1 PHASE 1: PRE-CONSTRUCTION Schematics Phase Based upon program requirements and design parameters, D&J will establish conceptual budget and preliminary schedule for the project, which will highlight specific needs and critical milestones during the schematics phase. After review of the conceptual budget by the project team, all major building systems will be analyzed to determine the most efficient and cost effective systems. Throughout the Schematics and Design Phase, D&J will continually update the project budget and provide value engineering alternatives to control costs and schedule. Conceptual Estimating D&J will survey building parameters, construction site logistics and major components to produce a realistic preliminary budget. Conceptual Systems Analysis Most construction projects can reasonably employ any of several major building systems. To help the Owner and the Architect choose among them, D&J s value engineering services will fully evaluate these major building systems and provide pricing information for each suitable alternative. Master Schedule After consulting with the Owner and the architect, D&J will submit a Preliminary Master Schedule, which will indicate work items of critical timing for design, construction and occupancy along with the key dates for major decisions by the project team. This Master Schedule will include projections for such procedures as design work, obtaining government permits, and the ordering of long lead items, if any. All team members are advised of their individual responsibilities to keep the project on time. Design Phase 80% potential cost savings are prior to start of construction. One of D&J s unique strength lies in our exceptional strong capability to provide comprehensive pre-construction services. The depth of this experience provides strength in project planning, cost estimating, and value engineering allowing the Owner to realize exceptional value in your completed program. Technical Services Total in-house technical resources. Conceptual estimating expertise. Value engineering specialist who focus on in-depth understanding of construction requirements. Comprehensive computer database of current construction facility costs. Full disclosure of all estimate documentation.

2 PHASE 1: PRE-CONSTRUCTION Our estimating staff will rely on both in-house historical data and their detailed knowledge of the market. This knowledge is also heavily relied on for package bids which conform to the skills and competitive bidding size of the local subcontractors. In addition, current estimating programs such as Expedition and others are also used to help develop and support the cost models. Project Budget As drawings and specifications are developed, we will refine and update the preliminary budget. Using all our pricing, current data resources and anything unique to the project, D&J will consolidate all data to provide a realistic construction budget. Budget Estimates D&J will assemble all known facts regarding the building program, current bidding climate, site conditions and historical costs. Considerable dialogue with the A/E disciplines will help define program concepts and quality levels for each system. Value Engineering D&J will provide systems analysis on all major building components for the project. Each building system is analyzed against the building parameters as defined for each project and recommendations are made for possible alternate schemes. Value Engineering is not synonymous with Cost Cutting, but a systematic procedure to evaluate design alternatives by functions, analyze cost/ value relationships Construction Planning D&J saves critical time anticipating construction planning early in the Design Phase of the project. Details concerning the project s work items, building systems and work schedule activities are addressed during the Design Phase. The availability of this information gives the field construction management team the earliest opportunity to implement orders for work item details and long-lead delivery purchases. Permits and Approvals D&J, if requested, will assist the Owner in obtaining approvals from local authorities as well as building permits and special permits other than those required to be obtained by the various trade contractors. We will also verify payment of application fees and assessments.

3 PHASE 1: PRE-CONSTRUCTION Construction Administration D&J is proud of its long standing reputation for satisfying clients. Throughout every stage of the Construction Phase, automated engineering systems monitoring assures us the capability of carrying out the requirements of the Schematics and Design Phases on time and within budget. Project Coordination Once work begins, the Owner, the architect, D&J and subcontractors will meet regularly to discuss job procedures, costs, and schedules. For the duration of the project, D&J will continue to coordinate these items to ensure quality construction and full value for costs. Project Supervision The superintendent is responsible for on-site management of day-to-day construction activities. Each project will have a superintendent assigned to monitor work of trade subcontractors for compliance to safety standards, labor relations, schedule, daily manpower needs, equipment cost and quality requirements. Onsite organization and lines of authority are established in order to ensure timely decisions pertaining to cost and schedule. Project Meetings D&J will schedule and conduct construction progress meetings to discuss matters relating to procedures, progress and scheduling. We will prepare and promptly distribute minutes of such meetings to all appropriate parties. Professional Consultant Services As required, D&J will make recommendations for retaining the services of consultants and will coordinate the services of any such consultants. Schedule Review The project Critical Path Method schedule will be updated and reissued to reflect project progress. Consideration and adjustments, as required, will be made to include activity sequences and durations, allocations of labor and materials, processing of shop drawings, product data, sample and delivery of products requiring long-lead time procurement. The CPM schedule will be further updated and regularly reissued to indicate current conditions and revisions required by actual experience. D&J will utilize Primavera SureTrak 3.0 Project Manager to maintain the CPM schedule throughout the duration of the project.

