1 Appendix I OFFICE OF THE MORGAN COUNTY SURVEYOR

2 This Page Left Intentionally Blank OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX I PAGE 1

3 Appendix II OFFICE OF THE MORGAN COUNTY SURVEYOR

4 This Page Left Intentionally Blank OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX II PAGE 1

5 Appendix III OFFICE OF THE MORGAN COUNTY SURVEYOR

6 _TYPE OF SURFACE RUNOFF COEFFICIENT_ Non-Urban Areas Bare Earth 0.55 Steep Grassed Areas (slope 2:1) 0.60 Turf Meadows 0.25 Forested Areas 0.20 Cultivated Fields 0.30 Urban Areas All Watertight Roof Surfaces 0.90 Pavement (concrete, asphalt) 0.85 Gravel 0.85 Impervious Soils (Heavy) 0.55 Impervious Soils (with turf) 0.45 Slightly Pervious Soil 0.25 Slightly Pervious Soil (with turf) 0.20 Moderately Pervious Soil 0.15 Moderately Pervious Soil (with turf) 0.10 Business, Commercial & Industrial 0.85 Apartments & Townhouses 0.70 Schools & Churches 0.55 Single Family Lots < 10,000 ft Lots < 12,000 ft Lots < 17,000 ft Lots > ½ Acre 0.35 Park, Cemetery or Unimproved Area VI-TR-55, Second Edition, June 1986 Table (TR-55 Table 3-1) : Runoff Coefficient s for use in the Rational Method calculations for Pipe, Channel and Detention Design OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX III PAGE 1

7 Worksheet 3.2.1: Time of Concentration or Travel Time Worksheet OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX III PAGE 2

8 _SURFACE DESCRIPTION n Smooth Surfaces (concrete, asphalt, gravel, bare soil) Fallow (no residue) 0.05 Cultivated Soils: Residue cover </= 20% 0.06 Residue cover > 20% 0.17 Grass: Short Grass Praire 0.15 Dense Grass 0.24 Bermuda Grass 0.41 Range (natural) 0.13 Woods: Light Underbrush 0.40 Dense Underbrush VI-TR-55, Second Edition, June 1986 Table (TR-55 Table 3-1): Roughness coefficient s (Manning s n) for sheet flow to be used in Time-of-Concentration calculations OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX III PAGE 3

9 Figure (TR-55 Figure 3-1): Average Velocities for Estimating Travel Time for Shallow Concentrated Flow. OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX III PAGE 4

10 210-VI-TR-55, Second Edition, June 1986 Worksheet (TR-55 Worksheet 2): Runoff Curve Number Worksheet OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX III PAGE 5

11 Table (TR-55 Table 2-2a): Runoff Curve Numbers for Urban Areas OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX III PAGE 6

12 Table (TR-55 Table 2-2b): Runoff Curve Numbers for Cultivated Agricultural Lands OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX III PAGE 7

13 Table (TR-55 Table 2-2c): Runoff Curve Numbers for Other Agricultural Lands OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX III PAGE 8

14 Return Period a b N R Table : IDF EQUATION VALUES OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX III PAGE 9

15 Return Period Rainfall Intensity (in/hr) Hours Minutes Table : IDF Table OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX III PAGE 10

16 Return Period Rainfall Depth (in) Hours Minutes Table : IDD Table OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX III PAGE 11

17 Cumulative Storm Time (Percent) Cumulative Storm Rainfall (percent) for Given Storm Type First Quartile Second Quartile Third Quartile Fourth Quartile (SOURCE: Rainfall Frequency Atlas of the Midwest by Huff and Angel) Table : Median Time Distributions of Heavy Storm Rainfall at a Point OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX III PAGE 12

18 Appendix IV OFFICE OF THE MORGAN COUNTY SURVEYOR

19 Pipe Material Manning s_n_ Concrete Pipe Concrete Boxes Corrugated Metal Pipe or Pipe Arch 2 2/3 x ½ Helical Corrugation /3 x ½ Annular Corrugation to to x 1 Corrugation x 1 Corrugation Structural Plate Pipe or Pipe Arch 6 x 2 Corrugation x 2½ Corrugation Spiral Ribbed Corrugated Metal Pipe Smooth High Density Polyethylene (HDPE) Smooth Lined Interior Polyvinyl Chloride (PVC) Smooth Interior Corrugated HDPE Ductile Iron Pipe Table : Manning s n Values for Pipes OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX IV PAGE 1

