1 Page 1 \ 22 RCA Name Multiple leaks in new pipeline Report Number 2013-B105 Report Date 9/8/2013 RCA Owner Marcus McCoy Root Analysis Report Problem Statement Focal Point Multiple leaks in new HDPE pipeline When Start Date 6/3/2013 End Date 6/4/2013 Unique Timing Initial hydro testing of a new line during extremely hot weather Where Business Unit System Widget processing division Phoenix, AZ Process water treatment line Actual I mpact Revenue Customer Service Delayed startup-2 weeks $400, Repair of leaks and replacement of coupling gaskets $125, Customer upset due to delayed startup $0.00 Actual I mpact Total: $525, Frequency 1 times overall Potential I mpact Environmental Revenue Reportable spills $0.00 Lost future contracts $5,000, Clean up costs $100, Potential I mpact Total: $5,100, Report and chart generated by Sologic s link software.

2 Report Summaries Page 2 \ 22 Executive Summary After over three miles of high-density polymer pipeline was installed with over 800 couplings, the initial 25 PSI hydro testing resulted in percent of the couplings leaking. The couplings leaked because gaskets were damaged during installation and because the pipe sealing surfaces were improperly prepared. Gasket damage was caused by gasket misalignment because of improper lubrication being used to install the gaskets, among other problems. This problem resulted in a $525,000 profit reduction due to delaying startup by two weeks ($400,000) and increasing out-of-pocket costs by $125,000 for repairs. Our customer was also unhappy with the delays. Additional, potential impacts include reportable spills due to the leaks, possible loss of a $5M contract and $100,000 in clean up costs. include, but are not limited to, using a vegetable oil for gasket lubrication during installation; polishing the sealing areas of the pipe prior to installing gaskets; using a Sawzall with a fine tooth blade to cut pipe instead of a chainsaw; shading the installation surfaces on sunny, hot days; and incorporating the piping and coupling manufacturer's recommendations into the piping specifications. and Effect Summary The multiple piping leaks in the piping was caused by multiple leaks at the couplings. The couplings leaked because gaskets were pinched/damaged during installation and because the pipe sealing surfaces were improperly prepared. The pinched gaskets were caused by the gaskets not sliding into designated seating areas within the coupling. The gaskets did not slide adequately due to lack of lubrication which would have allowed the gaskets to seat properly when the coupling was tightened. The lubrication used during installation was a soapy water solution with an unknown ratio mix of water and soap. The ratio of soap and water is unknown because the installers did not track the amount of soap put in the water bottles, but it was stated that there was not much soap in the mixture. A soapy solution was recommended by the manufacturer, but considering this application in the hot, sunny desert climate, it was ineffective because the water evaporated too quickly. Aside from the gasket pinch, additional causes related to imperfections in the pipe surface area did not allow gaskets to form a seal. These imperfections include scratches, gouges, and abnormalities in the pipe s gasket surface area. Scratches were created mostly during pipe transfer from the storage/staging area to the installation area. The scratches came when the 50 foot pipe s ends dragged on the ground during transportation. The pipe is lifted from the center with a forklift, but the high-density polymer pipe is malleable (especially when heated from warm ambient temperature) and the flexibility of the pipe allows the ends to bend and touch the ground. While not in constant contact with the ground, the transportation path is not smooth, level, and flat so the ends come in contact with ground surface and rocks when moving into installation position. Most of the smaller imperfections were not addressed during the original installation (only the dramatic gouges were prepped or eliminated). The seemingly smaller surface area scratches and imperfections were not highlighted as an area of trouble during the onsite coupling training provided by the manufacturer, so installation technicians were not aware of which surface imperfections required attention and which imperfections were acceptable. The demonstration that the manufacturer's representatives provided during training included installation of a 3 coupling on 3 PVC pipe with no lubrication. Scratches, lubrication, and high-density polymer pipe were not addressed during this demonstration; however, it is noted that when asked if soapy water could provide sufficient lubrication for installation, the manufacturer's representatives confirmed that a soapy solution would be acceptable. It is important to note that the manufacturer was not part of this investigation, and evidence gathered is from the installer s statements, photos, and supporting documentation. The manufacturer did provide field installation

3 handbooks with additional installation instructions and recommendations, but these handbooks were not used during installation, as field personnel assumed the onsite training was sufficient enough to install the couplings. Other surface area imperfections were created from chainsaw cuts used to adjust the pipe length in between couplings. Occasionally, the 50-foot standard pipe length was not appropriate when navigating the plant area, so the pipe would have to be cut shorter for specific applications. These cuts are not factory cuts and thus introduce a surface area that may contain imperfections such as uneven cuts (out of square), chain marks on the end of the pipe, and excess material left from rough cuts. Lastly, the leaks were not detected until the pipeline construction was completed because no incremental hydro testing was performed during construction. Originally, the project manager assigned to this project had to leave shortly after bidding and project kick-off. Once construction began, a new highly-recommended project manager was assigned. While incremental pipe testing was discussed between the original project manager and the internal project engineer, the new project manager was not aware of the need and did not perform incremental testing. It is unknown why the new project manager did not perform in-construction hydro testing. The new project manager was unavailable for this investigation as he is no longer on this project. Page 3 \ 22

4 Page 4 \ 22 ID 1 Label Solution Description Use vegetable oil (or equiv) for gasket lubricant Soapy water used as gasket lubricant Ken Anderson Pass 9/9/2013 Status Completed Long $ Solution Develop task package (better documention) Thought onsite training by manufacturer was sufficient This will help determine how to perform the task and what QC will need to be done with each task. 9/24/2013 Status Identified Long Pass 3 Solution Implement installation training that includes tightening torque. Include a certification and proficiency test. Improper tightening of coupling This solution will likely be addressed with the task package and formal training. This solution does not eliminate overtightening, but it does increase awareness. While the solution does not pass all criteria, it is considered a value added solution and should help reduce improper tightening of the coupling. Ken Anderson 9/15/2013 Status Identified Medium Pass 4 Solution Use Sawzall with fine tooth blade to cut pipe Chainsaw cuts aren't smooth Ken Anderson Pass 9/23/2013 Status Approved Short $400.00

5 5 Solution Design jig for moving pipe without pipe flexing (possibly using come-alongs and pipe ends) Pipe ends dragged on ground All pipe is already laid - this solution not necessary for this particular job - but could be useful for future. Further investigation is required to submit solution through criteria. Medium Status Not Checked Identified Page 5 \ 22 6 Solution Polish out scratches on pipe to ensure a smooth gasket surface before installation of gasket. HDPE pipe has surface scratches Cannot always eliminate scratching, but address scratches with surfacing process. This solution should be part of training and task package. Larry Davis 9/9/2013 Status Approved Short Pass 7 Solution Use file on scratches HDPE pipe has surface scratches Using a file is an alternative to using a flapper wheel when necessary. Alternative tool for smoothing out scratches and rough edges of pipe. Ken Anderson 9/9/2013 Status Identified Short Pass 8 Solution Use die grinder to smooth out scratches HDPE pipe has surface scratches Die grinder is an additional tool used to smooth out scratches and gasket surface imperfections. Ken Anderson 9/9/2013 Status Identified Short Pass 9 Solution Cut off section with scratch HDPE pipe has surface scratches

