1 124 E. Broadway Tucson, AZ Prepared for: CBRE Brokerage Services 3719 N. Campbell Ave. Tucson, AZ 85719
2
3 BACKGROUND: The Tucson Veterans of Foreign Wars building, located at 124 E. Broadway, Tucson, AZ appears to be constructed in the 1940 s with 13,720 square feet of building space and 9235 square feet of parking lot adjacent to the building. Based on provided building plans, the building is a two-story brick structure over a basement. The structural system consists of exterior brick walls and columns with concrete beams spanning between interior brick columns and supporting a steel metal pan and a system of open web steel joists. The building has gone through various renovations during the course of its history with the following documents provided for these improvements. DOCUMENTS PROVIDED/REVIEWED: The documents provided include but are not limited to: Drawings for the Master Control Relocation work by Roy Knappenberger with City of Tucson approval stamp dated, 08/08/1995 (10 sheets) Tenant Improvement Plans for Tucson Community Cable Corporation by The NBBJ Group/Gresham Larson dated, 08/08/1986 (12 sheets) Lobby Remodel Plans by Thomas Greenwood Architects, Inc., dated July 1995 (10 sheets) Master Control Relocation Plans by Logan T. White Engineering, dated 05/23/1995 (3 sheets) Building exterior and interior photographs VISUAL SITE INSPECTION: SMR performed a visual site inspection on August 24, 2016 to evaluate the following items: 1. Identify if the interior partitions are load bearing or not 2. Evaluate the general condition of the exterior brick walls for structural safety 3. Evaluate the condition of the crack in the exterior plaster finish Protected communication under pertinent code Page 3 of 8
4 1- INTERIOR PARTITIONS Interior partition walls are designed to divide the building s interior area into different rooms intended to be used for different purposes. Depending on the structural design of the building these walls can serve just for the purpose of dividing the area or they could also serve as load bearing walls to partially support the building loads. SMR performed a limited visual observation to determine if these walls are load bearing walls or simple partitions. During our observation we were able to remove some of the existing ceiling tiles to observe the as-built condition of the existing partition walls. Our observation indicates the walls terminate at the ceiling elevation or right below the second. In addition, to the extent possible to observe, the interior walls between the second floor and the roof framing appear to be non-load bearing partition walls. (see image #1 below for typical condition) Existing Framing Existing stud partition walls Image #1 Protected communication under pertinent code Page 4 of 8
5 2- EXTERIOR BRICK WALLS The exterior walls of the building are constructed from brick units with a mortar bed. During our visual inspection we could not determine if the brick walls are reinforced with steel bar reinforcing or not. The walls are typically built with individual brick units sitting in a mortar bed. We observed the walls are constructed with a small gap in the mortar layer between the brick units. Based on our visual observation, SMR does not believe the small gap possesses a structural deficiency for the performance of the walls. However, we recommend as part of future renovation of the facility, further investigation be carried out to determine if proper reinforcing is provided in the walls for wind and earthquake lateral force resistance. (see images #2 - #3 below for as-built condition) Exterior brick wall Image #2 Protected communication under pertinent code Page 5 of 8 Image #3
6 3- EXTERIOR PLASTER CRACKS During our field visit we observed a crack in the plaster finish on the south side of the exterior wall of the building. The crack appears to be only in the plaster, cosmetic in nature and limited to the exterior plaster finish. We do not see this crack to be a safety concern and it can be easily repaired by sealing and repainting. (see images #4 - #5 below for location and existing condition). Exterior wall crack location Image #4 Protected communication under pertinent code Page 6 of 8
7 Exterior wall crack Image #5 Image #6 Protected communication under pertinent code Page 7 of 8
8 CONCLUSIONS RECOMMENDATIONS Based on our general building observation and visual evaluation of the building condition, we have concluded the building is in good standing and has the structural integrity to be modified and renovated for future commercial use. The walls that are dividing up the spaces on the ground level as well as the second level are all partition walls. They can be modified or even removed as desired to accommodate a new design. We recommend that as part of the future renovation, the reinforcing in the brick walls to be evaluated in accordance with ASCE stipulations, which may require some destructive testing and possibly retrofitting of the walls. Protected communication under pertinent code Page 8 of 8
