SECTION 6 STORMWATER AND LAND DRAINAGE

Size: px
Start display at page:

Download "SECTION 6 STORMWATER AND LAND DRAINAGE"

Transcription

1 SECTION 6 STORMWATER AND LAND DRAINAGE Final Version, Approved September 2003

2 Section 6 and Land Drainage Contents 6.1 PERFORMANCE STANDARDS General MEANS OF COMPLIANCE General Resource Consents Gravity Mains Layout Open Drainage Manholes Catchpits Super Modified Catchpits Service Connections Bedding and Protection Pipe Materials Connection to Council's System Testing and Acceptance Specific Ward Requirements Table Final Version, Approved September 2003 Page 2

3 6.1 Performance Standards General A stormwater reticulation and disposal system that can be economically maintained and is adequate to safeguard people from injury or illness and to protect property and the natural environment from damage caused by surface water shall be provided. Council with input from Community Boards has developed and agreed on the Levels of Service to be provided for each stormwater scheme, which are within the Council s Areas of Benefit. All urban areas shall discharge as specified by the Levels of Service for each community (refer to table 6.11). generated by a property is required to be disposed of within the boundary of that property unless there is a sufficient capacity within the network and it is specifically authorised by Council s Representative disposal through soak-away pits is permitted provided the applicant can demonstrate that - they can be economically maintained, - the long-term soakage capacity is adequate A stormwater and disposal system which incorporates detention ponds to minimise the impact of surface water runoff is permissible were authorised in Ward Specific Requirements (refer table 6.11), provided alternative arrangements do not satisfy the requirements and that these details are included in the resource consent applications Detention Basins are to be self-draining without the use of pumping equipment and are not permitted to permanently hold water or be used as a water feature. Detention basins are to be adequately landscaped and constructed to be economically maintained unless specifically approved Retention Basins are not permitted unless demonstrated to be absolutely necessary and shall be constructed with a controlled engineering outflow. Retention basins are to be adequately landscaped and constructed to be economically maintained All stormwater reticulation and disposal systems are to be constructed to convey surface water to an approved outfall, by means of gravity flow where possible Where pipes or lined channels are used the systems shall avoid the likelihood of blockages, leakage, erosion, penetration by roots or the entry of groundwater and shall be located to avoid the likelihood of superimposed loads or normal ground movements Self-cleansing velocities (minimum of 0.65m/s) are to be maintained within reticulation systems. Final Version, Approved September 2003 Page 3

4 Surface flows on carriageways are to be controlled in order to enable safe and comfortable vehicle and pedestrian access across and along road reserves systems shall be designed and installed to cater for full development in the catchment upstream of the subject site. Downstream effects are to be fully addressed Where any public main passes through privately owned residential, commercial or industrial complexes, then the main should be installed outside of the building envelope. If this is not achievable then an easement shall be provided in favour of the Thames- Coromandel District Council to allow access and repairs to the main at all times. 6.2 Means of Compliance General All primary land drainage systems shall be piped (where required by the Specific Ward requirements) unless otherwise approved, or the runoff constitutes an existing natural perennial stream The design events for which the stormwater systems shall be designed are specified in Table The stormwater system shall be constructed to contain the 2% AEP flood level with the freeboard to habitable floor as in Table 6.1: Table 6.1 Catchment Minimum Freeboard Less than 1 hectare 150mm 1 to 5 hectares 200mm 5 to 20 hectares 300mm Greater than 50 hectares 500mm The design of the stormwater system shall generally be in accordance with the runoffs derived from the Rational Method for catchments less than 500 hectares and by the Modified Rational Method for catchments greater than 500 hectares. Other methods may be used to verify the results from the Modified Rational Method. Management Plans for some areas have been prepared. Rainfall data and design parameters are to be consistent with these plans. Refer to the Appendices for the Plans Systems shall be designed to cater for the peak design flow, without surcharge, based on a Colebrook - White pipe roughness coefficient Ks = 1.50 for pipes up to and including 1000mm diameter: and Ks = 0.60 for larger piped systems Lined channels shall be designed with the following Mannings n as in Table 6.2: Final Version, Approved September 2003 Page 4

5 Table 6.2 Lining Material Mannings n Dressed timber, joints flush Sawn timber, joints uneven Cement plaster Concrete, steel trowled Concrete, timber forms, unfinished Untreated gunite Brickwork or dressed masonry Rubble set in cement Earth, smooth, no weeds Earth, some stones and weeds Natural river channels: Clean and straight Winding, with pools and shoals Very weedy, winding and overgrown Resource Consents Resource Consents from may be required from Environment Waikato for the diversion and or discharge of stormwater. The applicant is responsible for making the necessary application and obtaining such Consents before the District Council will accept the completed works All developments within catchments where the Thames-Coromandel District Council have discharge resource consents will need to comply with any of the conditions that may apply to the proposed drainage system. In addition, any Catchment Management Plans recommendations must be adhered to Gravity Mains Layout The cover to all pipes from finished ground level shall be a minimum of 600mm or as per the pipe manufactures specifications, which ever is the greater. Where this minimum cover cannot be achieved an approved concrete cover slab or other approved measures may be authorised by the Councils Representative All inlets (other than service connections) to the primary piped reticulation in urban areas where the pipe is greater than 450mm shall be either through a sump, or a headwall with a vertically grating. Outlets may be through a headwall with a hinged horizontal grating and appropriate energy dissipation for the outlet so that no soil erosion will take place. Outlet grates shall be hinged in urban areas where the pipe is greater than 450mm to allow flow pressures to open if the grates become blocked. Care is needed to ensure flows aren t going to surcharge upstream of blocked grates Flood gates shall be provided on the downstream end of all pipes discharging into the ocean, tidal channels or natural waterways where backflow is a potential problem, or with 600mm diameter or greater. Final Version, Approved September 2003 Page 5