6 If gasket surface cannot be smoothed, it is recommended that the damaged area of the pipe be cut with a chainsaw and the new end prepped for gasket installation. Ken Anderson 9/29/2013 Status Identified Medium Pass Page 6 \ Solution Develop and implement standard operating procedures (SOP) for installation. Excess material not removed Develop SOP. These procedures should be included in formal training. Formal training will allow for employee record tracking. Jim Jones 9/15/2013 Status Approved Long Pass 12 Solution New policy to enforce document read and signed-off. Incorprate into employee training records. Manufacturer's document not referenced by all installers Create new policy. Further investigation into how the policy will be communicated and governed is required to submit solution through criteria. Jim Jones 9/29/2013 Status Identified Long Not Checked 13 Solution Document training records on mechanical coupling installations. Manufacturer's document not referenced by all installers Implement formal training records to ensure that personnel working on pipe installation has been formally trained for task. John Smith 9/29/2013 Status Identified Choose Pass 14 Solution Incorporate manfuacturer's document into piping specs and issue with all jobs Manufacturer's installation document not used John Smith Pass

7 9/29/2013 Status Approved Medium Page 7 \ Solution Fuse the pipes Leaks at mechanical joint (couplings) Not valid...customer wanted to use couplings to eliminate inside (ID) bead created from fusion. Ken Anderson Long Status Fail Identified 16 Solution Pipe caps during transportation HDPE pipe has surface scratches Implement a piece of equipment to protect the pipe ends from dragging on the ground. Further investigation required to determine feasibility of solution. 9/29/2013 Status Identified Medium Not Checked 17 Solution Work in evening or night shift hours Hot ambient temperature Solution may not be possible considering scheduling conflicts, but could be evaluated. Night time installation may increase unwanted safety and installation hazards. Investigate further. 9/29/2013 Status Identified Medium Not Checked 18 Solution Use water hose to cool HDPE pipe temperature Surface temperature of pipe was hot at install Solution may cause other unwanted obstacles with work area. Further investigation needed. 9/29/2013 Status Identified Short Not Checked

8 19 Solution Cover couplings until needed for installation Surface temperature of the coupling was hot at install Keep couplings covered to reduce direct sunlight that increases coupling surface temperature. Ken Anderson Pass 9/29/2013 Status Approved Short $ Page 8 \ Solution Include QA/QC in testing procedure. Separate installation and testing into two separate responsible parties. No incremental hydro testing performed on HDPE pipeline Control would assist in developing necessary testing procedures with installation team to incrementally test pipeline. John Smith 9/29/2013 Status Identified Long Pass 21 Solution Implement low pressure (air) and soap suds snoop test after every 1000' of line installed Hyrdo test is the only process to check for leaks Marcus McCoy Pass 9/26/2013 Status Approved Medium $50.00

9 Team Page 9 \ 22 ID Label Description Label Description 1 First Name John Last Name Smith Phone (1) Phone (2) Role District Manager Group john.smith@abc.com 2 First Name Jim Last Name Jones Phone (1) Phone (2) Role District Continuous Improvement Manager Group jim.jones@abc.com 3 First Name Larry Last Name Davis Phone (1) Phone (2) Role MPC - Project Engineer Group larry.davis@def.com 4 First Name Ken Last Name Anderson Phone (1) Phone (2) Role Hand Group ken.anderson@hij.com 7 First Name Rob Last Name Roy Phone (1) Phone (2) Role Project Manager Group rob.roy@abc.com 9 First Name Marcus Last Name McCoy Phone (1) Phone (2) Role Facilitator Group Artemis marcus.mccoy@artemisinvestigations.com

10 Page 10 \ 22 ID Label Description 1 Visual confirmation (pipe pressurized) Water in pipe 2 Pressure gauge Pipe pressurized Instrumentation 3 Couplings leaking Pipe pressurized Leaks at mechanical joint (couplings) Coupling gasket not properly aligned 4 Hyrdotesting procedure Water necessary for hydro testing

11 Page 11 \ 22 Direct Statement 5 Photos Surface imperfections on pipe Photo/Video 6 No other testing performed Coupling leaks not caught before final hydro test Original pipe superintendent did not do incremental testing on couplings Direct Statement 7 Past pipe experience expressed during recommendation Project personnel assumed that pipe super knew to incrementally test Direct Statement 8 Verbal witness statements (Hands) Employees not aware of HDPE pipe surface prepping needs Piping lifted from center wifth forklift

12 Page 12 \ 22 Direct Statement 17 Damaged gasket photos Coupling gaskets did not seal Coupling gaskets damaged Coupling gasket pinched Improper tightening of coupling Gasket area not adequately lubricated Soapy water not sufficient Photo/Video 18 Investigation gasket demonstration of creased gasket Coupling gaskets did not seal Gaskets rolled during installation Other Physical observation by technicians Coupling gaskets damaged Needed to change pipe length Gaskets are soft

13 Page 13 \ Physical gouges in gasket Coupling gasket creased Gasket area not adequately lubricated Photo/Video 21 Clamp tightened Close clamp Soapy water not sufficient Soapy water used as gasket lubricant Mechanical coupling reps confirmed soapy water was sufficient Does not always provide complete coverage of gasket area Soapy water has thin consistency Hot ambient temperature Coupling in original shipping container (open top pallet) Soapy water evaporated before installation completed OD of HDPE pipe imperfect HDPE pipe has surface scratches Piping flexible HDPE pipe flexes when hot (heated from ambient weather) Pipe end dragged on rocks located in work area Onsite training by manufacturer did not enforce necessity of surface prepping Not mentioned by manufacturer reps Manufacturer reps did not illustrate prepping HDPE pipe Used 3" PVC pipe for demonstration Manufacturer reps did not apply lubrication to gasket/pipe during demo/training Not the same materials as being applied on site Manufacturer's installation document not used Thought onsite training by manufacturer was sufficient Manufacturer's document not referenced by all installers Factory cuts aren't perfect Chainsaw cuts aren't smooth Soapy water solution deemed acceptable

14 Gaskets got stuck on parts of pipe during installation Ease of sealing Fast Easy Soapy water loses is lubricity as water evaporates Soapy water (as lubricant) requires fast installation No incremental hydro testing performed on HDPE pipeline Field clean-up on pipe ends not performed Page 14 \ 22 Direct Statement 22 Mechanical coupling specs Coupling designed to not have extra material in gasket area Soapy water solution deemed acceptable Document 23 Newly installed gaskets not leaking Gasket area not adequately lubricated Ken Anderson 24 Spray bottles used during lubrication Soapy water used as gasket lubricant

15 Page 15 \ 22 Direct Statement 25 Physical observation of soapy lubricant Soapy water has thin consistency 26 Installer Observation Gravity causes soapy solution to drain to the bottom area of pipe OD of HDPE pipe imperfect Pipe end dragged on rocks located in work area Onsite training by manufacturer did not enforce necessity of surface prepping Manufacturer reps did not illustrate prepping HDPE pipe Not the same materials as being applied on site Installation requires gaskets to slide over pipe Couplings sitting out in the sun prior to install 27 Project Manager Statement Only viable option for application Piping flexible Forklift most viable option Use of forklifft more economical than crane Work area not favorable for crane 35% grade (crane not able to work on that grade) Hyrdo test is the only process to check for leaks Standard procedure for cutting pipe length

16 Surface temperature of the coupling was hot at install Page 16 \ 22 Direct Statement 28 Supervisor observation Arid ambient conditions Direct Statement 29 No documentation Original pipe superintendent did not do incremental testing on couplings 30 Manufacturer does not specify Document 31 Lack of records (no formal records or history)

17 Page 17 \ Hot ambient temperature Couplings staged outside next to work area (about every 350 feet) Ease of installation Lower travel distance between couplings and pipe end Coupling in original shipping container (open top pallet) Soapy water evaporated before installation completed Pipe ends dragged on ground Need to transport pipe to final location HDPE pipe flexes when hot (heated from ambient weather) Forklift used to transfer HD pipe Work area not favorable for crane Manufacturer's installation document not used Thought manufacturer document was just for documentation purposes Pipe superintendent came highly recommended Hyrdo test is the only process to check for leaks Chainsaw cuts aren't smooth Needed to change pipe length Pipe ends sagged when pipe raised by forklift Soapy water solution convenient Surface temperature of pipe was hot at install Surface temperature of the coupling was hot at install Ends of the pipe contain imperfections Using chainsaw to make field cuts 33 Manufacturer field installation guide Soapy water would not chemically attack piping