20 Storm Drain Computation Sheet DATE PROJECT ROUTE COMPUTED BY: CHECKED BY: SHEET OF From Station To Length (ft) Increment Drainage Area (acres) Total Runoff Coefficient C Increment A x C Total Flow Time (min) To Upper End In Section Rainfall Intensity (in/hr) Total Runoff Q (cfs) Diameter of Pipe (in) Slope of Pipe (ft/ft) Flowing Full Velocity Upstream Invert Elevation Downstrea m Invert Elevation Manhole Invert Drop Depth of Cover Worksheet (INDOT Figure 36-12F): Storm Drain Computation Sheet OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX IV PAGE 2

21 Hydraulic Grade Line Computation Sheet DATE PROJECT ROUTE COMPUTED BY: CHECKED BY: SHEET OF Station TW D O Q O L O V O V 2 o /2g H O Sf O H f K O C D C d C Q C P C B K K(V 2 o /2g) EGL O EGL HGL TOC EGL-7 ELEV (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14 15) (16) (17) (18) (19) (20) (21) (22) Worksheet (INDOT Figure 36-13D): Hydraulic Grade line Computation Sheet OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX IV PAGE 3

22 INLET COMPUTATION SHEET DATE PROJECT ROUTE COMPUTED BY: SHEET OF Location Gutter Discharge (Design Frequency ) Gutter Discharge (Allowable Spread ) Inlet Discharge Remarks Inlet No. Stat. Drain Area A (acre) Runoff Coefficient C Time of Concentration T c (min.) Rainfall Intensity i (in/hr) Flow Q (cfs) Grade S o (ft/ft) Cross Slope S x (ft/ft) Prev. Runby (cfs) Total Gutter Flow (cfs) Depth d (ft) Gutter Width W (ft) Spread T (ft) W/T Inlet Type Intercept Q i (cfs) Runby Q r (cfs) Worksheet (INDOT Figure 36-10K): Inlet Spacing and Gutter Spread Computation Sheet OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX IV PAGE 4

23 _Type of Gutter or Pavement Manning s n _ Concrete Asphalt Pavement: Smooth Texture Rough Texture Concrete Gutter Asphalt Pavement: Smooth Rough Concrete Pavement: Float Finish Broom Finish For Gutters with small slope, where sediment may Accumulate, increase the n values above by: USDOT, FHWA, HDS-3 (1961) Table : Roughness coefficient s (Manning s n) for Street and Pavement Gutters OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX IV PAGE 5

24 _Open Channel Surface Material n Concrete Gravel Bottom with sides - Concrete Mortared Stone Rip-Rap Natural Stream Channels: Clean, Straight Stream Clean, Winding Stream Winding with weeds and pools With Heavy Brush and Timbers Flood Plains: Pasture Field Crops Light Brush and Weeds Dense Brush Dense Trees Chow, 1959 Table : Roughness coefficient s (Manning s n) for Open Channel Surfaces OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX IV PAGE 6

25 Typical Maximum Velocities for Open Channel Linings Open Channel Lining Material Desirable Maximum Velocity (ft/s) Concrete, Trowel Finish 15 Concrete, Broom or Float Finish 15 Rip-Rap 10 Gabions 10 New Earth (Uniform, Sodded, Clay) 3-5 Existing Earth (Fairly Uniform, With Some 3-5 Weeds Dense Weeds 3-5 Swale with Grass 3-5 Table : Desirable Maximum Velocities for Open Channel Linings OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX IV PAGE 7

26 Appendix V OFFICE OF THE MORGAN COUNTY SURVEYOR

27 This Page Left Intentionally Blank OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX V PAGE 1

28 Appendix VI OFFICE OF THE MORGAN COUNTY SURVEYOR

29 This Page Left Intentionally Blank OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX VI PAGE 1

30 Appendix VII OFFICE OF THE MORGAN COUNTY SURVEYOR

31 This Page Left Intentionally Blank OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX VII PAGE 1

32 Appendix VIII OFFICE OF THE MORGAN COUNTY SURVEYOR

33 Appendix IX OFFICE OF THE MORGAN COUNTY SURVEYOR

34 This Page Left Intentionally Blank OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX IX PAGE 1

35 Appendix X OFFICE OF THE MORGAN COUNTY SURVEYOR

36 This Page Left Intentionally Blank OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX X PAGE 1

37 Appendix XI OFFICE OF THE MORGAN COUNTY SURVEYOR

38 This Page Left Intentionally Blank OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX XI PAGE 1

39 Appendix XII OFFICE OF THE MORGAN COUNTY SURVEYOR

40 This Page Left Intentionally Blank OFFICE OF THE MORGAN COUNTY SURVEYOR APPENDIX XII PAGE 1

CHAPTER 3 STORMWATER HYDROLOGY. Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF

