INSTALLATION INSTRUCTIONS OPERATION AND MAINTENANCE MANUAL Models event SD, event, Event Plus, and event Plus2 (Condensing Boiler Systems)

Size: px
Start display at page:

Download "INSTALLATION INSTRUCTIONS OPERATION AND MAINTENANCE MANUAL Models event SD, event, Event Plus, and event Plus2 (Condensing Boiler Systems)"

Transcription

1 C US INSTALLATION INSTRUCTIONS OPERATION AND MAINTENANCE MANUAL Models event SD, event, Event Plus, and event Plus2 (Condensing Boiler Systems) A MAJOR CAUSE OF VENT RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCES (AIR SPACES) TO COMBUSTIBLE MATERIALS. IT IS OF UTMOST IMPORTANCE THAT THIS VENT BE INSTALLED ONLY IN ACCORDANCE WITH THESE INSTRUCTIONS. IMPORTANT: DO NOT INSTALL VENTING SYSTEM WITHOUT FIRST READING THESE INSTRUCTIONS.

2 TABLE OF CONTENTS General UL Listing USA and Canada Venting Applications Termination Height Requirements Horizontal Termination Requirements Vent Environment Part Identification Clearances and Enclosures Support Limits Limitations Individual Part Installation Basic Pipe and Fitting Assembly for Models event, eventplus and eventplus Basic Pipe and Fitting Assembly for Models eventsd Variable Straight (VS) Horizontal Termination (HT) Boiler Adapter Kits (BKF and BKR) Degree Tee (90T) Elbows (30L, 45L and 90L) Degree Lateral Tee (45LT) Degree Wye (90Y) Support Plate (SP) Wall Support (WS) Wall Guide (WG) Floor Roof Guide (FRG) Full Angle Ring (FR) Half Angle Ring (HR) Flashing (FL) Rain Collar (RC) Insulated Thimble (IT) Rain Cap (CC) Top Section (TS) Exit Cone (EXC) Guy Section (GS) End Cap (EC) Drain Tee Cap (DTC) Drain Section (Ds) Horizontal Drain (HD) Operating Precautions Maintenance GENERAL & These instructions cover installation requirements for the Schebler listed double wall special stainless steel venting systems: event SD, event, eventplus and eventplus2. Schebler models event SD, event, eventplus and eventplus2 must be installed in accordance with local building code and as well as national codes. Examine all components for possible damage prior to installation. Contact your local Schebler distributor with any questions. Proper joint construction is essential for a safe installation. Follow these instructions exactly as written. The venting system must be free to expand and contract. This venting system must be supported in accordance with these instructions. Check for proper joint construction when joining pipe to fittings. Different manufacturers have different joint systems and adhesives. Do not mix pipe, fittings or joining methods from different manufacturers. UL LISTING All Schebler event series Models are listed to UL 1738 and ULC for installations manufactured in even and odd diameters. The Schebler Models eventsd, event, eventplus, and eventplus2 maybe utilized in the same system. Proper installation methods must be followed as called for in these instructions. The venting system shall terminate in accordance with the requirements of CAN/CGA-b149.1, Natural Gas Installation code, or CAN/CGA-B149.2 Propane Installation code. Refer to The Schebler Company Venting System catalog for the description of all necessary parts. Check for unrestricted vent movement through, walls, ceiling, and roof penetrations. 2

3 VENTING APPLICATIONS Models event SD, event, eventplus and eventplus2 are a double wall special stainless steel venting system for gas fired appliances listed as Category II, III, & IV with a maximum flue gas temperature of 550 F, and 40" w.c. positive pressure. Gas vent - BH, Class I/Class II C. Models event SD, event, eventplus and eventplus2 is also suitable for other applications that call for an AL 29-4C vent. Models event SD, event, eventplus and eventplus2 are to be installed as a complete system connecting the appliance(s) to the outdoors, while operating under positive forced draft, negative induced draft, or neutral gravity flow internal pressure conditions using only Schebler models event SD, event, eventplus and eventplus2 vent parts. No vent part from another manufacturer should ever be mixed with models event SD, event, eventplus and eventplus2. If a drain fitting is required by the appliance manufacturer, it must be located as close to the flue outlet as possible. Multiple category II, III & IV appliances may not be common vented unless approved by the manufacturers. Do not mix natural draft and forced draft appliances together. Venting systems are to be sized in accordance the ASHRAE Handbook, Equipment Volume, the appliance manufacturer s instructions, or by contacting The Schebler Company. Models event SD, event, eventplus and eventplus2 shall not be routed into, through, to within any other vent such as an existing masonry or factory-built vent that is connected to another appliance. Recommendations that exterior mounted venting systems be enclosed below the roof line to limit condensation and protect against mechanical damage. Methods of providing additional insulation may be specified. A requirement to check the joints and seams for gas tightness when using the venting system with a Category III or IV appliance. The maximum rated pressure for which the venting system is intended to be used. Note: Horizontally terminated systems must be pitched ¼" per foot back toward the appliance being vented. Ensure any condensate is collected by strategically placing drains, or the appliance itself if permitted by the appliance manufacturer. Note: For vertically terminated systems it is recommended that longer horizontal runs be pitched ¼" per foot back toward the appliance being vented. Ensure any condensate is collected by strategically placing drains, or the appliance itself if permitted by the appliance manufacturer. VENT ENVIRONMENT It is suggested that a vent being installed in a corrosive atmosphere be constructed of Type 304, 430 or 316 stainless steel for the outer shell material. PART IDENTIFICATION These instructions and the catalog identify parts by name followed by a part code. Part numbers are made up of the model, part code, flue inside diameter and material code. The part number is shown on the UL label. EXAMPLE: The part number for a Model event (EV), 35 long Straight Section (35S), 8 ID (08), with a AL 29-4C stainless steel liner and an aluminized steel shell (K) would be EV35S08K. event Series material codes are shown in the following chart: CODE K L M R LINER/SHELL MATERIAL AL 29-4C Stainless Steel / Aluminized Steel AL 29-4C Stainless Steel / 304 Stainless Steel AL 29-4C Stainless Steel / 316 Stainless Steel AL 29-4C Stainless Steel / 430 Stainless Steel CLEARANCES AND ENCLOSURES CAUTION DO NOT PLACE ANY TYPE OF INSULATION OR COMBUSTIBLE MATERIALS IN THE REQUIRED CLEARANCE SPACES SURROUNDING THE VENT. This vent is to be installed unenclosed or with enclosures. If the vent passes through any zone or story of a building above that on which the connected appliance is located, it is to be enclosed in construction having a fire rating equal to or greater than that of the floor or roof assemblies through which it passes. NOTE: Always check with the Authority Having Jurisdiction for material with an appropriate fire rating. If a portion of the vent passes between a dropped ceiling and roof, that portion is to be enclosed in a fire rated enclosure or proper clearance to combustibles are maintained. Vents are not intended to pass through combustible walls. Any wall through which the vent passes must be of noncombustible construction unless proper clearance to combustibles are maintained. Vents installed in open rooms or fully ventilated areas on the same story as the equipment connected to it shall have a minimum clearance to combustibles as shown in the following tables: SYSTEMS TERMINATING VERTICALLY event Series Vent Clearances - Vertically Terminating Systems Inside Diameter 550 F (288 C) inches mm " (25mm) " (38mm) " ( 51mm) " (76mm) " (102mm) " (127mm) SYSTEMS TERMINATING HORIZONTALLY event Series Vent Clearances - Horizontally Terminating Systems Inside Diameter 550 F (288 C) inches mm " (25mm) " (38mm) " ( 51mm) " (76mm) " (102mm) " (127mm) " (152mm) Clearances to non-combustibles shall be necessary for installation, inspection and maintenance. TERMINATION HEIGHT REQUIREMENTS Vents are to terminate a minimum of 3-ft. (0.92 m) above the highest point of the roof penetration and 2-ft. (0.61m) minimum above any portion of a building within 10-ft (3.1 m) horizontally. Consult the Authority Having Jurisdiction about restrictions in your area. See NFPA

