1 National Building Code Part 9 Energy Efficiency: Focus Paper to Assist in the Review of Proposed Changes February 2012 Contents 0. Background and Purpose of the Paper 1. Development of NBC Part 9 Energy Efficiency Requirements 1.1 Schedule 1.2 Commenting on Proposed Changes 2. Affected Code Provisions 3. Introduction to Section Options for Compliance and Application of the Requirements 2.2 Scope of the Proposed Changes and Structure of the Part 9 EE Requirements 4. General Observations on the Proposed Provisions 4.1 Clarity, Constructability and Availability 4.2 Challenges and es 5. Highlighted Issues and Requirements Energy Performance Target General (Scope, Application, Compliance, Definitions) Building Envelope HVAC Requirements Service Water Heating System Requirements Performance Compliance for Housing 6. Costs and Benefits 6.1 Bases for Costing 6.2 Calculation of Cost-Benefit 6.3 Costing for Manufactured Homes Proposed NBC Part 9 Energy Efficiency Requirements February 2012 Page 1 of 17

2 0. Background and Purpose of the Paper The provinces and territories are supporting the updating of the National Building Code (NBC) to include energy efficiency requirements in Part 9 Housing and Small Buildings. Depending on the requirements that currently apply where your products are installed, the proposed changes could have a significant impact on housing and small building design and construction. This Focus Paper has been prepared for the use of CMHI members to provide an overview of the proposed changes and to assist in identifying proposed changes on which they may wish to comment. The paper does not discuss all of the proposed provisions. CMHI will be submitting comments. Copies may be obtained by ing achown@cmhi.ca. 1. Development of NBC Part 9 Energy Efficiency Requirements The proposed changes are well along in development. The work has been carried out by a Joint Task Group (JTG) of the Standing Committee on Housing and Small Buildings (SC-HSB) and the Standing Committee on Energy Efficiency in Buildings, and five sub-task groups (stgs). Manufacturers and builders were well represented, and CMHI was instrumental in ensuring that options are provided so that insurmountable obstacles are not created for factoryconstructed buildings. The following describes the remaining steps in the development process. 1.1 Schedule Public Review and Approvals The proposed changes have been published for public review on the national codes website. The public review period runs from 9 January to 2 March See After public review, comments will be reviewed by the stg on Code Consolidation and the parent standing committees (April 2012), and recommendations will be forwarded to the Canadian Commission on Building and Fire Codes for final approval (June 2012). Publication and Adoption The new requirements are scheduled to be published later in 2012 as an amendment to the 2010 NBC. Whether and when the requirements are adopted by the various authorities having jurisdiction will vary. Information will be provided to CMHI members as it becomes available. Proposed NBC Part 9 Energy Efficiency Requirements February 2012 Page 2 of 17

3 1.2 Commenting on Proposed Changes Proposed Change Forms The proposed change forms (PCFs) are posted individually in Code order and also in a single pdf document. Individual PCFs may address a single sentence through to several articles, with or without related Appendix notes. All comments on the proposed changes must be submitted through the individual PCFs on the national codes website. There is a Comment link at the top and bottom of each PCF. Where specific provisions are referenced in this paper, the code reference is identified along with the web link to the related PCF as shown on the public review web page, and the PCF file name, which can be used to search the pdf document. Guidelines and Instructions Guidelines for providing comments and instructions for submission are provided on the website. It is recommended that commentors review these before preparing comments. 2. Affected Code Provisions The new technical requirements will be provided in Division B, Section Energy Efficiency. New provisions are proposed for various other sections of Division B to provide useful crossreferences to the new energy efficiency requirements. New provisions are also proposed for Division A. These recognize energy efficiency as an objective of the NBC and identify related functional statements. A new subsection in Division C will specify reporting requirements where the performance compliance path is followed. 3. Introduction to Section Options for Compliance and Application of Requirements Options for Compliance Aside from alternative solutions that may always be proposed for compliance with national model codes, Part 9 will provide three approaches to compliance: Prescriptive Path prescriptive requirements including three simple building envelope trade-off options Performance Compliance Path full-building energy-use modeling National Energy Code for Buildings the NECB also provides prescriptive requirements with trade-offs and a performance path. Proposed NBC Part 9 Energy Efficiency Requirements February 2012 Page 3 of 17

4 Application of the NBC Part 9 Energy Efficiency Requirements Application of the energy efficiency compliance options depends on building type. Building Type Houses Houses with secondary suites Residential buildings containing only dwelling units and common spaces, where common spaces 20% of floor area Residential buildings not described above Buildings that include only occupancies of C, D, E or F3, or a combination of any of these, where the non-residential portions have a total floor area 300 m² Buildings containing non-residential occupancies, where the non-residential spaces are more than 300m² floor area Buildings containing F2 occupancies of any size Compliance Options Part 9 Part 9 Prescriptive Performance NECB X X X X X X 3.2 Scope of the Proposed Changes and Structure of the Part 9 Requirements Scope of the Proposed Changes The proposed changes to Part 9 will provide requirements and related appendix notes to address: building envelope (thermal transmission and air leakage), heating, ventilating and air-conditioning systems and equipment, service water heating systems and equipment. Note that, if the NECB is followed for compliance, that Code also provides requirements for: lighting, electrical systems and motors. Structure of Section The proposed requirements will be provided in five subsections in Section 9.36.: General (scope, application, compliance options and definitions) Building Envelope HVAC Requirements Service Water Heating System Requirements Performance Compliance. Proposed NBC Part 9 Energy Efficiency Requirements February 2012 Page 4 of 17

5 4. General Observations on Proposed Provisions 4.1 Clarity, Constructability, Availability Recognizing that the Code is a legal document and not written in plain language, clarity of the Code requirements and related Appendix notes is critical to proper interpretation. Code requirements must also recognize the ease or difficulty of various constructions and availability of equipment to meet the requirements. A number of requirements and Appendix notes are identified below under 5. Highlighted Issues and Proposed Changes that manufacturers may wish to review for clarity and constructability. 4.2 Challenges and es Considering the very stringent time constraints imposed on the development of the proposed Part 9 energy efficiency requirements, there is much that the Standing Committees, their Task Group members, and manufacturers and builders involved in the process can be proud of. Although the proposed changes will present some challenges, indicating support for an approach taken or for specific proposed changes is as important as providing critical comments where problems are identified. Where CMHI believes that the Task Group and Standing Committee have done a good job, the requirement is identified in this paper as resulting from a. 4.3 Costs and Cost:Benefit Individual proposed changes may also be reviewed in terms of the cost of the up-grade and cost:benefit. This issue is addressed separately in section 6 of this paper. 5. Highlighted Issues and Requirements Energy Performance Target The JTG was tasked with developing requirements that will achieve, on average, a significantly improved energy performance level compared to current national average home construction. The energy performance that will be achieved by the proposed requirements is considered to reflect a reasonable up-grade over the national average. Depending on current requirements in individual jurisdictions, there may be greater or lesser increases in actual performance. One criticism of the approach taken is that it does not recognize the efficiency of smaller houses compared to larger houses. This is an issue that has been identified for consideration in the next code cycle. Proposed NBC Part 9 Energy Efficiency Requirements February 2012 Page 5 of 17

