1 Update on Testing Medium Voltage Cable and Switchgear Systems Friday, May 29, 2015 Presented by: Ashley Harkness Electrical Reliability Services
2 Value--- When we find the one serious problem You can focus Effort / Manpower Maintenance $$$-- In the right place.
3 What we will look at: On Line Partial Discharge System Test No Outage Required Passive Diagnostic Technique Finding Water Tree Damage Non-destructive Tan Delta measurement 3
4 Take Aways. Best for your System Condition / Age Understand: Different Test / Different Results: Diagnostic Tests: Yield Trended Data On-Line tests: No Outage 4
5 MV System Life Estimate Hypothetical Cable System Failure Profile Failures Term. & Splice Failures Cumulative Term. & Splice Failures Cable Failures Cumulative Cable Failures Cumulative Total Failures Infant Mortality Normal Performance End of Life Time
6 Something to Consider Insulation breakdown is the leading cause of electrical failure. Partial Discharges (PD) are the first indications of insulation deterioration.
7 On Line PD Examples A Laboratory on a hill had three failures in December.
8 Outdoor Switchgear, Three Project Issues No shutdown. 2. No opening Hot gear 3. Survey---NOW! Main Distribution Air Switch and Transformer SF-6 Switches
9 12 kv Air Switch Insulator Support Tracking Damage Due to Dirt
10 Three Outdoor Switchgear Problems--- Found from Outside 1. Arcing to ground between A107-A Unshielded Cables Touching. 3. Insulator Tracking. PD data for multi Channels #1 # # PD Magnitude (mv) Phase (Degrees)
11 #1 SWITCHGEAR DAMAGE Arcing damage at insulator transition from cubicle to cubicle
12 #2 CABLE DAMAGE CORONA DAMAGE
13 #3 SWITCHGEAR DAMAGE Corona damage on the insulator and support structure Tracking damage on the insulator
14 Transformer Termination PD PD data for multi Channels Phase (Degrees) PD Magnitude (mv) BNK 303 Upper BNK 303 Lower
15 Termination: What Was Found Surface corona damage to the cable termination
16 What is Partial Discharge? Small electrical sparks within and across high voltage insulation. PD results in electrical breakdown of air PD erodes insulation PD causes insulation failure.
17 The Partial Discharge Process HEAT / CHEMICAL REACTIONS ACOUSTICS, SOUND LIGHT ELECTROMAGNETIC WAVES, PULSES
18 BASIC PROBLEM---
19 Insulator Tracking Damage The Insulator is a fiberglass and polymeric material.
20 Deterioration = Life Damage Due to Installation High installation side wall stresses Tight Cable Bends: shield deformation Cuts, scrapes: Broken jackets and shields Workmanship issues Damage Due to Operations Severe Loading, Short circuits; Temperature Extremes: Conductor Migration, Dielectric Changes Gaps and Voids, Semi-con / insulation separations
21 Load Break Elbow Dirt + Moisture + Poor Workmanship = Tracking, Failure, Shutdown
22 Metal-tape shield Outer Jacket Insulation shield Insulation Conductor shield Electrical Conductor Picture Provided by Okonite
23 Installation Damage
24 The Role of Cable Damage Shield Corrosion Disconnected Shield conductor Damaged Jacket/ water penetration Bending radius damage
25 The Role of Cable Damage Shield Conductor Corrosion:
26 The Role of Aging: Elevated Temperature accelerates aging Limits useful life Typical aging : Loss of volatile constituents Oxidation of materials leading to embrittlement Molecular changes due to hydrolytic interaction of insulation with water Chemical breakdown of constituents Organic materials change physical properties
27 Transients Weaken Insulation Transient PD voltage Unrecoverable fault Impulse 1 Impulse 2 Impulse 3 Impulse 4 Impulse 5 Time 7200V
28 And Then, There Were Rats How did we know?
29 How Do We Detect Online PD?
30 How Do We Detect Online PD? Apply Magnetic External Sensors Transient Earth Voltage (TEV) Internal local PD (Tracking, Leakage) No shutdown Does NOT evaluate the Cable Insulation
31 How the TEV Works Internal PD signals Leak out through openings External capacitive TEV senses the leaking RF The resulting signal images the PD
32 Permanent Sensors
33 Cable Mapping Finding the PD s Location along the cable.
34 LIKE RADAR Cable PD pulses time of flight = Distance
35 Mapping the Cable Run 4,500 4,000 3,500 3,000 2,500 2,000 1,500 1, PD Map of Circuit 1500kVA XFMR N. (from POA 3) All Joints Location (% along cable) Mapping showed the PD at ~85% of cable length: ~1031 ft.
