1 B401: DELETED B402: DELETED B403: DELETED B404: STRUCTURE/CULVERT IDENTIFICATION SIGNS B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS B406: ITEM FIELD PAINTING, MISC.; REPAIR PAINTING B407: ITEM MICRO-SILICA MODIFIED CONCRETE OVERLAY USING HYDRODEMOLITION, AS PER PLAN ITEM SURFACE PREPARATION USING HYDRODEMOLITION, AS PER PLAN ITEM MICRO-SILICA MODIFIED CONCRETE OVERLAY (VARIABLE THICKNESS), MATERIAL ONLY, AS PER PLAN ITEM FULL DEPTH REPAIR, AS PER PLAN ITEM WEARING COURSE REMOVED, ASPHALT, AS PER PLAN ITEM EXISTING CONCRETE OVERLAY REMOVED, AS PER PLAN B408: CORRECTING BRIDGE IDENTIFICATION SIGN NUMBERS: B409: SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.: CURB REPAIR B410: SPECIAL - STRUCTURE MISC.: CONCRETE SPALL REMOVAL B411: UNSUITABLE SOILS B412: ITEM FIELD PAVING OF EXISTING PIPE B413: ITEM 514 PAINTING OF STRUCTURAL STEEL B414: ITEM 515 HIGH EARLY STRENGTH KEY-WAY GROUT B415: ITEM 202 WEARING COURSE REMOVED, AS PER PLAN B416: DELETED B417: ITEM STRUCTURAL STEEL, MISC.: STEEL BEAM REPAIRS B418: ITEM SCUPPER MISC.: CLEANOUT B419: SPECIAL - STRUCTURE MISC.: STRUCTURE CLEANING B420: ITEM X CONDUIT, TYPE A, , AS PER PLAN B421: ITEM REMOVAL MISC.: CHANNEL CLEANOUT B422: ITEM STRUCTURAL STEEL, MISC.: REPLACEMENT OF DAMAGED CROSSFRAMES B423: DELETED B424: DELETED - 1 -

2 B425: ITEM MICRO-SILICA MODIFIED CONCRETE OVERLAY, AS PER PLAN ITEM MICRO-SILICA MODIFIED CONCRETE OVERLAY (VARIABLE THICKNESS), MATERIAL ONLY, AS PER PLAN ITEM FULL DEPTH REPAIR, AS PER PLAN ITEM WEARING COURSE REMOVED, ASPHALT, AS PER PLAN ITEM EXISTING CONCRETE OVERLAY REMOVED, AS PER PLAN - 2 -

3 B401: DELETED This note applied to Class HP Concrete and is no longer needed Revised 11/30/2015 B402: DELETED This note applied to Class HP Concrete and is no longer needed Revised 11/30/2015 B403: DELETED THE VERTICAL CLEARANCE NOTE HAS BEEN MOVED TO THE ROADWAY AS NOTE R414. Revised 05/10/2007 B404: STRUCTURE/CULVERT IDENTIFICATION SIGNS STRUCTURE IDENTIFICATION SIGNS (I-H25b) WILL BE PLACED ON EACH APPROACH OFF THE RIGHT SHOULDER, FACING TRAFFIC, AND BEHIND THE GUARDRAIL IF APPLICABLE. A QUANTITY OF ONE SIGN PER APPROACH WILL BE INSTALLED. THE SIGNS WILL HAVE A NON-REFLECTIVE WHITE SHEETING BACKGROUND. THE SIGNS WILL BE MOUNTED ON NEW NO. 2 POSTS AND WILL BE INSTALLED AS PER STANDARD CONSTRUCTION DRAWING TC-41.20, MOST CURRENT REVISION. EACH POST WILL BE 7.5 IN LENGTH. INSTALL SIGNS FOR THE FOLLOWING STRUCTURES: [add list of structures here] THE FOLLOWING QUANTITIES HAVE BEEN INCLUDED FOR EACH APPROACH: ITEM 630 SIGN, FLAT SHEET, , 1 SQ FT ITEM 630 GROUND MOUNTED SUPPORT, NO. 2 POST, 7.5 FT ITEM 630 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, 1 EACH ITEM 630 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSAL, 1 EACH Include this note on all bridge and culvert projects where object markers are not required to be installed for the bridge. Object markers shall be installed on all structures where a joint between the approach slab and bridge exists (i.e. object markers are not required on bridges with Integral Abutments, etc). Quantities shown are for EACH APPROACH; multiply the number of approaches on each structure and carry to Estimated Quantities for the appropriate structure. DO NOT EDIT THIS NOTE, US IT AS-IS. List the number of approaches for each structure (i.e. ATB [2 APPROACHES]). Revised 11/30/2015 B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS OBJECT MARKERS WILL BE PLACED ON EACH APPROACH OFF THE LEFT AND RIGHT SHOULDER, FACING TRAFFIC, AND BEHIND THE GUARDRAIL IF APPLICABLE. ONE OM- 3L AND ONE OM-3R WILL BE INSTALLED AT EACH APPROACH. THE SIGNS WILL BE - 3 -

4 MOUNTED ON NEW NO. 2 POSTS AND SHALL BE INSTALLED AS PER STANDARD CONSTRUCTION DRAWING TC-41.20, MOST CURRENT REVISION. EACH POST WILL BE 10.5 IN LENGTH. STRUCTURE IDENTIFICATION SIGNS (I-H25b) WILL BE INSTALLED ON THE SAME POST AND DIRECTLY BELOW THE OBJECT MARKER OFF THE RIGHT SHOULDER ON EACH APPROACH. A QUANTITY OF ONE SIGN WILL BE INSTALLED AT EACH APPROACH. THE SIGNS WILL HAVE A NON-REFLECTIVE WHITE SHEETING BACKGROUND. INSTALL SIGNS FOR THE FOLLOWING STRUCTURES: [add list of structures here] THE FOLLOWING QUANTITIES HAVE BEEN INCLUDED FOR EACH APPROACH: ITEM 630 SIGN, FLAT SHEET, , 1 SQ FT ITEM 630 SIGN, FLAT SHEET, 6 SQ FT ITEM 630 GROUND MOUNTED SUPPORT, NO. 2 POST, 21 FT ITEM 630 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, 3 EACH ITEM 630 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSAL, 2 EACH Object markers will be installed on all structures where a joint between the approach slab and bridge exists or where required based upon the Ohio Manual of Uniform Traffic Control Devices. Quantities shown are for EACH APPROACH; multiply the number of approaches on each structure and carry to Estimated Quantities for the appropriate structure. DO NOT EDIT THIS NOTE, US IT AS-IS. List the number of approaches for each structure (i.e. ATB [2 APPROACHES], SUM R [1 APPROACH]). Revised 11/30/2015 B406: ITEM FIELD PAINTING, MISC.; REPAIR PAINTING PAINTED AREAS THAT ARE DAMAGED OR RUSTED WILL BE DESIGNATED BY THE PROJECT ENGINEER. THE CMS PROCESS WILL BE USED TO REPAIR THESE AREAS. THE CONTRACTOR SHALL PROVIDE THE ENGINEER WITH ALL NECESSARY EQUIPMENT TO INSPECT THIS WORK. THE MAJORITY OF THE AREAS TO BE REPAIR PAINTED ARE: [ LIST THE AREAS ] AREAS TO BE REPAIR PAINTED ARE NOT LIMITED TO THESE AREAS. THE AREAS DESIGNATED BY THE PROJECT ENGINEER WILL BE PAINTED. Use this note when there is a need to perform repair painting on projects such as: Heat Straightening, etc. Revised 06/17/2009 B407: ITEM MICRO-SILICA MODIFIED CONCRETE OVERLAY USING HYDRODEMOLITION, AS PER PLAN ITEM SURFACE PREPARATION USING HYDRODEMOLITION, AS PER PLAN ITEM MICRO-SILICA MODIFIED CONCRETE OVERLAY (VARIABLE - 4 -

