1 ATTACHMENT I

2 PHILADELPHIA PRINCETON LEHIGH VALLEY WASHINGTON DC ORLANDO WEST PALM BEACH 111 South Independence Mall East / Suite 950 / Philadelphia, PA Tel / / Fax / info@o-n.com O DONNELL & NACCARATO Nick Cinalli, PE, SECB / President & CEO Samuel Robinson, AIA, LEED AP Director, Design and Construction 1234 Market Street, 16th Floor Philadelphia, PA RE: 5820 Germantown Avenue Structural Assessment Philadelphia, PA File No P0 We visited the above referenced site on March 10, 2011 and March 29, 2011 to visually review the building structure. The purpose of our visit was to visually access the overall building structure and provide structural recommendations for the required structural repairs as well as critical repairs resulting from the fire damage. Included in this report are our engineering observations and recommendations with photo documentation of the existing observed conditions. We have teamed with MidAtlantic Construction s cost estimating department to provide a cost estimate for our recommendations which is included as an attachment to this report. As requested by the Redevelopment Authority, we have incorporated boarding all existing windows as well as addressing the roof sub-structure and roofing system. The existing windows and deterioration of the roof is the combined result of the long term deterioration, direct result of the recent fire, and long term deterioration due to the fire. This will be discussed further in our observations and recommendations. At the time of our visit, the building was unoccupied and unheated. Drawings were not available at the time of our site visit. During the course of our site visit, we were accompanied by personnel from your office that provided us access to various parts of the building structure. EXISTING STRUCTURE DESCRIPTION The existing school building structure is a four story steel and timber framed structure supported by brick masonry bearing walls, with a basement. The building s façade is comprised of brick masonry, with a terra-cotta cornice and terra cotta capped parapets. The building s roof structure is comprised of steel angle gabled trusses that clear span the 50-0 width of the building at approximately 20-0 on center. Floor/ceiling framing consists of 13 ½ deep x 3 at 16 on center wide timber joists supporting wood decking with additional 13 ½ deep x 3 joists framing at 24 on center approximately 3-0 below the floor framing as ceiling framing.

3 Page 2 The rear portion of the building within the basement contained a below grade pool approximately 8-0 deep. The building s overall footprint is approximately 10,000 SF with the following estimated square footage per level: Basement Ground floor Second Floor Third Floor Fourth Floor Total Above Grade 10,000 SF 10,000 SF 5,000 SF 10,000 SF 8,500 SF 33,500 SF (not including basement) METHODOLOGY We conducted our investigation from walkable surfaces on the ground both within the building s interior and around the perimeter of the building s exterior. We documented our observations with digital photographs contained in the attached Appendix that are referenced throughout the report. We identified several deteriorated conditions as well as conditions that may contribute to future deterioration. We have summarized our findings into the following categories based on potential safety hazards and the overall performance of the structure(s) and repairs will be identified using these categories: Critical: Items in this category require immediate action. Critical items are observed potential safety hazards and immediate action should be taken to remove the hazard or prevent public access to the area until a permanent solution can be implemented. Structural components or systems described in this section have failed or can no longer be relied upon to perform their intended function. Priority One: We recommend that Items in this category be repaired within one year of the date of this report. Left unattended, these items will contribute to further deterioration and may become critical. The structural components or systems described as priority one are at or near the end of their useful life. Priority Two: We recommend that items in this category be repaired within one to three years. The structural components or systems described as priority two are performing adequately at this time, but are approaching the end of their expected useful life. If left unaddressed, priority two repairs may deteriorate further or contribute to the deterioration of the structure and become priority one or critical items. Maintenance: Items in this category should be addressed as part of a regular maintenance program and are necessary to reduce deterioration of the existing structural components and the proposed repairs.

4 Page 3 OBSERVATIONS While onsite we noted several deteriorated conditions where differing elements have caused distress on the building structure and envelope. We have categorized our observed deterioration in the following manner, and we will identify each observation with a corresponding letter: (A) Long Term Deterioration: This is deterioration is the result of the building being abandoned, unheated, and neglected for a significant period of time. (B) Direct Result of Fire (Fall 2010): These observed conditions are the direct result of the single event fire reported to have occurred in the fall of 2010, prior to Winter 2010/2011. (C) Long Term Deterioration due to Fire: This is deterioration that has further developed due to portions of the building envelope and structure having been compromised during the fire. This results in additional water infiltration and stressing structural elements because the building has not been stabilized. We observed the overall condition of the exterior masonry around the entire building. The west façade appears to have been coated with stucco and painted relatively recently. The north façade that faces Germantown Avenue shows signs of significant deterioration. The mortar in the mortar joints has deteriorated to the point where it can be removed without the use of any tools. In addition, the face brick on the masonry façade has become loose in some locations. This condition was observed as a typical condition to all the exposed brick façade around the entire building (A) and (C). Most of the windows on the 3 rd and 4 th floors have been broken or opened during the fire, and have not been boarded up (B). There is a significant amount of water infiltration entering the building at these locations saturating the plaster walls adjacent to and below the windows as well as the finished floor below (C). We observed the condition on the underside of the main entrance ramp to the building above the lower areaway on the north elevation. The structure was comprised of cast in place concrete. Concrete has spalled away and exposed reinforcing steel shows significant signs of deterioration (A). Upon entering the building on the ground floor, we observed a significant amount of debris piled on the ground floor framing. Some areas of this debris were saturated at the time of our site visit. We were unable to review the condition of the framing below this area due to the significant amount of debris (C).

5 Page 4 Within the ground floor auditorium at the south end of the building, we reviewed a condition of the dropped/coffered beams of the ceiling structure (between ground and 2 nd floors). These assumed steel beams were still encased in plaster and could not be verified at the time of our site visit. We noted an area where the beam support on a western masonry pier showed signs of deterioration, and there may be potential deterioration of steel girders encased within the plaster coffered ceiling. In addition, there was significant spalling of the plaster and flaking paint to indicate signs of water infiltration damage. Some of the beams appeared to have excessive deflection, although it could not be measured at the time of our visit (A), (B) and (C). This area should be further investigated during the stabilization of the building. We observed the condition of the ceiling and floor framing joists between the 2 nd and 3 rd floor. A small area of the ceiling had been cut out to expose fire damaged joists. We visually reviewed approximately 40 SF of fire damage in a western side corridor south of the main stairway (B). We observed other areas on the 2 nd floor where there was no apparent char damage from the fire, the wood floor/ceiling joists exhibited signs of smoke damage (B). Observation of the 3 rd floor ceiling/4 th floor structure revealed fire damage within the entire central corridor of the building. The wood joists have either been completely compromised or exhibit significant signs of char (B). The plaster ceiling was removed in its entirety and left as rubble/debris on the 3 rd floor which was partially wet from water infiltration (C). The northern most section of the building still contained plaster ceilings. In areas where plaster ceilings had been removed to expose the wood structure, the wood was smoke damaged (B). On the 4 th floor, the main lobby at the top of the staircase has been structurally compromised due to the fire damage. The floor has deflected several feet, and is not currently shored. This area is unsafe, and should be restricted from access until it can be properly shored (B). This area continues to deteriorate due to water infiltration from above. In addition, there is debris from the ceiling above that has added weight to the area, and is currently saturated from exposure (C). We observed the condition of the basement and pool area. There were visible signs of water infiltration along the walls including efflorescence and flaking paint. Water is likely infiltrating the building s masonry exterior and traveling down into the lower elevations of the wall (A) and (C). The rear stair tower of the building shows significant signs of masonry deterioration due to prolonged water infiltration and possible movement. There is a large crack and gap in the masonry wall between the side walls of the stair tower and the back of the main structure.