4 Models event, eventplus and eventplus2 INDIVIDUAL PART INSTALLATION This section identifies Models event, eventplus and eventplus2 by name and part number or part code. See the section titled Part Identification on page 3 of these instructions for part number details. When referring to parts always include the model and flue size to avoid confusion. These instructions comprise both general and specific requirements for all parts in the event, eventplus and eventplus2 series product lines only. (For Model event SD please refer to the specific instructions for Model eventsd. BASIC PIPE AND FITTING ASSEMBLY Before beginning an installation, thoroughly review these instructions. Inner Band Figure 1 - Straight Section SEALANT APPLICATION Figure 3 Step 1: Clean Flanges Step 2: Apply a continuous bead of Schebler part number S600 sealant covering the 1/2" flange of one of the two parts being joined. Fill the "V" groove of the inner band with the S600 sealant provided. See figure 2. Flange "V" of Inner Band Step 4A: (For eventplus2) Wrap inner band tightly with 4" wide insulation strip provided with the system. Step 4: Place outer band around both sections covering the space between the shells. The flanges on the outer band fit into the grooves on the shells. Install nuts/screws and tighten using screwdriver. Step 5: Figure 4 - Horizontal Installation Orientation S600 cure time is 3 days at ambient temperature. Step 3: Figure 2 Join flanged ends of two sections. Install inner band around the two flanges, and use a screw driver to tighten inner band around sections. -See figure 4 for correct orientation. Tap on inner band with rubber or rawhide mallet to ensure a proper tight joint. Note: Once properly installed, sealant will ooze out from between the band and event liner at the inner band connection. This is a indication that the proper amount of sealant has been applied and should not be removed. The sealant may be smoothed for a finished appearance. Note: For outdoor installations, or installations in areas of moisture, apply a bead of S600 sealant in the groove at upper end of the outer band and at the band overlap. Outer Band Figure 5 4

5 Model eventsd INDIVIDUAL PART INSTALLATION This section identifies Model eventsd by name and part number or part code. See the section titled Part Identification on page 3 of these instructions for part number details. When referring to parts always include the model and flue size to avoid confusion. These instructions comprise both general and specific requirements for all parts in the event, eventplus and eventplus2 series product lines only. (For Models event, eventplus and eventplus2 please refer to the specific instructions for Model eventsd. Before beginning an installation, thoroughly review these instructions. BASIC PIPE AND FITTING ASSEMBLY Figure 6 - Typical Straight Section Step 1: Step 2: Clean inside of female end, outside of male and, and vee groove of SD inner band. Apply a 3/4" continuous bead of Schebler S600 sealant provided to the outside of the male end approximately 3/8" from the edge. Apply a second 3/8" continuous bead of sealant on the inside of the female end, approximately 3/8" from the edge. Fill the vee groove of the SD inner band with S600. Figure 7 - Sealant Application Note: Once properly installed, sealant will ooze out from between the band and event liner at the inner band connection. This is a indication that the proper amount of sealant has been applied and should not be removed. Step 3: Insert male end of the event SD into the female end until it stops at the end of the stopping bead. Install SD inner band around the joint spacer clips, using a screwdriver to tighten the SD inner band around the clips with provided hardware. Lightly tap on SD inner band with rubber or rawhide mallet to ensure proper tight joint. Step 4: Step 5: Center outer band over gap between the outer shells of the two sections and tighten with supplied hardware. S600 cure time is 5 days at ambient temperature. Figure 9 Figure 8 - Final Inner Joint Connection Figure 10 - Final Outer band Connection 5

6 These sections identifies Models eventsd, event, eventplus and eventplus2 by name and part number or part code. See the section titled Part Identification on page 3 of these instructions for part number details. Refer to the correct models installation instructions for specific joint connection instructions. When referring to parts always include the model and flue size to avoid confusion. Variable Straights (VS) Model eventsd only. Refer to specific instructions for Models event, eventplus and event PLUS2 Variable Straight instructions. The inner liner is completed by using the inner liner section and slip collar. The inner liner section is cut to length. Take great care in measuring the length required so both joints can be properly secured before the section is cut. The slip collar will slide on to the inner liner section once cut to complete the ducts inner liner. The crimped end of the liner will connect the same as standard straight sections and is not to be cut. The Variable Straight is not designed to support any load. Variable Straights (VS) Models event, eventplus and event PLUS2 only. Refer to specific instructions for Model eventsd Variable Straight instructions. The inner liner is completed by using the inner liner section and slip collar. The inner liner section can be cut to length or slipped inside of the next fixed section of pipe. The slip collar will slide on to the inner liner section and will be drawn tight around the raw end of the inner liner. The flanged ends of the liner and slip collar will connect the same as standard straight sections. The outer comes in two halves. The outer can be cut to length or slipped over the adjacent section. The two halves are drawn together on the sides with the supplied hardware. The Variable Straight is not designed to support any load. GAS FLOW CONDENSATE FLOW Figure 11 Measuring length Variable Straight Length Do not cut the crimped end of the Variable Length Section. First cut back the outer shell of the section. Once completed cut back the inner liner of the same section the same distance as the outer shell. Slide on the slip collar over the inner liner and install section as per the instructions found on page 5. SLIP COLLAR INNER LINER FIXED JOINT SECTIONS TO BE JOINED Figure 13 GAS FLOW CONDENSATE FLOW Figure 12 Cutting to Length Required GAS FLOW INNER "V" BAND ON FLANGED END Figure 14 CONDENSATE FLOW Note: Once properly installed, sealant will ooze out from between the band and event liner at the inner band connection. This is a indication that the proper amount of sealant has been applied and should not be removed. SLIP COLLAR BUTTED AGAINST FLANGE INNER "V" BAND Figure 15 Note: Apply a bead of sealant between the slip collar and inner liner near the flanged end. 6

7 Exhaust systems terminating out a buildings sidewall have additional considerations as compared with traditional through roof terminations. Please refer to specific instructions contained in this section. Figure 16 Horizontal Termination Assembly HORIZONTAL TERMINATION (HT) The Horizontal Termination is utilized when an appliance is exhausted out the sidewall of a building. The system includes a duct Horizontal Termination, Wall Thimble, Thimble Clips, and Wall Flashing. BASIC eventsd WALL TERMINATION ASSEMBLY Step 1: Cut a opening in the wall just large enough to allow the Wall Thimble to penetrate the wall. Keep the Wall Thimble flush with the outside face of the wall. Figure 19 Final Horizontal Termination Installation Note: Horizontally terminated systems must be pitched ¼" per foot back toward the appliance being vented. Ensure any condensate is collected by strategically placing drains, or the appliance itself if permitted by the appliance manufacturer. HORIZONTAL TERMINATION REQUIREMENTS event Series Horizontal Support Spacing eventsd When Terminating Horizontally Up To 6' event, eventplus & eventplus2 Up To 12' Note: Minimum horizontal clearance from appliance outlet to wall of final termination is 3'. VERTICAL TERMINATION REQUIREMENTS Figure 17 Installation of the Wall Thimble event Series Horizontal Support Spacing eventsd When Terminating Vertically Up To 8' event, eventplus & eventplus2 Up To 12' Step 2: Utilizing the Wall Thimble Clips, secure the Wall thimble to the inside of the wall by fastening the clips to the Wall Thimble and the wall being penetrated. Space the clips equally around the perimeter of the Wall Thimble to ensure tight installation. Step 3: Center the Horizontal Termination in the Wall Thimble. A minimum of 3" of inner liner of the Horizontal Termination must penetrate past the outside of the wall and Wall Thimble. See figure 18. Figure 20 Termination Requirements Above a Pitched Roof Figure 18 Installation of the Horizontal Termination Step 4: Mount the Wall Flashing over the Wall Termination sealing the gap between the Wall Thimble and the wall opening. Level the Flashing and seal around perimeter of the Inner Liner with a bead of S600 sealant. Figure 21 Termination Requirements Above a Flat Roof Note: For vertically terminated systems it is recommended that long horizontal runs be pitched ¼" per foot back toward the appliance being vented. Ensure any condensate is collected by strategically placing drains, or the appliance itself if permitted by the appliance manufacturer. 7