CHAPTER 3 STORMWATER HYDROLOGY. Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF CHAPTER 3 STORMWATER HYDROLOGY Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF 3.1.1 Introduction to Hydrologic Methods...3.1-1 3.1.2 Symbols and Definitions...3.1-3 3.1.3 Rainfall

More information

iswm TM Technical Manual Hydrology:

iswm TM Technical Manual Hydrology: : 1.0 2.0 Downstream Assessment 3.0 Streambank Protection 4.0 Water Balance 5.0 Rainfall Tables 6.0 Hydrologic Soils Data Table of Contents 1.0... HO-1 1.1 Estimating Runoff... HO-1 1.1.1 Introduction

More information

and Hydraulic Analysis 412

and Hydraulic Analysis 412 Conveyance System Design and Hydraulic Analysis This chapter presents acceptable methods for the analysis and design of storm and surface water conveyance systems. Conveyance systems can be separated into

More information

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

DRAINAGE & DESIGN OF DRAINAGE SYSTEM Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means

More information

DIVISION 5 STORM DRAINAGE CRITERIA

DIVISION 5 STORM DRAINAGE CRITERIA DIVISION 5 STORM DRAINAGE CRITERIA Section 5.01 GENERAL The following storm drainage design criteria shall apply to all storm drainage designs in the City. Additional design criteria are specified in the

More information

CITY OF ROLLA STORMWATER DESIGN STANDARDS

CITY OF ROLLA STORMWATER DESIGN STANDARDS Revised Nov 07, 2017 4:28 p.m. CITY OF ROLLA STORMWATER DESIGN STANDARDS Prepared by: NTEGRITY Engineering, Inc. 1714 East 10 th Street P.O. Box 700 Rolla, MO 65402-0700 Phone: (573) 341-2100 Fax: (573)

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition STANDARD FOR SLOPE PROTECTION STRUCTURES Definition Structures to safely conduct surface runoff from the top of a slope to the bottom of the slope. Purpose The purpose of this practice is to convey storm

More information

Summary of Detention Pond Calculation Canyon Estates American Canyon, California

Summary of Detention Pond Calculation Canyon Estates American Canyon, California July 15, 2015 Bellecci & Associates, Inc Summary of Detention Pond Calculation Canyon Estates American Canyon, California 1. Methodology: Method: Unit Hydrograph Software: Bentley Pond Pack Version 8i

More information

Plan Name Plan No. Submitting Firm Contact Engineer. Review Date ESI Team ENGINEERS AND SURVEYORS INSTITUTE PEER REVIEW CHECKLIST CITY OF ALEXANDRIA

Plan Name Plan No. Submitting Firm Contact Engineer. Review Date ESI Team ENGINEERS AND SURVEYORS INSTITUTE PEER REVIEW CHECKLIST CITY OF ALEXANDRIA EROSION AND SEDIMENT CONTROL CHECKLIST (E&S) VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (1 of 2) Item # Description OK NO N/A 1 Limits of clearing and grading match on all appropriate sheets 2 Construction

More information

Stormwater Drainage Criteria Manual. City Of Clearwater Engineering Department Effective July 1, 2015

Stormwater Drainage Criteria Manual. City Of Clearwater Engineering Department Effective July 1, 2015 Stormwater Drainage Criteria Manual City Of Clearwater Engineering Department Effective July 1, 2015 Engineering Department STORMWATER DRAINAGE CRITERIA MANUAL Table of Contents STORMWATER DRAINAGE CRITERIA

More information

Table of Contents. Overview... 1

Table of Contents. Overview... 1 Chapter 3 Chapter 3 Table of Contents Overview... 1 Rainfall... 2 3-2-1 Rainfall Depths and Intensities... 2 3-2-2 Design Storm Distribution for Colorado Urban Hydrograph Procedure (CUHP)... 5 3-2-3 Temporal

More information

Activity Calculating Property Drainage

Activity Calculating Property Drainage Page 1 of 5 Activity 2.3.11 Calculating Property Drainage Introduction When a property is developed, it is important to understand that changes to watershed characteristics (i.e., land use, slope, soil

More information

Appendix B. Storm Drain System Data

Appendix B. Storm Drain System Data MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT Appendix Appendix B. Storm Drain System Data June 2017 MENIFEE VALLEY CAMPUS MASTER PLAN FINAL EIR MT. SAN JACINTO