6 Page 5 Also the eastern wall of the stair tower shows significant horizontal deflection at the top and parapet. The mortar joints have deteriorated to a point where bricks and mortar can be removed without the use of tools. In addition, the original wall construction did not appear to have a positive tie between the two intersecting walls, resulting in movement of the east stair wall (A). There is significant deterioration of the wood roof decking and some wood roof joists due to water infiltration. The water infiltration is the result of new roof openings created while fighting the fire, and well as long term deterioration of the roofing system at valley locations (A), (B) and (C). RECOMMENDATIONS Our structural recommendations are limited to stabilization of the building structure and prevention of further deterioration. It is not intended to address current structural code issues, architectural concerns or any issues related to mechanical, electrical or plumbing systems. The building will likely require further repairs or remediation based on altered future use of the building. The exterior masonry of the building requires full repointing of the mortar joints. Testing and analysis of the existing mortar should be done, and the new mortar should match the composition of the existing mortar. Previously repointed mortar joints utilized mortar that was harder than the surrounding bricks. As a result there has been accelerated deterioration of the mortar and bricks surrounding these repointed areas (Critical). In addition to repointing of mortar joints, cracked, spalled or deteriorated brick should be replaced during repointing. In areas where the masonry walls appear to have moved or become unstable, the masonry wall should be rebuilt (Critical). Broken windows should be replaced or boarded to prevent further water infiltration damage (Priority One). Although not an immediate life safety concern, the framed concrete slab at the building s main entry should be removed and replaced in kind (Priority One). Stabilization of the building should include removal of all debris within the building. The original floor construction was likely not designed to accommodate the load of saturated debris (Critical). Currently, floor framing that was compromised during the fire has not been shored. This area is unsafe above and below. If left unshored, the framing may collapse and bring adjacent framing or the exterior walls down with it (Critical). Proper stabilization of the building would involve removal of all charred framing, and replacement of framing in-kind. During this work, adjacent framing and exterior walls will likely require temporary shoring (Critical).

7 Page 6 During stabilization, all wet plaster and finished over structure should be removed to expose the concealed condition beyond. By inspection, if it is determined that there is significant deterioration, the structure should be analyzed based on its condition and either reinforced or replaced in kind. An allowance for remediation of structural steel should be included in the cost estimate (Priority One). Stabilization of the building should include replacement of the compromised roof structure in kind and some kind of temporary roof membrane over the whole roof to ensure a proper barrier against water infiltration (Priority One). The upper levels of the masonry walls at the rear stair tower of the building are currently unstable and should be reconstructed. During reconstruction of the masonry walls, a detail to provide positive connection between the stair tower walls and the existing main building wall should be implemented (Critical). SUMMARY AND CONCLUSIONS Based on our visual review of the exposed structural elements, there are several areas of life safety concern where critical repairs or shoring of the structure should be done immediately to stabilize the building. Furthermore, we observed several conditions as noted above that if left to deteriorate further, may add additional safety hazards if not addressed. We were commissioned by the Redevelopment Authority of Philadelphia to make a limited, visual, non-invasive observation of only the structural components herein referenced. This report is based upon clearly visible, open, and unobstructed structural components of the premises on the dates of observation. No opinion is rendered with regard to structural components or portions of the referenced elements that are concealed or structural elements not referenced in this report. This limited observation does not guarantee the structural integrity of the referenced components, nor the total premises under its current use nor any proposed alterations. If a thorough structural review of the total premises or any component is desired, we will provide a fee for your consideration and approval to provide such service upon your request. If you have any questions or require additional information, please contact our office. O DONNELL & NACCARATO, INC. Douglas F. Seaboldt, PE Project Executive S:\PROJECTS\1700's\1790\ \Report\5820 Germantown Avenue.doc

8 Page 7 Appendix Arial view of building (plan) Page 8 Photo Log Page 9 MidAtlantic s Cost Estimate with clarifications Page 19

9 Page 8 Arial View of Building from Google Earth

10 Page 9 Photo 1: Photo of North Elevation Photo 2: Close up of deterioration -underside of entrance steps

11 Page 10 Photo 3: Close up of deteriorated mortar joints Photo 4: Northwest corner elevation

12 Page 11 Photo 5: East Facade Photo 6: Deteriorated steel grating safety hazard

13 Page 12 Photo 7: Debris on ground floor Photo 8: Water infiltration damage Ground floor ceiling / 2 nd floor structure rear auditorium

14 Page 13 Photo 9: Ceiling and floor wood joist framing between ground floor and 2nd floor Photo 10: Cut away ceiling between 2 nd signs of fire damage and 3 rd floor

15 Page 14 between 2 nd Photo11: Ceiling and floor wood joist framing floor and 3 rd floor showing signs of char and smoke damage. Photo 12 3 rd floor ceiling / 4 th floor structure Main corridor char damage.