HOT SPRINGS FIRE DEPARTMENT EVALUATION OF DOWNTOWN LEGACY STRUCTURES Savoy Hotel Thompson Building Dugan Stewart Building May 16, 2012
HOT SPRINGS FIRE DEPARTMENT EVALUATION OF DOWNTOWN LEGACY STRUCTURES Savoy Hotel Thompson Building Dugan Stewart Building May 16, 2012 0 On May 16,, 2012 Hot Springs Firefighters conducted an evaluation
More informationStructural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity
System Codes and Criteria Design Codes and Standards The design code used is the Wisconsin Administrative Code along with the State of Wisconsin Department of Commerce-Safety & Buildings Chapters Comm
More informationSubject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3
MEMORANDUM To: Ashley Rosenthal Payne, Indianapolis Historic Preservation Commission Adrienne Schmetzer, Indiana Housing and Community Development Authority Architecture Preservation Interior Design Landscape
More informationABA Fashions Ltd. Plot #9, Block F, Tongi, Gazipur-1710 ( N, E) 08 MARCH 2014
ABA Fashions Ltd. Plot #9, Block F, Tongi, Gazipur-1710 (23.885176N, 90.399821E) 08 MARCH 2014 1 2 Observations 3 Highly stressed columns Cursory calculations indicate column at a high working stress.
More informationSuspended Metal lath and Cement Plaster. Coverings Rigid Insulation, 1/2 - in 0.75 psf. Floor Fill Lightweight Concrete, per inch 8 psf
Dead Loads Ceiling Suspended Metal lath and Cement Plaster 15 psf Coverings Rigid Insulation, 1/2 - in 0.75 psf Floor Fill Lightweight Concrete, per inch 8 psf Floor Finish Frame Partitions Ceramic or
More informationDETAIL DRAWINGS. RASTRA is a stay-in-place insulated concrete. form that is structurally strong, energy-efficient,
DETAIL DRAWINGS RASTRA is a stay-in-place insulated concrete form that is structurally strong, energy-efficient, soundproof, resistant to fire, high wind, mold and rodents and is made from 85% recycled
More informationHOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS
St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the
More informationHilton Baltimore Convention Center Hotel Western Podium
Hilton Baltimore Convention Center Hotel Western Podium CHRIS SIMMONS Structural Option Faculty Consultant: Dr. Ali M. Memari Thesis Proposal TABLE OF CONTENTS EXECUTIVE SUMMARY. Page 3 INTRODUCTION..
More informationProject Findings: Appendix 2
NSF Final Report CMMI-1034874 Project Findings: Appendix 2 Selected Damage Photos of Engineered Buildings PART 2. Teleco Office Tower Civil Engineering and Engineering Mechanics Department University of
More informationTable of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8
WISCONSIN PLACE RESIDENTIAL TECHNICAL ASSIGNMENT 2 OCTOBER 29, 2007 KURT KRASAVAGE THE PENNSYLVANIA STATE UNIVERSITY STRUCTURAL OPTION FACULTY ADVISOR: DR. ALI MEMARI 1 Table of Contents Table of Contents.2
More informationThe designer shall also submit additional information required by the University as described and underlined below.
I. Structural Engineering Submissions The designer shall submit all information required by the State Construction Office (SCO) as described in the State Construction Manual Chapter 300 - Project Design
More informationStructural Comparison between Pan Joist Concrete and Steel Frame Systems for UMCP Student Housing Building B
Structural Comparison between Pan Joist Concrete and Steel Frame Systems for UMCP Student Housing Executive Summary The proposed thesis will include an investigation of two different alternative structural
More informationINFORMATIONAL PACKAGE ACCESSORY RESIDENTIAL BUILDINGS (INCLUDING DETACHED GARAGES, STORAGE BUILDINGS & WORKSHOPS)
1102 4 th Street Telephone: 306-634-1819 Estevan, Saskatchewan, Canada Fax: 306-636-2199 S4A 0W7 INFORMATIONAL PACKAGE ACCESSORY RESIDENTIAL BUILDINGS (INCLUDING DETACHED GARAGES, STORAGE BUILDINGS & WORKSHOPS)
More informationStructural Technical Report #2 By Robert Whitaker
Structural Technical Report #2 By Robert Whitaker Robert Whitaker Structural ~ Parfitt Parkview at Bloomfield Station Bloomfield, NJ 10-31-05 Executive Summary This report covers the comparative redesign
More informationLATERAL DRIFT DESIGN IN COLD FORMED STEEL WALL SYSTEMS
1 LATERAL DRIFT DESIGN IN COLD FORMED STEEL WALL SYSTEMS Thomas Castle, S.E. 2 This presentation is published by the Cold-Formed Steel Engineers Institute ( CFSEI ). The information herein shall not constitute
More informationAnchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi
STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel
More informationApparel Gallery Ltd.