5 THICKNESS), MATERIAL ONLY, AS PER PLAN ITEM FULL DEPTH REPAIR, AS PER PLAN ITEM WEARING COURSE REMOVED, ASPHALT, AS PER PLAN ITEM EXISTING CONCRETE OVERLAY REMOVED, AS PER PLAN THESE ITEMS SHALL BE PERFORMED PER SUPPLEMENTAL SPECIFICATION "BRIDGE DECK REPAIR AND OVERLAY WITH CONCRETE USING HYDRO DEMOLITION" WITH THE FOLLOWING REVISIONS: THE THICKNESS OF THE CONCRETE OVERLAY REMOVED, ASPHALT WEARING COURSE REMOVED, PROPOSED OVERLAY, AND THE DEPTH OF HYDRODEMOLITION SHALL BE AS SPECIFIED IN THE PLANS. CONSTRUCTION JOINTS WILL NOT BE PERMITTED IN THE WHEEL LINE. (SEE ) THE COMPONENTS OF THE MICRO-SILICA MODIFIED CONCRETE SHALL BE PROPORTIONED AS FOLLOWS. CONCRETE TABLE QUANTITIES PER CUBIC YARD REGATES (SSD) TYPE FINE #8 COARSE * TOTAL * CEMENT CONTENT MICRO SILICA WATER TO CEMENT- ITIOUS RATIO AIR CONTENT +/- 2% FIBER (1 1/4" POLYPROPY- LENE) ** GRAVEL LIME- STONE SLAG * ALL COARSE REGATE SHALL HAVE AN ABSORPTION OF 1.00% OR GREATER AS DEFINED PER ASTM C127 ** FIBER MESH SHALL BE 100% VIRGIN POLYPROPYLENE IN A FIBRILLATED-NETWORK FORM AND SHALL BE 1 ¼ IN LENGTH. THE WEIGHTS SPECIFIED IN THE CONCRETE TABLE WERE CALCULATED FOR MATERIALS OF THE FOLLOWING BULK SPECIFIC GRAVITIES (SSD): NATURAL SAND AND GRAVEL 2.62, LIMESTONE SAND 2.68, LIMESTONE 2.65, SLAG 2.30, MICRO-SILICA SOLIDS 2.20, AND PORTLAND CEMENT FOR REGATES OF SPECIFIC GRAVITIES DIFFERING MORE THAN PLUS OR MINUS 0.02 FROM THESE, THE WEIGHTS IN THE TABLE WILL BE CORRECTED. FIBER MESH WEIGHTS NOT INCLUDED IN MIX DESIGN. ALL COARSE REGATE SHALL HAVE AN ABSORPTION OF 1.00% OR GREATER AS DEFINED BY ASTM C

6 ALL OTHER REQUIREMENTS OF THE SUPPLEMENTAL SPECIFICATION SHALL REMAIN IN EFFECT. (SEE ) THE FINAL DECK SOUNDING MAY TAKE PLACE WITHIN 24 HOURS OF A RAIN, AND THE DECK DOES NOT HAVE TO BE COMPLETELY DRY. (SEE ) FULL DEPTH REPAIR IS NOT REQUIRED IF LESS THAN ONE HALF OF THE DECK ORIGINAL CONCRETE THICKNESS IS SOUND. (SEE ) THE WET CURE TIME IS REDUCED FROM 72 HOURS TO 24 HOURS OR UNTIL A BEAM BREAK OF 600 PSI IS ACHIEVED, WHICHEVER IS GREATER. AFTER THE 24 HOUR WET CURE, THE FINISHED OVERLAY SURFACE SHALL BE CURED BY SPRAYING A UNIFORM APPLICATION OF CURING MATERIAL OF , TYPE 1 OR 1D, AS PER CMS METHOD (B) MEMBRANE CURING. IF THE CURING COMPOUND CAN NOT BE PLACED WITHIN THE SAME SHORT TERM CLOSURE PERIOD AS THE OVERLAY, THE CONTRACTOR MAY ALLOW TRAFFIC ONTO THE OVERLAY, AND SHALL, AT THE NEXT AVAILABLE SHORT TERM CLOSURE PERIOD, APPLY THE MEMBRANE CURING COMPOUND. (SEE ) TRAFFIC WILL NOT BE PERMITTED ON THE FINISHED OVERLAY SURFACE UNTIL AFTER THE COMPLETION OF THE 24 HOUR WET CURE, AND AFTER TWO TEST BEAMS HAVE ATTAINED AN AVERAGE MODULUS OF RUPTURE OF 600 PST (4.2 Mpa). (SEE ) THE OVERLAY SURFACE EVAPORATION RATE REQUIREMENTS ARE IN EFFECT FROM 9:30 AM TO 11:00 PM. THEY ARE NOT IN EFFECT FROM 11:00 PM TO 11:00 AM. (SEE ) FOR EACH PHASE, THE CONTRACTOR SHALL PROVIDE ENOUGH MATERIAL FOR TWO BEAM BREAKS EACH AT 12 HOURS, 24 HOURS, 36 HOURS, AND 48 HOURS. THE DEPARTMENT WILL PERFORM THE BEAM BREAK TESTS AND DOCUMENT THE TIME OF THE POUR, THE TIME OF THE BEAM BREAK TESTS, AND THE MODULUS OF RUPTURE FOR EACH BEAM UNTIL THE MODULUS OF RUPTURE OF THE TWO TESTS IS NOT LESS THAN 650 PSI (4.5 MPa). TRAFFIC IS ALLOWED ON THE OVERLAY AT 600 PSI (4.5 Mpa). ALL OTHER REQUIREMENTS OF THE SUPPLEMENTAL SPECIFICATION SHALL REMAIN IN EFFECT. Only use this note when directed to do so in the Scope of Services. Revised 02/20/2013 B408: CORRECTING BRIDGE IDENTIFICATION SIGN NUMBERS: SOME OF THE EXISTING BRIDGE NUMBER SIGNS HAVE INCORRECT BRIDGE NUMBERS ON THEM. THE FOLLOWING BRIDGE NUMBERS ARE THE CORRECT ONES AND WILL BE USED ON THE NEW BRIDGE IDENTIFICATIONS SIGNS. STRUCTURE - - (SFN: ) THE EXISTING SIGN SHOWS. THE CORRECT BRIDGE IDENTIFICATION NUMBER IS. This note is used on projects to correct the Structure ID Signs. Added 04/03/

