessment s on the Harford Community College campus have been well-maintained and are in excellent condition. Recent renovations to Havre

More information

Facility Assessment Report, Montgomery Independent School District

Facility Assessment Report, Montgomery Independent School District NATATORIUM CAMPUS DATA NATATORIUM 22628 Hwy 105 West, Montgomery TX 77356 Year Built 2009 Approx. Total Square Footage Grades Served 30,420 n/a Current Enrollment n/a Building Levels 1 1 MASTER PLAN 2

More information

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good. EAST LYME HIGH SCHOOL Located at 30 Chester Field Road, East Lyme, Connecticut 06333, the High School s original structure was built in 1967. An addition and alterations occurred in 1973. The building

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

Project Information Session / Meet and Greet # 3

Project Information Session / Meet and Greet # 3 ATL WEST DECK COMPONENT Project Information Session / Meet and Greet # 3 Holder-Austin-Moody-Bryson, a Joint Venture October 10 th, 2017 Agenda 1. HAMB, a JV Company Overview 2. ATL West Deck Project Description

More information

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 SDSU requests approval of this Facility Design Plan for renovation and addition to Harding

More information

BOWIE LEARNING CENTER

BOWIE LEARNING CENTER BOWIE LEARNING CENTER Bowie Learning Center BUILDING DATA BOWIE LEARNING CENTER 900 North Elm St., Weatherford, TX 76086 Year Built 1936 No. of Buildings No. of Portables 0 Approx. Total Square Footage

More information

CARL E. SCHLUTER ELEMENTARY SCHOOL

CARL E. SCHLUTER ELEMENTARY SCHOOL CARL E. SCHLUTER ELEMENTARY SCHOOL Carl E. Schluter Elementary School Campus Data CARL E. SCHLUTER ELEMENTARY SCHOOL 1220 Mesa Crest Drive, Haslet, Texas 76052 Year Built 2011 Approx. Total Square Footage

More information

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will

More information

RESIDENTIAL BUILDING REQUIREMENTS

RESIDENTIAL BUILDING REQUIREMENTS RESIDENTIAL BUILDING REQUIREMENTS Residential Building Requirements This is an informational booklet with some of the general residential construction requirements taken from the codes adopted by Campbell

More information

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com Edouard Modern Living Made Easy uichomes.com - new construction - 3 stories + full basement - 4 bedrooms - 2.5 baths - 2,380 s.f. call 314.881.2333 or e-mail sales@uicstl.com PLAN NTS DECK 13' 0" X 12'-0"

More information

DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016

DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016 DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition Summary

More information

Property Condition Assessment (PCA) Checklist c:\users\joseph\documents\hhc\blog\pca cklist template.doc Friday, August 11, 2006

Property Condition Assessment (PCA) Checklist c:\users\joseph\documents\hhc\blog\pca cklist template.doc Friday, August 11, 2006 FORUM for Historic Harvard Property Assessment (PCA) Checklist c:\users\joseph\documents\hhc\blog\pca cklist template.doc Friday, August 11, 2006 The purpose of this document is to identify in checklist

More information

DRAFT. Baker Center Special Campus Site Summary 64,153 SF. Introduction

DRAFT. Baker Center Special Campus Site Summary 64,153 SF. Introduction 1 Baker Center Special Campus Site Summary Address 3908 Avenue B Austin, TX 78751 Number of Permanent Campus Facilities 3 Original Year of Construction 1911 Total Campus Building Area (combined) 64,153

More information

SUMMARY. Appliance: Corrective Action(s)

SUMMARY. Appliance: Corrective Action(s) Appliances: Range/Oven/Cooktop Appliance: Corrective Action(s) Finding # 1 **Range anti-tip bracket is not installed. Anti-tip brackets are safety devices installed to prevent the range from tipping forward.