18 Page 18 \ 22 Document 34 Project calendar Construction performed in summertime Document 35 Site located in mountains Construction site in desert 36 HDPE pipe photos HDPE pipe is black in color OD of HDPE pipe imperfect HDPE pipe has surface scratches Pipe ends dragged on ground Excess pipe material hung over and folded back onto pipe end Excess material not removed Factory cuts aren't perfect Photo/Video

19 Page 19 \ HDPE pipe spec HDPE pipe is black in color HDPE pipe is heavy 38 In-house engineer statement Only viable option for application Larry Davis Direct Statement 39 Pipe location photos Photo/Video 40 Water pipeline currently exposed throughout site Direct Statement

20 Page 20 \ Plant site temperature 90+ and surface temperature of pipe higher than 90+ Soapy water evaporated before installation completed 42? Not tightening each bolt evenly (together)? Not tightening in a cross pattern? Manufacturer reps not prepared? Choose 43? Overtightening one side? Choose 44 weather data Arid ambient conditions

21 Page 21 \ 22 Choose 45 scientific data/studies Black objects absorb maximum solar radiation Water evaporates quickly in desert Choose

22 s Page 22 \ 22 ID Label Description 1 No procedure for ratio used 2 Fusing pipes requires reaming - more time and less desirable Leaks at mechanical joint (couplings) 3 One person was originally scheduled to be superintendent and performed bidding and original scope. That first person had to leave jobsite and second person was assigned to be the new pipe superintendent. All pipe superintendent references are for the second person, not the first. Project personnel assumed that pipe super knew to incrementally test

23 Chart Legend Transitory Report and chart generated by Sologic s link software. Construction performed in summertime Non-transitory Omission - Transitory Omission - Non-transitory g Hot ambient temperature Project calendar Focal Point f Solution Implemented Construction site in desert Work in evening or night shift hours Status Identified Solution may not be possible considering scheduling conflicts, but could be evaluated. Night time installation may increase unwanted safety and installation hazards. Investigate further. e Site located in mountains Arid ambient conditions Connects to: e Construction site in desert Supervisor observation weather data HDPE pipe is black in color Only viable option for application Soapy water evaporated before installation completed HDPE pipe photos HDPE pipe spec Project Manager Statement In-house engineer statement Plant site temperature 90+ and surface temperature of pipe higher than 90+ Surface temperature of pipe was hot at install Black objects absorb maximum solar radiation scientific data/studies Ease of installation Desired state Use water hose to cool HDPE pipe temperature Status Identified Solution may cause other unwanted obstacles with work area. Further investigation needed. Connects to: f Hot ambient temperature Couplings staged outside next to work area (about every 350 feet) Lower travel distance between couplings and pipe end Desired state Couplings sitting out in the sun prior to install Surface temperature of the coupling was hot at install Installer Observation Coupling in original shipping container (open top pallet) Project Manager Statement Connects to: g Hot ambient temperature Soapy water not sufficient Cover couplings until needed for installation Pass Status Approved Keep couplings covered to reduce direct sunlight that increases coupling surface temperature. Damaged gasket photos Soapy water has thin consistency Does not always provide complete coverage of gasket area Physical observation of soapy lubricant Gravity causes soapy solution to drain to the bottom area of pipe Installer Observation Gasket area not adequately lubricated Soapy water loses is lubricity as water evaporates Damaged gasket photos Physical gouges in gasket Newly installed gaskets not leaking Soapy water (as lubricant) requires fast installation Water evaporates quickly in desert Clamp tightened Close clamp Desired state scientific data/studies Mechanical coupling reps confirmed soapy water was sufficient? Gaskets rolled during installation Gaskets got stuck on parts of pipe during installation Soapy water solution deemed acceptable Investigation gasket demonstration of creased gasket Mechanical coupling specs Soapy water would not chemically attack piping Soapy water used as gasket lubricant Coupling gasket pinched Manufacturer field installation guide c Spray bottles used during lubrication Damaged gasket photos Use vegetable oil (or equiv) for gasket lubricant Soapy water solution convenient Pass Status Completed Installation requires gaskets to slide over pipe Installer Observation Coupling gasket not properly aligned Not tightening each bolt evenly (together)?? Water in pipe Water necessary for hydro testing Desired state Couplings leaking a? Visual confirmation (pipe pressurized) Hyrdotesting procedure Coupling gaskets damaged Improper tightening of coupling and or Overtightening one side?? Damaged gasket photos Physical observation by technicians Damaged gasket photos? Pipe pressurized Pressure gauge Couplings leaking Connects to: a Water necessary for hydro testing Implement installation training that includes tightening torque. Include a certification and proficiency test. Pass Status Identified This solution will likely be addressed with the task package and formal training. This solution does not eliminate overtightening, but it does increase awareness. While the solution does not pass all criteria, it is considered a value added solution and should help reduce improper tightening of the coupling. Not tightening in a cross pattern??? Coupling gaskets did not seal and or Coupling designed to not have extra material in gasket area Damaged gasket photos Investigation gasket demonstration of creased gasket Mechanical coupling specs Gaskets are soft Ease of sealing Desired state Physical observation by technicians Fast Desired state Coupling gasket creased Connects to: c Coupling gasket pinched Standard procedure for cutting pipe length Physical gouges in gasket Project Manager Statement Easy Desired state Using chainsaw to make field cuts Needed to change pipe length Desired state Leaks at mechanical joint (couplings) Physical observation by technicians Couplings leaking Fuse the pipes Fail Status Identified Not valid...customer wanted to use couplings to eliminate inside (ID) bead created from fusion. Ends of the pipe contain imperfections Chainsaw cuts aren't smooth Use Sawzall with fine tooth blade to cut pipe Pass Status Approved Factory cuts aren't perfect Need to transport pipe to final location Desired state HDPE pipe photos d Multiple leaks in new HDPE pipeline Pipe ends dragged on ground Piping flexible HDPE pipe flexes when hot (heated from ambient weather) HDPE pipe photos Pipe ends sagged when pipe raised by forklift Project Manager Statement Surface imperfections on pipe Design jig for moving pipe without pipe flexing (possibly using come-alongs and pipe ends) Status Identified All pipe is already laid - this solution not necessary for this particular job - but could be useful for future. Further investigation is required to submit solution through criteria. Piping lifted from center wifth forklift Photos HDPE pipe has surface scratches Verbal witness statements (Hands) HDPE pipe photos Pipe end dragged on rocks located in work area Connects to: d Need to transport pipe to final location Polish out scratches on pipe to ensure a smooth gasket surface before installation of gasket. Pass Status Approved Cannot always eliminate scratching, but address scratches with surfacing process. This solution should be part of training and task package. Installer Observation HDPE pipe is heavy Use file on scratches Pass Status Identified HDPE pipe spec Using a file is an alternative to using a flapper wheel when necessary. Alternative tool for smoothing out scratches and rough edges of pipe. Forklift used to transfer HD pipe Use of forklifft more economical than crane Desired state Use die grinder to smooth out scratches Pass Status Identified Die grinder is an additional tool used to smooth out scratches and gasket surface imperfections. Cut off section with scratch Forklift most viable option Project Manager Statement Pass Status Identified If gasket surface cannot be smoothed, it is recommended that the damaged area of the pipe be cut with a chainsaw and the new end prepped for gasket installation. Pipe caps during transportation Status Identified Project Manager Statement Work area not favorable for crane 35% grade (crane not able to work on that grade) OD of HDPE pipe imperfect Implement a piece of equipment to protect the pipe ends from dragging on the ground. Further investigation required to determine feasibility of solution. Project Manager Statement Project Manager Statement Installer Observation HDPE pipe photos Excess pipe material hung over and folded back onto pipe end Excess material not removed? Not mentioned by manufacturer reps Manufacturer reps not prepared? Not the same materials as being applied on site HDPE pipe photos HDPE pipe photos? Installer Observation Develop and implement standard operating procedures (SOP) for installation. Pass Status Approved Develop SOP. These procedures should be included in formal training. Formal training will allow for employee record tracking. Onsite training by manufacturer did not enforce necessity of surface prepping Used 3" PVC pipe for demonstration? Installer Observation Manufacturer reps did not illustrate prepping HDPE pipe Field clean-up on pipe ends not performed Employees not aware of HDPE pipe surface prepping needs Installer Observation Manufacturer reps did not apply lubrication to gasket/pipe during demo/training? Verbal witness statements (Hands) Thought onsite training by manufacturer was sufficient Original pipe superintendent did not do incremental testing on couplings? No incremental hydro testing performed on HDPE pipeline No other testing performed No documentation Manufacturer's installation document not used Develop task package (better documention) Pass Status Identified This will help determine how to perform the task and what QC will need to be done with each task. Coupling leaks not caught before final hydro test Include QA/QC in testing procedure. Separate installation and testing into two separate responsible parties. Pass Status Identified Control would assist in developing necessary testing procedures with installation team to incrementally test pipeline. Project personnel assumed that pipe super knew to incrementally test Past pipe experience expressed during recommendation Pipe superintendent came highly recommended Incorporate manfuacturer's document into piping specs and issue with all jobs Pass Status Approved Manufacturer's document not referenced by all installers Thought manufacturer document was just for documentation purposes? No other testing performed New policy to enforce document read and signed-off. Incorprate into employee training records. Hyrdo test is the only process to check for leaks Desired state Status Identified Create new policy. Further investigation into how the policy will be communicated and governed is required to submit solution through criteria. Document training records on mechanical coupling installations. Project Manager Statement Pass Status Identified Implement formal training records to ensure that personnel working on pipe installation has been formally trained for task. Implement low pressure (air) and soap suds snoop test after every 1000' of line installed Pass Status Approved

