PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

Size: px
Start display at page:

Download "PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR"

Transcription

1

2 EASEMENT NOTES:. EASEMENT LIMIT SHOWN AS PROVIDED BY. TESC NOTES:. CONTRACTOR SHALL DEVELOP TEMPORARY EROSION AND SEDIMENT CONTROL PLAN AND PROVIDE ONSITE CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL) THROUGHOUT DURATION OF PROJECT. 2. AT MINIMUM, THE FOLLOWING BEST MANAGEMENT PRACTICES (BMP) SHALL BE IMPLEMENTED: PROTECTION OF ALL INLETS INTO THE STORM DRAIN SYSTEM PER WSDOT STANDARD PLANS I (TYPICAL OF 4). SILT FENCE DOWNSTREAM OF ALL EXCAVATED AREAS PER WSDOT STANDARD PLAN I COMPOST SOCK AND EROSION CONTROL BLANKET PER WSDOT STANDARD PLANS PER I AND ON ALL SLOPES THAT HAVE BEEN CLEARED / GRUBBED. FLAG NATURAL VEGETATION AND INSPECT REGULARLY. CONTROL DUST. MAINTAIN CONSTRUCTION ACCESS AND PREVENT SEDIMENT FROM BEING TRACKED ONTO PAVED SURFACES. HATCH LEGEND CLEARING LIMIT ASPHALT REMOVAL GRADING / EXCAVATION LIMIT EXISTING EDGE OF ASPHALT CLEARING LIMIT STA , 5.7' LT STA 2+3.3, 6.' LT PROTECT DRIVEWAY AND MAINTAIN ACCESS THROUGH DURATION OF CONSTRUCTION 800 CONTINENTAL PLACE (360) FAX (360) STA +55.7, 6.5' LT EXISTING EDGE OF ASPHALT SAWCUT LIMIT ASPHALT REMOVAL STA , 8.4' LT EASEMENT (SEE NOTE, THIS ) APPROXIMATE GRADING/ EXCAVATION LIMIT PROVIDED APPROXIMATELY 00-LF OF TEMPORARY SILT FENCE EXISTING TREES TO BE REMOVED BY COUNTY FORCES CLEARING / GRUBBING LIMIT (5-FT WIDTH CENTERED ON PIPELINE ALIGNMENT) EXISTING TREES TO BE PRESERVED (DO NOT DISTURB), TYPICAL UNLESS NOTED OTHERWISE PROJECT NO.: ES FED. AID NO.: N EXISTING SITE AND TESC PLAN INCH SCALE BAR 2 OF 7 RBNLEE - March 2, 208-4:03 PM - Q:\_GEOTECH\50345 SLIDE\ WALL DESIGN UP\ DWG

3 CONSTRUCTION NOTES:. ALL CONSTRUCTION ACTIVITIES SHALL BE CONTAINED WITHIN RIGHT OF WAY OR EASEMENTS. 2. ALL SURFACE CONDITIONS SHALL BE RESTORED TO EXISTING OR BETTER CONDITIONS. 3. ACTUAL PIPE LOCATIONS SHALL BE VERIFIED IN THE FIELD. 4. EXISTING WATERLINE IS APPROXIMATELY 2.8' COVER. 5. ELEVATION OF EXISTING PRIVATE DRAIN LINE IS UNKNOWN. CONTRACTOR TO LOCATE THROUGH POTHOLING PRIOR TO CONSTRUCTION, AND NOTIFY SHOULD EXISTING LINE BE FOUND IN A DIFFERENT LOCATION AND/OR CONFIGURATION THAN SHOWN. MAY OPT TO LOWER INVERT OF CB-3 TO PROMOTE POSITIVE DRAINAGE TO CB-2 (.0% MINIMUM GRADE). CUT, CAP, AND ABANDON EXISTING PIPE RUNNING SOUTH ACROSS THE CB-3, STA +63.3A,.6' LT TYPE I CB WITH SOLID COVER Rim: 9.4' I.E. N: 6.0' (VERIFY) I.E. E: 5.9' CONNECT TO EXISTING PROPERTY OWNER DRAIN PIPE. CONTRACTOR TO POTHOLE AND LOCATE PRIOR TO CONSTRUCTION. 44 LF OF 2" DIAMETER CPE PIPE RESTORE ALL LANDSCAPED AREA DISTURBED WITHIN RIGHT OF WAY CB-2, STA A,.0' LT TYPE I CB WITH GRATED COVER Rim: 9.5' I.E. W: 5.0' I.E. E: 5.6' I.E. S: 2.5' 24 LF OF 2" DIAMETER CPE PIPE CB-4, STA A, 6.8' LT TYPE I CB WITH GRATED COVER Rim: 9.5' I.E. W: 7.5' 800 CONTINENTAL PLACE (360) FAX (360) EDGE OF ASPHALT ASPHALT THICKENED EDGE STA ' RT 9 LF OF 2" DIAMETER CPE PIPE SEE WALL DETAIL 5 00 LF OF 2" DIAMETER FUSION WELDED SOLID WALL HDPE PIPE (SDR 2) CB-, STA 2+2.A, 2.8' RT TYPE I CB WITH GRATED COVER Rim: 8.2' I.E N: 2.' I.E. S: 2.0' ASPHALT THICKENED EDGE STA ' RT PROJECT NO.: ES FED. AID NO.: PROVIDE VENT ACCESS STA B 60 LF OF 2" DIAMETER FUSION WELDED SOLID WALL HDPE PIPE (SDR 2) N SITE AND STORM DRAIN PLAN DIFFUSER TEE INCH SCALE BAR MHHW 3 OF 7 RBNLEE - March 2, 208-4:05 PM - Q:\_GEOTECH\50345 SLIDE\ WALL DESIGN UP\ DWG

