1 Introduction Moment Frame Analysis The moment frames in the Plaza for PPL Center were analyzed as four different systems defined by AISC: 1. Special Moment Frames 2. Intermediate Moment Frames 3. Ordinary Moment Frames 4. Moment Frames not Specifically Detailed for Seismic Resistance The frames are listed in order of decreasing ductility. The idea behind seismic design depends on the response of the lateral force resisting system to the ground motion. Under IBC 2000 and ASCE 7-98, steel frames can be designed for a lower lateral force provided that the frame achieves certain ductility. The AISC Seismic Provisions dictates the detailing criteria for the various categories of frames and assigns more stringent requirements to frames which are assumed to be more flexible. The result is a trade-off between heavier members with smaller connections and lighter members with larger, often stiffened connections. Construction Management Comparison The economy of each system was compared in both cost and time savings. With the increasing wages and unchanging material prices, most of the cost for a steel system lies in the detailing. As predicted, the most economical moment frame system resulted when a response modification factor of three was used for design which made the less stringent detailing requirements applicable. This design required the least fabrication and erection time and resulted in the largest cost savings. 38
2 Cost Comparison Assumed Costs Cost data associated with steel construction was acquired from two fabricators: Stewart-Amos Steel of Harrisburg, PA and Grossi Steel of Bensalem, PA. The costs used for the lateral system comparison are summarized in the table below. Stiffeners and Doubler Plates Total Material Fabrication 4 Stiffeners 600 lbs. steel $125 $20 $105 2 hrs. 2 Doubler Plates 700 lbs. steel $150 $15 $ hrs. Erection Labor Fabrication Labor 1 Ironworker $15/hr Shop Labor $15/hr. 3 min./bolt Overhead $35/hr Rolled Steel Plate Steel A992 $0.21/lb. 50ksi $0.32/lb. 36ksi $0.25/lb. The estimated costs of the connections are included in the summary tables from the previous section. The connections for moment frame A are included as a representative spreadsheet in Appendix 2. The total estimated cost of the frames is included with the frame diagrams. The frame diagrams for moment frame A have been added in Appendix 2 as a representative summary of the design costs. A summary of the total system cost is show in the table on the following page. 39
3 Fabrication and Erection Time The estimated time comparisons are listed in the table on the previous pages. The times were derived from the equivalent weights of steel, which are suggested by AISC, along with wage information from RS Means and Stewart- Amos Steel. The fabrication data only indicates the additional time that would be required to fabricate column stiffeners. The difference in fabrication time due to a greater number of bolts or thicker plates is negligible and is therefore assumed to be equal. The final costs are listed in the table below: Special Moment Frames A $50,145 $4,294 $22,480 $2, B $38,662 $3,310 $17,332 $1, C $38,662 $3,310 $17,332 $1, D $46,986 $4,023 $21,064 $1, Sum $274,617 1,676 hrs. Intermediate Moment Frames A $50,145 $4,294 $22,480 $2, B $38,662 $3,310 $17,332 $1, C $38,662 $3,310 $17,332 $1, D $46,986 $4,023 $21,064 $1, Sum $274,617 1,676 hrs. Ordinary Moment Frames A $60,753 $4,367 $11,180 $3, B $44,048 $3,167 $8,106 $2, C $44,048 $3,167 $8,106 $2, D $51,362 $3,692 $9,452 $2, Sum $262,953 1,334 hrs. R=3 A $70,906 $1,607 $2,340 $2, B $51,058 $1,157 $1,685 $1, C $51,058 $1,157 $1,685 $1, D $58,839 $1,334 $1,942 $1, Sum $252, hrs. 40
4 Comparison Results Total System Results It was proven in the structural comparison of the moment frames that a lower R-factor resulted in heavier members, but smaller connections. As shown in the table on the previous page, this combination results in a more economical frame. As the R-factor is increased, the efficiency of the frames is decreased. The chart above illustrates the trend of decreasing cost and time with a higher R-factor. Connections Connections drive the cost of steel construction. The heavy members and less stringent detailing requirements associated with low seismic design eliminated the need for stiffeners and doubler plates, which are pictured in the right. Stiffeners and doubler plates are easily designed with today s technology, but drive the fabrication costs up significantly because of the extensive labor required for the welding of the plates to the columns. Column Flange Stiffeners Stiffened Moment Connection Panel Zone Doubler Plate 41
