SECTION BASIC ELECTRICAL REQUIREMENTS
|
|
- Cody Day
- 6 years ago
- Views:
Transcription
1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions, apply to work of this section. 1.2 SUMMARY A. This section specifies the basic requirements for the electrical installations and includes requirements common to more than one section of Division 16. In addition, this section and Division 16 specifications apply to the raceway systems for the low voltage structural cable plant. It expands and supplements the requirements specified in sections of Division 1. B. Standards of the organizations listed below but referred to in the various sections by basic designation only, form a part of this specification to the extent indicated by the reference thereto: 1. American Society for Testing and Materials (ASTM). 2. National Fire Protection Association (NFPA). 3. American National Standards Institute (ANSI). 4. Illuminating Engineering Society (IES). 5. Institute of Electrical and Electronics Engineers (IEEE). 6. Insulated Cable Engineers Association ICEA). 7. National Electrical Manufacturer's Association (NEMA). 8. National Electrical Contractors' Association (NECA). 9. Underwriters' Laboratories, Inc. (UL). 10. Factory Mutual (FM). 11. Federal Specifications (FS). 12. National Electrical Code (NEC) with SNEC Amendments. 13. ANSI TIA/EIA Telecommunication Building Wiring Standards. C. References shall mean to the latest edition of the standard. D. Conform to local ordinances and codes. 1.3 QUALITY CONTROL A. Verify final locations for rough-ins with field measurements and with the requirements of the actual equipment to be connected. Contractor shall coordinate with the appropriate supplier, vendor, or subcontractor regarding the exact and specific rough-in requirements for equipment actually supplied. B. Conduits, junction boxes, wireway, etc. required for low voltage/telecommunications, cabling shall be coordinated with telecommunications cabling Contractor prior to rough-in. 1.4 ELECTRICAL INSTALLATIONS A. Coordinate electrical equipment and materials installation with other building components. B. Verify all dimensions by field measurement. Do not scale drawings. Page 1 of 6
2 C. Arrange for chases, slots, and openings in other building components to allow for electrical installations. D. Coordinate the installation of required supporting devices and sleeves to be set in poured in place concrete and other structural components, as they are constructed. E. Sequence, coordinate, and integrate installations of electrical materials and equipment for efficient flow of the work. Give particular attention to large equipment requiring positioning prior closing-in the building. F. Coordinate the access panel requirements with General Contractor to accommodate the installation of electrical equipment and materials. G. Where mounting heights are not detailed or dimensioned, install electrical services and overhead equipment to provide the maximum headroom possible. H. Install electrical equipment to facilitate maintenance and repair or replacement of equipment components. As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations. I. Coordinate the installation of electrical materials and equipment above ceilings with suspension system, mechanical equipment and systems, and structural components. J. Contractor shall review Mechanical, Structural, Food Service, Low Voltage System and Architectural drawings prior to bid. K. Final connections to equipment shall be per manufacturer's approved wiring diagrams, details and instructions. It shall be the Contractor's responsibility to provide materials and equipment compatible with equipment actually supplied. L. It is the intent of these drawings and specifications to establish a standard of quality. M. Work shall be performed in a workmanlike manner to the satisfaction of the Architect. N. Contractor shall verify and coordinate exact location of equipment to be furnished by others prior to rough-in. O. Contractor shall be responsible for replacing equipment which is damage due to incorrect field wiring provided under this section or factory wiring in equipment provided under this division. P. Contractors shall visit site prior to bid and verify that conditions are as indicated. Contractor shall include in his bid, costs required to make his work meet existing conditions. Q. Proposed substitutions of electrical equipment or request for "or equal" or approved equal" listing shall be submitted to architect not less than ten (10) working days prior to bid. Refer to specifications for additional information. R. Wire termination provisions for panelboards, circuit breakers, safety switches and all other electrical apparatus shall be listed as suitable for 75 degree C. Page 2 of 6