4 PROFILE - ALIGNMENT A SCALE: :0 (HORIZONTAL), :0 (VERTICAL) 2 OUTFALL PROFILE - ALIGNMENT B SCALE: :0 (HORIZONTAL), :0 (VERTICAL) RBNLEE - March 2, 208-4:06 PM - Q:\_GEOTECH\50345 SLIDE\ WALL DESIGN UP\ DWG P-5 60LF 2" DIAMETER SOLID WALL HDPE PIPE VENT ACCESS STA B SEE DETAIL, 6 P- 00LF 2" DIAMETER SOLID WALL HDPE PIPE CB-3 RIM: 9.4' I.E. N: 6.0' I.E. E: 5.9' CB-2 RIM: 9.5' I.E. W: 5.0' I.E. E: 5.6' I.E. S: 2.5' CB- RIM: 8.2' I.E. N: 2.' I.E. S: 2.0' CB-4 RIM: 9.5' I.E. W: 7.5' P-2 24LF 2" DIAMETER CPE P-4 9 LF 2" DIAMETER CPE 2.% P-3 44LF 2" DIAMETER CPE 2.% BLOCK WALL, SEE 5 PROVIDE ANCHOR BLOCK IN BASE OF WALL. SEE DETAIL, 6 PROVIDE MINOR GRADING AS REQUIRED TO ACCOMMO PIPE INSTALLATION ON SURFACE SLOPE PIPE TO MATCH, APPROXIMATELY 70-PERCENT PROVIDE DIFFUSER TEE AT TERMINUS. SEE DETAIL, 6 CB- INCH SCALE BAR 4 OF 7 STORM DRAIN PROFILES PROJECT NO.: ES FED. AID NO.: N/A 800 CONTINENTAL PLACE (360) FAX (360)

