1 Inventory Data: Structure Name Gailbraith Road Bridge 1 Main Hwy/Road # On Under Crossing Navig. Water Non-Navig. Water Rail Type: Road Ped. Other Hwy/Road Name Structure Location Latitude Owner(s) Galbraith Road 0.4 km South West of County Road 9 N Township of Lanark Highlands Longitude Heritage Not Cons. W Cons./not App. List/not Desig. Designation: Desig./not List Desig. & List MTO Region Eastern Road Class: Freeway Arterial Collector Local MTO District Ottawa Posted Speed Not posted No. of Lanes 2 Old County Lanark AADT <500 % Trucks Geographic Twp. Lanark Inspection Route Sequence Structure Type Simply Supported Steel Girder Interchange Number Total Deck Length 11.3 (m) Interchange Structure Number Overall Str. Width 6.9 (m) Min. Vertical Clearance (m Total Deck Area 78.0 (sq.m) Special Routes: Transit Truck School Bicycle Roadway Width 6.1 (m) Detour Length Around Bridge 10 (km) Skew Angle 0 (Degrees) Direction of Structure N-S No. of Spans 1 Fill on Structure 0 (m) Span Lengths 10.3 (m) Historical Data: Year Built 1950 Year of Last Major Rehab Last OSIM Inspection Last Enhanced OSIM Inspection Enhance Access Equipment May 12, 2011 Last Evaluation Current Load Limit 5 (tonnes) (ladder, boat, lift, etc.) Load Limit By-Law # Last Underwater Inspection Last Survey By-Law Expiry Date Rehab History: In 2010 a rehabilitation was done to the south end abutment/deck connection due to noticeable settlement. Page 1 of 14 June 2013

2 Scheduled Improvements: Ontario Structure Inspection Manual Inspection Form Structure Number: 12 Regional Priority Number Programmed Work Year Nature of Program Work: Appraisal Indices: Comments Fatigue Seismic Scour Flood Geometrics Barrier Curb Load Capacity 5 tonnes/axle At the time of the noted settlement in 2010, a load restriction of 5 tonnes per axle was posted at the bridge. Since the posting, a repair to the south end was completed, but the posting has not been removed. Page 2 of 14 June 2013

3 Field Inspection Information: Ontario Structure Inspection Manual Inspection Form Structure Number: 12 Date on Inspection: June 18, 2013 Type of Inspection: OSIM Enhanced OSIM Inspector: Kosta Karadakis, P.Eng. Others in Party: Thomas McCarthy Access Equipment Visual, Sounding Equipment, Digital Camera Weather: Sunny Temperature: 15 C Additional Investigations Required: Priority None Normal Urgent Estimated Cost Material Survey Detailed Deck Survey: Non-destructive Delamination Survey of Asphalt-Covered Deck: Concrete Substructure Survey: Detailed Coating Survey: Detailed Timber Investigation: Post-Tensioned Strand Investigation: Underwater Investigation: Fatigue Investigation: Seismic Investigation: Structure Evaluation: Monitoring Monitoring of Deformations, Settlements and Movements: Monitoring Crack Widths: Investigation Notes: Total Cost $0.00 Overall Structure Notes: Recommended Work on Structure: None Minor Rehab. Major Rehab. Replace Timing of Recommended work: 1 to 5 years 6 to 10 years Overall Comments: Significant section loss of interior girder ends, more prominent at south ends. South end girders buckled and temporary support installed in Date of Next Inspection: 2015 Suspected Performance 00 None 06 Bearing not uniformly loaded/unstable 12 Slippery Surfaces 01 Load carrying capacity 07 Jammed Expansion joint 13 Flooding/channel blockage 02 Excessive deformations (deflections & rotations) 08 Pedestrian/vehicular hazard 14 Undermining of foundation 03 Continuing settlement 09 Rough riding surface 15 Unstable embankments 04 Continuing movements 10 Surface ponding 16 Other 05 Seized bearings 11 Deck drainage Maintenance Needs 01 Lift and Swing Bridge Maintenance 07 Repair to Structural Steel 13 Erosion Control at Bridges 02 Bridge cleaning 08 Repair of Bridge Concrete 14 Concrete Sealing 03 Bridge Handrail Maintenance 09 Repair of Bridge Timber 15 Rout and Seal 04 Painting Steel Bridge Structures 10 Bailey Bridges Maintenance 16 Bridge Deck Drainage 05 Bridge Deck Joint Repair 11 Animal/Pest Control 17 Scaling (Loose Concrete or ACR Steel) 06 Bridge Bearing Maintenance 12 Bridge Surface Repair 18 Other Page 3 of 14 June 2013

