Storm Water Pollution Prevention Plan (SWPPP) for Small Construction Sites

Size: px
Start display at page:

Download "Storm Water Pollution Prevention Plan (SWPPP) for Small Construction Sites"

Transcription

1 for Small Construction Sites *(Please note this document is intended for guidance only and does not ensure permit compliance.) PROJECT NAME: Single Family Residence PROJECT SITE: XXXX Subdivision LOT # Block ADDRESS of SITE: OWNER NAME and ADDRESS: OWNER TELEPHONE NUMBER: SITE AREA: Approximately X ft X X ft (0.5 acre) See the plot plan PROJECT DESCRIPTION: A single-family house. XX bedrooms, XX bathrooms, Kitchen, Living Room, Game Room. Brick and rock outside. Light excavation to remove trees and grade the lot for the construction of house. After 80% of the house is complete the yard will be graded for driveway and landscaping at that time Silt Fence will be removed. RUNOFF COFFICIENT: SEQUENCE OF ACTIVITIES: Survey, Plot Plan, Building Permit, Storm Water Permit, Clear the Lot, Green Box (Toilet), Footing, Foundation, Filling, Framing, Bricking, Gas and Electricity pipeline, Grading the lot, Landscaping, and Final clean up

2 Page 2 NAME OF RECEIVING STREAM: Insert name of receiving stream. EXISTING SOIL INFORMATION Insert type of soil. ENDANGERED SPECIES This construction project is located in a developed subdivision; therefore, there are no endangered or threatened species affected by the project. EROSION AND SEDIMENT CONTROLS: Silt fence and Hay Bales will be installed as necessary to reduce or eliminate the runoff from the site to the water of the state or municipal storm sewer. (See included map for the direction of the flow and the erosion control measures used.) TIMING OF CONTROLS/MEASURES Silt Fences and/or hay bale walls will be installed in areas where needed prior to clearing the lot. When the site is stabilized (sod), silt fence and other erosion controls will be removed by the trash company. WASTE MATERIALS: Trash will be collected in the trash container on the site. The container will be emptied by the trash company. SANITARY WASTE: Portable Toilet from XXXX (Company Name) Rentals will be on the site after the clearing of the lot and remain until 90% of job is complete. Service of the portable toilet will be done by the XXXX Rentals. CONTROLS INSPECTION AND MAINTANCE PRACTIES: Erosion controls will be inspected weekly or after any storm event of 0.5 inches or greater to make sure the controls are in affect and do not require any maintenance. All erosion controls will be maintained in good working order. Any repair or replacement will be done as soon as possible but no later than 5 days after the inspection. NON-STORM WATER DISCHARGES: None

3 Page 3 MATERIAL MANAGEMENT PRACTIES: An effort will be made to store only enough products (Cements, sand, and dirt) to do the job. The project superintendent will inspect daily to ensure all materials are on the site and not in the street. COMPLETION OF JOB: After completion of the sewer line, water line, electricity line, and gas line the lot will be graded and ready for landscaping. All erosion controls will be removed and the street will be cleaned to make sure it is free of debris. Member of Company: Name of the people on the job site and their position. Each of the members are allowed to make any changes necessary to the erosion controls on the job site or this SWPPP. 303(d) list, TMDL, others: Keep one of the following paragraphs whichever is applicable. The storm water from the construction site discharges to XXXX (receiving stream). This water body is not on the list of impaired water bodies (i.e., 303(d) list) for siltation/turbidity. Since this water body is not impaired, a TMDL is not applicable to this construction project. or The storm water from the construction site discharges to XXXX (receiving stream). This water body is on the list of impaired water bodies (i.e., 303(d) list) for siltation/turbidity. Even though this project discharges to an impaired water body, a TMDL has not been written for the water body. Therefore, a TMDL is not applicable to this construction project. or The storm water from the construction site discharges to XXXX (receiving stream). This water body is on the list of impaired water bodies (i.e., 303(d) list) for siltation/turbidity. A TMDL has been written for the water body that is applicable to the construction project. The following information documents the construction projects compliance with the TMDL. Must include documentation that the storm water discharges from the site will meet the applicable TMDL guidelines.