5 NOTES:. DRAINAGE SLOT (BELOW WALL) SHALL CONSIST OF PERMEABLE BALLAST FILLED TRENCHES (2 TOTAL). EACH TRENCH SHALL HAVE DIMENSIONS OF 2'W X 2'H AND EXTEND FROM BEHIND THE WALL TO DAYLIGHT AT SLOPE IN FRONT OF WALL.. 2. OWNER'S ENGINEER SHALL BE ON SITE TO CONFIRM APPROPRIATE WALL FOUNDATION SUBGRADE CONDITIONS, ASSIST WITH BLOCK LAYOUT, AND VERIFY BACKFILL AND DRAINAGE MEASURES PRIOR TO INSTALLATION. 3. CONTRACTOR SHALL PROVIDE 24-HOUR NOTICE TO ENGINEER PRIOR TO FOUNDATION PREPARATION. 4. CONTRACTOR SHALL BE PREPARED TO PROVIDE ADDITIONAL BLOCKS, AND/OR MODIFY THE LAYOUT OF THE WALL FROM THAT SHOWN HERE, BASED ON FIELD CONDITIONS AND RECOMMENDATIONS GIVEN BY THE OWNER'S ENGINEER. CORNER OF WALL STA +98.3A, 26.3' RT Elevation S 68 0'0" E 5-FEET (TYP.) DRAINAGE SLOT LOCATIONS, SEE NOTE-, THIS PROPOSED DRAIN PIPE SHOWN FOR REFERENCE SEE 3 FOR LOCATION INFORMATION C' CLOSURE BLOCKS: SET BACK FROM WALL FACE (SEE PLAN) TOP WALL ELEV. 3.5 RBNLEE - March 2, 208-4:04 PM - Q:\_GEOTECH\50345 SLIDE\ WALL DESIGN UP\ DWG EDGE OF ASPHALT 2.5-FEET (TYP.) 2-INCH HDPE PIPE (PASSING THROUGH 2.5' X 2.5' OPENING) D D' ACPT- ACPT-3/HA- CROSS SECTION C-C' ACPT-2/HA-3 WALL PLAN SCALE: :5 3X BEAM BLOCK WALL ELEVATION C CROSS SECTION D-D' WALL ELEVATION SECTION 2.5' X 2.5' X 5' (W X H X L) PRE-CAST RETAINING WALL BLOCKS (TYP) MIN. 6-INCH CRUSHED SURFACING BASE COURSE (CSBC) CAST IN PLACE CONCRETE ANCHOR (SEE DETAIL 5, 6) SCALE: :5 (HORIZONTAL), :5 (VERTICAL) 2' W x 2' H DRAINAGE SLOT. SEE NOTE- THIS. (TYPICAL OF 2) CLOSURE BLOCK, SETBACK EQUAL TO WIDTH OF BLOCK Elevation SAMISH ISLAND EXISTING FILL ACPT-3/HA- ACPT-3/HA- GLACIAL MARINE DRIFT ACPT- GLACIAL TILL 6-INCH MIN. CSBC PERMEABLE BALLAST H CROSS SECTION C-C' SCALE: :0 (HORIZONTAL), :0 (VERTICAL) SAMISH ISLAND SAMISH ISLAND RD, SECTION AT 2+0 A GLACIAL MARINE DRIFT EXISTING FILL GLACIAL TILL ACPT FINISHED GRADE 6V FINISHED GRADE H 6-INCH MIN. CSBC 6V ACPT-2/ HA PERMEABLE BALLAST ACPT-2/ HA-3 -FOOT MIN. EMBEDMENT SAMISH ISLAND RD, SECTION AT 2+24 A CROSS SECTION D-D' SCALE: :0 (HORIZONTAL), :0 (VERTICAL) -FOOT MIN. EMBEDMENT PROJECT NO.: ES FED. AID NO.: N/A 800 CONTINENTAL PLACE (360) FAX (360) BLOCK WALL DETAILS 5 OF 7 INCH SCALE BAR

