1 I-1 GENERAL SECTION I ROADWORKS The Consultant Engineer is to monitor all specified asphalt, granular materials and sub-grade preparation to ensure all road and curb construction is undertaken as outlined in the criteria below. I-1.1 Road Composition The Geotechnical Consultant is to provide recommended road composition based on existing conditions and proposed road use. All granular composition, pavement design and roadworks installation must meet City of Markham minimum design thicknesses and testing requirements. Recycled Concrete Material shall be permitted in lieu of virgin granular A, B or crusher run limestone material, subject to meeting City of Markham Material Specification. The following is a typical minimum road composition; generally the Geotechnical Consultant will provide a site specific recommendation to be followed: Residential Top Asphalt HL3-40mm compacted thickness Base Asphalt HL8-75mm compacted thickness (one lift) Base 20mm diameter - 150mm compacted thickness Crusher Run Limestone or Granular A Sub-Base 50mm diameter - 300mm compacted thickness Crusher Run Limestone or Granular B Collector & Industrial Top Asphalt HL3-50mm compacted thickness Base Asphalt HL8-100mm compacted thickness (two lifts) Base 20mm - 150mm compacted thickness Crusher Run Limestone or Granular A Sub-Base 50mm - 450mm compacted thickness Crusher Run Limestone or Granular B I-2 PRIMARY ROADWORKS I-2.1 Pre-grade - Prior to Granular Import Prior to commencing with importing materials for roadworks, the Consultant Engineer is to check the grade sheets and layout to confirm the recommended road pre-grade elevations have been satisfied and the sub-grade is in suitable condition to be overlaid with road granular. Placement of granular prior to the City issuing approvals may result in complete removal of granular. Special conditions such as winter construction or construction in wet conditions may require full depth placement of granular material based on the recommendation of the Geotechnical Engineer and acceptance by the City. The following items should typically be taken into consideration prior to road granular import: All materials surrounding manholes have been compacted to sub-grade Sub-grade is graded and compacted to a 3% crossfall City of Markham Page 44 May 2015

2 Sub-grade is to extend 300mm beyond back of curb I Pre-grade Proof Roll For proof rolling use of 40,000kg gross mass vehicle with pneumatic tires. Non-standard proof rolling equipment will not be accepted. Proof roll to be conducted at road subgrade level. Make sufficient passes with proof vehicle to subject every point on surface to three separate passes of loaded tire. Where proof rolling reveals areas of defective subbase, remove defective (soft) subgrade materials to depth and extent as directed by Geotechnical Engineer and replace with new dry materials as approved by the Geotechnical Engineer and City of Markham. Replace subbase material and compact in accordance with this section. Finished subbase surface to be within 25 mm of elevation as indicated but not uniformly high or low. Maintain granular subbase in condition conforming to this section until succeeding base is constructed, or until granular subabse is accepted by the Geotechnical Engineer. The Consulting Engineer is to summarize the Proof Roll event in a Site Report form (see Appendix XIV Site Report), include the Geotechnical Consultant s report and issue this to the Developer, City of Markham, Contractor and Geotechnical Consultant. The locations and depths of any additional granular to be used or any areas to be sub-excavated are to be recorded by the Consulting Engineer and shown on as built drawings. Where extra depth of material is required, the Consulting Engineer is to ensure the subdrains are low enough (or adjusted) to drain these areas. I-2.2 Road Sub-base Road sub-base recommendations are to be provided by the Geotechnical Consultant based on site conditions and proposed uses and approved by the City as part of the engineering approval process. Road sub-base to be compacted to 100% SPD within 1 meter of finished road grade. In accordance with the City of Markham standards and OPSS 314 and in working closely with the Geotechnical Consultant, the following is to be adhered and monitored by the Consultant Engineer: Materials, depth and achieved compaction are per Geotechnical Consultant recommendations (on site and outlined in geotechnical report). City of Markham Page 45 May 2015

3 Material shall be placed without segregation in uniform layers such that the thickness of the compacted layer is not greater than 150mm, unless otherwise directed by the Geotechnical Consultant. Sub-base and base layers shall be bladed to a smooth surface in conformance to the required cross-section and maintained until placement of a subsequent layer, where applicable. I-2.3 Subdrains 150mm diameter rigid HDPE perforated subdrains with geotextile sock are set on both sides of the roadway to provide a path of least resistance for water to drain out of the road base and sub-base, to minimize water and frost damage. Subdrains to be installed at a uniform grade and alignment and connectors to the catchbasins. I Subdrain Installation Requirements The following is to be adhered and monitored by the Consultant Engineer, including reference to City of Markham road cross sections MR- 1to MR-13: Subdrains are to be 150mm diameter rigid HDPE perforated pipe enclosed by a perforated geotextile sock placed continuously between catchbasins below the subbase. Subdrain pipe is to be laid at a continuous grade with no settlements in the pipe. 20mm diameter clear stone or HL6 stone backfill is to be used around all subdrains, unless otherwise specified by the Geotechnical Engineer and approved by the City of Markham. The invert of the subdrain is to be higher than obvert of the catchbasin lead to the mainline sewer to ensure adequate drainage. Where utility road crossing (hydro, gas, etc.) have been installed after the roadworks, specific attention must be made to ensure the road sub-drain has not been damaged and that it will continue to drain. I-2.4 Road Base Road base recommendations are to be provided by the Geotechnical Consultant based on site conditions and proposed uses and approved by the City prior to import. The following is to be adhered and monitored by the Consultant Engineer during road base construction: Materials, depth and achieved compaction are per Geotechnical Consultant recommendations (on site and outlined in geotechnical report). Material shall be kept free from clay and other types of deleterious material. City of Markham Page 46 May 2015