Apparel Gallery Ltd. 147-148, Norshinghpur, Asulia, Savar, Dhaka (23.929985N,90.304914E) 23 March 2014 1 2 Observations Building 1 Heavy loading due to raised floor area on Ground Floor 3 Building 1 Raised
More informationStructural Inspection
General: Background: An inspection and structural analysis have been performed for the purpose of evaluating the buildings structural systems and components. A full set of structural drawings was utilized
More informationMITRE 3 Building McLean VA
Executive Summary: The MITRE 3 building is an eight story office building. Its current frame is composed of A992 wide flange shapes. The lateral resisting system is a moment frame. This moment frame consists
More informationEMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire
EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire Additional Instructions and Clarifications 1. Please review ARC 4496 before beginning the project identification
More informationSTRUCTURAL CONDITION ASSESSMENT
STRUCTURAL CONDITION ASSESSMENT ALLEN JAY ROCK GYM 1201 FAIRFIELD ROAD HIGH POINT, NC Prepared for: Prepared by: Guilford County Schools 617 West Market Street Greensboro, NC Adrian S. Durham, PE, SE,
More informationSCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC Permit Requirements
SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC. 320-226.5189 www.101developmentresources.com While every attempt has been made to insure the correctness of this handout, no guarantees are made to its accuracy
More informationElement Z General Design Requirements Existing Facilities Information
Anderson Central 100B, PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G
More informationAdministrative Changes
Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings
More informationBuilding Inspection Report
Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941
More informationStructural Redesign Gravity System
Redesign Gravity System Design Considerations A composite floor system was used for this design to maximize the efficiency of the material being used. This type of system requires less material and provides
More informationABOVEGROUND HOME FALLOUT SHELTER H-12-2 / November 1983 (Supercedes H-12-2 dated June 1980)
ABOVEGROUND HOME FALLOUT SHELTER H-12-2 / November 1983 (Supercedes H-12-2 dated June 1980) Page 1 General Information This family shelter is intended for persons who prefer an aboveground shelter or,
More informationFire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II
Fire Inspection and Code Enforcement, 7 th Edition Chapter 6 Building Construction: Components Today we will Discuss fire walls, party walls, fire partitions, and curtain walls Discuss roof types and coverings
More informationCity of Hughson Building Safety Division 7018 Pine Street Hughson, CA (209)
City of Hughson Building Safety Division 7018 Pine Street Hughson, CA 95326 (209) 883-4054 RESIDENTIAL ATTACHED PATIO COVERS Patio covers are one story roofed structures not more than 12 feet above grade,
More informationTHE STRATA UNIT May 25, 2008
THE STRATA UNIT May 25, 2008 Over the years, we have been asked time and time again from our experience as a cost consultant and a project manager from both a restoration and renovation point of view What
More informationBasement Renovation Guide For Residential Dwellings
1 Development Services Department Building Permit & Inspection Services Basement Renovation Guide For Residential Dwellings This document is a guide for home owners and does not cover all possible conditions.