6 2" DIA. HDPE PIPE SDR 2 3" MIN. 2:00 3" 5:00 PIPE SDR 2 2" DIA. HDPE FLOW NO HOLES OPPOSITE PIPE HOLE DIAMETER = 3" HDPE REMOVABLE CAP DIFFUSER HOLES: ORIENT TO BEST POSITION AFTER FIELD CHECK, (HOLES BETWEEN THE 2:00 AND 5:00 O'CLOCK POSITION) FLANGED CONNECTION (FLANGES WELDED TO PIPE ENDS). SEE NOTE, THIS. 2" DIAMETER HDPE TEE. SEE NOTE, THIS. 3" BRANCH LENGTH = 3' STAINLESS STEEL THUMB SCREWS SPACING = 3" FLOW FUSION WELD (FLANGED CONNECTION ALSO ACCEPTED) FLOW BEND ANGLE PER PLAN VENT/ACCESS NOTE:. VENT/ACCESS BEND TO BE FUSION WELDED TO HDPE PIPE. HDPE VENT/ACCESS (SEE VIEW A) FABRICATED HDPE VENT/ACCESS BEND, 2" DIA. HDPE PIPE SDR 2. SAWCUT (TYP) REMOVE TOP LAYER EXISTING HMA BEYOND TRENCH LIMIT CSTC, MATCH EXISTING THICKNESS 2" DIAMETER STAINLESS STEEL BOLTS & NUTS VENT VIEW A 2" (TYP) 5" 5" MIN 45" HMA CL /2" PG 64-22, MATCH EXISTING THICKNESS BANK RUN GRAVEL FOR TRENCH BACKFILL PIPE, CENTERED IN TRENCH PIPE ZONE BEDDING MATERIAL 800 CONTINENTAL PLACE (360) FAX (360) DIFFUSER TEE DETAIL 2 VENT/ACCESS DETAIL 3 TRENCH DETAIL DIFFUSER TEE NOTES:. HDPE TEE FOR DIFFUSER MAY BE EITHER MOLDED OR WELDED/FABRICATED. 2. HDPE SHALL BE PROVIDED WITH IRON PIPE SIZE (IPS) FLANGED ADAPTERS MATCHING SDR OF HDPE PIPE. BOLT HOLE PATTERN OF FLANGE TO MATCH ANSI B6.. PROVIDE STAINLESS BACKING RINGS ON EACH FLANGE. PROVIDE WATERTIGHT GASKET AND STAINLESS STEEL BOLTING HARDWARE. CAST IN PLACE 3,000 PSI CONCRETE TO ENCAPSULATE AND SURROUND THE PIPE 2.5-FEET W x 2.5-FEET H x 5-FEET L 2" EPOXY DOWEL 5/8-INCH BAR (4 PLACES BETWEEN PRECAST BLOCK AND CAST IN PLACE ANCHOR BLOCK) SHORELINE 2-INCH HDPE DRAIN PIPE WITH IN-LINE FLANGE ANCHOR BOTTOM BLOCK COURSE TEMPORARY PLYWOOD FORM (TYP. BOTH ENDS) SHORELINE PRECAST CONCRETE BLOCKS, PER PLANS, SEE 5 TEMPORARY PLYWOOD FORM (TYP. BOTH ENDS) V 6H.5 H : V FILL SLOPE PERMEABLE BALLAST WALL BACKFILL HDPE DRAIN PIPE WITH IN-LINE ANCHOR FLANGE SLOPED TO DRAIN AND CENTERED IN BLOCK OPENING 2.5-FEET WIDE x 2.5-FEET TALL x 5-FEET LONG CAST IN PLACE CONCRETE 4" CRUSHED SURFACING BASE COURSE MATERIAL ASPHALT THICKENED EDGE 5 8" 2" EDGE OF EXISTING EXISTING BASE ASPHALT THICKENED EDGE DETAIL PROJECT NO.: ES FED. AID NO.: N/A MISCELLANEOUS DETAILS PLAN VIEW SECTION VIEW PREPARED CSBC BEARING SURFACE INCH SCALE BAR 4 ANCHOR BLOCK DETAILS 6 OF 7 RBNLEE - March 2, 208-4:06 PM - Q:\_GEOTECH\50345 SLIDE\ WALL DESIGN UP\ DWG

7 800 CONTINENTAL PLACE (360) FAX (360) PROVIDE "END WORK" SIGN, SEE NOTE 4, THIS PROVIDE " WORK AHEAD" SIGN, SEE NOTE 4, THIS EDGE OF ASPHALT PROVIDE " WORK AHEAD" SIGN, SEE NOTE 4, THIS TRAFFIC CONTROL NOTES:. CONTRACTOR SHALL DEVELOP TEMPORARY TRAFFIC CONTROL PLAN PER CHAPTER 6 TEMPORARY TRAFFIC CONTROL OF MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) FOR REVIEW AND APPROVAL BY OWNER. 2. CONTRACTOR SHALL MANAGE TRAFFIC PER MUTCD THROUGH DURATION OF CONSTRUCTION. 3. MINIMUM STANDARD FOR TEMPORARY TRAFFIC CONTROL SHALL BE FLAGGER METHOD OF ONE-LANE, TWO-WAY TRAFFIC CONTROL (SECTION 6C. OF MUTCD). 4. PROVIDE CLASS A CONSTRUCTION SIGNAGE CONSISTING OF THE FOLLOWING AT EACH END OF THE PROJECT SITE: WORK AHEAD (W20-, 3 x 3) END WORK (G20-2 8" x 3) 3. POSITION CLASS A CONSTRUCTION SIGNAGE OUTSIDE TRAVELED WAY, WITHIN RIGHT-OF-WAY AT LOCATION BETWEEN 00' AND 200' FROM THE PROJECT LIMITS. INSTALL SIGNS ON FIXED POSTS PER WSDOT STANDARD PLAN K PROVIDE "END WORK" SIGN, SEE NOTE 4, THIS PROJECT NO.: ES FED. AID NO.: N CLASS-A SIGN PLAN INCH SCALE BAR 7 OF 7 RBNLEE - March 2, 208-4:04 PM - Q:\_GEOTECH\50345 SLIDE\ WALL DESIGN UP\ DWG

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 02630 - STORM DRAINAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Attachment D-1: Civil/Structural Scope of Work

Attachment D-1: Civil/Structural Scope of Work Attachment D-1: Civil/Structural Scope of Work Project: Location: Targa Sound Renewable Fuels Project Tacoma, WA Prepared by: NORWEST ENGINEERING Consulting Engineers 4110 N.E. 122 nd Avenue, Portland,

More information

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,

More information

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction. Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the

More information

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE 3.33' 3.0' 2.0' 4.33' 4.0' 3.0' 1.00' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3067-V OR AS NOTED ON PLANS. "INFA-SHIELD" SEAL OR EQUAL. RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR).

