1 Consulting Engineers THORSON BAKER & Associates, Inc West Streetsboro Road (330) phone Richfield, Ohio (330) fax STRUCTURAL ASSESSMENT OBSERVATION REPORT Client: Weber Murphy Fox Project No: Site Observation By: Mike Thorson Project: Girard Middle School Date of Observation: June 15, 2012 Project Site: Girard, PA Date of Report: June 29, 2012 PURPOSE: A site visit of the referenced site was conducted on June 15, The purpose of the visit was to structurally assess the condition of the existing Girard Middle School campus. GENERAL The Girard Middle School consists of the original school located to the west end of the facility, dating to approximately 1917 and two additions. Immediately adjacent to the east is a three story addition constructed in East of the 1953 addition is a one and two story addition constructed in The original school building constructed in 1917 is a two story wood framed structure. The floor and roof structure were not exposed to view and could not be observed. The exterior walls and corridor walls are load bearing masonry with wood floor joists spanning north and south from the exterior walls to the interior corridor walls. The 1953 addition is a steel framed building in the three story classroom structure and one story steel framed structure in the gymnasium and cafeteria wings. The structure is column supported with steel joist floor and roof structure with a concrete slab on wire lathe. This structure would qualify as non-combustible construction. The lowest level of the addition housing storage and industrial arts is a half story below grade. The basement walls are cast-in-place concrete The most recent 1993 addition is also a one and two story steel framed structure. Nowhere was the structure exposed to view however one can safely assume the floor structure is concrete on metal deck and the roof is metal deck on steel joist. This structure would also be considered non-combustible. OBSERVATIONS 1917 Building The exterior brick masonry walls are in need of significant repointing. In numerous locations, particularly around windows mortar has cracked and is undoubtedly permitting infiltration of wind driven rain (Photos 1 & 2). Lintels show signs of surface corrosion. The foundation walls exhibit significant cracks and require filling with a sealant (Photos 3 & 4). These cracks are vertical most likely indicating they are associated with drying shrinkage. It would appear that the walls may not be reinforced given the width of the cracks. The joints at the building corners and much of the stone accents require repointing (Photo 5).

2 Page 2 The outer brick wythe above the windows on the third level appears to be walking off of the lintels above the windows possibly creating an unsafe condition (Photos 6 & 7). It is not uncommon for structures of this vintage to not have a physical attachment between the exterior walls and the structure. Wind not only exerts a windward force but also a suction or leeward force which pulls an exterior wall away from the building. This lack of physical attachment in coordination with leeward wind could result in this condition where the exterior brick wythe is projecting as much as 2 ½ inches over the edge of lintel. A maximum brick overhang of ½ to ¾ inches is recommended. The lack of a direct positive attachment of the wall to the structure can result in longterm maintenance issues at well as in an extreme situation, loss of an entire section of wall in high winds Structure Exterior walls of this addition are a brick veneer with an air space between the veneer and a concrete masonry back-up. The veneer has weep tubes at regular intervals to drain condensation which forms in the air space between the veneer and block backup. These weeps however are filled with wasp mud and are not functioning as indicated. Similar to the 1917 structure the exterior walls do not appear to have been adequately attached to the structural frame. External wall anchors have been post installed in an attempt to correct this deficiency (Photos 8 & 9). In numerous locations the brick veneer is observed to overhang the lintels by as much as 2 ½ to 3 inches (Photos 10 & 11). The third floor level lintels appear to not have been properly flashed. All of these issues lead to water infiltration and deterioration of the masonry walls. The wall at the northwest corner of the 1953 addition where it abuts the 1993 addition has a vertical crack extending from approximately the second floor to the roof. This crack has caused a separation allowing water infiltration. In addition, the corner column at this location bears on the basement wall which also exhibits spalling and a significant crack. The exterior walls on the gymnasium have pulled away from the structure as much as 3 ½ inches and have been externally tied back to the structure by installing external whalers or wind columns (Photos 12, 13 & 14). All of the above issues establish a concern that the exterior walls of the 1953 addition were not adequately anchored. The same concerns identified in the original 1917 building are a concern with the 1953 addition. Numerous cracks were observed at building corners (Photos 15 & 16). Sealant at masonry control joints is also dry and cracked and in need of repair (Photo 17). Consistent with the comments of the school board administrators and maintenance staff, moisture infiltration into the building is undoubtedly an issue. The basement walls were also observed to be cracked at 8 to 10 feet on center (Photos 18, 19 & 20). Substantial ground water has been observed entering the basement at a number of these cracks. The top of the basement walls do not extend to the first floor and therefore are laterally unbraced (Photo 21). In general, with the exception of the vertical shrinkage cracks, the walls appear to have functioned adequately. The design of the basement walls however, is structurally unsound and may have attributed to some of the issues observed Addition In general the 1993 addition appears to be in good condition, with the exception of a roof leak near the administrative offices. Exterior windows were appropriately flashed, weeps were present and functioning. Control joints in the exterior walls were at appropriate intervals. Sealant in the masonry control joints due to age was dried out and in need of replacement, otherwise the 1993 addition was in good condition. Conclusion The condition of the original building and the 1953 additions are in marginal condition even in light of their age. Both structures have significant issues associated with the exterior building envelope. As noted in the report, in general the exterior walls are not appropriately attached to the structural frame, the exterior wythe of brick extends precariously 2 to 3 inches beyond the edge of window lintels and lintels exhibit some corrosion and are not properly flashed.