36 Waste Water Treatment Plant, Cable PD
37 Waste Water Treatment Plant Severely bent cables
38 On Line Partial Discharge Testing Advantages: NO OUTAGE NEEDED For Cables, etc., (HFCT) and Enclosure (TEV) For Switchgear/Transformer Encl. (TEV Only) Yields termination, insulator, and bushing: corona and tracking Partial Discharge testing can detect, trend, and locate hidden system damage before an unplanned outage.
39 On Line PD Test Methods
40 Initial Field Survey
41 Placing the TEV Sensors
42 Permanent Sensors External connector
43 Remember our opening--- When we find the one serious problem You can focus Effort / Manpower Maintenance $$$-- In the right place.
44 STAY SAFE! Contact me at: Electrical Reliability Services
Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards
Change History Date Description of Change Pages / Sections Modified Change Approver Initials 6/15/16 Updated division section from 16124 to 2605 - mgl44 13, removed references to other section 10/17/14
More informationSection ARMORED MEDIUM VOLTAGE CABLES SHIELDED 3 CONDUCTOR POWER CABLE - INTERLOCKED ARMOR
PART 1 - GENERAL Section 26 05 15 SHIELDED 3 CONDUCTOR POWER CABLE - INTERLOCKED ARMOR 1.1 Cable shall be 15 kv, shielded, three conductor with ground, stranded copper, with continuously welded and corrugated
More informationLA Engineering Academy
Laxmi Associates Consultancy Third party Inspection RLA Testing& Commissioning AMC Project Management Training 323-324, Sunplaza1, GIDC Road, Makarpura, Vadodara-390010. lxassociates@gmail.com, www.laxmiassociates.in,
More informationInstallation, Inspection and Maintenance of Dry Type Transformers
Dry Type TX 1 of 8 Installation, Inspection and Maintenance of Dry Type Page 1 of 8 Dry Type TX 2 of 8 Table Of Contents Page Number 1. General... 3 2. Installation... 3 3. Safety Inspections... 4 4. Safety
More informationConductor Shield A combination of semi-conducting tape and extruded thermosetting semi-conducting material meeting UL 1309, IEEE 1580 and UL1072.
37-105VFD MMV-VFD Power Cable Three : kv - 15kV 133% Level Rated 90 C s (3) Soft annealed flexible stranded tinned copper per IEEE 150 Table 11. Extruded thermosetting 90 C Ethylene Propylene Rubber (EPR),
More informationPulsed Eddy-Current (PEC) Inspection through Insulation
INDUSTRIAL SERVICES WHITE PAPER PULSED EDDY CURRENT Pulsed Eddy-Current (PEC) Inspection through Insulation Method statement of an advanced non-destructive testing technique for inspection through insulation.
More informationINNOVATIVE LIFE-CYCLE CONCEPTS FOR MEDIUM-VOLTAGE SWITCHGEAR ON BROWN COAL SURFACE MINING DEVICES
INNOVATIVE LIFE-CYCLE CONCEPTS FOR MEDIUM-VOLTAGE SWITCHGEAR ON BROWN COAL SURFACE MINING DEVICES Dr. S. Ruhland, Dr. U. Riedl ALSTOM Sachsenwerk GmbH, Germany The requirements for medium voltage switchgear
More informationEngineering Data for Copper and Aluminum Conductor Electrical Cables
2018 Edition Engineering Data for Copper and Aluminum Conductor Electrical Cables THE OKONITE COMPANY Okonite Cables...A higher Standard! The Okonite Company, 2018 Okonite Cables Table of Contents SECTION
More informationB. Provide liquid-filled secondary substation transformers as indicated on drawings.