4 Material shall be placed without segregation in uniform layers such that the thickness of the compacted layer is not greater than 150mm, unless otherwise directed by the Geotechnical Consultant. The granular base shall be maintained to grade and cross-section and to the specified compaction until the surface is paved. Prior to closing down operations for the completion of each day s work, the sub-base material shall be bladed and compacted. Granular road base materials to be compacted to 100% SPD. I-2.5 Base Curb Prior to the Contractor pouring base curb, the Consulting Engineer is to ensure the following: The vertical and horizontal placement of the stringline prior to base curb being poured has been verified by survey. The Geotechnical Consultant has reviewed the sub base material where the curb will be placed and confirmed adequate compaction has been achieved (i.e % SPD). Concrete mix designs have been provided by the Contractor and reviewed and approved by the Geotechnical Consultant and the City. Curb form to be per OPSD , , , or , as referenced on City approved drawings MR-14 and MR-15. Concrete shall confirm to OPSS 1350 and the following specific requirements: Class of Concrete 32 MPa at 28 days Coarse Aggregate 19.0 mm nominal maximum size Maximum Slump 60mm Air Content 6.0% ± 1.5% I-2.6 Base Asphalt HL8 (base asphalt) is to be placed no later in the year than December 1 or below temperatures of 2ºC as measured at the surface of the road. Ambient air temperatures during asphalt placement are to be 2ºC and rising. The Geotechnical Consultant is to abide by the City s listed testing requirements (see Section B-2.2 and K-3). On site inspections during asphalt placement works include testing for temperature, compacted thickness and degree of compaction. The Consulting Engineer is to ensure asphalt mix designs have been provided by the Contractor to the Geotechnical Consultant and reviewed and approved prior to placement. I Pre-Base Asphalt Inspection Prior to base asphalt being laid, the Consulting Engineer is to coordinate a Proof Roll inspection of the road base material with the Contractor, Geotechnical Consultant and City Inspector. The City of Markham Page 47 May 2015

5 Consulting Engineer is to ensure the road base materials have been previously tested by the Geotechnical Consultant have met material quality (including material type and moisture content) and compaction requirements. Prior to asphalt works, the Consultant Engineer is to undertake an on site inspection with the Contractor, Geotechnical Consultant and City of Markham ensuring the following is complete: Sewer videos have been reviewed and all deficiencies reported have been rectified and re-video recorded. All manholes and catchbasins are to be set 5 to 10mm below the base asphalt elevation. Asphalt ramping of asphalt to meet these structures is not permitted. The correct lid has been placed on the manhole (i.e. sanitary, storm or FDC). I Base Asphalt Inspections During asphalt works, the Consultant Engineer is to ensure the Contractor completing the work undertakes the following: Temporary asphalt curbs are to be placed behind each catchbasin. Asphalt thicknesses and temperatures are achieved per Geotechnical Consultant recommendations as approved by City of Markham. Asphalt maintains a minimum 2% fall at all locations. Asphalt is smooth and free of depressions. The maximum length of an asphalt cold joint is 180m or a minimum asphalt temperature of 85ºC. Tack coat to be placed where asphalt abuts curb, against all cold asphalt joints, manholes, structures, etc. I-3 UTILITY COORDINATION In conjunction with primary roadworks the Consulting Engineer is to ensure that a utility coordination meeting is held with a representative from the following parties: road works contractor, City of Markham, Developer, Gas, Cable TV, Telephone, Markham District Energy and Hydro utilities. As part of utility coordination the following items should be considered: Review the utility schedule to ensure this coincides with the overall roadworks schedule and timing of all utilities. Ensure that all utility design approvals are in place and that all parties show their utilities correctly on the City approved Composite Utility Plans. City of Markham Page 48 May 2015

6 A site inspection is to be coordinated by the Consultant Engineer with the Developer and Electrical/Utility Contractor before and following installation to ensure all underground servicing and roadworks have not be damaged due to utility construction. These site inspections are to be documented by the Consultant Engineer in the Site Visit Report (Appendix XIV). I-4 SECONDARY ROADWORKS I-4.1 Base Curb Inspections Base Curb inspections are completed to ensure a quality foundation is in place for the placement of top curb. Generally, any settling, grading, damaged stirrups or foundation issues will be dealt with before top curb is poured. See Appendix XVII Inspection Guidelines for Rectification Requirements for criteria to be referenced during base curb inspections. The Consulting Engineer is to coordinate base curb inspections with the Contractor, Consultant and City Inspector. The Consulting Engineer should document any base curb deficiencies including the length and location (street name and station) of curb to be removed and replaced (where cracked or missing sections), locations requiring saw cuts and areas where stirrups are to be replaced in accordance with Appendix XV Base Curb Inspection Report. Subsequent inspections are to be coordinated and undertaken if repairs to the base curb are required. Once all deficiencies have been rectified if any noted, a final inspection will be completed to approve the base curb foundation prior to top curb being poured. All base curb replacement sections shall be formed and constructed with a key and stirrups. I-4.2 Top Curb Prior to the Contractor pouring top curb, the Consulting Engineer is to ensure concrete mix designs have been reviewed and approved by the Geotechnical Consultant and the City. During preparations for top curb temporary asphalt fillers are removed from behind catchbasins and replaced with the top curb concrete. Prior to the Contractor pouring top curb, per City recommendations and OPSS 353 the Consulting Engineer is to ensure the following: Concrete mix designs have been provided by the Contractor and reviewed by the Geotechnical Consultant. Curb form to be per OPSD , , , or , as referenced on City approved drawings. Concrete shall confirm to OPSS 1350 and the following specific requirements: Class of Concrete 32 MPa at 28 days Coarse Aggregate 19.0 mm nominal maximum size Maximum Slump 60mm Air Content 6% ± 1.5% All base curb shall be thoroughly cleaned prior to placement of top curb works. City of Markham Page 49 May 2015