3 Page 3 In addition the brick masonry walls and cast stone accents require extensive re-pointing and repair. This will also require extensive lintel extensions and/or replacement. The exterior walls of the gymnasium, although they have been restructured and now have a physical connection to the building, are out of plumb and in need of some additional structural and cosmetic repairs. The northwest corner at the interface of the 1953 addition to the 1993 addition where the wall has separated as previously described will require significant restructuring. The basement walls of the original 1917 building as well as the 1953 addition require significant crack repair. The perimeter requires excavating to waterproof the perimeter walls and install a perimeter drain. Copings at the parapets were observed to be loose in numerous locations requiring removal and replacement. In summary there is significant work required in the original building and the 1953 addition to make the building envelope watertight and secure to the building frame. One additional consideration is that the original 1917 building is a wood framed structure and is combustible. Combustible construction typically is not permitted in new construction for educational buildings. The 1993 addition is in good general condition requiring only caulking of the exterior control joints and repair of a roof leak over the administrative offices.

4 Page 4 Photographs Photo 1 Photo 2 Photo 3 Photo 4

5 Page 5 Photo 5 Photo 6 Photo 7 Photo 8 Photo 9 Photo 10 Photo 11 Photo 12

6 Page 6 Photo 13 Photo 14 Photo 15 Photo 16 Photo 17 Photo 18

7 Page 7 Photo 19 Photo 20 Photo 21

October 26, 2017 Ref.: Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6

October 26, 2017 Ref.: Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6 October 26, 2017 Ref.: 351-1 Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6 Attention: Mr. Jim Sinnott Director of Facilities & Custodial Management Dear Sir:

More information

STRUCTURAL CONDITION ASSESSMENT

STRUCTURAL CONDITION ASSESSMENT STRUCTURAL CONDITION ASSESSMENT ALLEN JAY ROCK GYM 1201 FAIRFIELD ROAD HIGH POINT, NC Prepared for: Prepared by: Guilford County Schools 617 West Market Street Greensboro, NC Adrian S. Durham, PE, SE,

More information

MAttheW novesky, ra. Wiss, JaNNey, elstner associates, inc.

MAttheW novesky, ra. Wiss, JaNNey, elstner associates, inc. the last few feet: ParaPEt design, issues, and repair LogAn CooK MAttheW novesky, ra Wiss, JaNNey, elstner associates, inc. 10 South LaSalle, Suite 2600, Chicago, IL 60603 Phone: 312-372-0555 Fax: 312-372-0873

More information

2003 International Residential Building Code

2003 International Residential Building Code 2003 International Residential Building Code Section R305 Ceiling Height Habitable rooms, hallways, corridors, bathrooms, toilet rooms, laundry rooms and basements shall have a ceiling height of not less

More information

NCMA TEK TEK 19-5A FLASHING DETAILS FOR CONCRETE MASONRY WALLS

NCMA TEK TEK 19-5A FLASHING DETAILS FOR CONCRETE MASONRY WALLS NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology FLASHING DETAILS FOR CONCRETE MASONRY WALLS TEK 19-5A Water Penetration Resistance

More information

Technical Notes 28 - Anchored Brick Veneer, Wood Frame Construction Rev August 2002

Technical Notes 28 - Anchored Brick Veneer, Wood Frame Construction Rev August 2002 Technical Notes 28 - Anchored Brick Veneer, Wood Frame Construction Rev August 2002 Abstract: This Technical Notes deals with the prescriptive design of brick veneer with wood frame construction in buildings

More information

SECTION UNIT MASONRY SYSTEM

SECTION UNIT MASONRY SYSTEM SECTION 04320 UNIT MASONRY SYSTEM PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete masonry and face brick units. B. Reinforcement, anchorage, and accessories. 1.03 SUBMITTALS A. Submit product data under

More information

Rockland Library Assessment Executive Summary

Rockland Library Assessment Executive Summary Rockland Library Assessment Executive Summary performed for City of Rockland, Maine 270 Pleasant Street Rockland, ME 04841 February 2, 2016 Civil & Structural Engineering 132 Brentwood Street Portland,