More informationStructural Technical Report 1 Structural Concepts / Structural Existing Conditions Report
Michael A. Troxell Structural Option Advisor: Professor Parfitt College of Business Administration Oct. 5, 2005 Structural Technical Report 1 Structural Concepts / Structural Existing Conditions Report
More informationA Design-Build Project: Repairing the Courthouse Square Complex
A Design-Build Project: Repairing the Courthouse Square Complex Cracked drywall in office building Cracked basement walls Separated columns at expansion joint Source: http://djcoregon.com/news/2010/07/22/salem-government-building-unsound-being-vacated/
More informationREQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES
REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will
More informationTHE PLAZA AT PPL CENTER ALLENTOWN, PA
Building Function and Primary Use The owner of the new Plaza at PPL Center is Liberty Property Trust, but the primary tenant is PPL, which will use the building as the headquarters for its new subsidiaries
More informationOne and Two Family Additions
One and Two Family Additions An addition to a house, duplex, garage, or an accessory structure requires a building permit prior to performing any construction. Building Department & Permit Office Mon-Fri
More informationBOWIE LEARNING CENTER
BOWIE LEARNING CENTER Bowie Learning Center BUILDING DATA BOWIE LEARNING CENTER 900 North Elm St., Weatherford, TX 76086 Year Built 1936 No. of Buildings No. of Portables 0 Approx. Total Square Footage
More informationSabah Shawkat Cabinet of Structural Engineering 2017
3.1-1 Continuous beams Every building, whether it is large or small, must have a structural system capable of carrying all kinds of loads - vertical, horizontal, temperature, etc. In principle, the entire
More informationOn Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866)
TECHNICAL NOTE On Cold-Formed Steel Construction $5.00 Light Gauge Steel Engineers Association Washington, D.C. 20005 Toll Free (866) 465-4732 www.lgsea.com DESIGN OF BY-PASS SLIP CONNECTORS IN COLD-FORMED
More informationMEMORIAL SLOAN-KETTERING CANCER CENTER
MEMORIAL SLOAN-KETTERING CANCER CENTER SENIOR THESIS PRESENTATION THE PENNSLYVANIA STATE UNIVERSITY DEPARTMENT OF ARCHITECTURAL ENGINEERING PRESENTATION OUTLINE INTRODUCTION BUILDING DESCRIPTION EXISTING
More informationSection A A: Slab & Beam Elevation
CE 331, Spring 2011 Flexure Strength of Reinforced Concrete s 1 / 5 A typical reinforced concrete floor system is shown in the sketches below. The floor is supported by the beams, which in turn are supported
More informationRESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST
This list is provided as a guide to help you understand the information that must be contained on the construction drawings. This list is not all-inclusive of all building codes but is used as a general
More informationCE 3150 Reinforced Concrete Design Design Project
Problem Description For this design project you will work in your project groups to complete a partial design of an office building. Specifically, you will design and fully detail three components: 1.
More informationHATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES
HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES A deck/patio permit is required for all construction including decks, renovation of existing decks/patio, paver patios, and retaining walls (over 30 inches).
More informationSUBSTANTIAL IMPROVEMENT
SUBSTANTIAL IMPROVEMENT General Discussion The following discussion addresses several of the issues surrounding the NFIP regulations concerning substantial improvement and substantial damage. The attached
More informationOctober 26, 2017 Ref.: Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6
October 26, 2017 Ref.: 351-1 Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6 Attention: Mr. Jim Sinnott Director of Facilities & Custodial Management Dear Sir:
More informationAbanti Color Tex Ltd. Plot-S, A-646, Shashongaon Enayetnager, Fatullah, Narayangonj ( E, N) 28 June 2014
1 Abanti Color Tex Ltd. Plot-S, A-646, Shashongaon Enayetnager, Fatullah, Narayangonj (90.476444E, 23.622806N) 28 June 2014 2 Preliminary calculations suggest columns in Units 1 and 2 are highly stressed
More informationProperty Condition Assessment
Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072
More information10/23/2011. Plan Examination. Plan ExaminationPurpose. Catch problems in advance of construction.