Root Cause Analysis Report

Root Cause Analysis Report Page 1 \ 9 RCA Name Manufacturing NCR Example Report Number 522012 Report Date 5/2/2012 RCA Owner John Smith Root Analysis Report Problem Statement Focal Point Non-Conformance Reported on Brass Tubesheet

More information

Root Cause Analysis Report

Root Cause Analysis Report Page 1 \ 10 RCA Name Pipeline weld non-conformance Report Number 2012-001 Report Date 7/27/2012 Root Cause Analysis Report Problem Statement Focal Point Near miss-almost had to replace 5 miles of 6" underground

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

SPECIFICATION for ISCO HDPE DUAL CONTAINMENT PIPE

SPECIFICATION for ISCO HDPE DUAL CONTAINMENT PIPE SPECIFICATION for ISCO HDPE DUAL CONTAINMENT PIPE SECTION 15000 MECHANICAL 1. GENERAL 1.1 This specification shall govern the materials and installation of polyethylene dual contained system of pipe, structures

More information

VALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

VALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE PART 1 - GENERAL 1.1 DESCRIPTION A. This section designates the requirements for the manufacture and installation of polyvinyl chloride, abbreviated PVC, pressure pipe. 1.2 RELATED WORK SPECIFIED ELSEWHERE

More information

Fluid Sealing Association

Fluid Sealing Association Fluid Sealing Association STANDARD FSA-PSJ-702-19 RUBBER FLANGED NON-METALLIC EXPANSION JOINT INSTALLATION, MAINTENANCE, AND STORAGE REVISED February 2019 (supersedes 2015 edition) 994 Old Eagle School

More information

TECHNICAL SPECIAL PROVISION PIPE BURSTING BISCAYNE ISLAND DRAINAGE IMPROVEMENTS PROJECT NO.: B-30588

TECHNICAL SPECIAL PROVISION PIPE BURSTING BISCAYNE ISLAND DRAINAGE IMPROVEMENTS PROJECT NO.: B-30588 TECHNICAL SPECIAL PROVISION PIPE BURSTING BISCAYNE ISLAND DRAINAGE IMPROVEMENTS PROJECT NO.: B-30588 Mayor Tomas P. Regalado Commissioner Wilfredo Willy Gort, District 1 Commissioner Marc Sarnoff, District

More information

Double Containment DESIGN & INSTALLATION GUIDE TECHNICAL INFORMATION. Visit our web site

Double Containment DESIGN & INSTALLATION GUIDE TECHNICAL INFORMATION. Visit our web site Double DESIGN & INSTALLATION GUIDE TECHNICAL INFORMATION Visit our web site www.spearsmfg.com 1326 The information contained in this publication is based on current information and Product design at the

More information

DOUBLE CONTAINMENT DESIGN & INSTALLATION GUIDE

DOUBLE CONTAINMENT DESIGN & INSTALLATION GUIDE DC-3-0604 Spears Double Containment Systems are engineered for ease of installation and lower associated installation costs. Complete systems include all necessary components - carrier pipe, containment

More information

TILE ROOF INSTALLATION MANUAL ADDENDUM

TILE ROOF INSTALLATION MANUAL ADDENDUM Distributed and serviced in the USA by Hot Sun Industries Inc 1440 N. Benson Ave Unit D Upland CA 91786 858-683 0800 e-mail: ken@h2otsun.com web site: http://www.h2otsun.com TILE ROOF INSTALLATION MANUAL

More information

GEOMEMBRANE INSTALLATION GUIDELINES RUFCO 20, 30 & 40 MIL UNREINFORCED DURA SKRIM 30, 36 & 45 MIL REINFORCED

GEOMEMBRANE INSTALLATION GUIDELINES RUFCO 20, 30 & 40 MIL UNREINFORCED DURA SKRIM 30, 36 & 45 MIL REINFORCED GEOMEMBRANE INSTALLATION GUIDELINES RUFCO 20, 30 & 40 MIL UNREINFORCED DURA SKRIM 30, 36 & 45 MIL REINFORCED Sept 2010 TABLE OF CONTENTS SECTION PAGE 1.0 SUBGRADE PREPARATION 3 2.0 PANEL LAYOUT 4 3.0 IDENTIFICATION

More information

Outward Folding Bathscreen Instruction Manual

Outward Folding Bathscreen Instruction Manual Outward Folding Bathscreen Instruction Manual OBV3 Important Information Toughened glass is completely safe for use in our shower enclosures and bath screens; providing our products are installed according

More information

Receiving your order: Ambor Structures Container Unloading Guide

Receiving your order: Ambor Structures Container Unloading Guide Receiving your order: Ambor Structures Container Unloading Guide Ambor Structures is happy to provide logistical support for your tower orders. Once shipping arrangements have been made, Ambor will be

More information

COMPLETE REVISION October Process Industry Practices Piping. PIP PNSC0036 High Density Polyethylene (HDPE) Piping Installation Specification

COMPLETE REVISION October Process Industry Practices Piping. PIP PNSC0036 High Density Polyethylene (HDPE) Piping Installation Specification Piping High Density Polyethylene (HDPE) Piping Installation Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has

More information

SAMPLE SPECIFICATION for HIGH DENSITY POLYETHYLENE PIPING LEACHATE COLLECTION SYSTEMS

SAMPLE SPECIFICATION for HIGH DENSITY POLYETHYLENE PIPING LEACHATE COLLECTION SYSTEMS ISCO INDUSTRIES, LLC SAMPLE SPECIFICATION for HIGH DENSITY POLYETHYLENE PIPING LEACHATE COLLECTION SYSTEMS 1. GENERAL This specification shall govern the materials and installation of high density polyethylene