More information

Details for Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses

Details for Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses Details for Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses Released May 20, 2009 Updated March 9, 2011 Introduction: Wood frame structures with attached brick masonry veneer

More information

Water Penetration Resistance - Design and Detailing

Water Penetration Resistance - Design and Detailing Technical Notes on Brick Construction 7 114 Commerce Park Drive, Reston, Virginia 20191 www.gobrick.com 703-620-0010 Water Penetration Resistance - Design and Detailing Abstract: Proper design, detailing

More information

DIVISION 04 MASONRY CAST STONE. A. Design Considerations. 1. Cast stone shall comply with ASTM C1364, Standard Specification for Cast Stone.

DIVISION 04 MASONRY CAST STONE. A. Design Considerations. 1. Cast stone shall comply with ASTM C1364, Standard Specification for Cast Stone. DIVISION 04 MASONRY 04720 CAST STONE A. Design Considerations 1. Cast stone shall comply with ASTM C1364, Standard Specification for Cast Stone. 2. Care must be taken in the design of individual units

More information

Structural Inspection

Structural Inspection General: Background: An inspection and structural analysis have been performed for the purpose of evaluating the buildings structural systems and components. A full set of structural drawings was utilized

More information

PRELIMINARY STRUCTURAL INVESTIGATION REPORT

PRELIMINARY STRUCTURAL INVESTIGATION REPORT 124 E. Broadway Tucson, AZ Prepared for: CBRE Brokerage Services 3719 N. Campbell Ave. Tucson, AZ 85719 BACKGROUND: The Tucson Veterans of Foreign Wars building, located at 124 E. Broadway, Tucson, AZ

More information

MASONRY FAÇADE ANCHORAGE FAILURES

MASONRY FAÇADE ANCHORAGE FAILURES MASONRY FAÇADE ANCHORAGE FAILURES THE NEED FOR GREATER INVESTIGATION PRIOR TO REPAIR BY BLAIR E. BATES Hundreds of thousands of dollars are spent annually on maintaining building envelopes. Unfortunately,

More information

Perimeter Relief and Control Joints in Fire-Rated Gypsum Board

Perimeter Relief and Control Joints in Fire-Rated Gypsum Board Perimeter Relief and Control Joints in Fire-Rated Gypsum Board In multi-family residential construction, involving fire-rated assemblies stress relief in the firerated assemblies is important, but often

More information

Building Enclosure Detailing for Balconies

Building Enclosure Detailing for Balconies Building Enclosure Detailing for Balconies COLIN SHANE M.ENG., P.ENG., P.E. PRINCIPAL, SENIOR PROJECT MANAGER RDH BUILDING SCIENCE INC. JUNE 2017 Disclaimer: This presentation was developed by a third

More information

Project Findings: Appendix 2

Project Findings: Appendix 2 NSF Final Report CMMI-1034874 Project Findings: Appendix 2 Selected Damage Photos of Engineered Buildings PART 2. Teleco Office Tower Civil Engineering and Engineering Mechanics Department University of

More information

Section 4 - Design and Construction Overview

Section 4 - Design and Construction Overview Section 4 - Design and Construction Overview 4-1 Building Architecture/Enclosure The Pearland Recreation Center and Natatorium houses a recreation center and natatorium as shown in Figures 4-1.1 First

More information

Administrative Changes

Administrative Changes Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings

More information

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire Additional Instructions and Clarifications 1. Please review ARC 4496 before beginning the project identification

More information

Siding and Soffit Installation Guidelines

Siding and Soffit Installation Guidelines Siding and Soffit Installation Guidelines email web phone 07 46 16 Longboard Siding & Soffit INTRODUCTION INSTALLATION GUIDELINES NOTE: These instructions are prepared for persons experienced in the field

More information

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs November 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements....................................

More information

MOISTURE MANAGEMENT. Providing roofing and waterproofing solutions. Zionsville High School Roof Asset Management Plan

MOISTURE MANAGEMENT. Providing roofing and waterproofing solutions. Zionsville High School Roof Asset Management Plan MOISTURE MANAGEMENT Providing roofing and waterproofing solutions. Zionsville High School Roof Asset Management Plan Executive Summary Moisture Management conducted a detailed investigation of 34 roof

More information

MASONRY FAÇADE ANCHORAGE FAILURES

MASONRY FAÇADE ANCHORAGE FAILURES MASONRY FAÇADE ANCHORAGE FAILURES The need for greater investigation prior to repair. Presented by: Blair E. Bates, President. Building Restoration, Inc. Presentation Location: ICRI 2013 Fall Convention,

More information

The Inspection Process. Waxhaw N.C.