5 Schedule Comparison Project Requirements PPL Corporation will occupy the Plaza at PPL Center on April 30, PPL Corp. wants to relocate the unregulated subsidiaries as soon as possible to minimize the negative implications of having the regulated and unregulated divisions of the corporation in one headquarters. If the building is not turned over to Liberty Property Trust by April 30, 2003 a string of penalties occurs. PPL will receive compensation from Liberty Property Trust, who will in turn collect compensation from L.F.Driscoll, who will fault the sub-contractor responsible for the delay. As a result, it is very important for the project to stay on track. Schedule Modifications All items associated with the structural steel design, fabrication and erection fall on the critical path. Therefore, any time savings in the steel sequence would be beneficial. The existing east-west lateral system for the Plaza at PPL Center is special moment frames. The previous comparison indicated that is was more economical to design the frames using R=3 because it offers both cost and time savings. As shown in the table to the right, the low seismic design offers a time Connection Labor Special Moment Frames Frames not Detailed for Seismic Fabrication Erection Fabrication Erection ,676 hrs. 602 hrs. savings of 1074 man-hours, which is due to the time savings in the fabrication. For the special moment frames, the fabrication time was substantially increased by the addition of stiffener and doubler plates. The erection time is slightly higher for the low-seismic since more bolts were required to prevent block shear in the beam flanges. 42
6 Schedule Comparisons Designing with a response modification factor equal to three, 1090 hours are saved during the fabrication time, but sixteen hours are added during erection. Assuming an erection crew of six ironworkers, the sixteen hours has almost no effect on the erection schedule. However, the change in fabrication time will have a considerable effect on the overall project schedule. The difference in fabrication time can be contributed to the difference in the number of required stiffeners. Assuming a welding crew of 4-5 men, working eight hours each day for five days each week, the 1090 man-hours equates to about six weeks. Since steel fabrication in on the critical path for the project, the time savings takes the activity off the critical path allowing for six weeks of float time. With the existing schedule the decrease in fabrication time does not change the project completion date because the steel erection is dependent on the completion of sitework and foundations as seen in the schedules in Appendix 3, but it does allows for flexibility in the schedule and opens up other possibilities. The steel fabrication was scheduled to begin immediately after schematic design. There are inherent problems associated with this schedule. More often than not, major changes occur in the design after schematic drawings are issued. Fabricators will often charge the owner a larger contingency when fabrication is started earlier to prepare for future change orders. The time savings could allow for the steel fabrication to start at a later date. This would allow for a more complete set of design documents to be issued resulting in a lower contingency for the owner and less change orders. 43
7 A second option would be to retain the float within the schedule to allow for any problems that occur later in the construction. This is a sizeable float time and would probably be better utilized for delaying the fabrication for at least part of the time. Changing the foundation and sitework, could be a third possibility. The start of steel erection is dependent on the foundation. If possible, it would be beneficial to fast-track the foundation to allow for earlier erection of the steel. This change would allow for an earlier project completion date since all the steel related activities would be put back on the critical path. Conclusions In summary, designing the east-west lateral for the Plaza at PPL Center as moment frames not specifically detailed for seismic resistance instead of special moment frames results in a cost savings of $23,000 and saves six weeks of fabrication time. The savings can be attributed to the more economical connections that can be designed under low seismic. 44
THE PLAZA AT PPL CENTER ALLENTOWN, PA
: MOMENT FRAME COMPARISON Introduction Design Intent IBC 2000 and ASCE 7-98 recognizes steel frames designed with a response modification factor, R, less than or equal to three as structural steel systems
More informationTHE PLAZA AT PPL CENTER HAMILTON BOULEVARD AT 9 TH STREET - ALLENTOWN, PA
THE PLAZA AT PPL CENTER HAMILTON BOULEVARD AT 9 TH STREET - ALLENTOWN, PA Amy Graver, Structural Option - Dr. Hanagan, Advisor 12.16.2002 THESIS PROPOSAL Executive Summary Architecture The Plaza at PPL
More informationTHE PLAZA AT PPL CENTER HAMILTON BOULEVARD AT 9 TH STREET - ALLENTOWN, PA
THE PLAZA AT PPL CENTER HAMILTON BOULEVARD AT 9 TH STREET - ALLENTOWN, PA Amy Graver, Structural Option - Dr. Hanagan, Advisor 10.21.2002 PRO-CON STRUCTURAL STUDY OF ALTERNATE FLOOR SYSTEMS Executive Summary
More informationCHAPTER 1 INTRODUCTION 1.1 MOMENT END-PLATE CONNECTIONS
CHAPTER 1 INTRODUCTION 1.1 MOMENT END-PLATE CONNECTIONS The typical moment end-plate connection shown in Fig. 1-1 consists of a plate that is shop-welded to the end of a beam which is then bolted to the
More informationTHE BRACE CONNECTION THE BOLTED OPTION FIGURE 1 MODEL SHOWING THE BOILER AND THE STRUCTURAL SUPPORT SYSTEM (BOILER BUILDING)
Comparative Study of Bolted versus Welded SCBF Connections Authors: Robert P. Krumpen III P.E., Bechtel Corporation, rpkrumpe@bechtel.com Dr. Peter J. Carrato P.E. S.E., Bechtel Corporation, pcarrato@bechtel.com
More informationICC-ES Evaluation Report Issued November 1, 2011 This report is subject to renewal November 1, 2012.
ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-1093* Issued November 1, 2011 This report is subject to renewal November 1, 2012. A Subsidiary of the International Code Council
More informationLearning Objectives. Topics. Moment Frames: Design and Detailing per AISC 341 and 358. Topics. Lateral Analysis/Choosing your Code
Topics Moment Frames: Design and Detailing per AISC 341 and 358 By Matthew J. Mester, PE, SE SidePlate Systems, Inc. SE University, June, 2017 www.learnwithseu.com 2 Learning Objectives Topics Identify
More informationBrent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan
Structural Design: Goals: The original design of 200 Minuteman Drive was dictated largely by Brickstone Properties, the building s owner. The new design of 200 Minuteman Drive, with additional floors,
More informationTips for Successful Delegation of Connection Design
Tips for Successful Delegation of Connection Design 2 by Clifford Schwinger, P.E. The Harman Group, Structural Engineers King of Prussia, Pa. cschwinger@harmangroup.com Delaware Valley Association of Structural
More informationIntroduction to Cambering
Image courtesy of CAMBCO Inc. 35 Introduction to Cambering Cambering is the process of creating an intentional slight curvature in a beam Image courtesy of CAMBCO Inc. 36 18 Introduction to Cambering Camber
More informationACHIEVING DUCTILE BEHAVIOR OF MOMENT CONNECTIONS PART II
Beam Seismic Design Panel zone ACHIEVING DUCTILE BEHAVIOR OF MOMENT CONNECTIONS PART II The results of additional tests provide further confirmation that weld metal toughness is key in achieving ductile
More informationConstruction Management Study
Construction Management Study CONSTRUCTION MANAGEMENT STUDY A construction management study of the alternate concrete system was done to examine the impact that changing the building s superstructure material
More informationSupplemental Structural Correction Sheet Steel Moment Frame Design (2017 LABC)
Supplemental Structural Correction Sheet Steel Moment Frame Design (2017 LABC) Plan Check/PCIS Application No.: Checked By: Your feedback is important, please visit our website to complete a Custom Survey
More informationMOMENT RESISTING CONNECTION WITH SIDEPLATE (GEOMETRIC ASPECTS)
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 194 MOMENT RESISTING CONNECTION WITH SIDEPLATE (GEOMETRIC ASPECTS) Ardeshir DEYLAMI 1, and R. ASHRAF
More informationTech Tips SidePlate Connections FAQ 09/30/2017
Tech Tips SidePlate Connections FAQ 09/30/2017 Page 1 of 15 Introduction to SidePlate Connection Technology SidePlate Connection Technology is ideally suited to protect structures against seismic events,
More informationFigure 1 Example of HSS column splice
HSS Column Splices Mike Manor, PE, MLSE FORSE Consulting Technical Consultant to the Steel Tube Institute Hollow Structural Sections (HSS) columns are prevalent in many types of construction, especially
More informationInsulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM):
SECTION 05120 STRUCTURAL STEEL PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03342 - Insulating Cellular Concrete. 2. 05210 - Steel Joists. 3. 09900 - Painting. 1.02 REFERENCES A. America Society
More informationtwenty one Steel Construction 1 and design APPLIED ARCHITECTURAL STRUCTURES: DR. ANNE NICHOLS SPRING 2018 lecture STRUCTURAL ANALYSIS AND SYSTEMS
APPLIED ARCHITECTURAL STRUCTURES: STRUCTURAL ANALYSIS AND SYSTEMS DR. ANNE NICHOLS SPRING 2018 lecture twenty one steel construction http://nisee.berkeley.edu/godden and design Steel Construction 1 Steel
More informationDIVISION: METALS SECTION: STRUCTURAL STEEL FRAMING REPORT HOLDER: SEISMIC STRUCTURAL DESIGN ASSOCIATES, INC.
0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 1093 Reissued 03/2018 This report is subject to renewal 03/2019. DIVISION: 05 00
More informationSupplemental Structural Correction Sheet Steel Brace Frame Design (2017 LABC)
Supplemental Structural Correction Sheet Steel Brace Frame Design (2017 LABC) Plan Check Submittal Date: Plan Check / PCIS App #: Job Address: Applicant: P.C. Engineer: (print first / last name) E-mail:
More informationmanualwise BRACED FOR BETTER SEISMIC DESIGN
An introduction to the newest edition of AISC s Seismic Design Manual. manualwise BRACED FOR BETTER SEISMIC DESIGN BY ERIC BOLIN, PE, AND MICHAEL GANNON, SE, PE DO YOU DESIGN PROJECTS with seismic systems?
More informationTECHNICAL REPORT 2 BUILDING CODES, SPECIFICATIONS, AND LOADS
TECHNICAL REPORT 2 BUILDING CODES, SPECIFICATIONS, AND LOADS SECOND & STATE BUILDING HARRISBURG PA JADOT A MOOSMAN STRUCTURAL OPTION Primary AE Faculty Consultant... Dr. Thomas E. Boothby Date of Submission...