More information

APPENDIX G HYDRAULIC GRADE LINE

APPENDIX G HYDRAULIC GRADE LINE Storm Drainage 13-G-1 APPENDIX G HYDRAULIC GRADE LINE 1.0 Introduction The hydraulic grade line is used to aid the designer in determining the acceptability of a proposed or evaluation of an existing storm

More information

City of Oakland. Public Works Agency Standards STORM DRAINAGE DESIGN GUIDELINES. Engineering Design & ROW Management Division

City of Oakland. Public Works Agency Standards STORM DRAINAGE DESIGN GUIDELINES. Engineering Design & ROW Management Division City of Oakland PUBLIC WORKS AGENCY 250 FRANK H. OGAWA PLAZA 4 TH FLOOR OAKLAND, CALIFORNIA 94612 (510) 238-3437 FAX (510) 238-7227 TTD (510) 238-3254 Public Works Agency Standards STORM DRAINAGE DESIGN

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

Facilities Development Manual

Facilities Development Manual State of Wisconsin Department of Transportation Facilities Development Manual ORIGINATOR Director, Bureau of Highway Development PROCEDURE 13-25-35 CHAPTER 13 Drainage SECTION 25 Storm Sewer Design SUBJECT

More information

CACHE VALLEY STORM WATER DESIGN STANDARDS. As Amended by Logan City November 2010

CACHE VALLEY STORM WATER DESIGN STANDARDS. As Amended by Logan City November 2010 CACHE VALLEY STORM WATER DESIGN STANDARDS As Amended by Logan City November 2010 Updated November 2010 Table of Contents A. Definitions... 3 B. Design Requirements... 5 1. Storm Event... 5 2. Allowable

More information

3.0 STORM DRAINAGE SYSTEM DESIGN

3.0 STORM DRAINAGE SYSTEM DESIGN SPALDING COUNTY, GEORGIA CHAPTER 3 3.0 STORM DRAINAGE SYSTEM DESIGN... 3-1 3.1 OVERVIEW... 3-1 3.1.1 INTRODUCTION... 3-1 3.1.2 DRAINAGE SYSTEM COMPONENTS... 3-1 3.1.3 INLET AND STORM DRAIN PIPE DESIGN...

More information

RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016

RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016 April 12, 2016 Mr. Craig Perl, P.E. Senior Engineer City of Aurora Public Works Department 15151 E. Alameda Parkway Aurora, CO 80012 RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016

More information

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development City of Redwood City Stormwater Pollution Prevention Program Drainage Guidelines for Residential Development General Requirements A. Plot & Finished Grading Plan must be submitted with Building Permit

More information

Culvert Sizing procedures for the 100-Year Peak Flow

Culvert Sizing procedures for the 100-Year Peak Flow CULVERT SIZING PROCEDURES FOR THE 100-YEAR PEAK FLOW 343 APPENDIX A: Culvert Sizing procedures for the 100-Year Peak Flow A. INTRODUCTION Several methods have been developed for estimating the peak flood

More information

Preliminary Drainage Analysis

Preliminary Drainage Analysis Preliminary Drainage Analysis Tanimura and Antle Employee Housing Town of Spreckels County of Monterey, California LIB150205 May 29, 2015 Prepared For: Tanimura and Antle Produce Prepared By: 9699 Blue

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1 CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1

More information

Hancor, Inc. Drainage Handbook Hydraulics 3-1

Hancor, Inc. Drainage Handbook Hydraulics 3-1 Hancor, Inc. Drainage Handbook Hydraulics 3-1 3-0 HYDRAULICS TABLE OF CONTENTS 3-1 Overview of Hydraulic Considerations...3-2 3-2 Design Manning s Value...3-2 3-3 Discharge Curves...3-4 3-3 The Conveyance

More information

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives

More information

MODEL Stormwater Local Design Manual. City of Centerville

MODEL Stormwater Local Design Manual. City of Centerville MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge

More information

Gwinnett County Stormwater System Assessment Program

Gwinnett County Stormwater System Assessment Program Gwinnett County Stormwater System Assessment Program Jonathan Semerjian, PE Dept. of Water Resources Stormwater Management Sam Fleming, PE Dewberry Presentation Overview Project Background Drivers Enhanced

More information

10.0 Storm Sewer Systems

10.0 Storm Sewer Systems October 2003 Chapter 10.0, Storm Sewer Systems Page 1 10.0 Storm Sewer Systems 10.1 Introduction A storm sewer system consists of a system of inlets, pipes, manholes, junctions, cleanouts, outlets, and