6 Secondary overland flowpaths shall generally be aligned alongside the road network and reserve areas. Where such flowpaths are required to cross private property an appropriate easement in favour of the Council shall be provided to ensure its protection. It is preferred that secondary flowpaths on private property be on accessways Primary stormwater shall be piped across any footpath or berm. Unless specifically authorised. No building over primary pipe systems will be permitted Open Drainage Systems Where natural open stream systems or formed drainage channels are to be incorporated in the land drainage system, they shall be of sufficient width to contain the full design flood flow together with the freeboard given in Table 6.1 and to ensure protection from unacceptable scouring. Sufficient access for maintenance shall be provided Open drainage systems may be subject to Environment Waikato resource consents The flow characteristics of natural open stream systems shall be based on the likely long term stream condition. Consideration shall be given to the density and suitability of vegetation and take due account of blockages under peak flood conditions Manholes Accessible inspection chambers are to be provided at all changes of grade, direction and pipe size, and shall not exceed 90m spacing for pipelines up to 1000mm diameter, above which spacings may extend to 200m. Each branch line shall join a main line at a manhole junction Manholes shall be located on all drainage lines and at the end of all terminal lines greater than 50m in length All stormwater manholes shall be constructed as detailed on Drawings A Outlet pipes from manholes shall have a soffit level 20mm lower than that of the lowest incoming line, plus 5mm per 10 degrees of angle change between the two lines. Specific hydraulic design may be required for pipes where head losses are critical Catch-pits Catch-pits (including back entry catch-pits) shall be constructed as on Drawings to and Single and double catch-pits shall only be installed. Catchpits shall be fitted with grates and frames The maximum capacity of a single sump shall be taken as 30l/s and that of a double sump as 50l/s Catch-pits shall be designed to take at least the 20% AEP design runoff Catch-pits shall generally be located as follows: Final Version, Approved September 2003 Page 6

7 - On roads having a carriageway width up to and including 10m, a maximum channel run of 125m and on all roads with carriageways greater than 10m shall have a maximum channel run of 90m. - At all valley positions a double side entry sump is required. - As required for catchment areas Catch-pits shall be connected to the primary stormwater system by a pipe of at least 225mm diameter to an adjacent manhole (if the adjacent stormwater system is of greater size than 600mm diameter and the manhole is not conveniently located, the sump lead may be saddled directly to the pipe) Super Modified Catchpits Super Modified Catchpits shall be installed where the gradient exceeds 1 in 20 or where there is a high possibility that a double catchpit is unable to manage the inlet flows equivalent to a 20% AEP event. (Refer Plan No C) Service Connections Where service connections are approved, each residential lot shall include a lateral of at least 100mm diameter, which shall be extended from the main reticulation system to terminate at a minimum distance of 1.0m within the main body of the lot. Larger diameter service connections may be required for multi-unit or industrial lots Service connections shall be laid true to line and grade at right angles to the main line in an acceptable manner The connection point of the laterals to each lot shall be sited, when possible, in a location that will not reduce the building area available. This will generally be approximately 1.0m from a side boundary The connection point of the laterals to each lot shall be sited, when possible, on the low side of proposed sites having a cross fall greater than 1.0m Service connections shall be brought to between 0.6m and 1.2m of the final ground surface. Connections should be marked with stakes either tied with detector tape or stakes in contact with end caps, or with an identified concrete slab When the line is deeper than 4m, service connections will not be permitted directly to the line Bedding and Protection The pipe bedding shall be in accordance with the Concrete Pipe Selection & Installation Guide By The Concrete Pipe Association of Australasia and the manufactures guide to installation of PVC pipes The pipe bedding shall be in accordance with the Concrete Pipe Selection & Installation Guide By The Concrete Pipe Association of Australia and the manufactures guide to installation of PVC pipes. Final Version, Approved September 2003 Page 7

8 All drainage lines shall be designed and constructed to withstand all the likely loads they will be subject to during the life of the system. The load carrying capacity in relation to their installation conditions shall be calculated in accordance with NZS/AS 3725:1989 Loads on Buried Concrete Pipes and AS 2566:1998 Buried Flexible Pipelines, where appropriate For drainage lines laid at grades steeper than 10% (including service connections) the bedding and surround material shall be of a low-grade (7Mpa) weak concrete. For lines exceeding 20% in grade, anchor blocks located at pipe joints, not exceeding 6m spacing Where public drains are located within rights of way or private access legs, all other utility services such as power, telephone and gas shall be located 300mm clear of the pipe Pipe Materials Land drainage reticulation construction material shall be as defined in the Council s approved Materials Schedule. All public stormwater pipes shall have a minimum diameter of 300mm with the exception of catch-pit leads which may be 225mm. All joints on pipes and fittings less than 1050mm in diameter shall be factory made flexible type complying with the Council s approved Materials Schedule Connection To Council s System Only an approved contractor under the supervision of the Councils operators may make connections to Councils system with the appropriate approvals in place Testing and Acceptance Prior to acceptance of the completed land drainage system, the applicant s representative shall have supplied the Council with As Built drawings as per the Section 1 of this document and shall include any overland flowpaths and open channel systems together with certification The tests for drainage systems shall be a visual inspection of manholes and lines, inspection of secondary flowpaths, and a check on open water courses at the upstream and downstream boundaries When requested the Council may require each manhole structure to be tested in accordance with NZS Flooding the channel shall test the effectiveness of the channels and sump. Any ponding of water in the channel greater than 3mm under a 3m straight edge shall render the work unacceptable Specific Ward Requirements Table 6.11 WARD Coromandel / Colville COMMUNITY FACILITY REQUIREMENT Final Version, Approved September 2003 Page 8