4 Page 4 CERTIFICATION: I certify under penalty of law that this document and all the attachments were prepared under my direction or supervision in accordance with Storm Water Permit Number ARR I am aware that there are significant penalties for submission false information, including the possible of fine and imprisonment for knowing violations. Signed (Operator): Position Singed (Member): Position Signed(Member): Position

5 Page 5 Small Construction Inspection Form Name of Company: Site Location: Date Location Silt Fence OK? Hay Bales OK? Initial Stabilization OK? Amount of Rain (inches) Time Inspectors Initials Correction CERTIFICATION: I certify under penalty of law that this document and all the attachments were prepared under my direction or supervision in accordance with Storm Water Permit Number ARR I am aware that there are significant penalties for submission false information, including the possible of fine and imprisonment for knowing violations. Signed: Title: Date:

6 SMALL (LESS THAN 5 ACRES) CONSTRUCTION SITE NOTICE FOR THE Arkansas Department of Environmental Quality (ADEQ) Storm Water Program NPDES GENERAL PERMIT NO. ARR Permit No. ARR The following information is posted in compliance with Part I.B.7.a.iv of the ADEQ General Permit Number ARR for discharges of storm water runoff from small construction sites. Additional information regarding the ADEQ storm water program may be found on the internet at: Permit Number Contact Name: Phone Number: ARR Project Description (Name, Location, etc.): Start Date: End Date: Total Acres: Location of Storm Water Pollution Prevention Plan: For Construction Sites Authorized under Part I.B.6.c (Small Construction Sites Authorization) the following certification must be completed: I (Typed or Printed Name of Person Completing this Certification) certify under penalty of law that I have read and understand the eligibility requirements for claiming an authorization under Part I.B.2.a.iii of the ADEQ General Permit Number ARR A storm water pollution prevention plan has been developed and implemented according to the requirements contained in Part I.B.7.a.iv of the permit. A copy of this signed notice is supplied to the operator of the MS4 if discharges enter a regulated small, medium, or large MS4 system as defined in Part II.C of the ADEQ General Permit Number ARR I am aware there are significant penalties for providing false information or for conducted unauthorized discharges, including the possibility of fine and imprisonment for knowing violations. Signature and Title Date

LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum

LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum LOUISIANA URBAN STORMWATER COALITION EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum SWPPP NOTIFICATION SIGN Post sign at entrance of site or areas where the public can easily access.

More information

General Information for Builders. September 2014

General Information for Builders. September 2014 General Information for Builders September 2014 Benton Community Development Department P.O. Box 607 Benton, AR 72018 (501) 776-5938 or fax 776-5922 January 2014 Builders and Developers The Community Development

More information

11 Ways to Avoid Storm Water Fines. No Exceptions!

11 Ways to Avoid Storm Water Fines. No Exceptions! 11 Ways to Avoid Storm Water Fines Do not start until you have gone over this with a SWPPP Rep. No Exceptions! 1. Contact Mark Atwood at 801-319-1331 or Jake Pettersson at 801-709-4463. 2. Submit a Notice

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

James Ferrell 10/3/07 Page 2

James Ferrell 10/3/07 Page 2 October 15, 2007 James Ferrell 103 Sandal Court Hot Springs, Arkansas 71913 RE: Construction Site at 5552 Central Avenue NPDES Permit No.: ARR150000 Dear Mr. Ferrell: On October 8, 2007,, I performed a

More information

City: Stormwaterville Zip Code: County: Addison. City: Stormwaterville Zip Code: County: Addison

City: Stormwaterville Zip Code: County: Addison. City: Stormwaterville Zip Code: County: Addison NOTICE OF INTENT TO USE GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II MUNICIPAL SEPARATE STORM SEWER SYSTEMS (RULE 62-621.300(7)(b), F.A.C.) For FDEP Internal Use Only Permit : FLR INSTRUCTIONS:

More information

Starting Construction: Your Storm Water Permit

Starting Construction: Your Storm Water Permit Starting Construction: Your Storm Water Permit Asma Vahora Compliance Assistance Specialist Small Business and Local Government Assistance San Antonio- Region 13 210-403-4039 Asma.Vahora@tceq.texas.gov

More information

Clean Water Act Industrial Stormwater Applicability Flowchart. July 2009

Clean Water Act Industrial Stormwater Applicability Flowchart. July 2009 Clean Water Act Industrial Stormwater Applicability Flowchart July 2009 Office of Compliance Office of Enforcement and Compliance Assurance U.S. Environmental Protection Agency 1200 Pennsylvania Avenue,

More information

SITE DESIGN ENGINEER'S STATEMENT:

SITE DESIGN ENGINEER'S STATEMENT: SITE DESIGN ENGINEER'S STATEMENT: THESE DETAILED PLANS AND SPECIFICATIONS WERE PREPARED UNDER MY DIRECTION AND SUPERVISION. SAID PLANS AND SPECIFICATIONS HAVE BEEN PREPARED ACCORDING TO THE CRITERIA ESTABLISHED

More information

Construction Application for Permit (CAP) Instructions

Construction Application for Permit (CAP) Instructions Construction Application for Permit (CAP) Instructions A CAP is required to be completed and submitted to the Wayne Soil & Water Conservation District (SWCD) office for non-farm, earth-disturbing activities

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department: Permit Requirements: Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install,

More information

Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions

Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions As of Oct. 1, 2010, Tacoma property owners are required to have a certified inspection of their private side

More information

Overall Instructions

Overall Instructions Farm Evaluation Survey Overall Instructions This Farm Evaluation Survey is prepopulated with member information you provide to the Coalition. If any information is incorrect, please indicate the correct

More information

Soil Erosion and Sedimentation Control Compliance Form

Soil Erosion and Sedimentation Control Compliance Form Town of Southern Pines Soil Erosion and Sedimentation Control Compliance Form Tracts Less than Thirty-Thousand Square Feet (30,000 SF) Residential and Commercial This compliance form shall be prominently

More information

Stormwater Management Program Plan (SWMPP) NPDES Permit ALR Revised May 31, Prepared By:

Stormwater Management Program Plan (SWMPP) NPDES Permit ALR Revised May 31, Prepared By: City of Fultondale 1210 Walker Chapel Road P.O. Box 699 Fultondale, Al 35068 Stormwater Management Program Plan () Revised May 31, 2017 Prepared By: 7110 University Court, Montgomery, Alabama 36117 (THIS

More information

Form 2L - Land Application of Industrial Wastewater and/or Sludge

Form 2L - Land Application of Industrial Wastewater and/or Sludge Return to: Oklahoma Department of Environmental Quality Industrial Permits Section Water Quality Division 707. N. Robinson P.O. Box 1677 Oklahoma City, OK 73101-1677 Revised July 2016 Oklahoma DEQ Application

More information

SACHSE EROSION CONTROL GUIDELINES

SACHSE EROSION CONTROL GUIDELINES SACHSE EROSION CONTROL GUIDELINES Section I. Definitions The following words, terms, and phrases, when used in this guideline, shall have the meanings ascribed to them in this Section, except where the

More information

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL 901.1 DESCRIPTION Install, maintain and remove temporary erosion and pollution control devices as required during the construction of the project. BID

More information

Common Plan of Development Storm Water Pollution Prevention Plan for: Operator(s):

Common Plan of Development Storm Water Pollution Prevention Plan for: Operator(s): Common Plan of Development Storm Water Pollution Prevention Plan for: Insert Subdivision Name Address City, State, Zip Code Operator(s): Insert Company Name Company Representative Name Address City, State,

More information

STORMWATER MANAGEMENT PROGRAM. Table of Contents

STORMWATER MANAGEMENT PROGRAM. Table of Contents STORMWATER MANAGEMENT PROGRAM Yakima Valley College March 1st, 0 1 0 1 Table of Contents INTRODUCTION... PROGRAM COMPONENTS... S.D.1: PUBLIC EDUCATION AND OUTREACH... Label Storm Drain Inlets:... Public

More information

Virginia Stormwater Management Permitting

Virginia Stormwater Management Permitting Virginia Stormwater Management Permitting Construction Activities J. Douglas Fritz Overview of VSMP Construction Stormwater Permitting Discharges from regulated Construction Activities are industrial discharges

More information

RESIDENTIAL BUILDING PERMIT

RESIDENTIAL BUILDING PERMIT A APPLICATION FOR A RESIDENTIAL BUILDING PERMIT JACKSON CO. MS. PLAN CASE NUMBER: PERMIT NUMBER: ACCEPTED BY: APPROVED BY: Application is hereby made for a permit under the provisions of the Comprehensive

More information

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782 Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782 Members of the Red Fox Run Property Owner s Association, Inc. Attached are the guidelines of the Architectural Review Committee

More information

RE: Complaint Investigation at Highway 282 near Mountainburg in Crawford County

RE: Complaint Investigation at Highway 282 near Mountainburg in Crawford County October 8, 2010 Mr. Jimmy Johnson, Engineer City of Fort Smith Utilities Department 3900 Kelley Highway Fort Smith, AR 72904 RE: Complaint Investigation at Highway 282 near Mountainburg in Crawford County