4 Repair and Rehabilitation Required: Priority Element Repair and Rehabilitation Required 6 to 10 1 to 5 Within years years 1 year Urgent Estimated Structural Cost Structure Demolition $50,000 Structure Replacement $400,000 OR Deck Rehab. = Sidewalk/Curb Rehab. = Barriers Rehab. = Joints Rehab. = Girders Rehab. = Abuments Rehab. = Pier Rehab. = Other Estimated Structure Dimensions for Costing (m) Deck Length = Deck Width = Total Structural Cost $450, Associated Work: Approaches: Detours: Traffic Control: Utilities: Other: Comments Estimated Associated Work Cost Total Associated Work Cost $0.00 Total Estimated Construction Cost $450, Justification:. Page 4 of 14 June 2013

5 Element Data Element Group: Approaches Length: 6.0m Element Name: Wearing Surface Width: 7.0m Location: N/S approaches Height: Material: Surface Treatment Count: 2.0 Element Type: Total Quantity: 84.0 m 2 Data: m 2 / m / each / % / all Comments: Many pot holes and filled pot holes noted at S approach. Ravelling of the surface also noted. Re-surface asphalt pavement during replacement Element Group: Barriers Length: 17.7m Element Name: Railing Systems Width: Location: E/W side of structure Height: Material: Steel Count: 2 Element Type: Posts and two rails Total Quantity: 35.4m Data: m 2 / m / each / % / all Comments: Collision damage to two posts. Significant surface rust of steel also. Railing system does not meet current bridge design standards and should be upgraded with next rehab. Upgrade barrier system during replacement. Element Group: Decks Length: 11.3m Element Name: Deck Top Width: 6.9m Location: Height: Material: Cast-in-Place Concrete Count: 1 Element Type: Total Quantity: 78.0m 2 Covered by surface treatment Data: m 2 / m / each / % / all Comments: Unable to view majority of deck, but exposed outside edges with severe scaling and disintegration. Surface treatment covering concrete is in good condition expect for a couple small areas. Replace with during structure replacement Page 5 of 14 June 2013

6 Element Group: Sidewalks/Curbs Length: 17.7 m Element Name: Curbs Width: 0.38m Location: E/W side of roadway Height: 0.26m Material: Cast-in-Place Concrete Count: 2 Element Type: Total Quantity: 31.9 m 2 Data: m 2 / m / each / % / all Comments: Rusting staining from reinforcing was noted. Disintegration of E exterior curb. Replace during complete replacement Element Group: Embankments and Streams Length: Element Name: Embankments Width: Location: Height: Material: Native Soil Count: 4 Element Type: Total Quantity: 4 Data: m 2 / m / each / % / all 4 Comments: Moderate erosion of embankment due to rain run-off at all quadrants Element Group: Abutments Length: Element Name: Abutment Walls Width: 6.9m Location: N/S ends Height: 3.0m Material: Cast-in-Place Concrete Count: 2 Element Type: Total Quantity: 41.4 m 2 Data: m 2 / m / each / % / all Comments: Unable to view the S abutment wall as it is covered with structural steel support from strengthening rehab. N wall is in good condition with light scaling and rust staining from girders. Ballast walls also appear to be in good condition. Page 6 of 14 June 2013