4 PHASE 2: CONSTRUCTION QUALITY ASSURANCE Through a program of stringent procedures implemented during the construction project, Dunlop & Johnston, Inc. has successfully raised the quality of our construction projects well above the industry standard and strives to continue this high level of commitment to quality. The main procedures implemented are: open communication during the design phase; shop drawing review; material confirmation; placement testing; and quality follow through. During the construction design phase constant communication and review with the architect and subcontractors helps set the quality and performance expectations to be achieved. Diligent review of shop drawings and submittals by all parties is a critical step to verify the materials to be used meet or exceed the needs of the project. Upon approval the onsite superintendent will verify all materials brought on site are in accordance with the approved submittals. During placements of the materials quality testing from outside sources are used for items such as concrete, steel, masonry, site work to assure proper handling and placing methods are utilized. Along with outside testing agencies all D&J employees are geared to keep a watchful eye out for any quality issues that may arise and address them immediately. If an issue with quality arises the matter is documented and corrected to meet the standards set by D&J. These issues are internally reviewed in order to gain an understanding where the process failed in order to correct the system and avoid future issues. Through this review process D&J has been able to reduce the quality related issues on projects as well as improve a projects overall time duration by avoiding quality related pitfalls. After Safety, Quality Assurance is the most important role every D&J Employee is responsible for each and every day. The company is geared around the quality of our work and ultimately the owner s satisfaction in the product delivered.

5 PHASE 2: CONSTRUCTION Reports and Records D&J will keep accurate and detailed written records of the project s progress during all stages of construction: submit written progress reports to the Owner including progress photographs, manpower analysis, schedule updates, financial status and critical items. D&J will maintain a detailed daily log of all events occurring on the job site or related to progress of the project.. Job Site Records, Contracts, Drawings and Manuals D&J will maintain at the job site, available to the Owner, current record of all contracts: including shop drawings, commercial and technical standards and specifications, and other related documents and revisions which arise out of the contract or the construction work. At the completion of the project, all record drawings, operating and maintenance manuals will be delivered to the Owner. Certification of Substantial and Final Completion As the work of each of the trade contractors approaches completion, D&J will prepare a list of incomplete items and a schedule for their completion. We will monitor progress and prepare for final inspection and issuance of the Certificate of Final Completion by the Architects. D&J will secure and transfer to the Owner required guarantees, affidavits, releases, bonds and waivers. We will also deliver all keys, manuals, record drawings and attic stock to the Owner. Primavera Contract Manager Primavera Contract Manager is the latest version of a leading contract management and project administration tool that D&J uses to ensure that the construction schedule that we have planned is executed successfully, on-time and on-budget. Primavera Contract Manager gives our project managers and job superintendents the peace of mind that all project information from contracts, changes, drawings, submittals, meeting minutes and correspondence is linked to critical issues and presented to the Owner on demand.

6 PHASE 3: POST CONSTRUCTION Post Construction Services are important after the completion of any project. Training programs, asbuilt drawings, certifications, safety programs/issues are offered and in most cases, mandatory at the end of and acceptance of the project. The Project Manager and the Project Superintendent or other D&J team members will identify the appropriate post construction services and be responsible for implementing or reviewing them at the completion of the project with the owner and representatives. Training & Occupancy Immediately prior to occupancy, D & J will certify the performance and testing of building systems to verify that they are operating in accordance with required criteria. Subsequently, a through training session will be scheduled for the any representative the Owner deems necessary. This meeting will serve to orient the Owner s staff with the building s systems. Proper maintenance and care of certain equipment will be discussed in detail. At this time, all closeout and record documents will be delivered to the Owner. These items, including but not limited to Certificates of Inspection and Occupancy, Operation and Maintenance Manuals, etc., will be combined in an easy-to-use format. To facilitate a smooth and effortless transition to the new facilities, D&J will offer all assistance necessary to the Owner. Warranty Period D&J will continue to monitor the project for a period of one year following occupancy in order to assist the Owner with any warranty questions and procedures. Additionally we will facilitate the performance of all warranty work to provide minimal disruption of the operations of the Owner.

Owner s Representative SCOPE OF SERVICES

Owner s Representative SCOPE OF SERVICES Owner s Representative SCOPE OF SERVICES Scope of Services DeMaria s steady growth has enabled the construction of more sophisticated buildings through various methods and services. As your Owners Representative,

More information

This document describes how Austin implements projects using The Austin Method. Step 1 Preliminary Design and Engineering

This document describes how Austin implements projects using The Austin Method. Step 1 Preliminary Design and Engineering The Austin Company offers multiple approaches in implementing a project. These generally can be classified into either a design-bid-construct or design-build project approach. In addition, Austin offers

More information

Step 1 Preliminary Design and Engineering

Step 1 Preliminary Design and Engineering The Austin Company offers a variety of approaches in implementing a project. These generally can be classified into either a design-bid-construct or design-build project approach. In addition, Austin offers

More information

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility RFP Components CLIENT: TradePort International Corporation, Operators of John C. Munro

More information

ATTACHMENT D SCOPE OF SERVICES

ATTACHMENT D SCOPE OF SERVICES ATTACHMENT D SCOPE OF SERVICES OBJECTIVE Owner s Capital Improvement Program (major capital, minor construction, repair, and rehabilitation projects) includes numerous construction and renovation projects.