3 S. Systems shall be complete, operable and ready for continuous operations. Lights, switches, receptacles, motors, etc., shall be connected and operable. T. Electrical equipment shall be located to maintain clear and level clearances outlined in NEC Panelboards, switchboards, transformers, disconnects, switches, breakers, etc. shall be located to comply with NEC (a). Where the clearances outlined in NEC cannot be obtained, the Contractor shall notify the engineer prior to performing any rough-in. U. Maintain separation between telecommunication conduits and electrical feeders, electronic ballasts, transformers, etc. to minimize electromagnetic compatibility issues. V. Telecommunications horizontal cabling conduit runs that exceed 100 feet shall be provided with junction boxes for every 100 feet or fraction thereof in excess of 100 feet. W. Contractor shall coordinate horizontal telecommunications cabling routing to ensure TIA/EIA distance standards are not exceeded; in effect, 90 meters/295 feet from TR termination to outlet termination. X. Contractor shall not exceed two (2) 90 degree elbows in telecommunications conduit runs. If more than two (2) 90 degree turns are required, pullboxes shall be provided for every 180 degrees of bend. Y. Contractor shall review telecommunications and other low voltage drawings and provide all raceway, conduit, cable tray, etc. as required. Ladder tray within the Telecommunications Room (TR)shall be furnished and installed by the low voltage cabling Contractor. 1.5 ELECTRICAL SUBMITTALS A. Refer to the Conditions of the Contract (General and Supplementary) and Division 1 Section: SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES for submittal definitions, requirements, and procedures. B. Data shall be submitted at one time in three ring binders and indexed as scheduled below. Partial submittals will not be accepted Lightning Protection Closed Circuit Television (CCTV) System Grounding and Bonding Hangers and Supports for Electrical Systems Vibration and Seismic Controls for Electrical Systems Electrical Identification Conductors and Cables Medium Voltage Cables Raceways and Boxes Underfloor Raceways for Electrical Systems Cable Trays Wiring Devices Lighting Control Devices Electrical Power Monitoring and Control Packaged Engine Generator Static Uninterruptible Power Supply Page 3 of 6
4 Medium Voltage Transformers Surge Protective Device Medium Voltage Switchgear Secondary Unit Substations Enclosed Switches and Circuit Breakers Transfer Switches Enclosed Controllers Switchgear Switchboards Panelboards Motor Control Centers Enclosed Bus Assemblies Low Voltage Transformers Fuses Interior Lighting Exterior Lighting Obstruction Lighting Telecommunications Infrastructure C. Submit shop drawings and product data grouped to include complete submittals of related systems, products and accessories in a single submittal. D. Identify products requiring color selections. E. Identify products for use on project. 1.6 PRODUCT OPTIONS AND SUBSTITUTIONS A. Substitutions will not be permitted. 1.7 PRODUCT LISTING A. Prepare listing of major electrical equipment and materials for the project. B. Submit this listing as a part of the submittal requirement specified in the Division 1 Section: "SUBSTITUTION". 1.8 NAMEPLATE DATA A. Provide permanent operational data nameplate on each item of power operated equipment, indicating, manufacturer, product name, model number, serial number, capacity, operating and power characteristics, labels of tested compliances, and similar essential data. Locate nameplates in an accessible location. 1.9 DELIVERY, STORAGE AND HANDLING A. Deliver products to project properly identified with names, model numbers, types, compliance labels and similar information needed for distinct identification; adequately packaged and protected to prevent damage during shipment, storage and handling. B. Store equipment and materials at the site, unless off-site storage is authorized in writing. Contractor shall protect stored equipment and materials from damage and theft. Page 4 of 6
5 C. Coordinate deliveries of electrical materials and equipment to minimize construction congestion. Limit each shipment of materials and equipment to the items and quantities needed for the smooth and efficient flow of installations RECORD DOCUMENTS A. Refer to the Division 1 Section: "CONTRACT CLOSEOUT" for requirements. The following paragraphs supplement the requirements of Division 1. B. Mark drawings to indicate revisions to conduit size and location both exterior and interior, actual equipment locations, dimensioned to column lines; concealed equipment, dimensioned to column lines; distribution and branch electrical circuitry; fuse and circuit breaker size and arrangement support and hanger details; Change Orders; Addendums; concealed control system devices. C. Mark specifications to indicate approved substitutions; Change Orders; Addendums and equipment and materials used OPERATION AND MAINTENANCE DATA A. Refer to Division 1 Section: "CONTRACT CLOSEOUT" for procedures and requirements for preparation and submittal of maintenance manuals. B. In addition to the information required by Division 1 for Maintenance Data, include the following information in English. 1. Description of function, normal operating characteristics and limitations, performance curves, engineering data tests, and complete nomenclature and commercial numbers of all replaceable parts. 2. Manufacturer's printed operating procedures to include start-up, break-in, routine and normal operating instructions; regulation, control, stopping, shut-down and emergency instructions and summer and winter operating instructions. 