7 Element Group: Abutments Length: 3.3m Element Name: Wingwalls Width: Location: All 4 quadrants Height: 1.5m Material: Cast-in-place Concrete Count: 4 Element Type: Total Quantity: 19.8m 2 Data: m 2 / m / each / % / all Comments: Hairline and narrow cracks were noted in the walls. Element Group: Decks Length: 11.3 m Element Name: Soffit Thin Slab Width: 6.9 m Location: Underside of deck Height: Material: Cast-in-place Concrete Count: 1 Element Type: Total Quantity: 78.0 m 2 Data: m 2 / m / each / % / all Comments: Stained cracks were noted. Small spalls with exposed rebar also noted and provide poor portion. Complete replacement. Element Group: Beams/MLE s Length: 11.3 m Element Name: Girders Width: 0.20 m Location: Height: 0.53 m Material: Steel Count: 5 Element Type: I - type Total Quantity: 93.4 m 2 Coating Data: m 2 / m / each / % / all Comments: The top flange of exterior girders exhibit surface rust. The south ends of girders have significant section loss, likely due to leaking deck joint above. S end of interior girders buckling. The north ends of interior girders have significant section loss and buckling appears to be initiating. Replace during complete replacement Page 7 of 14 June 2013

8 Element Group: Accessories Length: Element Name: Signs Width: Location: Height: Material: Count: 8 Element Type: Total Quantity: 8 Data: m 2 / m / each / % / all 8 Comments: Approaches were posted with two hazard markers, bump signs, and a load limit signs at the time of inspection. Element Group: Embankments and Streams Length: Element Name: Streams and Waterways Width: Location: West to East Height: Material: Count: Element Type: Total Quantity: All Data: Comments: m 2 / m / each / % / all all Element Group: Abutments Length: Element Name: Bearings Width: Location: N/S ends Height: Material: Steel Count: 10 Element Type: Pinned plates Total Quantity: 10 Data: m 2 / m / each / % / all 4 6 Comments: Unable to view many of the bearings due to high water levels and strengthening at S abutment. Exterior bearings were in good condition with some surface rust exposed, while interior girders showing signs of significant rust. Page 8 of 14 June 2013

9 1 North approach looking south 2 East elevation (outlet) Page 9 of 14 June 2013

10 3 South joint, repaired end 4 North joint, note settlement at approach Page 10 of 14 June 2013

11 5 Disintegration of exterior curb at SE 6 - Substandard structure connection Page 11 of 14 June 2013

12 7 - Interior girder buckling at south end 8 - Interior girder buckling at south end Page 12 of 14 June 2013

13 9 - Significant section loss and buckling initiating in interior girder at north end 10 - Severe rusting of north end girder Page 13 of 14 June 2013

14 11 - Temporary support at south abutment 12 Typical condition of deck soffit Page 14 of 14 June 2013

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION NBI INSPECTION DWCJ Inspector Name Agency / Company Name Insp. Freq. Insp. Date Evan Currie Great Lakes Engineering Group 12 07/31/2017 GENERAL NOTES Posting Signs in Place DECK 1. Surface (SIA-58A) 2.

More information

Alberta Transportation Bridge Inspection & Maintenance System (Web 2005) N-1 Bridge. Bridge Inspection Form Type Lot No. 2

Alberta Transportation Bridge Inspection & Maintenance System (Web 2005) N-1 Bridge. Bridge Inspection Form Type Lot No. 2 Bridge File Number Year Built/Year Supstr 75340 N-1 Bridge 1962/1962 Bridge or Town Name LACOMBE Located Over 12:10 L1 0.000;12:10 R1 0.000 Located On 2:26 R1 17.464 Water Body Cl./Year Navigabil. Cl./Year

More information

HistoricBridges.org - National Bridge Inventory Data Sheet

HistoricBridges.org - National Bridge Inventory Data Sheet HistoricBridges.org - National Bridge Inventory Data Sheet 3 Inventory The National Bridge Inventory contains data submitted by state transportion departments to the Federal Highway Administration in coded