More informationTechnical Report 2: Pro-Con Structural Study of Alternate Floor Systems
Gateway Plaza Wilmington, DE October 31, 2005 Elizabeth Hostutler Structural Option Advisor: Linda Hanagan Technical Report 2: Pro-Con Structural Study of Alternate Floor Systems EXECUTIVE SUMMARY The
More informationCrossroads at Westfields Building II
Crossroads at Westfields Building II Chantilly, Va STEPHEN LUMPP Structural option Faculty Consultant: Dr. Andres Lepage Technical Report 2 EXECUTIVE SUMMARY This report is a study of alternate floor systems
More informationCORPORATE HEADQUARTERS
TECHNICAL REPORT 1 `` CORPORATE HEADQUARTERS Great Lakes Region, U.S.A. M. JULIA HAVERTY STRUCTURAL OPTION ADVISOR: H. SUSTERSIC 12 SEPTEMBER 2014 Contents Executive Summary... 2 Purpose and Scope... 3
More informationfifteen steel construction: materials & beams ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS SUMMER 2016 lecture
ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS SUMMER 2016 lecture fifteen steel construction: materials & beams Steel Beams 1 Steel Beam Design American Institute of Steel Construction
More informationTrump Taj Mahal Hotel
Trump Taj Mahal Hotel Atlantic City, New Jersey Thesis Proposal Prepared By: Stephen Reichwein, Structural Option Faculty Advisor: Dr. Andres Lepage The Pennsylvania State University Department of Architectural
More information2016 AISC Standards. Specification for Structural Steel Buildings & Code of Standard Practice for Steel Buildings and Bridges.
2016 AISC Standards Specification for Structural Steel Buildings & Code of Standard Practice for Steel Buildings and Bridges Eric Bolin Staff Engineer June 1, 2017 2016 AISC Standards 2018 INTERNATIONAL
More informationHOW TO. ESTIMATE the COST CONTENTS O F S T R U C T U R A L S T E E L ROBERT R. BONENFANT, JR. - JULY RATIOS AND ANALYSIS Main CSI Division
HOW TO ESTIMATE the COST O F S T R U C T U R A L S T E E L CONTENTS ROBERT R. BONENFANT, JR. - JULY 2008 1. INTRODUCTION 7. RATIOS AND ANALYSIS Main CSI Division 8. MISCELLANEOUS AND PERTINENT Specific
More informationw Whittles Publishing
Practical Design of Steel Structures Based on Eurocode 3 (with case studies): A multibay melting shop and finishing mill building Karuna Moy Ghosh CEng, FIStructE (London), MIECivil Engg. (India), Chartered
More informationTHE USE OF DUCTILITY IN NUCLEAR FACILITIES
SECED 2015 Conference: Earthquake Risk and Engineering towards a Resilient World 9-10 July 2015, Cambridge UK THE USE OF DUCTILITY IN NUCLEAR FACILITIES Paul DOYLE 1 Abstract The author works for a nuclear
More informationTaking It to the Limit BY JOHN ROACH, PE, AND JOHN BOEKELMAN, SE, PE, RA CannonDesign
A Pennsylvania healthcare facility needed additional clinical space in a tight urban center. So it expanded the only way it could: up. Taking It to the Limit BY JOHN ROACH, PE, AND JOHN BOEKELMAN, SE,
More informationPanduit Corporation Tinley Park, Illinois. Outset and Inset Cabinets Seismic Load Rating and Anchorage Design
Panduit Corporation Tinley Park, Illinois Outset and Inset Cabinets Seismic Load Rating and Anchorage Design February 13, 2013 Degenkolb Job Number B2439007.00 www.degenkolb.com 500 Degenkolb Engineers
More informationItem 442 Metal for Structures
Item 442 Metal for Structures 1. DESCRIPTION 2. MATERIALS Provide structural steel, high-strength bolts, forgings, steel castings, iron castings, wrought iron, steel pipe and tubing, aluminum castings
More informationRutgers University Law School Building Addition and Renovation Camden, NJ
Building Addition and Renovation Camden, NJ Technical Assignment 1 October 5, 2007 Nathan E. Reynolds Structural Option Senior Thesis The Pennsylvania State University Faculty Consultant: Professor M.
More informationOVERALL STRUCTURAL SYSTEM
EXECUTIVE SUMMARY The at the Pittsburgh International Airport, PA, is a 275,000 square foot multi-use building located directly adjacent to the airport s landside terminal. The building consists of an
More informationTop Things To Know About HSS Connections
Top Things To Know About HSS Connections SEAoPA Philadelphia, PA Wednesday, December 2, 2015 Brad Fletcher, S.E. Atlas Tube Market Leader Largest size range in North America 1 16 square, up to 5/8 wall
More informationTHE PLAZA AT PPL CENTER ALLENTOWN, PA
Building Function and Primary Use The owner of the new Plaza at PPL Center is Liberty Property Trust, but the primary tenant is PPL, which will use the building as the headquarters for its new subsidiaries
More informationFOUR. at the Fore BY RICHARD B. GARLOCK, P.E.