More information

Irrigation Rehabilitation Program Design and Construction Standards

Irrigation Rehabilitation Program Design and Construction Standards Irrigation Rehabilitation Program Design and Construction Standards Prepared by the IRP Standards Review Committee For Alberta Agriculture and Rural Development, Irrigation Secretariat April 26, 2010 Adopted

More information

Methods of Streamflow Analysis

Methods of Streamflow Analysis 4 Methods of Streamflow Analysis CHAPTER 4 Streamflow Measurements Danielle M. Andrews Department of Crop and Soil Sciences, The Pennsylvania State University I. INTRODUCTION Perennial carries water all

More information

Module 10b: Gutter and Inlet Designs and Multiple Design Objectives

Module 10b: Gutter and Inlet Designs and Multiple Design Objectives Module 10b: Gutter and Inlet Designs and Multiple Design Objectives Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Evening traffic plows through high water at the intersection of

More information

SITE DESIGN ENGINEERING, LLC. 11 Cushman Street, Middleboro, MA P: F:

SITE DESIGN ENGINEERING, LLC. 11 Cushman Street, Middleboro, MA P: F: INTRODUCTION This drainage report was prepared for the proposed site re-development at in Burlington, Massachusetts. The project site is approximately 1.05± acres consisting of approximately 70% impervious

More information

Project Drainage Report

Project Drainage Report Design Manual Chapter 2 - Stormwater 2A - General Information 2A-4 Project Drainage Report A. Purpose The purpose of the project drainage report is to identify and propose specific solutions to stormwater

More information

Treatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation

Treatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation Stormwater Engineering Bioretention Design Bill Hunt, PE, Ph.D. Extension Specialist & Assistant Professor NCSU-BAE www.bae.ncsu.edu/stormwater Bioretention Design Six Step Process 1 Determine Volume to

More information

BMP 6.4.4: Infiltration Trench

BMP 6.4.4: Infiltration Trench BMP 6.4.4: Infiltration Trench An Infiltration Trench is a leaky pipe in a stone filled trench with a level bottom. An Infiltration Trench may be used as part of a larger storm sewer system, such as a

More information

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth

More information

Section 600 Runoff Table of Contents

Section 600 Runoff Table of Contents Section 600 Runoff Table of Contents 601 INTRODUCTION...600-1 602 RATIONAL METHOD...600-1 602.1 Rational Method Formula...600-2 602.2 Time of Concentration...600-2 602.3 Intensity...600-4 602.4 Runoff

More information

Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan

Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan TR-20 is a computer program for the simulation of runoff occurring from a single storm event. The program develops flood hydrographs from runoff and routes

More information

LAWRENCE, KANSAS STORMWATER MANAGEMENT CRITERIA

LAWRENCE, KANSAS STORMWATER MANAGEMENT CRITERIA LAWRENCE, KANSAS STORMWATER MANAGEMENT CRITERIA FEBRUARY 1996 CITY OF LAWRENCE, KANSAS STORMWATER MANAGEMENT CRITERIA TABLE OF CONTENTS Pg 1.0 GENERAL 1.1 Introduction... 1 1.2 Applicability... 1 1.3 General

More information

CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS

CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 JANUARY 2010 TABLE OF CONTENTS SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 APPENDIX ROADWAY DESIGN DRAINAGE

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design

More information

the 2001 season. Allison brought high winds and street flooding to Houston, after

the 2001 season. Allison brought high winds and street flooding to Houston, after Module 10b: Gutter and Inlet Designs and Multiple Design Objectives Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Evening traffic plows through high water at the intersection of

More information

Chapter 8. Inlets. 8.0 Introduction. 8.1 General

Chapter 8. Inlets. 8.0 Introduction. 8.1 General . Introduction This chapter provides criteria and design guides for evaluating and designing storm sewer inlets in the City of Centennial. The review of all planning submittals will be based on the criteria

More information

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction. Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the

More information

Catch Basin Inserts: Method to Determine CB Inserts Act as Full Capture Devices

Catch Basin Inserts: Method to Determine CB Inserts Act as Full Capture Devices WATERSHED PROTECTION DIVISION DEPARTMENT OF PUBLIC WORKS BUREAU OF SANITATION CITY OF LOS ANGELES Catch Basin Inserts: Method to Determine CB Inserts Act as Full Capture Devices Catch Basin Inserts: Method