More information

DEEP SOAK PRODUCT REQUIREMENTS. A. Product Requirements. B. Product Inspection. C. Clearance Requirements T01-A

DEEP SOAK PRODUCT REQUIREMENTS. A. Product Requirements. B. Product Inspection. C. Clearance Requirements T01-A DEEP SOAK INSTALLATION INSTRUCTIONS / INTEGRATED ACRYLIC BATH(WITH APRON/DRAIN) K-98156T/K-98157T/K-98158T/K-98159T BEFORE YOU BEGIN Please read these instructions carefully to familiarize yourself with

More information

ODYSSEY FLOOR MODEL. Owner s Manual. O-6400-F shown rev 118

ODYSSEY FLOOR MODEL. Owner s Manual. O-6400-F shown rev 118 Owner s Manual ODYSSEY FLOOR MODEL O-6400-F shown 67-1455 rev 118 3730 E. Southern Avenue, Phoenix, AZ 85040 USA 800-778-8779 Workhorseproducts.com 1 Table of Contents I. Introduction & Safety Information.

More information

G-FIRE GROOVED COUPLINGS

G-FIRE GROOVED COUPLINGS G-FIRE GROOVED COUPLINGS Figure 5 G-FIRE Rigid Page 5 Figure 5 Flexible Page GRINNELL are designed for grooved end pipe and are available in nominal sizes of 25mm (") to 3mm (2") including BS, and ISO

More information

Impression Graphic panels

Impression Graphic panels Impression Graphic panels Installation Guidelines 6003.I Rev. 02 8/15 Please Read Disclaimers: PLEASE READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION!! These guidelines are provided in good faith to

More information

SOLAR ENERGY INTRODUCTION:

SOLAR ENERGY INTRODUCTION: INTRODUCTION: SOLAR ENERGY Solar energy is energy that comes from the sun. Every day the sun radiates an enormous amount of energy. The sun radiates more energy in one second than people have used since

More information

N Scale Double Track Lift Bridge v1.2

N Scale Double Track Lift Bridge v1.2 N Scale Double Track Lift Bridge v1.2 3.25"W x 16"L x 7.5"H Plus two 5" long approach bridges Instructions for assembly of the Lift Bridge Included in this kit: Instructions and part diagrams 138ea. 1/16"

More information

Fuel Information Sheet

Fuel Information Sheet Wood (Biomass) Maine has 17 million acres of forest. Wood is a renewable energy source; we can grow more trees and manage forested areas. Wood must be transported to where it is used. Wood requires storage

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS SECTION 02620 PART 1 GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required to install High Density Polyethylene (HDPE) pressure pipe, fittings, and appurtenances

More information

SceptaCon Trenchless Raceway for Electrical and Telecommunication Cables

SceptaCon Trenchless Raceway for Electrical and Telecommunication Cables ELECTRICAL & TELECOMMUNICATION SYSTEMS SceptaCon Trenchless Raceway for Electrical and Telecommunication Cables 2" - 6" www.kraloyfittings.com THE ELECTRICAL ADVANTAGE THE MISSING LINK IN YOUR PVC SYSTEM

More information

6.5 oz/yd g/m 2. 35/35 lb f min. 155/155 N min. 1.5% max. each direction Adhesion - Heat Sealed Seam ASTM D751, Dielectric Weld

6.5 oz/yd g/m 2. 35/35 lb f min. 155/155 N min. 1.5% max. each direction Adhesion - Heat Sealed Seam ASTM D751, Dielectric Weld EXAMPLE SPECIFICATION FOR 8130 XR-5 1.01 scope of work 1.02 products 1.03 submittals 1.04 factory fabrication 1.05 inspection & testing of factory seams 1.06 certification & test reports 1.07 panel packaging

More information

PIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE

PIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE PIPE BURSTING GRAVITY SEWER MAINS WITH HDPE PIPE SUGGESTED STANDARD SPECIFICATION January, 2012 Prepared by International Pipe Bursting Association Thanks to the following participants for the development

More information

EFFECTIVE ROOT CAUSE ANALYSIS

EFFECTIVE ROOT CAUSE ANALYSIS EFFECTIVE ROOT CAUSE ANALYSIS David Tooth CEngFIMechE Copyright 2011 Sologic, LLC. All Rights Reserved. 1 What RCA is NOT... A search for a Single Root Cause Root Cause!) A search for a Quick Fix! A search

More information

Irrigation Assessment Report Mariana Glen Loveland, CO July 13, 2017

Irrigation Assessment Report Mariana Glen Loveland, CO July 13, 2017 2639 Spruce St Irrigation Assessment Report Mariana Glen Loveland, CO 80537 July 13, 2017 Executive Summary This report contains a summary and the results of an irrigation assessment performed at Mariana

More information

50.20 Drainage Structure Design

50.20 Drainage Structure Design 50.20 Drainage Structure Design All drainage structures, with the exception of bridges, culvert bridges and, in some cases, culverts, shall be designed for HS20-44 loading. Refer to Section 50.22 for design

More information

LAYING PIPELINES IN STEEPEST TERRAIN CABLE CRANE SYSTEMS THE MOST EFFICIENT SOLUTION FOR BIG CHALLENGES.

LAYING PIPELINES IN STEEPEST TERRAIN CABLE CRANE SYSTEMS THE MOST EFFICIENT SOLUTION FOR BIG CHALLENGES. LAYING PIPELINES IN STEEPEST TERRAIN CABLE CRANE SYSTEMS THE MOST EFFICIENT SOLUTION FOR BIG CHALLENGES. www.lcs-cablecranes.com PERFORMANCE, Lycke Koersen, Maats, the Netherlands, explains how important

More information

Operating Instructions

Operating Instructions Operating Instructions A-2600 SERIES AWWA SWING CHECK VALVE 500 West Eldorado Street Decatur, Illinois 62522 www.muellercompany.com! WARNING! 1. Read and follow all pertinent instructions carefully. Proper

More information

PLASTIC FITTINGS Avenue Edmonton, AB Canada T6E 5Z7. Toll Free: Phone: (780) Fax: (780)

PLASTIC FITTINGS Avenue Edmonton, AB Canada T6E 5Z7. Toll Free: Phone: (780) Fax: (780) 9333 45 Avenue Edmonton, AB Toll Free: 1-800-272-9693 Phone: (780) 436-1930 Fax: (780) 435-4849 info@can-con.com TABLE OF CONTENTS PLASTIC FITTINGS POLYETHYLENE PIPE...- 1 - SERVICE RISERS... - 3 - TRANSITION

More information

SECTION LAYING AND JOINTING BURIED PIPELINES

SECTION LAYING AND JOINTING BURIED PIPELINES SECTION 02650 LINES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Installation of all underground pipelines. Provide pipeline materials, coatings and linings as specified and pipe of the types, sizes

More information

INSTALLATION PRACTICES

INSTALLATION PRACTICES INSTALLATION PRACTICES Installing any piping system properly requires preplanning. The installation is more than the welding of components. It requires the proper environment, material inventory, welding

More information

Power Technologies. Question. Answer. Energy is the ability to do work or change the system. Answer. Question. What are the various sources of energy?