More information

Building Code 8 th Edition

Building Code 8 th Edition Massachusetts State Building Code 8 th Edition Kevin S. Hastings, P.E., LEED AP R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com RW R.W. Sullivan Engineering

More information

OFFICE OF EDUCATIONAL FACILITIES FLORIDA BUILDING CODE SECTION 423 APPLICATION MATRIX

OFFICE OF EDUCATIONAL FACILITIES FLORIDA BUILDING CODE SECTION 423 APPLICATION MATRIX 423.1 Scope: Public educational facilities 423.2 Public schools and community colleges general requirements 423.2.1 Owner 423.2.2 Exemption from local requirements 423.2 Code enforcement 423.3.1 School

More information

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #160 Douthit Hills Student Community, Clemson University Project Tony Greene

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #160 Douthit Hills Student Community, Clemson University Project Tony Greene March 2, 2018 Page 1 CURRENT CONSTRUCTION ACTIVITIES WEST ZONE Completed Final Paint in B6 Corridors. Completed Final Clean in CL1 Units. Continued Signing Off Punch List Items in the West Zone. Continued

More information

Exhibit A Declaration of Restrictions Development and Design Standards For Ridge Park Estates

Exhibit A Declaration of Restrictions Development and Design Standards For Ridge Park Estates Exhibit A Declaration of Restrictions Development and Design Standards For Ridge Park Estates Spokane County, Washington For All Property Owners The following Development and Design Standards shall be

More information

Training Certification Categories

Training Certification Categories Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and

More information

Margaret Batts Tobin Laboratory

Margaret Batts Tobin Laboratory Roof Evaluation of Margaret Batts Tobin Laboratory The University of Texas At San Antonio Performed for UTSA Zero/Six Consulting, LLC 8423 Stewart Road Galveston, Texas 77554 409 740 0090 voice Table of

More information

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT Building Permit Application Instructions NOTICE: Keep these instructions for your records. Please read and understand these instructions completely prior to completing and submitting your building permit

More information

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3 MEMORANDUM To: Ashley Rosenthal Payne, Indianapolis Historic Preservation Commission Adrienne Schmetzer, Indiana Housing and Community Development Authority Architecture Preservation Interior Design Landscape

More information

ENERGY AUDIT. 123 Main Street Mississauga, Ontario. January 1, Report To: Mr. John Smith Smith Printing Company.

ENERGY AUDIT. 123 Main Street Mississauga, Ontario. January 1, Report To: Mr. John Smith Smith Printing Company. Report To: Mr. John Smith Smith Printing Company ENERGY AUDIT 123 Main Street Mississauga, Ontario January 1, 2009 120 Carlton Street, Suite 212 Toronto, Ontario M5A 4K2 Tel 416-964-3246 Toll Free 1-866-964-3246

More information

Project Findings: Appendix 2

Project Findings: Appendix 2 NSF Final Report CMMI-1034874 Project Findings: Appendix 2 Selected Damage Photos of Engineered Buildings PART 1. St. Louis Gonzague Cafeteria Building Civil Engineering and Engineering Mechanics Department

More information

Classroom Facilities Assessment Program. Building Phone: Enrollment Date is the date in which the current enrollment was taken.

Classroom Facilities Assessment Program. Building Phone: Enrollment Date is the date in which the current enrollment was taken. Building Information - Cincinnati City SD (43752) - Jacobs Center Middle (81778) Program Type: Setting: Assessment Name: Classroom Facilities Assessment Program Urban Jacobs Center Middle School Assessment

More information

1 BASE HOME CONSTRUCTION SPECIFICATIONS: TOWNHOMES 5-13-2015 Note: Specifications noted below may change based on selected options. Verify upgrades from the base specifications with the option sheets and

More information

KETTERING ICE ARENA STRUCTURAL & MEP STUDY

KETTERING ICE ARENA STRUCTURAL & MEP STUDY KETTERING ICE ARENA STRUCTURAL & MEP STUDY PREPARED BY: HEAPY ENGINEERING MECHANICAL ELECTRICAL COMMISSIONING TECHNOLOGY 1400 WEST DOROTHY LANE DAYTON, OHIO 45409-1310 HEAPY PROJECT NO. 2013-07046 MARCH,

More information

*Additional Projects were not part of the voter-approved 2006 Bond. They were able to be completed due to savings from other projects.