9 Coromandel Urban Properties Retention Ponds Open Water Courses Kerb Discharge Existing New Discharges Proposed Design generated on a property will be disposed of in a managed manner and authorisation of disposal will be required in each case. The on-site system must be capable of carrying a 10 year (10% AEP) 10 minute rain event and must be maintainable. Permitted. Any pond used as a retention pond or water feature will be subject to Management Plan approval. Permitted, subject to Design Constraints and Management Plan approval Not permitted unless otherwise authorised Conditional on existing systems capacity and resource consent conditions. Subject to meeting Council s requirements relating to resource consent conditions. Primary piped system in all urban areas capable of carrying a 5 year (20% AEP) rain event Culverts in all areas capable of carrying a 20 year (5% AEP) rain event Open channels and overland flow-path capable of carrying a 50 year (2% AEP) to ensure that such surface water shall not enter buildings. Bridges capable of withstanding a 100 year (1% AEP) rain event. Final Version, Approved September 2003 Page 9

10 WARD Thames COMMUNITY FUNCTION REQUIREMENT Thames Properties Retention Ponds Open Water Courses Kerb Discharge Existing New Discharges Proposed Design Constraints generated on a property will be disposed of in a managed manner and authorisation of disposal will be required in each case. The on-site system must be capable of carrying a 10 year (10% AEP) 10 minute rain event and must be maintainable. Permitted. Any pond used as a retention pond or water feature will be subject to Management Plan approval. Permitted, subject to Design Constraints and Management Plan approval Not permitted unless otherwise authorised Conditional on existing systems capacity and resource consent conditions. Subject to meeting Council s requirements relating to resource consent conditions. Primary piped system in all urban areas (other than Thames Central area) capable of carrying a 5 year (20% AEP) rain event Primary piped system in Thames Central Area (Refer Thames Central Area Plan) capable of carrying a 20 year (5% AEP) rain event Culverts in all areas capable of carrying a 20 year (5% AEP) rain event Open channels and overland flow-path capable of carrying a 50 year (2% AEP) to ensure that such surface water shall not enter buildings. Bridges capable of withstanding a 100 year (1% AEP) rain event. Final Version, Approved September 2003 Page 10

11 WARD Whangamata COMMUNITY FUNCTION REQUIREMENT Whangamata Properties Retention Treatment Ponds Open Courses Water Kerb Discharge Existing New Discharges Proposed Design Constraints generated by a property is to be disposed of within the boundary of that property unless otherwise authorised by the Council. The on site system must be capable of carrying a 10 year (10% AEP) 10 minute rain event and must be maintainable. Preferred for treatment. Not permitted to permanently hold water or be used as a water feature. Retention ponds to be self-draining. Subject to Management Plan approval. Permitted as provides some treatment, subject to Design Constraints and Management Plan approval. Not permitted unless otherwise authorised. Conditional on existing systems capacity and resource consent conditions. Subject to meeting Council s requirements relating to resource consent conditions. Primary piped system in all urban areas capable of carrying a 10 year (10% AEP) rain event Culverts in all areas capable of carrying a 20 year (5% AEP) rain event Open channels and overland flow-path capable of providing some treatment and carrying a 50 year (2% AEP) rain event to ensure that such surface water shall not enter buildings. Bridges capable of withstanding a 100 year (1% AEP) rain event. Final Version, Approved September 2003 Page 11

12 WARD Tairua/Pauanui COMMUNITY FUNCTION REQUIREMENT Pauanui Properties Retention Ponds Open Water Courses Kerb Discharge Existing New Discharges Proposed Design Constraints The strategy in Pauanui is to re-charge the water aquifer; hence stormwater generated by a property is to be disposed of within the boundary of that property unless otherwise authorised by the Council s Representative. The on-site system must be capable of carrying a 10 year (10% AEP) 10 minute rain event and must be maintainable. Permitted. Not permitted to permanently hold water or used as a water feature. Retention ponds to be self-draining. All ponds will be subject to Management Plan approval. Permitted, subject to Design Constraints and Management Plan approval. Not permitted without specific authorisation. Conditional on existing systems capacity and resource consent conditions. Subject to meeting Council s requirements relating to resource consent conditions. Primary piped system in all urban areas capable of carrying a 5 year (20% AEP) rain event Culverts in all areas capable of carrying a 20 year (5% AEP) rain event Open channels and overland flow-path capable of carrying a 50 year (2% AEP) to ensure that such surface water shall not enter buildings. Bridges capable of withstanding a 100 year (1% AEP) rain event. Final Version, Approved September 2003 Page 12