More information

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON 6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON STORM WATER MANAGEMENT DESIGN BRIEF NEW DEVELOPMENT DRAINAGE SYSTEM REV 0 August 29, 2017 PREPARED BY: HALLEX PROJECT #170532 HALLEX NIAGARA HALLEX HAMILTON

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose STANDARD FOR GRASSED WATERWAYS Definition A natural or constructed watercourse shaped or graded in earth materials and stabilized with suitable vegetation for the safe conveyance of runoff water. Purpose

More information

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification 7. Introduction This chapter summarizes methods to evaluate runoff conveyance in various street cross sections and curb types in the Town of Castle Rock and identifies acceptable upper limits of street

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any

More information

CHAPTER 3 HYDROLOGY AND HYDRAULICS 3.1 SCOPE 3.2 COMPUTATION METHODS FOR RUNOFF

CHAPTER 3 HYDROLOGY AND HYDRAULICS 3.1 SCOPE 3.2 COMPUTATION METHODS FOR RUNOFF CHAPTER 3 HYDROLOGY AND HYDRAULICS 3.1 SCOPE This section sets forth the hydrologic parameters to be used in computations to determine volumes and peak rates of stormwater runoff as well as the hydraulic

More information

CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS

CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS APRIL 2011 APRIL 2011 Page 1 Chapter Table of Contents 12.1 Policy... 12-3 12.1.1 Table 1... 12-3

More information

Article 20: Erosion Control and Stormwater Management

Article 20: Erosion Control and Stormwater Management Article 20: Erosion Control and Stormwater Management Section 360: Purpose, Scope of Authority, Performance Guarantee and Approvals A. Purpose. The purpose of this document is to set forth minimum requirements

More information

3.0 Planning and Submittal Requirements

3.0 Planning and Submittal Requirements October 2003, Revised February 2005 Chapter 3.0, Planning and Submittal Requirements Page 1 3.0 Planning and Submittal Requirements 3.1 Drainage Studies and Drawings The City of Greenwood Village (Village)

More information

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Storm Sewer Design Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Major floods are dramatic and water flow routes must be recognized when minor drainage systems fail. These types

More information

Urban Drainage Introduction. A.Ramachandra Rao. C.B. Burke. T.T. Burke, Jr.

Urban Drainage Introduction. A.Ramachandra Rao. C.B. Burke. T.T. Burke, Jr. 32 Urban Drainage A.Ramachandra Rao Purdue University C.B. Burke Christopher B. Burke Engineering, Ltd. T.T. Burke, Jr. Christopher B. Burke Engineering, Ltd. 32.1 Introduction 32.2 The Rational Method

More information

APPENDIX A: STORMWATER HYDROLOGY

APPENDIX A: STORMWATER HYDROLOGY APPENDIX A: STORMWATER HYDROLOGY In low impact development (LID), the objective of stormwater control measures (SCMs) is to mimic or replicate the hydrologic function of a natural system. This approach

More information

Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015

Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015 Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015 Urban Runoff Background How we got here What Problem?? Provenance of the Problem Unified Sizing Criteria What

More information

Drainage of Highway Pavements

Drainage of Highway Pavements PDHonline Course C343 (8 PDH) Drainage of Highway Pavements Instructor: Vincent D. Reynolds, MBA, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088

More information

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) Hydromodification design criteria for the North Orange County permit area are based on the 2- yr, 24-hr

More information

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS COMPLETE THROUGH REVISION #18 April 2009 CITY STANDARD DETAILS REVISIONS Revision No. Revision Date Effective Date 2 August

More information

124 MODERN SEWER DESIGN

124 MODERN SEWER DESIGN 14 MODERN SEWER DESIGN Fabricated fittings are hydraulically superior. 5. HYDRAULIC DESIGN OF STORM SEWERS CHAPTER 5 Hydraulic Design of Storm Sewers 15 The hydraulic design of a sewer system may have

More information

ATTACHMENT 4: Design Calculations and Construction Details

ATTACHMENT 4: Design Calculations and Construction Details Pennsylvania Pipeline Project Erosion and Sediment Control Plan Southeast Region: Spread 6 November 2016 ATTACHMENT 4: Design Calculations and Construction Details Tetra Tech Pennsylvania Pipeline Project

More information

Session A6- Mannings "n" roughness characteristic occurring in semi-smooth turbulent flow of nature- Iike fishways

Session A6- Mannings n roughness characteristic occurring in semi-smooth turbulent flow of nature- Iike fishways University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