More information

Chapter 4 State Requirements for Educational Facilities Section 4.1

Chapter 4 State Requirements for Educational Facilities Section 4.1 providential cause, other impending danger to life safety, or pursuant to Section 1013.46(1)(b), F.S., the board can declare an emergency, can negotiate a contract with a design-build firm, design professional,

More information

EXHIBIT 6 Preconstruction Work

EXHIBIT 6 Preconstruction Work EXHIBIT 6 Preconstruction Work The following tasks shall be accomplished by the CM/GC as part of its obligations during the preconstruction phase. The work is to be coordinated with the services requirements

More information

Construction Documents Education Program

Construction Documents Education Program PLANNING AND PRE-DESIGN THE CONSTRUCTION SPECIFICATIONS INSTITUTE 110 South Union Street, Suite 100 Alexandria, VA 22314-3351 www.csinet.org CDEP 1.0.1: 03-1 Copyright Materials This presentation is protected

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE

DIVISION 1 GENERAL REQUIREMENTS SECTION PROJECT SCHEDULE DIVISION 1 GENERAL REQUIREMENTS SECTION 01 32 16 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. All drawings and technical specifications, Notice to Bidders, Instructions and Information to Bidders, Bid Proposal

More information

WOHLSEN CONSTRUCTION COMPANY

WOHLSEN CONSTRUCTION COMPANY WOHLSEN CONSTRUCTION COMPANY JOB DESCRIPTION Job Title: Special Projects Estimator & Project Manager Job Reports To: SPG Manager Exempt or Non-Exempt: Exempt Job Summary: In addition to other duties as

More information

SECTION CONSTRUCTION PROGRESS DOCUMENTATION SECTION CONSTRUCTION PROGRESS DOCUMENTATION

SECTION CONSTRUCTION PROGRESS DOCUMENTATION SECTION CONSTRUCTION PROGRESS DOCUMENTATION PART 1 GENERAL 1.01 SECTION INCLUDES A. Preliminary schedule. SECTION 01 32 00 SECTION 01 32 00 B. Construction progress schedule, with network analysis diagrams and reports. C. Daily construction reports.

More information

CONSTRUCTION MANAGEMENT

CONSTRUCTION MANAGEMENT CONSTRUCTION MANAGEMENT Construction Management is not a new idea. The function of the Construction Manager is to work on behalf of the owner to complete a project within the plans and specifications provided.

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

DeFoe Corp. 800 South Columbus Ave. Mount Vernon, NY QUALITY ASSURANCE MEASUREMENT ANALYSIS AND IMPROVEMENT

DeFoe Corp. 800 South Columbus Ave. Mount Vernon, NY QUALITY ASSURANCE MEASUREMENT ANALYSIS AND IMPROVEMENT DeFoe Corp. 800 South Columbus Ave. Mount Vernon, NY 10550 QUALITY ASSURANCE TABLE OF CONTENTS SECTION I SECTION 2 SECTION 3 SECTION 4 SECTION 5 QUALITY MANAGEMENT SYSTEM MANAGEMENT RESPONSIBILITY RESOURCE

More information

VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES. Part I: Proposal Information

VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES. Part I: Proposal Information VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES Part I: Proposal Information A General Information The Village of Vernon Hills is soliciting proposals for construction

More information

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk

More information

What You Should Know For Auditing Capital Projects Presented by: Robert S. Bright, President

What You Should Know For Auditing Capital Projects Presented by: Robert S. Bright, President What You Should Know For Auditing Capital Projects Presented by: Robert S. Bright, President September 1, 2009 1 Part One Agenda Why the Session? Audit Themes Increasing Your Value Establishing Objectives

More information

INVITATION FOR BID (IFB):

INVITATION FOR BID (IFB): DATE: May 8, 2018 ADDENDUM NO. 1 INVITATION FOR BID (IFB): B180022132 RPD Furnish & Install Ballistic Glass Lobby Counters IFB #B180022132 WAS ISSUED: Wednesday April 25, 2018 RECEIPT DATE: May 23, 2018

More information

CONSTRUCTION MANAGEMENT REQUEST FOR PROPOSAL EAST RUTHERFORD PUBLIC SCHOOLS

CONSTRUCTION MANAGEMENT REQUEST FOR PROPOSAL EAST RUTHERFORD PUBLIC SCHOOLS CONSTRUCTION MANAGEMENT REQUEST FOR PROPOSAL EAST RUTHERFORD PUBLIC SCHOOLS I. INTRODUCTION The East Rutherford School District is planning to hold a referendum on December 12, 2017 that incorporates facility

More information

CONSTRUCTION MANAGEMENT CORE COMPETENCIES

CONSTRUCTION MANAGEMENT CORE COMPETENCIES CONSTRUCTION MANAGEMENT CORE COMPETENCIES A Guide to the Construction Management Core Competencies and their Body of Knowledge CM PROFESSIONAL PRACTICE... 1 CM PROJECT MANAGEMENT... 4 COST MANAGEMENT...