13 Tairua Properties Retention Ponds Open Water Courses Kerb Discharge Existing New Discharges Proposed Design Constraints generated by a property is to be disposed of within the boundary of that property unless otherwise authorised by the Council s Representative. The on-site system must be capable of carrying a 10 year (10% AEP) 10 minute rain event and must be maintainable. Permitted. Not permitted to permanently hold water or used as a water feature. Retention ponds to be self-draining. All ponds will be subject to Management Plan approval. Permitted, subject to Design Constraints and Management Plan approval. Not permitted without specific authorisation. Conditional on existing systems capacity and resource consent conditions. Subject to meeting Council s requirements relating to resource consent conditions. Primary piped system in all urban areas capable of carrying a 5 year (20% AEP) rain event Culverts in all areas capable of carrying a 20 year (5% AEP) rain event Open channels and overland flow-path capable of carrying a 50 year (2% AEP) to ensure that such surface water shall not enter buildings. Bridges capable of withstanding a 100 year (1% AEP) rain event. Final Version, Approved September 2003 Page 13

14 WARD Mercury Bay COMMUNITY FUNCTION REQUIREMENT Whitianga Matarangi Hahei Cooks Beach All Ward urban areas Properties Retention Ponds Open Water Courses Kerb Discharge Existing New Discharges Proposed Design Constraints generated by a property is to be disposed of within the boundary of that property unless otherwise authorised by the Council s Representative. The on-site system must be capable of carrying a 10 year (10% AEP) 10 minute rain event and must be maintainable. Permitted. Not permitted to permanently hold water or used as a water feature. Retention ponds to be self-draining. All ponds are subject to Management Plan approval. Permitted, subject to Design Constraints and Management Plan approval. Not permitted unless otherwise authorised Conditional on existing systems capacity and resource consent conditions. Subject to meeting Council s requirements relating to resource consent conditions. Primary piped system in all urban areas capable of carrying a 5 year (20% AEP) rain event Culverts in all areas capable of carrying a 20 year (5% AEP) rain event Open channels and overland flow-path capable of carrying a 50 year (2% AEP) to ensure that such surface water shall not enter buildings. Bridges capable of withstanding a 100 year (1% AEP) rain event. Final Version, Approved September 2003 Page 14

CONTENTS. Section 6 Stormwater and Land Drainage CODE OF PRACTICE FOR SUBDIVISION AND DEVELOPMENT 6.1 SCOPE... 2

CONTENTS. Section 6 Stormwater and Land Drainage CODE OF PRACTICE FOR SUBDIVISION AND DEVELOPMENT 6.1 SCOPE... 2 CONTENTS 6.1 SCOPE... 2 6.2 PERFORMANCE STANDARDS... 2 6.2.1 General... 2 6.3 MEANS OF COMPLIANCE... 4 6.3.1 General... 4 6.3.2 Resource Consents... 6 6.3.3 Gravity Mains Reticulation Layout... 6 6.3.4

More information

TAURANGA CITY COUNCIL

TAURANGA CITY COUNCIL Code of Practice for Development TAURANGA CITY COUNCIL SECTION 4 Stormwater Drainage 4. STORMWATER DRAINAGE MINIMUM REQUIREMENTS 4.A General 4.A.1 Most developments will modify the predevelopment drainage

More information

Section 5: Stormwater. Tauranga City Council

Section 5: Stormwater. Tauranga City Council Section 5: Tauranga City Council Contents Scope 5.A General 5.A.1 5.A.2 5.A.3 5.A.4 5.A.5 5.B. Design Standard 5.B.1. 5.B.2 Overall System Design 5..B.3 Secondary Flows 5.B.4. Freeboard 5.B.5 5.B.6 5.B.7

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to:

Learning objectives. Upon successful completion of this lecture, the participants will be able to: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to: Describe and perform the required step for designing sewer system networks Outline Design

More information

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm

More information

7 STORMWATER AND DRAINAGE

7 STORMWATER AND DRAINAGE 7 STORMWATER AND DRAINAGE 7.1 Introduction The purpose of Council s stormwater engineering standards is to provide design guidance and minimum standards for the design and construction of stormwater management

More information

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

DRAINAGE & DESIGN OF DRAINAGE SYSTEM Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means

More information

DESIGN STANDARD TABLE OF CONTENTS

DESIGN STANDARD TABLE OF CONTENTS DESIGN STANDARD DS-5 STORMWATER TABLE OF CONTENTS DS-5.1 General...1 DS-5.2 Minimum Requirements...1 DS-5.3 Regional Council Requirements...1 DS-5.4 Design...2 DS-5.5 Conveyance - Primary and Secondary

More information

10.0 Storm Sewer Systems

10.0 Storm Sewer Systems October 2003 Chapter 10.0, Storm Sewer Systems Page 1 10.0 Storm Sewer Systems 10.1 Introduction A storm sewer system consists of a system of inlets, pipes, manholes, junctions, cleanouts, outlets, and

More information

5.1 INTRODUCTION OBJECTIVES PERFORMANCE CRITERIA KEY REFERENCES... 2

5.1 INTRODUCTION OBJECTIVES PERFORMANCE CRITERIA KEY REFERENCES... 2 CONTENTS SECTION 5 - STORMWATER 5.1 INTRODUCTION... 1 5.2 OBJECTIVES... 1 5.3 PERFORMANCE CRITERIA... 1 5.4 KEY REFERENCES... 2 5.5 GENERAL DESIGN REQUIREMENTS... 3 5.5.1 Design Methodology... 3 5.5.2

More information

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth

More information

South Waikato District Council Code of Practice for Subdivision and Development PART 4. Drainage. Part 4: Drainage 56

South Waikato District Council Code of Practice for Subdivision and Development PART 4. Drainage. Part 4: Drainage 56 PART 4 Drainage Part 4: Drainage 56 PART 4: DRAINAGE 401 STORMWATER DRAINAGE 401.1 General The stormwater drainage system shall be available to any building site within urban development or subdivision.