City of Saint John. Storm Drainage Design Criteria Manual

City of Saint John. Storm Drainage Design Criteria Manual Storm Drainage Design Criteria Manual March 7, 2016 LIST OF 2016 REVISIONS PAGES SECTION TITLE iii, iv, v, vi All Table of Contents 31-35 3 SUBMISSION REQUIREMENTS March 7, 2016 Page i DISCLAIMER The material

More information

2A Stormwater Regulations and Permitting A. Iowa Drainage Law and Resources 1 B. Regulated Activities 1

2A Stormwater Regulations and Permitting A. Iowa Drainage Law and Resources 1 B. Regulated Activities 1 Design Manual Chapter 2 - Stormwater Table of Contents TOC Table of Contents Chapter 2 - Stormwater 2A General Information 2A-1--------------------------------General Information A. Concept... 1 B. Informing

More information

Sizing Criteria Worksheets and Examples

Sizing Criteria Worksheets and Examples Appendix B Sizing Criteria Worksheets and Examples This Appendix provides sizing criteria worksheets and examples to illustrate the correct procedures for determining the water quality design flow and

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW1 September 2017 SW1.01 Purpose SW1.02 Acronyms ANSI ASTM BFE BMP CERCLA CFS CMP CN CSI CUE DIP DPS DVS EGL FEMA FFE FHWA FPG GI GIS GISSD GPS HEC-RAS

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

STORMWATER MANAGEMENT CRITERIA

STORMWATER MANAGEMENT CRITERIA JOPLIN, MISSOURI STORMWATER MANAGEMENT CRITERIA AM ALLGEIER, MARTIN and ASSOCIATES, INC. Consulting Engineers and Surveyors 1.0 GENERAL 1.1 Introduction: This document provides uniform procedures

More information

City of Tulsa. Stormwater Design Criteria Manual

City of Tulsa. Stormwater Design Criteria Manual City of Tulsa Stormwater Design Criteria Manual 2014 Table of Contents Chapter 100 EXECUTIVE SUMMARY... 101 101 INTRODUCTION... 101 101.1 Manual Organization... 101 101.2 Manual Contents... 101 101.2.1

More information

Chapter 11 Culverts and Bridges

Chapter 11 Culverts and Bridges Chapter 11 Culverts and Bridges Contents 1.0 Introduction... 1 2.0 General Design... 1 2.1 Design Criteria... 1 2.2 Design Flows... 1 2.3 Permitting and Regulations... 1 2.4 Aesthetics and Safety... 2

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

ARTICLE V: STORMWATER MANAGEMENT AND DRAINAGE SYSTEMS

ARTICLE V: STORMWATER MANAGEMENT AND DRAINAGE SYSTEMS ARTICLE V: STORMWATER MANAGEMENT AND DRAINAGE SYSTEMS Section 501: Purpose An adequate drainage system including necessary ditches, pipes, culverts, drains, inlets, bridges, detention ponds, etc. shall

More information

TECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance

TECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance TECHNICAL BULLETIN Synthetic Turf Athletic Field Drainage Design Assistance The SportsEdge HQ geocomposite strip drain products are engineered specifically for use in synthetic turf athletic field base

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01 Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development

More information

City of Elgin SUBDIVISION FINAL ENGINEERING Engineering Submittal Checklist

City of Elgin SUBDIVISION FINAL ENGINEERING Engineering Submittal Checklist If this is a re-submittal, please provide a point-by-point response to previous review comments, identifying how each comment has been addressed, location in the plan set of the changes made to address

More information

Drop Height For Channel Erosion Control

Drop Height For Channel Erosion Control Drop Height For Channel Erosion Control James C.Y. Guo, Professor and Director Department of Civil Engineering, U. of Colorado at Denver, Denver, Colorado 8017 E-mail: James.Guo@cudenver.edu Introduction

More information

Section 12 Hydraulic Design and Analysis

Section 12 Hydraulic Design and Analysis Section 12 Hydraulic Design and Analysis Section Topics Methodology Documentation Functionality Summary Re-Sizing Methodology Fixed/Resize Combined Flow Storm: Sizing as per d/d Structures.dat Storm vs.