More information

REQUEST FOR PROPOSAL FOR. CONSTRUCTION MANAGER and DESIGN TEAM FOR. Downtown Preservation Project URBAN RE DEVELOPMENT AUTHORITY OF PITTSBURGH

REQUEST FOR PROPOSAL FOR. CONSTRUCTION MANAGER and DESIGN TEAM FOR. Downtown Preservation Project URBAN RE DEVELOPMENT AUTHORITY OF PITTSBURGH REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER and DESIGN TEAM FOR Downtown Preservation Project URBAN RE DEVELOPMENT AUTHORITY OF PITTSBURGH December 2010 I. GENERAL The Urban Redevelopment Authority of

More information

Project # 570-CSI-001. Expand Mental Health Center, Building 27 SCOPE OF WORK

Project # 570-CSI-001. Expand Mental Health Center, Building 27 SCOPE OF WORK DEPARTMENT OF VETERANS AFFAIRS VA Central California Healthcare System Project # 570-CSI-001 Expand Mental Health Center, Building 27 SCOPE OF WORK 1. GENERAL DESCRIPTION The awarded contractor shall provide

More information

PLANNING AND EVALUATION PRELIMINARY DESIGN

PLANNING AND EVALUATION PRELIMINARY DESIGN PLANNING AND EVALUATION Project Initiation Discuss and refine client requirements Project brief, Schedule, Budget Confirm client's space needs and program Establish scope of work Obtain client-supplied

More information

Exhibit B - A/E Scope of Services (General Contracting Project) State of Ohio Professional Services Agreements for Public Facility Construction

Exhibit B - A/E Scope of Services (General Contracting Project) State of Ohio Professional Services Agreements for Public Facility Construction - State of Ohio Professional Services Agreements for Public Facility Construction TABLE OF CONTENTS ARTICLE 1 - BASIC SERVICES... 1 ARTICLE 2 - PROGRAM VERIFICATION STAGE... 2 ARTICLE 3 - SCHEMATIC DESIGN

More information

C. Requirements of this Section relate to customized fabrication and installation procedures, not production of standard products.

C. Requirements of this Section relate to customized fabrication and installation procedures, not production of standard products. SECTION 01400 QUALITY CONTROL SERVICES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification

More information

Level 3 NVQ Diploma in Construction Contracting Operations

Level 3 NVQ Diploma in Construction Contracting Operations Level 3 NVQ Diploma in Construction Contracting Operations Qualification Specification ProQual 2016 Contents Page Introduction 3 Qualification profile 3 Qualification Structure 4 Centre requirements 12

More information

Audio Sessions. Session 5 MEETINGS. Construction Contract Administration Education Program

Audio Sessions. Session 5 MEETINGS. Construction Contract Administration Education Program Audio Sessions Session 5 MEETINGS Education Program Certified Construction Contract Administrator (CCCA) Preparatory Course 2011 The Construction Specifications Institute www.csinet.org This presentation

More information

SECTION QUALITY CONTROL

SECTION QUALITY CONTROL SECTION 01 45 00 QUALITY CONTROL PART 1 - GENERAL 1.1 DESCRIPTION This section specifies requirements for Contractor Quality Control (CQC) for Design-Bid-Build (DBB) or Design-Build (DB) construction projects.

More information

G , Request for Proposal Land Survey

G , Request for Proposal Land Survey G601 1994, Request for Proposal Land Survey AIA Document G601 1994 allows owners to request proposals from a number of surveyors based on information deemed necessary by the owner and architect. G601 1994

More information

DRAFT. Request for Proposal for Construction Manager at Risk Services ASHRAE. New Headquarters Building. Peachtree Corners, GA

DRAFT. Request for Proposal for Construction Manager at Risk Services ASHRAE. New Headquarters Building. Peachtree Corners, GA DRAFT Request for Proposal for Construction Manager at Risk Services ASHRAE New Headquarters Building Peachtree Corners, GA 1. INTRODUCTION AND PROJECT DESCRIPTION A. Introduction On behalf of ASHRAE,

More information

East Central College

East Central College SECTION 013200 - CONSTRUCTION PROGRESS DOCUMENTATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

SECTION CONSTRUCTION OPERATIONS AND SITE UTILIZATION PLAN

SECTION CONSTRUCTION OPERATIONS AND SITE UTILIZATION PLAN SECTION 01 14 11 CONSTRUCTION OPERATIONS PART 1 - GENERAL 1.1 SUMMARY A. The Construction Operations Plan provides a coordinated construction environment to ensure an orderly, secure and safe operation

More information

Education Construction & Management Development Advisory Services

Education Construction & Management Development Advisory Services Statement of Qualifications Project Development Education Construction & Management Development Advisory Services Site Selection Project Planning Design & Development Project Management Construction Oversight

More information

Ex AC. Examination for Architects in Canada Examen des architectes du Canada

Ex AC. Examination for Architects in Canada Examen des architectes du Canada Ex AC Examination for Architects in Canada Examen des architectes du Canada General and Specific Objectives Theme 1 general objective specific objectives rogramming 1.1 Understand the process for the preparation

More information

PROJECT NAME SECTION GENERAL COMMISSIONING REQUIREMENTS

PROJECT NAME SECTION GENERAL COMMISSIONING REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. The Owner has contracted an independent Commissioning Authority. The Commissioning Authority is an independent and knowledgeable third party, hired to verify that the systems

More information

REQUEST FOR QUALIFICATIONS (RFQ-18084) CONSTRUCTION MANAGEMENT AT RISK (CMAR) SERVICES STATEMENT OF QUALIFICATIONS (SOQ)