The Inspection Process. Waxhaw N.C. The Inspection Process In Waxhaw N.C. This information is provided by the Waxhaw Enforcement Division to assist you in the progression of your project. Nothing in this document should be considered "Code"

More information

Residential Building Inspections

Residential Building Inspections Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved

More information

Margaret Batts Tobin Laboratory

Margaret Batts Tobin Laboratory Roof Evaluation of Margaret Batts Tobin Laboratory The University of Texas At San Antonio Performed for UTSA Zero/Six Consulting, LLC 8423 Stewart Road Galveston, Texas 77554 409 740 0090 voice Table of

More information

BOWIE LEARNING CENTER

BOWIE LEARNING CENTER BOWIE LEARNING CENTER Bowie Learning Center BUILDING DATA BOWIE LEARNING CENTER 900 North Elm St., Weatherford, TX 76086 Year Built 1936 No. of Buildings No. of Portables 0 Approx. Total Square Footage

More information

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity System Codes and Criteria Design Codes and Standards The design code used is the Wisconsin Administrative Code along with the State of Wisconsin Department of Commerce-Safety & Buildings Chapters Comm

More information

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate Colphene BSW Training and Application Guide Colphene BSW Waterproofing Membrane. 1. Prepare substrate Substrate must be structurally sound. Surface must be free of voids, spalled areas, loose aggregate,

More information

Structural Assessment Live Fire Training Building. FSCJ South Campus Jacksonville, Florida. Florida State College at Jacksonville

Structural Assessment Live Fire Training Building. FSCJ South Campus Jacksonville, Florida. Florida State College at Jacksonville Structural Assessment Live Fire Training Building FSCJ South Campus Jacksonville, Florida Florida State College at Jacksonville November 21, 2011 Report of a Structural Assessment of Live Fire Training

More information

Technical Notes 24G - The Contemporary Bearing Wall - Detailing [Dec. 1968] (Reissued Feb. 1987) INTRODUCTION

Technical Notes 24G - The Contemporary Bearing Wall - Detailing [Dec. 1968] (Reissued Feb. 1987) INTRODUCTION Technical Notes 24G - The Contemporary Bearing Wall - Detailing [Dec. 1968] (Reissued Feb. 1987) INTRODUCTION The selection of a wall type and appropriate connection details is one of the most important

More information

1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated:

1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated: SECTION 04220 CONCRETE UNIT MASONRY PART 1 - GENERAL 1.01 SCOPE: A. The CONTRACTOR shall furnish all labor, materials and equipment necessary for the masonry construction as shown on the drawings or as

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

Concrete Block Machines Typical Fixed Block Machine

Concrete Block Machines Typical Fixed Block Machine SEAOG 2016 Masonry Workshop Concrete Masonry Units and Terminology Concrete Masonry in Georgia Georgia World Congress Center Reference: Inspector s Handbook Masonry Institute of America Roy Keck, FACI

More information

Sabah Shawkat Cabinet of Structural Engineering 2017

Sabah Shawkat Cabinet of Structural Engineering 2017 3.1-1 Continuous beams Every building, whether it is large or small, must have a structural system capable of carrying all kinds of loads - vertical, horizontal, temperature, etc. In principle, the entire

More information

STUCCO FAILURES and REMEDIATION Roger G. Morse AIA

STUCCO FAILURES and REMEDIATION Roger G. Morse AIA STUCCO FAILURES and REMEDIATION Roger G. Morse AIA Morse Zehnter Associates Rensselaer Technology Park 165 Jordan Road Troy, NY 12180 rgmorse@mzaconsulting.com Florida Environment Hot Humid High ground

More information

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST This list is provided as a guide to help you understand the information that must be contained on the construction drawings. This list is not all-inclusive of all building codes but is used as a general

More information

Inspection of New One- and Two- Family Dwellings

Inspection of New One- and Two- Family Dwellings Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Inspection of New One- and Two- Family Dwellings Planning and Development

More information

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE - 268-5161 Residential Accessory Structures This information has been compiled for the benefit of any person

More information

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3 MEMORANDUM To: Ashley Rosenthal Payne, Indianapolis Historic Preservation Commission Adrienne Schmetzer, Indiana Housing and Community Development Authority Architecture Preservation Interior Design Landscape

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072

More information

Building Construction Occupations

Building Construction Occupations Job Ready Assessment Blueprint Building Construction Occupations Test Code: 2011 / Version 01 Measuring What Matters Specific Competencies and Skills Tested in this Assessment: Safety and General Knowledge

More information

R CODE CHANGE PROPOSAL FORM (See instructions on page 2)

R CODE CHANGE PROPOSAL FORM (See instructions on page 2) CODE CHANGE PROPOSAL FORM (See instructions on page 2) Code: IRC 12/13 Sections 301.2.2.2.1 Proponent: Charles S. Bajnai, Chesterfield County, VA, ICC Building Code Action Committee 1. Delete as shown

More information

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210)

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210) Quality Inspection 8618 London Heights San Antonio, TX 78254 Phone: (210) 240-0476 PRE DRYWALL INSPECTION REPORT Prepared For: DELETED (Name of Client) Concerning: DELETED, San Antonio, TX 78258 (Address

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

The designer shall also submit additional information required by the University as described and underlined below.