3. Maintenance procedures for routine preventative maintenance and troubleshooting, disassembly, repair and reassembly; aligning and adjusting instructions. 4. Servicing instructions and lubrication charts and schedules. C. Contractor installed labels/equipment marking and instruction shall be in English WARRANTIES A. Refer to the Division 1 Section: WARRANTIES and BONDS for procedures and submittal requirements for warranties. Refer to individual equipment specifications for warranty requirements. B. Compile and assemble the warranties specified in Division 16, into a separated set of vinyl covered, three ring binders, tabulated and indexed for easy reference. C. Provide complete warranty information for each item to include product or equipment to Page 5 of 6
6 1.13 CLEANING include date of beginning of warranty or bond; duration of warranty or bond; and names, addresses and telephone numbers and procedures for filing a claim and obtaining warranty services. A. Refer to the Division 1 Section: "CONTRACT CLOSEOUT" or "CLEANING" for general requirements for final cleaning. END OF SECTION Page 6 of 6
B. Accept materials on site in original factory packaging, labeled with manufacturer s identification.
SECTION 26 05 02 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Work Included: Furnish all labor, material, services and skilled supervision necessary for the construction, erection, installation,
More informationA. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).
16450 GROUNDING ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 05 26 An optional keynote to the
More informationSECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS
SECTION 270528 PATHWAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Communications equipment coordination and installation. 2. Sleeves for pathways and cables. 3. Raceway
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationThis product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.
Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519 METAL CLAD CABLE - MC-PLUS Neutral
More informationTemporary Wiring Practices And Guidelines For NECA. National Electrical Contractors Association Omaha, Nebraska
Temporary Wiring Practices And Guidelines For NECA National Electrical Contractors Association Omaha, Nebraska Table of Contents I. Planning II. Lighting and Power III. Maintenance IV. Inspections V. Routing
More informationLow Voltage Switchgear Construction Checklist (under 500 kva)
Low Voltage Switchgear Checklist (under 500 kva) Project: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.
More informationSECTION INSULATED WIRE AND CABLE
SECTION 16120 INSULATED WIRE AND CABLE PART 1 GENERAL 1.01 DESCRIPTION A. This section covers the contract item Insulated Wire and Cable, which includes the following items with accessories, and appurtenances:
More informationCONSULTING ENGINEERS 5145 Livernois, Suite 100 Troy, Michigan Tel: Fax:
CONSULTING ENGINEERS 5145 Livernois, Suite 100 Troy, Michigan 48098-3276 Tel: 248-879-5666 Fax: 248-879-0007 www.peterbassoassociates.com DATE 03/06/2017 ISSUE BIDS SHEET No. SHEET TITLE PROJECT TITLE
More informationSECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less)
SECTION 260523 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less) PART 1 - GENERAL 1.1 SUMMARY A. Related Documents: 1. Drawings and general provisions of the Subcontract apply
More informationSECTION GROUNDING AND BONDING
SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and
More informationSECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number
MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and
More informationThe Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999
CANADIAN ELECTRICAL CODE 1 The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 Repealed by Chapter E-6.3 Reg 8 (effective June 24, 2003). Formerly Chapter E-6.3 Reg 6 (effective March
More informationA. This section includes building wire and cable rated 600V and less Full Short Circuit Device, Coordination and Arc Fault Study
PART 1: GENERAL 1.01 Underground Ducts and Manholes A. The work included in this section of the construction standards consists of the design requirements for the complete layout and installation of a
More informationTitle: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards
Date Description of Change Pages / Sections Modified ID 6/15/16 Updated format, division title, and removed references to other sections. - mgl44 A. Summary This section contains design criteria for the
More informationELECTRIC METERING GENERAL
1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 EQUIPMENT 5.0 METER REQUIREMENTS 6.0 METER FACILITIES 7.0 ELECTRICAL CONNECTIONS 2.0 SCOPE This guide covers general requirements and codes for
More informationDOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES
Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating
More informationUnit Substation Transformer Construction Checklist (under 500 kva)
Unit Substation Transformer Checklist (under 500 kva) Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.
More informationANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists
SECTION 412213- BRIDGE CRANES Part 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationMECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 5/12/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions
MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 5/12/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Is it illegal to install a wet-niche luminaire face-up
More informationSECTION COMMON WORK RESULTS FOR COMMUNICATIONS
SECTION 27 05 00 COMMON WORK RESULTS FOR COMMUNICATIONS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationA. Product Data shall be provided for each type of product indicated.
32 31 13 CHAIN LINK FENCES AND GATES SECTION 1 GENERAL 1.1 SUMMARY This Section includes the following: 1. Chain Link Fences 2. Gates for Chain Link Fences. See electrical specifications for electrical
More informationBUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466
BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein
More informationDIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...
DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General Requirements
More information(Condensed from National Electric Code)
WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,
More informationFOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR
FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR Section 083713- Four Fold Doors- With Single Overhead Mounted Operator Part 1-General 1.1 Related Document: A. Drawing and general provisions of contract,
More informationSECTION WIRE AND CABLE Raceways and Conduit Motor Power and Control Wiring.
SECTION 16120 WIRE AND CABLE PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 16112 - Raceways and Conduit. 2. 16155 - Motor Power and Control Wiring. 1.02 SYSTEM DESCRIPTION A. Performance Requirements:
More informationThis guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.
SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial
More informationSECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:
SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.
More informationFORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual
FORM HEADWALL (floating) Installation Manual FORM HEADWALL (floating) OVERVIEW The Form is a UL-listed configurable headwall system. This system includes multiple horizontal equipment channels integrated
More informationB. Provide a complete conduit system with associated couplings, connectors, and fittings.
SECTION 26 05 33 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 260500. B. Provide a complete conduit system with associated couplings, connectors, and fittings. 1.02 RELATED
More informationDESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7
DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 1.1. REFERENCE STANDARDS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification
More informationThis guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.
GORBEL PRODUCT SPECIFICATIONS 2010 Gorbel, Inc., P.O., Box 593, Fisher, New York 14453-0593 PHONE: 800-821-0086, FAX: 585-924-6273; WEBSITE: www.gorbel.com November SECTION 41 22 31PRIVATE FREE STANDING
More informationPower Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features
DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International
More informationSECTION BASIC ELECTRICAL MATERIALS AND METHODS
SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:
More informationSECTION CHAIN-LINK FENCES AND GATES 02821/1
SECTION 02821 - CHAIN-LINK FENCES AND GATES 02821/1 PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Chain-Link Fences: 2. Gates: horizontal slide or swing. 3. Fences installed where
More informationSpecification Lightning Protection Systems
Specification Lightning Protection Systems General: Summary A) This Section specifies the lightning protection system for the building(s) or structure(s). This system provides safety for the building and
More informationCHAPTER 29 PLUMBING SYSTEMS
2009 International Building Code and Commentary Errata (Only errata to Commentary are shown-see International Building Code Errata for Code Errata) (Portions of text and tables not shown are unaffected
More informationITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION
SECTION 74 AIRPORT OBSTRUCTION LIGHTS (FAA L-119) 74-1 GENERAL The Contractor shall perform all work required by the plans and specifications for construction of obstruction lights in accordance with the
More information2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property
2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical
More informationUNDERGROUND SERVICES SECONDARY
Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-
More informationCommunications Page 1 of 9
Page 1 of 9 Last Update: April 23 rd, 2014 Introduction Design In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a
More informationA/E Design Deliverable Checklist
A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic
More informationPHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS
1 Introduction 1.1 In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a utility. It should be assumed that all new
More informationSECTION GENERAL PROVISIONS - ELECTRICAL PART 1 - GENERAL 1.1 RELATED DOCUMENTS:
SECTION 260100 - GENERAL PROVISIONS - ELECTRICAL PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of the Contract, including General and Special Conditions and Division 1 Specification
More informationPORT OF SAN FRANCISCO ELECTRICAL CODE. Based on the 2016 California Electrical Code
2016 PORT OF SAN FRANCISCO ELECTRICAL CODE Based on the 2016 California Electrical Code The complete 2016 Port of San Francisco Electrical Code adopts and amends the 2013 edition of the California Electrical
More informationSECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:
SECTION 13 05 41 SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED 1-25-13 PART 1 GENERAL 1.1 DESCRIPTION: A. Provide seismic restraint in accordance with the requirements of this section
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 12 2113 - LOUVER BLINDS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationB. Provide liquid-filled secondary substation transformers as indicated on drawings.