SECTION 26 12 13 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 26 05 00. B. Provide liquid-filled secondary substation transformers as indicated on drawings. 1.02 RELATED
More informationHistory of Cable Systems HISTORICAL OVERVIEW OF MEDIUM & HIGH VOLTAGE CABLES. Nigel Hampton
HISTORICAL OVERVIEW OF MEDIUM & HIGH VOLTAGE CABLES Nigel Hampton Copyright GTRC 2012 Objective To present the evolution of cables in time to understand the lessons from the past: the legacy problems and
More informationCONTACT ELECTRICAL CHARACTERISTICS TIGER CLAW CONTACT TESTING. A. Gas Tight
CONTACT ELECTRICAL CHARACTERISTICS TIGER CLAW CONTACT TESTING A. Gas Tight 1. Purpose - To evaluate the integrity of the contact interface by assessment of the gas tight characteristics of the contacting
More informationElectrical Insulating Tapes
Electrical Insulating Tapes Energy, Mining, Industrial and Contractors applications LV and MV electrical jointing and termination applications Adhesive or Self-amalgamating UV resistant Cold and weather
More informationInstruction guide Medium Voltage equipment on sites exposed to high humidity and/or heavy pollution. Recommendations for installation and use
Medium Voltage equipment on sites exposed to high humidity and/or heavy pollution Recommendations for installation and use Contents Introduction 2 Use of MV equipment 2 Normal service conditions for indoor
More information15 kv EPR Insulated, Jacketed, URD Cable
15 kv EPR Insulated, Jacketed, URD Cable 1000 kcm Copper Conductor with Tape Shield Page 1 of 11 Table Of Contents 1 GENERAL... 3 2 STANDARDS... 3 3 APPROVED CABLE MANUFACTURERS... 3 4 REEL SPECIFICATIONS...
More informationFAST SPOTTER WT-FS-5.0
. FAST SPOTTER WT-FS-5.0 Installation, Operating and Maintenance Manual WELDING TECHNOLOGIES www.weldingnet.com 1365 Horseshoe Dr., Blue Bell, PA 19422 Phone: 610-278-9325 Fax: 610-278-9325 Toll Free Number:
More informationAlvin.Xu, ABB Xiamen Switchgear Co,Ltd, Green & Energy saving concept of ABB MV apparatus For a better tomorrow.
Alvin.Xu, ABB Xiamen Switchgear Co,Ltd, 2014-11 Green & Energy saving concept of ABB MV apparatus For a better tomorrow Slide 1 VD4 vacuum circuit-breaker in China Inheritance and innovation Y1992 Y2003
More informationELECTRICAL BULLETIN
PO Box 697 Halifax, Nova Scotia B3J 2T8 ELECTRICAL BULLETIN 2015-01 From: David MacLeod, C.E.I., P.Eng. Pg. 1 of 7 Provincial Chief Electrical Inspector Date: March 10, 2015 Subject: Adoption of the 2015
More informationCONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 48-05 Van Dam Street Long Island City, NY 11101 ELECTRIC METER SHOP DEPARTMENT METER ENGINEERING SPECIFICATION MES-350 REVISION 3 June 2016 EFFECTIVE DATE
More informationProduct Information. Stress Control Element Insulation. 3M QS 2000E 24kV I DN A
Volume: Power Utility Section: Medium-Voltage Power Cables 6/10 (12) kv up to 21/36 (42) kv Product: 3M QS 2000E Number/Issue: AABBCC46047#E/01 Date: February, 13.2007 Author: W. Röhling / R. Hornig 1.
More informationDissolved Gas Analysis of Transformer Oils: Effects of electric arc
Proceedings of the 6th WSEAS International Conference on Power Systems, Lisbon, Portugal, September 22-24, 26 376 Dissolved Gas Analysis of Transformer Oils: Effects of electric arc SUWARNO School of Electrical
More informationEffective June, Eaton-Durham Model # UTRS223ACH. Siemens, Model # SUAS877-PG. (or Landis & Gyr # UAS877-PG) Milbank. Model # U1980-O.
Siemens, Model # SUAS877-PG (or Landis & Gyr # UAS877-PG) Eaton-Durham Model # UTRS223ACH Milbank Midwest Model # U980-O UTRS223AMEP These are some examples of the single meter sockets we require for underground
More informationUNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Medium Voltage Switchgear. Basis of Design.