6 General (Scope, Application, Compliance, Definitions) Application Code Reference(s): Compliance A (1)-1 Compliance by Building Type Web Link(s): Add Scope Application and Defined Terms PCF File Name(s): NBC10-DivB add-HSB-EEB-Scope_Application_Generalrevised Consistent with the application of Part 9, the JTG and SC-HSB recognized the administrative overhead that comes with requiring compliance with the NECB rather than Part 9. As far as possible, small buildings other than houses have been kept within the application of Section Validation of the approach and consideration of possible further expansion of the application of the Part 9 requirements have been identified for the next code cycle Building Envelope Calculation of Building Envelope Areas, Clarity Code Reference(s): Calculation of Areas for Ceilings, Walls, Fenestration and Doors Web Link(s): Add Subsection Building Envelope PCF File Name(s): NBC10-DivB add-HSB-EEB-Scope_Application_BE Depending on your building designs and whether the building envelope trade-offs or performance path is used, calculation of building envelope areas may or may not be necessary. Calculation of building envelope areas is needed for: determining 2% area allowed for penetrations through the insulation compliance with - the building envelope trade-off options - the performance compliance path. For surface-mounted buildings, gross wall area includes the perimeter area of the rim joists. This is important for the calculation of the fenestration and door to gross wall are ratio (see Building Envelope Trade-offs below) and ensures that gross wall area is measured in the same manner for both surface-mounted buildings and buildings on full foundations. Proposed NBC Part 9 Energy Efficiency Requirements February 2012 Page 6 of 17

7 Specification of Thermal Properties Proper interpretation and application of the requirements will be facilitated because the proposed changes use terminology for thermal properties consistent with industry use. That is, thermal resistance (RSI) values are specified for walls, floors and ceilings and overall thermal transmittance (USI) values are specified for windows, doors and skylights, rather than specifying all limits in USI. See also the discussions below on Calculation of Thermal Resistance, Nominal Insulation for Assemblies Above Ground and Nominal Insulation for Walls in Contact with Ground. Calculation of Thermal Resistance Clarity Code Reference(s): Calculation of Effective Thermal Resistance of Assemblies A (1) Compliance Method - Calculation Web Link(s): Add Subsection Building Envelope PCF File Name(s): NBC10-DivB add-HSB-EEB-Scope_Application_BE Calculation of effective thermal resistance of assemblies is needed for compliance with: the prescriptive requirements where assemblies other than those described in the Appendix are used the building envelope trade-off options the performance compliance path. The proposed Article specifies which components must be included in the calculation of effective thermal resistance and which components may be excluded. The proposed Appendix note describes the relationships between effective and nominal thermal resistance (RSI) and overall thermal transmittance (USI). The note explains how to calculate effective RSI and provides tables of values for use in these calculations. Continuity of Insulation, Clarity Code Reference(s): Continuity of Insulation Web Link: Add Article on Continuity of Insulation PCF File Name(s): NBC10-DivB add-HSB-EEB-Continuity_Insulation For effective performance, insulation in the building envelope should be continuous. This is not always practical. The proposed changes identify exceptions for some cases and require localized increases in insulation to compensate in others. The proposed changes permit an exception to the insulation continuity requirements where masonry cladding is supported on foundation walls that are insulated on the exterior. Although the detail creates a significant thermal break, the exception is considered to be reasonable until calculations can be done to determine comparative energy savings and cost of maintaining insulation continuity. Proposed NBC Part 9 Energy Efficiency Requirements February 2012 Page 7 of 17

8 Insulation for Assemblies Above Ground Constructability Code Reference(s): Required Thermal Characteristics of Opaque Assemblies Above and Not in Contact with Ground Web Link(s): Above-Ground Assemblies: Add thermal resistance values for above-ground assemblies PCF File Name(s): NBC10-DivB add-HSB-EEB-Above_Ground Tables A and B specify minimum effective thermal resistances (RSI) for above ground assemblies depending on climate zone and whether an HRV is installed. Keeping in mind that the overall level of building energy performance must meet that reflected by the proposed requirements, manufacturers may wish to consider and comment on the construction implications of the specified minimum RSI values, particularly in the colder climate zones. Nominal Insulation for Walls above Ground Clarity Code Reference(s): A (1)-2 Nominal Insulation Values Web Link(s): Above-Ground Assemblies: Add thermal resistance values for above-ground assemblies PCF File Name(s): NBC10-DivB add-HSB-EEB-Above_Ground The proposed Appendix note identifies some typical above-ground wall constructions that will provide the minimum effective thermal resistances required in the six climate zones. These examples identify nominal thermal resistances of the insulation in these assemblies and the residual thermal resistance provided by other materials. Manufacturers may wish to review the examples to determine whether: the examples include commonly-used wall assemblies the information is clear and easily understood. Attic Insulation, Clarity, Constructability Code Reference(s): Required Thermal Characteristics of Opaque Assemblies Above and Not in Contact with Ground, Sentence (2) Web Link: Above-Ground Assemblies: Add thermal resistance values for above-ground assemblies PCF File Names: NBC10-DivB add-HSB-EEB-Above_Ground Sentence (2) allows the insulation at the perimeter of attics under sloped roofs to be reduced below the minimums specified in Tables (1) A and B. The Sentence specifies: the absolute minimum nominal level of insulation installed above the exterior walls [RSI 2.52 (R-20)]. This is unusual for some wall assemblies as, for example, attic insulation would not normally be carried to the exterior of a masonry-clad assembly. Proposed NBC Part 9 Energy Efficiency Requirements February 2012 Page 8 of 17

9 the maximum distance from the exterior wall before the insulation must comply with the Table values [1200 mm (~4 )]. It is not clear whether this is to be measured from the interior or exterior of the wall. Manufacturers may wish to review this provision to determine whether it describes constructions that are practical and cost-effective in the climate zones in which their products are installed. Note that, for manufactured homes with lower ceiling height, a trade-off option is provided. See Building Envelope Trade-Offs below. Fenestration and Door to Wall Area Ratio Consistent with the concept of a minimum code where issues are regulated only where needed, the proposed requirements do not specify a prescriptive limit on fenestration and door to wall area ratio (FDWR). This recognizes that, on average, FDWR values for housing range between 17% and 22%, and this is considered to be reasonable with respect to energy efficiency. FDWR values are used as reference values in one of the building envelope trade-off options and in the performance path; these also range between 17% and 22%. Window and Door Thermal Performance Code Reference(s): Required Thermal Characteristics of Windows, Doors and Skylights Web Link: Windows, Doors and Skylights: Add thermal characteristics for windows, doors and skylights PCF File Name(s): NBC10-DivB add-HSB-EEB-Windows_Doors Manufacturers and window producers may wish to compare the maximum specified U- values, or the alternative minimum ER ratings, against available products. An exception is provided for one door to allow for an ornamental entrance. Site-Built Windows and Glazed Doors Code Reference(s): Required Thermal Characteristics of Windows, Doors and Skylights, Sentence (2) Web Link: Windows, Doors and Skylights: Add thermal characteristics for windows, doors and skylights PCF File Name(s): NBC10-DivB add-HSB-EEB-Windows_Doors Innovative site-builders do not always buy building components off the shelf and it is recognized that atypical fenestration and door systems have and continue to play a positive role in energy efficiency. Consequently, optional prescriptive requirements are proposed for site-built windows and glazed doors. Manufacturers may wish to support inclusion of this provision in recognition of the need for the Code to be flexible. Proposed NBC Part 9 Energy Efficiency Requirements February 2012 Page 9 of 17