7 One stage curb shall be installed adjacent to all school and park blocks prior to base asphalt placement. I-4.3 Concrete Sidewalk and Multi-Use Pathway The Consultant Engineer is to monitor all preparations, formworks and materials and ensure the outlined criteria below is adhered during construction of sidewalks. Concrete sidewalks are to be installed in accordance with the City standard MR-20 through MR-24. The work required for concrete sidewalk shall include earthwork, 50mm (minimum) granular A base, compaction, preparation work, form work, utility adjustment and isolation, concrete placing and finishing, jointing, curing and protection. A plastic membrane shall be laid over the subgrade, prior to placing concrete. I Sidewalk Materials Concrete shall confirm to OPSS 1350 and the following specific requirements: Class of Concrete 30 Mpa at 28 days Coarse Aggregate 19.0 mm nominal maximum size Air Content 6% ± 1.5% Maximum Slump 50 ± 20mm Expansion joints shall be filled with bituminous fiberboard material having a minimum of 12mm thickness and conform to Type A material in OPSS Material used for sidewalk granular base shall conform to OPSS Curing compound shall conform to OPSS I Joints Per OPSS 351, longitudinal and transverse joints shall be constructed of the type, and at the locations, specified in the Contract. The concrete adjacent to all formwork and joints shall be finished with a tool that produces a 5mm rounded edge and a smooth, horizontal surface with a maximum width of 50mm. Dummy joints shall be hand formed using a 5mm radius dummy joint tool (refer to City standard MR-20 and MR-21). Contraction joints shall be placed at every third dummy joint and shall be sawcut or formed to a depth which is 0.25 of the sidewalk thickness. Expansion joints shall be constructed to the full depth of the slab. Expansion joints shall be filled with expansion joint material and shall be clean and dry at the time of construction. These joints shall be constructed where the sidewalk abuts a rigid object or changes direction. City of Markham Page 50 May 2015

8 I Sidewalk Installation Requirements City of Markham standard MR-20 through MR-24 and the following are to be adhered and monitored by the Consultant Engineer: During sidewalk construction, the Consultant Engineer is to ensure the following: Concrete mix designs have been provided by the Contractor to the Geotechnical Consultant and reviewed and approved prior to use. Sidewalk forms are per City approved design drawings and OPSS 919. Proper bedding including a plastic barrier has been placed prior to concrete being poured. Sidewalk maintains a minimum 2% fall (maximum 4%) at all locations. Sidewalk ramps do not exceed a maximum slope of 5%. Geotechnical Consultant is on site and testing is completed for every 100 cubic meters of concrete. Minimum of one set of tests for each day. All sidewalk repair or replacement sections shall include the immediate restoration of the boulevard including the placement and watering of sod and asphalt replacement as required. I-4.4 Top Asphalt The Consulting Engineer is to ensure the roads and infrastructure is prepared prior to the scheduled date of top asphalt, including all base asphalt and curb repairs. Base asphalt and curb shall be thoroughly cleaned prior to placement of top asphalt and curb. Base asphalt has been inspected and manholes and catchbasins adjusted to match the proposed finished asphalt elevations. HL3 (top asphalt) is not to be placed later in the year than November 14 or below ambient air temperatures of 7ºC as measured at the surface of the road. The Consulting Engineer is to ensure asphalt mix designs have been provided by the Contractor to the Geotechnical Consultant and reviewed and approved prior to use. The Geotechnical Consultant is to abide by the City s listed testing requirements (see Section B- 2.2 and K-3). On site inspections during asphalt laying works shall include but not limited to testing for temperature, asphalt material content and compacted thickness and compaction. I Base Asphalt Inspections Base Asphalt inspections are completed to ensure a quality base is in place for the placement of top asphalt. Any settling, grading, or base issues will be preemptively dealt with before top asphalt is placed. The Consulting Engineer is to coordinate base asphalt inspections with the Contractor, Geotechnical Engineer and City Inspector. The Consulting Engineer must also City of Markham Page 51 May 2015

9 prepare a Site Report (see Appendix XIV Site Report) tracking the inspection noting any base asphalt deficiencies including the length and location (street name and station) of base asphalt to be ground or removed and replaced where cracked or otherwise damaged. Subsequent inspections are to be coordinated and undertaken if repairs to the base asphalt are required. Once all deficiencies have been rectified if any noted, a final inspection will be completed by the Consulting Engineer, Geotechnical Engineer, Contractor and City Inspector to approve the base conditions prior to placement of top asphalt. I Tack Coat Material Immediately prior to top asphalt being laid a tack coat layer is to be placed. Per City of Markham standards and OPSS 310, the tack coat shall consist of SS-1 emulsified asphalt diluted with an equal volume of water. This material is to coat the surface of the base asphalt, curbs and manholes which will aid in the top asphalt binding to all surfaces. I Top Asphalt Installation Requirements During asphalt works, the Consulting Engineer is to ensure the Contractor completing the work undertakes the following: Asphalt is to be mixed and compacted per OPSS 310 and confirmed by the Geotechnical Consultant. Asphalt thicknesses and temperatures are achieved per the approved design and Geotechnical Consultant recommendations as approved by City of Markham. Asphalt maintains a minimum 2% fall at all locations. Asphalt is smooth and free of depressions. The maximum length of an asphalt cold joint is 180m or a minimum asphalt temperature of 85ºC. I-5 ROADWAY RESTORATION The Consulting Engineer is to ensure any disturbed unpaved road surfaces are prepared to the required grades and density ready for a subsequent cover of granular or surfacing courses. Per OPSS 301, restoring roadway surfaces shall consist of the following: a) The scarification (uniform loosening to remove damaged areas) of the existing surface to a depth not less than 75mm, but sufficient to remove potholes. b) Restoring or reshaping the scarified material. c) Compacting of the scarified materials according to OPSS 501. d) Ensuring the finished surface is within tolerance by checking the accuracy with the cross section. City of Markham Page 52 May 2015