7 B409: SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.: CURB REPAIR THIS ITEM WILL BE USED TO REPAIR THE DETERIORATED FACE OF THE CURB ON THE BRIDGE DECK AND/OR APPROACH SLABS. THIS WORK WILL BE PERFORMED IN ACCORDANCE WITH ITEM PATCHING CONCRETE STRUCTURES AND AS MODIFIED HEREIN. PRIOR TO THE SURFACE CLEANING SPECIFIED IN AND WITHIN 24 HOURS OF PLACING PATCHING MATERIAL, BLAST CLEAN ALL SURFACES TO BE PATCHED INCLUDING THE EXPOSED REINFORCING STEEL. ACCEPTABLE METHODS INCLUDE HIGH-PRESSURE WATER BLASTING WITH OR WITHOUT ABRASIVES IN THE WATER, ABRASIVE BLASTING WITH CONTAINMENT, OR VACUUM ABRASIVE BLASTING. PAYMENT FOR ALL OF THE ABOVE DESCRIBED LABOR AND MATERIALS WILL BE MADE AT THE CONTRACT PRICE BID FOR SPECIAL - PATCHING CONCRETE STRUCTURE, MISC.: CURB REPAIR AND WILL BE PAID FOR PER FOOT. This is used on rehab projects where the face of the curb is deteriorated and in need of repair. Added 05/06/2009 B410: SPECIAL - STRUCTURES: CONCRETE SPALL REMOVAL THIS WORK WILL CONSIST OF REMOVING ALL VISIBLY SPALLED AREAS OF THE BOTTOM DECK FLOOR OF STRUCTURE(S) - - WITHOUT SOUNDING. AFTER SPALLED CONCRETE AREAS HAVE BEEN REMOVED, REMOVAL AREAS WILL BE SEALED WITH ITEM 512, SEALING OF CONCRETE SURFACES (EPOXY-URETHANE). CONCRETE SPALL REMOVAL WILL BE PAID FOR AT THE UNIT BID PRICE FOR SPECIAL STRUCTURE MISC.: CONCRETE SPALL REMOVAL. THIS PRICE WILL INCLUDE THE COST OF LABOR, EQUIPMENT, AND ALL INCIDENTALS REQUIRED TO COMPLETE THIS WORK. SPEC, STRUCTURES: CONCRETE SPALL REMOVAL, SQ YD 512, SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), SQ YD This is used on rehab projects where the floor has spalls which need to be removed to protect the public. Revised 07/14/2016 B411: UNSUITABLE SOILS THE FOLLOWING ITEMS AND QUANTITIES ARE TO BE USED AS DIRECTED BY THE ENGINEER TO ADDRESS UNSUITABLE SOILS ENCOUNTERED IN THE AREA UNDER THE PROPOSED BOX CULVERT. ITEM EXCAVATION, CU YD ITEM GRANULAR MATERIAL, TYPE C (703.16), CU YD ITEM GEOTEXTILE FABRIC, TYPE D, SQ YD Provide this on ALL Box Culvert Plans. Calculate the above quantities based upon a thickness of 18" and an area equal to the area of the bedding material required under the Box Culvert Specifications. Added 08/10/

8 B412: ITEM FIELD PAVING OF EXISTING PIPE FIELD PAVE THE EXISTING (SIZE AND TYPE). THE CONTRACTOR WILL PAVE THE BOTTOM OF THE EXISTING PIPE AS SHOWN IN THE DETAIL. AREAS TO BE PAVED WILL BE CLEANED TO REMOVE ALL DEBRIS AND SEDIMENT AND WILL BE PAID FOR UNDER ITEM SPECIAL - PIPE CLEANOUT. THE CONTRACTOR WILL BE REQUIRED TO USE ITEM 503 COFFERDAMS AND EXCAVATION BRACING (CRIBS, AND SHEETING) TO DEWATER THE EXISTING PIPE PRIOR TO THE PREPARATION AND FIELD PAVING. AFTER THE PIPE HAS BEEN CLEANED OF ALL DEBRIS AND SEDIMENT, NO WATER WILL BE ALLOWED TO CONTAMINATE THE PIPE. IF ANY CONTAMINATION OCCURS, THE CONTRACTOR WILL RESEAL THE AREA AND RECLEAN THE PIPE AT NO ADDITIONAL COST. ALL EROSION UNDER THE PIPE AND IN THE VOIDS WHERE THE PIPE IS RUSTED THROUGH WILL BE FILLED WITH ITEM 613 LOW STRENGTH MORTAR BACKFILL. ANY TREES LOCATED WITHIN 10 OF THE HEADWALLS THAT MAY POTENTIALLY DAMAGE THE CULVERT IN THE FUTURE OR ENCROACH UPON THE STREAM BEAD OR FIELD PAVING OPERATIONS WILL BE REMOVED. REMOVAL WILL BE DETERMINED BY THE PROJECT ENGINEER AND REMOVED UNDER ITEM 201 CLEARING AND GRUBBING. This note to be on projects where we are Field Paving Culverts. Revised 02/20/2013 B413: ITEM 514 PAINTING OF STRUCTURAL STEEL THE COLOR FOR THE FINISHED COAT OF STRUCTURE(S) - - WILL CONFORM TO FEDERAL COLOR NUMBER (COLOR). This note to be on projects where we are specifying a color other than as shown in the CMS. Added 08/10/2009 B414: ITEM 515 HIGH EARLY STRENGTH KEY-WAY GROUT KEY-WAY GROUT WILL BE EXAMINED FOR VISIBLE DETERIORATION AFTER THE REMOVAL OF THE ASPHALT CONCRETE OVERLAY AND WATERPROOFING. ANY GROUT DETERMINED TO BE REPLACED BY THE PROJECT ENGINEER WILL BE REMOVED BY ITEM 202, PORTIONS OF STRUCTURE REMOVED, AS PER PLAN AND THE GROUT WILL BE REPLACED USING ITEM 515, HIGH EARLY STRENGTH KEY-WAY GROUT. PAYMENT FOR THIS ITEM WILL INCLUDE ALL LABOR, MATERIALS, EQUIPMENT, AND ANY INCIDENTALS REQUIRED TO PERFORM THIS WORK. PAYMENT WILL BE MADE AT THE UNIT BID PRICE PER FOOT FOR ITEM 515, HIGH EARLY STRENGTH KEY-WAY GROUT. This note is only used when the existing asphalt concrete deck of an existing box beam bridge is being removed and replaced. The quantity used should be approximately 20% of the total required for the entire bridge. Added 11/17/

9 B415: ITEM 202 WEARING COURSE REMOVED, AS PER PLAN REMOVE ALL OF THE ASPHALT CONCRETE ON STRUCTURE(S) - -. THICKNESS VARIES WITH A MINIMUM THICKNESS OF ". MILLING OR OTHER MECHANICAL METHOD OF ASPHALT DECK REMOVAL MAY BE PERFORMED TO WITHIN 1/2"` OF THE TOP OF THE EXISTING PRESTRESSED CONCRETE BOX BEAMS. THE LAST 1/2"` OF ASPHALT CONCRETE TO BE REMOVED AND THE WATERPROOFING WILL BE REMOVED USING A NONDESTRUCTIVE METHOD SUCH AS HAND SCRAPING. THE CONTRACTOR WILL USE CAUTION IN REMOVING THE REMAINING ASPHALT AND WATERPROOFING TO ENSURE NO DAMAGE OCCURS TO THE PRESTRESSED CONCRETE BOX BEAMS. ANY DAMAGE TO THE BOX BEAMS WILL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. PAYMENT FOR THIS ITEM WILL INCLUDE ALL LABOR, MATERIALS, EQUIPMENT, AND ANY INCIDENTALS REQUIRED TO PERFORM THIS WORK. PAYMENT WILL BE MADE AT THE UNIT BID PRICE PER SQUARE YARD FOR ITEM 202, WEARING COURSE REMOVED, AS PER PLAN. This note is only used when the existing asphalt concrete deck of an existing box beam bridge is being removed and replaced. Added 11/17/2010 B416: DELETED This note is no longer needed, CMS 611 is used and no special requirements are needed. Revised 11/30/2015 B417: ITEM STRUCTURAL STEEL, MISC.: STEEL BEAM REPAIRS AFTER ABRASIVE BLASTING OF THE STRUCTURAL STEEL HAS BEEN COMPLETED IN PREPARATION FOR PAINTING AND THE PRIME COAT OF PAINT APPLIED (WORK WILL CONFORM TO CMS 514) THE CONTRACTOR WILL EXAMINE THE CONDITION OF THE EXISTING BEAMS AT THE ABUTMENTS AND INTERMEDIATE JOINTS (IF THEY EXIST) AND MAKE THE NECESSARY REPAIR RECOMMENDATIONS. THE STRUCTURAL STEEL REPAIR WORK WILL CONSIST OF REPAIRING THE DETERIORATED BEAMS BY THE ADDITION OF WELDED STEEL PLATES, STIFFENERS, ANGLES, ETC. ALL WORK WILL CONFORM TO CMS 513. THESE TASKS, AS DIRECTED BY THE ENGINEER, WILL BE COMPLETED BEFORE THE INTERMEDIATE COAT OF PAINT IS APPLIED. THE CONTRACTOR WILL PROVIDE THE ENGINEER WITH THE REPAIR PROCEDURE AND FIELD MEASUREMENT CALCULATIONS IN DETERMINING THE ACTUAL QUANTITY OF WORK REQUIRED PER THE REQUIREMENTS NOTED BELOW. 1. THE POTENTIAL REPAIR AREAS WILL BE LIMITED TO 10 FEET FROM THE ABUTMENT BEARINGS AND 10 FEET IN EACH DIRECTION FROM INTERMEDIATE JOINTS (IF THEY EXIST). 2. FLANGE AREA PERFORATIONS WILL BE REPAIRED. 3. USING A UT THICKNESS GAUGE, THE CONTRACTOR WILL QUANTIFY THE AREA OF SECTION LOSS FOR EACH BRIDGE. THE REPAIR AREA WILL BE IDENTIFIED USING A 4" x 4" WEB GRID. THE THINNEST STEEL WITHIN EACH GRID AREA WILL BE NOTED. MEASUREMENTS WILL BE RECORDED AND A COPY SUBMITTED TO THE ENGINEER