The first tower to open at the original World Trade Center site, 4WTC maximizes its space and views with creative column construction. FOUR at the Fore BY RICHARD B. GARLOCK, P.E. Joe Woolhead APRIL 2015
More informationDisplacement Based Assessment and Improvement of a Typical New Zealand Building by an Average Engineer
Displacement Based Assessment and Improvement of a Typical New Zealand Building by an Average Engineer M.L. Grant LGE Consulting, Masterton 2016 NZSEE Conference ABSTRACT: The Radiohouse building is a
More informationCORPORATE HEADQUARTERS
TECHNICAL REPORT 1 REVISIONS `` Image Courtesy RTKL CORPORATE HEADQUARTERS Great Lakes Region, U.S.A. M. JULIA HAVERTY STRUCTURAL OPTION ADVISOR: H. SUSTERSIC 12 DECEMBER 2014 Contents Executive Summary...
More informationSchool of Engineering and Applied Science Building Miami University, Oxford, OH Technical Assignment 3 December 3, 2007
School of Engineering and Applied Science Building Miami University, Oxford, OH Technical Assignment 3 December 3, 2007 Jonathan Kirk AE 481W Senior Thesis The Pennsylvania State University Faculty Advisor:
More informationAnalysis 2 Pre-fabricated Metal Stud Crete Panels-Structural Breadth
Analysis 2 Pre-fabricated -Structural Breadth Background The current façade design calls for stick built 3-5/8 masonry on a 7-5/8 metal stud back-up with exterior sheathing board, 1 cavity board insulation
More information111 MORGAN ST. Ryan Friis
Technical Report No. 1 September 30, 2002 Executive Summary: 111 Morgan St. is a 9 story cast-in-place concrete condominium building being constructed in Chicago, Illinois. The building s floor system
More informationINFLUENCE OF DIFFERENT TYPES OF FULLY RESTRAINED CONNECTIONS ON THE RESPONSE OF SMRF STRUCTURES
INFLUENCE OF DIFFERENT TYPES OF FULLY RESTRAINED CONNECTIONS ON THE RESPONSE OF SMRF STRUCTURES Akshay GUPTA And Helmut KRAWINKLER SUMMARY The behavior, response, and performance of code-compliant designs
More informationThis Technical Note describes how this program can be used in the design of continuity plates.
COMUTERS AND STRUCTURES, INC., BERKELEY, CALIORNIA DECEMBER 2001 STEEL RAME DESIGN UBC97-ASD Technical Note This Technical Note describes how this program can be used in the design of continuity plates.
More information22. DESIGN OF STEEL BRACED FRAMES Eccentrically Braced Steel Frames
22. DESIGN OF STEEL BRACED FRAMES 22.1 Eccentrically Braced Steel Frames Objective is to dissipate energy in the shear or moment links and to protect the remainder of the frame from inelastic action, including
More informationTypes Of Roofs - Vault
1 Types Of Roofs - Vault Implementation Of the Concrete On Vault Implementation Of Vault Earthquake Damage 2 Types Of Roofs - Joist And Block 3 Types Of Coverage Roofs-Composite 4 5 Building Structure
More informationsteelwise WHAT S NEW WITH PREQUALIFIED CONNECTIONS? A look at the latest version of AISC 358.
A look at the latest version of AISC 358. steelwise WHAT S NEW WITH PREQUALIFIED CONNECTIONS? BY MICHAEL D. ENGELHARDT, PhD, AND MARGARET A. MATTHEW, PE WHEN IT COMES to the chronicles of steel construction,
More informationNorth Mountain IMS Medical Office Building
North Mountain IMS Medical Office Building Phoenix, Arizona Michael Hopple Technical Assignment 2 October 29 th, 2007 AE 481W-Senior Thesis The Pennsylvania State University Faculty Adviser: Dr. Ali Memari,
More informationEarth and Engineering Sciences Building University Park, Pennsylvania
Executive Summary The Earth and Engineering Sciences building is a 4 story educational and laboratory facility. An additional basement level is located below grade and provides the foundation for the East
More informationCHAPTER 14 SLOTTEDWEB (SW) MOMENT CONNECTION
1 CHAPTER 14 SLOTTEDWEB (SW) MOMENT CONNECTION The user s attention is called to the fact that compliance with this chapter of the standard requires use of an invention covered by patent rights. 1 By publication
More informationPark Potomac Office Building E
Kyle Wagner (IP) Advisor: Professor Kevin Parfitt 12/11/2009 Table of Contents I. Executive Summary. 3 II. Introduction / Material Strengths. 4 III. Codes and Design Standards.. 5 IV. Existing Structural
More informationExperimental Evaluation of The Seismic Behavior of Steel- Braced RC Frames
1/7 Paper IFHS-211 Experimental Evaluation of The Seismic Behavior of Steel- Braced RC Frames M. L. Nehdi Currently at Alhosn University, Abu Dhabi, United Arab Emirates M. A. Youssef and H. Ghaffarzadeh
More informationComparison of haunched and constant depth steel box bridge girders, International Bridge Conference, Pittsburgh, PA., June 1984 (F.L. Publ.