More information

Temporary Watercourse Crossing: Culverts

Temporary Watercourse Crossing: Culverts Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol

More information

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1 CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information

Part 5: Stormwater and Land Drainage

Part 5: Stormwater and Land Drainage Part 5: Stormwater and Land Drainage Part 5: Stormwater and Land Drainage Contents 5.1 Referenced Documents...5-3 5.1.1 Source documents... 5-4 5.2 Introduction... 5-4 5.2.1 Philosophy... 5-4 5.2.2 Objectives...

More information

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction. Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the

More information

Initial Construction Costs For Various Pavement and Drainage Options

Initial Construction Costs For Various Pavement and Drainage Options Interpave Initial Construction Costs For Various Pavement and Drainage Options Final Prepared For Interpave Scott Wilson Ltd Interpave Pavement Design CONTENTS 1. Overview 2. Summary of Pavement Types

More information

MODEL Stormwater Local Design Manual. City of Centerville

MODEL Stormwater Local Design Manual. City of Centerville MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge

More information

Design of Sewerage System for Jaffarpur area in Southwest New Delhi

Design of Sewerage System for Jaffarpur area in Southwest New Delhi International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 1 (2014), pp. 29-34 Research India Publications http://www.ripublication.com/ijcer.htm Design of Sewerage System for

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL () September 2017 Page Chapter 1 Acronyms and Definitions 1.01 Purpose 1 1.02 Acronyms 1 1.03 Definitions 3 Chapter 2 Introduction 2.01 Purpose 1 2.02 Applicability

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

STORMWATER BUBBLE UP PIT

STORMWATER BUBBLE UP PIT Cast iron swing grate in cast iron frame A Nominal 90 mm inlet SECTION A x ID concrete chamber. Available chamber depths 400mm or 600mm deep CHAMBER PLAN Stormwater pipe House Chamber location in vehicle

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

SACHSE EROSION CONTROL GUIDELINES

SACHSE EROSION CONTROL GUIDELINES SACHSE EROSION CONTROL GUIDELINES Section I. Definitions The following words, terms, and phrases, when used in this guideline, shall have the meanings ascribed to them in this Section, except where the

More information

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Created by Simpo PDF Creator Pro (unregistered version)  Asst.Prof.Dr. Jaafar S. Maatooq Lect.No.9 2 nd Semester Barrages, Regulators, Dams 1 of 15 In order to harness the water potential of a river optimally, it is necessary to construct two types of hydraulic structures, as shown in Figure

More information

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES STORMWATER DRAINAGE DESIGN

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES STORMWATER DRAINAGE DESIGN CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES STORMWATER DRAINAGE DESIGN D5 DESIGN GUIDELINES CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES D5 ISSUE: NO:4 Jan 2017 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL...4

More information

SpencerHolmes engineers - surveyors - planners

SpencerHolmes engineers - surveyors - planners Preliminary Stormwater Design Mary Potter Hospice 48-62 Mein Street Newtown Wellington SpencerHolmes engineers - surveyors - planners PO Box 588 Level 6, 8 Willis Street Wellington New Zealand Phone 04

More information

DIVISION 5 STORM DRAINAGE CRITERIA

DIVISION 5 STORM DRAINAGE CRITERIA DIVISION 5 STORM DRAINAGE CRITERIA Section 5.01 GENERAL The following storm drainage design criteria shall apply to all storm drainage designs in the City. Additional design criteria are specified in the

More information

WaStop Check Valve System

WaStop Check Valve System WaStop Check Valve System Scan for more information Technical Guide D9.1 WaStop is a unique patented check valve that stops backflow in drains, providing reliable protection against pipe infiltration by

More information

APPENDIX G HYDRAULIC GRADE LINE

APPENDIX G HYDRAULIC GRADE LINE Storm Drainage 13-G-1 APPENDIX G HYDRAULIC GRADE LINE 1.0 Introduction The hydraulic grade line is used to aid the designer in determining the acceptability of a proposed or evaluation of an existing storm

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition STANDARD FOR SLOPE PROTECTION STRUCTURES Definition Structures to safely conduct surface runoff from the top of a slope to the bottom of the slope. Purpose The purpose of this practice is to convey storm

More information

The Proposed Auckland Unitary Plan (notified 30 September 2013)

The Proposed Auckland Unitary Plan (notified 30 September 2013) ART 3 REGIONAL AND DISTRICT RULES»Chapter H: Auckland wide rules»4 Natural resources» 4.14 Stormwater management Introduction The roposed Auckland Unitary lan (notified 30 September 2013) This section

More information

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08 (b) Discuss in brief shaft spillway with neat sketches. Marks 04 OR Q (2) Explain in brief USBR stilling basin. Marks 08 Stilling Basins The basins are usually provided with special appurtenances including

More information

FIRM NAME DESIGNER: CHECKER: DATE: FPID #: DESCRIPTION: COUNTY: DRAINAGE DESIGN CHECKLIST. Designers Initials. Checkers Initials.