10 4. ANY AREA 8" HIGH x 4 WIDE WITH 30% AVERAGE SECTION LOSS ON THE WEB WILL BE REPAIRED. 5. SECTION LOSS MORE THAN 50% FOR AN AREA GREATER THAN 8" HIGH x 4 WIDE WILL BE REPAIRED FOR THE FULL HEIGHT OF THE WEB. 6. USE THE MOST READILY AVAILABLE STEEL MATERIAL THICKNESS THAT IS AT MINIMUM EQUAL TO THE ORIGINAL THICKNESS OF THE BEAM/GIRDER SECTION TO BE REPAIRED. 7. NEW STEEL MATERIAL WILL BE SHOP PRIMED. 8. AREAS OF SECTION LOSS LOCATED BEHIND THE BACK SIDE OF THE BEARING, BETWEEN THE BEARING LOAD PLATE AND BACKWALL WILL NOT BE REPAIRED. 9. AFTER THE REPAIRS HAVE BEEN COMPLETED, REPAIR ALL DAMAGED AREAS OF THE PRIME COAT IN ACCORDANCE WITH CMS THE DEPARTMENT WILL PAY FOR THE ACCEPTED QUANTITIES BASED UPON ACTUAL DETAILS AND DIMENSIONS AT UNIT PRICE (POUND) BID FOR ITEM STRUCTURAL STEEL, MISC.: STEEL BEAM REPAIRS. This note is to be on projects where specified in the Scope of Services. This is to be used on bridge painting projects to repair the beams. The quantity supplied will be estimated in the field. Added 12/08/2010 B418: ITEM SCUPPER MISC.: CLEANOUT THIS WORK WILL CONSIST OF REMOVING ALL DEBRIS FROM ON TOP AND INSIDE OF THE SCUPPERS. SCUPPER CLEANOUT WILL BE PAID FOR AT THE UNIT PRICE BID FOR ITEM 518, SCUPPER MISC.: CLEANOUT. THIS PRICE WILL INCLUDE THE COST FOR LABOR, EQUIPMENT, AND ALL INCIDENTALS REQUIRED TO COMPLETE THIS WORK. This note is to be on projects where specified in the Scope of Services. Added 12/09/2010 B419: SPECIAL - STRUCTURES.: STRUCTURE CLEANING THIS WORK WILL CONSIST OF CLEANING THE BEAMS/GIRDERS AND BEARINGS OF STRUCTURE(S) - - AS PER CMS ALSO, ALL DIRT AND DEBRIS FROM THE ABUTMENTS, BEAM SEATS, AND PIER CAPS WILL BE REMOVED AND WASHED WITH POTABLE WATER. THIS WORK WILL BE COMPLETED PRIOR TO THE REPAIR PAINTING OPERATIONS. STRUCTURE CLEANING WILL BE PAID FOR AT THE LUMP SUM BID FOR SPECIAL, STRUCTURE MISC.: STRUCTURE CLEANING. THIS PRICE WILL INCLUDE THE COST FOR LABOR, EQUIPMENT, AND ALL INCIDENTALS REQUIRED TO COMPLETE THIS WORK. This note is to be on projects where specified in the Scope of Services. Added 07/16/2016 B420: ITEM X CONDUIT, TYPE A, , AS PER PLAN INCLUDED WITH THIS ITEM IS THE OPENING FOR THE STORM SEWER OUTLET CONDUIT. REFER TO THE SITE PLAN SHEET FOR THE LOCATION. THE OPENING WILL BE FORMED AND CONSTRUCTED IN THE SHOP AND INCLUDE DIAGONAL #5 REINFORCING STEEL FRAMING THE OPENING ON BOTH FACES. PROVIDE A MINIMUM OF 1 1/2" OF CLEARANCE FROM THE EDGE OF THE OPENING TO THE OUTSIDE OF THE

11 STORM SEWER OUTLET PIPES. AFTER PLACING THE STORM SEWER OUTLET CONDUIT, GROUT ALL OPENINGS BETWEEN THE PIPE AND STRUCTURE LESS THAN 4 INCHES WITH MORTAR AND GROUT (CMS 602). ALL OPENINGS BETWEEN THE PIPE AND STRUCTURE GREATER THAN 4 INCHES WITH NONSHRINK MORTAR (CMS ). This is to be used when a conduit outlet through the wall of a four sided box culvert. Revised 02/20/2013 B421: ITEM REMOVAL MISC.: CHANNEL CLEANOUT THIS WORK WILL CONSIST OF RE-ESTABLISHING THE ORIGINAL CHANNEL PROFILE BY REMOVING SEDIMENT BUILDUP, VEGETATION, AND DEBRIS FROM THE EXISTING CHANNEL WITHIN STATE RIGHT-OF-WAY LIMITS AS SPECIFIED IN THE PLANS FOR STRUCTURES - -. ANY TREES LOCATED WITHIN CHANNEL OR BANK LIMITS WILL BE INCLUDED UNDER ITEM 201, CLEARING AND GRUBBING. ALL MATERIALS REMOVED SHALL BE DISPOSED OF IN ACCORDANCE WITH AND OF THE CMS WITH THE APPROVAL OF THE ENGINEER. NO AREAS OF EXISTING CHANNEL PROTECTION SHALL BE REMOVED IN ORDER TO RESTORE THE ORIGINAL CHANNEL PROFILE. AFFECTED CHANNEL AREAS SHALL BE CLEANED OUT TO THE SATISFACTION OF THE ENGINEER. CHANNEL CLEANOUT WILL BE PAID FOR AT THE UNIT PRICE BID FOR ITEM 202 REMOVAL MISC.: CHANNEL CLEANOUT. THIS PRICE WILL INCLUDE THE COST FOR LABOR, EQUIPMENT, AND ALL INCIDENTALS REQUIRED TO COMPLETE THE CHANNEL CLEANOUT. This is to be used when directed on the Scope of Services. Added 06/25/2012 B422: ITEM STRUCTURAL STEEL, MISC.: REPLACEMENT OF DAMAGED CROSSFRAMES THIS WORK CONSISTS OF REPLACING DAMAGED CROSSFRAMES THAT ARE BENT OF HAVE SECTION LOSS. THIS ITEM WILL INCLUDE SUPPLYING NEW CROSSFRAMES AND WELDING THEM BACK TO THE ORIGINAL POSITIONS OF THE CROSSFRAMES THAT ARE BEING REPLACED. AFTER REMOVAL, ALL WELDS WILL BE GROUND SMOOTH IN PREPARATION OF WELDING THE NEW CROSSFRAMES IN PLACE. ALL CROSSFRAMES TO BE REPLACED WILL BE FIELD MEASURED TO VERIFY SIZE AND LENGTHS PRIOR TO ORDERING MATERIAL. THE NEW CROSSFRAMES WILL BE WELDED TO THE GIRDERS OR BEAMS ON BOTH SIDES OF THE VERTICAL LEG AND ON THE TOP SIDE OF THE HORIZONTAL LEG. THE ANGLE WILL BE WELDED USING A 1/4" CONTINUOUS FILLET WELD. STEEL MEMBERS TO BE FABRICATED UNDER THIS ITEM WILL NOT REQUIRE SHOP DRAWINGS PRIOR TO FABRICATION. AISC CERTIFICATION IS NOT REQUIRED. THE CONTRACTOR WILL TAKE THE NECESSARY FIELD MEASUREMENTS TO VERIFY MEASUREMENTS BEFORE ORDERING MATERIALS. THE ENGINEER WILL HAVE THE AUTHORITY AND THE RESPONSIBILITY FOR ENSURING THAT THE STEEL IS ACCEPTABLE. AFTER FABRICATION THE PAY WEIGHTS SHALL BE COMPUTED IN COMPLIANCE WITH ITEM 513 OF THE CONSTRUCTION AND MATERIAL SPECIFICATIONS AND SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL. ALL LABOR, MATERIALS, EQUIPMENT, AND INCIDENTALS NECESSARY TO COMPLETE THIS ITEM EXCEPT FOR PAINT WILL BE INCLUDED FOR PAYMENT UNDER ITEM STRUCTURAL STEEL MISC.: REPLACEMENT OF DAMAGED CROSSFRAMES