8 BOILER ADAPTER KITS (BKF and BKR) "C" Clamp Starter Section 90 DEGREE TEE (90T) When properly supported, the 90-Degree Tee will support 50 feet of vertical vent. This fitting is used to connect horizontal pipe runs into the vertical vent as well as a drain and/or inspection opening. Where access for a drain or an inspection opening is required, the following method for support can be used: Split Starter Ring Boiler outlet Figure 22 - Flanged Boiler Adapter For flanged appliance outlets, the Boiler Kit Flanged (BKF) should be used. The Boiler Kit Flanged consists of a split starter ring, starter section and the required number of "C" clamps for the installation. The Boiler Kit Flanged is installed in the following procedure: Apply a continuous bead of the proper sealant to the inner flange on one end of the Starter Section. Center the starter section on the boiler flange and place the two piece Split Starter Ring over the bottom flange on the Starter Section. Be sure that the tabs on the Split Starter Ring overlap and all parts fit snug. Place the required number of "C" clamps over the boiler flange and starter ring and tighten clamps. The flange can be field drilled to match the appliance outlet if desired. All other vent parts can now be installed (see joint assembly for the proper procedure). Figure Tees A. Suspended Tee - Support Plate or Wall Support at upper tee joint as shown in Figure 17. Raw end to connect to raw boiler outlet Rolled Flange to be connected to next section of pipe Figure 23 - Raw Boiler Adapter For a raw appliance outlets the Boiler Kit Raw (BKR) should be used. The Boiler Kit Raw consists of a collar type starter section. The Boiler Kit Raw is installed in the following procedure: Figure 25 - Suspended Tee B. Two axis support - This method is recommended if the total thermal expansion is expected to be above ¼ as shown in Figure Apply a continuous bead of the proper sealant to the inner flange of the appliance outlet. Place the starter section on the appliance outlet and tighten in place with the hardware provided. All other vent parts can now be installed (see joint assembly for the proper procedure). The boiler kits include a seal ring that will cover the gap between the inner and the outer shell. The seal ring clamps around the outer shell pipe and is held in place with (4) ¼ x 1 ½ bolts. Figure 25 - Two Axis Supported Tee 8

9 DRAIN TEE CAP (DTC) 90 DEGREE WYE (90Y) The Wye fitting is used when the vertical vent is located between two boilers and a low-pressure loss system is required. The Wye should be installed with the usual precautions observed for thermal expansions. Figure 26 - Drain Tee Cap The event, event Plus and event Plus2 has a 1" drain pipe that must be connected to a suitable drain. The eventsd has a 1/2" drain connection. The Drain Tee Cap must be connected at all times to a suitable drain. Upon entering the vent, rain will wash down and remove any corrosive combustible residue. The Drain Tee Cap must be installed with sealant at its mating surfaces with the flanged joint. This will ensure that moisture is drained through the drain as intended and will provide a tight seal. The Tee Cap can be installed for inspection access as required. 30, 45 AND 90 DEGREE ELBOWS (30L, 45L AND 90L) These elbows must be protected from the effects of thermal expansion. SUPPORT PLATE (SP) Figure 29-90Y The Support Plate offers the greatest strength for support of the event Series Venting System. It will provide vertical support and will provide for joint alignment and support for horizontal applications. Between any two fixed points in a system or whenever an adjustable length must be used to prevent the bending of tees and other fittings, locate and secure the Support Plate as necessary by means of structural ties to the building. The Support Plate must be secured to structural members of the building, which can adequately support the weight of the vent as shown on page 12 of these instructions. Figure 27-45, 30 and 90 Elbows 45 DEGREE LATERAL TEE (45LT) For venting systems that require a 45 degree entry to the vertical vent, the 45 Degree Lateral Tee (45LT) may be used. The 45 Degree Lateral Tee should be supported in the same way as the 90 Degree Tee. When properly supported, the 45 Degree Lateral Tee will support 50 feet of vertical vent and may be installed with a Drain Tee Cap or End Cap. Figure 30 - Support Plate Attachment The Support Plate consists of a split clamp flange, split plate and necessary hardware. The split clamp flange and the split plate are used to clamp the inner flanges together and are turned 90 degrees apart. The notches in the split plate and in the clamp flange are to accommodate the inner band end clips, allowing the "V" to rest solidly on the split plate. The installation procedure is as follows: Figure Lateral Tee Connect the joint to be supported by use of the inner band as previously discussed. Connect the split clamp flange to the split plate with the provided hardware. The split plate should be below the finished joint and the clamp flange should be above the finished joint. 3/8 x 1 ½ bolts should be used in all of the inner clamp flange holes. Tighten all bolts. Install the special outer bands provided and seal with sealant. 9

10 Proper performance and long service life of the Model event Series Venting System requires that the vent be rigidly braced and supported. Every installation offers unique support and bracing requirements and the following guidelines will provide minimum acceptable sizes for the mechanical hardware supplied by others. When the support plate is bolted to framework 3/8 bolts should be used in all of the holes on the perimeter of the support plate. event Series Size Framework Bracing 4" - 20" 2 x 1 x 3/16 to 5 x 2 x 2 x 2 x 3/16 3/16 or equivalent 22" - 36" 5 x 2 x 3/16 to 6 x 2 x 3 x 3 x 1/4 3/16 or equivalent 38" - 48" 6 x 2 x 3/8 or equivalent 4 x 4 x 3/8 The Wall Support is intended for attachment to non-combustible structures. When attached, the Wall Support provides a fixed point in the vent system. Install a Variable Length below a Wall Support to provide the necessary expansion compensation. The Wall Support, when properly installed, will allow for the required clearances to combustibles along the wall and will support the length of pipe outlined on page 12 of these instructions. WALL GUIDE (WG) The wall guide is used to protect the vertical vent from lateral wind loads and to allow for thermal expansions. When assembled, the proper installation location is at a joint but below the outer band. The outer wall of the vent must be able to move away from the outer ring of the wall guide. When properly attached to a combustible wall, the Wall Guide will maintain the proper clearances to combustibles. Wall Guides should be equally spaced along the wall at spacings no greater than 16 for 4 through 10 diameters and 24 for 12 through 48 diameters. WALL SUPPORT (WS) Figure 31 - Support Plate Bracing The Wall Support consists of two split plates, brackets and all necessary hardware. The notches in the split plates on the Wall Support are to accommodate the inner band end clips, allowing the "V" to be clamped between the split plates. Installation for the Wall Support is accomplished with the following procedure: Figure 33 - Wall Guide Connect the joint to be supported by use of the inner band as previously discussed. Connect the split clamp flange to the split plate with the provided hardware. The split plate should be below the finished joint and the clamp flange should be above the finished joint. 3/8 x 1 1/2 bolts should be used in all of the inner clamp flange holes. Tighten all bolts. Bolt the wall brackets to the split plate assembly with the (6) 3/8 x 1 ½ bolts as provided. Locate and bolt the entire assembly to the wall with (8) ½ dia. bolts. Apply sealant around outer Half Bands and support plate for exterior installations. CAUTION: Always maintain proper clearances to combustibles when installing all guides and supports. Keep all insulation away from required clearance (air) spaces surrounding the vent. Guides and supports are only suitable for attachment to noncombustible construction due to possible heat conduction. FLOOR ROOF GUIDE (FRG) Floor Roof Guides are used to provide lateral support for the vent in the roof and floor opening. The Floor Roof Guide is to be bolted to non-combustible construction in (4) four places. Figure 34 - Floor Roof Guide Figure 32 - Wall Support 10