16 Page 15 Photo 13 Deteriorated attic level joists due to water infiltration from holes cut in the roof during the fire Photo 14 Compromised 4 th floor due to fire with saturated debris

17 Page 16 Photo 15 Attic view showing steel trusses and saw-cut roof opening from fire Photo 16 Overall Roof looking south. Note saw-cut holes in roof and broken glass in skylights

18 Page 17 Photo 17 Roof of south stair tower. Note horizontal deflection of top of wall and deteriorated joints of parapet cap Photo 18 Photo of rear of building Note significant spalling and deterioration of brick masonry

19 Page 18 Photo 19 Close up of masonry in rear stair tower. Note deteriorated mortar joints Photo 20 Masonry joint at northeast corner of rear stair tower against main building Note movement of wall east

20 Mid-Atlantic Construction 5820 Germantown Ave. 925 Harvest Drive, Suite 220 Philadelphia, Pa. Blue Bell, PA Structual Assessment Preliminary Budget for Structural Stabilization Proposal dated April 6, 2011 CSI CODE DESCRIPTION QUANTITY UNIT UNIT COST TOTAL DIVISION TOTAL DIVISION 1 - GENERAL CONDITIONS Supervision Superintendent (40 hrs / week ) including travel expense 7.0 MO $ 12,000 $ 84,000 Project Manager MH $ 125 $ 51,250 General Expenses Travel Expense 7.0 MO $ 200 $ 1,400 Superintendent Cell Phone and Wireless Air Card Onsite 7.0 MO $ 200 $ 1,400 First Aid Equipment and Supplies 7.0 MO $ 20 $ 140 Computer / Camera / Copy Machine Onsite 7.0 MO $ 50 $ 350 Drawing Reproduction 1.0 L.S. $ 300 $ 300 Express mail / Courier services 0.0 MO $ 50 $ - Small Tools 1.0 L.S. $ 2,500 $ 2,500 Jobsite Office Supplies 1.0 L.S. $ 500 $ 500 Total General Conditions $ 141,840 DIVISION 1 - General Construction Temp Utilities and Services Temp Toilets (Use and Maintain building restrooms) 7 MO $ 300 $ 2,100 Electrical Consumption BY OWNER Temporary Water BY OWNER Temporary Protection Weather Protection 1 LS $ 30,000 $ 30,000 Secure Building 1 LS $ 5,000 $ 5,000 Cleaning Dumpsters 22 EA $ 900 $ 19,800 Cleanup- Labor to supplement Trades 1,220 MH $ 55 $ 67,100 Final Cleanup 1 L.S. $ 10,000 $ 2,500 Window Cleaning 0 L.S. $ - Total General Construction $ 126,500 Page 1 of 4

21 Mid-Atlantic Construction 5820 Germantown Ave. 925 Harvest Drive, Suite 220 Philadelphia, Pa. Blue Bell, PA Structual Assessment Preliminary Budget for Structural Stabilization Proposal dated April 6, 2011 CSI CODE DESCRIPTION QUANTITY UNIT UNIT COST TOTAL DIVISION TOTAL DIVISION 2 - DEMOLITION Demolition 1 L.S. 60, $60,000 Removal of debris,equipment,and furniture from basement-pool area incl. Removal of debris, equipment, and furniture from 1st floor areas incl. Removal of debris, equipment, and furniture from 2nd floor areas incl. Removal of debris, equipment, and furniture from 3rd floor areas incl. Removal of debris, equipment, and furniture from 4th floor areas incl. Equipment removal from Boiler / Mechanical Room at basement level NOT INCLUDED Removal of finish wood flooring at water damaged areas 1 L.S. 40, $40,000 Removal of existing plaster ceilings and wall areas at 2nd floor (approximately 20%) 1 L.S. 45, $45,000 Removal of existing plaster ceilings and wall areas at 3rd floor incl. Removal of existing plaster ceilings and wall areas at 4th floor incl. Removal of plaster from (2) columns at he 1st floor auditorium 1 L.S. 5, $5,000 Demolition of fire damaged flooring and joist between 2nd and 3rd floors (approximately 30%) 1 L.S. 35, $35,000 Demolition of fire damaged flooring and joist between 3rd and 4th floors incl. Demolition of attic level joists and deck 1 L.S. 55, $45,000 Demolition of roof structure, skylites and existing roofing 1 L.S. 52, $52,000 Removal of the rear exterior steel stairs between the 3rd and 4th floor 1 L.S. 20, $20,000 Weather protection for roof demolition work 1 L.S. 12, $12,000 Total Demolition $ 314,000 DIVISION 4 - MASONRY Repoint existing brick structure (based on approximately 33,000 S.F. of masonry wall) 33,000 S.F $660,000 Remove and replace lose brick and cast stone incl. Replace missing exterior masonry incl. Rebuild upper levels of rear masonry stair tower ( ALLOWANCE) 1 L.S. 40, $40,000 DIVISION 5 - STEEL Total Masonry $ 700,000 Shoring for structural repairs (ALLOWANCE) 1 L.S. 200, $200,000 Repair and/or replace structural steel (ALLOWANCE) 1 L.S. 125, $125,000 Secure (2) steel sidewalk grates at front entrance 2 EA 2, $5,000 Page 2 of 4

22 Mid-Atlantic Construction 5820 Germantown Ave. 925 Harvest Drive, Suite 220 Philadelphia, Pa. Blue Bell, PA Structual Assessment Preliminary Budget for Structural Stabilization Proposal dated April 6, 2011 CSI CODE DESCRIPTION QUANTITY UNIT UNIT COST TOTAL DIVISION TOTAL Total Steel $ 330,000 DIVISION 6 - WOOD AND PLASTICS Carpentry Replace 2nd floor ceiling joist and 3rd floor, floor joist and deck (approximately 20%) 1 L.S. 1,072, $1,072,800 Replace 3rd floor, ceiling joist and 4th floor, floor joist and deck incl. Replace 4th floor ceiling joist and attic floor joist and deck 1 L.S. 92, $92,000 Replace roof framing purlins, and deck. Steel roof trusses to remain 1 L.S. 470, $470,000 Total Wood & Plastics $ 1,634,800 DIVISION 7 - THERMAL AND MOISTURE Roofing Install new.060 EPDM roof with 1/2" Dens Deck fastened to wood deck 1 L.S. 128, $128,700 Install gutters and downspouts as required BY OTHERS Total Thermal and Moisture Protection $128,700 DIVISION 8 - DOORS AND WINDOWS Secure Exterior Miscellaneous Exterior Openings (Openings to be secured from inside the building) 1 L.S. 32, $32,500 Total Doors & Windows $32,500 DIVISION 15 - MECHANICAL MECHANICAL NOT INCLUDED $0 Page 3 of 4

23 Mid-Atlantic Construction 5820 Germantown Ave. 925 Harvest Drive, Suite 220 Philadelphia, Pa. Blue Bell, PA Structual Assessment Preliminary Budget for Structural Stabilization Proposal dated April 6, 2011 CSI CODE DESCRIPTION QUANTITY UNIT UNIT COST TOTAL DIVISION TOTAL PLUMBING Temporary water connection for required construction work 1 L.S. 3, $3,000 FIRE PROTECTION: NOT INCLUDED $0 Total Mechanical, Plumbing and Fire Protection $ 3,000 DIVISION 16 - ELECTRICAL ELECTRICAL Install new 200AMP electrical panel 1 L.S. 12, $12,300 Install power to basement, 1st floor, 2nd floor, 3rd floor, 4th floor and attic for required construction work Install lighting for 1st floor, 2nd floor, 3rd floor, 4th floor, and attic for required construction work. All lighting wiring to be in conduit FIRE ALARM SYSTEM IS NOT INCLUDED Total Electrical $ 12,300 TOTALS DIRECT WORK SUBTOTAL $ 3,423,640 Taxes & Insurance 1.00% $ 34,236 Building Permit, Cert. of Occupancy and Cert. of Use Permits NOT INCLUDED 0 Construction Contingency NOT INCLUDED 0 Overhead & Fee 4.00% $ 138,315 TOTAL $ 3,596,191 $ - $ 3,596,191 Page 4 of 4