The designer shall also submit additional information required by the University as described and underlined below. I. Structural Engineering Submissions The designer shall submit all information required by the State Construction Office (SCO) as described in the State Construction Manual Chapter 300 - Project Design

More information

DETAIL DRAWINGS. RASTRA is a stay-in-place insulated concrete. form that is structurally strong, energy-efficient,

DETAIL DRAWINGS. RASTRA is a stay-in-place insulated concrete. form that is structurally strong, energy-efficient, DETAIL DRAWINGS RASTRA is a stay-in-place insulated concrete form that is structurally strong, energy-efficient, soundproof, resistant to fire, high wind, mold and rodents and is made from 85% recycled

More information

Tile on Existing. Viewpoint

Tile on Existing. Viewpoint Viewpoint Tile on Existing Exterior Reinforced Concrete BalconieS By Steven C. Turner Exterior reinforced concrete balconies are often covered by tile set in mortar beds with grouted joints. These installations

More information

A Design-Build Project: Repairing the Courthouse Square Complex

A Design-Build Project: Repairing the Courthouse Square Complex A Design-Build Project: Repairing the Courthouse Square Complex Cracked drywall in office building Cracked basement walls Separated columns at expansion joint Source: http://djcoregon.com/news/2010/07/22/salem-government-building-unsound-being-vacated/

More information

04/05/2014. Introductions. Agenda. Heritage Adaptive Reuse: A Catalyst for Revitalization

04/05/2014. Introductions. Agenda. Heritage Adaptive Reuse: A Catalyst for Revitalization Heritage Adaptive Reuse: A Catalyst for Revitalization Susan Spencer Lewin, OAA, CS&P Architects Scott Weir, OAA, ERA Architects Introductions Susan Spencer Lewin, CS&P Architects Scott Weir, ERA Architects

More information

111 MORGAN ST. Ryan Friis

111 MORGAN ST. Ryan Friis Technical Report No. 1 September 30, 2002 Executive Summary: 111 Morgan St. is a 9 story cast-in-place concrete condominium building being constructed in Chicago, Illinois. The building s floor system

More information

Facility Assessment Report, Montgomery Independent School District

Facility Assessment Report, Montgomery Independent School District NATATORIUM CAMPUS DATA NATATORIUM 22628 Hwy 105 West, Montgomery TX 77356 Year Built 2009 Approx. Total Square Footage Grades Served 30,420 n/a Current Enrollment n/a Building Levels 1 1 MASTER PLAN 2

More information

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1% CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE EXAM ID: I1 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 6% 0101. Project Administration 1% Verify that

More information

Lithia Dodge East 5500 L St. Omaha, NE

Lithia Dodge East 5500 L St. Omaha, NE Lithia Dodge East 5500 L St. Omaha, NE Perimeter Photos Failed Joints at North Rear Wall Control Joints Look Good Inadequate Downspout Elbows Erosion Along Wall Minor Efflorescence Roof Section Photos

More information

Structural Redesign Gravity System

Structural Redesign Gravity System Redesign Gravity System Design Considerations A composite floor system was used for this design to maximize the efficiency of the material being used. This type of system requires less material and provides

More information

One and Two Family Additions

One and Two Family Additions One and Two Family Additions An addition to a house, duplex, garage, or an accessory structure requires a building permit prior to performing any construction. Building Department & Permit Office Mon-Fri

More information

Center School Building Site Assessment & Economic Development Planning Project

Center School Building Site Assessment & Economic Development Planning Project Center School Building Site Assessment & Economic Development Planning Project Prepared for: Town of Hatfield, MA Prepared by: HAI Architecture, Inc. Bartram & Cochran Lindgren & Sharples Barry Engineers

More information

The Empire State Building was completed in 1931,

The Empire State Building was completed in 1931, The Empire State Building Façade Evaluation and Repair of an Engineering Landmark By Robert J. Nacheman, P.E. The Empire State Building was completed in 1931, after only sixteen months of construction.

More information

CTP STITCH-TIE AGAIN! Quick and easy way to re-anchor existing veneers to back-up structures.