More information

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517) Date Issued Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI 48854 PH. (517) 676-8395 FAX (517) 676-8364 APPLICATION FOR SOIL EROSION AND SEDIMENTATION POLLUTION

More information

Storm Water Annual Report

Storm Water Annual Report Storm Water Annual Report City of Tolleson Storm Water Management Program July 2014 June 2015 (Year 12) Prepared for: City of Tolleson 9555 West Van Buren Tolleson, AZ 85353 Prepared by: Michael Baker

More information

Storm Water Pollution Prevention Program (SWPPP)

Storm Water Pollution Prevention Program (SWPPP) Storm Water Pollution Prevention Program (SWPPP) Prepared November 2006 Effective Date: February 15, 2007 Expiration Date: May 31, 2011 As Required By: GENERAL PERMIT NO. MNR040000 AUTHORIZATION TO DISCHARGE

More information

The Village of Wellington NPDES Guidance/Reference Document

The Village of Wellington NPDES Guidance/Reference Document The Village of Wellington NPDES Guidance/Reference Document The following Permit Compliance Guidance/Reference Document has been compiled to assist the copermittee in fulfilling the requirements of the

More information

Cass County Soil Erosion & Sedimentation Control Program

Cass County Soil Erosion & Sedimentation Control Program Cass County Soil Erosion & Sedimentation Control Program Both residents and visitors of Cass County enjoy the beauty of over 250 lakes and ponds, along with numerous streams, creeks, and wetlands that

More information

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703)

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703) Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA 20155 Phone (703) 754-6750 Work Request # UNDERGROUND DISTRIBUTION FACILITIES AGREEMENT (FOR COMMERCIAL CUSTOMER) Developer/Builder/Owner

More information

Elements of the Storm Water Management Plan. Storm Water Pollution Prevention Plan (SWPPP)

Elements of the Storm Water Management Plan. Storm Water Pollution Prevention Plan (SWPPP) Elements of the Storm Water Management Plan Storm Water Pollution Prevention Plan (SWPPP) Small Construction Site Storm Water Management Rodney Hendrick Water Quality Specialist LSU Ag Center Plan Requirements

More information

North Carolina Sedimentation Control Law

North Carolina Sedimentation Control Law 1 North Carolina Sedimentation Control Law North Carolina Sediment Control Law 1 North Carolina Sedimentation Control Law The purpose of this section is to highlight the portions of the North Carolina

More information

Key Requirements of the Construction General Permit Scott Taylor, P.E. Tanya Bilezikjian, P.E.

Key Requirements of the Construction General Permit Scott Taylor, P.E. Tanya Bilezikjian, P.E. Key Requirements of the Construction General Permit Scott Taylor, P.E. Tanya Bilezikjian, P.E. Learning Objectives Course participants shall be able to: Recognize basic permit elements Recognize the need

More information

KABA DEMOLITION INFORMATION PACKET

KABA DEMOLITION INFORMATION PACKET I. Demolition Process Checklist Structures Requiring No Permit Residential Structures 200 Square Feet or Less Commercial Structures 120 Square Feet or Less Structures Requiring No Bond 1 and 2 Family Residential

More information

6.1 Introduction to Wastewater Issues

6.1 Introduction to Wastewater Issues Section 6: Water Pollution This Section will help you: Understand if you generate industrial wastewater; Understand where your wastewater goes; Make sure you meet requirements for floor drains; Properly

More information

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2 CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2 7.1. GENERAL.... 2 7.1.1. Inspection Restriction Dates.... 2 7.1.2. Complete Improvements.... 2 7.1.3. Public Improvements.... 2 7.1.4. Warranty

More information

I. RELEASE FROM PLANNING PRIOR TO SUBMITTAL TO ENGINEERING DEPARTMENT

I. RELEASE FROM PLANNING PRIOR TO SUBMITTAL TO ENGINEERING DEPARTMENT Revised August 2005 I. RELEASE FROM PLANNING PRIOR TO SUBMITTAL TO ENGINEERING DEPARTMENT Before the applicant submits improvement plans and reports for Engineering plan checking, the applicant shall contact

More information

Phase II MS4 Annual Report Transmittal for Fort Bend County Municipal Utility District No TPDES Permit Number: TXR040319

Phase II MS4 Annual Report Transmittal for Fort Bend County Municipal Utility District No TPDES Permit Number: TXR040319 Rebecca Villalba, Team Leader Texas Commission on Environmental Quality Storm Water and Pretreatment Team (MC-148) P.O. Box 13087 Austin, Texas 78711-3087 Re: Phase II MS4 Annual Report Transmittal for

More information

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN

More information

Figure 1. Report of Inspection Process Flowchart.