SECTION 26 12 13 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 26 05 00. B. Provide liquid-filled secondary substation transformers as indicated on drawings. 1.02 RELATED
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-26 29 23 (April 2006) -------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-16261 (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More information2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING
2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING E3305.3: now reads The space equal to the width and depth of the panelboard and extending
More informationSECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-26 05 48.00 10 (October 2006) ---------------------------------- Preparing Activity: USACE Superseding UFGS-26 05 48.00 10 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationFor the 2008 Code, the minimum clear distances were revised to reflect an accurate metric conversion (also known as a soft conversion).
II. 600 Volts, Nominal, or Less 110.26 Spaces About Electrical Equipment. Sufficient access and working space shall be provided and maintained about all electrical equipment to permit ready and safe operation
More informationTable of Contents. Preface
Preface This document comprises the Southern Nevada Amendments to the 2005 National Electrical Code as published by the National Fire Protection Association. It was developed by the jurisdictions listed
More informationCONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 48-05 Van Dam Street Long Island City, NY 11101 ELECTRIC METER SHOP DEPARTMENT METER ENGINEERING SPECIFICATION MES-350 REVISION 3 June 2016 EFFECTIVE DATE
More informationDIVISION 27 COMMUNICATIONS COMMUNICATIONS GENERAL. Part 1 - General. Record Version
DIVISION 27 COMMUNICATIONS 270000 COMMUNICATIONS GENERAL Part 1 - General Record Version 20140609 1.1 Related Sections A. This specification section provides general conditions for all division 27 specifications.
More informationCHAPTER 5 METERING REQUIREMENTS
CHAPTER 5 METERING REQUIREMENTS CHAPTER 5 METERING REQUIREMENTS 5.1 General 1. All installations connected to, or intended to be connected to HK Electric s supply of electricity must comply with HK Electric
More informationSECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS
SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,
More informationSECTION MEDIUM VOLTAGE TRANSFORMERS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the
More informationTYPICAL INSTALLATION INSTRUCTIONS
TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect
More informationStandard of Practice - Campus Electrical Distribution System
A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all
More informationCity and County of San Francisco CONTRACT No A SFO - Data Center, Building 60 SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SCOPE OF WORK A. Cable Trays for Communications Cabling 1. Cable Trays 2. Cable Runways 3. Basket Tray B. Cable Tray Support
More informationA. All materials shall be listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).
16120 WIRE AND CABLE ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 05 19 An optional keynote
More informationSTREET LIGHTING. Springville City Power standard street lights will be installed in accordance with Springville City Power's Line Extension Policy.
General The following general requirements shall apply to street lights installed in new underground residential subdivisions or developments located within the service area of Springville City Power (within
More informationRequest for Proposal
Request for Proposal Dillon School District Three Telecommunications Cabling for Latta Middle School Contact: Robert McIntyre, Director of Technology (843) 752-7101 office phone (843)752-2081 office fax
More informationA/E Design Deliverable Checklist
A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic
More informationMember Service Electric Wiring Guidelines
Member Service Electric Wiring Guidelines Table of Contents A. Definitions... 2 B. Member Service Wiring Guidelines... 2 C: Meter located on the house from an underground source - pad transformer or j-box....