Power Technologies. Question. Answer. Energy is the ability to do work or change the system. Answer. Question. What are the various sources of energy? What is energy? Energy is the ability to do work or change the system. What are the various sources of energy? Fossil fuels Oil (Petroleum) Propane Natural gas Coal Alternative fuels Nuclear Wind Solar

More information

AMCOT COOLING TOWER CORPORATION LRC-H & LRC-LNS CROSS FLOW COOLING TOWER OPERATIONS AND MAINTAINENCE MANUAL

AMCOT COOLING TOWER CORPORATION LRC-H & LRC-LNS CROSS FLOW COOLING TOWER OPERATIONS AND MAINTAINENCE MANUAL AMCOT COOLING TOWER CORPORATION LRC-H & LRC-LNS CROSS FLOW COOLING TOWER 1. Preface OPERATIONS AND MAINTAINENCE MANUAL 1-800-444-8693 Operation and Maintenance Manual For Amcot LRC-H Cooling Tower & LRC-LNS

More information

Guidelines To Gas Metal Arc Welding (GMAW)

Guidelines To Gas Metal Arc Welding (GMAW) Guidelines To Gas Metal Arc Welding (GMAW) WARNING ARC WELDING can be hazardous. This document contains general information about the topics discussed herein. This document is not an application manual

More information

Cornerview Shower Enclosure & Base

Cornerview Shower Enclosure & Base Cornerview Shower Enclosure & Base SHOWER ENCLOSURE AND BASE INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For

More information

CW 3120 INSTALLATION OF SUBDRAINS TABLE OF CONTENTS

CW 3120 INSTALLATION OF SUBDRAINS TABLE OF CONTENTS December 2010 CW 3120 INSTALLATION OF SUBDRAINS TABLE OF CONTENTS 1. DESCRIPTION...1 1.1 General...1 1.3 Referenced Standard Construction Specifications...1 1.4 Referenced Standard Details...1 2. MATERIALS...1

More information

Root Cause Analysis Report

Root Cause Analysis Report Page 1 \ 8 RCA Name Near Miss - Asphalt Drop Report Number RCA 2012.314 Report Date 3/2/2012 RCA Owner Safety Manager Root Analysis Report Problem Statement Focal Point Near miss incident When Start Date

More information

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION POLYETHYLENE PRESSURE PIPE

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION POLYETHYLENE PRESSURE PIPE SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 33 11 13.24 POLYETHYLENE PRESSURE PIPE PART 1 GENERAL... 2 1.1 Description... 2 1.2 Reference Specification... 2 1.3

More information

Series 2000PV Mechanical Joint Restraint for PVC Pipe

Series 2000PV Mechanical Joint Restraint for PVC Pipe Series 2000PV Mechanical Joint Restraint for PVC Pipe Features and Applications: For restraining plain end PVC pipe at mechanical joint fittings and appurtenances Sizes 3 inch through 36 inch Sizes 42

More information

Armor Plate Pipe Wrap

Armor Plate Pipe Wrap Armor Plate Pipe Wrap Training and Certification Course Course Elements Section 1 - Pipeline Repair Systems Section 2 - Pipeline Coating Systems Section 3 - Surface Preparation Section 4 - Required Number

More information

Model Specifications for Sclairpipe High Density Polyethylene (HDPE) Pipe

Model Specifications for Sclairpipe High Density Polyethylene (HDPE) Pipe This publication is intended for use as a guide to support the designer of piping systems. The recipient is encouraged to independently verify all information and agrees that such information is not to

More information

SPECIAL SPECIFICATION 6623 Multi-Duct Conduit System

SPECIAL SPECIFICATION 6623 Multi-Duct Conduit System 2004 Specifications Houston District SPECIAL SPECIFICATION 6623 Multi-Duct Conduit System 1. Description. Furnish and place a Multi-Duct Conduit (MDC) system that is suitable for installation in an outdoor

More information

8000 PIVOT EXPORT 6-5/8" PIPE 90" COUPLER SPACING

8000 PIVOT EXPORT 6-5/8 PIPE 90 COUPLER SPACING 8000 PIVOT EXPORT 6-5/8" PIPE 90" COUPLER SPACING PICTURE Copyright 2009 Valmont Industries, Inc. 8PSP0097 09-97 6-5/8" Export Pipe - 90" Spacing Truss Package Locations 09-0 35' Span 3 5 3 57.5' Span

More information

FreeStyle Linear Drain with Full Mortar Bed Adapter Kit

FreeStyle Linear Drain with Full Mortar Bed Adapter Kit FreeStyle Linear Drain with Full Mortar Bed Adapter Kit U.S. Patent No. 8,474,068 Patents Pending: Canada & EP Publication No. 2354339 Discard Linear Drain installation instructions and refer to these

More information

Smart Clamp patent #8,220,113

Smart Clamp patent #8,220,113 Faster Change Outs Half-Turn Installation Increased Uptime Ergonomic Benefits Compression Control Supports ASME-BPE Seal Performance Requirements Vibration Resistant Smart Clamp patent #8,220,113 Smart

More information

6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware

6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware Tools/materials you might need for proper installation 6D galvanized screws 100% silicone caulking caulking gun acrylic latex caulk shims tape measure 1/8 drill bit Phillips screw driver cardboard china

More information

Multi-Piece EasyStep Product Installation Instructions

Multi-Piece EasyStep Product Installation Instructions Tools/materials you might need for proper installation 6D galvanized screws 100% silicone caulking (See specific caulking recommendations) caulking gun shims tape measure 1/8 drill bit Phillips screw driver

More information

1 PVC or ABS drain with strainer

1 PVC or ABS drain with strainer Patents Pending ProBase II Single-Slope Shower Base and Kit CONTENTS 1. General Information...1 2. Materials...1 3. Planning...2 4. Preparation...3 5. Layout...3 6. Install Base and Shims...4 7. Install

More information

Industrial Services. Minimizing Downtime. Maximizing Performance. LDAR. Leak Detection and Repair (LDAR) Services

Industrial Services. Minimizing Downtime. Maximizing Performance. LDAR. Leak Detection and Repair (LDAR) Services Industrial Services Minimizing Downtime. Maximizing Performance. LDAR Leak Detection and Repair (LDAR) Services Leak Detection and Repair (LDAR) Services Advantages of Team s Emission Control + Single

More information

Plastic Pipe and Fittings Association ASTM D2239, D3035, D2737

Plastic Pipe and Fittings Association ASTM D2239, D3035, D2737 Irrigation NSF 14 and 61 Potable Water AWWA C901-08 Cold Water Service IAPMO PS24-69 Plastic Pipe Institute Uniform Plumbing Code Plastic Pipe and Fittings Association ASTM D2239, D3035, D2737 DriscoPlex

More information

Reflective Insulation Specification & Application Guide for Post Frame and Metal Building Construction

Reflective Insulation Specification & Application Guide for Post Frame and Metal Building Construction Reflective Insulation Specification & Application Guide for Post Frame and Metal Building Construction WHAT IS PLY-FOIL? Ply-Foil is a multilayer, reflective insulation which comes in rolls consisting

More information

Freedom One-Piece Barrier Free Showers Installation Instructions

Freedom One-Piece Barrier Free Showers Installation Instructions Tools & Materials you might need for proper installation Materials: 2-1 gallon buckets of solid wood flooring adhesive or 100% silicone adhesive (non-shrink) 20-1.25 wood screws 1-5 gallon bucket (to mix

More information

Roth MultiTank (RMT) Certified Installer Training

Roth MultiTank (RMT) Certified Installer Training Roth MultiTank (RMT) Certified Installer Training Roth MultiTank Multi-usage for water cistern, pump, holding, rainwater or septic tank Inner layer of FDA approved virgin HDPE, two inside layers of PE

More information

SOLID WALL PVC SEWER PIPE

SOLID WALL PVC SEWER PIPE INSTALLATION GUIDE FOR SOLID WALL PVC TABLE OF CONTENTS INTRODUCTION: Introduction 3 Receiving 4 Unloading and Handling 5-6 Storage 7 Trenching 8 De-Watering 9 Field Cutting 10 Lowering Pipe into the Trench