Figure 1. Report of Inspection Process Flowchart. INSTRUCTIONS FOR A REPORT OF INSPECTION FOR AN ON-SITE WASTEWATER TREATMENT FACILITY INSTRUCTIONS Within six months before the date of a property transfer, the person who is transferring a property served

More information

STORMWATER POLLUTION PREVENTION PLAN

STORMWATER POLLUTION PREVENTION PLAN STORMWATER POLLUTION PREVENTION PLAN CITY OF CLAREMORE, OKLAHOMA PROJECT January 26, 2016 720 Ramm Road Claremore, Oklahoma 74017 CITY OF CLAREMORE Stormwater Pollutiuon Prevention Plan CITY OF CLAREMORE

More information

City of Anacortes Utility Rates & Information January 2016

City of Anacortes Utility Rates & Information January 2016 The City of Anacortes provides water, storm drain, sewer, and solid waste services. City of Anacortes Utility rates are established by ordinance. The City of Anacortes bills monthly minimum charges (base

More information

WHITNEY OAKS COMMUNITY ASSOCIATION P.O. Box 1459, Folsom, CA (916) (916)

WHITNEY OAKS COMMUNITY ASSOCIATION P.O. Box 1459, Folsom, CA (916) (916) WHITNEY OAKS COMMUNITY ASSOCIATION, (916) 985-3633 (916) 985-3744 www.kocal.com In the past, plans for the custom lots have been processed and reviewed by the development team. Since the development of

More information

The following materials and documents are required in order for you to obtain a Building Permit:

The following materials and documents are required in order for you to obtain a Building Permit: Imperial Municipal Services 263 Northland Drive Rockford, MI 49341 (616)863-9294 or 1-800-442-2794 Fax: (616)863-9298 E-mail: info@imsinspections.com Algoma Township 10531 Algoma Ave. NE Rockford, MI 49341-7108

More information

MILLER'S CROSSING PROPERTY OWNERS ASSOCIATION ARCHITECTURAL CONTROL COMMITEE GUIDELINES AND PROCEDURES (Effective 27 November 2007)

MILLER'S CROSSING PROPERTY OWNERS ASSOCIATION ARCHITECTURAL CONTROL COMMITEE GUIDELINES AND PROCEDURES (Effective 27 November 2007) MILLER'S CROSSING PROPERTY OWNERS ASSOCIATION ARCHITECTURAL CONTROL COMMITEE GUIDELINES AND PROCEDURES (Effective 27 November 2007) PURPOSE OF THIS DOCUMENT This document has been developed to describe

More information

STORMWATER PROGRAM MANAGEMENT PLAN FOR TOWN OF CAPE ELIZABETH, MAINE

STORMWATER PROGRAM MANAGEMENT PLAN FOR TOWN OF CAPE ELIZABETH, MAINE I Bob STORMWATER PROGRAM MANAGEMENT PLAN FOR TOWN OF CAPE ELIZABETH, MAINE Permit Years 1through 5 (June 1, 2013 to June 1, 2018) Submitted to Maine DEP December 2013 Revised April 2014 Table of Contents

More information

Food Service Establishment Permit Application

Food Service Establishment Permit Application Pinellas County Department of Environment and Infrastructure Water & Sewer Division, Grease Management Program Food Service Establishment Permit Application SECTION A: INTRODUCTION Pinellas County s Grease

More information

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

Starting Construction: Your Storm Water Permit

Starting Construction: Your Storm Water Permit Starting Construction: Your Storm Water Permit Asma Vahora Compliance Assistance Specialist Small Business and Local Government Assistance San Antonio- Region 13 210-403-4039 Asma.Vahora@tceq.texas.gov

More information

UMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist

UMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist UMD Storm Water Program Construction Requirements Greg Archer, MBA Environmental Compliance Specialist Phase 2 Regulatory Overview Dec. 1999 EPA issues Phase 2 Federal Register Municipalities (MS4) from

More information

Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide

Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide Roscommon County SESC Program 500 Lake Street Roscommon, Michigan 48653 Phone: 989-275-8323 Fax: 989-275-8640 Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide INCLUDED ATTACHMENTS