24 School Building Structural Stabilization 5820 Germantown Ave. Philadelphia, PA. Preliminary Budget Site Qualifications and Clarifications April 7, The budget is based on Preliminary Structural Assessment Report by O Donnell and Naccarato, and our site visit. - Permits, tap fees, water meter, connection fees, impact fees, sewer fees, etc. are by others. - Any utility shut off fees required for building demolition are by others. - Removal of hazardous materials ( ie. Asbestos, lead paint, etc.) are not included. It is assumed that the debris, fire damaged materials, and plaster are not to be treated as hazardous. - It is assumed that there will be access at either side of the building for staging and locate dumpsters. - Securing of existing exterior openings is included in the budget. Work to be performed from inside the building. - Weather protection and security for work by others, is not included. - No work is figured for the existing boiler/ mechanical room. - Removal and replacement of roof structure is included in the budget. The existing steel roof trusses are to remain and be reused. - Plaster removal from (2) structural columns at the 1 st floor auditorium for visual inspection, is included. - The masonry budget is based on visual inspection at street level. A more thorough inspection including scaffolding or lifts should be done if it is decided to proceed further with the project. - An allowance for structural shoring is included in the budget - An allowance for structural steel repair is included. There appears to be fire damage to the structural steel in the corridor walls between the 3 rd floor ceiling and 4 th floor, floor structure. This allowance should be considered for the observable steel damage, and not for any hidden structural damage or deterioration. - Inspection and testing costs are by others. - Price is based on open shop labor. Union Meeting Corporate Center 925 Harvest Drive, Suite 220 Blue Bell, PA P: F:

25 School Building 5820 Germantown Ave., Philadelphia, PA Assumptions & Qualifications April 7, 2011 Page 2 of 2 Allowances (included in Preliminary Budget) Rebuild Rear Stair Tower at Upper Levels $ 40, Structural Shoring $ 200, Structural Steel Replace and Repair $ 125,000.00

No structural deficiencies were observed to the west exterior elevation.

No structural deficiencies were observed to the west exterior elevation. August 9, 2016 Ms. Jennifer Spencer, AIA, NCARB Gary W. Anderson Architects 200 Prairie Street, Suite 201 Rockford, IL 61107 Subject: Structural Observations 227 North Wyman Street Rockford, IL Dear Ms.

More information

STRUCTURAL CONDITION ASSESSMENT

STRUCTURAL CONDITION ASSESSMENT STRUCTURAL CONDITION ASSESSMENT ALLEN JAY ROCK GYM 1201 FAIRFIELD ROAD HIGH POINT, NC Prepared for: Prepared by: Guilford County Schools 617 West Market Street Greensboro, NC Adrian S. Durham, PE, SE,

More information

KORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No

KORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No 000130 1 PURPOSE: Professional Engineering Consultants, P.A. (PEC) was engaged by University of Kansas Design & Construction Management to perform an assessment of Stouffer Place Apartment Building 20

More information

STRUCTURAL ASSESSMENT REPORT

STRUCTURAL ASSESSMENT REPORT STRUCTURAL ASSESSMENT REPORT FOR WASHINGTON PARK NATIONAL BANK 6300 South Cottage Grove Ave. Chicago, Illinois 60637 Prepared For: Cook County Land Bank Authority 69 W. Washington, Chicago Illinois April

More information

City of Washburn Building Assessment

City of Washburn Building Assessment City of Washburn Building Assessment Structural Assessment Report 204 W. Bayfield St. September 30, 2016 KOA No. 162078.01 Prepared For: City of Washburn 119 Washington Ave. Washburn, WI 54891 Prepared

More information

October 26, 2017 Ref.: Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6

October 26, 2017 Ref.: Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6 October 26, 2017 Ref.: 351-1 Newfoundland & Labrador English School District 95 Elizabeth Avenue St. John s, NL A1B 1R6 Attention: Mr. Jim Sinnott Director of Facilities & Custodial Management Dear Sir:

More information

STRUCTURAL ASSESSMENT OBSERVATION REPORT

STRUCTURAL ASSESSMENT OBSERVATION REPORT Consulting Engineers THORSON BAKER & Associates, Inc. 3030 West Streetsboro Road (330) 659-6688 phone Richfield, Ohio 44286 (330) 659-6675 fax www.thorsonbaker.com STRUCTURAL ASSESSMENT OBSERVATION REPORT

More information

East Lyme Middle School EAST LYME MIDDLE SCHOOL

East Lyme Middle School EAST LYME MIDDLE SCHOOL Description: N EAST LYME MIDDLE SCHOOL The school consists of a multi story building with lower, main and upper level floors. The typical floor framing for the main and upper levels is wide flange steel

More information

NEW YORK CITY SCHOOL CONSTRUCTION AUTHORITY CIP SUMMARY

NEW YORK CITY SCHOOL CONSTRUCTION AUTHORITY CIP SUMMARY PROJECT: Exterior Masonry JOB NO: D012259 SCHOOL: PS 189 K (Brooklyn) EXHIBIT 5 DATE: 2/13/2009 BUILDING ID: K189 REV: CONSULTANT: Goshow Architects FINAL ESTIMATE CIP SUMMARY GENERAL CONDITIONS $ 105,076

More information

General Building Information

General Building Information Software Module s Description Page 1 General Building Information BUILDING AREA AND HEIGHT - This module designed to determine the height and area of buildings on the basis of occupancy group classification

More information

May 17, Mr. Fred Preuss Oak Park River Forest High School 201 North Scoville Avenue Oak Park, IL 60302

May 17, Mr. Fred Preuss Oak Park River Forest High School 201 North Scoville Avenue Oak Park, IL 60302 Larson Engineering, Inc. 118 S. Clinton Street, Suite 250 Chicago, IL 60661-5775 312.345.0540 Fax: 312.332.1484 www.larsonengr.com May 17, 2016 Mr. Fred Preuss Oak Park River Forest High School 201 North

More information

RYAN BIGGS CLARK DAVIS

RYAN BIGGS CLARK DAVIS December 7, 2016 Mr. Timothy Wales, P.E. City Engineer City of Saratoga Springs City Hall - 474 Broadway Saratoga Springs, New York 12866 Re: 26 Caroline Street Investigation Saratoga Springs, New York