More information

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. SECTION 33 05 13 MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. B. Related Sections: 1. Section 03 20 00 - Concrete

More information

TYPE "A" CATCH BASIN

TYPE A CATCH BASIN 27" 1.67' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3250-BV OR APPROVED EQUAL. "INFI SHIELD" SEAL OR APPROVED EQUAL RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR). PLASTER OUTSIDE,

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

SECTION FACILITY SANITARY SEWERS

SECTION FACILITY SANITARY SEWERS SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Construction Documents (CDs) Required Signature Blocks and Standard Notes

Construction Documents (CDs) Required Signature Blocks and Standard Notes Development Services Department 100 N. Wilcox Street, Castle Rock CO 80104 Project Manager 720-733-3582 Construction Documents (CDs) Required Signature Blocks and Standard Notes Revised July 17, 2017 INDEMNIFICATION

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 JANUARY 2010 TABLE OF CONTENTS SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 APPENDIX ROADWAY DESIGN DRAINAGE

More information

16. Design of Pipeline Structures.

16. Design of Pipeline Structures. 16. Design of Pipeline Structures. a. General. 1) The following guidelines are for the design of structures for water and sewer pipelines including structural concrete and miscellaneous metals design.

More information

SEWER FORCE MAIN HDPE PIPE

SEWER FORCE MAIN HDPE PIPE SECTION 15150 SEWER FORCE MAIN HDPE PIPE PART 1: GENERAL 1-1 DESCRIPTION: This specification governs the material, pipe, fittings, joining methods and general construction practice for High Density Polyethylene

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 221313 - FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014 Sunnyside Valley Irrigation District Addendum No. 1 Enclosed Lateral Improvements Projects 2010-2011 Issued: 8/30/2010 Contract 10-003: Regions 011, 013 & 014 Page 1 of 7 Sunnyside Valley Irrigation District

More information

Storm. Section. B. General Design and Drawing Standards Design

Storm. Section. B. General Design and Drawing Standards Design Section Storm 5 General Plans for the existing stormwater system are maintained in digital and printed form by the City. Copies may be obtained from the Utility Division of the Public Works Department.

More information

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. PART 1 - GENERAL 1.1 DESCRIPTION A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section 01300 Record

More information

Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000

Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000 Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000 610S.1 This item shall govern the proper care and treatment of all trees and other vegetation

More information

SECTION UTILITY MANHOLES AND STRUCTURES

SECTION UTILITY MANHOLES AND STRUCTURES SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition

More information

Uwall UNIVERSAL CONSTRUCTION MANUAL

Uwall UNIVERSAL CONSTRUCTION MANUAL Uwall UNIVERSAL Retaining Wall System CONSTRUCTION MANUAL TM President s Letter CSI is a leader in its industry supplying precast infrastructure products throughout New England and beyond since 1972, developing

More information

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL: N 1133521.33 E 1689742.43 STA: 10+53.07 INSTALL: 2-10" 90 BENDS CONNECT TO MIDDLEBUSH HALL INTERIOR PLANT PLUMBING MIDDLEBUSH HALL HW1 HWS HWR 10+00 FREDRICK APARTMENTS FINE ARTS INSTALL 422 LF 10" HWS

More information

CHAPTER 6. Sanitary Sewer

CHAPTER 6. Sanitary Sewer CHAPTER 6 Sanitary Sewer A. Introduction All proposed developments, subdivisions, and buildings must have a properly designed and constructed sanitary sewer collection system. The system shall provide

More information

SECTION CONSTRUCTION SERVICES

SECTION CONSTRUCTION SERVICES SECTION 01100 CONSTRUCTION SERVICES PART 1 GENERAL 1.01 - Section Includes A. Mobilization. B. Construction Surveys. C. Record Documents. 1.02 Description Of Work A. Mobilization: includes the preparatory