11 FULL AND HALF ANGLE RINGS (FR AND HR) The full and half rings are used to guide the vent either vertically or horizontally. The rings should be placed at intervals shown in the chart below and securely connected to the building structure. The diameter of the Full Ring is slightly larger than the pipe. This will allow the pipe to slide within the ring. This movement must be allowed to compensate for thermal expansion. INSULATED THIMBLE (IT) The insulated thimble is used in conjunction with the flashing and rain collar when clearances to combustibles cannot be maintained at a roof penetration. The Insulated Thimble should be dropped through the roof opening. The (4) four tabs will set upon the roof deck and nailed or bolted down. The flashing is then set over the Insulated Thimble. event Series Horizontal Support Spacing eventsd When Terminating Horizontally Up To 6' eventsd When Terminating Vertically Up To 8' Event, eventplus & eventplus2 Up To 12' event Series Vertical Guide Spacing All event Series Diameters 5" to 10" Up To 16' All event Series Diameters 11" to 48" Up To 24' RAIN CAP (CC) Figure 37 - Insulated Thimble Figure 35 - Full Ring and Half Ring FLASHING AND RAIN COLLAR (FL AND RC) The Rain Cap provides partial protection from rain and debris. The Rain Cap is mounted on the end of a standard pipe section with the use of a inner band. A closure ring is provided to close off the space between the inner and outer liners. A minimum clearance of 8 feet (2.44 m) is recommended to ensure that all exhausted products are dispersed away from the building and intakes. To install the Rain Cap, the following procedure should be used: Both the Flashing and the Rain Collar are designed to fit the outside of the Model event Series Venting System. They are constructed of galvanized steel and should be protected from corrosion by cleaning and painting. The Flashing is nonventilated and for non-combustible and combustible flat roofs. Flashings of a special pitch are available upon request. The Flashing should be protected from lateral movement of the stack by use of the Full Ring or the floor/roof Guide Apply a bead of the proper sealant to the flange of the inner pipe to receive the Rain Cap. Place the Rain Cap on the existing inner flange and attach the "V" band as previously mentioned. Install the provided collar as shown. Apply a silicon sealant to fill any gaps and joints on the collar and tighten all bolts. The Rain Collar is secured around the pipe immediately above the flashing and should be sealed with a silicone sealant. Figure 36 - Roof Penetration Figure 38 - Rain Cap Assembly 11

12 To clean the flue or replace the Rain Cap, reverse the above procedure. To reinstall, follow the installation procedure. TOP SECTION (TS) The Top Section is installed using the same procedures as a Rain Cap (CC). Figure 39 - Top Section EXIT CONE (EXC) The Exit Cone is installed using the same procedure as the Rain Cap (CC). Figure 42 Rigid Guying Angle GUY SECTION (GS) Figure 40 - Exit Cone When the height above the roof line exceeds 12 feet, a Guy Section is recommended. The inner flanges of the Guy Section are connected in the same procedure as the typical pipe sections. The outer shell is then sealed by using special half bands and sealant. Guy wires or braces are to be attached to the horizontal flanges of the Guy Section (See Figure 35). The cables and pipe guys must be slightly loose to allow for thermal expansions. To reduce the thermal expansion effects on rigid bracing or guy wires, a Support Plate (SP) or Wall Support (WS) may be installed at or below the roof line. Guy tensioners may be required if the thermal expansion exceeds the allowable slack in cables. Figure 43 Bracing Requirements Figure 41 - Guy Section Figure 44 Maximum Freestanding Height 12

13 LIMITATIONS MAXIMUM HEIGHT ABOVE TOP LATERAL BRACE OR GUY Vent Inside Diameter Maximum Height 4-10 ( mm) 8 feet (2.44m) ( mm) 12 feet (3.66m) If the height above the roof line is less than that specified above, no guying or bracing is required. However, a Insulated Thimble (IT), Floor/Roof Guide (FRG) or Full Ring (FR) at the roof line is necessary to protect the Flashing (FL) from side loads caused by wind. For heights above the roof line greater than that shown above, the vent must be guyed or braced. Guying or bracing is accomplished by use of the Guy Section (GS) Full Ring (FR) or Wall Guide (WG). Guy wires or braces are to be attached to the horizontal flanges of the Guy Section. While 3 guys are usually sufficient, it is recommended that 4 equally spaced wires at an angle of 45 from the vertical be utilized. The cables and guys must be slightly loose to allow for the thermal expansion. Rigid bracing requires two braces with not less than 60 angle between them. The braces must be attached to a Guy Section (GS) or Full Ring (FR). DRAIN TEE CAP (DTC) DRAIN SECTION (DS) Figure 45 - End Cap The drain tee cap is installed exactly the same as the end cap. The drain section is used to drain rain water and condensation from within the stack. The NPT nipple should be connected to a suitable drain. event SERIES SUPPORT LIMITS SECTION INSIDE DIA. SUPPORT PLATE (SP) WALL SUPPORT (WS) inches mm feet meters feet meters Figure 46 - Drain Section HORIZONTAL DRAIN (HD) The horizontal drain is used to drain rain water and condensation from within the breeching. The NPT nipple should be connected to a suitable drain. END CAP (EC) The end cap is used to cap off a tee and to allow a means to enter the system for inspection and cleaning. The end cap is installed by connecting the inner cone to the adjacent pipe section with a inner band and sealant. The outer cover piece is then fitted over the outer shell and bolted into place with (2) ¼ x 1 ½ stainless steel bolts. Whenever the end cap is removed for inspection purposes the flanges must be cleaned and resealed when reinstalling the part. Figure 47 - Horizontal Drain 13

14 OPERATING PRECAUTIONS A licensed or qualified vent sweep should be contacted to clean the vent. Contact local building or fire officials about restrictions and installation inspection in your area. MAINTENANCE Venting and Exhaust Systems 1. After the installation of the vent or exhaust system, ensure that the required clearances are maintained and For tee caps, adequate clearance is required around clean-outs to assure accessibility for removal of caps and products accumulated within the vent. 2. that the system continues to be supported properly. The venting system should be inspected if there is any evidence of damage to the vent system, and at least annually, for internal deposits, soundness and correct clearances. Cleaning and repairs shall be as needed. It is recommended that exterior mounted venting systems located in geographical areas which experience sustained low ambient temperatures be enclosed to reduce or limit condensation, creosote buildup and poor draft Caulking on exterior portions of the vent, flashing, rain collar, etc. should be inspected and repaired or replaced as needed to prevent leakage. Painted portions of the vent shall be cleaned and touched-up or repainted as required to prevent corrosion. Supports, guys, braces, etc. should be inspected at least annually to make sure bolts are tight. For further information see NFPA 211, latest edition, chapter titled Maintenance. 14

15 5665 Fenno Rd. Bettendorf, IA Jan 2012 Phone: Fax:

MODEL IPIC SERIES 4G GREASE DUCT

MODEL IPIC SERIES 4G GREASE DUCT INSTALLATION AND MAINTENANCE INSTRUCTIONS WALMART APPLICATION 637N MODEL IPIC SERIES 4G GREASE DUCT 7N71 IT IS OF THE UTMOST IMPORTANCE THAT THIS DUCT BE INSTALLED ONLY IN ACCORDANCE WITH THESE INSTRUCTIONS.