More information

Implementation of a Bridge Management System In The Province of Nova Scotia

Implementation of a Bridge Management System In The Province of Nova Scotia Implementation of a Bridge Management System In The Province of Nova Scotia Kent Speiran, Nova Scotia Department of Transportation and Public Works Jim Francis. Nova Scotia Department of Transportation

More information

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges. STANDARD BRIDGE & CULVERT COMPONENTS Alberta Bridge Inventory In Alberta there are about 13,300 bridges. Types of bridges in Alberta: Standard bridges 3521 (26%) Bridge size culverts 8348 (63%) Major bridges

More information

Post Earthquake Bridge Safety Assessment Program

Post Earthquake Bridge Safety Assessment Program Post Earthquake Bridge Safety Assessment Program WSDOT/ Structures Team-April 2017 Paul Brallier, SE-, HNTB Corporation Jeri Bernstein, SE-WSDOT 1 Introduction Purpose: Provide agency personnel an introduction

More information

1.0 CHAPTER 1 INTRODUCTION

1.0 CHAPTER 1 INTRODUCTION 1.0 CHAPTER 1 INTRODUCTION 1.1 INTRODUCTION The Alberta Transportation bridge inspection program is an essential part of a comprehensive inventory, inspection, maintenance, and data management system called

More information

US 278 East Bound and West Bound. MacKay Creek and Skull Creek. Cursory Above Water and Underwater Investigation Of. Over

US 278 East Bound and West Bound. MacKay Creek and Skull Creek. Cursory Above Water and Underwater Investigation Of. Over Cursory Above Water and Underwater Investigation Of US 278 East Bound and West Bound Over MacKay Creek and Skull Creek In Hilton Head, South Carolina Bridges over MacKay Creek Bridges over Skull Creek

More information

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Presentation Outline Project History Project Scope Construction Alternatives Plan

More information

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA PURPOSE AND SCOPE These criteria modify and supplement the applicable sections of the AREMA Manual of Recommended Practice in connection

More information

Deck Joints and Bearings

Deck Joints and Bearings Deck Joints Deck Joints and Purpose is to: bridge the gap between spans protect the ends of the girders allow for expansion, contraction and rotational movement prevent water and salt from leakage Most

More information

A STRUCTURAL ASSESSMENT STUDY ON THE SUSTAINABILITY OF SULTAN ISKANDAR BRIDGE KUALA KANGSAR PERAK MALAYSIA

A STRUCTURAL ASSESSMENT STUDY ON THE SUSTAINABILITY OF SULTAN ISKANDAR BRIDGE KUALA KANGSAR PERAK MALAYSIA A STRUCTURAL ASSESSMENT STUDY ON THE SUSTAINABILITY OF SULTAN ISKANDAR BRIDGE KUALA KANGSAR PERAK MALAYSIA Lim Char Ching Public Works Department, Malaysia Email: cclim.jkr@1govuc.gov.my, Tel: 012-238

More information

BRIDGE PREVENTIVE MAINTENANCE STRATEGY FOR ERIE-NIAGARA LOCAL BRIDGE OWNERS

BRIDGE PREVENTIVE MAINTENANCE STRATEGY FOR ERIE-NIAGARA LOCAL BRIDGE OWNERS BRIDGE PREVENTIVE MAINTENANCE STRATEGY Approved January 3, 2007 BLANK Purpose To maximize the non-deficient service life of local bridges in the Erie-Niagara region, members of the Greater Buffalo-Niagara

More information

BRIDGE INSPECTION REPORT

BRIDGE INSPECTION REPORT Bridge No. 054-77-161.66(2388) BARS No. ROCKPORT I/C N (CSWB) over I 77 NORTH I-77 NBL 8.37 MILES S OF WV 14 Wood County District 3 IS on the NHS ADT - 007000-2011 Type of Inspections Performed: BRIDGE