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

Current Standard Plates including Transmittal Letters are available on the web at:

Current Standard Plates including Transmittal Letters are available on the web at: MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (6-03) MANUAL: Standard

More information

Transportation, Engineering and Development Business Group Standard Construction Plan Notes for Development Projects January 2013

Transportation, Engineering and Development Business Group Standard Construction Plan Notes for Development Projects January 2013 Transportation, Engineering and Development Business Group Standard Construction Plan Notes for Development Projects January 0 The City of Naperville Transportation, Engineering and Development (TED) Business

More information

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections. SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sanitary Sewer Gravity Mains B. Sanitary Sewer Force Mains C. Sanitary Sewer Services 1.02 DESCRIPTION OF WORK A. Construct sanitary sewer gravity

More information

SECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD

SECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD PART 1: GENERAL 1.01 The design guidelines contained herein include the requirements for drainage and vent systems utilized at The University of Texas at Austin. It is the intention of this document to

More information

Task Order Authorization

Task Order Authorization Task Order Authorization Task Order Number: 6 Task Order Name: 2017 Small Drainage Program Hourly Rate: See attached Exhibit B Budget Not To Exceed: $79,795.00 This Task Order pertains to the On-Call Agreement

More information

New Fulton State Hospital Energy Control Center and Services Building (ECC/SVC) Project Number: M

New Fulton State Hospital Energy Control Center and Services Building (ECC/SVC) Project Number: M SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

ENGINEERING DESIGN & IMPROVEMENT STANDARDS

ENGINEERING DESIGN & IMPROVEMENT STANDARDS ENGINEERING DESIGN & IMPROVEMENT STANDARDS 2016 Prepared by: Engineering Division For latest edition of these Improvement Standards, refer to City of Visalia website at: www.visalia.city/engineeringdocuments

More information

Fabrication and Installation Table of Contents

Fabrication and Installation Table of Contents Fabrication and Installation Table of Contents HDPE AQUASHIELD PRODUCTS 2 Fabrication and Installation 2 System Fabrication 3 Aqua-Swirl Installation 4 Step 1 Excavation and Bedding 4 Step 2 Pipe Connection

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with

More information

***************************************************************************************************************

*************************************************************************************************************** 02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations.

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations. COACHELLA VALLEY WATER DISTRICT DOMESTIC WATER CHECKLIST Tract/Parcel No: Project Common Name: Developer: Engineer: Engineer Signature: Date: Phone: Phone: Print: This is only a general checklist; please

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

PART 1 GENERAL REQUIREMENTS

PART 1 GENERAL REQUIREMENTS PART 1 GENERAL REQUIREMENTS Contract Closeout Plan 110 Arrow diagram for project close-out...3 Erosion Control 121 Straw bale barrier... 5 122 Silt fence... 7 123 Diversion dike... 9 124 Inlet protection...

More information

4 EXTREME FOUNDATION PANELS

4 EXTREME FOUNDATION PANELS 4 EXTREME FOUNDATION PANELS For House Crawl Space On Concrete Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions.

More information

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and

More information

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1 DIVISION 3: SEWER 3.1 DESIGN CRITERIA A. APPLICABILITY 1. These Design Standards shall govern all construction and upgrading of public sanitary sewer facilities in the City of Dundee and applicable work

More information

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction. General: 1. Construct utilities in accordance to TWA approved plans and shop drawings. Any deviation from the approved plans shall be approved by the DEVELOPER S ENGINEER and TWA 2. A preconstruction meeting

More information

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

TYPICAL INSTALLATION INSTRUCTIONS

TYPICAL INSTALLATION INSTRUCTIONS TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect

More information

LANDSCAPE RETAINING WALLS

LANDSCAPE RETAINING WALLS SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9070 - Landscape Retaining Walls LANDSCAPE RETAINING WALLS PART - GENERAL.0 SECTION INCLUDES A. Modular Block Retaining Walls

More information

SERVICE LINES, METERS AND APPURTENANCES

SERVICE LINES, METERS AND APPURTENANCES AUGUST02 SECTION 02646 SERVICE LINES, METERS AND APPURTENANCES PART 1 - GENERAL 1.1 DESCRIPTION A. This section concerns materials and installation of corporation stops, curb stops, service lines, meters,

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS SECTION 02620 PART 1 GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required to install High Density Polyethylene (HDPE) pressure pipe, fittings, and appurtenances

More information

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY Section Includes: 1. Pipe and fittings. 2. Drain Basin. 3. De-chlorination tablet feeder. 4. Non-pressure transition couplings.