More information

Z-Vent Model SVE Series III

Z-Vent Model SVE Series III Special Stainless Steel Venting System for Gas Burning Appliances Category I, II, III, & IV Tested and Listed By Underwriters Laboratories Inc. UL 1738 & BH636 Note the following before installation of

More information

MODEL N, VSI, IVSI & ZC SINGLE WALL, DOUBLE WALL AIR & CERAMIC FIBER INSULATED POSITIVE PRESSURE PIPING SYSTEMS

MODEL N, VSI, IVSI & ZC SINGLE WALL, DOUBLE WALL AIR & CERAMIC FIBER INSULATED POSITIVE PRESSURE PIPING SYSTEMS INSTALLATION INSTRUCTIONS & MAINTENANCE GUIDE MODEL N, VSI, IVSI & ZC SINGLE WALL, DOUBLE WALL AIR & CERAMIC FIBER INSULATED POSITIVE PRESSURE PIPING SYSTEMS BOILER STACK ENGINE EXHAUST GREASE DUCT VENTILATION

More information

Gas Fireplaces. P36D-10 Gas Fireplace. Unit Dimensions With Vignette Faceplate. *** Important: Framing height requires consideration of the hearth

Gas Fireplaces. P36D-10 Gas Fireplace. Unit Dimensions With Vignette Faceplate. *** Important: Framing height requires consideration of the hearth 28-15/16 (735mm) Model P36D-NG10 P36D-LP10 Fuel Type Natural Gas Propane Gas Fireplaces Minimum Supply Pressure Manifold Pressure - High Manifold Pressure - Low 5 W.C. (1.25 kpa) 3.8 W.C. (0.95 kpa) 1.1

More information

HIGH EFFICIENCY POSITIVE PRESSURE VENTING SYSTEMS FOR CONDENSING APPLIANCES, CATEGORIES II, III AND IV Single & Double Wall Construction

HIGH EFFICIENCY POSITIVE PRESSURE VENTING SYSTEMS FOR CONDENSING APPLIANCES, CATEGORIES II, III AND IV Single & Double Wall Construction HIGH EFFICIENCY POSITIVE PRESSURE VENTING SYSTEMS FOR CONDENSING APPLIANCES, CATEGORIES II, III AND IV Single & Double Wall Construction Models HEP HEPL HEPL2 28 KJ This symbol shows that CHEMINÉE LINING.E

More information

Concentric Vent/Air System Supplement

Concentric Vent/Air System Supplement Concentric Vent/Air System Supplement This document is intended to be used by a qualified heating contractor or service technician. Read all instructions within this document and within the CHAL- LENGER

More information

SUBMITTAL RECORD. Material Selection FLUE (INNER WALL) CASING (OUTER WALL) GALVALUME

SUBMITTAL RECORD. Material Selection FLUE (INNER WALL) CASING (OUTER WALL) GALVALUME SUBMITTAL RECORD UL 1978 - Grease Duct Professional Series Kitchen Ventilation DCL Single Wall DAS1 1-inch Air Insulated DIS1 1-inch Insulated (AES WOOL) DIS2 2-inch Insulated (AES WOOL) DIS4 4-inch Insulated

More information

METALLIC CHIMNEY LINER SYSTEM Single Wall Construction Rigid Chimney Liner. Installation Instructions. Models

METALLIC CHIMNEY LINER SYSTEM Single Wall Construction Rigid Chimney Liner. Installation Instructions. Models METALLIC CHIMNEY LINER SYSTEM Single Wall Construction Rigid Chimney Liner Installation Instructions Models IPP Cat. I: Part 1 HEP Cat I, II, III, IV: Part 2 3STS This symbol shows that Cheminée Lining.E

More information

DuraFlex. Flexible stainless steel relining for masonry chimney. UL 1777 and ULC S635.

DuraFlex. Flexible stainless steel relining for masonry chimney. UL 1777 and ULC S635. DuraFlex Flexible stainless steel relining for masonry chimney. UL 1777 and ULC S635. Specifications DuraFlex SW Applications DuraFlex SW smooth wall flexible relining for masonry chimney. Use with gas,

More information

Air flue duct for use with ecotec boilers

Air flue duct for use with ecotec boilers For the installer Flue installation instructions Air flue duct for use with ecotec boilers Concentric System Ø 80/5 (Galvanized steel air duct/plastic flue duct) GB Contents Notes on the documentation

More information

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge Assembly Manual 8x9 PATENTS ARE PENDING Approximate Size 7640303 Storage Area Building Dimensions Exterior Dimensions Roof Edge to Roof Edge Interior Dimensions Wall to Wall Sq. Ft. Cu. Ft. Width Depth

More information

MODEL GZ Zero Clearance Grease Duct Installation Instructions Tested to UL 1978/ULC S662, UL 2221/ULC S144, ASTM E814 CO., INC.

MODEL GZ Zero Clearance Grease Duct Installation Instructions Tested to UL 1978/ULC S662, UL 2221/ULC S144, ASTM E814 CO., INC. MODEL GZ Zero Clearance Grease Duct Installation Instructions Tested to UL 1978/ULC S662, UL 2221/ULC S144, ASTM E814 CO., INC. NOTES TABLE OF CONTENTS LISTING & CODE COMPLIANCE..................................................................

More information

DuraPlus. All-fuel, triple-wall chimney system. UL 103 HT.

DuraPlus. All-fuel, triple-wall chimney system. UL 103 HT. DuraPlus ll-fuel, triple-wall chimney system. UL 103 HT. Specifications pplications DuraPlus himney is a triple-wall, all-fuel chimney for use with wood stoves, fireplaces, furnaces, boilers, stoves, ranges,

More information

Pre-Fabricated Roof Curbs

Pre-Fabricated Roof Curbs Knock Down Curb Assembly Instructions These roof curb assembly instructions are to be used as general guidelines only. Included with shipment are as-built drawings for proper location of sections and channels.

More information

Gas Fireplaces. P33 Zero Clearance Direct Vent Gas Fireplace. *** Important: Framing height requires consideration of the hearth

Gas Fireplaces. P33 Zero Clearance Direct Vent Gas Fireplace. *** Important: Framing height requires consideration of the hearth P33 Zero Clearance Direct Vent Gas Fireplace P33 WITH THE FLUSH OR BAY FRONT Model P33-NG4 P33-LP4 Fuel Type Natural Gas Propane Minimum Supply Pressure 5 W.C. (1.25 kpa) 12 W.C. (3.00 kpa) Manifold Pressure

More information

MODEL SS/SSD/SSID SUBMITTAL RECORD

MODEL SS/SSD/SSID SUBMITTAL RECORD MODEL SS/SSD/SSID SUBMITTAL RECORD Single Wall or Double Wall AL29-4C Special Gas Vent for Category I, II, III and IV TYPE L VENT Low temperature venting system INTERNATIONAL, INC. 4 to 24 Diameter Vent

More information

Installation instructions

Installation instructions Installation instructions Holetherm Double-walled flue gas discharge system (DW) 2016 All information in this release is subject to misprints. No liability is accepted for the consequences of misprints.