More information

INSPECTION AND ACCEPTANCE FOR MAINTENANCE

INSPECTION AND ACCEPTANCE FOR MAINTENANCE Inspection and Acceptance For Maintenance Page 1 (Last revised 6/29/10) INSPECTION AND ACCEPTANCE FOR MAINTENANCE SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Acceptance Sewer As Built Drwg Example

More information

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS UNINCORPORATED JACKSON COUNTY BUILDING PERMITS May, 2014 Department of Public Works Planning and Environmental Health PREFACE The purpose of this manual is to provide an overview of the procedures to apply

More information

S.O.P. No. HMD

S.O.P. No. HMD Page: 1 of 9 PURPOSE: To establish (SOP) for submission requirements, review process and approval of applications for Non-vehicular Access Permits for the purpose of connection or discharge to any MassDOT

More information

SMALL SITE Stormwater Pollution Prevention Plan For:

SMALL SITE Stormwater Pollution Prevention Plan For: SMALL SITE Stormwater Pollution Prevention Plan For: Insert Project Name Insert Project Site Location/Address Insert City, State, Zip Code Owner: Rhode Island Department of Transportation Insert Name 2

More information

Stormwater Pollution Prevention Plan for:

Stormwater Pollution Prevention Plan for: Stormwater Pollution Prevention Plan for: Lemon Creek Valley Juneau, Alaska Under the NPDES 2008 Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activities: Permit No.

More information

The Clean Water Act: Phase I

The Clean Water Act: Phase I Nearly 40 percent of all surveyed bodies of water in the U.S. do not meet the Environmental Protection Agency s (EPA s) water quality standards because of untreated polluted runoff that is often discharged

More information

Module 7: When Things Deviate from the Plan!

Module 7: When Things Deviate from the Plan! Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 7: When Things Deviate from the Plan! Sponsors: ODOT Local Technical Assistance Program (LTAP) November 2012 March

More information

Boise City Public Works General Drainage Plan Review Requirements Checklist

Boise City Public Works General Drainage Plan Review Requirements Checklist Boise City Public Works General Drainage Plan Review Requirements Checklist Development Name Bldg. Permit # Drainage Reviewer Site Address Initial Review Date ODI Number Designer Company Name Treated Acres

More information

STORMWATER MANAGEMENT PROGRAM. Pottawatomie County, Kansas Stormwater Management Program

STORMWATER MANAGEMENT PROGRAM. Pottawatomie County, Kansas Stormwater Management Program STORMWATER MANAGEMENT PROGRAM Pottawatomie County, Kansas Stormwater Management Program AGENDA PROJECT BACKGROUND STORMWATER MANAGEMENT PLAN (SMP) ELBO CREEK WATERSHED SAND CREEK WATERSHED HOW IT ALL TIES

More information

Concrete Waste Management

Concrete Waste Management Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information

Review of State and Federal Stormwater Regulations November 2007

Review of State and Federal Stormwater Regulations November 2007 Review of State and Federal Stormwater Regulations November 2007 By: James T. Spaulding, PE, CPESC Joseph M. Ducharme, Jr., PE TTG ENVIRONMENTAL CONSULTANTS, LLC 27 LOCKE ROAD, CONCORD, NH 03301-5301 TELEPHONE:

More information

SECTION EROSION AND SEDIMENTATION CONTROLS

SECTION EROSION AND SEDIMENTATION CONTROLS SECTION 312500 EROSION AND SEDIMENTATION CONTROLS PART 1 - GENERAL 1.01 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL

More information

TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK

TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK I, swear (affirm) that I have read the Town of Ocean Ridge s Construction Site Management Handbook in its entirety and do hereby agree to comply

More information

General Permit No.: OHR Page 53 of 146

General Permit No.: OHR Page 53 of 146 Page 53 of 146 Part 8 Sector-Specific Requirements for Industrial Activity Subpart J Sector J Non-Metallic Mineral Mining and Dressing. You shall comply with Part 8 sector-specific requirements associated

More information

MARCH 2013 TO MARCH 2014 (YEAR 11) REPORTING PERIOD VILLAGE OF SKOKIE, ILLINOIS

MARCH 2013 TO MARCH 2014 (YEAR 11) REPORTING PERIOD VILLAGE OF SKOKIE, ILLINOIS ILLINOIS ENVIRONMENTAL PROTECTION AGENCY ANNUAL FACILITY INSPECTION REPORT NPDES PERMIT FOR STORM WATER DISCHARGES FROM MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4) MARCH 2013 TO MARCH 2014 (YEAR 11) REPORTING