REQUEST FOR QUALIFICATIONS (RFQ-18084) CONSTRUCTION MANAGEMENT AT RISK (CMAR) SERVICES STATEMENT OF QUALIFICATIONS (SOQ) REQUEST FOR QUALIFICATIONS (RFQ-18084) CONSTRUCTION MANAGEMENT AT RISK (CMAR) SERVICES STATEMENT OF QUALIFICATIONS (SOQ) Project: Ludden Library Renovation & Expansion By Laramie County Community College

More information

QUALITY INTEGRATED ENGINEERING SERVICES to the energy sector

QUALITY INTEGRATED ENGINEERING SERVICES to the energy sector QUALITY INTEGRATED ENGINEERING SERVICES to the energy sector COMPANY PROFILE offers a complete service including Project Management, Engineering, Procurement, Construction Management, Training and related

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Project Control Schedule C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Project Control Schedule C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 01310 - Project Control Schedule C O N T E N T S PART 1 - SCHEDULE REQUIREMENTS PROGRESS SCHEDULE... 1 PART 2 - SUBMITTAL PROCEDURES... 2 PART 3 - DEFINITIONS...

More information

Quality Management in Construction Projects 8. Dr. Nabil El Sawalhi

Quality Management in Construction Projects 8. Dr. Nabil El Sawalhi Quality Management in Construction Projects 8 Dr. Nabil El Sawalhi 1 Quality in Construction Projects Construction projects are constantly increasing in technological complexity. Electromechanical services

More information

REQUEST FOR QUALIFICATIONS AND PROPOSAL FOR OWNER S REPRESENTATIVE March 21, 2014

REQUEST FOR QUALIFICATIONS AND PROPOSAL FOR OWNER S REPRESENTATIVE March 21, 2014 REQUEST FOR QUALIFICATIONS AND PROPOSAL FOR OWNER S REPRESENTATIVE March 21, 2014 Cortex Innovation Community requests qualifications from qualified firms and a fee proposal from such firms for the services

More information

TOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR

TOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR February 5, 2018 SUMMARY OF CM/GC SELECTION PROCESS FOR DIMMIT II APARTMENT BUILDING The Town of Winter Park requests proposals from qualified Construction Manager / General Contractor (CM/GC) firms for

More information

Facilities Services 2017 Project Close-Out Process

Facilities Services 2017 Project Close-Out Process Facilities Services 2017 Project Close-Out Process December 11, 2017 Linda J. Lindsey, CPA, CGAP, Senior Director Alva Johnson, Internal Auditor Table of Contents Page Number EXECUTIVE SUMMARY 1 BACKGROUND

More information

(To be printed on Professional s Letterhead) PRE-CONSTRUCTION MEETING AGENDA (Professional to provide attendance sign-up sheet

(To be printed on Professional s Letterhead) PRE-CONSTRUCTION MEETING AGENDA (Professional to provide attendance sign-up sheet (To be printed on Professional s Letterhead) PRE-CONSTRUCTION MEETING AGENDA (Professional to provide attendance sign-up sheet Project Name: UM Project # Design Professional: Meeting Place: Meeting Time:

More information

The construction phase, of course, is the execution of the work as required by the contract documents when the building is finally built.

The construction phase, of course, is the execution of the work as required by the contract documents when the building is finally built. L1C4: Commercial Building Fundamentals Lesson 7 Study Guide Construction The construction phase, of course, is the execution of the work as required by the contract documents when the building is finally

More information

Pre-Construction Meeting Minutes

Pre-Construction Meeting Minutes Project Name Project # Project Address Tel: Fax: Gilbane Building Company Pre-Construction Meeting Date Start End Next Meeting Next Time Prepared By Company Purpose Location Next Location General Notes

More information

REQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services

REQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services REQUEST FOR PROPOSALS Construction Manager CM Services Pre-Construction and Construction Services Big Sky Fire Department Station 1 Project Big Sky Fire District OWNER Big Sky, Montana November 2016 Request

More information

Chapter 6, Construction

Chapter 6, Construction Chapter 6, Construction CHAPTER CONTENTS 6.1 OWNER-CONTRACTOR AGREEMENT A. Preparation B. Owner Signature C. Award 6.2 PRE-CONSTRUCTION CONFERENCE A. Administration B. Attendees C. Pre-Construction Conference

More information

DRAFT ITEM GP-100 ITEM GP-100 CONTRACTOR QUALITY CONTROL PROGRAM 1.1 GENERAL

DRAFT ITEM GP-100 ITEM GP-100 CONTRACTOR QUALITY CONTROL PROGRAM 1.1 GENERAL 1.1 GENERAL When the specification requires a Contractor Quality Control Program, the Contractor shall establish, provide, and maintain an effective Quality Control Program that details the methods and

More information

QUALITY REQUIREMENTS

QUALITY REQUIREMENTS SECTION 014000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

DIVISION 1- GENERAL REQUIREMENTS

DIVISION 1- GENERAL REQUIREMENTS DIVISION 1- GENERAL REQUIREMENTS This division contains the following elements: 1.1 General 1.2 Summary of Work 1.3 Administration 1.4 Quality 1.5 Temporary Facilities 1.6 Products 1.7 Execution 1.8 Closeout