FIRM NAME DESIGNER: CHECKER: DATE: FPID #: DESCRIPTION: COUNTY: DRAINAGE DESIGN CHECKLIST. Designers Initials. Checkers Initials. I. Drainage Report A. Executive Summary - Brief Overview of Project Drainage Design B. Project Description 1. Existing Conditions 2. Proposed Project Conditions 3. Project Justification Narrative - Basin

More information

STORM WATER MANAGEMENT REPORT

STORM WATER MANAGEMENT REPORT Silvercreek Junction STORM WATER MANAGEMENT REPORT Howitt Creek at the Silvercreek Parkway Site Guelph, Ontario August, 2008 TSH File 22304A-04 August 19, 2008 STORMWATER MANAGEMENT REPORT Howitt Creek

More information

SEWER SYSTEM DESIGN GUIDELINES

SEWER SYSTEM DESIGN GUIDELINES SEWER SYSTEM DESIGN GUIDELINES PART 1 GENERAL 1.1 GENERAL GUIDELINES A. The following sewer system design guidelines are based on Federal, State and Local health requirements, and the Berkeley County Water

More information

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS Section 1 Intent. 49 Section 2 Floodplain Requirements 49 Section 3 Water-Oriented Accessory Structures 50 Section 4 Stairways,

More information

CHAPTER 6. Sanitary Sewer

CHAPTER 6. Sanitary Sewer CHAPTER 6 Sanitary Sewer A. Introduction All proposed developments, subdivisions, and buildings must have a properly designed and constructed sanitary sewer collection system. The system shall provide

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification 7. Introduction This chapter summarizes methods to evaluate runoff conveyance in various street cross sections and curb types in the Town of Castle Rock and identifies acceptable upper limits of street

More information

iswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1

iswm TM Criteria Manual City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June Chapter 1 City of Azle Section 14 City of Azle Subdivision Ordinance DRAFT-June 2010... Chapter 1 i CITY OF AZLE iswm CRITERIA MANUAL FOR SITE DEVELOPMENT AND CONSTRUCTION Incorporating the Regional NCTCOG Integrated

More information

Chapter 11 Culverts and Bridges

Chapter 11 Culverts and Bridges Chapter 11 Culverts and Bridges Contents 1.0 Introduction... 1 2.0 General Design... 1 2.1 Design Criteria... 1 2.2 Design Flows... 1 2.3 Permitting and Regulations... 1 2.4 Aesthetics and Safety... 2

More information

f) Culverts in series shall be spaced at least 20 feet between each other. 2.7 C Culverts

f) Culverts in series shall be spaced at least 20 feet between each other. 2.7 C Culverts 2.7 C Culverts 1. General Culverts are intended to safely pass flow under road crossings. Criteria are designed to protect, maintain, and enhance public health, safety, and the environment. Where culverts

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7: Hydraulic Design of Sewers and Storm Water Drains

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7: Hydraulic Design of Sewers and Storm Water Drains Module 7: Hydraulic Design of Sewers and Storm Water Drains Lecture 7: Hydraulic Design of Sewers and Storm Water Drains 7.0 HYDRAULIC DESIGN OF SEWERS AND STORM WATER DRAINS 7.1 General Consideration

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

S.O.P. No. HMD

S.O.P. No. HMD Page: 1 of 9 PURPOSE: To establish (SOP) for submission requirements, review process and approval of applications for Non-vehicular Access Permits for the purpose of connection or discharge to any MassDOT

More information

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1 DIVISION 3: SEWER 3.1 DESIGN CRITERIA A. APPLICABILITY 1. These Design Standards shall govern all construction and upgrading of public sanitary sewer facilities in the City of Dundee and applicable work

More information

The City of North Las Vegas (CNLV) does not allow valley gutters to be constructed across streets with right-of-way widths of 80 feet or greater.

The City of North Las Vegas (CNLV) does not allow valley gutters to be constructed across streets with right-of-way widths of 80 feet or greater. Background The City of rth Las Vegas strives to provide the development community with adequate information to ensure the successful completion of any project in the City. To aid in the submittal of a

More information

STORMWATER CATCHPITS CAPACITY IN NEW ZEALAND BETWEEN THEORY AND PRACTICE

STORMWATER CATCHPITS CAPACITY IN NEW ZEALAND BETWEEN THEORY AND PRACTICE STORMWATER CATCHPITS CAPACITY IN NEW ZEALAND BETWEEN THEORY AND PRACTICE Husham Issa Al-Saleem Humes Pipeline Systems ABSTRACT New Zealand Territorial Authorities (TA s) infrastructure design standards

More information

Design Guidelines. 1. INTRODUCTION 2. SECTION SPECIFICATIONS 3. HOUSE DESIGN RULES

Design Guidelines. 1. INTRODUCTION 2. SECTION SPECIFICATIONS 3. HOUSE DESIGN RULES Design Guidelines. 1. INTRODUCTION Waimakariri District Council (WDC) and Ravenswood Developments Ltd (Ravenswood) have in place a number of rules and covenants that effect the development of sections