More information

INTERNATIONAL BUILDING CODE

INTERNATIONAL BUILDING CODE INTERNATIONAL BUILDING CODE MODEL BUILDING CONDITIONS ASSESSMENT The Reid and Hughes building is a four-story, four-bay, brick building, constructed in 1869 with a later addition known as the Williams

More information

STRUCTURAL BUILDING CONDITION SURVEY

STRUCTURAL BUILDING CONDITION SURVEY STRUCTURAL BUILDING CONDITION SURVEY Our Project No. 140565 Prepared For: Mayfair Hotel Development Corporation Date: 3 December 2014; Revised: 15 December 2014 15 December 2014 Mayfair Hotel Development

More information

EASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923

EASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923 INITIAL YEAR BUILT 1923 BUILDING AREA 288,800 SF CURRENT PROGRAM CAPACITY 1,425 ENROLLMENT 2008 565 WARD 6 PROPOSED PROGRAM CAPACITY 1,100 Site Plan EASTERN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

April 10, Mr. Steven McMahon Manager of Architectural Services East Dollar Tree Stores, Inc. 500 Volvo Parkway Chesapeake, VA 23320

April 10, Mr. Steven McMahon Manager of Architectural Services East Dollar Tree Stores, Inc. 500 Volvo Parkway Chesapeake, VA 23320 508 Baylor Court Suite C Chesapeake, VA 23320 757.436.2070 ph 757.436.0610 fx Mr. Steven McMahon Manager of Architectural Services East Dollar Tree Stores, Inc. 500 Volvo Parkway Chesapeake, VA 23320 Re.:

More information

ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA Tel: Fax:

ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA Tel: Fax: ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA 02144 Tel: 617.628.1700 Fax: 617.628.1711 March 3, 2016 Mr. Jeff Hoover, Principal Tappe Architects, 6 Edgerly Place

More information

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE: S FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE: Included Costs: Items that must be included in the costs of improvement or costs to repair are those that are directly associated with the

More information

Timeline of Events with Meyers High School & Memorial Stadium

Timeline of Events with Meyers High School & Memorial Stadium Timeline of Events with Meyers High School & Memorial Stadium During the 2016-2017 school year, the district has been monitoring several areas of concern at Meyers High School and Memorial Stadium. These

More information

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012

Existing Site Aerial Frederick High School Feasibility Study September 5, 2012 Existing Site Aerial Building Developmental History 1981 1966 1939 1977 1978 1955 1966 Exterior Roof: Most of existing roof has multi ply built up roofing. Some areas have gravel ballast, others have cap

More information

CONTRACT NO. DOL-ETA-16-C-0043

CONTRACT NO. DOL-ETA-16-C-0043 CONTRACT NO. DOL-ETA-16-C-0043 EXTERIOR FAÇADE WALL BRACING GULFPORT JOB CORPS CENTER GULFPORT, MISSISSIPPI SEPTEMBER 2016 PREPARED FOR: U.S. DEPARTMENT OF LABOR PREPARED BY: September 30, 2016 Maria J.

More information

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3%

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3% CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE EXAM ID: I6 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 3 % 0101. Project Administration 3% Verify that plans,

More information

Structural Condition Assessment

Structural Condition Assessment 108 6 th Street, Garland, Texas Engineering Report Date: September 29, 2016 RLG No. : 16729 Prepared for: Mr. Jeff D. Bulls III AIA 3030 LBJ Freeway, Suite 1220 Dallas, TX 75234 PM: Harold F. Phillips

More information

Group Eight Engineering Limited

Group Eight Engineering Limited Group Eight Engineering Limited Structural Mechanical Electrical 499 King Street East, Suite 200 Hamilton, ON L8N 1E1 Consulting Engineers Tel: (905) 525-6069 Fax: (905) 528-7310 E-Mail: info@group8eng.com

More information

Sparks Engineering, Inc. S T R U C T U R A L E V A L U A T I O N, D E S I G N A N D T E S T I N G

Sparks Engineering, Inc. S T R U C T U R A L E V A L U A T I O N, D E S I G N A N D T E S T I N G Sparks Engineering, Inc. S T R U C T U R A L E V A L U A T I O N, D E S I G N A N D T E S T I N G February 29, 2008 Ms. Leslie Wolfenden Save Austin's Cemeteries PO Box 41814 Austin, TX 78704 (512) 917-1666

More information

UCC Permit Application Procedures

UCC Permit Application Procedures How do I apply for a permit? UCC Permit Application Procedures 1. Please complete the CodeMaster Pan Review Application 2. Please provide the scope of work description and/or construction documents/plans.

More information

Subject: Amphitheater School District Reroofing Projects Amphi High School, Building 900 Roof Evaluation SCI Project Number:

Subject: Amphitheater School District Reroofing Projects Amphi High School, Building 900 Roof Evaluation SCI Project Number: 27 June 2016 Mr. Shane Chism, AIA Breckenridge Group 4625 E. Fort Lowell Road Tucson, Arizona 85712 Subject: Amphitheater School District Reroofing Projects Amphi High School, Building 900 Roof Evaluation

More information

Section 4 - Design and Construction Overview

Section 4 - Design and Construction Overview Section 4 - Design and Construction Overview 4-1 Building Architecture/Enclosure The Pearland Recreation Center and Natatorium houses a recreation center and natatorium as shown in Figures 4-1.1 First

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S./I.S. 266 - QUEENS, 74-10 COMMONWEALTH BLVD, New York, 11426 Inspection Id Inspection Type Time In Last Edited SA : Architectural

More information

Eidem Farm Brooklyn Park, MN

Eidem Farm Brooklyn Park, MN Eidem Farm Brooklyn Park, MN East Farm House Structural Condition Assessment Prepared By 1 0 0 P O R T L A N D A V E N U E S O U T H, S U I T E 1 0 0 M I N N E A P O L I S, M I N N E S O T A 5 5 4 0 1

More information

JAY E. BUTLER, being first duly sworn deposes and states as follows: 1. I am a Professional Engineer licensed in the State of New York.