12 Use this note when it is required to replace deteriorated cross frames. Be sure to include an item to paint the cross frames. Added 07/06/2012 B423: DELETED not needed. This should be handled on a project by project basis. A standardized note is Added 11/30/2015 B424: DELETED not needed. This should be handled on a project by project basis. A standardized note is Added 11/30/2015 B425: ITEM MICRO-SILICA MODIFIED CONCRETE OVERLAY, AS PER PLAN ITEM MICRO-SILICA MODIFIED CONCRETE OVERLAY (VARIABLE THICKNESS), MATERIAL ONLY, AS PER PLAN ITEM FULL DEPTH REPAIR, AS PER PLAN ITEM WEARING COURSE REMOVED, ASPHALT, AS PER PLAN ITEM EXISTING CONCRETE OVERLAY REMOVED, AS PER PLAN THESE ITEMS SHALL BE PERFORMED PER SUPPLEMENTAL SPECIFICATION BRIDGE DECK REPAIR AND OVERLAY WITH CONCRETE SCARIFICATION AND CHIPPING WITH THE FOLLOWING REVISIONS: THE THICKNESS OF THE CONCRETE OVERLAY REMOVED, ASPHALT WEARING COURSE REMOVED, PROPOSED OVERLAY, AND THE DEPTH OF REMOVAL BY SCARIFICATION SHALL BE AS SPECIFIED IN THE PLANS. CONSTRUCTION JOINTS WILL NOT BE PERMITTED IN THE WHEEL LINE. (SEE ) THE COMPONENTS OF THE MICRO-SILICA MODIFIED CONCRETE SHALL BE PROPORTIONED AS FOLLOWS. CONCRETE TABLE QUANTITIES PER CUBIC YARD REGATES (SSD) TYPE FINE #8 COARSE * TOTAL * CEMENT CONTENT MICRO SILICA WATER TO CEMENT- ITIOUS RATIO AIR CONTENT +/- 2% FIBER (1 1/4" POLYPROPY- LENE) ** GRAVEL LIME- STONE

13 SLAG * ALL COARSE REGATE SHALL HAVE AN ABSORPTION OF 1.00% OR GREATER AS DEFINED PER ASTM C127 ** FIBER MESH SHALL BE 100% VIRGIN POLYPROPYLENE IN A FIBRILLATED-NETWORK FORM AND SHALL BE 1 ¼ IN LENGTH. THE WEIGHTS SPECIFIED IN THE CONCRETE TABLE WERE CALCULATED FOR MATERIALS OF THE FOLLOWING BULK SPECIFIC GRAVITIES (SSD): NATURAL SAND AND GRAVEL 2.62, LIMESTONE SAND 2.68, LIMESTONE 2.65, SLAG 2.30, MICRO-SILICA SOLIDS 2.20, AND PORTLAND CEMENT FOR REGATES OF SPECIFIC GRAVITIES DIFFERING MORE THAN PLUS OR MINUS 0.02 FROM THESE, THE WEIGHTS IN THE TABLE WILL BE CORRECTED. FIBER MESH WEIGHTS NOT INCLUDED IN MIX DESIGN. ALL COARSE REGATE SHALL HAVE AN ABSORPTION OF 1.00% OR GREATER AS DEFINED BY ASTM C127 ALL OTHER REQUIREMENTS OF THE SUPPLEMENTAL SPECIFICATION SHALL REMAIN IN EFFECT. (SEE ) THE FINAL DECK SOUNDING MAY TAKE PLACE WITHIN 24 HOURS OF A RAIN, AND THE DECK DOES NOT HAVE TO BE COMPLETELY DRY. (SEE ) FULL DEPTH REPAIR IS NOT REQUIRED IF LESS THAN ONE HALF OF THE DECK ORIGINAL CONCRETE THICKNESS IS SOUND. (SEE ) THE WET CURE TIME IS REDUCED FROM 72 HOURS TO 24 HOURS OR UNTIL A BEAM BREAK OF 600 PSI IS ACHIEVED, WHICHEVER IS GREATER. AFTER THE 24 HOUR WET CURE, THE FINISHED OVERLAY SURFACE SHALL BE CURED BY SPRAYING A UNIFORM APPLICATION OF CURING MATERIAL OF , TYPE 1 OR 1D, AS PER CMS METHOD (B) MEMBRANE CURING. IF THE CURING COMPOUND CAN NOT BE PLACED WITHIN THE SAME SHORT TERM CLOSURE PERIOD AS THE OVERLAY, THE CONTRACTOR MAY ALLOW TRAFFIC ONTO THE OVERLAY, AND SHALL, AT THE NEXT AVAILABLE SHORT TERM CLOSURE PERIOD, APPLY THE MEMBRANE CURING COMPOUND. (SEE ) TRAFFIC WILL NOT BE PERMITTED ON THE FINISHED OVERLAY SURFACE UNTIL AFTER THE COMPLETION OF THE 24 HOUR WET CURE, AND AFTER TWO TEST BEAMS HAVE ATTAINED AN AVERAGE MODULUS OF RUPTURE OF 600 PST (4.2 Mpa). (SEE ) THE OVERLAY SURFACE EVAPORATION RATE REQUIREMENTS ARE IN EFFECT FROM 9:30 AM TO 11:00 PM. THEY ARE NOT IN EFFECT FROM 11:00 PM TO 11:00 AM. (SEE ) FOR EACH PHASE, THE CONTRACTOR SHALL PROVIDE ENOUGH MATERIAL FOR TWO BEAM BREAKS EACH AT 12 HOURS, 24 HOURS, 36 HOURS, AND 48 HOURS. THE DEPARTMENT WILL PERFORM THE BEAM BREAK TESTS AND DOCUMENT THE TIME OF THE POUR, THE TIME OF THE BEAM BREAK TESTS, AND THE MODULUS OF RUPTURE FOR EACH BEAM UNTIL THE MODULUS OF RUPTURE OF THE TWO TESTS IS NOT LESS THAN 650 PSI (4.5 MPa). TRAFFIC IS ALLOWED ON THE OVERLAY AT 600 PSI (4.5 Mpa)