Basis of Design This section applies to the design and selection of medium voltage switchgear, primarily for use in substations. Design Criteria 13.8kV equipment shall be 15kV class, 4.16kV and 2.4kV equipment
More informationNon Destructive Inspection Technology for Thermal Power Plants
37 Non Destructive Inspection Technology for Thermal Power Plants MIKIYASU URATA *1 KIYOTAKA AOKI *1 NAOYA URATA *2 KOICHI TAGAMI *2 MANABU KONDO *2 SHINTARO MATSUMOTO *3 In boiler facilities for thermal
More information3.0) TRANSMISSION LINES MINIMUM REQUIRED STANDARDS LINES
3.0) TRANSMISSION LINES MINIMUM REQUIRED STANDARDS LINES 3.2 Underground Lines [below sections will be renumbered at a later date] 5.0 GENERAL REQUIREMENTS 5.1 Underground transmission lines 69 kv and
More informationSECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less)
SECTION 260523 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less) PART 1 - GENERAL 1.1 SUMMARY A. Related Documents: 1. Drawings and general provisions of the Subcontract apply
More informationEvaluation of Aluminum Cable Presentation for IEEE OCS September 14, 2011 Breck Booker, Southwire
Evaluation of Aluminum Cable Presentation for IEEE OCS September 14, 2011 Breck Booker, Southwire Today s Topics Brief Overview of Southwire In-depth Discussion on Aluminum Characteristics Discussion of
More informationELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (4th)
Factory Name Address Joyna Bazer Road, Jamirdia, Valuka Factory ID 9504 Electrical Safety dates Initial Date 06/07/2014 Date of 5 th Follow Up Report Received Date 07/27/2015 Date of 6 th Follow Up Date
More informationELECTRICAL SAFE WORK PRACTICES
ELECTRICAL SAFE WORK PRACTICES I. PURPOSE To establish minimum acceptable standards for AC and DC electrical safe work practices. The program includes requirements for the training of qualified and unqualified
More informationStandard of Practice - Campus Electrical Distribution System
A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all
More informationUnderground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11
Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11 Underground Residential Distribution (URD) Index General Discussion... 1-2 Description... 3-7 Drawings (Available
More informationB. Provide a complete conduit system with associated couplings, connectors, and fittings.
SECTION 26 05 33 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 260500. B. Provide a complete conduit system with associated couplings, connectors, and fittings. 1.02 RELATED
More informationThe complete guide to transformers and packaged substations
LAND LOGICAL POWER The complete guide to transformers and packaged substations Contents Land Logical Power transformers An introduction to the complete range of Land Logical Power transformers and package
More informationPIP PCEPA003 Process Analyzer System Field Installation Guidelines
January 2016 Process Control PIP PCEPA003 Process Analyzer System Field Installation Guidelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,
More informationPower Factor Fundamentals
Power Factor Fundamentals What we will learn: Most Industrial loads require both Real power and Reactive power to produce useful work You pay for BOTH types of power Capacitors can supply the REACTIVE
More informationGas-insulated medium-voltage switchgear. for marine and offshore applications. Answers for energy.