More information

NRA TB 13 Revised Road Drainage Standards

NRA TB 13 Revised Road Drainage Standards NRA TB 13 Revised Road Drainage Standards GE-TBU-01026 March 2015 General Technical TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for

More information

Article 20: Erosion Control and Stormwater Management

Article 20: Erosion Control and Stormwater Management Article 20: Erosion Control and Stormwater Management Section 360: Purpose, Scope of Authority, Performance Guarantee and Approvals A. Purpose. The purpose of this document is to set forth minimum requirements

More information

Hydrodynamic Separation Product Calculator

Hydrodynamic Separation Product Calculator Hydrodynamic Separation Product Calculator Example Project BMP #1 CDS 2015-4 Project Information Project Name Example Project Option # A Country US State Kentucky City Covington Contact Information First

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

Landscaping and Fencing

Landscaping and Fencing Landscaping and Fencing Fences, driveways, paving, retaining walls, landscaping & other garden features To be read in conjunction with General Requirements: A guide to building on properties containing

More information

CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS

CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 JANUARY 2010 TABLE OF CONTENTS SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 APPENDIX ROADWAY DESIGN DRAINAGE

More information

Chapter 8. Inlets. 8.0 Introduction. 8.1 General

Chapter 8. Inlets. 8.0 Introduction. 8.1 General . Introduction This chapter provides criteria and design guides for evaluating and designing storm sewer inlets in the City of Centennial. The review of all planning submittals will be based on the criteria

More information

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS WATER RESOURCES MANAGEMENT DIVISION Water Investigations Section

More information

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES 4.1 GENERAL REQUIREMENTS 4.1.1 Water and fire protection distribution facilities are to be provided solely for the purpose of supplying potable

More information

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown

More information

WATER 6.1 GUIDELINES

WATER 6.1 GUIDELINES 6-1 6.0 WATER 6.1 GUIDELINES The requirements of the Queensland Water Resources Commission Guidelines for Planning and Design of Urban Water Supply Schemes shall be followed in general. The requirements

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

Establish quality requirements, manage, and monitor the installation of subdivision infrastructure

Establish quality requirements, manage, and monitor the installation of subdivision infrastructure Page 1 of 5 Establish quality requirements, manage, and monitor the installation of subdivision infrastructure Level 6 Credits 18 Purpose This unit standard is for people who are working, or who intend

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 02630 - STORM DRAINAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual. for: Located at: Prepared for: Prepared by:

Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual. for: Located at: Prepared for: Prepared by: Stormwater Quality Extended Detention Basin Operation and Maintenance (O&M) Manual for: Insert Development Name Located at: Insert Address Prepared for: Insert Property Owner Name, Address, and Phone Number

More information

Index. Composition and Order of Plan Set. Utility Plan... 5

Index. Composition and Order of Plan Set. Utility Plan... 5 City of Des Plaines Public Works and Engineering Department Revised-October 5, 2012 Index Composition and Order of Plan Set Title Page Number Cover Sheet... 1 Requirements for Site Development... 2 Grading

More information

Training on Roads for Water and Resilience

Training on Roads for Water and Resilience Training on Roads for Water and Resilience 1 DRAINAGE FROM UNPAVED ROADS Outline 3 1. 2. 3. 4. 5. 6. 7. Introduction Important considerations Drainage management Surface drainage features Subsurface drainage

More information

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision Plat Name: Location Description/ Nearest Intersection: Acreage:

More information

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES 3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES All sanitary sewers shall be designed in accordance with these Design Standards, LBWD Rules and Regulations, and to accepted engineering principles. In

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

Index. Page numbers followed by f indicate figures.

Index. Page numbers followed by f indicate figures. Index Aerodynamic method, 103, 110 111 Algae, 131, 173, 175 Alternate depth, 88 Alternating block method, 132, 140 141 Attenuation, 106, 107f, 118, 120 Page numbers followed by f indicate figures. Baseflow

More information

Stormwater Management System Project Review

Stormwater Management System Project Review TRANSIT NEW ZEALAND SH1 AVALON DRIVE BYPASS Project Review TRANSIT NEW ZEALAND TRANSIT NEW ZEALAND SH1 AVALON DRIVE BYPASS Project Review Prepared By Emma Innocente Environmental Engineer Cedric Malaval

More information

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report

UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report Prepared for: Cameron McCarthy Landscape Architects LLP

More information

A.3 Concrete Cross gutter 18

A.3 Concrete Cross gutter 18 TABLE OF CONTENTS SECTION NUMBER PAGE NO. SECTION 1 - General Requirements 1-3 SECTION 2 - Preparation of Plans 4-8 SECTION 3 - Inspection 9-10 SECTION 4 - Roads and Streets 11-15 STANDARD DRAWINGS A.1

More information

Concrete pipe reference manual Issue 1

Concrete pipe reference manual Issue 1 Strength. Performance. Passion. Concrete pipe reference manual Issue 1 Contents 1. Introduction 3 Manufacturing 3 Joint types 3 Durability 4 Hydraulics 4 Size class (DN) 4 Load class 5 6. Pipes for pressure

More information

E7. Taking, using, damming and diversion of water and drilling

E7. Taking, using, damming and diversion of water and drilling E7. Taking, using, damming and diversion of water and drilling E7.1. Introduction Taking, using, damming and diversion of surface water and groundwater provisions in this plan apply in accordance with