JAY E. BUTLER, being first duly sworn deposes and states as follows: 1. I am a Professional Engineer licensed in the State of New York. SUPREME COURT OF THE STATE OF NEW YORK COUNTY OF NEW YORK In the Matter of DEVELOP DON T DESTROY BROOKLYN; Index No. DANIEL GOLDSTEIN; ATLANTIC AVENUE BETTERMENT ASSOCIATION; RJI No. FORT GREENE ASSOCIATION;

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope

More information

Structural Conditions Assessment of Current Lapeer District Schools Administration Building 250 Second Street, Lapeer, Michigan

Structural Conditions Assessment of Current Lapeer District Schools Administration Building 250 Second Street, Lapeer, Michigan November 2, 2015 Melissa A. Malcolm Library Director Lapeer District Library 201 Village West Dr S Lapeer, MI 48446 RE: Structural Conditions Assessment of Current Lapeer District Schools Administration

More information

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018

Dr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018 G2 Gordon + Gordon Architecture. LLC Dr. Edward Livingston Trudeau Building 118 Main Street, Saranac Lake, NY Building Systems Report June 24, 2018 Harry Gordon, FAIA 164 Otter Slide Road Saranac Lake

More information

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit: TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be

More information

SAVE YOURSELF TIME AND MONEY! PLEASE READ THE FOLLOWING INFORMATION:

SAVE YOURSELF TIME AND MONEY! PLEASE READ THE FOLLOWING INFORMATION: TOWN OF SURFSIDE BEACH, SC SUBSTANTIAL IMPROVEMENT NOTICE TO PROPERTY OWNERS Rebuilding your Home or Non-residential structure after the storm? Adding on, renovating, or remodeling your home or business?

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: HS FOR MATH, SCI & ENGINEERING-M, 240 CONVENT AVENUE, New York, 10031 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-12-20

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Asset: Building Assessment Survey 2017-2018 NYC SCHOOL CONSTR. AUTHORITY - QUEENS, 30-30 THOMSON AVE, New York, 11101 Inspection Id Inspection Type Time In Last Edited SA : Architectural

More information

PHILMONT WAREHOUSE BUILDING PRELIMINARY STRUCTURAL ASSESSMENT

PHILMONT WAREHOUSE BUILDING PRELIMINARY STRUCTURAL ASSESSMENT PHILMONT WAREHOUSE BUILDING PRELIMINARY STRUCTURAL ASSESSMENT Prepared for: GATTER ARCHITECTS 111 MAIN ST. PHILMONT, NY 12565 Prepared by: TACONIC ENGINEERING, DPC PO BOX 272 CHATHAM, NY 12037 TACONIC

More information

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3 MEMORANDUM To: Ashley Rosenthal Payne, Indianapolis Historic Preservation Commission Adrienne Schmetzer, Indiana Housing and Community Development Authority Architecture Preservation Interior Design Landscape

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S. 12 - QUEENS, 42-00 72 STREET, New York, 11377 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2017-09-26

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: P.S. 65 - BROOKLYN, 158 RICHMOND STREET, New York, 11208 Inspection Id Inspection Type Time In Last Edited Architectural - Senior 2018-05-15 11:22 AM 2018-06-12

More information

STRUCTURAL EVALUATION

STRUCTURAL EVALUATION SMELTER BUILDINGS STRUCTURAL EVALUATION Resolution Copper Mining, LLC West Plant Area September 7, 2016 Safety Share Preventable Motor Vehicle Accidents 1. Aim High in Steering. 2. Get The Big Picture.

More information

Building Codes and Ordinances ARC 227

Building Codes and Ordinances ARC 227 Building Codes and Ordinances ARC 227 Week 6 Fire Resistive Construction 03.02.10 Instructor: Rick Staub, AIA Email: staub@pointonearchitects.com Phone: 860-434-7707 Fire Resistive Construction Passive

More information

109 S. MARKET CURTIS ARCHITECTURE & DESIGN PC SITE MAP EXISTING PHOTOGRAPH PROPOSED RENDERING

109 S. MARKET CURTIS ARCHITECTURE & DESIGN PC SITE MAP EXISTING PHOTOGRAPH PROPOSED RENDERING HISTORIC PHOTOGRAPH EXISTING PERSPECTIVE PROPOSED PERSPECTIVE TUCKPOINT ENTIRE BUILDING FACADE WITH MORTAR MATCHING ORIGINAL, REMOVE ALL FASTENERS, BRACKETS & MISC. METAL. REPAIR STAINED GLASS ABOVE EACH

More information

THE DISASTERS OF SEPTEMBER 11, 2001 DAVID T. BIGGS, P.E. Principal Ryan-Biggs Associates, P.C. Troy, New York USA

THE DISASTERS OF SEPTEMBER 11, 2001 DAVID T. BIGGS, P.E. Principal Ryan-Biggs Associates, P.C. Troy, New York USA THE DISASTERS OF SEPTEMBER 11, 2001 DAVID T. BIGGS, P.E. Principal Ryan-Biggs Associates, P.C. Troy, New York USA SUMMARY This paper presents some structural observations, findings, and recommendations

More information

LEAD PAINT ABATEMENT

LEAD PAINT ABATEMENT LEAD PAINT ABATEMENT Lead Paint Abatement and Coatings Application for Steel Preservation and Exterior Renovation, South Helix House in Culter, ME Description: Aulson performed lead paint abatement; surface

More information

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan Brief Building Overview: 200 Minuteman Park stands as a 200,000 square foot Class A office building in Andover, Massachusetts, worth roughly $15,000,000. Although the building has a large square footage,

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S. 207 - QUEENS, 159-15 88 STREET, New York, 11414 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-03-23

More information

CHAPTER 34 EXISTING BUILDINGS

CHAPTER 34 EXISTING BUILDINGS CHAPTER 34 EXISTING BUILDINGS SECTION 3401 GENERAL 3401.1 Scope. Provisions of this chapter shall govern the application of this code to existing buildings. Exception: Buildings and structures located

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S. 134 - BROOKLYN, 4001 18 AVENUE, New York, 11218 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-04-02

More information

SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC Permit Requirements

SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC Permit Requirements SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC. 320-226.5189 www.101developmentresources.com While every attempt has been made to insure the correctness of this handout, no guarantees are made to its accuracy

More information

INSPECT DIRECT Pty Ltd

INSPECT DIRECT Pty Ltd Web Page: www.inspectdirect.com.au INSPECT DIRECT Pty Ltd Property Address: Sample.Dilapidation.Report Victoria Building Status / Dilapidation Report This is not a Pest Inspection The Building Status /

More information

Insured: John Doe Home: (123) Property: 123 Meadow Road. Hail City, TX 43252

Insured: John Doe Home: (123) Property: 123 Meadow Road.   Hail City, TX 43252 1 Insured: John Doe Home: (123) 456-7891 Property: 123 Meadow Road E-mail: Johhn@1yahoo.com Hail City, TX 43252 Estimator: Company: E877879 Claim Number: 123456789 Policy Number: 123-45-678EE Type of Loss:

More information

CSE Engineering, Inc.