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO 42 380 68 coddington ave ledbetter road shawnee creek s patton street ledbetter road wesley ave 68 starr drive 42 twist run 85 35

More information

Engineering Design Center. Standard Drawings. 1st Edition -January 2016

Engineering Design Center. Standard Drawings. 1st Edition -January 2016 Engineering Design Center Standard Drawings 1st Edition -January 2016 Golden State Water Company Standard Drawings 1/11/2016 Table of Contents PART A STANDARD DRAWINGS Section I Pipeline Construction P-1

More information

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY Guidance on restoration of City Rights-of-Way Public Works Department Directors Office 747 Market Street Suite 408 Tacoma, WA 98402 253-591-5525 Right-of-Way

More information

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown

More information

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs November 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements....................................

More information

ADDENDUM NO. 1. Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities

ADDENDUM NO. 1. Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities ADDENDUM NO. TO Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities Date of Addendum: December, 00 Hethcoat & Davis, Inc. 78 Franklin Road,

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects 2.0 ROADWAYS 2.1 Road Classification 2.1.1 Standard Drawing Classification All Road Widths and Road Allowances shall be designed in accordance with the most recent Town of New Tecumseth Standards: TNT.SD

More information

PVC Fittings & Laterals for Solid-Wall PVC Sewer Pipe

PVC Fittings & Laterals for Solid-Wall PVC Sewer Pipe Design and Installation Guide PVC Fittings & Laterals for Solid-Wall PVC Sewer Pipe TABLE OF CONTENTS Introduction 2 Products 3 Main-Line Fittings & Service-Line Fittings 3-4 Connections to Dissimilar

More information

02800 SHADE STRUCTURES

02800 SHADE STRUCTURES 02800 SHADE STRUCTURES for PLAY AREAS ****************************************** SPECIFIER: The shade structure shall utilize a four point hypar system with four columns located a minimum of 10 feet from

More information

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1 CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1

More information

RETAINING WALL LEVEL BACKFILL

RETAINING WALL LEVEL BACKFILL City of Poway Development Services Department Building Division (858) 668-4645 (858) 668-4646 (Inspection Line) building@poway.org RETAINING WALL LEVEL BACKFILL Construction of retaining walls, except

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

A. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms.

A. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms. PART 1: GENERAL 1.01 Purpose A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Hydrodynamic Separation Product Calculator

Hydrodynamic Separation Product Calculator Hydrodynamic Separation Product Calculator Example Project BMP #1 CDS 2015-4 Project Information Project Name Example Project Option # A Country US State Kentucky City Covington Contact Information First

More information

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service. CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation

More information

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS UTAH COUNTY HEALTH DEPARTMENT Div. of Environmental Health 151 South University Avenue, Provo 84601 (801) 851-7525 FAX 851-7521 GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS This is intended to

More information

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS COMPLETE THROUGH REVISION #18 April 2009 CITY STANDARD DETAILS REVISIONS Revision No. Revision Date Effective Date 2 August

More information

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8, Classic 6 and Legend unit segmental

More information

Section 13. Guidelines for the Design of Ground Mounted Sign Supports

Section 13. Guidelines for the Design of Ground Mounted Sign Supports Section 13 BDC11MR-04 13.1 Introduction Highway signs fall into two main categories, which are subdivided as follows: 1. Overhead Signs a. Sign Bridge Structures (GO) b. Sign Cantilever Structures (GO)

More information

Building Permit Submittal Requirements

Building Permit Submittal Requirements CITY OF MONTE SERENO 18041 Saratoga-Los Gatos Road Monte Sereno, CA 95030 Phone (408) 354-7635 Fax (408) 395-7653 www.cityofmontesereno.org Building Permit Submittal Requirements NOTE: Submit three (3)

More information

SWIMMING POOL PERMIT AND INSPECTION REQUIREMENTS

SWIMMING POOL PERMIT AND INSPECTION REQUIREMENTS Building Inspections SWIMMING POOL PERMIT AND INSPECTION REQUIREMENTS Permit Applications Pool permit applications are now being accepted online at http://etrakit.flower-mound.com/. Starting November 1,

More information

Storm Drain Inlet Protection

Storm Drain Inlet Protection Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