10 Insulation for Assemblies Below or in Contact with Ground Clarity Code Reference(s): Required Thermal Characteristics of Building Assemblies Below or in Contact With the Ground Web Link: Below-Ground Assemblies: Add thermal resistance values for below-ground assemblies PCF File Name(s): NBC10-DivB add-HSB-EEB-Below_Ground Tables A and B specify minimum effective thermal resistances (RSI) for assemblies below or in contact with the ground depending on climate zone and whether an HRV is installed. The footnotes and subsequent Sentences provide important information on exceptions and the required extent of insulation for floors-on-ground. Nominal Insulation for Walls in Contact with Ground Clarity Code Reference(s): A (1)-2 Nominal Insulation Values for Below Ground assemblies Web Link: Below-Ground Assemblies: Add thermal resistance values for below-ground assemblies PCF File Name(s): NBC10-DivB add-HSB-EEB-Below_Ground The proposed Appendix note identifies some typical below-ground wall constructions that will provide the minimum thermal resistances required in the six climate zones. These examples identify nominal thermal resistances of the insulation in these assemblies and the residual thermal resistance provided by other materials. Manufacturers and builders may wish to review the examples to determine whether: the examples include common wall assemblies that builders will use the information is clear and easily understood. Airtightness Testing Code Reference(s): Required Level of Airtightness Building Envelope Proposed House, Sentence (9) Web Link(s): and Airtightness: Add prescriptive airtightness requirements to Proposed House Requirements: Add calculation methods for the proposed house in the Performance Path PCF File Name(s): NBC10-DivB add-HSB-EEB-Airtightness NBC10-DivB add-HSB-EEB-Proposed_House Airtightness testing for all Part 9 buildings in all locations in the country is not practical. Consequently, airtightness testing is not required in prescriptive path. Where a manufacturer wishes to trade exceptional airtightness for lower performance of other elements, test values can be input in the performance path. Proposed NBC Part 9 Energy Efficiency Requirements February 2012 Page 10 of 17

11 Airtight Construction Clarity, Constructability Code Reference(s): Required Level of Airtightness Construction of Air Barrier Details Web Link: and Airtightness: Add prescriptive airtightness requirements PCF File Name(s): NBC10-DivB add-HSB-EEB-Airtightness Article requires building assemblies to comply with either: certain criteria when tested in accordance with ULC S742 Specification for Air Barrier Assemblies, or details described prescriptively in Article The North American Fenestration standard is referenced for minimum airtightness of windows doors and skylights, and properties are specified for materials intended to provide airtightness. Manufacturers may wish to review the prescriptively described details to determine if they reflect current good practice. Building Envelope Trade-Offs Clarity, Code Reference(s): Simple Trade-offs for Above-ground Components of the Building Envelope Web Link(s): Add opaque-to-opaque and transparent-to-transparent trade-off methods [Does not include Sentence (4)] Add Sentence 4 on opaque-to-transparent trade-off method for factory-constructed housing PCF File Name(s): NBC10-DivB add-HSB-EEB-Simple_Trade-off NBC10-DivB (04)-add-HSB-EEB-Simple_Trade-off_Factory The first PCF describes trades that are allowed where the effective RSI of above-ground opaque elements is decreased provided the effective RSI of other above-ground opaque elements is increased the U-value of windows is increased provided the U-value of other windows is decreased Some limits are placed on the extent to which effective RSI may be reduced. The second PCF [Sentence (4)] describes trades that are allowed where the effective RSI of attic or exposed-floor insulation may be decreased in buildings where there is limited window and door area. These trade-offs are permitted only in singlestorey buildings where ceiling height is lower than standard and the FDWR excluding skylights does not exceed 15%. The trade-off is meant to address height limitations that are imposed by transportation regulations on some factory-constructed buildings while recognizing equivalent performance. The PCFs include related Appendix notes to explain the equations. Proposed NBC Part 9 Energy Efficiency Requirements February 2012 Page 11 of 17

12 Manufacturers may wish to review the trade-off options to determine if they provide a useful degree of flexibility in building design and construction without having to resort to the performance compliance path HVAC Requirements Duct Insulation Code Reference(s): Equipment and Ducts, Sentence(5) A (5)-1 Increased Duct Side Insulation Web Link(s): Equipment and Ducts: Add Sentence 5) on trade-off for duct insulation PCF File Name(s): NBC10-DivB (05)-add-HSB-EEB-Duct_Trade-off Sentence (3) requires ducts installed outside the plane of insulation in the building envelope to be insulated to the same level as required for exterior walls. The exception provided in Sentence (5) allows for a reduction in insulation to as little as RSI 2.11 (R-12) under ducts that are installed below insulated floors provided additional insulation is installed on the sides of the duct. This provides equivalent performance and recognizes challenges faced by some factory-constructed buildings where overall height is limited by transportation regulations. The exception may also address constructability issues where ducting is installed in garages under heated space. Heat Recovery Ventilators (HRVs) Code Reference(s): Heat Recovery Ventilation Web Link: Heat Recovery Ventilation: Add Article on HRV requirements - where installed PCF File Name(s): NBC10-DivB add-HSB-EEB-HRV_dwelling HRVs are not required on the principal exhaust of a ventilation system. This recognizes the reported frequency of problems with installation, maintenance and operation. Where HRVs are installed, minimum levels of efficiency are specified. As noted above, the contribution of HRVs to energy efficiency is recognized and reduced building envelope insulation levels are permitted where HRVs are installed. [See and ] HVAC Equipment Availability, Code Reference(s): Equipment Efficiency Web Link: and Equipment Efficiency: Add Article for minimum required HVAC efficiency ratings PCF File Name(s): NBC10-DivB add-HSB-EEB- Equipment_efficiency_HVAC_Revised Proposed NBC Part 9 Energy Efficiency Requirements February 2012 Page 12 of 17

13 The efficiency table for HVAC equipment lists equipment even where no performance limits are specified. This is important so that the equipment can be installed under Part 9 rather than building having to be designed according to the NECB. Manufacturers and builders may wish to review the Table to determine if it includes equipment that is currently being installed or available Service Water Heating System Requirements SHW Equipment Availability, Code Reference(s): Equipment Efficiency [Note that article heading on the PCF is incorrectly given as ] Web Link: and Equipment Efficiency: Add Article for minimum required SWH efficiency ratings PCF File Name(s): NBC10-DivB add-HSB-EEB- Equipment_efficiency_SWH-revised The efficiency table for SHW equipment lists equipment even where no performance limits are specified. Like HVAC equipment, this is important so that the equipment can be installed without the building having to comply with the NECB. Manufacturers and builders may wish to review the table to determine if it includes equipment that is currently being installed or available Performance Compliance for Housing Application Code Reference(s): to Scope, Application, Defined Terms, General Web Link(s): to Add Scope and Application of Performance Path PCF File Name(s): NBC10-DivB add-HSB-EEB- Scope_Application_Performance The performance compliance option currently applies only to residential buildings that contain only dwelling units and limited or no common space. Subsection refers to all of these buildings as houses. Due to time constraints, buildings other than houses must comply with the NECB for performance compliance for the time being. Development of a performance option for non-residential buildings will be considered in the next code cycle. Approach Code Reference(s): to Calculations and Data to Proposed House to Reference House Proposed NBC Part 9 Energy Efficiency Requirements February 2012 Page 13 of 17

14 Web Link(s): PCF File Name(s): to Calculation Methods: Add general calculation methods for Performance Path to Proposed House Requirements: Add calculation methods for the proposed house in the Performance Path to Reference House Requirements: Add calculation methods for the reference house in the Performance Path NBC10-DivB add-HSB-EEB-Calculation_Performance NBC10-DivB add-HSB-EEB-Proposed_House NBC10-DivB add-HSB-EEB-Reference_House The performance compliance path allows the energy performance of any element of the building to be lower than prescribed provided the reduction is made up by increased performance of another element. Compliance is determined through full-building computer modelling comparing the annual energy consumption of a proposed house with the annual energy consumption of a reference house that complies with the prescriptive requirements. Section identifies all of the parameters and assumed values that must be used in calculating whole-building annual energy consumption. These include weather data site information operating conditions and schedules for the reference and proposed houses characteristics of the reference and proposed buildings calculation procedures. 6. Costs and Benefits Note: Cost and cost benefit information may be found at: Links to cost and cost-benefit information are also provided in the PCFs. This information should be used with caution. 6.1 Bases for Costing National Average Construction Because the NBC is a national model code, costing is based on national averages. As a first step, a national average was established for home construction based on a builder survey and data from National Resources Canada (NRCan). This house has the following characteristics: Proposed NBC Part 9 Energy Efficiency Requirements February 2012 Page 14 of 17