14 ALL OTHER REQUIREMENTS OF THE SUPPLEMENTAL SPECIFICATION SHALL REMAIN IN EFFECT. Only use this note when directed to do so in the Scope of Services. Added 12/03/

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN P401: ITEM 254 - PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN P402: ITEM 254 - PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, AS PER PLAN P403: ITEM 304 - AGGREGATE BASE, AS PER PLAN P404: DELETED P405:

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 11/21/2014 Project 140560 Addendum No. 2 PID No. 82972 HAM IR 275

More information

SPECIAL SPECIFICATION 4491 Type CAC Concrete

SPECIAL SPECIFICATION 4491 Type CAC Concrete 2004 Specifications SPECIAL SPECIFICATION 4491 Type CAC Concrete 1. Description. Remove unsound concrete and replace with Type CAC, calcium aluminate concrete for ultra high early strength concrete repairs.

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information

DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids

DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids General Info Number: PROJECT NO. 43-17-04 : BRIDGE DECK REPAIR AND BRIDGE REMOVAL OHIO TURNPIKE OVER QUARRY ROAD, M.P. 138.0 OHIO TURNPIKE OVER INACTIVE RAILROAD, M.P. 138.2 LORAIN COUNTY, OHIO Deadline:

More information

ACHD Bridge and Culvert Policy DRAFT

ACHD Bridge and Culvert Policy DRAFT ACHD Bridge and Culvert Policy DRAFT Standard Drawings and additional construction details are contained in the separate ACHD Bridge Design Guide and are hereto made part of this policy by reference. DEFINITIONS

More information

SECTION 920 SANITARY AND STORM SEWER MANHOLES

SECTION 920 SANITARY AND STORM SEWER MANHOLES SECTION 920 SANITARY AND STORM SEWER MANHOLES 920.1 GENERAL This section contains items which are relative to the installation of sanitary and storm sewer manholes. 920.2 REFERENCES 920.2.1 ASTM C 43 C

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018:

ANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018: ADDENDUM NO. 3 PROJECT NO. 43805 (PART A & B) PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 PM ON MAY 24, 208: Q#32 Addendum # answered Question #7 indicating that an average depth of 3 feet for the

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 848 BRIDGE DECK REPAIR AND OVERLAY WITH CONCRETE USING HYDRO-DEMOLITION

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 848 BRIDGE DECK REPAIR AND OVERLAY WITH CONCRETE USING HYDRO-DEMOLITION STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 848 BRIDGE DECK REPAIR AND OVERLAY WITH CONCRETE USING HYDRO-DEMOLITION January 20, 2017 848.01 Description 848.02 Bridge Decks with

More information

SECTION STORM DRAINAGE

SECTION STORM DRAINAGE SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation

More information

SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay

SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay 2004 Specifications SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay 1. Description. Furnish and place a multi-layer polymer overlay consisting of a crack seal, polymer resin and aggregates.

More information

FEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96

FEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96 General Info Number: PROJECT NO. 43-19-02 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE OVER ABANDONED RAILROAD M.P. 34.2, OHIO TURNPIKE OVER STATE ROUTE 108 M.P. 34.5, COUNTY ROUTE

More information

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section 02540-1 of 10 SECTION 02540 STORM DRAIN REHABILITATION 02540.01 GENERAL A. Description Storm drain rehabilitation shall include, but not necessarily be limited to, pipe joint sealing, inlet and manhole

More information

SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams

SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams 1993 Specifications CSJ 0162-01-080, etc. SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams 1. Description. This Item shall govern for the repair of impact damaged prestressed

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS Section SECTION 39 - MANHOLES TABLE OF CONTENTS Page 39-1 GENERAL... 39.1 39-2 CONCRETE MANHOLES... 39.1 39-2.01 NOT USED... 39.1 39-2.02 Concrete Storm Drain Manholes... 39.1 39-3 SADDLE SEWER MANHOLES...

More information

SPECIAL SPECIFICATION 2042 Decorative Colored Pattern Concrete Paving

SPECIAL SPECIFICATION 2042 Decorative Colored Pattern Concrete Paving 2004 Specifications CSJ 0196-02-120 SPECIAL SPECIFICATION 2042 Decorative Colored Pattern Concrete Paving 1. Description. This Item shall govern for the furnishing and placing of colored concrete wave

More information

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones.

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones. ITEM 432 RIPRAP 432.1. Description. This Item shall govern for the furnishing and placing of riprap of the type and details shown on the plans and in accordance with this Item. 432.2. General. Riprap furnished

More information

Bridge and Culvert Design Standards

Bridge and Culvert Design Standards 3004 ROADWAY DESIGN STANDARDS 3004.1 Roadway Design Roadway planning and design for the public road system shall conform to the following guidelines and referenced specifications. Use the most current

More information

Section 710. WATERPROOFING AND PROTECTIVE COVERS

Section 710. WATERPROOFING AND PROTECTIVE COVERS 710.01 Section 710. WATERPROOFING AND PROTECTIVE COVERS 710.01. Description. This work consists of providing and placing membrane waterproofing and protective covers. 710.02. Materials. Provide materials

More information

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25 General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO

More information

ADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018

ADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018 CBBEL PROJECT NO. 02-0065.H0226 ADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018 Modification No. 1 In regards to the COBBLESTONE PAVERS specification,

More information

SPECIAL SPECIFICATION 4653 Polypropylene Pipe

SPECIAL SPECIFICATION 4653 Polypropylene Pipe 2004 Specifications CSJ 2158-01-013, Etc. SPECIAL SPECIFICATION 4653 Polypropylene Pipe 1. Description. Furnish and install polypropylene pipe for constructing polypropylene pipe culverts or polypropylene

More information

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,

More information

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT October 3, 2018 Please find the following addendum to the below mentioned QUOTE. Addendum No.: 2 Quote#: 312-00-18-26-1 Project Name: Windsor Dr.

More information

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , & TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS Financial Project ID 429140-1-52-01, 429140-2-52-01 & 428267-1-52-01 The official record of this Technical Special Provision is the electronic file signed

More information

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4 City of Columbia Engineering Regulations PART 25: SPECIFICATIONS FOR ALTITUDE VALVE VAULT Table of Contents Paragraph Description Page No. 25.1 General 25-1 25.2 Materials 25-1 25.3 Concrete Masonry Work

More information

SECTION MINOR CONCRETE

SECTION MINOR CONCRETE SECTION 03300 - MINOR CONCRETE CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And Payment...