Gas-insulated medium-voltage switchgear for marine and offshore applications Answers for energy. 8DH10 switchgear up to 24 kv, up to 20 ka, up to 1,250 A up to 17.5 kv, up to 25 ka, up to 1,250 A Full
More informationUNDERGROUND SERVICES SECONDARY
Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-
More informationPART MATERIAL REMARK Metal Case with Pig-tail. Brass (Metal Case) Copper (Pig-tail) Star Contact Copper Silver Plated
1. SCOPE This specification defines the technical requirements of TZ-D series thermal-link with PROFFUSE brand that are produced according to IEC 60691, UL 60691,GB 9816. 2. APPLICABLE STANDARDS IEC 60691,
More informationGas measurements as a mean for identification of Partial Discharges in XLPE HV cable insulation
Gas measurements as a mean for identification of Partial Discharges in XLPE HV cable insulation Patrick Janus, Hans Edin, Kruphalan Tamil Selva KTH Royal Institute of technology Stockholm, Sweden Abstract
More informationCCC Services for oil-filled- and XLPE-Cable Systems
sc CCC Services for oil-filled- and XLPE-Cable Systems Service Programme for Cable Systems As a supplier of MV- and HV-cable systems with several decades of experience, CCC GmbH Berlin offers the full
More informationINTERNAL INSULATION FAILURE MECHANISMS OF HV EQUIPMENT UNDER SERVICE CONDITION
INTERNAL INSULATION FAILURE MECHANISMS OF HV EQUIPMENT UNDER SERVICE CONDITION By V.V. SOKOLOV A.K.LOKHANIN Summary In order to determine of efficient diagnostic system and to prevent catastrophic failures,
More information2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property
2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical
More informationBasic Reliability Analysis of Electrical Power Systems
Basic Reliability Analysis of Electrical Power Systems Course No: E03-020 Credit: 3 PDH Velimir Lackovic, Char. Eng. Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980
More informationWIRING METHODS CHAPTER 38
CHAPTER 38 WIRING METHODS SECTION E3801 GENERAL REQUIREMENTS E3801.1 Scope. This chapter covers the wiring methods for services, feeders and branch circuits for electrical power and distribution. E3801.2
More informationUsing capacitance sensors to monitor soil moisture. Interpreting the numbers
Using capacitance sensors to monitor soil moisture Interpreting the numbers Terry Prichard Water Management Specialist Dept. Land, Air, and Water Resources UC Davis MEASURES OF SOIL WATER STATUS There
More informationArtificial Accelerated Ageing Test of Silicone Rubber Housing Material for Lightning Arrester
Artificial Accelerated Ageing Test of Silicone Rubber Housing Material for Lightning Arrester W. Payakcho, J. Grasaesom, S. Thong-om and B. Marungsri* Abstract This paper presents the experimental results
More informationThis section applies to the design and installation relating to wire and cable systems and terminations. 16G Figure 1 16G Figure 2
Wire, Cable and Terminations Basis of Design This section applies to the design and installation relating to wire and cable systems and terminations. Design Criteria Medium Voltage Review and modify the
More informationAnalysis of distribution system reliability and outage rates
Reclosers Technical Data TD280026EN Supersedes pril 2003 (R280-90-7) COOPER POWER SERIES nalysis of distribution system reliability and outage rates Recloser Technical Data TD280026EN nalysis of distribution
More informationB. Accept materials on site in original factory packaging, labeled with manufacturer s identification.
SECTION 26 05 02 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Work Included: Furnish all labor, material, services and skilled supervision necessary for the construction, erection, installation,
More informationPair Count Minimum Bend Radius Design Type Maximum Pulling Tension
EnduraGain OSP Cable Installation Guidelines EnduraGain OSP Cable Superior Essex manufactures EnduraGain Outside Plant (OSP) cables for outdoor use in Category 5, 5e, 6 and 6A cables designs. Category
More informationHigh Energy Arcing Faults (HEAF) and Their Impact on PRA for a Nuclear Power Plant Latest International Operating Experience and Research Activities
High Energy Arcing Faults (HEAF) and Their Impact on PRA for a Nuclear Power Plant Latest International Operating Experience and Research Activities Marina Roewekamp GRS ggmbh, Germany Nicholas Melly,
More informationSpecifications for Residential Overhead Electric Service Installation
Specifications for Residential Overhead Electric Service Installation This brochure addresses most typical residential overhead service installations. Variances for the following specifications must be
More informationTitle: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards
Date Description of Change Pages / Sections Modified ID 6/15/16 Updated format, division title, and removed references to other sections. - mgl44 A. Summary This section contains design criteria for the
More informationAcoustic Fiber Optic Monitoring of PCCP and Pipelines of Other Materials. Stewart Day, Pure Technologies
Acoustic Fiber Optic Monitoring of PCCP and Pipelines of Other Materials Stewart Day, Pure Technologies 1 Presentation Outline PCCP Common failure modes Metallic pipe failure modes PCCP & metallic pipe
More information2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING
2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING E3305.3: now reads The space equal to the width and depth of the panelboard and extending
More informationArticle 324: Flat Conductor Cable (FCC) 1.! Type FCC (flat conductor cable) cable wiring system is designed for installations under.
Part F: Code Book Questions Article 324: Flat Conductor Cable (FCC) 1.! Type FCC (flat conductor cable) cable wiring system is designed for installations under.! (a) tile! (c) carpet squares! (b) carpet!