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF

DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF Section CONTENTS Page RO- 1.0 OVERVIEW... 1 2.0 RATIONAL METHOD... 3 2.1 Rational Formula... 3 2.2 Assumptions... 4 2.3 Limitations... 4 2.4 Time of Concentration... 5 2.4.1 Initial Flow Time... 5 2.4.2

More information

CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL

CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL SECTION 600 STORM RUNOFF TABLE OF CONTENTS 601 INTRODUCTION 603 601.1 - Basin Characteristics 603 602 TIME OF

More information

FLAGSTAFF FAMILY FOOD BANK FLOOD REMEDIATION PROJECT

FLAGSTAFF FAMILY FOOD BANK FLOOD REMEDIATION PROJECT FLAGSTAFF FAMILY FOOD BANK FLOOD REMEDIATION PROJECT Final Design Report 5/12/2016 Erik Henricksen, Elena Smith, Garrett Ribas, Meshal Alotaibi Table of Contents Acknowledgments... 3 1.0 Project Description...

More information

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar Hydrology and Water Management Dr. Mujahid Khan, UET Peshawar Course Outline Hydrologic Cycle and its Processes Water Balance Approach Estimation and Analysis of Precipitation Data Infiltration and Runoff

More information

Run-On and Run-Off Control System Plan Neal North Energy Center Monofill

Run-On and Run-Off Control System Plan Neal North Energy Center Monofill Run-On and Run-Off Control System Plan Neal North Energy Center Monofill MidAmerican Energy Company, Neal North Energy Center Coal Combustion Residual Rule Compliance October 10, 2016 Run-On and Run-Off

More information

Chatham Park Stormwater Manual

Chatham Park Stormwater Manual Chatham Park Stormwater Manual Table of Contents A. Introduction... 2 B. Calculation Methods... 2 C. BMP Design Standards... 3 D. Compliance Points... 3 E. Critical Environmental Resources... 3 F. Submittal

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

DRAINAGE PLAN OF NAU S EASTBURN EDUCATION AND GAMMAGE BUILDINGS FINAL PROPOSAL

DRAINAGE PLAN OF NAU S EASTBURN EDUCATION AND GAMMAGE BUILDINGS FINAL PROPOSAL MAY 10, 2016 DRAINAGE PLAN OF NAU S EASTBURN EDUCATION AND GAMMAGE BUILDINGS FINAL PROPOSAL Connor Klein, Jiangnan Yi, Yuzhi Zhang, Yi Yang NORTHERN ARIZONA UNIVERSITY NAU Water Buffalo Engineering Table

More information

16.0 Water Quality Management Criteria for Developed Land

16.0 Water Quality Management Criteria for Developed Land October 2003, Revised February 2005 Criteria for Developed Land Page 1 16.1 Introduction 16.0 Water Quality Management Criteria for Developed Land Stormwater quality control is an integral part of any

More information

Chapter 6 Hydrology TABLE OF CONTENTS CHAPTER 6 - HYDROLOGY

Chapter 6 Hydrology TABLE OF CONTENTS CHAPTER 6 - HYDROLOGY Chapter 6 Hydrology TABLE OF CONTENTS CHAPTER 6 - HYDROLOGY... 6-1 6.1 Introduction... 6-1 6.1.1 Objective... 6-1 6.1.2 Definition... 6-1 6.1.3 Factors Affecting Floods... 6-1 6.1.4 Sources of Information...

More information

Watershed size and name: The drainage area is acres. The pond is located within the Ohio River watershed. (2016 Inflow Design Plan)

Watershed size and name: The drainage area is acres. The pond is located within the Ohio River watershed. (2016 Inflow Design Plan) A. B. Brown History of Construction 40 CFR 257.73 (c) (i.) (ii.) (iii.) Owner Name: Southern Indiana Gas and Electric Company dba Vectren Power Supply Owner Address: One Vectren Square, PO Box 209, Evansville,

More information

Decatur, Georgia Stormwater Management Policy Guidelines. DRAFT November 5, 2014

Decatur, Georgia Stormwater Management Policy Guidelines. DRAFT November 5, 2014 Decatur, Georgia Stormwater Management Policy Guidelines Stormwater Management Policy Guidelines Decatur, Georgia STORMWATER MANAGEMENT POLICY GUIDELINES 1.0 Introduction... 3 2.0 Determining Predevelopment

More information

CITY OF BENICIA IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BENICIA IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BENICIA DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION 250 EAST L STREET, BENICIA, CA 94510 Phone: (707) 746-4240 CITY OF BENICIA IMPROVEMENT PLAN REVIEW CHECKLIST Tract Map # This checklist is

More information

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to

More information

Index. Composition and Order of Plan Set. Utility Plan... 5

Index. Composition and Order of Plan Set. Utility Plan... 5 City of Des Plaines Public Works and Engineering Department Revised-October 5, 2012 Index Composition and Order of Plan Set Title Page Number Cover Sheet... 1 Requirements for Site Development... 2 Grading

More information