Plan Examination 1 Plan ExaminationPurpose 2 Catch problems in advance of construction. 3 1 Discovery of problems in the field results in higher cost. 4 Can a good plan review eliminate all problems in
More informationSIDEWALK & RAILING REPLACEMENT BOARD OF ED BUILDING
PROJECT: 25 E 5 S SALT LAKE CITY, UTAH 84111 CODE ANALYSIS APPLICABLE CODES 675 E. 5 S. Suite 4 DFCM PROJECT NUMBER: 182782 DFCM CONTRACT NUMBER: 18793 STRUCTURAL ENGINEER: REAVELEY ENGINEERS + ASSOCIATES
More informationStructural Assessment Live Fire Training Building. FSCJ South Campus Jacksonville, Florida. Florida State College at Jacksonville
Structural Assessment Live Fire Training Building FSCJ South Campus Jacksonville, Florida Florida State College at Jacksonville November 21, 2011 Report of a Structural Assessment of Live Fire Training
More informationBuilding Design Data
Building Design Data.. 1. Building Design The KORE ICF System is designed to meet the requirements of the Building Regulations 1997-2006, in the case of two storeys, single occupancy dwellings. If the
More informationCONTENTS. Using Advanced CAD to Create 2D and 3D Objects in Chief Architect 1. Introduction..2
CONTENTS SECTION 1 Using Advanced CAD to Create 2D and 3D Objects in Chief Architect 1 Introduction..2 CHAPTER 1 THE BASIC EDIT TYPES 3 Steps: Working with the Different Edit Types...3 Can You Do It?...11
More informationCATAMARAN TOWER - 1 Seef Area Plot 19, 20
STATUS REPORT NO 18 [As on September 30, 2017] This report is intended as a status report and covers only the activities completed till date, non-completed works and work-in-progress. A. Project Details
More informationHOW CONFINED MASONRY BUILDINGS FAIL IN EARTHQUAKES
HOW CONFINED MASONRY BUILDINGS FAIL IN EARTHQUAKES DIGRESSION: How Confined Masonry Buildings Fail in Earthquakes Overturning (collapse) of masonry gable wall Out-of-plane failure of masonry wall In plane
More informationBuilding Guide. Colorado Chapter of the International Code Council
12/29/16 Building uide Colorado Chapter of the International Code Council How to Use this uide Check with your jurisdiction regarding type of submittal (paper or electronic) and for additional requirements.draw
More information2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)
2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:
More informationPost-Disaster Safety Evaluations Using ATC-20/45
Post-Disaster Safety Evaluations Using ATC-20/45 Presented by: Drew Martin, P.E., S.E. September 2, 2015 2015 APWA International Public Works Congress and Exposition Funded and Updated By: Office of Emergency
More informationThe Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee
The Structural Redesign of Boyds Bear Country and its Related Systems Included in this Presentation: Background and Existing System Proposal Problem / Solution Structural System Redesigns Pre-cast Concrete
More informationHollowcore Floors. The ideal structural floor solution for all building types in all sectors.
Hollowcore Floors Hollowcore Floors The ideal structural floor solution for all building types in all sectors. 2 3 System Overview Prestressed hollowcore units form part of the comprehensive range of precast
More informationRebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.
FEMA 50% RULE - SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT/DAMAGE Z101-0410 NOTICE TO PROPERTY OWNERS Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information
More informationThe Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage
The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco
More informationLOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN
INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS
More informationDetailed Structural Assessment Southern Nevada Health District Main Building Las Vegas, NV
Detailed Structural Assessment Southern Nevada Health District Main Building Las Vegas, NV Prepared for PGAL, Inc. Prepared by Walter P. Moore and Associates, Inc. 3883 Howard Hughes Parkway, Suite 190
More informationRESIDENTIAL CONSTRUCTION New Dwellings and Additions
How to Obtain a Building Permit For RESIDENTIAL CONSTRUCTION New Dwellings and Additions MIAMI COUNTY, KANSAS CODE SERVICES DEPARTMENT 201 South Pearl Street, Suite 201 Paola, Kansas 66071-1777 Phone:
More informationISO Types 1-6: Construction Code Descriptions
ISO 1 Frame (combustible walls and/or roof) Typically RMS Class 1 Wood frame walls, floors, and roof deck Brick Veneer, wood/hardiplank siding, stucco cladding Wood frame roof with wood decking and typical