SECTION TAPPING SLEEVES AND VALVES

SECTION TAPPING SLEEVES AND VALVES SECTION 33 12 16.17 TAPPING SLEEVES AND VALVES PART 1: GENERAL 1.01 SCOPE Furnish, install and test all tapping sleeves, tapping valves, and tapping saddles as shown on the Drawings. 1.02 RELATED WORK

More information

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA PURPOSE AND SCOPE These criteria modify and supplement the applicable sections of the AREMA Manual of Recommended Practice in connection

More information

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00 Description Page No Summary Amount Summary 1/7 230,694.60 22,019.25 22,642.65 2/6 96,801.30 80,150.60 114,056.00 Total Per Unit (MYR) 327,495.90 102,169.85 136,698.65 Total Unit(s) X 1 2 2 Total Per Type

More information

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. Beit Hanoun Emergency Water Supply Project "Beit Hanoun Emergency Water Supply Project" " Rehabilitation and Construction of Beit Hanoun Water Network " BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE Bill of Quantities PREAMBLE TO

More information

REROUTING DRAINAGE SYSTEMS

REROUTING DRAINAGE SYSTEMS MINNESOTA WETLAND RESTORATION GUIDE REROUTING DRAINAGE SYSTEMS TECHNICAL GUIDANCE DOCUMENT Document No.: WRG 4A-4 Publication Date: 10/14/2015 Table of Contents Introduction Application Design Considerations

More information

Preferred Elevated Tank Site

Preferred Elevated Tank Site Preferred Elevated Tank Site Preferred Site No. 3 is on private property owned by Hopewell Developments. Approximately 5 acres of land will be required, including lands required for a permanent access

More information

DESIGN CONSIDERATIONS FOR NSWS NATURAL STONE RETAINING AND FREE-STANDING WALL SYSTEMS

DESIGN CONSIDERATIONS FOR NSWS NATURAL STONE RETAINING AND FREE-STANDING WALL SYSTEMS DESIGN CONSIDERATIONS FOR NSWS NATURAL STONE RETAINING AND FREE-STANDING WALL SYSTEMS Natural Stone Wall Solutions, Inc (NSWS ) 2352 Main Street, Suite 103 Concord, MA 01742 (978) 461-1777 Concept and

More information

PRELIMINARY DEVELOPMENT PLAN INFORMATION

PRELIMINARY DEVELOPMENT PLAN INFORMATION PRELIMINARY DEVELOPMENT PLAN INFORMATION SITE AREA =.0 AC. (,8,8 S.F.) BUILDING FOOTPRINT =,8 S.F. PAVEMENT/PARKING AREA = 0,98 S.F. BUILDING COVERAGE OF SITE = % SITE IMPROVEMENT PLAN NOTES. ALL UTILITY

More information

SECTION GRAVITY IRRIGATION PIPELINES RUBBER GASKETED REINFORCED CONCRETE PIPE (RGRCP)

SECTION GRAVITY IRRIGATION PIPELINES RUBBER GASKETED REINFORCED CONCRETE PIPE (RGRCP) SECTION 02513 GRAVITY IRRIGATION PIPELINES RUBBER GASKETED REINFORCED CONCRETE PIPE (RGRCP) PART 1 GENERAL 1.01 SECTION INCLUDES A. Irrigation pipeline, as herein specified, consists of installing pipe

More information

Engineering Plan Submittal Requirements. Revised: October 6, 2017

Engineering Plan Submittal Requirements. Revised: October 6, 2017 Engineering Plan Submittal Requirements Revised: October 6, 2017 Page 1 of 11 Introduction: These Engineering Plan Submittal Requirements are intended to standardize City requirements for civil engineering

More information

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories. SECTION 02830 CHAIN LINK FENCES AND GATES (GALVANIZED) 1.0 GENERAL 1.1 Section Includes A. Fence framework, fabric, gates, and accessories. B. Excavation for post bases; concrete footing for posts. C.

More information

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES 3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES All sanitary sewers shall be designed in accordance with these Design Standards, LBWD Rules and Regulations, and to accepted engineering principles. In

More information

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES 4.1 GENERAL REQUIREMENTS 4.1.1 Water and fire protection distribution facilities are to be provided solely for the purpose of supplying potable

More information

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

SECTION IV. PIPELINE EXCAVATION AND BACKFILL SECTION IV. PIPELINE EXCAVATION AND BACKFILL A. Description of Work B. Surface Types C. Backfill D. Surface Restoration A. DESCRIPTION OF WORK 1. Extent: Excavation of trenches for pipelines shall include

More information