10 The Contractor is responsible to maintain the scarified surface to the profile, cross-section, and density until the project is accepted or if applicable, until any subsequent granular or surfacing course is completed. Unsuitable material encountered during restoring operations shall be removed to a depth not less than 150mm and replaced by acceptable granular material. I-6 DRIVEWAY RESTORATION Throughout construction works, access to driveways must be maintained unless otherwise arranged. Per OPSS 311 and the City of Markham, the Consultant Engineer is to ensure the following is to be adhered and monitored: The hot mix asphalt shall be placed on the prepared base to the line, grade, dimensions, and thickness outlined in the City approved engineering design. The prepared base shall be dry, well compacted, and approved by the Geotechnical Consultant. Hot mix asphalt shall not be placed unless the surface is dry and the air temperature is at least 7ºC and rising. Asphalt shall not be dumped faster than it can be properly raked, screeded and compacted. Areas inaccessible to a roller shall be compacted with hand operated hot tampers. The sidewalks, driveways, and boulevards and the resurfaced sidewalks shall not be opened to pedestrians or vehicles until the mix has cooled sufficiently to prevent deformation. Forms or other approved means shall be used to obtain proper line and neat uniform edges. I-7 ROAD SETTLEMENT If in the opinion of the City, settlement has occurred at the base course or top course of asphalt levels, a road review will be required to determine the structural integrity of the road. The cost of any additional testing or analysis by a Geotechnical Engineer will be borne by the Developer. A review of the condition of the roads determines whether the maintenance period of the road should be extended or if reconstruction is required. I-8 PAVEMENT MARKING All pavement markings as shown on the approved engineering drawings including but not limited to center line, stop bars, pedestrian crossings, bicycle lanes and parking spaces shall be installed upon the completion of base asphalt and again upon completion of top course asphalt. The pavement markings on base asphalt shall be painted with two coats including glass reflective beads. Durable rubberized pavement markings shall be used on top asphalt. At the discretion of the City, the pavement markings shall be repainted/refreshed as required prior to final assumption of the development. Pavement markings shall be in accordance with OPSS 1715 & 1716, see Appendix XXIX. City of Markham Page 53 May 2015

11 Line painting shall be as per OPSS 1712: Material Specification for Organic Solvent Based Traffic Paint. As well as OPSS : Material Specification for Traffic Paint Reflectorizing Glass Beads. I-9 SECTION I SUMMARY CHECKLIST Consultant Engineer is to collect all grade sheets, review and survey site to ensure specified asphalt and granular materials are placed per the approved drawings. Geotechnical Consultant is on site as required based on the construction schedule. Proof roll review and inspection test is coordinated with the Contractor, Developer, Geotechnical Consultant and the City for the pre-grade prior to the placement of granular. Road sub-base and base are placed as per the City Requirements outlined in Sections I- 3.2 and I-3.4. Base curb mix design is approved and Contractor string line is verified. Proof roll review and inspection test is coordinated with the Contractor, Developer, Geotechnical Consultant and the City for the road base prior to the placement of base asphalt. Base asphalt mix design is approved and inspections are completed. Base asphalt is placed per the specified conditions outlined in Section I-3.6. Base curb inspections are completed as per Appendix XV Base Curb Inspection Report and deficiencies have been rectified. Top asphalt mix design is approved and base asphalt inspections/proof roll are completed as per Section I-4.4. Consultant Engineer is to coordinate and carry out inspections related to roadworks, top curbs, sidewalks, top asphalt, boulevard grading and sodding for Acceptance for Maintenance and Final Assumption. City of Markham Page 54 May 2015

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3 CITY OF TORONTO TS 3.70 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS 3.70.01 SCOPE...3 TS

More information

Allen & Sherriff Architects, Inc Yonge Street, S202, Richmond Hill, Ontario L4C 5K9 Tel: Fax: File Ref.

Allen & Sherriff Architects, Inc Yonge Street, S202, Richmond Hill, Ontario L4C 5K9 Tel: Fax: File Ref. Allen & Sherriff Architects, Inc. 10350 Yonge Street, S202, Richmond Hill, Ontario L4C 5K9 Tel: 905-884-1117 Fax: 905-884-4970 File Ref. 4166 Tender No.: T18-21 St. Theresa C.S. Child Care Expansion Durham

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 351 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK TABLE OF CONTENTS 351.01 SCOPE 351.02 REFERENCES 351.03 DEFINITIONS 351.04 DESIGN

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 353 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS

More information

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects 2.0 ROADWAYS 2.1 Road Classification 2.1.1 Standard Drawing Classification All Road Widths and Road Allowances shall be designed in accordance with the most recent Town of New Tecumseth Standards: TNT.SD

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 353 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS

CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS CITY OF TORONTO STANDARD CONSTRUCTION SPECIFICATIONS FOR ROADS TS 3.80 November 2010 CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS INDEX TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS 3.80.03

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 350 MARCH 1998 CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE 350.01 SCOPE 350.02 REFERENCES 350.03 DEFINITIONS TABLE OF CONTENTS

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 353 NOVEMBER 2016 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS

More information

City of Regina Standard Construction Specification SECTION 2350 PLACEMENT OF ASPHALTIC CONCRETE SURFACE 1.0 GENERAL. 1.1 Scope

City of Regina Standard Construction Specification SECTION 2350 PLACEMENT OF ASPHALTIC CONCRETE SURFACE 1.0 GENERAL. 1.1 Scope 1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 The work shall consist of placing asphaltic concrete to a compacted thickness conforming to the lines, grades, and cross-sections as shown on the plan or as designated

More information

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS SECTION 32 16 13 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required

More information

CONSTRUCTION SPECIFICATION FOR KEYHOLE EXCAVATION AND PERMANENT REINSTATEMENT OF KEYHOLE CORES TABLE OF CONTENTS

CONSTRUCTION SPECIFICATION FOR KEYHOLE EXCAVATION AND PERMANENT REINSTATEMENT OF KEYHOLE CORES TABLE OF CONTENTS CITY OF TORONTO TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS TS 4.70 November 2007 CONSTRUCTION SPECIFICATION FOR KEYHOLE EXCAVATION AND PERMANENT REINSTATEMENT OF KEYHOLE CORES TABLE OF

More information

SECTION ASPHALT PAVING

SECTION ASPHALT PAVING SECTION 02500 ASPHALT PAVING PART 1 GENERAL 1.1 RELATED DOCUMENTS a) Drawings and general provisions of the Contract, including the General and Supplementary General Conditions and Division 00 & 01 specification

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS

CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 553 FEBRUARY 1991 CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS 553.01 SCOPE 553.02 REFERENCES 553.03 DEFINITIONS TABLE OF CONTENTS 553.04 SUBMISSION

More information

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The Work of this Section shall be all labour, materials, equipment and supervision necessary

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3 CITY OF TORONTO TS 3.65 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS 3.65.01 SCOPE...3 TS 3.65.02 TS 3.65.03 REFERENCES...3

More information

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving. SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.