CSE Engineering, Inc. CSE Engineering, Inc. Consulting Structural Engineers December 3, 2012 Mr. Joel Heenan Plans Examiner City of Albany Building Department 333 Broadalbin Street Albany, OR 97321 Re: : Old Church Building

More information

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements % 8/13/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 64 64% 2.2 Accessibility 0 66 66% 2.3 Structural 0 77 77% 2.4 Building Envelope 0 4 4% 2. Interior

More information

Forensics Engineering 8th Congress Forging Forensic Frontiers November 29 December 2, 2018, Austin, TX

Forensics Engineering 8th Congress Forging Forensic Frontiers November 29 December 2, 2018, Austin, TX This paper was published at the Forensic Engineering 8th Congress, held November 29-December 2, 2018 in Austin, TX. The published version of this paper is available for purchase and download at: https://ascelibrary.org/doi/book/10.1061/9780784482018

More information

WILKINSON ELEMENTARY SCHOOL

WILKINSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1976 BUILDING AREA 144,900 SF CURRENT PROGRAM CAPACITY 508 ENROLLMENT 2008 451 WARD 8 PROPOSED PROGRAM CAPACITY 600 Site Plan WILKINSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012)

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012) Gaines Charter Township 8555 Kalamazoo Ave SE Caledonia MI 49316 PH: 616 698-6640 Fax: 616 698-2490 www.gainestownship.org Building Department Statement of Special Inspections Michigan Building Code 2012

More information

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1% CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE EXAM ID: I1 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 6% 0101. Project Administration 1% Verify that

More information

STRUCTURAL EVALUATION OF WASHINGTON ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD)

STRUCTURAL EVALUATION OF WASHINGTON ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD) STRUCTURAL EVALUATION OF WASHINGTON ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD) For WLC Architects Kaiser Building 1300 Potrero Avenue Richmond, CA 94804 By DASSE Design, Inc.

More information

Horse Farm, Livestock Office, and Horticulture Shed Cost Evaluation Report, Revised to address comments

Horse Farm, Livestock Office, and Horticulture Shed Cost Evaluation Report, Revised to address comments November 4, 2014 Heidi Hubble Facilities and Services MSC 3545 New Mexico State University P.O. Box 30001 Las Cruces, NM 88003 Re: Horse Farm, Livestock Office, and Horticulture Shed Cost Evaluation Report,

More information

REPORT OF BUILDING INSPECTIONS TECOLUCA, EL SALVADOR. Prepared by: Global Village Engineers

REPORT OF BUILDING INSPECTIONS TECOLUCA, EL SALVADOR. Prepared by: Global Village Engineers REPORT OF BUILDING INSPECTIONS TECOLUCA, EL SALVADOR Prepared by: Global Village Engineers 23 JANUARY, 2001 23 January 2001 Senor Carlos Cortez Hernandez Alcaldia Municipal de Tecoluca San Vicente, El

More information

Structural Inspection

Structural Inspection General: Background: An inspection and structural analysis have been performed for the purpose of evaluating the buildings structural systems and components. A full set of structural drawings was utilized

More information

Project Findings: Appendix 2

Project Findings: Appendix 2 NSF Final Report CMMI-1034874 Project Findings: Appendix 2 Selected Damage Photos of Engineered Buildings PART 2. Teleco Office Tower Civil Engineering and Engineering Mechanics Department University of

More information

COPYRIGHTED MATERIAL. Contents. 1 Making Buildings 3. 3 Wood Foundations and. Preface to the Sixth Edition xi. Sitework 31

COPYRIGHTED MATERIAL. Contents. 1 Making Buildings 3. 3 Wood Foundations and. Preface to the Sixth Edition xi. Sitework 31 Contents Preface to the Sixth Edition xi 1 Making Buildings 3 Learning to Build 4 Buildings and the Environment 5 The Work of the Design Professional 11 The Work of the Construction Professional 19 Trends

More information

SEATTLE CENTRAL COLLEGE BROADWAY PERFORMANCE HALL SEATTLE, WASHINGTON STRUCTURAL EVALUATION FOR PREPARED BY PCS STRUCTURAL SOLUTIONS

SEATTLE CENTRAL COLLEGE BROADWAY PERFORMANCE HALL SEATTLE, WASHINGTON STRUCTURAL EVALUATION FOR PREPARED BY PCS STRUCTURAL SOLUTIONS STRUCTURAL EVALUATION FOR SEATTLE CENTRAL COLLEGE BROADWAY PERFORMANCE HALL SEATTLE, WASHINGTON PREPARED BY PCS STRUCTURAL SOLUTIONS NOVEMBER 1, 2017 17-733 TABLE OF CONTENTS Page I. PREFACE ii II. EXECUTIVE

More information

2003 International Residential Building Code

2003 International Residential Building Code 2003 International Residential Building Code Section R305 Ceiling Height Habitable rooms, hallways, corridors, bathrooms, toilet rooms, laundry rooms and basements shall have a ceiling height of not less

More information

REPORT OF ROOF CONDITION STUDY. YOUR FACILITY Your Facilities Location. Date YOUR FACILITY S IDENTIFICATION. Prepared for Your Company

REPORT OF ROOF CONDITION STUDY. YOUR FACILITY Your Facilities Location. Date YOUR FACILITY S IDENTIFICATION. Prepared for Your Company REPORT OF ROOF CONDITION STUDY YOUR FACILITY Your Facilities Location YOUR FACILITY S IDENTIFICATION Date Prepared for Your Company 1114 Grindstone, Union, Kentucky 41091 (859) 657-6677 [Report Date] [Client]

More information

Re.: Dollar Tree D10236 Startown Crossing, Newton, NC Structural Report on Findings, Site Visit (September 21, 2016)

Re.: Dollar Tree D10236 Startown Crossing, Newton, NC Structural Report on Findings, Site Visit (September 21, 2016) 508 Baylor Court Suite C Chesapeake, VA 23320 757.436.0610 phone 757.436.2070 fax Mr. Steven McMahon Manager of Architectural Services Dollar Tree Stores, Inc. 500 Volvo Parkway Chesapeake, VA 23320 Re.:

More information

TOWN OF ROTTERDAM BUILDING DEPARTMENT RESIDENTIAL ACCESSORY BUILDINGS AND STRUCTURE PERMIT APPLICATION Ext 395

TOWN OF ROTTERDAM BUILDING DEPARTMENT RESIDENTIAL ACCESSORY BUILDINGS AND STRUCTURE PERMIT APPLICATION Ext 395 TOWN OF ROTTERDAM BUILDING DEPARTMENT RESIDENTIAL ACCESSORY BUILDINGS AND STRUCTURE PERMIT APPLICATION 518-355-7575 Ext 395 Needed to Obtain a Residential Accessory Structure Building Permit: 1. Building

More information

SPECIFICATION OF REPAIRS

SPECIFICATION OF REPAIRS SPECIFICATION OF REPAIRS HUD CASE NUMBER: Applicant Name: test applicant 2 Property Address: County: 1451 S. Rimpau Ave. Ste 105, Corona, CA 92879 Riverside Contact Name: Contact Phone No: Best Time to