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

SPECIFICATIONS FOR STRUCTURAL EXCAVATION SPECIFICATIONS FOR STRUCTURAL EXCAVATION 1.0 DESCRIPTION The Work shall consist of:.1 Excavation and removal of material for the placement of foundations, substructure units, approach slabs, transition

More information

[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:]

[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:] SECTION 14 - REMOVALS 14-1 GENERAL This item shall consist of removing, [salvaging], [abandoning,] [stockpiling] and/or disposing of existing [pavements,] [asphalt-treated bases (ATB),] [cement-treated

More information

ESTIMATE OF QUANTITIES

ESTIMATE OF QUANTITIES ESTIMATE QUANTITIES STATE S.D. SHEET NO. TOTAL SHEETS 2 12 SPECIFICATIONS TEMPORARY PAVEMENT MARKING, Continued STATE S.D. SHEET NO. TOTAL SHEETS 3 12 South Dakota Standard Specifications for Roads and

More information

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS AFTER FEBRUARY 1, 2011 ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS 481.1 Description. This specification shall govern for the construction of monolithic, reinforced concrete box sewers of the size,

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows. 403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage

More information

SPECIAL SPECIFICATION 4425 Thermoplastic Pipe

SPECIAL SPECIFICATION 4425 Thermoplastic Pipe 2004 Specifications CSJ 0264-07-028 SPECIAL SPECIFICATION 4425 Thermoplastic Pipe 1. Description. Furnish and install thermoplastic pipe for constructing thermoplastic pipe culverts or thermoplastic storm

More information

MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following:

MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following: MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL EFFECTIVE DATE: OCTOBER 14, 2011 200.07 Contractor Quality Control - is replaced with the following: (a) (b) (c) Scope: These requirements

More information

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING

More information

ITEM 432 TUNNEL CONSTRUCTION

ITEM 432 TUNNEL CONSTRUCTION AFTER MARCH 1, 2012 ITEM 432 TUNNEL CONSTRUCTION 432.1 Description. This Item shall govern for tunnel lines under railroads, state highways, and concrete paved streets or other obstructions indicated.

More information

Editing notes to assist users are separated from specification text by rows of asterisks. Delete these notes prior to final printing.

Editing notes to assist users are separated from specification text by rows of asterisks. Delete these notes prior to final printing. SECTION 09635 LIMESTONE FLOORING This guide specification has been prepared by TexaStone Quarries LLC to assist design professionals in the preparation of a specification section covering cut limestone

More information

Bids JANUARY 10, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $29,000,000.00) Miller Bros. Const., Inc. $27,699,031.59

Bids JANUARY 10, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $29,000,000.00) Miller Bros. Const., Inc. $27,699,031.59 General Info Number: PROJECT NO. 43-19-07 Description: BRIDGE REHABILITATION AND 3RD LANE WIDENING OHIO TURNPIKE OVER AI CREEK M.P. 47.4, OHIO TURNPIKE OVER S.R. 64 (N. MAIN ST.) M.P. 47.5 MILEPOST 46.50

More information

ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007

ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007 ERRATA SHEET FOR STANDARD SPECIFICATION BOOK FOR STATE ROAD AND BRIDGE CONSTRUCTION, EDITION 2007 Sheet 1 of 7 GENERAL The Kansas Department of Transportation STANDARD SPECIFICATIONS FOR STATE ROAD AND

More information

Section 403. DRAINAGE STRUCTURES

Section 403. DRAINAGE STRUCTURES 403.01 Section 403. DRAINAGE STRUCTURES 403.01. Description. This work consists of adjusting, constructing, or temporarily lowering drainage structures and cleaning existing drainage structures and leads

More information

1. Payment for concrete sidewalks is on square foot basis. a. Limits for measurement for trench excavation as follows:

1. Payment for concrete sidewalks is on square foot basis. a. Limits for measurement for trench excavation as follows: Section 02775 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Reinforced concrete sidewalks. B. Wheelchair ramps. C. Reinforced slope paving. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment for concrete

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

729 - MULTI-LAYER POLYMER CONCRETE OVERLAY SECTION 729 MULTI-LAYER POLYMER CONCRETE OVERLAY

729 - MULTI-LAYER POLYMER CONCRETE OVERLAY SECTION 729 MULTI-LAYER POLYMER CONCRETE OVERLAY SECTION 729 MULTI-LAYER POLYMER CONCRETE OVERLAY 729.1 DESCRIPTION Prepare the surface of the reinforced concrete bridge deck and construct a multi-layer polymer concrete overlay (overlay) as shown on

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $3,379,844.00 Scott Construction Corporation - Portland, ME $3,572,184.50 CPM Constructors - Freeport, ME $3,732,667.25 Page 1 of 16 Wyman

More information

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION ADDENDUM NO. 1 PROJECT NO ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON DECEMBER 29, 2015

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION ADDENDUM NO. 1 PROJECT NO ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON DECEMBER 29, 2015 OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION ADDENDUM NO. 1 PROJECT NO. 43-16-05 ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON DECEMBER 29, 2015 Q#1 Can Asbury Road (MP 197.8) & State Route 700 (MP

More information

ITEM NO. 307 CONCRETE STRUCTURES

ITEM NO. 307 CONCRETE STRUCTURES ITEM NO. 307 CONCRETE STRUCTURES This item shall govern the construction of box culverts, headwalls, wingwalls, bridges, box transitions, approach slabs, retaining walls, inlets, storm sewer structures,

More information

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section. Product Specification for: Rapid Set DOT Repair Mix SECTION 03 01 30 MAINTENANCE OF CAST-IN-PLACE CONCRETE SECTION 03 01 40 MAINTENANCE OF PRECAST CONCRETE SECTION 03 01 50 MAINTENANCE OF CAST DECKS AND

More information

17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS

17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS 17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS 17.1 Description The work covered by this section of the specifications consists of furnishing all labor, the construction and installation of open storm drain

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION OF 1990 90P-270 Sheet 1 of 5 SECTION PAVEMENT PATCHING Page 591, Section. Delete the Section and replace with

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 808 REINFORCED CONCRETE VAULTS

San Antonio Water System Standard Specifications for Construction ITEM NO. 808 REINFORCED CONCRETE VAULTS San Antonio Water System Standard Specifications for Construction ITEM NO. 808 REINFORCED CONCRETE VAULTS 808.1 DESCRIPTION: Reinforced concrete vaults shall be cast-in-place and shall include reinforcing

More information

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section. SECTION 03 01 30 MAINTENANCE OF CAST-IN-PLACE CONCRETE SECTION 03 01 40 MAINTENANCE OF PRECAST CONCRETE SECTION 03 01 50 MAINTENANCE OF CAST DECKS AND UNDERLAYMENT SECTION 03 01 60 MAINTENANCE OF GROUTING

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 847

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 847 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 847 BRIDGE DECK REPAIR AND OVERLAY WITH CONCRETE USING SCARIFICATION AND CHIPPING APRIL 15, 2005 847.01 Description 847.02 Bridge Decks

More information

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000) General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER

More information

Construction Specification 62 Grouted Rock Riprap

Construction Specification 62 Grouted Rock Riprap Construction Specification 62 Grouted Rock Riprap 1. Scope The work consists of furnishing, transporting, and the installation of grouted rock riprap revetments and blankets, including filter or bedding

More information

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES AFTER MARCH 1, 2012 ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES 430.1 Description. This item shall govern for all excavation required for the construction of sewers, sewer structures, pipe culverts,

More information

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items: ITEM 431 PNEUMATICALLY PLACED CONCRETE 431.1. Description. This Item shall govern for furnishing and placing of "Pneumatically Placed Concrete" for encasement of designated structural steel members, the

More information

9 Concrete Pavement Patching

9 Concrete Pavement Patching 9 Concrete Pavement Patching Materials Concrete Mix Design Concrete Mix Criteria Trial Batch Demonstration of CMD Acceptance Removal of Concrete Partial Depth Patches Full Depth Patched Placement of Patching

More information

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices. SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 321216 - ASPHALT PAVING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 04821 TEMPORARY VEHICLE AND EQUIPMENT FUELING AREA PART 1 - GENERAL 1.01 Description Installation of erosion and sediment control for a temporary vehicle and equipment fueling

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

SECTION EROSION CONTROL DEVICES

SECTION EROSION CONTROL DEVICES SECTION 02374 PART 1 GENERAL EROSION CONTROL DEVICES 1.1 SUMMARY A. Section Includes: 1. Diversion Channels. 2. Rock Energy Dissipator. 3. Paved Energy Dissipator. 4. Rock Basin. 5. Rock Barriers. 6. Sediment

More information

SECTION UNIT MASONRY

SECTION UNIT MASONRY SECTION 04200 UNIT MASONRY PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, and equipment and perform functions required in the installation and maintenance of the work covered by this Section.