More information

THE REGIONAL MUNICIPALITY OF PEEL BASIS OF PAYMENT FOR RESTORATION

THE REGIONAL MUNICIPALITY OF PEEL BASIS OF PAYMENT FOR RESTORATION THE REGIONAL MUNICIPALITY OF PEEL BASIS OF PAYMENT FOR RESTORATION INDEX Page PR.1 ASPHALT RESTORATION... 1 PR.2 SODDING AND SEEDING... 2 PR.3 COLD MIX... 3 PR.4 COLD PLANING... 4 PR.5 SAWCUT EXISTING

More information

Construction Specification for Concrete Unit Pavers

Construction Specification for Concrete Unit Pavers Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS

More information

SECTION ASPHALT PAVING AND SURFACING

SECTION ASPHALT PAVING AND SURFACING SECTION 02500 ASPHALT PAVING AND SURFACING PART 1 - GENERAL 1.01 WORK INCLUDED A. Traffic control as required to divert vehicular and pedestrian traffic around construction. B. Spreading and compacting

More information

THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION

THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION Standard Specifications for Restoration INDEX PAGE R.1 GENERAL...1 R.2 SCOPE...1 R.3 MATERIALS...1 R.4 CONSTRUCTION...2 R.4.1 General...2

More information

ROAD PAVEMENTS GENERAL

ROAD PAVEMENTS GENERAL ROAD PAVEMENTS GENERAL Contents Clause Title Page 701 Pavement Construction... 2 702 Horizontal Alignments, Surface Levels and Surface Regularity of Pavement Courses... 2 703 Not Used... 4 704 Not Used...

More information

Special Provision No. 405F03 March 2005

Special Provision No. 405F03 March 2005 PIPE SUBDRAINS - Item No. VIDEO CAMERA INSPECTION Item No. Special Provision No. 405F03 March 2005 OPSS 405, February 1990, Construction Specification for Pipe Subdrains is deleted in its entirety and

More information

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING AFTER NOVEMBER 1, 2008 ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING 252.1 Description. This work shall consist of a stabilized base course composed of a mixture of the existing bituminous

More information

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL This section covers the restoration of roadways and sidewalks, in whole or in part, with bituminous concrete paving. WITHIN 4 DAYS OF BACKFILLING IN AREAS

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 321216 - ASPHALT PAVING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

CITY OF LETHBRIDGE SECTION Construction Specifications Page 1 of 7 BACKFILL REGULATIONS FOR PUBLIC RIGHT-OF-WAYS

CITY OF LETHBRIDGE SECTION Construction Specifications Page 1 of 7 BACKFILL REGULATIONS FOR PUBLIC RIGHT-OF-WAYS Construction Specifications Page 1 of 7 1. GENERAL 1.1 The following specifications apply to compaction of all water, sewer and shallow utility service cuts, repairs, replacements, mainbreaks, extensions,

More information

INDEX DESCRIPTION MATERIALS APPROVAL FOR BASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6

INDEX DESCRIPTION MATERIALS APPROVAL FOR BASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6 03005_Jan31_2018.pdf Page 1 of 6 INDEX Page 03005-1 DESCRIPTION 2 03005-2 MATERIALS 2 03005-3 APPROVAL FOR BASE COURSE 3 03005-4 CONSTRUCTION 3 03005-5 MEASUREMENT 6 03005-6 PAYMENT 6 03005_Jan31_2018.pdf

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related

More information

DIVISION 4.3 CITY OF SARNIA CONCRETE SIDEWALKS, CURBS AND DRIVEWAYS STANDARDS 2018

DIVISION 4.3 CITY OF SARNIA CONCRETE SIDEWALKS, CURBS AND DRIVEWAYS STANDARDS 2018 DIVISION 4.3 CITY OF SARNIA CONCRETE SIDEWALKS, CURBS AND DRIVEWAYS STANDARDS 2018 1 CONCRETE MATERIALS, CONSTRUCTION METHODS AND TESTING PROCEDURES A. MATERIALS... 3 1. CONCRETE FOR SIDEWALK AND CURBS

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

Special Provision No. 399F01 December 2014

Special Provision No. 399F01 December 2014 FULL DEPTH CRACK REPAIRS Item No. Special Provision No. 399F01 December 2014 1.0 SCOPE This Special Provision covers the requirements for full depth crack repairs in asphaltic concrete pavements. 2.0 REFERENCES

More information

SECTION FLEXIBLE PAVING

SECTION FLEXIBLE PAVING SECTION 321200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Include GENERAL CONDITIONS and applicable parts of Division 1 as part of this Section. B. Examine all Drawings and other Sections of the Specifications

More information

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements. SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction

More information

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS The City of Blue Springs hereby adopts Section 2200 of the Kansas City Metropolitan Chapter of APWA Construction and Material

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS Section SECTION 39 - MANHOLES TABLE OF CONTENTS Page 39-1 GENERAL... 39.1 39-2 CONCRETE MANHOLES... 39.1 39-2.01 NOT USED... 39.1 39-2.02 Concrete Storm Drain Manholes... 39.1 39-3 SADDLE SEWER MANHOLES...