More information

PALMERSTON NORTH CITY PALMERSTON NORTH STORMWATER DRAINAGE BYLAW. Administration Manual

PALMERSTON NORTH CITY PALMERSTON NORTH STORMWATER DRAINAGE BYLAW. Administration Manual PALMERSTON NORTH CITY PALMERSTON NORTH STORMWATER DRAINAGE BYLAW 2015 Administration Manual 1 Contents Part One Introduction... 4 Part Two Standard Conditions For Stormwater Connections... 5 Appendix 1

More information

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar Hydrology and Water Management Dr. Mujahid Khan, UET Peshawar Course Outline Hydrologic Cycle and its Processes Water Balance Approach Estimation and Analysis of Precipitation Data Infiltration and Runoff

More information

This chapter describes the potential hydrological effects of the Project in terms of:

This chapter describes the potential hydrological effects of the Project in terms of: 19. Hydrology Overview The Project will result in changes to existing hydrology from land use changes and from changes to stream morphology. Hydrological and hydraulic modelling has been undertaken to

More information

Stormwater collection products for all NZ stormwater specifications

Stormwater collection products for all NZ stormwater specifications Stormwater collection products for all NZ stormwater specifications Designs to meet your local requirements Stormwater drainage is an essential task, with the need to convey water from the sides of roads

More information

Chapter 5 Hydraulic Structures

Chapter 5 Hydraulic Structures Chapter 5 Hydraulic Structures 5.1 Flow Splitter Designs 5.1.1 General Design Criteria A flow splitter must be designed to deliver the WQ design flow rate specified in this volume to the WQ treatment facility.

More information

16.0 Water Quality Management Criteria for Developed Land

16.0 Water Quality Management Criteria for Developed Land October 2003, Revised February 2005 Criteria for Developed Land Page 1 16.1 Introduction 16.0 Water Quality Management Criteria for Developed Land Stormwater quality control is an integral part of any

More information

ROOF TOP RAIN WATER HARVESTING. Manohar Patil

ROOF TOP RAIN WATER HARVESTING. Manohar Patil ROOF TOP RAIN WATER HARVESTING Manohar Patil Why harvest rainwater To arrest ground water To beneficiate water quality in aquifers To conserve surface water runoff To reduce soil erosion What is Rainwater

More information

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF) Preface In 2008, the inter-agency Drainage Act & Section 28 Regulations Team (DART) was established by the Ministry of Natural Resources (MNR) and the Ministry of Agriculture, Food and Rural Affairs (OMAFRA)

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432 PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:

More information

GUIDELINES FOR SEPTIC SYSTEM DESIGN

GUIDELINES FOR SEPTIC SYSTEM DESIGN GUIDELINES FOR SEPTIC SYSTEM DESIGN Single Family Residential For multi family or commercial buildings, Or If in the Oakdale area, contact the Department of Environmental Resources Regarding septic system

More information

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER 4 INDEX DRAINAGE

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER 4 INDEX DRAINAGE CHAPTER 4 INDEX DRAINAGE Supplement to Chapter 4 4.01 GENERAL INFORMATION 4.01.01 References 4.01.03 General Procedures 4.02 STORM SEWER DESIGN 4.02.15 Sewer Bulkheads 4.02.18 Storm Sewers Under Structures

More information

STORMWATER MANAGEMENT

STORMWATER MANAGEMENT DRAINAGE SOLUTIONS SINCE 1908 STORMWATER MANAGEMENT STORMWATER TREATMENT AND FLOW CONTROL ENVIRONMENTAL PROTECTION EASE OF MAINTENANCE RELIABLE PERFORMANCE ARMTEC.COM STORMWATER TREATMENT Armtec is excited

More information

PART 1 GENERAL REQUIREMENTS

PART 1 GENERAL REQUIREMENTS PART 1 GENERAL REQUIREMENTS Contract Closeout Plan 110 Arrow diagram for project close-out...3 Erosion Control 121 Straw bale barrier... 5 122 Silt fence... 7 123 Diversion dike... 9 124 Inlet protection...

More information

10.1 INTRODUCTION 10.1 DRAINAGE

10.1 INTRODUCTION 10.1 DRAINAGE CHAPTER 10 DRAINAGE 10.1 INTRODUCTION The drainage system manages both surface and subsurface water coming off the road surface and from the surrounding countryside. The purpose of the system is to ensure

More information

VOTR Site Assessment Victoria on the River

VOTR Site Assessment Victoria on the River i Executive Summary A. Introduction AECOM New Zealand Limited (AECOM) was engaged by Hamilton City Council (HCC) to undertake a geotechnical assessment of the (VOTR) site in Hamilton s central business

More information

Types of cross drainage works

Types of cross drainage works Definition: A cross drainage work is a structure carrying the discharge from a natural stream across a canal intercepting the stream. Canal comes across obstructions like rivers, natural drains and other

More information

City of Tulsa. Stormwater Design Criteria Manual

City of Tulsa. Stormwater Design Criteria Manual City of Tulsa Stormwater Design Criteria Manual 2014 Table of Contents Chapter 100 EXECUTIVE SUMMARY... 101 101 INTRODUCTION... 101 101.1 Manual Organization... 101 101.2 Manual Contents... 101 101.2.1

More information