More information

Chapter 1, Introduction

Chapter 1, Introduction Chapter 1, Introduction CHAPTER CONTENTS 1.1 THE DESIGNERS MANUAL A. Purpose B. Contents 1.2 THE DIVISION OF FACILITIES PLANNING 1.3 THE UNIVERSITY AS OWNER A. The Owner B. Owner Agency 1.4 CAPITAL IMPROVEMENTS

More information

B. OPR and BoD documentation may be included by reference for information only.

B. OPR and BoD documentation may be included by reference for information only. SECTION 01 91 13 - GENERAL COMMISSIONING REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Scope of Work Bid Package C-4 - West Polished Concrete

Scope of Work Bid Package C-4 - West Polished Concrete Scope of Work Bid Package C-4 - West Polished Concrete CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,

More information

ROLES AND RESPONSIBILITIES

ROLES AND RESPONSIBILITIES Audio Sessions Session 2 ROLES AND RESPONSIBILITIES Education Program Certified Construction Contract Administrator (CCCA) Preparatory Course 2011 The Construction Specifications Institute www.csinet.org

More information

APPENDIX D CONSTRUCTION PHASE CRITERIA

APPENDIX D CONSTRUCTION PHASE CRITERIA A. GENERAL REQUIREMENTS CONSTRUCTION PHASE CRITERIA For the Construction Phase of the Project, the Architect/Engineer (A/E) is responsible for providing project administration for the Owner in accordance

More information

Richard B. Fisher Middle School Building The William Penn Charter School Philadelphia, PA

Richard B. Fisher Middle School Building The William Penn Charter School Philadelphia, PA Dan Packer Construction Management Richard B. Fisher Middle School October 16, 2002 Project Delivery Evaluation Dr. Michael Horman EXECUTIVE SUMMARY This assignment allowed me to understand the way that

More information

SECTION CONTRACTOR QUALITY CONTROL

SECTION CONTRACTOR QUALITY CONTROL SECTION 01451 CONTRACTOR QUALITY CONTROL PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within

More information

SECTION CONSTRUCTION PROGRESS DOCUMENTATION

SECTION CONSTRUCTION PROGRESS DOCUMENTATION SECTION 01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

Science Technology Engineering and Mathematics (STEM) Initiative

Science Technology Engineering and Mathematics (STEM) Initiative DEPARTMENT of FACILITIES DESIGN December 17, 2013 and CONSTRUCTION REQUEST for PROPOSAL Science Technology Engineering and Mathematics (STEM) Initiative PRE-CONSTRUCTION SERVICES Facilities Design and

More information

Document B252TM 2007

Document B252TM 2007 Document B252TM 2007 Standard Form of Architect s Services: Architectural Interior Design for the following PROJECT: (Name and location or address) This document has important legal consequences. Consultation

More information

CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING)

CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING) 01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION (SCHEDULING) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

ISO 9001: 2008 Engineering Design Construction Quality Management System Sample - Selected pages (not a complete plan)

ISO 9001: 2008 Engineering Design Construction Quality Management System Sample - Selected pages (not a complete plan) ISO 9001: 2008 Engineering Design Construction Quality Management System Sample - Selected pages (not a complete plan) Part 1: Project-Specific Quality Plan Part 2: Company Quality Manual Part 3: Submittal

More information

SECTION PAYMENT PROCEDURES

SECTION PAYMENT PROCEDURES SECTION 012900 PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract including General and Supplementary Conditions and other Division 01 Specifications Sections apply

More information

Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101

Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101 Forsyth County General Services Department Construction Management Division 201 North Chestnut Street Winston-Salem, NC 27101 Request for Qualifications Construction Manager at Risk (CMAR) INSTRUCTIONS

More information

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Multi-Institutional Academic Health Science & Research Center Evansville, IN SECTION 019113 - GENERAL COMMISSIONING REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

SECTION QUALITY REQUIREMENTS

SECTION QUALITY REQUIREMENTS SECTION 014000 - PART 1 - GENERAL 1.1 SUMMARY A. Defines SRP requirements for Contractor Quality Control and Owner Quality Assurance. As an Electric and Water Utility, SRP has many critical facilities.

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION Cost is a major factor in most decisions regarding construction, and cost estimates are prepared throughout the planning, design, and construction phases of a construction project,

More information

A62 PRE-CONSTRUCTION MEETING AGENDA

A62 PRE-CONSTRUCTION MEETING AGENDA Provided below are the agenda items typically required by the Owner for the Pre-Construction Meeting. Guidance provided in agenda items does not revise the requirements of the Agreement. Instructions:

More information

Florida Cleanroom Systems

Florida Cleanroom Systems Florida Cleanroom Systems Design Build Projects / Project Quality Control Plan (PQCP) Quality Control / Quality Assurance Manual May 2010 1 TABLE OF CONTENTS Section 1: Introduction 3 1.1 Defining Plan

More information

CONSTRUCTION DOCUMENTS Part 1

CONSTRUCTION DOCUMENTS Part 1 Audio Presentation Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT) Preparatory Course 2011 The Construction Specifications Institute www.csinet.org