More information

BRIDGE INSPECTION REPORT

BRIDGE INSPECTION REPORT Bridge No. 054-77-161.66(2388) BARS No. ROCKPORT I/C N (CSWB) over I 77 NORTH I-77 NBL 8.37 MILES S OF WV 14 Wood County District 3 IS on the NHS ADT - 007000-2011 Type of Inspections Performed: BRIDGE

More information

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc. Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on

More information

Evaluation of Rehabilitation Alternatives for the Cedar Avenue Bridge

Evaluation of Rehabilitation Alternatives for the Cedar Avenue Bridge Evaluation of Rehabilitation Alternatives for the Cedar Avenue Bridge Mn/DOT Bridge No. 3145 Prepared for Minnesota Department of Transportation and City of Bloomington, Minnesota Prepared by www.meadhunt.com

More information

MINISTRY OF TRANSPORTATION ONTARIO MANAGING OUR ASSETS

MINISTRY OF TRANSPORTATION ONTARIO MANAGING OUR ASSETS MINISTRY OF TRANSPORTATION ONTARIO MANAGING OUR ASSETS Financial Management Institute of Canada November 19, 2008 Ministry s Assets Mature network - large inventory Over 16,500 km Over 2,800 bridges 8

More information

Structural - Engineering Review Checklist

Structural - Engineering Review Checklist Structural - Engineering Review Checklist Project: List Corridor Criteria ID Review Priority (H,M,L) TOPICS S-_-## Structural Design Codes, Manuals and Specifications 6.1.0 REFERENCES DESIRED Criteria

More information

BRIDGE GIRDERS TECHNICAL GUIDE

BRIDGE GIRDERS TECHNICAL GUIDE ARMTEC.COM BRIDGE MATERIALS / / TECHNICAL GUIDE REGIONal SPECIFICATIONS / AB / MB / SK PRECAST CONCRETE GIRDERS AND BEAMS DESIGNED TO SUPPORT BRIDGE DECKS AND TRAFFIC LOADS Proven strength In-house engineering

More information

Inspection guidance for bridge expansion joints. Part 2 Inspector s Practical Guide

Inspection guidance for bridge expansion joints. Part 2 Inspector s Practical Guide Inspection guidance for bridge expansion joints W:\Structures Team\08 - Non Project\50 - Expansion joints on TLRN\04 - Inspection Manual\Documents\v01a\[Final] vol 2 v01a.docx 19/05/2011 Contents 0 Document

More information

Bridges. Chapter 6: chapter contents

Bridges. Chapter 6: chapter contents Chapter 6: Bridges chapter contents Characteristics of Well-Maintained Bridges 95 Optimum Timing/Conditions for Maintenance 95 Bridge Maintenance Activities 96 Bridge Washing 96 Debris Removal 96 Guardrail

More information

Superstructure Guidelines

Superstructure Guidelines Superstructure Guidelines The following are additional guidelines on using the following types of superstructure. Pre-stressed Concrete Beams To check beam size use the beam size chart. The chart was created

More information

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25 General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO

More information

Use of Hand-Held Thermographic Camera for Condition TPF-5(152)

Use of Hand-Held Thermographic Camera for Condition TPF-5(152) Use of Hand-Held Thermographic Camera for Condition TPF-5(152) Glenn A.Washer, Ph.D. Department of Civil and Environmental Engineering University of Missouri washerg@missouri.edu Midwest Bridge Preservation

More information

In Service Replacement of Box Girder Bottom Slab

In Service Replacement of Box Girder Bottom Slab In Service Replacement of Box Girder Bottom Slab WSDOT Bridge No. 5/537S - Span 11 Craig R. Boone, P.E., S.E. Lynn Peterson Secretary of Transportation 2015 Western Bridge Engineers Seminar Reno, Nevada

More information

Bridge articulation No. 1.04

Bridge articulation No. 1.04 Bridge articulation Scope This Guidance Note gives advice on the selection of the articulation arrangements, the choice of bearing types and dispositions of bearings, for bridges where relative movement

More information

Bonner Bridge Replacement Update:

Bonner Bridge Replacement Update: Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner

More information

Alder Drive / Blair Road Bridge Replacement Projects

Alder Drive / Blair Road Bridge Replacement Projects Alder Drive / Blair Road Bridge Replacement Projects Presented By: County of El Dorado Community Development Agency Transportation Division Matthew Smeltzer, P.E. Deputy Director of Engineering Paul Hom,

More information

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION Vireak Hinh, P.Eng. R.V. Anderson Associates Ltd., Toronto, Canada Jennifer Trimble Region of Halton, Oakville, Canada

More information

RETROFIT AND REPLACEMENT OF DUMBARTON RAILROAD BRIDGES

RETROFIT AND REPLACEMENT OF DUMBARTON RAILROAD BRIDGES RETROFIT AND REPLACEMENT OF DUMBARTON RAILROAD BRIDGES Kuan S. Go, P.E., Semyon Treyger, S.E., Michael Jones, S.E., HNTB Corporation Stephen J. Hill, Bernard Susanto, Wenlin Yang, San Mateo County Transit

More information

Chapter 4 Bridge Program Drawings

Chapter 4 Bridge Program Drawings Chapter 4 Bridge Program Drawings Section 4.10-Bridge Railing Introduction Steel bridge railing and concrete bridge barrier rail are installed along the edge of the bridge roadway to keep errant vehicles

More information

ATHABASCA RIVER BRIDGE REHABILITATION PROJECT

ATHABASCA RIVER BRIDGE REHABILITATION PROJECT ATHABASCA RIVER BRIDGE REHABILITATION PROJECT PROJECT INFORMATION Project Name Athabasca River Bridge Rehabilitation Project Location Highway 40 (over the Athabasca River), Entrance, Alberta Year Completed

More information

Designing Bridges for Inspectability

Designing Bridges for Inspectability Designing Bridges for Inspectability Sreenivas Alampalli 1 and Arthur P. Yannotti 2 1 New York State Department of Transportation 50 Wolf Road, Albany, NY 12232 (518) 457-5498; salampalli@dot.state.ny.us

More information

LRFD Bridge Design Manual Changes

LRFD Bridge Design Manual Changes LRFD Bridge Design Manual Changes Dave Dahlberg Bridge Design Manual & Policy Engineer May 17, 2017 Bridge Office mndot.gov/bridge Overview 1) Concrete mix designations 2) Reinforcing bar development and

More information

Implementing Asset Management: WSDOT s Experience

Implementing Asset Management: WSDOT s Experience Implementing Asset Management: WSDOT s Experience 6 th National Conference on Transportation Asset Management Aaron Butters, P.E. Systems Analysis and Program Development Manager November 2, 2005 1 Highway

More information

QEW Garden City Skyway Niagara Street to Glendale Avenue Risk and Value Engineering Support Major Infrastructure Decisions

QEW Garden City Skyway Niagara Street to Glendale Avenue Risk and Value Engineering Support Major Infrastructure Decisions QEW Garden City Skyway Niagara Street to Glendale Avenue Risk and Value Engineering Support Major Infrastructure Decisions Rob Kivi, P.Eng. MMM Group Limited Garden City Skyway 48 span, 2.2 km long high

More information

JULY 2016 LRFD BRIDGE DESIGN 11-1

JULY 2016 LRFD BRIDGE DESIGN 11-1 JULY 016 LRFD BRIDGE DESIGN 11-1 11. ABUTMENTS, PIERS, AND WALLS This section contains guidance for the design and detailing of abutments, piers, retaining walls, and noise walls. Abutments and piers are

More information

VENETIAN CAUSEWAY. (Venetian Way) Project Development & Environment (PD&E) Study FROM NORTH BAYSHORE DRIVE TO PURDY AVENUE. FM No.