More informationData Bus Connector and Terminator Requirements Document DB-1001-A. Revision C
Data Bus Connector and Terminator Requirements Document DB-1001-A Revision C 2507 W. Geneva Dr. Tempe, Arizona 85282 Phone [602] 231-8616 FAX [602] 273-9135 www.phxlogistics.com TABLE OF CONTENTS 1. Introduction
More informationCompact Substation Design. Kobus Coetzer TGOOD Africa
Compact Substation Design Kobus Coetzer TGOOD Africa 1. 2. 3. 4. TGOOD Electric Compact Substation Design Considerations Project Reference Agenda 1. TGOOD Electric Key Facts Sino German Joint Venture Leading
More informationTOGA PRESENTATION REVIEW OF CASE STUDIES. Paul Boman,
TOGA PRESENTATION REVIEW OF CASE STUDIES Paul Boman, paul_boman@hsb.com October 8, 2014 HSB s TOGA History TOGA Transformer Oil Gas Analyst Registered trademark of Hartford Steam Boiler Inspection and
More informationAPEC 2016 Component Level Safety Certification in Systems- IEC /UL1577. MARK CANTRELL Senior Applications Engineer
APEC 2016 Component Level Safety Certification in Systems- IEC60747-17/UL1577 MARK CANTRELL Senior Applications Engineer 3/20/2016 Agenda What is safety isolation Isolation Concepts Regulatory Landscape
More informationUtility Department Standards. Electrical Distribution & Outdoor Lighting 3.0 UMASS AMHERST. Physical Plant
Utility Department Standards Electrical Distribution & Outdoor Lighting 3.0 UMASS AMHERST Physical Plant Forward These are Standards, with selected specification sections added for clarity. This document
More informationNDT in Grouted PT Inspection for Bridges
NDT in Grouted PT Inspection for Bridges PTI Technical Conference & Exhibition Miami, FL May 8, 2007 Hong-gang gang Cao CTLGroup (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 1 of 37
More informationAluminum Wiring. Facts and Figures
Aluminum Wiring by Nick Gromicko and Kenton Shepard Between approximately 1965 and 1973, single-strand aluminum wiring was sometimes substituted for copper branch-circuit wiring in residential electrical
More informationEarthing of Utility and Industrial Distribution Systems
Earthing of Utility and Industrial Distribution Systems YOU WILL LEARN: 4 hour live, practical online course Friday, 26 th February, 2015 8.00AM WST; 10.00AM AEST The basic principles of grounding of electrical
More informationTESTING PTE EARTHING
1 SCOPE This section of the Power Systems Live Working Manual details the procedures to be followed to achieve Safety from the System when carrying out examination, testing and remedial work on PTE (Pole
More informationGalvanic and Stray Current Corrosion
Chapter 5 Galvanic and Stray Current Corrosion MElec-Ch5-1 Overview Galvanic Corrosion Understanding Galvanic Corrosion Controlling Galvanic Corrosion Stray Current Corrosion Understanding Stray Current
More informationCondition Monitoring. Simon Rowland The University of Manchester
Condition Monitoring Simon Rowland The University of Manchester My Intentions: Inform HubNet paper on Condition Monitoring Set out ideas in this primer session Establish questions for following workshop
More informationFeatures Small size Low insertion loss High selectivity Hermetic seal. 1000MHz MHz. 1500MHz MHz. 1795MHz MHz.
SAW Filters RF SAW Filters for TDSCDMA SF15 Series (Diplex Type Dual Filter) Features Small size Low insertion loss High selectivity Hermetic seal Applications TDSCDMA How to Order SF 15 19 T A SB A1 1
More informationGas-insulated medium-voltage switchgear. for wind parks. Answers for energy.