More information

Installation Instructions

Installation Instructions InnoFlue Single Wall, Flex, Concentric Vent System The installation instructions should be kept with the appliance for maintenance. Examine all components for possible shipping damage prior to installation.

More information

ROOF MOUNT KIT OWNERS MANUAL

ROOF MOUNT KIT OWNERS MANUAL ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Primus Wind Power, Inc. 938 Quail St. Lakewood, CO 80215 Phone: (303) 242-5820 www.primuswindpower.com AIR is a trademark of Primus Wind Power, Inc. ROOF

More information

FIREPLACE INSERT ENCLOSURE INSTALLATION INSTRUCTIONS

FIREPLACE INSERT ENCLOSURE INSTALLATION INSTRUCTIONS FIREPLACE INSERT ENCLOSURE INSTALLATION INSTRUCTIONS ENCLOSURE MODEL 90566400 FOR INSERT MODEL 5660NA And ENCLOSURE MODEL 90566000 FOR INSERT MODEL 5660 STANDARD KEEP THESE INSTRUCTIONS FOR FUTURE USE

More information

Taking value to the highest level.

Taking value to the highest level. Venting Solutions Taking value to the highest level. Example: 2D Drawings Schebler Chimney Systems is a premier source of custom, modular prefabricated stainless steel chimneys, heavy wall engineered stacks,

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS CHIMNEY CONNECTOR WALL THIMBLE MODEL IWT INSTALLATION INSTRUCTIONS Warnock Hersey C US LISTED ULC-S641/UL103 IT IS OF THE UTMOST IMPORTANCE THAT THIS WALL THIMBLE BE INSTALLED ONLY Y IN ACCORD CCORDANCE

More information

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS SECTION 270528 PATHWAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Communications equipment coordination and installation. 2. Sleeves for pathways and cables. 3. Raceway

More information

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SECTION ACOUSTICAL PANEL CEILINGS

SECTION ACOUSTICAL PANEL CEILINGS SECTION 095113 ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Simpson Dura-Vent Engineered Excellence

Simpson Dura-Vent Engineered Excellence DuraLiner Simpson Dura-Vent Engineered Excellence pplications Materials and onstruction DuraLiner DuraLiner ensures safe and efficient venting of heating appliances, while protecting the masonry chimney

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519 METAL CLAD CABLE - MC-PLUS Neutral

More information

SI T T FST

SI T T FST SI 440-600-700-700T-780-780T-900-1100 Freestanding TAPER TOP Open Fire - Wood Burner Installation Instructions Note: FLUE SYSTEMS Casing. Flue System may require to be Doubled Lined to Comply. Ref ASNZS:2918:2001

More information

INSTALLATION AND MAINTENANCE INSTRUCTIONS FOR

INSTALLATION AND MAINTENANCE INSTRUCTIONS FOR INSTALLATION AND MAINTENANCE INSTRUCTIONS FOR FLEXIBLE STAINLESS STEEL RELINING PIPE Lifetime Warranty UL/ULC Listed Sizes: 3" 8" diameters Manufactured Exclusively for: Copperfield Chimney Supply, 304

More information

Questar ThermWise Duct Technical Specifications

Questar ThermWise Duct Technical Specifications Questar ThermWise Duct Technical Specifications 1. Introduction and Scope: This document sets forth the specifications for duct sealing and duct insulation in accordance to Questar ThermWise Weatherization

More information

Installation Instructions. High-Temperature, Factory Insulated Double-Wall Masonry Relining system 5" Round 6", 8" Round and Oval.

Installation Instructions. High-Temperature, Factory Insulated Double-Wall Masonry Relining system 5 Round 6, 8 Round and Oval. Installation Instructions High-Temperature, Factory Insulated Double-Wall Masonry Relining system 5" Round 6", 8" Round and Oval DuraLiner A MAJOR CAUSE OF VENT RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED

More information

INSTALLATION INSTRUCTIONS for MP-RC1 TWO PIECE CONSTRUCTION TO BE INSTALLED ON COMPLETED ROOF DECK

INSTALLATION INSTRUCTIONS for MP-RC1 TWO PIECE CONSTRUCTION TO BE INSTALLED ON COMPLETED ROOF DECK INSTALLATION INSTRUCTIONS for MP-RC1 TWO PIECE CONSTRUCTION TO BE INSTALLED ON COMPLETED ROOF DECK A. 1. Using curb ribs as a guide, layout and mark roof openings on completed roof deck as outside curb

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

Double Containment DESIGN & INSTALLATION GUIDE TECHNICAL INFORMATION. Visit our web site

Double Containment DESIGN & INSTALLATION GUIDE TECHNICAL INFORMATION. Visit our web site Double DESIGN & INSTALLATION GUIDE TECHNICAL INFORMATION Visit our web site www.spearsmfg.com 1326 The information contained in this publication is based on current information and Product design at the

More information

SECTION GYPSUM BOARD ASSEMBLIES

SECTION GYPSUM BOARD ASSEMBLIES SECTION 09 21 16 GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.1 SECTION INCLUDES A. Metal stud wall and ceiling framing, 20 gauge. B. Metal channel suspended ceiling framing. C. Gypsum board. D. Gypsum sheathing.

More information

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER Dyplast Products Copyright 2012 1 Rev 0112 DYPLAST PRODUCTS

More information

RS24-10 Single-Section Skylight System

RS24-10 Single-Section Skylight System INSTALLATION INSTRUCTIONS RS24-10 VERSION 1.100316 DATED: 10/03/16 RS24-10 Single-Section Skylight System under/over seam clip double diverter US Patent D750,282 www.rnssales.com sales@rnssales.com 805.375.3980

More information

Installation Instructions. Air-Cooled Chimney for Isokern Fireplaces

Installation Instructions. Air-Cooled Chimney for Isokern Fireplaces Installation Instructions Air-Cooled Chimney for Isokern Fireplaces A MAJOR CAUSE OF VENT RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCES (AIR SPACES) TO COMBUSTIBLE MATERIALS. IT IS OF THE UTMOST

More information

Fire Barrier Duct Wrap 615+

Fire Barrier Duct Wrap 615+ Fire Barrier Duct Wrap 615+ Duct Wrap Fire Protection System for Commercial Kitchen Grease and Ventilation Air Ducts Product Data Batts and blankets for use in fire resistive duct assemblies see UL fire

More information

KS SERIES - VERTICAL INSTALLATION

KS SERIES - VERTICAL INSTALLATION CS-DS-01-KSV CS DISCLAIMER CS-PP-01-KSV PANEL PROFILES CS-PP-02-KSV PANEL PROFILES CS-PP-03-KSV PANEL PROFILES CS-PJ-01-KSV KS SERIES EXPANDED PANEL JOINT CS-PJ-02-KSV KS SERIES ENGAGED PANEL JOINT CS-PJ-03-KSV

More information

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE This specification is intended to describe the general requirements applicable to a proper structural cantilever rack design. In addition, it is

More information

Diffused Aeration Piping Equipment

Diffused Aeration Piping Equipment 1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections

More information

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board. 1.2 RELATED WORK A. Installation of steel framing members for walls, partitions,

More information

SECTION TURBINE VENTILATORS

SECTION TURBINE VENTILATORS SECTION 07 72 00 TURBINE VENTILATORS **This is a CSI Three-Part Specification using CSI MasterFormat 2004-2010 Section Numbers and Titles. This specification must be edited to suit your particular project.