More information

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will

More information

CITY OF FARGO SPECIFICATIONS EROSION AND SEDIMENT CONTROL

CITY OF FARGO SPECIFICATIONS EROSION AND SEDIMENT CONTROL EROSION AND SEDIMENT CONTROL PART 1 DESCRIPTION OF WORK The work to be completed under this section of the Specifications and the accompanying plans shall include all labor, materials, and equipment necessary

More information

Application for Renewal Industrial Wastewater Discharge Permit

Application for Renewal Industrial Wastewater Discharge Permit Application for Renewal Industrial Wastewater Discharge Permit An Application for Renewal for Industrial Wastewater Discharge Permit must be completed and submitted to the Industrial Pretreatment office

More information

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER THE CORPORATION OF THE MUNICIPALITY OF SOUTH HURON 322 Main Street South, P.O. Box 759, Exeter, Ontario N0M 1S6 PHONE: (519) 235-0310 FAX: (519) 235-3304 TOLL FREE: 1-877-204-0747 WEBSITE: www.southhuron.ca

More information

Application For Waste Regulation (Check all that apply)

Application For Waste Regulation (Check all that apply) Environmental Protection and Growth Management Department ENVIRONMENTAL ENGINEERING AND PERMITTING DIVISION 1 North University Drive, Mailbox #201 Plantation, Florida 33324 954-519-1483 FAX 954-519-1412

More information

NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, SEPTEMBER 30, 2018

NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, SEPTEMBER 30, 2018 NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, 2017 - SEPTEMBER 30, 2018 Introduction This document serves as the Pennsylvania Department of Environmental Protection

More information

APPLICATION FOR CONSTRUCTION LETTER OF APPROVAL

APPLICATION FOR CONSTRUCTION LETTER OF APPROVAL APPLICATION FOR CONSTRUCTION LETTER OF APPROVAL DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENTAL CONTROL DIVISION OF SOIL AND WATER CONSERVATION SHORELINE AND WATERWAY MANAGEMENT SECTION Office of the

More information

Hazardous Waste Management

Hazardous Waste Management Objectives EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Objective

More information

BMP #: Water Quality Inserts

BMP #: Water Quality Inserts Structural BMP Criteria BMP #: Water Quality Inserts Catch basin inserts are commercially available (manufactured) devices and are generally configured to remove one or more of the following contaminants:

More information

Ordinance amending the San Francisco Public Works Code by adding Article 4.2,

Ordinance amending the San Francisco Public Works Code by adding Article 4.2, FILE NO. ORDINANCE NO. 1 [Stormwater Management.] Ordinance amending the San Francisco Public Works Code by adding Article., sections., requiring the development and maintenance of stormwater management

More information

JEFFERSON COUNTY STORM WATER MANAGEMENT

JEFFERSON COUNTY STORM WATER MANAGEMENT JEFFERSON COUNTY STORM WATER MANAGEMENT B-210 Courthouse, Birmingham, Alabama 35203 Telephone: (205) 325-8741 Erosion and Sedimentation Control Measures for Commercial Projects (Plans Requirements) -All

More information

PERMIT APPLICATION FOR RECLAIMED WATER REUSE (RWR)

PERMIT APPLICATION FOR RECLAIMED WATER REUSE (RWR) PERMIT APPLICATION FOR RECLAIMED WATER REUSE (RWR) ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION-MUNICIPAL SECTION PO BOX 301463 MONTGOMERY, ALABAMA 36130-1463 INSTRUCTIONS: APPLICATIONS

More information

EROSION & SEDIMENT CONTROL/STORMWATER CERTIFICATION: (Rev ) SP1 G180

EROSION & SEDIMENT CONTROL/STORMWATER CERTIFICATION: (Rev ) SP1 G180 EROSION & SEDIMENT CONTROL/STORMWATER CERTIFICATION: 1-16-07 (Rev 1-15-08) SP1 G180 General Schedule and conduct construction activities in a manner that will minimize soil erosion and the resulting sedimentation

More information

Commercial Tax Abatement

Commercial Tax Abatement A confirmation letter is issued by the City upon receipt of this application. This application is not effective and not considered filed until the confirmation letter has been issued. Filing does not assure