More informationLetter of Intent 1026 Sherman Ave
Letter of Intent 1026 Sherman Ave Overview We would like to tear down the existing structure which is not fit for occupancy or renovation and build a new home which is appropriate to the feel, class, size
More informationStructural Inspection Report
Revision: Issue 2 Date: 23 rd June 2014 Cherry Pvt. Ltd. Florence Fashions Ltd. Ultimate Ltd. Chandand Fashion Ltd. Joy Fashion Ltd. Structural Inspection Report Authors: Adrian Ryan, Cathal Mac an tsearraigh
More informationGround + 4 floor RCC frame structure in Goa Floor to floor height is 3.0m Plan dimension, 24.0 m x 13.5 m SBC = 20 t/sqm, hard Strata is consider for
Ground + 4 floor RCC frame structure in Goa Floor to floor height is 3.0m Plan dimension, 24.0 m x 13.5 m SBC = 20 t/sqm, hard Strata is consider for seismic analysis Analysis done using structural designing
More informationFDA CDRH Laboratory Silver Spring, Maryland. Executive Summary: Timothy Mueller Structural Option Walter Schneider
Executive Summary: The FDA-CDRH Laboratory is currently being built on the Food and Drug Administration s White Oak Consolidation Campus. It is a four story building with a full below grade ground floor
More informationBUILDING INTEGRITY SUMMARY REPORT
BUILDING INTEGRITY SUMMARY REPORT SUPPLIER NAME UNITS AUDITED Opex Mills 4X 6X Denim Rope Denim SSL SSL3 Utility Diesel SUPPLIER ADDRESS AUDIT DATE January 2014 AUDIT PERFORMED BY AUDIT TEAM Kanchpur,
More informationTHE CONSTRUCTION SUPERVISOR
City of Aurora Building Inspections 15151 E Alameda Pkwy Aurora, CO 80012 (303) 739-7420 THE CONSTRUCTION SUPERVISOR When a building permit has been issued for any construction within the City, the Supervisor
More informationARCHITECTURAL EXPANSION JOINT PRE-INSTALLATION INSPECTION
Date Project Name Location (city/state) Project Address Installer: Architect /Engineering Firm: General Contractor: Your Name: Contact Person: Contact Person: Phone: Phone: Phone: Mobile: Mobile: Mobile
More informationModular Wood Framing Goes Vertical
Modular Wood Framing Goes Vertical By: Troy Bean, P.E., S.E. DCI Engineers January 2013 The Wood Products Council is a Registered Provider with. Credit(s) earned on completion of this program will be reported
More informationCopyright. magazine. CFS Load Bearing Construction
Progressive Collapse Requirements Cold-Formed Steel Load Bearing Construction By Nabil A. Rahman, Ph.D., P.E., Michael Booth and Gary Bennett Figure 1: Cold formed steel load bearing mid-rise construction.
More informationBuilding Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT
Building Permit Application Instructions NOTICE: Keep these instructions for your records. Please read and understand these instructions completely prior to completing and submitting your building permit
More informationRECONSTRUCTION AND REPLACEMENT OF EARTHQUAKE DAMAGED MASONRY CHIMNEYS
INFORMATION BULLETIN / PUBLIC BUILDING CODE REFERENCE NO.: LABC 2113 and LARC R1001 DOCUMENT NO.: P/BC 2014-070 Previously Issued As: P/BC 2008-070 Effective: 01-01-2014 Revised: 01-16-2014 RECONSTRUCTION
More informationHow to fill in your Timber Frame Order Form
How to fill in your Timber Frame Order Form 1 General Would you like us to check slab or design the building to Architects drawings? Check Slab: Is the Slab in place already, if so has your architect checked
More informationCity Planning & Development - Development Services (CPD-DS) 414 E. 12th Street 5 th Floor Kansas City, Missouri Telephone (816)
The purpose of this document is to advise you of the information needed to properly evaluate a permit application for your residential project. Please submit your completed permit application at the following
More informationStructural Assessment Report 2118 Milvia Street Berkeley, California
2118 Milvia Street Berkeley, California REPORT PREPARED FOR: PERALTA COMMUNITY COLLEGE DISTRICT REPORT PREPARED BY: KPW STRUCTURAL ENGINEERS, INC KPW PROJECT NO. 14C199.00 19 JUNE 2014 Table of Contents
More informationR CODE CHANGE PROPOSAL FORM (See instructions on page 2)
CODE CHANGE PROPOSAL FORM (See instructions on page 2) Code: IRC 12/13 Sections 301.2.2.2.1 Proponent: Charles S. Bajnai, Chesterfield County, VA, ICC Building Code Action Committee 1. Delete as shown
More informationDICTATOR Lift Shaft System