15 Building Feature Current National Average House Wall insulation RSI eff 2.89 R-20 nominal Attic insulation RSI eff 7.00 R-40 nominal Basement insulation, walls RSI eff 1.82, full height R-12 nominal, full height Basement insulation, floor slabs uninsulated uninsulated Rooms over unheated spaces RSI eff 4.94 R-28 nominal Windows double-glazed, low-e, argon fill, insulated spacers, vinyl frame, USI 1.8 Doors insulated steel door RSI 1.14 insulated steel door R- 6.5 Heating system type and efficiency Gas 90%, forced air Electric 100%, forced air Oil 75% DHW system efficiency Gas 55% Electric 82% Ventilation system mechanical ventilation, no heat recovery ventilator Air conditioning no air-conditioning Heat pumps no heat pumps Because of wide-spread variation in airtightness, the national average varies in this respect. Climate Zone Up-Grade Costs Heating Degree-Days Representative Location Vancouver to 3999 Toronto to 4999 Montreal A 5000 to 5999 Winnipeg B 6000 to 6999 Fort McMurray Yellowknife 4.00 Airtightness, ac/h 50 Costs for complying with the proposed energy efficiency requirements are incremental costs above the cost for the average national house. Incremental costs for up-grading individual building elements have been determined for each of six cities that were selected as being representative of the climate zones in the country. Incremental costs take into account material and labour costs. Note: Incremental costs for individual building elements will be correct for your houses only if 1. the construction of the houses you currently manufacture is the same as in the national average house 2. the material and labour costs at your plant are the same as those for the representative city in the climate zone where your products are installed. Proposed NBC Part 9 Energy Efficiency Requirements February 2012 Page 15 of 17

16 6.2 Calculation of Cost-Benefit Averages The cost-benefit information provides consumption, energy savings, percentage energy reduction, cost and benefit for each of the representative cities and a national average. Zone A 7B 8 Location Vancouver Toronto Montreal Winnipeg Fort McMurray Yellowknife Energy Saving 4.6% 8.1% 11.1% 12.7% 20.1% 32.9% Cost $1,697 $1,926 $3,943 $4,613 $8,164 $16,299 Benefit (savings per year) $68 $146 $197 $278 $524 $1,317 Like the costing information, the cost-benefit information is based on the national average house and the costs and performance improvements above this national average. The cost-benefit information is also based on particular house configuration and a blended energy cost that combines costs for gas and electricity. Note: The cost-benefit information is correct for your houses only if 1. the houses you currently manufacture are the same as the average national house 2. the material and labour costs in your plant location are the same as those for the representative city in the climate zone where your products are installed 3. the energy type(s) for HVAC and SWH in the houses you currently build are the same as those for the representative city in the climate zone where your products are installed 4. the national blended energy rate is the same as the energy rate where your products are installed Weighting In addition to the national average, the cost-benefit information provides weighted values based on population in each climate zone. National Average National Average Weighted Consumption (kwhe/yr) 38,469 31,420 Savings (kwhe/yr) (%) 6,357 17% 3,480 11% Cost $ 7,102 $ 4,753 Benefit (savings per year) $ 384 $ 210 Proposed NBC Part 9 Energy Efficiency Requirements February 2012 Page 16 of 17

17 6.3 Costing for Manufactured Homes CMHI is compiling incremental cost information for an archetype manufactured home. The first set of calculations consider: current provincial and territorial requirements as the baseline to establish the cost of upgrades to the proposed NBC level (Where energy efficiency is not currently regulated, the characteristics of the national average house will be used as the baseline.) material and labour cost data from the representative cities that are more likely to reflect costs at plant locations rather than costs where the products are installed. Preliminary calculations indicate that, for an archetype 16 x 68 home, incremental costs are likely to range between $1,400 and $5,800 with the highest increment for homes in the coldest climate zone. If an authority having jurisdiction applies the energy efficiency requirements to Z240 home, the incremental cost is likely to be higher. Proposed NBC Part 9 Energy Efficiency Requirements February 2012 Page 17 of 17

Phase Two Change Proposal for the Next Edition of the Building Code: 2-CC-B POTENTIAL CHANGE TO ONTARIO S BUILDING CODE:

Phase Two Change Proposal for the Next Edition of the Building Code: 2-CC-B POTENTIAL CHANGE TO ONTARIO S BUILDING CODE: Phase Two Change Proposal for the Next Edition of the Building Code: 2-CC-B-12-02-05 POTENTIAL CHANGE TO ONTARIO S BUILDING CODE: SUMMER AND FALL 2017 CONSULTATION Ministry of Municipal Affairs PROPOSED

More information

Clarifying the Fenestration Energy Performance requirement in the Ontario Building Code Supplementary Standard SB12

Clarifying the Fenestration Energy Performance requirement in the Ontario Building Code Supplementary Standard SB12 Clarifying the Fenestration Energy Performance requirement in the Ontario Building Code Supplementary Standard SB12 February 2012 Legal Notice - Disclaimer and exclusion of liability This document is provided

More information

Energy efficiency in housing and small buildings performance path

Energy efficiency in housing and small buildings performance path Energy efficiency in housing and small buildings performance path Section 9.36. Building Type - Houses, houses with secondary suites - Buildings containing only dwelling units and common spaces 20% floor

More information

1) For the purpose of this Section, the term common space shall mean all spaces required to

1) For the purpose of this Section, the term common space shall mean all spaces required to August 2016 - This pdf is for information purposes only, and does not form the replacement package of the BC Building Code print product. This document includes Revisions up to Revision 9, effective December

More information

Energy Efficiency: Designing Wood-Frame Buildings for Occupant Comfort

Energy Efficiency: Designing Wood-Frame Buildings for Occupant Comfort Please add relevant logo here Energy Efficiency: Designing Wood-Frame Buildings for Occupant Comfort Presented by: Peter J. Arsenault, FAIA, NCARB, LEED-AP Disclaimer: This presentation was developed by

More information

National Energy Code of Canada for Buildings (NECB)

National Energy Code of Canada for Buildings (NECB) National Energy Code of Canada for Buildings (NECB) Presented at: Manitoba Energy Code for Buildings (MECB) Training Day September 17, 2014 Heather Knudsen, P. Eng. NRC Construction Canadian Codes Centre

More information

Understanding the National Energy Code of Canada for Buildings, 2011

Understanding the National Energy Code of Canada for Buildings, 2011 Understanding the National Energy Code of Canada for Buildings, 2011 Introduction Manufacturer of fiberglass construction products Fiberglass windows Fiberglass doors Fiberglass cladding support systems

More information

BC BUILDING CODE ERRATA

BC BUILDING CODE ERRATA BC BUILDING CODE ERRATA The following changes should be made to print and offline copies of the 2012 BC Codes. The 2012 BC Codes subscription products include these changes. Highlighted text is used in

More information

New Hampshire Residential Energy Code

New Hampshire Residential Energy Code CHAIRMAN STATE OF NEW HAMPSHIRE EXECUTIVE DIRECTOR Thomas B. Getz AND SECRETARY COMMISSIONERS Debra A. Howland Susan S. Geiger TDD Access: Relay NH Nancy Brockway 1-800-735-2964 Tel. (603) 271-2431 FAX