CTP STITCH-TIE AGAIN! Quick and easy way to re-anchor existing veneers to back-up structures. Helical Wall Tie System for Stabilizing Veneers and Structural Repair AGAIN! ANOTHER CTP SOLUTION! CTP STITCH-TIE Quick and easy way to re-anchor existing veneers to back-up structures. Brick to Concrete

More information

Brick Veneer / Wood Stud Walls

Brick Veneer / Wood Stud Walls TECHNICAL NOTES on Brick Construction 1850 Centennial Park Drive, Reston, Virginia 20191 www.gobrick.com 703-620-0010 28 November 2012 Brick Veneer / Wood Stud Walls Abstract: This Technical Note deals

More information

FLUID APPLIED WATERPROOFING

FLUID APPLIED WATERPROOFING SECTION 07120 FLUID APPLIED WATERPROOFING PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03300 - Cast-In-Place Concrete. 2. 09200 - Metal Studs, Metal Lath, Suspension Ceilings, Plaster, and Stucco.

More information

SECTION REFLECTIVE-FACED, MASONRY CAVITY WALL INSULATION

SECTION REFLECTIVE-FACED, MASONRY CAVITY WALL INSULATION MANUFACTURER S GUIDE SPECIFICATIONS SECTION 04 27 23 REFLECTIVE-FACED, MASONRY CAVITY WALL INSULATION 900 Hensley Lane Wylie TX 75098 800-527-7092 www.carlisleccw.com 07.09.13 Carlisle and R2+ are trademarks

More information

Our nation s inventory of vintage

Our nation s inventory of vintage Our nation s inventory of vintage structures has evolved to include a broad range of signature features. Many vintage structures have crenellated above-roofline parapet walls with heights ranging from

More information

THE STRATA UNIT May 25, 2008

THE STRATA UNIT May 25, 2008 THE STRATA UNIT May 25, 2008 Over the years, we have been asked time and time again from our experience as a cost consultant and a project manager from both a restoration and renovation point of view What

More information

Top Signs of Façade Problems How to See the Invisible Vision is the art of seeing things invisible Jonathan Swift NAREIM Home Page

Top Signs of Façade Problems How to See the Invisible Vision is the art of seeing things invisible Jonathan Swift NAREIM Home Page Top Signs of Façade Problems How to See the Invisible Vision is the art of seeing things invisible Jonathan Swift NAREIM Home Page Carolyn L. Searls www.sgh.com Outline How and Where to Look for the Invisible

More information

A M E R I C A N A R C H I T E C T U R A L M A N U F A C T U R E R S A S S O C I A T I O N

A M E R I C A N A R C H I T E C T U R A L M A N U F A C T U R E R S A S S O C I A T I O N A M E R I C A N A R C H I T E C T U R A L AAMA 2410-13 Standard Practice for Installation of Windows with an Exterior Flush Fin Over an Existing Window Frame M A N U F A C T U R E R S A S S O C I A T I

More information

SPECIFICATION GUIDELINE

SPECIFICATION GUIDELINE SPECIFICATION GUIDELINE Environmental Stoneworks Corporate Office 6300 East Stapleton Drive South Denver, CO 80216 Phone (303) 309-3040 Fax (303) 309-3059 www.estoneworks.com Environmental Stoneworks specification

More information

INTRODUCTION TO CURTAIN WALL DESIGN USING COLD-FORMED STEEL

INTRODUCTION TO CURTAIN WALL DESIGN USING COLD-FORMED STEEL TECHNICAL NOTE On Cold-Formed Steel Construction $5.00 Light Gauge Steel Engineers Association Washington, D.C. Toll-Free: 1 (866) 465-4732 www.lgsea.com INTRODUCTION TO CURTAIN WALL DESIGN USING COLD-FORMED

More information

SURESILL WATER MANAGEMENT GUIDE

SURESILL WATER MANAGEMENT GUIDE THE SURE LEVEL OF PROTECTION SURESILL WATER MANAGEMENT GUIDE FOR WINDOWS AND DOORS *1 SLOPED SILL PAN ASSEMBLY Cut the channel plate ¼ smaller than the rough opening. Check the fit with end caps before

More information

STarTing over: reskinning deteriorated

STarTing over: reskinning deteriorated STarTing over: reskinning deteriorated MaSonrY WallS in occupied CondoMiniuM ToWerS REiD Johnson, PEng, AnD sarah gray, PEng, CAhP Wsp halsall 2300 Yonge Street, Suite 2300, Toronto, Ontario, Canada M4P1E4

More information

CRAWL-SPACE CONSTRUCTION

CRAWL-SPACE CONSTRUCTION CRAWL-SPACE CONSTRUCTION Many basementless houses are built over a crawl space- that is, the grade-level floor is over an excavation which is deep enough to allow a man to gain access to the underfloor

More information

Copyright. magazine. CFS Load Bearing Construction

Copyright. magazine. CFS Load Bearing Construction Progressive Collapse Requirements Cold-Formed Steel Load Bearing Construction By Nabil A. Rahman, Ph.D., P.E., Michael Booth and Gary Bennett Figure 1: Cold formed steel load bearing mid-rise construction.