More information

TEXAS TECH UNIVERSITY HEALTH SCIENCES CENTER MEDICAL SCIENCE BUILDING II EARLY GMP SUB SELECTION REQUEST FOR PROPOSAL

TEXAS TECH UNIVERSITY HEALTH SCIENCES CENTER MEDICAL SCIENCE BUILDING II EARLY GMP SUB SELECTION REQUEST FOR PROPOSAL TEXAS TECH UNIVERSITY HEALTH SCIENCES CENTER MEDICAL SCIENCE BUILDING II El Paso, Texas EARLY GMP SUB SELECTION REQUEST FOR PROPOSAL for the BUILDING CONCRETE GLASS AND GLAZING FIRE SPRINKLER MECHANICAL

More information

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS Professional Construction Management Services Harrisburg International Airport Rehabilitate Runway 13-31 Susquehanna Area Regional

More information

BULLETIN 34: BUILDING ENVELOPE SERVICES APPROPRIATE PROFESSIONAL PRACTICE

BULLETIN 34: BUILDING ENVELOPE SERVICES APPROPRIATE PROFESSIONAL PRACTICE 200-4010 Regent Street Burnaby BC V5C 6N2 Canada Telephone: (604) 430-8035 Toll Free Canada-wide: 1-888-430-8035 Facsimile: (604) 430-8085 BULLETIN 34: BUILDING ENVELOPE SERVICES APPROPRIATE PROFESSIONAL

More information

Building Enclosure Pre-construction Meeting

Building Enclosure Pre-construction Meeting Building Enclosure Pre-construction Meeting Melissa Payne, BECxP, CxA+BE, CDT Miller Engineering, P.C. Air Barrier Association of America (ABAA) is a Registered Provider with The American Institute of

More information

CONSTRUCTION STANDARD DOCUMENT

CONSTRUCTION STANDARD DOCUMENT CONSTRUCTION STANDARD DOCUMENT OVERALL CONSTRUCTION SCHEDULE REQUIREMENTS The Overall Schedule shall be prepared by the Contractor based on information from all subcontractors engaged on this project.

More information

ARTICLE 1 - ARCHITECT/ENGINEER S BASIC SERVICES

ARTICLE 1 - ARCHITECT/ENGINEER S BASIC SERVICES - Architect/Engineer s Scope of Services (Multiple-Prime Project) State of Ohio Professional Services Agreements for Public Facility Construction 1.1 General ARTICLE 1 - ARCHITECT/ENGINEER S BASIC SERVICES

More information

Advantage. Proximity & Price. General Services Administration Federal Acquisition Service Authorized Federal Supply Schedule Price List

Advantage. Proximity & Price. General Services Administration Federal Acquisition Service Authorized Federal Supply Schedule Price List Proximity & Price Advantage On-line access to contract ordering information, terms and conditions, up-to-date pricing, and the option to create an electronic delivery order are available through GSA Advantage!,

More information

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /21/2012 PAGE 1 OF 12 PROJECT RECORDS MANAGEMENT

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /21/2012 PAGE 1 OF 12 PROJECT RECORDS MANAGEMENT Project Procedure PROJECT RECORDS MANAGEMENT 09/21/2012 PAGE 1 OF 12 1.0 PURPOSE The purpose of this procedure is to establish the methods and responsibilities for identifying, collecting, indexing, storing,

More information

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202 Procurement Department Bid Office Customer Center 1 st Floor, Room 002 21 W. Church Street Jacksonville, Florida 32202 June 28, 2017 ADDENDUM NUMBER: TWO (2) TITLE: Riverview Water Main Extension Phase

More information

SECTION SUPPLEMENTARY GENERAL CONDITIONS

SECTION SUPPLEMENTARY GENERAL CONDITIONS SECTION 00800 SUPPLEMENTARY GENERAL CONDITIONS PART 1 - GENERAL 1.1 SCOPE OF WORK In general, the Work consists of application of a fluid applied membrane, installation of new tapered insulation, installation

More information

Township of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement

Township of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement Township of Severn REQUEST FOR PROPOSAL Architectural & Professional Services Fire Station Replacement Deadline for proposal submission is June 15, 2017 at 2:00 p.m. Contact Person: Tim Cranney Director

More information

A62 UT PRE-CONSTRUCTION MEETING AGENDA

A62 UT PRE-CONSTRUCTION MEETING AGENDA Provided below are the agenda items typically required by the Owner for the Pre-Construction Meeting. Guidance provided in agenda items does not revise the requirements of the Agreement. Instructions:

More information

Audio Sessions. Session 4 PROCUREMENT. Construction Contract Administration Education Program

Audio Sessions. Session 4 PROCUREMENT. Construction Contract Administration Education Program Audio Sessions Session 4 PROCUREMENT Construction Contract Administration Education Program Certified Construction Contract Administrator (CCCA) Preparatory Course 2011 The Construction Specifications

More information

GENERAL AND SPECIFIC OBJECTIVES

GENERAL AND SPECIFIC OBJECTIVES GENERAL AND SPECIFIC OBJECTIVES 2018 LICENSING AUTHORITIES WHICH RECOGNIZE THE EXAC ARE: Alberta Association of Architects [ AAA ] Architectural Institute of British Columbia [ AIBC ] Architect s Association