More information

Plan Check & Field Inspection Guide

Plan Check & Field Inspection Guide Plan Check & Field Inspection Guide 1992 MEC, 1993 MEC, and 1995 MEC Inside This Guide Plan Check Field Inspection Plan Check Building plans and specifications must be submitted with each building application

More information

1. When using the REScheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is.

1. When using the REScheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is. Energy Conservation Code Residential Building CHAPTER 4 WORKSHEET 1. When using the REScheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is _

More information

Boulder City NV Prepared by (Print Name) Signature Date

Boulder City NV Prepared by (Print Name) Signature Date City of Boulder City Community Development Department Building & Safety Division 401 California Avenue Boulder City, NV 89005-2600 702-293-9282 (Main Line) 702-293-9392 (Fax) 2009 International Energy

More information

IECC Commercial Significant Changes Summary Tier I

IECC Commercial Significant Changes Summary Tier I 2009-2015 IECC Commercial Significant Changes Summary Tier I The first change is in the layout of the book. Instead of having Chapters 1-3 that applied to all projects and then having Chapter 4 Residential

More information

Module number 6 provides an on-line, self-paced training seminar on energy efficiency and energy conservation for residential buildings.

Module number 6 provides an on-line, self-paced training seminar on energy efficiency and energy conservation for residential buildings. Module number 6 provides an on-line, self-paced training seminar on energy efficiency and energy conservation for residential buildings. 1 This chapter sets forth the requirements for energy efficiency

More information

Energy Trigger (A Existing Building Upgrade Mechanism Model)

Energy Trigger (A Existing Building Upgrade Mechanism Model) Trigger (A-11.2.1.2 Existing Building Upgrade Mechanism Model) Applicability All Building Permit applications for projects related to existing buildings are required to follow the energy upgrade trigger

More information

ENERGY STAR for New Homes: Technical Specification - Ontario January 2011, revised September 2011

ENERGY STAR for New Homes: Technical Specification - Ontario January 2011, revised September 2011 ENERGY STAR for New Homes: Technical Specification - Ontario January 2011, revised September 2011 ENERGY STAR for New Homes: Technical Specification - Ontario January 2011, revised September 2011 ENERGY

More information

Spray Polyurethane Foam. Insulation and Air Barrier Requirements of the 2012 I-Codes. Spray Foam Coalition

Spray Polyurethane Foam. Insulation and Air Barrier Requirements of the 2012 I-Codes. Spray Foam Coalition Spray Polyurethane Foam Design Guidance Insulation and Air Barrier Requirements of the 2012 I-Codes Spray Foam Coalition about the collaboration the center for the polyurathanes industry (CPI) of the

More information

C H A P T E R 3. Completing the Residential Analysis Worksheet STEP 1: WINDOWS AND OTHER GLASS AREAS

C H A P T E R 3. Completing the Residential Analysis Worksheet STEP 1: WINDOWS AND OTHER GLASS AREAS C H A P T E R 3 Completing the Residential Analysis Worksheet The Residential Analysis Worksheet is designed to help the reader in making the preliminary calculations necessary to complete Forms 600A-04,

More information

PART 1 BUILDING ENVELOPE THERMAL ANALYSIS (BETA) GUIDE

PART 1 BUILDING ENVELOPE THERMAL ANALYSIS (BETA) GUIDE BUILDING ENVELOPE THERMAL ANALYSIS (BETA) GUIDE Table of Contents 1.1 OVERVIEW... 1-1 1.2 METHODOLOGY FOR DETERMINING THERMAL PERFORMANCE OF BUILDING ENVELOPE ASSEMBLIES... 1-1 1.2.1 Methodology Summary...

More information

M 158 DEPOSITED. April 7, 2017 B.C.REG.

M 158 DEPOSITED. April 7, 2017 B.C.REG. M 158 DEPOSITED April 7, 2017 B.C.REG. 138/2017 SCHEDULE 1 Book I (General) of the British Columbia Building Code established by the British Columbia Building Code Regulation, B.C. Reg. 264/2012, is amended

More information

Fenestration Energy Performance:

Fenestration Energy Performance: number 9 Builder Insight Fenestration Energy Performance: A Roadmap for Understanding Requirements for Residential Buildings in British Columbia Overview Energy performance requirements for windows, doors

More information

Examining the case for adopting the National Energy Code for Buildings:

Examining the case for adopting the National Energy Code for Buildings: Examining the case for adopting the National Energy Code for Buildings: Consultation Discussion Document July 2015 Table of Contents Introduction... 1 Current Context in Newfoundland and Labrador... 2

More information

Wisconsin Uniform Dwelling Code Energy Worksheet

Wisconsin Uniform Dwelling Code Energy Worksheet Page 1 Wisconsin Uniform Dwelling Code Energy Worksheet Instructions: This worksheet is a Safety & Buildings Division (S&BD)-approved method of manually showing compliance with the energy conservation

More information

Zero Carbon Building Energy Modelling Guidelines. October 31, 2017

Zero Carbon Building Energy Modelling Guidelines. October 31, 2017 Zero Carbon Building Energy Modelling Guidelines October 31, 2017 Contents 1. INTRODUCTION... 3 1.1 DEFINITIONS... 4 2. CALCULATING TEDI... 5 2.1 INTERNAL HEAT GAINS... 6 2.2 CALCULATING BUILDING ENVELOPE

More information

Fenestration Components: Mechanical Summary. Water heater energy factor: Ef Fuel type: Gas Electric Other

Fenestration Components: Mechanical Summary. Water heater energy factor: Ef Fuel type: Gas Electric Other This information must be on the drawing documents not attached to plans. The following Compliance statements must be on the drawings: 2009 International Energy Conservation Code Statement of acknowledgement

More information

Administrative Changes

Administrative Changes Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings

More information

Is Your Envelope Effective? BCBEC Luncheon January 29, 2009

Is Your Envelope Effective? BCBEC Luncheon January 29, 2009 Is Your Envelope Effective? Patrick Roppel P Eng Patrick Roppel P.Eng BCBEC Luncheon January 29, 2009 Goals for this Presentation Why we might be concerned with heat loss through the envelope (U-value

More information

CSA Z Technical Requirements for Manufactured Homes Implications of the More Significant Proposed Changes

CSA Z Technical Requirements for Manufactured Homes Implications of the More Significant Proposed Changes CSA Z240.2.1 Technical Requirements for Manufactured Homes Implications of the More Significant Proposed Changes Prepared for the CSA Technical Committee 21 March 2014 Contents 0. Introduction 1 1. Roof

More information

Italcementi Center for Research and Innovation

Italcementi Center for Research and Innovation Italcementi Center for Research and Innovation Bergamo, Italy LEED-NC v2.1 EAc1 A. Project Narrative (Viridian) analyzed the energy use of the proposed Italcementi Center for Research and Innovation located

More information

Chapter 2: Foundation

Chapter 2: Foundation Chapter 2: Foundation Crawlspace [V502.1.2] [V502.1.2] [V502.1.3] Vents. Vents in the crawlspace help keep floor insulation and floor framing dry. Crawlspace vents also reduce the potential for radon buildup

More information

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) 2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:

More information

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection Slab on Grade & Basements: A capillary break is installed on top of all footings Slab / Pre-Drywall / Thermal Inspection A minimum of 4" of clean or washed gravel (0.5" diameter or greater) is placed over

More information

Connecticut 2011 Baseline Study of Single-Family Residential New Construction. Final Report

Connecticut 2011 Baseline Study of Single-Family Residential New Construction. Final Report Connecticut 2011 Baseline Study of Single-Family Residential New Construction Final Report October 1, 2012 Submitted to: Connecticut Energy Efficiency Board Submitted by: Group, Inc. KEMA, Inc. Cadmus