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING

CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 314 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR UNTREATED SUBBASE, BASE, SURFACE, SHOULDER, SELECTED SUBGRADE, AND STOCKPILING TABLE OF CONTENTS

More information

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 314 DECEMBER 1993 CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR, SUBBASE, BASE, SURFACE SHOULDER AND STOCKPILING 314.01 SCOPE 314.02 REFERENCES

More information

Construction Specification for Concrete Curb and Concrete Curb and Gutter

Construction Specification for Concrete Curb and Concrete Curb and Gutter Engineering & Construction Services Division Standard Specifications for Road Works TS 3.50 September 2017 for Concrete Curb and Table of Contents TS 3.50.01 SCOPE... 3 TS 3.50.02 REFERENCES... 3 TS 3.50.03

More information

Please ensure receipt of this Addendum is acknowledged on page 1 of the Form of Tender.

Please ensure receipt of this Addendum is acknowledged on page 1 of the Form of Tender. No. 1 Project: 47th Ave Road Reconstruction Owner: District of Chetwynd Date: March 5, 2019 Ref. No.: 1320.0095.01 This Addendum is issued prior to Tender Closing Date, in accordance with the Tender Documents

More information

SECTION CONCRETE PAVING

SECTION CONCRETE PAVING PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 32 13 13 CONCRETE PAVING A. Extent of concrete curbs, walks, and paving as show on drawings B. Earthwork and prepared sub-base C. Concrete and related materials

More information

KU Medical Center 2018 PAVEMENT RESTORATION PROJECT Project No May 4, 2018

KU Medical Center 2018 PAVEMENT RESTORATION PROJECT Project No May 4, 2018 SECTION 321216 - ASPHALT PAVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Requirements of the Contract apply to this Section. 1.2 SUMMARY A. Section Includes: 1. Cold milling of existing

More information

Select Subgrade Material, Compacted

Select Subgrade Material, Compacted 314.1 GENERAL B314 SHOULDER, SELECTED SUBGRADE, AND STOCKPILING OPSS.PROV 314 Granular materials meeting the requirements of OPSS.PROV 1010 are obtained from pits and quarries, and recycled materials.

More information

DISTRICT OF HOPE SUPPLEMENTARY SPECIFICATIONS

DISTRICT OF HOPE SUPPLEMENTARY SPECIFICATIONS DISTRICT OF HOPE SUPPLEMENTARY SPECIFICATIONS SUPPLEMENTARY CONSTRUCTION SPECIFICATIONS The District of Hope has adopted the Master Municipal Construction Document and Standard Detail Drawings, printed

More information

DIVISION 2100 SITEWORK

DIVISION 2100 SITEWORK DIVISION 2100 SITEWORK SECTION 2120 STABILIZED SUBGRADE PART 1 - GENERAL 1.01 SCOPE This section covers the preparation of subgrade for pavement, sidewalks, recreational trails, and drive approaches. 1.02

More information

APPENDIX "B" ASPHALT CONCRETE PAVEMENT FOR STREET AND DRIVEWAY CONSTRUCTION

APPENDIX B ASPHALT CONCRETE PAVEMENT FOR STREET AND DRIVEWAY CONSTRUCTION APPENDIX "B" ASPHALT CONCRETE PAVEMENT FOR STREET AND DRIVEWAY CONSTRUCTION The work covered by these specifications consists of furnishing all labor, equipment and materials and in performing all operations

More information

TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984

TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984 1 TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION June 1984 1. DEFINITIONS APPROVAL, APPROVED, ACCEPTED OR WORDS OR TERMS OF SIMILAR MEANING: Written approval of the Highway Superintendent. BASE

More information

SECTION 503 TEMPORARY PAVEMENT RESTORATION

SECTION 503 TEMPORARY PAVEMENT RESTORATION SECTION 503 TEMPORARY PAVEMENT RESTORATION 503-1 DESCRIPTION: This work consists of furnishing, placing, compacting, and maintaining a temporary pavement surface suitable for driving in accordance with

More information

Construction Specification for Utility Adjustments

Construction Specification for Utility Adjustments Engineering & Construction Services Division Standard Specifications for Road Works TS 4.50 September 2017 for Utility Adjustments Table of Contents TS 4.50.01 SCOPE... 2 TS 4.50.02 REFERENCES... 2 TS

More information

Construction Specification for Keyhole Excavation and Reinstatement of Keyhole Cores

Construction Specification for Keyhole Excavation and Reinstatement of Keyhole Cores Engineering & Construction Services Division Standard Specifications for Road Works TS 4.70 September 2017 for Keyhole Excavation and Reinstatement of Keyhole Cores Table of Contents TS 4.70.01 SCOPE...

More information

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR SUBBASE, BASE, SURFACE, SHOULDER, AND STOCKPILING

CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR SUBBASE, BASE, SURFACE, SHOULDER, AND STOCKPILING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 314 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR UNTREATED GRANULAR SUBBASE, BASE, SURFACE, SHOULDER, AND STOCKPILING TABLE OF CONTENTS 314.01 SCOPE

More information

Construction Specification for Keyhole Excavation and Permanent Reinstatement of Keyhole Cores

Construction Specification for Keyhole Excavation and Permanent Reinstatement of Keyhole Cores Engineering & Construction Services Division Standard Specifications for Road Works TS 4.70 April 2014 for Keyhole Excavation and Permanent Reinstatement of Keyhole Cores Table of Contents TS 4.70.01 SCOPE...

More information

Construction Specification for Keyhole Excavation and Permanent Reinstatement of Keyhole Cores

Construction Specification for Keyhole Excavation and Permanent Reinstatement of Keyhole Cores Engineering & Construction Services Division Standard Specifications for Road Works TS 4.70 April 2018 for Keyhole Excavation and Permanent Reinstatement of Keyhole Cores Table of Contents TS 4.70.01 SCOPE...

More information

Construction Specification for Keyhole Excavation and Temporary Reinstatement of Keyhole Cores

Construction Specification for Keyhole Excavation and Temporary Reinstatement of Keyhole Cores Engineering & Construction Services Division Standard Specifications for Road Works TS 4.70 April 2016 for Keyhole Excavation and Temporary Reinstatement of Keyhole Cores Table of Contents TS 4.70.01 SCOPE...