*Additional Projects were not part of the voter-approved 2006 Bond. They were able to be completed due to savings from other projects. SECONDARY SCHOOLS Kirby Middle School Demolish 300, 400, and 500 buildings partial Change in total rebuild design New academic building - 33 classrooms *Rent portables for temporary classrooms partial

More information

Features & Amenities. EXTERIOR FINISHES COMMUNITY FEATURES

Features & Amenities.  EXTERIOR FINISHES COMMUNITY FEATURES Features & Amenities COMMUNITY FEATURES EXTERIOR FINISHES WARRANTY COVERAGE Located in the heart of Troy along the east side of Rochester Road, between Wattles and Long Lake Roads Easy access to I-75 and

More information

RESIDENTIAL COMPONENT TECHNOLOGY Mobile Manufactured Housing

RESIDENTIAL COMPONENT TECHNOLOGY Mobile Manufactured Housing RESIDENTIAL COMPONENT TECHNOLOGY Mobile Manufactured Housing GENERAL INFORMATION Policy Number: Insured Name: Property Address: Property Zip: Agent: Branch: Current Coverage: _ Account Number: _ PROPERTY

More information

Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal

Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal The following documentation provides an example submittal for the LEED-NC v2.1 Energy & Atmosphere Credit 1 (EAc1). This sample EAc1 submittal

More information

Mueller Laboratory Renovation

Mueller Laboratory Renovation Mueller Laboratory Renovation Technical Report #1 By Mark Jackson Construction Management Option 9/19/14 Executive Summary The Mueller Laboratory building on the Penn State University Park campus was built

More information

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5 Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey 01-2320 sqft.spf] Page 1 of 5 PREPARATION PRELIM PERMITS & FEES Building Permit 1 each 2200.00 _ 2200.00

More information

FLOORPLAN /ELEVATION SQ.FT. BDRM BATHS GARAGE BASE PRICE

FLOORPLAN /ELEVATION SQ.FT. BDRM BATHS GARAGE BASE PRICE FLOORPLAN /ELEVATION SQ.FT. BDRM BATHS GARAGE BASE PRICE PROVIDENCE Prairie 1713 2 + Den 2 2 $341,400 Country Cottage 1713 2 + Den 2 2 $343,400 Craftsman 1713 2 + Den 2 2 $349,400 2 bedrooms + den or optional

More information

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION 1 PLAN INFORMATION Residential plans must be legible and capable of digital scanning. All sheets shall be the same size and distinctly labeled with a sheet title and number. The minimum dimension of the

More information

Energy Trigger (A Existing Building Upgrade Mechanism Model)

Energy Trigger (A Existing Building Upgrade Mechanism Model) Trigger (A-11.2.1.2 Existing Building Upgrade Mechanism Model) Applicability All Building Permit applications for projects related to existing buildings are required to follow the energy upgrade trigger

More information

December 9, Mr. J. Thomas Helton, Ed.D. Columbus State University Foundation Properties, Inc University Avenue Columbus, Georgia 31907

December 9, Mr. J. Thomas Helton, Ed.D. Columbus State University Foundation Properties, Inc University Avenue Columbus, Georgia 31907 1841 W Oak Parkway, Suite F Marietta, Georgia 30062 www.cardnoatc.com 770.427.9456 Fax 770.427.1907 December 9, 2013 Mr. J. Thomas Helton, Ed.D. Columbus State University Foundation Properties, Inc. 4225

More information

DATE: Thursday, October 5,, :00 Noon Local Time

DATE: Thursday, October 5,, :00 Noon Local Time Issued: September 14, 2017 REQUEST FOR PROPOSALS FOR PROFESSIONAL ARCHITECTURAL / ENGINEERING SERVICES FOR CENTRAL RECREATION CENTER PUBLIC IMPROVEMENTS FOR THE CITY OF CLEVELAND Issuing Office: City of

More information

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco

More information

Technical Facility Management FACILITY CONSULTING SERVICES. The Facility Audit Program

Technical Facility Management FACILITY CONSULTING SERVICES. The Facility Audit Program Technical Facility Management FACILITY CONSULTING SERVICES The Facility Audit Program TFM Audit Program - Schedule Customer: Dates of Visit: AREA TFM CUSTOMER SUBJECT Goals/Objectives Schedule Key Interviews