Gas-insulated medium-voltage switchgear for wind parks Answers for energy. Switchgear for wind turbines: 8DH10 up to 24 kv, up to 20 ka, up to 1,250 A up to 17.5 kv, up to 25 ka, up to 1,250 A Best performance
More informationExtended-Frequency SMA Connectors
Extended-Frequency SM Connectors Extended-Frequency SM Connectors This brochure introduces two new series of connectors that extend SM performance beyond the MIL-PRF-39012 upper frequency limit of 18 GHz,
More informationSECTION INSULATED WIRE AND CABLE
SECTION 16120 INSULATED WIRE AND CABLE PART 1 GENERAL 1.01 DESCRIPTION A. This section covers the contract item Insulated Wire and Cable, which includes the following items with accessories, and appurtenances:
More informationRevisions for the 2011 National Electrical Code - Part 2
PDHonline Course E356 (3 PDH) Revisions for the 2011 National Electrical Code - Part 2 Instructor: Patrick Ouillette 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone &
More informationDETAIL SPECIFICATION SHEET CABLE, ELECTRICAL, -20 C TO +105 C, 1000 VOLTS, TYPE LSFSGU
INCH-POUND MIL-DTL-24643/17F 1 October 2009 SUPERSEDING MIL-DTL-24643/17E 22 August 2002 DETAIL SPECIFICATION SHEET CABLE, ELECTRICAL, -20 C TO +105 C, 1000 VOLTS, TYPE LSFSGU This specification is approved
More informationService plans enhance the benefits of preventive maintenance programs
Service plans enhance the benefits of preventive maintenance programs White Paper Document 1910DB1612 by Charles Alvis Executive summary Companies are continually being tasked by management to increase
More informationSECTION GROUNDING AND BONDING
SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and
More informationPLEASE READ INSTRUCTIONS IN CONJUNCTION WITH THE ILLUSTRATIONS. PLEASE SAVE THESE INSTRUCTIONS
VAUFHM Underfloor Heating Mat Range Installation and Wiring Instructions Stock Ref. N 446175 446192 446176 446193 446177 446194 446178 446195 446179 446196 446180 446197 446181 446198 446182 446199 446183
More informationELECTRICAL BULLETIN
PO Box 697 Halifax, Nova Scotia B3J 2T8 Labour and Advanced Education ELECTRICAL BULLETIN 2012-01 From: David MacLeod,C.E.I.,P.Eng. Pg 1 of 8 Provincial Chief Electrical Inspector Date : March 1, 2012
More informationElectrical Utility Department Standards. Electrical Distribution & Outdoor Lighting V5.0 July 2017 UMASS AMHERST. Physical Plant
Electrical Utility Department Standards Electrical Distribution & Outdoor Lighting V5.0 July 2017 UMASS AMHERST Physical Plant Forward These are Standards, with selected specification sections added for
More informationroduct Scope: Substation
roduct Scope: Substation Three Phase or Single Phase, 50 or 60 Hz, 55ºC, 65ºC, 75ºC, 55ºC/65ºC, 55ºC/75ºC, 65ºC/75ºC Envirotemp FR3 fluid or Mineral Oil Three Phase: 300 12,000 kva Single Phase: 167 6,667
More informationDMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)
DELHI METRO RAIL CORPORATION LIMITED DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) SPECIFICATION NO. DMES- T/0018/ DMRC-E-TR-CABLE-2 SPECIFICATIONS FOR 33 kv CABLES FOR ELEVATED AND Issued on: Date Stage
More informationU.V resistance UL Sunlight Resistance. Flame retardant IEC
Cable for underground power distribution and subtransmission. Description Application Underground power distribution and subtransmission. As transformer feeders in substations. In power plants, industrial
More informationPassive components : 5 years failure analysis feedback From all markets
2 nd SPCD 12-14 October 2016 Passive components : 5 years failure analysis feedback From all markets Eric ZAIA (Material Engineer) Béatrice MOREAU (Passive components & PCB dpt. Manager) SUMMARY 1 Introduction
More informationSST2222A V CEO I C. 40V 600mA. Datasheet. NPN Medium Power Transistor (Switching) lfeatures 1)BV CEO >40V(I C =10mA) 2)Complements the SST2907A
SST2222A NPN Medium Power Transistor (Switching) Datasheet Parameter V CEO I C Value 40V 600mA loutline SOT-23 SST3 lfeatures 1)BV CEO >40V(I C =10mA) 2)Complements the SST2907A linner circuit lapplication
More informationACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT
ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT Specification for Acoustical Insulation (Lagging) for Piping and Equipment 1 of 5 TABLE OF CONTENTS 1.0SCOPE..... 3 2.0REFERENCED PUBLICATIONS...