More information

CONSTRUCTION CODE PERMIT INFORMATION

CONSTRUCTION CODE PERMIT INFORMATION CONSTRUCTION CODE PERMIT INFORMATION INTRODUCTION The Lebanon County Planning Department is a Pennsylvania Certified 3 rd Party Inspection Agency. The Lebanon County Planning Department is under contract

More information

Outline 11/9/2009. History & Architecture Deteriorated conditions Preservation rationale Access Repairs. Jailhouse talk

Outline 11/9/2009. History & Architecture Deteriorated conditions Preservation rationale Access Repairs. Jailhouse talk Preserving the Big House Restoration of the Central Tower at Lewisburg Federal Penitentiary Outline History & Architecture Deteriorated conditions Preservation rationale Access Repairs Arch & crenellated

More information

Proper Installation of Insulated Metal Wall Panels

Proper Installation of Insulated Metal Wall Panels Proper Installation of Insulated Metal Wall Panels Insulated metal panels (IMPs) are an ideal cladding solution for pre-engineered metal buildings. They are available in lengths up to 50, and may also

More information

Inspection Report Summary

Inspection Report Summary Inspection Report Summary Prepared for: Property Location: XXXXXXXXXXXXXXXX XXXXXXXXXXXXX Dallas, Texas 75XXX Contact Info: Home Phone: XXXXXXXXXXXX E-mail: XXXXXXXXXXXXXXXX Date of Inspection: October

More information

My Home Was Built In What Can I Expect To See On My Report?

My Home Was Built In What Can I Expect To See On My Report? My Home Was Built In 1956. What Can I Expect To See On My Report? Common Issues in 40 70 Year Old Homes Evidence of foundation settlement Older roof, limited service life remaining Older electrical system

More information

Concrete Masonry. Weights and Process. Grades & Types

Concrete Masonry. Weights and Process. Grades & Types Concrete Masonry Weights and Process Two basic weights Normal weight 40 lbs. / unit 1,200-1,800psi comp strength Lightweight 22-28 lbs. / unit 700-1,000 psi comp strength Molded with a very dry mix - 3

More information

PHASE (pre-drywall) INSPECTION REPORT

PHASE (pre-drywall) INSPECTION REPORT PHASE (pre-drywall) INSPECTION REPORT Prepared For: (Name of Client) Concerning: Phase Sample 2014 (Address or Other Identification of Inspected Property) By: Dean Limbaugh #4599 2014 (Name and License

More information

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Table of Contents 1. Title 2. Designation 3. List of Figures 4. Scope 5. Referenced

More information

MCCARTY ARCHITECTS, P.A. POST OFFICE BOX 440 / 533 WEST MAIN STREET TUPELO, MS / FOR ANSWERS TO QUESTIONS CONTACT: JUSTIN HARRINGTON

MCCARTY ARCHITECTS, P.A. POST OFFICE BOX 440 / 533 WEST MAIN STREET TUPELO, MS / FOR ANSWERS TO QUESTIONS CONTACT: JUSTIN HARRINGTON ADDENDUM NUMBER FROM: MCCARTY ARCHITECTS, P.A. POST OFFICE BOX 0 / 533 WEST MAIN STREET TUPELO, MS 3880 / 3880 FOR ANSWERS TO QUESTIONS CONTACT: JUSTIN HARRINGTON PHONE: -8-00 PROJECT: ACADEMIC STUDENT

More information

HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES

HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES A deck/patio permit is required for all construction including decks, renovation of existing decks/patio, paver patios, and retaining walls (over 30 inches).

More information

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2) Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction

More information

R CODE CHANGE PROPOSAL FORM (See instructions on page 2)

R CODE CHANGE PROPOSAL FORM (See instructions on page 2) CODE CHANGE PROPOSAL FORM (See instructions on page 2) Code: IRC 12/13 Table R403.1(1) Proponent: Charles S. Bajnai, Chesterfield County, VA, ICC Building Code Action Committee, James R. Baty II, Technical

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

HISTORIC MASONRY CLADDING

HISTORIC MASONRY CLADDING HISTORIC MASONRY CLADDING COLUMBIA UNIVERSITY GSAPP - A4124 BUILDING SYSTEMS AND MATERIALS DEC. 07, 2016 Chris Gembinski, Assistant Adjunct Professor HISTORIC MASONRY CLADDING FUNCTION AND REQUIREMENTS