Lehigh University Lehigh Preserve Fritz Laboratory Reports Civil and Environmental Engineering 1984 Comparison of haunched and constant depth steel box bridge girders, International Bridge Conference,
More informationSEISMIC CODE DEVELOPMENT FOR STEEL STRUCTURES by Helmut Krawinkler*
127 SEISMIC CODE DEVELOPMENT FOR STEEL STRUCTURES by Helmut Krawinkler* Presented at the Pacific Structural Steel Conference, Auckland, August 1986 SYNOPSIS This paper discusses revisions proposed by the
More informationSEISMIC PERFORMANCE OF SCBF BRACED FRAME GUSSET PLATE CONNECTIONS
4th International Conference on Earthquake Engineering Taipei, Taiwan October 12-13, 2006 Paper No. 80 SEISMIC PERFORMANCE OF SCBF BRACED FRAME GUSSET PLATE CONNECTIONS Charles W. Roeder 1, Dawn E. Lehman
More informationSTEEL REACTION FRAME
STEEL REACTION FRAME Kyle Coleman, CEE Laboratory Manager Andrew Myers, Assistant Professor Jerome F. Hajjar, Professor and Chair, Director, STReSS Laboratory Department of Civil and Environmental Engineering,
More informationLATEST UPDATES TO U.S. SEISMIC DESIGN PROVISIONS FOR STRUCTURAL STEEL BUILDINGS
13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 2004 Paper No. 1998 LATEST UPDATES TO U.S. SEISMIC DESIGN PROVISIONS FOR STRUCTURAL STEEL BUILDINGS James O. Malley
More informationQuestion 8 of 55. y 24' 45 kips. 30 kips. 39 kips. 15 kips x 14' 26 kips 14' 13 kips 14' 20' Practice Exam II 77
Question 8 of 55 A concrete moment frame building assigned to SDC = D is shown in the Figure. Equivalent lateral force analysis procedure is used to obtain the seismic lateral loads, E h, as shown. Assume
More informationStructural Redesign Gravity System
Redesign Gravity System Design Considerations A composite floor system was used for this design to maximize the efficiency of the material being used. This type of system requires less material and provides
More informationSEISMIC DESIGN OF STEEL FRAMES CONSIDERING STRUCTURAL WEIGHT AND FABRICATION COST
October -,, Beijing, China SEISMIC DESIGN OF STEEL FRAMES CONSIDERING STRUCTURAL WEIGHT AND FABRICATION COST K.Sawada,H.Shimizu,A.Matsuo,T.Sasaki,T.Yasui,A.Namba,T.Takamatsu,H.Tamai Assistant Professor,
More informationDanielle Shetler - Structural option Courtyard by Marriott Lancaster, PA
Structural Analysis Overview: During the structural analysis of the in Lancaster, Pa, a redesign of the lateral and gravity system from masonry bearing and shear walls to a staggered truss system was performed.
More informationSTRUCTURAL STEEL FRAMING
SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section includes 1. Structural steel framing 2. Structural steel framing required for support and framing of rooftop mechanical
More informationNON-LINEAR BEHAVIOR OF STEEL PLATE SHEAR WALL WITH LARGE RECTANGULAR OPENING
NON-LINEAR BEHAVIOR OF STEEL PLATE SHEAR WALL WITH LARGE RECTANGULAR OPENING Ardeshir DEYLAMI 1 And Hossein DAFTARI 2 SUMMARY Steel plate shear walls have been used more and more in the steel structures
More informationThe SlottedWeb Steel Moment Connection
The SlottedWeb Steel Moment Connection Seismic Structural Design Associates http://slottedweb.com Jay Allen, S.E. Jay Allen President (602)President 251-0329 Jim Partridge, C.E. Jim Partridge Secretary
More informationVisteon Village Corporate Center
Visteon Village Corporate Center Van Buren Township, MI Technical Assignment #1 Jamison Morse Structural Option Advisor: Dr. Andres Lapage Jamison Morse Structural Option Visteon Village Center Advisor:
More informationPAUL PARFITT. BAE/MAE Structural Option Senior Thesis Tower 333 May 4 th 2007
PAUL PARFITT BAE/MAE Structural Option Senior Thesis Tower 333 May 4 th 2007 Tower 333 Introduction Proposal Lateral System Redesign Elimination of Moment Frames Core-Only Solution Cost Analysis & Schedule
More informationLateral System Analysis and Confirmation Design (S-3)
November 13, 2002 Lateral System Analysis and Confirmation Design (S-3) Executive Summary: This report summarizes the analysis of the lateral systems used in the 250 West Street building in Columbus, Ohio.