More information

Energy modeling in IDA ICE according to ASHRAE , app. G

Energy modeling in IDA ICE according to ASHRAE , app. G Energy modeling in IDA ICE according to ASHRAE 90.1-2007, app. G About this document This document is a user s guide for a relatively experienced IDA ICE operator for using the 90.1 add-in and for performing

More information

Oregon High Performance Home Requirements

Oregon High Performance Home Requirements Oregon High Performance Home Requirements A Business Energy Tax Credit for Homebuilders Homebuilders who construct homes to the Oregon High Performance Home (HPH) standard are now eligible for the Business

More information

Energy Code Basics for Residential Buildings. Presented by Newport Ventures NEWPORT VENTURES

Energy Code Basics for Residential Buildings. Presented by Newport Ventures NEWPORT VENTURES Energy Code Basics for Residential Buildings Presented by Newport Ventures Course Overview / Introduction 1. Overview of definitions and compliance changes 2. Building envelope requirements including air

More information

BUILDING ENCLOSURE DESIGN GUIDE WOOD FRAME MULTI-UNIT RESIDENTIAL BUILDINGS. Summary. 1. Introduction

BUILDING ENCLOSURE DESIGN GUIDE WOOD FRAME MULTI-UNIT RESIDENTIAL BUILDINGS. Summary. 1. Introduction BUILDING ENCLOSURE DESIGN GUIDE WOOD FRAME MULTI-UNIT RESIDENTIAL BUILDINGS David Ricketts M.Sc., P.Eng. RDH Building Engineering Ltd., 224 West 8 th Avenue, Vancouver, B.C. V5Y 1N5 Summary 1. Introduction

More information

RESEARCH HIGHLIGHT. Design and Construction of the Northern Sustainable House Arviat, Nunavut

RESEARCH HIGHLIGHT. Design and Construction of the Northern Sustainable House Arviat, Nunavut RESEARCH HIGHLIGHT March 2015 Technical Series Design and Construction of the Northern Sustainable House Arviat, Nunavut INTRODUCTION To support sustainable housing design in the North, Canada Mortgage

More information

RESEARCH HIGHLIGHT. Documentation of Super-Insulated Housing in Yukon

RESEARCH HIGHLIGHT. Documentation of Super-Insulated Housing in Yukon RESEARCH HIGHLIGHT March 2017 Technical Series INTRODUCTION Since 2007, Yukon Housing Corporation (YHC) has built 224 super-insulated public housing units, with approximately 300 market units built across

More information

Instructions for the Residential Building Data Collection Checklist 2009 International Energy Conservation Code with 2011 Georgia Amendments

Instructions for the Residential Building Data Collection Checklist 2009 International Energy Conservation Code with 2011 Georgia Amendments Instructions for the Residential Building Data Collection Checklist 2009 International Energy Conservation Code with 2011 Georgia Amendments Use of these instructions with a residential data collection

More information

Truss Heel Heights and Energy Code Requirements. Overview Revised 2/17/2017

Truss Heel Heights and Energy Code Requirements. Overview Revised 2/17/2017 Truss Heel Heights and Energy Code Requirements Overview Revised 2/17/2017 SBCA has been the voice of the structural building components industry since 1983, providing educational programs and technical

More information

Case Study #9 Phoenix Rising

Case Study #9 Phoenix Rising Case Study #9 Phoenix Rising SUMMARY: This profile features the first of Habitat for Humanity s (HFH) SuperGreen houses built in the Yukon. They began constructing this triplex after Yukon Housing Corporation

More information

Net Zero Building Enclosure Retrofits for Houses: An Analysis of Retrofit Strategies

Net Zero Building Enclosure Retrofits for Houses: An Analysis of Retrofit Strategies Net Zero Building Enclosure Retrofits for Houses: An Analysis of Retrofit Strategies Graham Finch, PEng Associate Member ASHRAE Brittany Hanam, PEng, BEMP Associate Member ASHRAE, Building Energy Modeling

More information

Construction Report NYSERDA Residential Performance Challenge

Construction Report NYSERDA Residential Performance Challenge Construction Report NYSERDA Residential Performance Challenge WELYTOK TOWNHOMES October 2014 Submitted to: NYSERDA 17 Columbia Circle Albany, NY 12203 Submitted by: HOMEPIC Team CDH Energy Corp. PO Box

More information

Thermal Bridging and Whole Building Energy Performance

Thermal Bridging and Whole Building Energy Performance Thermal Bridging and Whole Building Energy Performance Steve Murray, P.Eng. PMP Morrison Hershfield May 8 & 9, 2013 1 Acknowledgments The real work for ASHRAE 1365 RP was done by others in MH s Vancouver

More information

ASHRAE 90.2 Kuwait What Can be Learned From It?

ASHRAE 90.2 Kuwait What Can be Learned From It? ASHRAE 90.2 Kuwait What Can be Learned From It? Prof. Walid Chakroun Kuwait University Sixth "Zayed Seminar" on Green Economy: Success Stories from the GCC May 8-9, 2013 Today s building designs mortgage

More information

ENERGY STAR Qualifying Criteria for Residential Windows, Doors, and Skylights Sold in Canada Version 3.0 October 1, 2010

ENERGY STAR Qualifying Criteria for Residential Windows, Doors, and Skylights Sold in Canada Version 3.0 October 1, 2010 ENERGY STAR Qualifying Criteria for Residential Windows, Doors, and Skylights Sold in Canada Below is the product criteria for ENERGY STAR qualified residential windows, doors, and skylights sold in Canada

More information

THE GEORGIA ENERGY CODE: 2009 IECC + AMENDMENTS

THE GEORGIA ENERGY CODE: 2009 IECC + AMENDMENTS THE GEORGIA ENERGY CODE: 2009 IECC + AMENDMENTS For the Georgia Association of Home Inspectors Bourke Reeve ABOUT SOUTHFACE 1 EARTHCRAFT Regional Green Building Program HISTORY OF ENERGY CODES MEC 1992,

More information

APPROVED. Acceptable to the code official for compliance with the provisions of the applicable Code or referenced Standard.

APPROVED. Acceptable to the code official for compliance with the provisions of the applicable Code or referenced Standard. Chapter 1 101.1 Title. These regulations shall be known as the North Carolina Energy Conservation Code as approved by the North Carolina Building Code Council on March 11, 2008, to be effective January

More information

3.1 Noise Overlay District

3.1 Noise Overlay District 3.1 A. Purpose The purpose of this District is to establish a Noise Overlay Zoning District within the. B. Special Definitions As used in this Article only, the following terms shall be defined as set

More information

Compliance Certificate

Compliance Certificate REScheck Software Version 4.6.4 Compliance Certificate Project RESIDENCE Energy Code: 2009 IECC Location: Perkasie, Pennsylvania Construction Type: Single-family Project Type: New Construction Conditioned

More information

Least Cost Path to Achieving 50% Reduction in Residential Energy Use (in Heating Climates)

Least Cost Path to Achieving 50% Reduction in Residential Energy Use (in Heating Climates) Least Cost Path to Achieving 50% Reduction in Residential Energy Use (in Heating Climates) Jan Harris, X Prize Foundation Michael Blasnik, Blasnik and Associates ABSTRACT This paper describes the findings

More information

Presentation Overview: NC Energy Code RESNET Standards HERS Index HERS Verification Process

Presentation Overview: NC Energy Code RESNET Standards HERS Index HERS Verification Process Presentation Overview: NC Energy Code RESNET Standards HERS Index HERS Verification Process NC Energy Code Requirements ENERGY STAR and NC Energy Code in Alignment RESNET Standards HERS Index A scoring