More information

LEAD DESIGN PROFESSIONAL:

LEAD DESIGN PROFESSIONAL: 2009 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:

More information

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project:

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project: RLS CONSTRUCTION GROUP Phone: 717-502-6680 Fax: 717-502-6681 www.rlscg.com Invitation to Bid RLS Construction Group requests your firm to submit a quotation on the following project: Project: Location:

More information

******** Condominiums Masonry Assessment

******** Condominiums Masonry Assessment ******** Condominiums Masonry Assessment On April 23rd, 2014, I examined the exterior masonry conditions and photographed both general and specific conditions on the building. I was directed by **********,

More information

Structural Assessment Live Fire Training Building. FSCJ South Campus Jacksonville, Florida. Florida State College at Jacksonville

Structural Assessment Live Fire Training Building. FSCJ South Campus Jacksonville, Florida. Florida State College at Jacksonville Structural Assessment Live Fire Training Building FSCJ South Campus Jacksonville, Florida Florida State College at Jacksonville November 21, 2011 Report of a Structural Assessment of Live Fire Training

More information

MEMORANDUM. From: Moffatt & Nichol. Date: April 3, Subj: Wharf J-10 Evaluation of Structure for EIR Document. M&N File No:

MEMORANDUM. From: Moffatt & Nichol. Date: April 3, Subj: Wharf J-10 Evaluation of Structure for EIR Document. M&N File No: 2001 North Main St, Ste 360, Walnut Creek, CA 94596 Ph: 925-944-5411 ; Fax: 925-944-4732 MEMORANDUM To: Ed Byrne From: Moffatt & Nichol Date: April 3, 2006 Subj: Wharf J-10 Evaluation of Structure for

More information

Connaught. Facility Audit report for: Connaught Regina, SK. Report Created: Page 1 of 20

Connaught. Facility Audit report for: Connaught Regina, SK. Report Created: Page 1 of 20 Connaught Facility Audit report for: Connaught Regina, SK Report Created: 2012-04-02 Page 1 of 20 Facility Details Facility Connaught Address: Location: Regina, SK Facility Zone: 8 Grade Configuration:

More information

NEWS LETTER MARCH 27, 2009

NEWS LETTER MARCH 27, 2009 PLANNING, BUILDING & DEVELOPMENT SERVICES DEPARTMENT 580-1 Street S.E. Medicine Hat, Alberta T1A 8E6 Telephone: 529-8374 FAX 502-8038 1 NEWS LETTER MARCH 27, 2009 GENERAL As you are probably aware there

More information

RAYMOND EDUCATION CAMPUS

RAYMOND EDUCATION CAMPUS INITIAL YEAR BUILT 1924 BUILDING AREA 73,600 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 302 WARD 1 PROPOSED PROGRAM CAPACITY 600 Site Plan RAYMOND - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: SECOND OPPORTUNITY SCHOOL - K, 797 BUSHWICK AVENUE, New York, 11221 Inspection Id Inspection Type Time In Last Edited SA : Architectural

More information

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT 1 East Franklin Street Phone: 301-790-4163 Third Floor Hagerstown, MD 21740 Fax: 301-791-2650 BUILDING PERMIT APPLICATION FOR RESIDENTIAL ACCESSORY

More information

BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS

BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS Please note: This construction plan component list is to be used as a guide to assist you with your project. There may be elements unique to your project not

More information

HARLEY CLARKE MANSION Condition Assessment

HARLEY CLARKE MANSION Condition Assessment HARLEY CLARKE MANSION Condition Assessment 2603 Sheridan Road Evanston, Illinois 60201 Final Report August 24, 2016 WJE No. 2016.5003 Prepared for: Ms. Lisa DiChiera Landmarks Illinois 30 North Michigan

More information

Limited Exterior Masonry Assessment Roosevelt Elementary School

Limited Exterior Masonry Assessment Roosevelt Elementary School Limited Exterior Volume 2 of 2 November 29. 2007 Produced for: Medford Public Schools Medford, Oregon In Consultation with: 710 NE 21 st Avenue, Suite 200, Portland, Oregon 97232 P: 503.517.0283 F: 503.517.0285

More information

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS AIA General Conditions... GC-1 to GC-44 Amendments to General Conditions... AM-1 to AM-2 Supplements to General Conditions... SU-1 to SU-7 00200 Instructions To Bidders... 1 3 00201 Contractor s Bidding

More information

APPENDIX 3E HAZELWOOD HOTEL SPECIFICATIONS

APPENDIX 3E HAZELWOOD HOTEL SPECIFICATIONS APPENDIX 3E HAZELWOOD HOTEL SPECIFICATIONS 1. GENERAL 1.1 Refer to Section 2.1 of Schedule 3 [Design and Construction Specifications] regarding compliance with Schedule 3 and this Building Specification.

More information

0103 Plan Reading 4% Read plans to verify the project conforms with the code, approved plans, and construction documents.

0103 Plan Reading 4% Read plans to verify the project conforms with the code, approved plans, and construction documents. Certification: Commercial Building Inspector Exam ID: B2 Scope: A Commercial Building Inspector will be responsible for performing inspections of structures to determine compliance with the various Building

More information

SITE AND BUILDING INSPECTION CHECKLIST

SITE AND BUILDING INSPECTION CHECKLIST PARISH BUILDING Page 1 of 6 SITE AND GROUNDS DATE INIT COMMENTS DATE INIT COMMENTS Ramps & Provisions for Handicap Designated parking spaces for Handicap Has soil dropped or heaved Is there standing water

More information

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. FEMA 50% RULE - SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT/DAMAGE Z101-0410 NOTICE TO PROPERTY OWNERS Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information

More information

Nathan Clifford School Building Conditions Assessment Report

Nathan Clifford School Building Conditions Assessment Report Nathan Clifford School Building Conditions Assessment Report Submitted To: The City of Portland April 12, 2013 Prepared By: Winton Scott Architects Becker Structural Engineers, Inc. Conditions Assessment

More information

FINEGAN INSPECTION SERVICES, INC.

FINEGAN INSPECTION SERVICES, INC. FINEGAN INSPECTION SERVICES, INC. TERRY FINEGAN 76 WEST FOSTER MAINEVILLE ROAD MAINEVILLE, OHIO 45039 683-0733-PHONE 697-0163-FAX Email- finegan @ fuse.net CLIENT: 1/14/08 Mr. BUILDING LOCATION As in all

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

Structural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report

Structural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report 1 THE ODYSSEY ARLINGTON, VA Aaron Snyder Structural Option Advisor: M. Kevin Parfitt, PE Structural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report Executive

More information