DICTATOR Lift Shaft System The Modular Lift Shaft System, also for Retrofitting Certified According to EN 1090 A lift is becoming more and more important for daily life, not only in newly constructed buildings
More information2111 N Albany Ave, Tampa, FL West Tampa Cigar Factory and Land. Office Building For Sale. For More Information:
Office Building For Sale Executive Summary OFFERING SUMMARY Sale Price: $1,950,000 Price / SF: $58.50 Lot Size: 1.3 Acres Year Built: 1903 Building Size: 33,334 SF Zoning: CI - Commercial Intensive Market:
More informationCITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures
CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE - 268-5161 Residential Accessory Structures This information has been compiled for the benefit of any person
More informationSJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series
SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series SUMMARY David Samuelson Steel joists are growing in recognition as being a very economical
More informationMassachusetts General Hospital - Building for the Third Century Lateral System Analysis and Confirmation Design
Massachusetts General Hospital - Building for the Third Century Lateral System Analysis and Confirmation Design 55 Fruit Street 02114 The Pennsylvania State University Department of Architectural Engineering
More informationStructural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)
Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction
More informationCompleted. Project. Melbourne High School. Comprehensive Additions and Renovations
Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project
More informationINITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)
INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory Name: Karardi, Shibpur, Narsingdi, Narsingdi Dhaka Bangladesh 10 May 2013 The Alliance for Bangladesh Worker Safety Page 1/15 10 May 2013 Introduction
More informationOWNER S REPONSIBILITIES AND PREPARATION INSTRUCTIONS. Schedule "C"
OWNER S REPONSIBILITIES AND PREPARATION INSTRUCTIONS Schedule "C" Building Code All Ready To Move (RTM) Homes are built according to the Alberta Building Code and National Building Code. Please note that
More informationOffering Memorandum. Fresenius Kidney Care Center 6826 Madison Ave. Indianapolis, Indiana. Kurt Meyer, CCIM
Offering Memorandum Table of Contents Disclaimer..... i Investment Overview..... 1 Property Description Location & Map. 2 Demographics...... 3 Building Description.. 4 Site Plan.... 5 Floor Plans.......
More informationNorth Mountain IMS Medical Office Building
North Mountain IMS Medical Office Building Phoenix, Arizona Michael Hopple Technical Assignment 1 October 5 th, 2007 AE 481W-Senior Thesis The Pennsylvania State University Faculty Adviser: Dr. Ali Memari,
More informationHistoric Preservation Commission
Historic Preservation Commission APPLICATION F CERTIFICATE OF APPROPRIATENESS PROPERTY ADDRESS: DATE: APPLICANT S NAME: APPLICANT S MAILING ADDRESS: CITY:. ZIP: TELEPHONE # HOME/CELL: WK: EMAIL: PROPERTY
More informationSECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:
SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.
More information151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University
November 16 th, 2007 William J. Buchko AE 481w Senior Thesis The Pennsylvania State University Thesis Advisor: Kevin Parfitt Table of Contents Executive Summary... 3 Structural System Overview Foundation...
More informationSEISMIC PERFORMANCE OF LOW-RISE PRE-ENGINEERING BUILDINGS WITH TILT-UP AND MASONRY FAÇADE WALLS DURING THE CANTERBURY EARTHQUAKES IN NEW ZEALAND
10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska SEISMIC PERFORMANCE OF LOW-RISE PRE-ENGINEERING BUILDINGS WITH TILT-UP
More informationProject Address: Name of Person Completing Form:
Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties
More informationResidential Inspector s Guide: Building and Energy based on the 2009 International Residential Code Chapters 1-11
Residential Inspector s Guide: Building and Energy based on the 2009 International Residential Code Chapters 1-11 Residential Inspector s Guide Building and Energy Based on the 2009 IRC, Chapters 1-11
More informationHome Remodeling Project. Presented by: Amit Chauhan
TCMG 505/MGMT532 Fall 2009 Home Remodeling Project Presented by: Amit Chauhan Ground Work! Question? The cost to renovate the existing home will you get a good return on your remodeling investment (ROI)?
More information