More information

Interpretation Variables and Common Areas of Confusion. Of the 2009 IECC

Interpretation Variables and Common Areas of Confusion. Of the 2009 IECC Interpretation Variables and Common Areas of Confusion Of the 2009 IECC 1. (Mandatory) provisions vs. (Prescriptive) provisions: The IECC contains flexibility by allowing different approaches to achieve

More information

ENERGY EFFICIENCY CERTIFICATION

ENERGY EFFICIENCY CERTIFICATION ENERGY EFFICIENCY CERTIFICATION This form must be completed for developments that qualified for competitive points in the Energy Efficient Design category. Complete Part A for single-family and multifamily

More information

Fiscal Note for 2018 NC Energy Conservation Code and Energy Provisions of 2018 NC Residential Code

Fiscal Note for 2018 NC Energy Conservation Code and Energy Provisions of 2018 NC Residential Code Fiscal Note for 2018 NC Energy Conservation Code and Energy Provisions of 2018 NC Residential Code Agency: NC Building Code Council Statute: G.S. 143-136; 143-138 Contact: Impact: Barry Gupton NC Department

More information

Michigan Energy Code Training and Implementation Program

Michigan Energy Code Training and Implementation Program Michigan Energy Code Training and Implementation Program 1.0 Hour Advanced Program Course Number 16201 Residential Energy Air Sealing School of Planning, Design & Construction Michigan State University

More information

Errata Sheet. LEED for Schools Reference Guide First Edition for the document titled:

Errata Sheet. LEED for Schools Reference Guide First Edition for the document titled: Errata Sheet for the document titled: LEED for Schools Reference Guide First Edition 2007 Notes: Updates to this document are posted on the LEED for Schools Rating System page and the Reference Guide electronic

More information

Personal: Residential Grant Table for ecoenergy Retrofit

Personal: Residential Grant Table for ecoenergy Retrofit 1 of 9 7/27/11 7:07 AM NRCan > OEE > Grant Table ecoenergy Retrofit Homes Personal: Residential Grant Table for ecoenergy Retrofit Homes Save NOW with a home retrofit grant Save later on your energy bills.

More information

Residential Development & Building Application - ADDITIONS / ALTERATIONS / DEMOLITIONS -

Residential Development & Building Application - ADDITIONS / ALTERATIONS / DEMOLITIONS - DEVELOPMENT SERVICES (Edmonton Tower) 2 nd Floor, 10111 104 Avenue NW EDMONTON, AB T5J 0J4 PHONE: 311 or if outside of Edmonton 780-442-5311 EMAIL: developmentservices@edmonton.ca Residential Development

More information

ENERGY EFFICIENT RETROFIT OF A HIGH-RISE MULTIFAMILY BUILDING

ENERGY EFFICIENT RETROFIT OF A HIGH-RISE MULTIFAMILY BUILDING ENERGY EFFICIENT RETROFIT OF A HIGH-RISE MULTIFAMILY BUILDING Brittany Hanam 1, Lorne Ricketts 2, Andrew Pape-Salmon 3 ABSTRACT The National Institute of Building Sciences estimates that over 70% of the

More information

Code Requirements For Residential Windows & Doors

Code Requirements For Residential Windows & Doors International NEW 2016 EDITION! Code Requirements For Residential Windows & Doors Courtesy of the American Architectural Manufacturers Association The family of International Codes published by the International

More information

Presented by: John Hockman B.E.S. JLHockman Consulting Inc. With many thanks to Harold Orr, Rob Dumont, Gary Proskiw and Anil Pareckh 2012

Presented by: John Hockman B.E.S. JLHockman Consulting Inc. With many thanks to Harold Orr, Rob Dumont, Gary Proskiw and Anil Pareckh 2012 Presented by: John Hockman B.E.S. JLHockman Consulting Inc. With many thanks to Harold Orr, Rob Dumont, Gary Proskiw and Anil Pareckh 2012 Presentation Objectives: Review past design concepts and technologies

More information

780 CMR: 9 th Edition Massachusetts State Building Code. Presented to: BSA Codes Committee. DATE: January 20, 2016

780 CMR: 9 th Edition Massachusetts State Building Code. Presented to: BSA Codes Committee. DATE: January 20, 2016 780 CMR: 9 th Edition Massachusetts State Building Code Presented to: BSA Codes Committee DATE: January 20, 2016 This course is registered with AIA CES for continuing professional education. Credit(s)

More information

Slab edge insulation is one of

Slab edge insulation is one of How to Properly Insulate a Slab Presented by: Mike Turns, Associate Director, PHRC Tuesday, April 10, 2012 1:00 PM www.enrg.psu.edu/phrc 4 Slab edge insulation is one of the most abused details in construction.

More information

SAN MIGUEL COUNTY & TOWN OF MOUNTAIN VILLAGE BUILDING DEPARTMENTS PRESCRIPTIVE ENERGY CODE & GREEN BUILDING STANDARD

SAN MIGUEL COUNTY & TOWN OF MOUNTAIN VILLAGE BUILDING DEPARTMENTS PRESCRIPTIVE ENERGY CODE & GREEN BUILDING STANDARD SAN MIGUEL COUNTY & TOWN OF MOUNTAIN VILLAGE BUILDING DEPARTMENTS PRESCRIPTIVE ENERGY CODE & GREEN BUILDING STANDARD The Prescriptive Energy Code & Green Building Standard requirements for San Miguel County

More information

PRESCRIPTIVE COMPLIANCE METHOD

PRESCRIPTIVE COMPLIANCE METHOD CHAPTER PRESCRIPTIVE COMPLIANCE METHOD 3 SECTION 301 GENERAL 301.2 Building materials. Building materials shall comply with the requirements of this section. 301.2.1 Existing materials. Materials already

More information

Training Certification Categories

Training Certification Categories Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and

More information

Single Family Residence Building Permits

Single Family Residence Building Permits Village of Northbrook Department of Building & Development Guide to: Designing, Documenting & Inspecting For Energy Code Compliance Single Family Residence Building Permits New Construction Additions Alterations

More information

Passive House in Canada: Case Studies on a Near EnerPHit Retrofit and Post-Occupancy Research

Passive House in Canada: Case Studies on a Near EnerPHit Retrofit and Post-Occupancy Research Passive House in Canada: Case Studies on a Near EnerPHit Retrofit and Post-Occupancy Research Brittany Coughlin, RDH Building Science Inc. 224 W 8 th Ave, Vancouver, BC Canada Phone: +011 604 873 1181;

More information

2012 INTERNATIONAL CODES SIGNIFICANT CHANGES

2012 INTERNATIONAL CODES SIGNIFICANT CHANGES 2012 INTERNATIONAL CODES SIGNIFICANT CHANGES TIM PATE CHIEF BUILDING OFFICIAL CITY AND COUNTY OF BROOMFIELD 2012 IRC 1. Section R302.1 has been modified to allow reduced fire separation distances when

More information

Evaluation of Energy Savings of the New Chinese Commercial Building Energy Standard

Evaluation of Energy Savings of the New Chinese Commercial Building Energy Standard Evaluation of Energy Savings of the New Chinese Commercial Building Energy Standard Wei Feng, Ke Huang, Mark Levine and Nan Zhou, Lawrence Berkeley National Laboratory Shicong Zhang, Lawrence Berkeley

More information

Building Energy Code:

Building Energy Code: BSA meeting Building Energy Code: Overview in MA Ian Finlayson Deputy Director, Energy Efficiency Division National Model Code Refresher Updates every 3 years open stakeholder process Approx 30% EE savings

More information

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST This list is provided as a guide to help you understand the information that must be contained on the construction drawings. This list is not all-inclusive of all building codes but is used as a general