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE ROAD BASE

CONSTRUCTION SPECIFICATION FOR CONCRETE ROAD BASE CITY OF TORONTO STANDARD CONSTRUCTION SPECIFICATIONS FOR ROADS TS 3.40 November 2009 CONSTRUCTION SPECIFICATION FOR CONCRETE ROAD BASE INDEX TS 3.40.01 SCOPE... 3 TS 3.40.02 REFERENCES... 3 TS 3.40.03

More information

Revision No. 14. September Engineering & Construction Services Division Standard Specifications for Road Works. Revised/New (Insert) TS No.

Revision No. 14. September Engineering & Construction Services Division Standard Specifications for Road Works. Revised/New (Insert) TS No. Engineering & Construction Services Division Standard Specifications for Road Works Revision 14 September 2017 TS TS 1.00 Apr 2014 Sep 2017 TS 1.10 Apr 2014 Sep 2017 Construction Specification for Maintenance

More information

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5 Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5 1.0 EXCAVATION AND FILL 1.1 GENERAL.1 The excavation or fill shall be made to provide proper grade, lines and crosssection for the laying of

More information

CONSTRUCTION SPECIFICATION FOR PIPE SUBDRAINS

CONSTRUCTION SPECIFICATION FOR PIPE SUBDRAINS ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 405 NOVEMBER 2017 (Formerly OPSS 405, November 2008) Note: The MUNI implemented in November 2017 replaces OPSS 405 COMMON, November 2008 with no technical

More information

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 355 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS TABLE OF CONTENTS 355.01 SCOPE 355.02 REFERENCES

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

2.1.1 Concrete shall conform to Section Granular Material shall conform to: SIEVE DESIGNATION. Plasticity Index 0-6

2.1.1 Concrete shall conform to Section Granular Material shall conform to: SIEVE DESIGNATION. Plasticity Index 0-6 1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 Concrete sidewalk, sidewalk crossing, curb and gutter, rolled curb and gutter, monolithic walk, curb and gutter, concrete apron and structural sidewalk shall be

More information

SECTION BITUMINOUS CONCRETE PAVING

SECTION BITUMINOUS CONCRETE PAVING PART 1 GENERAL 1.1 SECTION INCLUDES: SECTION 02400 BITUMINOUS CONCRETE PAVING A. The intent of this specification section is to provide requirements for materials, equipment, and methods for constructing

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

CONSTRUCTION SPECIFICATION FOR PIPE SUBDRAINS

CONSTRUCTION SPECIFICATION FOR PIPE SUBDRAINS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 405 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR PIPE SUBDRAINS TABLE OF CONTENTS 405.01 SCOPE 405.02 REFERENCES 405.03 DEFINITIONS 405.04 DESIGN AND

More information

Overlay Applications. Overlays and Asphaltic Surfaces. Base Conditions. Subgrade. Existing PCC Pavement. Base Course 7/6/2010

Overlay Applications. Overlays and Asphaltic Surfaces. Base Conditions. Subgrade. Existing PCC Pavement. Base Course 7/6/2010 Overlay Applications Repair of existing surface Overlays and Asphaltic Surfaces Milling WisDOT/WAPA Asphalt Pavement Project Manager Training Rubblization June 2010 Base Conditions Mixtures to be placed

More information

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PORTLAND CEMENT. Section PORTLAND CEMENT STABILIZED SUBGRADE

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PORTLAND CEMENT. Section PORTLAND CEMENT STABILIZED SUBGRADE PART 1 GENERAL 1.01 SUMMARY Section 02338 PORTLAND CEMENT This Section includes foundation course of Portland cement stabilized natural subgrade material. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1.

More information

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway. Last Revision by CO Special Provisions: 09/14/18 Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2018-143 ((2360) PLANT MIXED ASPHALT PAVEMENT (MSCR)) when using this writeup.

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLING

CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 333 NOVEMBER 2003 CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLING TABLE OF CONTENTS 333.01 SCOPE 333.02 REFERENCES 333.03 DEFINITIONS 333.04

More information

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL January 2000 Page 1 of 10 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 APPROVALS PART 2 PRODUCTS 2.01 CEMENT 2.02 WATER The General Conditions of the Contract,

More information

SPECIAL SPECIFICATION 3157 Cold Processed - Recycled Paving Material (RPM) for Use as Aggregate Base Course

SPECIAL SPECIFICATION 3157 Cold Processed - Recycled Paving Material (RPM) for Use as Aggregate Base Course 1993 Specifications SPECIAL SPECIFICATION 3157 Cold Processed - Recycled Paving Material (RPM) for Use as Aggregate Base Course 1. Description. This Item, Cold Processed - Recycled Paving Material (RPM),

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

Construction Specification for Concrete Bus Pad

Construction Specification for Concrete Bus Pad Engineering & Construction Services Division Standard Specifications for Road Works TS 3.41 June 2017 for Concrete Bus Pad Table of Contents SCOPE... 3 REFERENCES... 3 DEFINITIONS... 3 DESIGN AND SUBMISSION

More information

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 401 NOVEMBER 2015 (Formerly OPSS 401, November 2013) CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 401.01

More information

Revision No. 8. April Engineering and Construction Services Division Standard Specifications for Road Works. TS No. All TS specifications

Revision No. 8. April Engineering and Construction Services Division Standard Specifications for Road Works. TS No. All TS specifications Engineering and Construction Services Division Standard Specifications for Road Works Revision 8 April 2014 All specifications 1.00 Mar 2012 Apr 2014 1.10 Nov 2009 Apr 2014 1.20 Jun 2001 Apr 2014 The style

More information

SECTION 8 CURBS, SIDEWALKS AND WALKWAYS CONTENTS

SECTION 8 CURBS, SIDEWALKS AND WALKWAYS CONTENTS CONTENTS DESIGN CRITERIA SECTION NO. Scope 8.00 Right-of-Way and Pavement Widths 8.01 Curbs - General 8.02 Walkway Vehicle Barricades 8.03 Driveway and Lane Crossings 8.04 Standard Longitudinal Grade 8.05