More information

1. Pre-Construction Conference Information: Date of Pre-Construction Conference: Owner/Operator Name:

1. Pre-Construction Conference Information: Date of Pre-Construction Conference: Owner/Operator Name: PRE-CONSTRUCTION CONFERENCE CERTIFICATION FORM For Coverage(s) Under South Carolina NPDES General Permit For Stormwater Discharges From Construction Activities SCR100000 (Maintain As Part of On-Site SWPPP)

More information

MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA TELEPHONE: FAX:

MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA TELEPHONE: FAX: MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA 16801 TELEPHONE: 814-231-3021 FAX: 814-231-3020 Checklist for Submission of APPLICATION for DEMOLITION PERMIT To obtain a permit for demolition

More information

Storm Drain Inlet Protection for Construction Sites (1060)

Storm Drain Inlet Protection for Construction Sites (1060) Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain

More information

Storm Water Pollution Prevention Plan (SWPPP) Approved By: Eric St Pierre, GM

Storm Water Pollution Prevention Plan (SWPPP) Approved By: Eric St Pierre, GM Page 1 of 41 STORM WATER POLLUTION PREVENTION PLAN Idaho Concrete Company (ICCO) Location (By Mapping Software): Heron River Pit 43.6967, -116.4672 S Seneca Springs Way T4N R1W S17 Boise Meridian Star,

More information

REQUEST FOR ELECTRIC SERVICE Residential

REQUEST FOR ELECTRIC SERVICE Residential This form should be completed if you are applying to have new electric facilities installed on your property for the purpose of providing electric service to a permanent or seasonal residential dwelling,

More information

Richland County Department of Public Works Engineering (Land Development) Division

Richland County Department of Public Works Engineering (Land Development) Division Richland County Department of Public Works Engineering (Land Development) Division Commercial Projects What is a Commercial Project? Projects that are not related to residential single family homes and/or

More information

What is a stormwater utility fee?

What is a stormwater utility fee? What is a stormwater utility fee? A stormwater utility fee is similar to a water or sewer utility fee. In essence, customers pay a fee to convey stormwater from their properties. The City of Goodlettsville

More information

Building Permit Applications for new home construction will not be accepted unless the following documentation is included at the time of submission:

Building Permit Applications for new home construction will not be accepted unless the following documentation is included at the time of submission: Building Permit Applications for new home construction will not be accepted unless the following documentation is included at the time of submission: Copy of Alberta Government s New Home Registration

More information

Soil and Site Evaluation for OSS

Soil and Site Evaluation for OSS Please Note: The application for site evaluation is a $275 fee. A complete application and payment is expected prior to service. The Health Department will only accept complete applications for processing.

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION CITY OF GENEVA, NEW YORK The purpose of the site plan and architectural review process is to secure compliance with the City s Zoning Ordinance and to promote

More information

Ports of Long Beach and Los Angele Summary of Key Water and Sediment Quality Programs & Projects. Common and/or Joint POLB/POLA Programs & Projects

Ports of Long Beach and Los Angele Summary of Key Water and Sediment Quality Programs & Projects. Common and/or Joint POLB/POLA Programs & Projects Ports of Long Beach and Los Angele Summary of Key Water and Sediment Quality Programs & Projects Common and/or Joint POLB/POLA Programs & Projects Bight 08 Regional Survey Bight 08 is a regional survey

More information

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-3

Texas Department of Transportation Book 2 - Technical Provisions. IH 35E Managed Lanes Project. Attachment 4-3 Texas Department of Transportation Book 2 - Technical Provisions IH 35E Managed Lanes Project Attachment 4-3 Form 2448 IH 35E Managed Lanes Project Book 2 - Technical Provisions Attachment 4-3 Show Form

More information

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR050000 Storm Water Pollution Prevention Plan Worksheet Instructions The TCEQ Small Business and Local Government Assistance

More information

BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER:

BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER: BUILDING PERMIT APPLICATION TYPE OF PERMIT: NEW CONSTRUCTION ADDITION ALTERATION HUD HOME MODULAR HOME OTHER: DESCRIPTION OF PROJECT: ESTIMATED VALUE: ADDRESS SUBDIVISION BLOCK: LOT: ZONING: PROPERTY INFORMATION

More information

Stormwater Management Plan

Stormwater Management Plan Stormwater Management Plan For The National Pollutant Discharge Elimination System (NPDES) Phase II Municipal Separate Storm Sewer System Permit City of Newnan Prepared By 1039 Sullivan Road, Suite 200

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information