More information

Daytona Beach Pier Building Renovation Jun 2010

Daytona Beach Pier Building Renovation Jun 2010 SECTION 15150 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

MODULAR ACOUSTIC FENCING INSTALLATION GUIDE

MODULAR ACOUSTIC FENCING  INSTALLATION GUIDE MODULAR ACOUSTIC FENCING WWW.QUICKBUILTSYSTEMS.COM.AU INSTALLATION GUIDE INTRODUCTION THE QUICKBUILT FENCE SYSTEM IS A SMARTLY DESIGNED MODULAR SYSTEM EASY AND FAST TO INSTALL AND COST EFFECTIVE. // THE

More information

DuraFlex AL. Installation Instructions

DuraFlex AL. Installation Instructions Installation Instructions Flexible aluminum relining system for relining masonry chimneys for natural gas or liquid propane category I, draft hood equipped appliances, and appliances tested and listed

More information

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual Series 200 UL Introduction Series 200 UL Introduction SnapNrack Series

More information

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

UNDERGROUND SERVICES SECONDARY

UNDERGROUND SERVICES SECONDARY Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-

More information

Technical Services Information Bureau

Technical Services Information Bureau Technical Services Information Bureau INSTALLING ACOUSTICAL LAY-IN TYPE CEILINGS IN SEISMIC REGIONS AUGUST 2009 UPDATED MAY 2017 TECHNICAL BULLETIN This document covers the installation practices recognized

More information

FLUE KIT INSTALLATION MANUAL

FLUE KIT INSTALLATION MANUAL FLUE KIT INSTALLATION MANUAL 7 76 9 55 ROOM SEALED TELESCOPIC FLUE 7 76 9 086 PLUME MANAGEMENT SYSTEM GREENSTAR 60/00 HORIZONTAL FLUE FOR USE WITH WORCESTER GREENSTAR GAS-FIRED APPLIANCES: Greenstar FS

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

METALLIC CHIMNEY LINER SYSTEMS

METALLIC CHIMNEY LINER SYSTEMS SINGLE WLL CONSTRUCTION RIGID CHIMNEY LINER METLLIC CHIMNEY LINER SYSTEMS TECHNICL DT ND PRTS SELECTION Models CBI and CBH Commerical/Industrial Stainless Steel Single Wall Construction CONTENTS SECTION...

More information

SECTION HVAC DUCTS AND CASINGS

SECTION HVAC DUCTS AND CASINGS SECTION 23 31 00 HVAC DUCTS AND CASINGS PART 1 -GENERAL 1.1 SUMMARY A. Section includes metal ductwork, nonmetallic ductwork, casing and plenums, buried ductwork, kitchen hood ductwork, duct cleaning.

More information

Fig Beam Clamp Retaining Strap (B-Line B3367)

Fig Beam Clamp Retaining Strap (B-Line B3367) Fig. 69 - Beam Clamp Retaining Strap (B-Line B3367) Size Range: 3 /8"-16 thru 3 /4"-10 rod 4 (101.6mm) thru 16 (406.4mm) lengths Note: longer lengths are available consult factory Material: Pre-Galvanized

More information

TC54. for architects & designers. Dimensions Clearances Venting

TC54. for architects & designers. Dimensions Clearances Venting for architects & designers TC54 Series D Dimensions Clearances enting IMPORTANT This booklet is intended as a basic specification guide for architects, designers and builders. Please refer to the Instruction

More information

Roof Replacement. Notes: T-1 (Title Sheet) Roof Key Plan Russell House Student Union 1400 Greene Street Columbia, South Carolina 29208

Roof Replacement. Notes: T-1 (Title Sheet) Roof Key Plan Russell House Student Union 1400 Greene Street Columbia, South Carolina 29208 Notes: Drawing Index T-1 Title R-1 Roof Plan - Existing Conditions R-2 Roof Plan - New D-1 Roof Details D-2 Roof Details D-3 Roof Details M-1 Mechanical - Roof Plan M-2 Mechanical - Details Roof Key Plan

More information

PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION

PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION DRAINAGE SOLUTIONS SINCE 1908 PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION PROVEN PERFORMANCE ARMTEC.COM

More information

Planning and installation instructions

Planning and installation instructions Planning and installation instructions Stofix Oy Ahlmaninkatu 2 E 40100 Jyväskylä Finland stofixgroup@stofix.com www.stofix.com 2 PLANNING AND INSTALLATION INSTRUCTIONS... 1 1 General... 3 2 Project Design...

More information

Administrative Changes

Administrative Changes Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information

Rinnai Infinity XR26/HD200 Internal Flueing

Rinnai Infinity XR26/HD200 Internal Flueing Flueing Options and Rinnai Flue Kits Available Rinnai have developed two flueing kits to make installation of Rinnai Infinity XR26i/XR26ia and HD200i Internal units as easy as possible. Use the kit options

More information

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED Chapter 17 Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.1.1 Applicability The regulations in this chapter apply to any private potable water supply system where plumbing fixtures are

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 1316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

When I started tiling, we didn t do our own shower pans that BATHS

When I started tiling, we didn t do our own shower pans that BATHS BATHS Preventing Leaks in Tiled Showers Detail the pan properly before any tile is installed BY TOM MEEHAN Photos by Roe Osborn When I started tiling, we didn t do our own shower pans that job fell to

More information

FastWrap+ 1 1 /2 Commercial Kitchen Grease Duct Air Ventilation Duct

FastWrap+ 1 1 /2 Commercial Kitchen Grease Duct Air Ventilation Duct FastWrap+ 1 1 /2 Commercial Kitchen Grease Duct Air Ventilation Duct Fire Protection Systems Product Data and Installation Guide NFPA 96 IMC 1. Product Description - New and Improved FastWrap+ Thermal

More information

SECTION GYPSUM BOARD

SECTION GYPSUM BOARD SECTION 09250 GYPSUM BOARD PART 1GENERAL 1.1 SUMMARY A. Related Documents: General and Supplementary Conditions of the Contract, Division 1 - General Requirements, and Drawings are collectively applicable

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING SECTION 221316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following soil and waste, sanitary drainage and vent piping inside the building: 1. Pipe, tube,

More information

Installation instructions

Installation instructions Installation instructions Holetherm Single-walled flue gas discharge system (EW) 2016 All information in this release is subject to misprints. No liability is accepted for the consequences of misprints.

More information

Container Installation Guide

Container Installation Guide Container Insulation Container Installation Guide Panels and Inserts The InSoFast CX Container panel and the Inserts are designed to fit most shipping containers. Containers have three types of corrugations:

More information

Flue Pipe Considerations

Flue Pipe Considerations Flue Pipe Considerations Objective The application summary outlined here will communicate the necessary flue piping arrangement for EnergyLogic (EL) furnaces and boilers and give a fundamental understanding

More information

NATIONAL GYPSUM COMPANY Wood Frame Walls And Ceilings Single- And Double-Layer Construction

NATIONAL GYPSUM COMPANY Wood Frame Walls And Ceilings Single- And Double-Layer Construction Walls And Ceilings Single- And Double-Layer Construction 09 9 00/NGC Single-Layer Construction The single-layer construction system consists of a single layer of Gold Bond brand Gypsum Board applied to

More information

PITTSBURGH CORNING ASSEMBLY INSTRUCTIONS. KWiK N EZ Rigid Track Silicone System for Thinline Series Glass Block

PITTSBURGH CORNING ASSEMBLY INSTRUCTIONS. KWiK N EZ Rigid Track Silicone System for Thinline Series Glass Block Page 1 of 6 PITTSBURGH CORNING KWiK N EZ Rigid Track Silicone System for Thinline Series Glass Block ASSEMBLY INSTRUCTIONS Introduction The KWiK N EZ Rigid Track Silicone System is the easiest way to install

More information

LP SmartSide Perfection Shingle

LP SmartSide Perfection Shingle Application Instructions Fiber Substrate Lap Siding A A - Lap Siding ON SITE STORAGE Store off the ground well supported, on a flat well-drained surface. (Diagram 1a) Additional support may be required

More information

RS32 Multi-Section Skylight System under/over seam clip double diverter

RS32 Multi-Section Skylight System under/over seam clip double diverter INSTALLATION INSTRUCTIONS RS32-x RS32 Multi-Section Skylight System under/over seam clip double diverter www.rnssales.com sales@rnssales.com 805.375.3980 Fax 805.375.3981 SKYLIGHT ACRYLIC skyline series

More information

The GlasRoc Shaftliner Type X advantage...