More informationBasic Service. This Section provides information regarding a. Introduction
Basic Service Introduction This Section provides information regarding a new electric Basic Service for a single phase service less than or equal to 400 amps, and a three phase service less than 50kW.
More informationSECTION PACKAGE BOOSTER PUMP STATIONS
SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to
More information1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.
SECTION 260529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. 1.2
More informationTelecommunication Spaces
Telecommunication Spaces October 19, 2016 Page 1 Revision History Telecommunication Spaces Standard Effective Date Email Version Contact Phone OIT-TS strevena@csustan.edu 1.0 Stan Trevena 209.667.3137
More informationB. Insulated Conductors: Stranded copper wire, green or green with yellow stripe insulation, insulated for 600 V, and complying with UL 83.
SECTION 270526 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Grounding conductors. 2. Grounding connectors. 3. Grounding busbars. 4. Grounding
More informationCom-Tray. Under Floor
Com-Tray Chalfant, a leading supplier of cable trays and systems for utilities, industrial plants, and commercial service, offers Com-Tray, a unique modular, cost-saving system for routing and protecting
More informationUNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES
7.01 GENERAL UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES Also refer to Chapter 3 (Service Entrances), and Chapter 4 (Metering Installation). OPPD will install,
More informationTitle: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards
Change History Date Description of Change Pages / Sections Modified Change Approver Initials 6/15/16 Updated division section from 16124 to 2605 - mgl44 13, removed references to other section 10/17/14
More informationEffective June, Eaton-Durham Model # UTRS223ACH. Siemens, Model # SUAS877-PG. (or Landis & Gyr # UAS877-PG) Milbank. Model # U1980-O.
Siemens, Model # SUAS877-PG (or Landis & Gyr # UAS877-PG) Eaton-Durham Model # UTRS223ACH Milbank Midwest Model # U980-O UTRS223AMEP These are some examples of the single meter sockets we require for underground
More informationNASSAU COUNTY ELECTRICAL PERMIT APPLICATION FOR CONTRACTORS
BUILDING PERMIT# (Revised 12/31/17) AP# PERMIT # Cost $ Check# Receipt# NASSAU COUNTY ELECTRICAL PERMIT APPLICATION FOR CONTRACTORS 6 TH EDITION (2017) OF THE FLORIDA BUILDING CODE IS IN EFFECT 2014 NATIONAL
More informationELECTRICAL BULLETIN
PO Box 697 Halifax, Nova Scotia B3J 2T8 Labour and Advanced Education ELECTRICAL BULLETIN 2012-01 From: David MacLeod,C.E.I.,P.Eng. Pg 1 of 8 Provincial Chief Electrical Inspector Date : March 1, 2012
More information1. Vertical reciprocating conveyor, Hydraulic straddle VRC.
PART 1: GENERAL 1.01 Section Includes: 1. Vertical reciprocating conveyor, Hydraulic straddle VRC. a. Machine, controller, platform, structural steel hoist frame. b. Wire mesh enclosure and gates. Related
More informationThis section applies to the design and installation relating to wire and cable systems and terminations. 16G Figure 1 16G Figure 2
Wire, Cable and Terminations Basis of Design This section applies to the design and installation relating to wire and cable systems and terminations. Design Criteria Medium Voltage Review and modify the
More informationSECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how?