More information

SECTION BITUMINOUS CONCRETE PAVEMENT

SECTION BITUMINOUS CONCRETE PAVEMENT SECTION 321216 BITUMINOUS CONCRETE PAVEMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Installation Guidelines

Installation Guidelines 815 NE 172 nd Avenue Vancouver, WA 98684 877-694-0141 Installation Guidelines Installation steps include job planning, layout, excavating and preparing the soil subgrade, applying geotextiles (optional),

More information

SECTION PORTLAND CEMENT CONCRETE

SECTION PORTLAND CEMENT CONCRETE PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including the supplemental documents as indicated in the Site Work General Provisions, apply to work of this

More information

Protect Your Pavement Asset Like the Rest! Is Pavement on your Radar Screen? Parking Lots & Low Volume Facilities

Protect Your Pavement Asset Like the Rest! Is Pavement on your Radar Screen? Parking Lots & Low Volume Facilities Pavement Rocky Mountain Asphalt Conference & Equipment Show Managing Parking Lot Pavements Preventive Maintenance and Rehabilitation Options Landscaping Roofing February 18, 2009 Denver, CO Presented by:

More information

CONSTRUCTION SPECIFICATION FOR OPEN GRADED DRAINAGE LAYER

CONSTRUCTION SPECIFICATION FOR OPEN GRADED DRAINAGE LAYER ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 320 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR OPEN GRADED DRAINAGE LAYER TABLE OF CONTENTS 320.01 SCOPE 320.02 REFERENCES 320.03 DEFINITIONS 320.04

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section CEMENT STABILIZED BASE COURSE. 1. Foundation course of cement stabilized crushed stone.

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section CEMENT STABILIZED BASE COURSE. 1. Foundation course of cement stabilized crushed stone. PART 1 GENERAL 1.01 SUMMARY A. This section includes: Section 02712 1. Foundation course of cement stabilized crushed stone. 2. Foundation course of cement stabilized bank run gravel. 1.02 MEASUREMENT

More information

SECTION RIGID PAVEMENT

SECTION RIGID PAVEMENT SECTION 02750 PART 1 GENERAL RIGID PAVEMENT 1.1 SUMMARY A. Section Includes: 1. Concrete sidewalks. 2. Concrete stair steps. 3. Concrete integral curbs gutters. 4. Concrete parking areas and roads. B.

More information

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates. SECTION 32 14 23 ASPHALT UNIT PAVING PART 1 GENERAL 1.1 DESCRIPTION Work Included: All labor, materials, appliances, tools, equipment, facilities, transportation, and services for and incidental to performing

More information

CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLED MIX

CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLED MIX ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 333 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR COLD IN-PLACE RECYCLED MIX TABLE OF CONTENTS 333.01 SCOPE 333.02 REFERENCES 333.03 DEFINITIONS 333.04

More information

CONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

CONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01

More information

SECTION PAVING SLABS ON AN AGGREGATE BASE

SECTION PAVING SLABS ON AN AGGREGATE BASE SECTION 32 14 13.16 PAVING SLABS ON AN AGGREGATE BASE (1995 MasterFormat Section 02784) NOTE: This guide specification for the U.S. is for paving slabs on a sand bed over a compacted aggregate base for

More information

SECTION PAVING SLABS ON AN AGGREGATE BASE

SECTION PAVING SLABS ON AN AGGREGATE BASE SECTION 32 14 13.16 PAVING SLABS ON AN AGGREGATE BASE (1995 MasterFormat Section 02784) NOTE: This guide specification for the U.S. is for paving slabs on a sand bed over a compacted aggregate base for

More information

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas.

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas. SECTION 1300 - ASPHALTIC CONCRETE PAVEMENT 1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas. 1302 GENERAL. Pavement shall be constructed to the lines, grades,

More information

TOWN OF AJAX DESIGN CRITERIA SECTION B ROADWAYS

TOWN OF AJAX DESIGN CRITERIA SECTION B ROADWAYS TOWN OF AJAX DESIGN CRITERIA SECTION B ROADWAYS B1 B 1.00 B 1.01 CLASSIFICATIONS STREET CLASSIFICATION All roadways in new developments shall be classified according to the traffic volume expected and

More information

STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX

STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX Rev. 2016 STANDARD DETAIL SPECIFICATIONS FOR STREET CONSTRUCTION, WALKWAYS, AND PAVEMENT RESTORATION CITY OF EDEN PRAIRIE, MINNESOTA INDEX ARTICLE PAGE 1. Pavement Removal and Restoration... P-1 2. Street

More information

CITY OF WINDSOR STANDARD SPECIFICATIONS JULY 2012 S-31 KEYHOLE EXCAVATION TABLE OF CONTENTS

CITY OF WINDSOR STANDARD SPECIFICATIONS JULY 2012 S-31 KEYHOLE EXCAVATION TABLE OF CONTENTS TABLE OF CONTENTS 31.01. SCOPE OF WORK... 1 31.02. REFERENCES... 1 31.03. DEFENITIONS... 1 31.04. MATERIALS... 2 31.05. EQUIPMENT... 3 31.06. CONSTRUCTION... 4 31.07. QUALITY ASSURANCE... 6 31.08. MEASUREMENT

More information

Renfrew Victoria Hospital ASPHALT TACK COATS Section Professional Building Page 1 Albert Street

Renfrew Victoria Hospital ASPHALT TACK COATS Section Professional Building Page 1 Albert Street Renfrew Victoria Hospital ASPHALT TACK COATS Section 32 12 13.16 Professional Building Page 1 PART 1 - GENERAL 1.1 SECTION INCLUDES.1 Materials and application of asphalt tack coat to an existing asphalt

More information

BASE CONSTRUCTION MATERIALS A Aggregate

BASE CONSTRUCTION MATERIALS A Aggregate BASE CONSTRUCTION 2211 AGGREGATE BASE 2211.1 DESCRIPTION This work consists of placing aggregate base. 2211.2 MATERIALS A Aggregate... 3138 Provide the class of aggregate as required by the contract. 2211.3

More information