More informationBUILDING RETROFITS: BREATHING NEW LIFE INTO EXISTING BUILDING STRUCTURES
BUILDING RETROFITS: BREATHING NEW LIFE INTO EXISTING BUILDING STRUCTURES CLIFFORD SCHWINGER Clifford Schwinger Clifford Schwinger, P.E. is Vice President and Quality Assurance Manager at Cagley Harman
More informationEngDoc.ir. Page 1 of 51
Page 1 of 51 1994 Northridge Earthquake Widespread failure of welded flange - bolted web moment connections Page 2 of 51 Damage Observations: Steel Moment Connections Pre-Northridge Welded Flange Bolted
More informationKiski Area High School Allegheny Township, PA FLOOR SYSTEM ANALYSIS
FLOOR SYSTEM ANALYSIS Objective The objective of the following breadth study is to determine if an alternative floor system for Building N would be more advantageous than the existing floor system. The
More informationMARKET SQUARE PLAZA 17 NORTH SECOND STREET HARRISBURG, PENNSYLVANIA
17 NORTH SECOND STREET HARRISBURG, PENNSYLVANIA NICOLE L. RENNO SENIOR THESIS FINAL REPORT PENN STATE UNIVERSITY ARCHITECTURAL ENGINEERING STRUCTURAL OPTION APRIL 5, 2005 TABLE OF CONTENTS I. TABLE OF
More informationMOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS
MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS PARKERSBURG, WEST VIRGINIA DOMINIC MANNO STRUCTURAL OPTION FACULTY CONSULTANT: DR. ANDRES LEPAGE Technical Report 3 11-21-08 TABLE OF CONTENTS TABLE OF
More informationSeismic Considerations of Circuit Breakers
Seismic Considerations of Circuit Breakers Willie Freeman, IEEE 693 Working Group ABB Inc, Mt. Pleasant PA, USA IEEE Tutorial - 2008 Abstract: The tutorial covers the seismic qualification of high voltage
More informationEric Alwine Structural Option George Read Hall The University of Delaware Dr. Boothby Technical Assignment #2 October 31, 2005 EXECUTIVE SUMMARY:
EXECUTIVE SUMMARY: THIS REPORT IS A COMPARISON OF ALTERNATE FLOOR SYSTEMS FOR GEORGE READ HALL. FOUR DIFFERENT SYSTEMS WERE DESIGNED AND COMPARED TO THE EXISTING HAMBRO FLOOR SYSTEM. THE FOUR SYSTEMS WERE
More information181 Fremont San Francisco, CA. Tech Report 3 10/17/2014. PSUAE Structural Option Advisor: Dr. Thomas Boothby
181 Fremont San Francisco, CA Tech Report 3 10/17/2014 PSUAE Structural Option Advisor: Dr. Thomas Boothby Caroline Klatman cjk5258@psu.edu October 17, 2014 Dr. Thomas Boothby The Pennsylvania State University
More informationUNION STATION EXPANSION AND RESTORATION TECHNICAL REPORT I
UNION STATION EXPANSION AND RESTORATION WASHINGTON DC TECHNICAL REPORT I Joseph W. Wilcher III Adviser: M.K. Parfitt September 29, 2008 TABLE OF CONTENTS Executive Summary... 2 Structural Systems Foundation...
More informationU.S. General Services Administration Progressive Collapse Design Guidelines Applied to Concrete Moment-Resisting Frame Buildings
2004 ASCE Structures Congress Nashville, Tennessee May 18-22, 2004 U.S. General Services Administration Progressive Collapse Design Guidelines Applied to Concrete Moment-Resisting Frame Buildings By David
More informationA-Series Aluminum Gantry Crane
SPANCO PRODUCT SPECIFICATIONS 1 A-Series Aluminum Gantry Crane This guide can be used to prepare a bid specification for the incorporation of an A-Series Gantry Crane into a competitive bid project or
More informationLetter of Transmittal
Letter of Transmittal November 17, 2014 Ali Said Structural Thesis Advisor The Pennsylvania State University aus59@psu.edu Dear Doctor Said, The following technical report fulfills the fourth Technical
More informationCHAPTER 4. 1:6-Scale Frame: Stiffness and Modal Testing 4.1 OVERVIEW
CHAPTER 4 1:6-Scale Frame: Stiffness and Modal Testing 4.1 OVERVIEW A 1:6-scale steel moment frame was designed for shaking-table experiments described in Chapter 5 based on Drain-2DX (DRAIN) analyses.