SECTION 08360 SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Glazed Aluminum
More informationSECTION COOLING TOWER
PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue
More informationSection ARMORED MEDIUM VOLTAGE CABLES SHIELDED 3 CONDUCTOR POWER CABLE - INTERLOCKED ARMOR
PART 1 - GENERAL Section 26 05 15 SHIELDED 3 CONDUCTOR POWER CABLE - INTERLOCKED ARMOR 1.1 Cable shall be 15 kv, shielded, three conductor with ground, stranded copper, with continuously welded and corrugated
More informationELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (4th)
Factory Name Address Joyna Bazer Road, Jamirdia, Valuka Factory ID 9504 Electrical Safety dates Initial Date 06/07/2014 Date of 5 th Follow Up Report Received Date 07/27/2015 Date of 6 th Follow Up Date
More informationGUIDE SPECIFICATIONS FOR DETENTION ELECTRONIC REQUIREMENTS
DETENTION EQUIPMENT MANUAL NAAMM STANDARD DEMA 111990-11 DETENTION ELECTRONIC REQUIREMENTS 11 July, 20011 DEMA 111990-11 GUIDE SPECIFICATIONS FOR DETENTION ELECTRONIC REQUIREMENTS A Division of NATIONAL
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT ACTIVE COMPOSITE MILLS LTD. Dewan Idris Road, Zirabo, Ashulia, Savar, Dhaka, Bangladesh Factory List: 1. Active Composite Mills Ltd. Inspected by: Hemlal Report Generated
More informationSECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)
SECTION 08332 [08 33 13] COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Metal Counter
More informationBASIC TELECOMMUNICATION REQUIREMENTS January Communications
SECTION 27 05 00 BASIC TELECOMMUNICATION REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Contractor shall include in the Bid all labor, materials, tools, plant, transportation, storage costs, training, equipment,
More informationElectric Service Requirements. Residential Overhead. Engineering Specification T002. February
Electric Service Requirements Residential Overhead Engineering Specification T002 February 2017 0362-16 ENG. SPEC. T002 REV. 3 RESIDENTIAL OVERHEAD INSTALLATIONS page 1 of 12 Table of Contents 1 GENERAL
More informationTECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT
TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT 1.1 General 1.1.1 These Special Conditions of Contract supplement the General Instructions.
More informationGEK B Instructions. Test Cabinet. for Power/Vac Vacuum Circuit Breakers
g GEK 105263B Instructions Test Cabinet for Power/Vac Vacuum Circuit Breakers Power/Vac Test Cabinet Table of Contents Section 1. Introduction 1-1 Safety... 3 1-2 Maintenance... 3 Section 2. Receiving,
More informationWhy Do I Need a Permit? D ID Y OU K N OW? Protects property values. Makes Selling Property Easier. Site Plan Page 2. Plan Requirements Page 2
Swimming Pools Building Guide for Homeowners Why Do I Need a Permit? D ID Y OU K N OW? There are many important reasons to obtain building permits and to have inspections performed for your construction
More informationCITY OF ALBANY Public Works Department ADDENDUM #2 WC CROWN ZELLERBACH GATES IMPROVEMENTS
CITY OF ALBANY Public Works Department ADDENDUM #2 WC-16-01 CROWN ZELLERBACH GATES IMPROVEMENTS In order to clarify the intent of the Specifications and Drawings, the following provisions are provided
More informationEDGEWATER, FLORIDA JUNE 14, 2010
SECTION 12 2413 - ROLLER WINDOW SHADES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationNEW M EXICO STATE UNIVERSTIY HARDMAN-JACOBS LEARNING CENTER GREEN. December 2016 TECHNICAL SPECIFICATIONS TABLE OF CONTENTS
NEW M EXICO STATE UNIVERSTIY HARDMAN-JACOBS LEARNING CENTER GREEN December 2016 TECHNICAL SPECIFICATIONS TABLE OF CONTENTS TITLE SECTION NUMBER TEM PORARY TREE PROTECTION 015639 ELECTRICAL GENERAL PROVISIONS
More informationUNIVERSITY OF ALASKA FAIRBANKS DIVISION 14 - CONVEYING EQUIPMENT DESIGN STANDARDS SECTION
PART 1 - GENERAL 1.01 Elevator manufacturer to provide equipment and installation warranty and maintenance services for at least one year after acceptance. This requires routine monthly inspection, emergency
More informationWITH THE TITLE 24. replacement. story. stories, etc. R disconnects. to, PV. unit and any. supporting frame. conditions. greater than the main
CITY OF CYPRESS Building Division 5275 Orange Avenue, Cypress, California 906300 714-229-6730 buildingpermits@ @ci.cypress.ca.us RESIDENTIAL PHOTOVOLTAIC SYSEMS ALL WORK SHALL REQUIRE COMPLIANCE WITH THE
More informationChapter - Six. Electrical Construction and Documentation
Chapter - Six Electrical Construction and Documentation 1 Electrical Contracting Works An engineering project in which electrical installation works include may be residential, public, commercial buildings;
More information