More information

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION May 19, 2015 The Addison Public Library invites you to submit a reply to this Request for

More information

Owner's Representative Scope Matrix - D/B Rev 10/28/2013

Owner's Representative Scope Matrix - D/B Rev 10/28/2013 Ecluded Owner's Representative Scope Matri - D/B Rev 10/28/2013 The following matri is a worksheet to identify required and optional scope for Owner's Representative services. Please identify the scope

More information

LEVEL I PREQUALIFICATION DOCUMENTS OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA

LEVEL I PREQUALIFICATION DOCUMENTS OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA Project No. 4484/A4L-379/964840 LEVEL I PREQUALIFICATION DOCUMENTS for OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North

More information

Scope of Work Bid Package C-8 - West Overhead Doors

Scope of Work Bid Package C-8 - West Overhead Doors Scope of Work Bid Package C-8 - West Overhead Doors CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,

More information

New York City Transit (NYCT) DATE: July 19, 2018 CONSTRUCTION/ARCHITECTURAL & ENGINEERING CONTRACT SOLICITATION NOTICE/PROJECT OVERVIEW MTA-NYCT IS NOW ADVERTISING FOR THE FOLLOWING: SSE #: 0000226381

More information

Saint Luke s Episcopal Church 73 South Fullerton Avenue Montclair, NJ 07042

Saint Luke s Episcopal Church 73 South Fullerton Avenue Montclair, NJ 07042 Saint Luke s Episcopal Church 73 South Fullerton Avenue Montclair, NJ 07042 REQUEST FOR PROPOSALS (RFP) 2016-3.0 (Architectural Design & Construction) RFP OPENS: RFP CLOSES: Introduction St. Luke s is

More information

RWA, Inc. TECHNICAL SPECIFICATIONS NORTH COLLIER BOULEVARD PAVING AND DRAINAGE IMPROVEMENTS Willow Park Drive Suite 200 Naples, FL 34109

RWA, Inc. TECHNICAL SPECIFICATIONS NORTH COLLIER BOULEVARD PAVING AND DRAINAGE IMPROVEMENTS Willow Park Drive Suite 200 Naples, FL 34109 RWA, Inc. TECHNICAL SPECIFICATIONS NORTH COLLIER BOULEVARD PAVING AND DRAINAGE IMPROVEMENTS 6610 Willow Park Drive Suite 200 Naples, FL 34109 MAY 23, 2012 NORTH COLLIER BOULEVARD PAVING AND DRAINAGE IMPROVEMENTS

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 4000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Educational Use Only S A M P L E S A M P L E

Educational Use Only S A M P L E S A M P L E CONSENSUSDOCS 240 STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER This document was developed through a collaborative effort of entities representing a wide cross-section of the construction

More information

REQUEST FOR PROPOSAL. Design-Build Services for Intensive Care Unit and Patient Tower Expansion St. Charles Medical Center - Bend.

REQUEST FOR PROPOSAL. Design-Build Services for Intensive Care Unit and Patient Tower Expansion St. Charles Medical Center - Bend. REQUEST FOR PROPOSAL Design-Build Services for Intensive Care Unit and Patient Tower Expansion St. Charles Medical Center - Bend For St. Charles Health System Issued: May 9, 2016 Proposal Due: June 9,

More information

150/ G Versus 150/ H Contractor Quality Control Program

150/ G Versus 150/ H Contractor Quality Control Program AC 150/5370-10G AC 150/5370-10H 1 Part 1 of General Provisions Part 2 of General Construction Items 2 Section 100 Item C-100 3 Quality Control Program (CQCP) 4 100-01 General. When the specification requires

More information

Project Execution Plan

Project Execution Plan Gulf Integrated Group Project Execution Plan P. O. Box: 19002, Doha Qatar Tel: +974-4582289/90/91 Fax: +974-4687886 COMMITTED TO QUALITY SECTION 1 1.0 INTRODUCTION Gulf Integrated Group (GIG) is pleased

More information

Commissioning Guidelines for the Arkansas Energy Performance Contracting Program

Commissioning Guidelines for the Arkansas Energy Performance Contracting Program Commissioning Guidelines for the Arkansas Energy Performance Contracting Program Version 1.1 March 2014 Arkansas Economic Development Commission Energy Office 900 West Capitol Avenue Little Rock, Arkansas

More information

RISE Certified Solar Roofing Professional (CSRP) Job Task Analysis August 2011 RISE CERTIFIED SOLAR ROOFING PROFESSIONAL (CSRP) JOB TASK ANALYSIS

RISE Certified Solar Roofing Professional (CSRP) Job Task Analysis August 2011 RISE CERTIFIED SOLAR ROOFING PROFESSIONAL (CSRP) JOB TASK ANALYSIS RISE CERTIFIED SOLAR ROOFING PROFESSIONAL (CSRP) JOB TASK ANALYSIS Primary Objective: Given a proposed roof-mounted photovoltaic (PV) system design, a solar roofing professional will apply essential knowledge,

More information