More informationTable of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8
WISCONSIN PLACE RESIDENTIAL TECHNICAL ASSIGNMENT 2 OCTOBER 29, 2007 KURT KRASAVAGE THE PENNSYLVANIA STATE UNIVERSITY STRUCTURAL OPTION FACULTY ADVISOR: DR. ALI MEMARI 1 Table of Contents Table of Contents.2
More informationCONNECTION STIFFNESS IMPLEMENTATION PROCEDURE
CONNECTION STIFFNESS IMPLEMENTATION PROCEDURE FOR Risa 3D USERS 09/29/17 Modeling of Lateral Frames Using SidePlate Connection Technology: The inherent SidePlate connection stiffness can be implemented
More informationPro-Con Structural Study for Alternative Floor Systems October 27, 2004
Ismail Al-Hadhrami Structural Option Faculty Consultant: Dr. Thomas Boothby Agricultural Hall and Annex East Lansing, MI Pro-Con Structural Study for Alternative Floor Systems October 27, 2004 Executive
More informationSEISMIC APPLICATIONS OF HOLLOW STRUCTURAL SECTIONS (HSS) IN MOMENT RESISTING FRAMES
SEISMIC APPLICATIONS OF HOLLOW STRUCTURAL SECTIONS (HSS) IN MOMENT RESISTING FRAMES By Emily Guglielmo, SE, Martin/Martin, STI Technical Committee Member Use of Hollow Structural Section (HSS) members
More informationSTATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014
STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural
More informationSTEEL STRUCTURAL SYSTEMS
STEEL STRUCTURAL SYSTEMS Steel elements are of two basic types: Structural steel shapes are formed into their final shapes by hot-rolling. This method produces such common elements as wide flange sections,
More informationVIRTUAL STEEL MODEL CONCEPT FOR INFORMATION AND FABRICATION INTEGRATION
VIRTUAL STEEL MODEL CONCEPT FOR INFORMATION AND FABRICATION INTEGRATION Rachik Elmaraghy 1 and Dominique Bauer 2 ABSTRACT This paper discusses reported problems related to the lack of communication between
More informationASCE Steel Bridge Project Proposal
2015-2016 ASCE Steel Bridge Project Proposal To CENE 476 Grading Instructor: Mark Lamer, P.E. From 2015-2016 ASCE Steel Bridge Team: Kaitlin Vandaveer Logan Couch Brian Jouflas Matthew Rodgers December
More informationTHE AISC SEISMIC PROVISIONS: PAST, PRESENT AND FUTURE
THE AISC SEISMIC PROVISIONS: PAST, PRESENT AND FUTURE J.O. MALLEY BIOGRAPHY OF AUTHOR James O. Malley is a Senior Principal with Degenkolb Engineers of San Francisco, California. He received both his Bachelors
More informationOCTAGONAL SHAPE REDUCES AIRPLANE HANGAR COSTS
OCTAGONAL SHAPE REDUCES AIRPLANE HANGAR COSTS While a square hangar would have been simpler to design, an octagonal building substantially reduced life cycle costs By Charles Sacre, P.E. THE PROGRAM FOR
More informationStructural Technical Report #2 Pro/Con Study of Alternate Floor Systems
Christopher McCune Structural Option Eight Tower Bridge Faculty Advisor: Dr. Hanagan October 31 st, 2005 Structural Technical Report #2 Pro/Con Study of Alternate Floor Systems Executive Summary This technical
More informationconference preview A look at the AISC Chapter C stability provisions and the role of the K-factor in stability design.
conference Stability Analysis and Design A look at the AISC 360-10 Chapter C stability provisions and the role of the K-factor in stability design. By Clifford Schwinger, P.E. The 2010 AISC Specification
More informationENHANCING STEEL BRIDGES
ENHANCING STEEL BRIDGES A series of NSBA focus groups brings to light methods to improve the cost, speed and quality of steel bridges By Andy Johnson and Bill McElency Of critical importance to designers
More informationOn Improved Performance Of Eccentrically Braced Frames With Replaceable Shear Link
On Improved Performance Of Eccentrically Braced Frames With Replaceable Shear Link M. Moestopo Faculty of Civil and Environmental Engineering, Institut Teknologi Bandung, Indonesia. A. Novan Faculty of
More informationThe Ultimate Structural Engineering Software Package!
RCsolver Superior Concrete Design Software by Deep Excavation LLC in association with Civil Engineering Department of A.U.TH. The Ultimate Structural Engineering Software Package! Deep Excavation LLC proudly
More informationThese systems are evaluated on the basis of serviceability issues such as:
1 Traci Peterson Option: Structural Faculty Consultant: Memari The Del Monte Center at The North Shore Pittsburgh, PA Structural Technical Report 2 Pro Con Structural Study of Alternate Floor Systems Date
More information