More information

The Energy Audit National Weatherization Training Conference Priority Lists Experiences and Impacts Nick Milano

The Energy Audit National Weatherization Training Conference Priority Lists Experiences and Impacts Nick Milano 2009 National Weatherization Training Conference Priority Lists Experiences and Impacts Nick Milano The Energy Audit Except for materials to eliminate H&S hazards all weatherization materials installed

More information

White Paper ENVELOPE-FIRST APPROACH TO NET-ZERO ENERGY BUILDINGS

White Paper ENVELOPE-FIRST APPROACH TO NET-ZERO ENERGY BUILDINGS BOULDER CHICAGO NASHVILLE SALT LAKE CITY SAN FRANCISCO SPRINGFIELD, MO WASHINGTON, DC 2540 Frontier Avenue, Suite 100 Boulder, Colorado 80301 303.444.4149 White Paper ENVELOPE-FIRST APPROACH TO NET-ZERO

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma LEED Green Building Certification The purpose of the LEED Green Building Rating is to provide a national standard that aims to improve environmental, health and economic performance of buildings using

More information

Web-Based Energy Savings Calculator for Building Envelope Air Tightness

Web-Based Energy Savings Calculator for Building Envelope Air Tightness Web-Based Energy Savings Calculator for Building Envelope Air Tightness André Desjarlais Oak Ridge National Laboratory Air Barrier Association of America (ABAA) is a Registered Provider with The American

More information

Inspection of New One- and Two- Family Dwellings

Inspection of New One- and Two- Family Dwellings Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Inspection of New One- and Two- Family Dwellings Planning and Development

More information

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. For use by Principal Authority Application number: Permit number (if different):

More information

E d u c a t i o n a l S e m i n a r s f o r B u i l d i n g & R e s i d e n t i a l C o d e

E d u c a t i o n a l S e m i n a r s f o r B u i l d i n g & R e s i d e n t i a l C o d e I N D E X E d u c a t i o n a l S e m i n a r s f o r B u i l d i n g & R e s i d e n t i a l C o d e Title Course Number *Seminar Length (days) Pg. Class Scheduling Policies 8 International Building Code

More information

Guidelines for the labelling and promotion of ENERGY STAR certified fenestration products sold in Canada

Guidelines for the labelling and promotion of ENERGY STAR certified fenestration products sold in Canada Guidelines for the labelling and promotion of ENERGY STAR certified fenestration products sold in Canada February, 2015 (amended June 2015) These Guidelines provide detailed information on how to label

More information

APPLICANT / CONTACT:_

APPLICANT / CONTACT:_ DEVELOPMENT SERVICES (Edmonton Tower) 2 nd Floor, 10111 104 Avenue NW EDMONTON, AB T5J 0J4 PHONE: 311 or if outside of Edmonton 780-442-5311 EMAIL: developmentservices@edmonton.ca New Single Family House

More information

CHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION

CHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION Chapter 1: Overview of Energy Efficient Construction 1 CHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION Chapter 1 is a quick reference guide that discusses the key components and features of energy

More information

Module Approved construction details

Module Approved construction details Module 10.1 Approved construction details Learning Outcomes On successful completion of this module learners will be able to - Describe approved construction details to reduce thermal bridging and improve

More information

EIFS The cladding with the lowest carbon footprint

EIFS The cladding with the lowest carbon footprint EIFS The cladding with the lowest carbon footprint & what s the deal with glass-box syndrome? Kevin Day Primary Agenda (what you re here for, I suspect ) EIFS = cladding with the lowest carbon footprint

More information

2017 Metrics Research

2017 Metrics Research 2017 Metrics Research Summary Report September 2017 A report prepared for BC Housing and the Energy Step Code Council. With the support of Natural Resources Canada and Remi Charron. KEY FINDINGS This Summary

More information

RESIDENTIAL ENERGY EFFICIENCY

RESIDENTIAL ENERGY EFFICIENCY CHAPTER 4 RESIDENTIAL ENERGY EFFICIENCY SECTION 401 GENERAL 401.1 Scope. This chapter applies to residential buildings. 401.2 Compliance. Projects shall comply with Sections 401, 402.4, 402.5, and 403.1,

More information

NB Power s Home Insulation Energy Savings Program as of August 1, PROGRAM INTRODUCTION PROGRAM OVERVIEW ELIGIBILITY...

NB Power s Home Insulation Energy Savings Program as of August 1, PROGRAM INTRODUCTION PROGRAM OVERVIEW ELIGIBILITY... NB Power s Home Insulation Energy Savings Program as of August 1, 2017 Program Guidelines Table of contents 1 PROGRAM INTRODUCTION 2 2 PROGRAM OVERVIEW 2 3 ELIGIBILITY 3 ELIGIBLE HOMES 3 INELIGIBLE BUILDINGS

More information

A Field Study of Airflow in Mid to High-Rise Multi-Unit Residential Buildings

A Field Study of Airflow in Mid to High-Rise Multi-Unit Residential Buildings A Field Study of Airflow in Mid to High-Rise Multi-Unit Residential Buildings Lorne Ricketts, MASc, EIT John Straube, PhD, P.Eng. ABSTRACT Airflow into, out of, and within buildings is a fundamental factor

More information

ESR-1826 Reissued February 1, 2013 This report is subject to renewal February 1, 2015.

ESR-1826 Reissued February 1, 2013 This report is subject to renewal February 1, 2015. * ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-1826 Reissued February 1, 2013 This report is subject to renewal February 1, 2015. A Subsidiary of the International Code Council

More information

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit: TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be

More information

Home Energy Assessment Rebate Guide

Home Energy Assessment Rebate Guide Home Energy Assessment Rebate Guide 61. Book an initial Home Energy Assessment. STEPS to Energy Savings To book an assessment, visit our website or call us at 1 877 999 6035 to be connected with an Efficiency

More information

RESEARCH HIGHLIGHT. Design Development of Low-Energy and Affordable Multi-Unit Residential Buildings

RESEARCH HIGHLIGHT. Design Development of Low-Energy and Affordable Multi-Unit Residential Buildings RESEARCH HIGHLIGHT Design Development of Low-Energy and Affordable Multi-Unit Residential Buildings Case study: Bois Ellen Co-operative Residence, Laval, Quebec April 2016 Technical Series INTRODUCTION

More information

Vermont Residential Building Energy Code. Handbook

Vermont Residential Building Energy Code. Handbook Vermont Residential Building Energy Code Handbook A Guide to Complying with Vermont s Residential Building Energy Standards (Act 20, 1997 & Act 45, 2009) Edition 3.0 October 2011 Effective October 1, 2011

More information

One and Two Family Additions

One and Two Family Additions One and Two Family Additions An addition to a house, duplex, garage, or an accessory structure requires a building permit prior to performing any construction. Building Department & Permit Office Mon-Fri

More information

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II Fire Inspection and Code Enforcement, 7 th Edition Chapter 6 Building Construction: Components Today we will Discuss fire walls, party walls, fire partitions, and curtain walls Discuss roof types and coverings

More information

2012 NC Energy Conservation Code (2012 NCECC) Commercial Building Compliance

2012 NC Energy Conservation Code (2012 NCECC) Commercial Building Compliance 2012 NC Energy Conservation Code (2012 NCECC) Commercial Building Compliance Billy Hinton, PE NC Department of Insurance Engineering Division Code Services Section Objectives Today we will address: 1.

More information

Applying the Building Code During Design

Applying the Building Code During Design Applying the Building Code During Design A Step-By-Step Process AIA Learning Units The Salt Lake City CSI Chapter is a Registered Provider with The American Institute of Architects Continuing Education

More information