The GlasRoc Shaftliner Type X advantage... C e r t a i n T e e d SHAFTLINER F o r A r e a S e p a r a t i o n F i r e w a l l s Shaftliner S Type X for Area Separation GlasRoc Shaftliner is a specially formulated product for applications where

More information

Liner Replacement Instructions:

Liner Replacement Instructions: Liner Replacement Instructions: Before beginning the replacement procedure... Be sure to disconnect electrical service to all of your electrical components of the pool. Use extreme caution when working

More information

DIRECT-TEMP SELKIRK DIRECT VENT SYSTEM

DIRECT-TEMP SELKIRK DIRECT VENT SYSTEM C I NTERTEK War nock CM Her sey US U L LISTED CAUTION: WEAR GLOES WHILE HANDLING SHEET METAL PARTS TO AOID PERSONAL INJURY. SHARP EDGES OR PROJECTIONS CAN CUT YOU. Selkirk DIRECT-TEMP Direct ent system

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS GUIDE FOR TIMBER AND CONCRETE FLOORS EDITION: APRIL 2016 IMPORTANT: This guide is for the installation of a Step Up shower base on a timber or concrete floor. If you require a walk in (flush with floor)

More information

Proper Installation of Insulated Metal Wall Panels

Proper Installation of Insulated Metal Wall Panels Proper Installation of Insulated Metal Wall Panels Insulated metal panels (IMPs) are an ideal cladding solution for pre-engineered metal buildings. They are available in lengths up to 50, and may also

More information

Modern Rumford. MR 48 fireplaces

Modern Rumford. MR 48 fireplaces Modern Rumford MR 48 fireplaces Construction Guidelines For MR-48-1 Kit System Cellar Building, Suite 300 1124 NW Couch Street Portland, OR 97209 Ph. 503-227-0547 Fax 503-227-0548 info@mobergfireplaces.com

More information

Encapsulated, Sealed & Closed Crawlspace Installation Manual

Encapsulated, Sealed & Closed Crawlspace Installation Manual YourCrawlSpace, Inc. 1007 Johnni4 Dodds Blvd. Mt. Pleasant, SC 29464 Toll Free: 877-44-CRAWL (27295) Local: (843) 593-1115 Encapsulated, Sealed & Closed Crawlspace Installation Manual Copyright 2017 Your

More information

PLATON FOUNDATION WRAP

PLATON FOUNDATION WRAP DRAINAGE SOLUTIONS SINCE 1908 PLATON FOUNDATION WRAP RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS DRY ADVANCED TECHNOLOGY EASY INSTALLATION PROVEN PERFORMANCE ARMTEC.COM

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Assembly Instruction wedi Fundo Floor element

Assembly Instruction wedi Fundo Floor element Assembly Instruction wedi Fundo Floor element Assembly Instructions wedi Fundo Legend A Caulking nut B Rubber caulking gasket C Drain body D wedi sealant E Rubber gasket F Fiber gasket G Locking nut A

More information

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Reflective Insulation Specification & Application Guide for Post Frame and Metal Building Construction

Reflective Insulation Specification & Application Guide for Post Frame and Metal Building Construction Reflective Insulation Specification & Application Guide for Post Frame and Metal Building Construction WHAT IS PLY-FOIL? Ply-Foil is a multilayer, reflective insulation which comes in rolls consisting

More information

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.

SECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products. SECTION 05720 ORNAMENTAL ALUMINUM RAILING ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products. This section is based on the products of Superior Aluminum Products,

More information

Optima Vector Plank. Installation Instructions. Ceiling

Optima Vector Plank. Installation Instructions. Ceiling Ceiling Systems Between us, ideas become reality Optima Vector Plank Installation Instructions 1. GENERAL 1.1. Product Description The Vector products referenced in these instructions are made from fiberglass.

More information

Industry Standard Terms & Definitions Of The Steel Deck Institute

Industry Standard Terms & Definitions Of The Steel Deck Institute Industry Standard Terms & Definitions Of The Steel Deck Institute A specialized set of jargon to describe common terms used by manufacturers and other professionals associated with the usage of Steel Deck

More information

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE SECTION 13125 PART 1 - GENERAL 1.1 SUMMARY A. Section includes the design, engineering, fabrication and erection of a frame-supported, tensilemembrane structure complete with entrance and exit doors and

More information

Trench Duct Class Catalog 5230CT9601R10/08

Trench Duct Class Catalog 5230CT9601R10/08 5230CT9601R10/08 2009 Class 5230 CONTENTS Application.................................................5 Unassembled Trench Duct Components.........................6 Factory Assembled Trench Duct..............................11

More information

PASSIVE FIRE PROTECTION PRODUCTS

PASSIVE FIRE PROTECTION PRODUCTS OCTOBER 2016 PASSIVE FIRE PROTECTION PRODUCTS www.allproof.com CONTENTS FIRE TESTING 1 ADVANCED INTUMESCENT 2 ALLPROOF INTUMESCENT TECHNOLOGY: 2 LOW PROFILE S 3 CONCRETE SLAB TEST RESULTS: 4 FLOOR WASTE

More information

PREP + INSULATION. DISCLAIMER: These tools are for illustrative purposes only and

PREP + INSULATION. DISCLAIMER: These tools are for illustrative purposes only and PREP + INSULATION HOME ENERGY UPGRADES What every contractor needs to know. Copyright 2012 Advanced Energy. All Rights Reserved 103 HOME ENERGY UPGRADES Prep + Insulation Contents Air sealing is a challenging

More information

Sorrento Stone Surrounds

Sorrento Stone Surrounds Sorrento Stone Surrounds For use with Riva 800, Riva 1050 & Studio 22 Installation and Maintenance Instructions For Use in Great Britain and Republic of Ireland (GB & IE) This product is suitable for use

More information

SECTION SECTIONAL OVERHEAD DOORS

SECTION SECTIONAL OVERHEAD DOORS SECTION 08360 SECTIONAL OVERHEAD DOORS PART 1 GENERAL 1.1 SECTION INCLUDES A. Aluminum Doors B. Track and Framing 1.2 RELATED SECTIONS A. Section 04810 - Unit Masonry Assemblies: Prepared opening in masonry.

More information

SECTION I -- IRONWORK

SECTION I -- IRONWORK SECTION I -- IRONWORK CONTENTS PAGE 1. GENERAL... I-2 1.1. Introduction... I-2 2. REQUIREMENTS... I-2 2.1. General... I-2 2.2. Auxiliary Framing... I-2 2.3. High Seismic Risk Zone Requirements... I-3 2.4.

More information

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210)

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210) Quality Inspection 8618 London Heights San Antonio, TX 78254 Phone: (210) 240-0476 PRE DRYWALL INSPECTION REPORT Prepared For: DELETED (Name of Client) Concerning: DELETED, San Antonio, TX 78258 (Address

More information