More information

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT April 17, 2018 Please find the following addendum to the below mentioned QUOTE. Addendum No.: 1 Quote#: 310-00-18-08-1 Project Name: Greenleaves

More information

SECTION RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL PART 2 - MATERIALS AND METHODS

SECTION RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL PART 2 - MATERIALS AND METHODS SECTION 01200 RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL 1.01 SCOPE This specification covers the work within the street right-of-way (property line) for the repair of that area which is disturbed during

More information

Significant Changes. 101 Definitions and Terms. 102 Bidding Requirements and Conditions 105 Control of Work

Significant Changes. 101 Definitions and Terms. 102 Bidding Requirements and Conditions 105 Control of Work 1 SIGNIFICANT CHANGES IN CDOT's 2017 STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION The following are significant changes from the 2011 Standard Specifications Book to the new 2017 Standard Specifications

More information

SPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket

SPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket 1993 Specifications CSJ 0331-04-045 SPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket 1. Description. This Item shall govern for the furnishing, installing and energizing a sacrificial

More information

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges. STANDARD BRIDGE & CULVERT COMPONENTS Alberta Bridge Inventory In Alberta there are about 13,300 bridges. Types of bridges in Alberta: Standard bridges 3521 (26%) Bridge size culverts 8348 (63%) Major bridges

More information

Final Estimates Level 2

Final Estimates Level 2 Florida Department of TRANSPORTATION Final Estimates Level 2 Module 6: Structures 11/1/2017 FDOT Final Estimates Level 2 Release 11, Module 6 1 6-1 Module Content Concrete Structures Bridges Substructure

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 02514 MANHOLES 1.0 GENERAL 1.1 SCOPE This section provides for construction of sewer manholes complete in place, including the furnishing and adjusting to grade of an existing

More information

This drawing. is preliminary. and not for. construction or. implementation. purposes. project number 170 END VIEW DESIGN STRENGTHS: PLAN

This drawing. is preliminary. and not for. construction or. implementation. purposes. project number 170 END VIEW DESIGN STRENGTHS: PLAN project number 70 Reference Line 2-0" Reference 3 -" 6-0" 6-0" 3 -" Line Box Culvert Roadway Finished Channel -0" -0" E VIEW 20-0" Riprap 0-0" Riprap Outlet Invert El 87.0 Sta 233+00.00 Inlet Invert El

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt

More information

Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel

Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California 93030 Tel 805.385.8280 October 24, 2018 ADDENDUM NO. 2 Vineyard Avenue Street Resurfacing Project PW 16-12 SCHEDULED

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 7 NOTE: This special provision is generally written in the imperative mood. The subject, the

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $13,984,117.36 Reed & Reed, Inc. - Woolwich, ME $14,883,139.00 Page 1 of 11 CPM Constructors Freeport, ME 201.11 Clearing AC 2.00 10000.00

More information

SECTION 503 TEMPORARY PAVEMENT RESTORATION

SECTION 503 TEMPORARY PAVEMENT RESTORATION SECTION 503 TEMPORARY PAVEMENT RESTORATION 503-1 DESCRIPTION: This work consists of furnishing, placing, compacting, and maintaining a temporary pavement surface suitable for driving in accordance with

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section CEMENT STABILIZED BASE COURSE. 1. Foundation course of cement stabilized crushed stone.

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section CEMENT STABILIZED BASE COURSE. 1. Foundation course of cement stabilized crushed stone. PART 1 GENERAL 1.01 SUMMARY A. This section includes: Section 02712 1. Foundation course of cement stabilized crushed stone. 2. Foundation course of cement stabilized bank run gravel. 1.02 MEASUREMENT

More information

SECTION 30 - CONCRETE STRUCTURES TABLE OF CONTENTS

SECTION 30 - CONCRETE STRUCTURES TABLE OF CONTENTS SECTION 30 - CONCRETE STRUCTURES TABLE OF CONTENTS Section Page 30-1 GENERAL... 30.1 30-2 FOOTINGS... 30.1 30-3 FORMS... 30.1 30-4 REMOVAL OF FORMS... 30.1 30-5 REINFORCEMENT... 30.2 30-6 MIXING AND TRANSPORTING...

More information

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT August 7, 2018 Please find the following addendum to the below mentioned BID. Addendum No.: 1 Bid#: 314-00-18-38-2 Project Name: Johnny F. Smith

More information

SECTION BORING AND/OR JACKING PIPE

SECTION BORING AND/OR JACKING PIPE 02910-1 of 6 SECTION 02910 BORING AND/OR JACKING PIPE 02910.01 GENERAL A. Description Boring and/or jacking pipe shall include, but not necessarily be limited to, furnishing and installing carrier pipe

More information

San Antonio Water System Specifications for Construction ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES

San Antonio Water System Specifications for Construction ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES 853.1 DESCRIPTION: This item shall govern the construction of FRP sanitary sewer manholes, complete in place and the materials

More information

SPECIAL SPECIFICATION 4897 Repair Structural Concrete

SPECIAL SPECIFICATION 4897 Repair Structural Concrete 1993 Specifications CSJ 0331-04-045 SPECIAL SPECIFICATION 4897 Repair Structural Concrete 1. Description. This Item shall govern for the repair of delaminated, spalled and chipped areas of concrete foundations,

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS

CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 553 FEBRUARY 1991 CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS 553.01 SCOPE 553.02 REFERENCES 553.03 DEFINITIONS TABLE OF CONTENTS 553.04 SUBMISSION

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

SECTION BUILDING EARTHWORK

SECTION BUILDING EARTHWORK Conditions of Use/ Responsibility of Data Montgomery County Public Schools Facilities Guide DIVISION 2 - SITE WORK These guideline specifications are to be used by the A/E as a base document in the development

More information

SECTION RIGID PAVEMENT

SECTION RIGID PAVEMENT SECTION 02750 PART 1 GENERAL RIGID PAVEMENT 1.1 SUMMARY A. Section Includes: 1. Concrete sidewalks. 2. Concrete stair steps. 3. Concrete integral curbs gutters. 4. Concrete parking areas and roads. B.

More information

Section REINFORCING STEEL

Section REINFORCING STEEL Section 03210 PART 1 GENERAL 1.01 SUMMARY This Section includes the furnishing and subsequent placing of reinforcing steel, deformed and smooth, chairs, ties, splicing devices, and other reinforcing accessory

More information

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation

More information

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

Florock Seamless Flooring Systems

Florock Seamless Flooring Systems Architectural Specification -- FloroCryl Shop MMA (Methyl Methacrylate) - Silica Sand Single Broadcast 1/16 (1.59 mm) Flooring System Part 1: General 1.01 System Description A. Roller-applied penetrating

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR CONCRETE FORM LINERS AND COLOR STAIN COATING

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR CONCRETE FORM LINERS AND COLOR STAIN COATING VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR CONCRETE FORM LINERS AND COLOR STAIN COATING 1.0 GENERAL A. Description Construction of textured and colored formed concrete surfaces using simulated

More information

SECTION 806 MANHOLE REHABILITATION

SECTION 806 MANHOLE REHABILITATION SECTION 806 MANHOLE REHABILITATION 806-1 DESCRIPTION: This specification consists of all work, materials, labor and equipment required for manhole rehabilitation for the purpose of eliminating infiltration