More information

Site Preparation... 2

Site Preparation... 2 TRUFIREWALLS INSTALLATION MANUAL This Installation Manual is intended to assist in the preparation and installation of TruFireWalls products manufactured by Oldcastle Enclosure Solutions. The TruFireWalls

More information

SOLID WALL PVC SEWER PIPE

SOLID WALL PVC SEWER PIPE INSTALLATION GUIDE FOR SOLID WALL PVC SEWER PIPE TABLE OF CONTENTS Introduction 3 Receiving 4 Unloading and Handling 5-6 Storage 7 Trenching 8 De-Watering 9 Field Cutting 10 Lowering Pipe into the Trench

More information

Bale Accumulator/Mover. Owners Manual

Bale Accumulator/Mover. Owners Manual Bale Accumulator/Mover Owners Manual 026 FORWARD Haukaas Mfg. Ltd. would like to take this opportunity to thank you for purchasing a HAUKAAS Bale Mover. This manual is published as a guide and service

More information

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems. NORTH MARIN WATER DISTRICT STANDARD SPECIFICATIONS SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS PART 1 GENERAL 1.01 DESCRIPTION This section includes materials and installation of ductile-iron pipe and

More information

Lifting Gear Hire Corporation

Lifting Gear Hire Corporation 187,500 lbs. Capacity Air Skate System Air Float - AF01036-6KIT Air Bearing Skids These air bearing skids let you move loads from 2,400 to 52,500 lbs per skid easily and safely. Look over the specifications

More information

Bore-Gard. Boreable Multi-Gard Assembly Multi-Gard Trenchless Raceway

Bore-Gard. Boreable Multi-Gard Assembly Multi-Gard Trenchless Raceway Bore-Gard Boreable Multi-Gard Assembly............................176 Multi-Gard...177 Trenchless Raceway................................178 179 Bore-Gard Trenchless Raceway Product Overview RUS Accepted

More information

JUST THE FACTS CONCRETE PIPE VS. HDPE

JUST THE FACTS CONCRETE PIPE VS. HDPE JUST THE FACTS CONCRETE PIPE VS. HDPE Just the FACTS! DRAINAGE PIPE PERFORMANCE AND DESIGN COMPARISON CONCRETE VS. HDPE Contents Current Standards............................2 Corrugation Growth and its

More information

HDSS HIGH DEFLECTION HIGH PRESSURE RESTRAINED PIPE

HDSS HIGH DEFLECTION HIGH PRESSURE RESTRAINED PIPE PIPE HIGH DEFLECTION HIGH PRESSURE RESTRAINED PIPE FABRICATION RESTRAINED JOINTS FITTINGS GASKETS COATINGS & LININGS CONTENTS GENERAL INFO Pipe " " 2 Suggested Specification Wording 3 ASSEMBLY Alternate

More information

Construction Red Flags. April 17, 2018 William (Clay) Herndon, P.E.

Construction Red Flags. April 17, 2018 William (Clay) Herndon, P.E. Construction Red Flags April 17, 2018 William (Clay) Herndon, P.E. 1 General Site Management & Safety Site Safety Site Specific PPE Hard Hat, Safety Glass, Vest What does the Contractor provide? Safe working

More information

Contents. dimensions and weights external loads deflection and testing installation...17

Contents. dimensions and weights external loads deflection and testing installation...17 GRAVITY SEWER Contents 01 02 03 04 05 06 07 08 09 product description...2 short form specification...5 dimensions and weights....................... 6 flow/discharge charts....................... 8 external

More information

BEFORE YOU GET STARTED...

BEFORE YOU GET STARTED... BEFORE YOU GET STARTED... We re con dent you ll love your gorgeous new Next furniture. However, it s worth making absolutely certain before you put it all together. So, let s quickly run through these

More information

Freedom Barrier Free Shower Pan Installation Instructions

Freedom Barrier Free Shower Pan Installation Instructions Tools & Materials you might need for proper installation Materials: 2-1 gallon buckets of solid wood flooring adhesive (non-shrink) or 100% silicone adhesive 20-1.25 wood screws 1 - tube of non-shrink

More information

Freedom Barrier Free Shower Pan Installation Instructions

Freedom Barrier Free Shower Pan Installation Instructions Tools & Materials you might need for proper installation Materials: 2-1 gallon buckets of solid wood flooring adhesive (non-shrink) or 100% silicone adhesive 20-1.25 wood screws 1 - tube of non-shrink

More information

Quality Metrics Pipeline Construction

Quality Metrics Pipeline Construction 1.0 ACTIVITY DESCRIPTION 1.1 The purpose of this document is to describe guidelines for establishing and using quality metrics during or in support of natural gas pipeline construction activities. 1.2

More information

CHAPTER 6 - SANITARY SEWER

CHAPTER 6 - SANITARY SEWER CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings

More information

PERFORMANCE PIPE DRISCOPLEX 4000/4100 Pipe Water and Wastewater Piping Systems

PERFORMANCE PIPE DRISCOPLEX 4000/4100 Pipe Water and Wastewater Piping Systems PERFORMANCE PIPE DRISCOPLEX 4000/4100 Pipe Water and Wastewater Piping Systems Corrosion Resistant Leak Proof Fused Joints Ideal for Trenchless Applications Flexible Hydraulically Efficient Will Not Tuberculate

More information

Air Skates Airfloat 25,000 Lbs. to 315,000 Lbs., AF Model

Air Skates Airfloat 25,000 Lbs. to 315,000 Lbs., AF Model Airfloat 25,000 Lbs. to 315,000 Lbs., AF Model Air Bearing Skids These air bearing skids let you move loads from 6,250 to 52,500 lbs per skid easily and safely. Look over the specifications and packages

More information

Installation Instructions

Installation Instructions Installation Instructions Thank you for choosing the Synergy Reef Shadow Overflow. Please note that this is a Do-It-Yourself project and can be installed in either glass or acrylic aquariums. Always keep

More information

component developments Stainless Steel Industrial Floor Drainage

component developments Stainless Steel Industrial Floor Drainage component developments Stainless Steel Industrial Floor Drainage Component Developments What we do We design, manufacture and supply standard, adapted and bespoke stainless steel building products. We

More information

ABOVEGROUND. AWSS Liner Documentation Revision 2.0. For Layfield Enviro Liner materials

ABOVEGROUND. AWSS Liner Documentation Revision 2.0. For Layfield Enviro Liner materials This package is supplied with liners intended to be used in Aboveground Synthetically-Lined Wall Storage Systems (AWSS). This package should be kept on the site where the liner is being used and made available

More information

Flexible Pavement Preservation Treatment Construction Patching and Edge Repair AT-TC3PP T1-JA01. Suggested Field Considerations

Flexible Pavement Preservation Treatment Construction Patching and Edge Repair AT-TC3PP T1-JA01. Suggested Field Considerations Suggested Field Considerations The following field considerations are a guide to the important aspects of patching or edge repair. These issues should be determined as required before, during, and after

More information

FIVE STAR PRODUCTS, INC. (800)

FIVE STAR PRODUCTS, INC.  (800) FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 Page 1 of 11 DESIGN-A-SPEC GUIDELINES FIVE STAR RS ANCHOR GEL CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS PART

More information

Multi-Piece EasyStep Product Installation Instructions

Multi-Piece EasyStep Product Installation Instructions Tools/materials you might need for proper installation 6D galvanized screws caulking gun shims tape measure 1/8 drill bit Phillips screw driver cardboard china marker (or grease pencil) furring strips

More information

INSPECTION, HANDLING, STORAGE, AND TRANSPORTATION OF POLYETHYLENE (PE) PLASTIC PIPE, TUBING, AND FITTINGS FOR GAS MAINS AND SERVICES