More information

Vertigo Cladding Board

Vertigo Cladding Board Installation guide Vertigo Cladding Board Geolam: a stunning alternative to wood cladding Vertigo is a composite wood cladding board requiring minimum maintenance. Durable and fade resistant, it will not

More information

A. ASTM C190 - Test Method for Tensile Strength of Hydraulic Cement Mortars

A. ASTM C190 - Test Method for Tensile Strength of Hydraulic Cement Mortars SECTION 04850 (04 40 00) MSI PRECAST STONE VENEER SYSTEM PART 1 GENERAL 1.1 SECTION INCLUDES A. MSI Precast Stone Veneer for exterior and interior vertical surfaces. 1.2 RELATED SECTIONS Specifier Notes:

More information

Building Design Data

Building Design Data Building Design Data.. 1. Building Design The KORE ICF System is designed to meet the requirements of the Building Regulations 1997-2006, in the case of two storeys, single occupancy dwellings. If the

More information

Foundation/Site Work Code Requirements

Foundation/Site Work Code Requirements Q: What is a Foundation Only permit and why did I receive one when I filed for a full Building Permit? All Building Permits for new construction and additions are reviewed for zoning compliance. This review

More information

JC Code & Construction Consultants, Inc. Advanced Training: The FBC & ASTM C 1063

JC Code & Construction Consultants, Inc. Advanced Training: The FBC & ASTM C 1063 JC Code & Construction Consultants, Inc. Advanced Training: The FBC & ASTM C 1063 1 Welcome! This course was developed by : JC Code & Construction Consultants, Inc. DBPR Provider Number 0003379 www.jccode.com

More information

DESIGN, DURABILITY, AND THE POLITICS OF SUSTAINABILITY (WHAT DO THE THREE LITTLE PIGS TEACH US?)

DESIGN, DURABILITY, AND THE POLITICS OF SUSTAINABILITY (WHAT DO THE THREE LITTLE PIGS TEACH US?) DESIGN, DURABILITY, AND THE POLITICS OF SUSTAINABILITY (WHAT DO THE THREE LITTLE PIGS TEACH US?) ABSTRACT Eric K. Olson 1 and Werner H. Gumpertz 2 In the story of the three little pigs, the big bad wolf

More information

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco

More information

Chapter Meeting: Joint Meeting with Boston CSI and ICRI at Granite Links Insulating Load-Bearing Masonry Building January 8, 2014

Chapter Meeting: Joint Meeting with Boston CSI and ICRI at Granite Links Insulating Load-Bearing Masonry Building January 8, 2014 Kohta Ueno January 8, 2014 Insulating Load-Bearing Masonry Buildings Overview ICRI/CSI-Insulating Load-bearing Masonry Buildings 2 Mass Walls (Rain Control) Moisture is absorbed/safely stored during rain

More information

Radon Vent Pipe System. Labeling Performance Indicators

Radon Vent Pipe System. Labeling Performance Indicators Section 6 Radon Vent Pipe Labeling Performance Indicators Radon Vent Pipe System Connected after sub-grade system installed Pipe cannot be trapped Provide space in chases Support at each floor level Discharge

More information

On Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866)

On Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866) TECHNICAL NOTE On Cold-Formed Steel Construction $5.00 Light Gauge Steel Engineers Association Washington, D.C. 20005 Toll Free (866) 465-4732 www.lgsea.com DESIGN OF BY-PASS SLIP CONNECTORS IN COLD-FORMED

More information

2 1. In cracked external corners place wooden planks across the crack and then support the planks with wooden members.

2 1. In cracked external corners place wooden planks across the crack and then support the planks with wooden members. MANUAL AND GUIDELINES FOR EMERGENCY SAFETY MEASURES IN EARTHQUAKE DAMAGED MASONRY AND HERITAGE BUILDINGS 1 In the earthquake there are two reasons for the development of defects in any building. a Due

More information

Home Inspection Report Report Number: For The Property Located On:

Home Inspection Report Report Number: For The Property Located On: Home Inspection Report Report Number: 416-129 For The Property Located On: Some Place Dr Prepared For Exclusive Use By: John and Jane Doe Report Prepared By: Adam Duncan; License No.: 3533 Inspector Signature:

More information

OREGON ROOF CONSULTING - ROOF INSPECTION FORM

OREGON ROOF CONSULTING - ROOF INSPECTION FORM Oregon CCB: 199121 PO Box 220190, Milwaukie, OR 97222 Washington License: OREGORC871MR OREGON ROOF CONSULTING - ROOF INSPECTION FORM General Roof Conditions: NA = Not Applicable Debris on Roof Physical

More information