More information

SIDEWALK & RAILING REPLACEMENT BOARD OF ED BUILDING

SIDEWALK & RAILING REPLACEMENT BOARD OF ED BUILDING PROJECT: 25 E 5 S SALT LAKE CITY, UTAH 84111 CODE ANALYSIS APPLICABLE CODES 675 E. 5 S. Suite 4 DFCM PROJECT NUMBER: 182782 DFCM CONTRACT NUMBER: 18793 STRUCTURAL ENGINEER: REAVELEY ENGINEERS + ASSOCIATES

More information

Property Offering. Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711

Property Offering. Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711 Property Offering Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711 Executive Summary We are pleased to present an outstanding cold storage opportunity in Evansville, Indiana. Built in

More information

HISTORIC PLAN, FLOOR PLANS, AERIAL PHOTOS

HISTORIC PLAN, FLOOR PLANS, AERIAL PHOTOS 1 Page 1 of 28 HISTORIC PLAN, FLOOR PLANS, AERIAL PHOTOS HISTORIC PLAN NOT TO SCALE NORTH 2 Page 2 of 28 SITE PLAN NOT TO SCALE NORTH 3 Page 3 of 28 BUILDING INSPECTION REPORT The assessment of site and

More information

THE STRATA UNIT May 25, 2008

THE STRATA UNIT May 25, 2008 THE STRATA UNIT May 25, 2008 Over the years, we have been asked time and time again from our experience as a cost consultant and a project manager from both a restoration and renovation point of view What

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma LEED Green Building Certification The purpose of the LEED Green Building Rating is to provide a national standard that aims to improve environmental, health and economic performance of buildings using

More information

CODE COMPLIANCE PLAN REVIEW PROCEDURES

CODE COMPLIANCE PLAN REVIEW PROCEDURES CODE COMPLIANCE PLAN REVIEW PROCEDURES 1. All construction for state agencies on state-owned or state leased-purchased properties or facilities are to submit design documents for code compliance plan reviews

More information

Manufacturing Facilities Proposal

Manufacturing Facilities Proposal Manufacturing Facilities Proposal Construction proposal To assist business owners with expansion projects, Wisconsin Public Service has compiled information and renderings of common building types in business

More information

CAREERS. in the Construction TRADES

CAREERS. in the Construction TRADES CAREERS in the Construction TRADES Electrical Modern life would not be possible without electricians. If you like to know how electric currents make things work, then this is the trade for you. Qualified

More information

Mount Vernon Elementary School Grades PK 5

Mount Vernon Elementary School Grades PK 5 Barbour County Schools Comprehensive Educational Facilities Plan 2010-2020 Mount Vernon Elementary School Grades PK 5 Blackwood Associates, Inc. / MSES consultants, Inc. / Roy Blizzard and Associates Mount

More information

Jane Addams Elementary School S Avenue H Chicago, IL 60617

Jane Addams Elementary School S Avenue H Chicago, IL 60617 00 S Avenue H Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

INSPIRE each student to develop a strong

INSPIRE each student to develop a strong DEL PASO MANOR ELEMENTARY SCHOOL Valuing a culturally and academically DIVERSE COMMUNITY, Del Paso Manor Elementary School s Mission is to EDUCATE and INSPIRE each student to develop a strong A C A D E

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Facilities Condition Assessment Qualcomm Stadium

Facilities Condition Assessment Qualcomm Stadium Qualcomm Stadium Facilities Condition Assessment Qualcomm Stadium Facilities Condition Assessment AECOM San Diego, California April 2011 Qualcomm Stadium Qualcomm Stadium Facilities Condition Assessment

More information

THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE

THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE Reimbursement estimates are component by component assessments of the value of completed repairs. They are produced through the use of Xactimate assessment

More information

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011 UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011 CONTENTS A. PURPOSE B. DESIGNATED RESPONSIBILITIES C. DEFINITIONS D. PROJECT SUBMITTAL PROCEDURE E. REQUIREMENTS

More information

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II Fire Inspection and Code Enforcement, 7 th Edition Chapter 6 Building Construction: Components Today we will Discuss fire walls, party walls, fire partitions, and curtain walls Discuss roof types and coverings

More information

Floor Plan. *The floor plan represents a section view of a residence which has had an imaginary cut made approximately 4 feet above the floor line.