INSPECTION, HANDLING, STORAGE, AND TRANSPORTATION OF POLYETHYLENE (PE) PLASTIC PIPE, TUBING, AND FITTINGS FOR GAS MAINS AND SERVICES LAST REVIEW DATE: 3/1/17 EFFECTIVE DATE: 5/4/17 REVIEW CYCLE: 5 Years SPECIFICATION: TITLE: INSPECTION, HANDLING, STORAGE, AND TRANSPORTATION OF POLYETHYLENE (PE) PLASTIC PIPE, TUBING, AND FITTINGS FOR

More information

the SureCoat Roof System.

the SureCoat Roof System. 1 The SureCoat Roof System General Application Essentials CONDITION OF ROOF BEFORE APPLICATION 1. Roof must be structurally sound and leak-free (meaning all SureCoat repairs to leaking areas must be made

More information

Proweld Equipment Owner & Maintenance Manual FIELD 12 TRENCH (Widos 4900)

Proweld Equipment Owner & Maintenance Manual FIELD 12 TRENCH (Widos 4900) Proweld Equipment Owner & Maintenance Manual FIELD 12 TRENCH (Widos 4900) 35 Green Street, PO Box 653, Malden, MA 02148 Tel: (781) 321-5409 - Fax (781) 321-4421 - Toll Free: (800) 343-3618 www.asahi-america.com

More information

Fresh concrete can be lifted from the ground level to the upper floor level by

Fresh concrete can be lifted from the ground level to the upper floor level by 3a Concreting Operation 1. Concrete lifting 1.1 Hoists Fresh concrete can be lifted from the ground level to the upper floor level by hoists. However, the further distribution from the hoist to placing

More information

QUALITY ASSURANCE MANUAL FOR APPLICATORS OF ELASTOMERIC SHEET LININGS

QUALITY ASSURANCE MANUAL FOR APPLICATORS OF ELASTOMERIC SHEET LININGS QUALITY ASSURANCE MANUAL FOR APPLICATORS OF ELASTOMERIC SHEET LININGS 1.0 Purpose To establish a recommended quality assurance program for applicators of elastomeric sheet linings. 2.0 Scope This bulletin

More information

Recommended Application Procedures

Recommended Application Procedures Recommended Application Procedures www.streetbond.com Updated: FEB 2013 Introduction StreetBond150 is an epoxy modified, acrylic, waterborne coating specifically designed for application on HMA pavements.

More information

Innovation in Joint Restraint Systems for PVC Pressure Pipe and Fittings. Clean & Safe Drinking Water Workshop. Wednesday, March 25, 2015

Innovation in Joint Restraint Systems for PVC Pressure Pipe and Fittings. Clean & Safe Drinking Water Workshop. Wednesday, March 25, 2015 Innovation in Joint Restraint Systems for PVC Pressure Pipe and Fittings Clean & Safe Drinking Water Workshop Wednesday, March 25, 2015 Thrust forces Gasketed joints are made to seal and not to restrain,

More information

ARDEX GUIDE SPECIFICATION ARDEX CD Concrete Dressing and ARDEX CD FINE Concrete Dressing Polymer-Modified, Portland Cement-Based, Resurfacing Compound

ARDEX GUIDE SPECIFICATION ARDEX CD Concrete Dressing and ARDEX CD FINE Concrete Dressing Polymer-Modified, Portland Cement-Based, Resurfacing Compound ARDEX GUIDE SPECIFICATION ARDEX CD Concrete Dressing and ARDEX CD FINE Concrete Dressing Polymer-Modified, Portland Cement-Based, Resurfacing Compound SECTION 03 01 30 MAINTENANCE OF CAST-IN-PLACE CONCRETE

More information

Veranda ArmorGuard Decking, Veranda Composite Decking and Fiberon Horizon Composite Decking Installation Instructions

Veranda ArmorGuard Decking, Veranda Composite Decking and Fiberon Horizon Composite Decking Installation Instructions Veranda ArmorGuard Decking, Veranda Composite Decking and Fiberon Horizon Composite Decking Installation Instructions VerandaDeck.com 800.566.3337 (800.HomeDepot) Decking Profiles Veranda ArmorGuard Decking

More information

Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining and HDPE

Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining and HDPE Caribbean Water & Wastewater Conference 2015 Topic: Water & Wastewater Pipeline Rehabilitation, Trenchless Technology Fully Structural Renewal of 39-inch PCCP Water Transmission Main with Swagelining and

More information

System Application Guideline

System Application Guideline Page 1 of 5 INTRODUCTION This Application Guideline has been published to ensure proper use and installation of Fitzgerald Formliners GrayLastic products. It is recommended that all personnel involved

More information

Installation Guide. PrivacyShield Outdoor Enclosure

Installation Guide. PrivacyShield Outdoor Enclosure Installation Guide PrivacyShield Outdoor Enclosure Table of Contents 1.0 Introduction... 2 2.0 Materials, Delivery & Tools... 2 3.0 Layout and Post Locations. 3 4.0 Foundations... 5 5.0 PVC Installation....

More information

INTERNAL MECHANICAL JOINT SEAL FOR INDUSTRIAL & MUNICIPAL PIPING

INTERNAL MECHANICAL JOINT SEAL FOR INDUSTRIAL & MUNICIPAL PIPING INTERNAL MECHANICAL JOINT SEAL FOR INDUSTRIAL & MUNICIPAL PIPING PART 1 GENERAL 1.1 SUMMARY A. The work covered under this specification includes the furnishing of all materials, tools, equipment, and

More information

Down-Tube End Coating Specification Rev

Down-Tube End Coating Specification Rev DESCRIPTION OF WORK Down-Tube End Coating Specification Rev. 10-21-01 The ARCOR down-tube end coating system is currently a 8-10 mil system applied at 6-8 down the tube tied in with a 30-40 mils Tubesheet

More information

2 Solid Decking P roduct Description

2 Solid Decking P roduct Description 2 Solid Decking P roduct Description Species: Douglas Fir, Alaska Cedar, Western Red Cedar, Ponderosa Pine. Timberweld inventories Select Grade Douglas Fir. Special Products: FSC Douglas fir is available.

More information

SECTION PIPE INSTALLATION

SECTION PIPE INSTALLATION SECTION 02232 PIPE INSTALLATION A. General The pipe shall be Ductile Iron pipe with Tyton push-on joints and cement lined as described and manufactured in accordance with ANSI/AWWA C151/A21.51. Gaskets

More information

StormPod Arch Installation Guide

StormPod Arch Installation Guide StormPod Arch Installation Guide xx Foundation Bed Preparation Use standard construction procedures for the construction of the bed for StormPod Modular Arch Systems. As with any construction project,

More information

PCHROME SPRAYING INSTRUCTIONS

PCHROME SPRAYING INSTRUCTIONS PCHROME SPRAYING INSTRUCTIONS FOR DECORATIVE APPLICATIONS While the coating instructions must be carefully followed to achieve a optimum result, the process is not limited to the treatment of one article

More information

C900/RJ. CertainTeed. PVC Pipe. with CertainTeed s proven Certa-Lok restrained joint system. Directional Drilling

C900/RJ. CertainTeed. PVC Pipe. with CertainTeed s proven Certa-Lok restrained joint system. Directional Drilling 1 CertainTeed C900/RJ PVC Pipe with CertainTeed s proven Certa-Lok restrained joint system Directional Drilling Underground Water Mains and Restrained, Non-Metallic Change-of-Direction Fittings (No Thrust

More information

the P.R. Skate, LLC Pallet Rack Moving System Product Manual

the P.R. Skate, LLC Pallet Rack Moving System Product Manual the P.R. Skate, LLC Pallet Rack Moving System Product Manual the P.R. Skate, LLC Product Manual In this manual we will cover both normal operation of the P.R. Skate moving system and safety issues that

More information