More informationCONDUITS AND FITTINGS
CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit
More informationBASIC CONCEPTS IN ELECTRICAL DESIGN. Prepared by Engr. John Paul Timola
BASIC CONCEPTS IN ELECTRICAL DESIGN Prepared by Engr. John Paul Timola ELECTRICAL CONDUCTORS AND INSULATORS Electrical Conductors substances that offer a very low resistance to current flow. Insulators
More informationCanadian Electrical Code, Part I Full Impact Assessment
Copyright CSA Group 2015 Canadian Electrical Code, Part I Full Impact Assessment Subject 3644 Polarity identification for photovoltaic (PV) dc system conductors & Subject 3694 Photovoltaic (PV) dc arc-fault
More informationDistribution Transformer Failures In Port Harcourt
Global Advanced Research Journal of Engineering, Technology and Innovation (ISSN: 2315-5124) Vol. 3(7) pp. 202-206, November, 2014 Available online http://garj.org/garjeti/index.htm Copyright 2014 Global
More informationCondensed Study Guide
192-0401 Corrosion Reactions This module will discuss a variety of corrosion types. Each type involves either a chemical reaction or an electrochemical reaction. Chemical Reaction Chemicals in the environment
More informationúê üßµö ÖãÆü ü ¾Ö³ÖÖÖ - III
Subject: Implementation of IS/IEC 60947-2:2003 due to revision of IS 13947 series of specifications as IS/IEC 60947 series 1. ETD has informed regarding the publication of the series of specifications
More informationIndustrial Coatings: HIGHLY DURABLE, SUPERHYDROPHOBIC AND OLEOPHOBIC. (White Paper) NeverWet LLC
Industrial Coatings: HIGHLY DURABLE, SUPERHYDROPHOBIC AND OLEOPHOBIC (White Paper) NeverWet LLC Background: Metal surfaces have high surface energy, are negatively charged, and hydrophilic as shown by
More informationWE01A GMA (MIG) Plug Weld
Uniform Procedures For Collision Repair WE01A GMA (MIG) Plug Weld 1. Description This procedure describes methods for making and evaluating gas metal arc (GMA) plug welds (MIG plug welds) on all types
More informationmv & hv switchgears Installation Servicing Testing Commissioning
mv & hv switchgears Installation Servicing Testing Commissioning mission With exceptional professionalism we always exceed our customers' expectations by increasing their productivity and competitiveness
More informationOutdoor Carrier Class Shielded Ethernet Cable. Models: PRO, CARRIER, Connectors. Increase Performance. Extreme Weatherproof. ESD Damage Protection
1Datasheet Outdoor Carrier Class Shielded Ethernet Cable Models: PRO, CARRIER, Connectors Increase Performance Extreme Weatherproof ESD Damage Protection Extended Cable Support Datasheet Protect your networks
More informationEnergy Division Insulators
Energy Division http://energy.tycoelectronics.com Insulators R Insulators Tyco Electronics Energy Division covers a wide range of polymeric, hybrid and porcelain insulators. For decades all these products
More informationCHAPTER 11 CONDUITS AND FITTINGS
CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1
More informationUnit Substation Transformer Construction Checklist (under 500 kva)
Unit Substation Transformer Checklist (under 500 kva) Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.
More informationNUCLEAR POWER CORPORATION OF INDIA LTD. (A GOVT. OF INDIA ENTERPRISE) SPECIFICATION NO.PB-E-542/REV. No.0
REVISION NO. 0 NUCLEAR POWER CORPORATION OF INDIA LTD. (A GOVT. OF INDIA ENTERPRISE) SPECIFICATION NO.PB-E-542/REV. No.0 PAGE NO. 1 OF 24 DATE OF ISSUE (MONTH/YEAR) TOTAL NO. OF PAGES (Including cover
More informationTechnical Specification for LV ABC Fuse Switch Disconnectors
Ergon Energy Corporation Limited Technical Specification for LV ABC Fuse ETS-06-02-02 Check this is the latest Process Zone version before use. Specification ETS 06-02-02 Ver 3 Contents 1. Purpose and
More informationThermocouples. Operating and Maintenance Manual English. Thermocouples
Thermocouples Operating and Maintenance Manual English Seite 1 / 8 Operating and Maintenance Manual Thermocouples Table of Contents 1 General Information 3 2 Functionality 4 2.1 Thermo Lines and Compensating
More information