Floor Plan. *The floor plan represents a section view of a residence which has had an imaginary cut made approximately 4 feet above the floor line. Floor Plan Symbols Floor Plan *The floor plan represents a section view of a residence which has had an imaginary cut made approximately 4 feet above the floor line. *Residential floor plans are generally

More information

Classroom Facilities Assessment Program. Building Phone: Enrollment Date is the date in which the current enrollment was taken.

Classroom Facilities Assessment Program. Building Phone: Enrollment Date is the date in which the current enrollment was taken. Building Information - Cincinnati City SD (43752) - Parham Elem (61606) Program Type: Setting: Assessment Name: Classroom Facilities Assessment Program Urban Parham Elementary Assessment Date: 2001-05-25

More information

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER THE CORPORATION OF THE MUNICIPALITY OF SOUTH HURON 322 Main Street South, P.O. Box 759, Exeter, Ontario N0M 1S6 PHONE: (519) 235-0310 FAX: (519) 235-3304 TOLL FREE: 1-877-204-0747 WEBSITE: www.southhuron.ca

More information

Seasons Business Center New Construction!

Seasons Business Center New Construction! Seasons Business Center New Construction!...Seasons Business Center Stow, Ohio 114,188 SF of High Bay Space 32 Clear Height 80 480 ESFR Sprinklers Tax Abatement Available 8 Reinforced Concrete Floor 271

More information

Homebuyers Survey. Final Report. Mr Client. A Home, A Street, A Town. 3rd July 2014

Homebuyers Survey. Final Report. Mr Client. A Home, A Street, A Town. 3rd July 2014 Homebuyers Survey Final Report Mr Client A Home, A Street, A Town 3rd July 2014 Alpine Water Management Ltd Dorset House Regent Park Kingston Road Leatherhead KT22 7PL Tel: 0845 319 9 319 www.alpinedamp.co.uk

More information

Project Findings: Appendix 2

Project Findings: Appendix 2 NSF Final Report CMMI-1034874 Project Findings: Appendix 2 Selected Damage Photos of Engineered Buildings PART 2. Teleco Office Tower Civil Engineering and Engineering Mechanics Department University of

More information

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630

James B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630 Linder Ave Chicago, IL 030 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Calgary Health Region Carewest Cross Bow Auxiliary Hospital B1073A Calgary Report run on: March 3, 9:44 AM Building Name: Address: Location: Building Id: Gross Area (sq.

More information

Page 3 of 12. Inspected Describe. Explained. Health & Safety. Maj. Def. Examiner Notes STRUCTURE N/A. Financial Impact. Impact.

Page 3 of 12. Inspected Describe. Explained. Health & Safety. Maj. Def. Examiner Notes STRUCTURE N/A. Financial Impact. Impact. STRUCTURE Foundations * Floor structure * Wall structure * Ceiling structure * Roof structure * Deficiencies in structure * Access Method d Under floor crawlspace/attic * Page 3 of 12 EXTERIOR Exterior

More information

COMMERCIAL PLANS SUBMITTAL CHECKLIST For Commercial and Multi-family (3 or more units) Building Permit Applications

COMMERCIAL PLANS SUBMITTAL CHECKLIST For Commercial and Multi-family (3 or more units) Building Permit Applications COMMERCIAL PLANS SUBMITTAL CHECKLIST For Commercial and Multi-family (3 or more units) Building Permit Applications Building Permit Application (3 rd Page MUST be signed & notarized by Owner!) Plans can

More information

THE CONSTRUCTION SUPERVISOR

THE CONSTRUCTION SUPERVISOR City of Aurora Building Inspections 15151 E Alameda Pkwy Aurora, CO 80012 (303) 739-7420 THE CONSTRUCTION SUPERVISOR When a building permit has been issued for any construction within the City, the Supervisor

More information