VENETIAN CAUSEWAY. (Venetian Way) Project Development & Environment (PD&E) Study FROM NORTH BAYSHORE DRIVE TO PURDY AVENUE. FM No. VENETIAN CAUSEWAY (Venetian Way) Project Development & Environment (PD&E) Study FROM NORTH BAYSHORE DRIVE TO PURDY AVENUE FM No. 422713-2-22-01 Efficient Transportation Decision Making (ETDM): 12756 Project

More information

!"#$ % 1( =4+0(1*0)4 A)*.(.)44)4 8(: 4 0, 2(3*05. Page 1A of 10 11

!#$ % 1( =4+0(1*0)4 A)*.(.)44)4 8(: 4 0, 2(3*05. Page 1A of 10 11 !"#$ % 9 8 8 8784 867 *-+(+ +,- 40. -8/5 '()* +,-. *()/ 0,, 0, (*0 )4 *, /)(*0)4 06&5 &60 455678 ()() 90( (:8; +,- (7)4 4 0 4(+0()*0/ 0()*5 ', 0@A' +,- -* =B9C+ ()( 0 0, +0(0 8(:5 ', =40(*0( +,- (?)/ 4

More information

ODOT Design & Construction Requirements for MSE Walls

ODOT Design & Construction Requirements for MSE Walls ODOT Design & Construction Requirements for MSE Walls Peter Narsavage, P.E. Foundation Engineering Coordinator Ohio Department of Transportation Office of Structural Engineering 2006 Ohio Transportation

More information

MMM Group Limited. Eagle Island Pier Inspection Report. Prepared for: District of West Vancouver. July

MMM Group Limited. Eagle Island Pier Inspection Report. Prepared for: District of West Vancouver. July MMM Group Limited Eagle Island Pier Inspection Report Prepared for: District of West Vancouver July 2013 5013307-001 STANDARD LIMITATIONS This report was prepared by MMM Group (MMM) for the account of

More information

Preserva on Assessment

Preserva on Assessment Preserva on Assessment For Ftorkowski Road Bridge over Hun ngton Creek BMS # 40 7217 0482 6006 Luzerne County PennDOT Engineering District 4 0 Final Report June 2016 Prepared by TranSystems for the Pennsylvania

More information

Inspection & Maintenance of Concrete Facilities By Cheyenne Wohlford CCS GROUP, LLC

Inspection & Maintenance of Concrete Facilities By Cheyenne Wohlford CCS GROUP, LLC Inspection & Maintenance of Concrete Facilities By Cheyenne Wohlford 1 Introduction Most Grain Elevators were built between 1950 and 1960 with a life expectancy of 30 years. Operational changes since 1960

More information

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects

The Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects The Chief Estimator Software Item Cost Summary Bridge & Overpass Projects Elevated Transit Guideways Precast Girder Elevated Guideway 10 Abutment Excavation & Backfill 1,500.00 m3 222 10,368 8,634 1,309

More information

Inspection & Maintenance of Concrete Facilities

Inspection & Maintenance of Concrete Facilities Inspection & Maintenance of Concrete Facilities Introduction Most Grain Elevators were built between 1950 and 1960 with a life expectancy of 30 years. Deterioration occurs with: Normal wear & tear Exposure

More information

MIDAS Training Series

MIDAS Training Series MIDAS midas Civil Title: All-In-One Super and Sub Structure Design NAME Edgar De Los Santos / MIDAS IT United States 2016 Substructure Session 1: 3D substructure analysis and design midas Civil Session

More information

AUGUST 2016 LRFD BRIDGE DESIGN 3-1

AUGUST 2016 LRFD BRIDGE DESIGN 3-1 AUGUST 2016 LRFD BRIDGE DESIGN 3-1 3. LOADS AND LOAD FACTORS The loads section of the AASHTO LRFD Specifications is greatly expanded over that found in the Standard Specifications. This section will present

More information

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000) General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER

More information

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s)

G2-0 List of Active Ministry of Transportation of Ontario Drawings (MTOD s) G2-0 List of Active Ministry of Transportation of Ontario Drawings ( s) DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings 01/04/1994 04/01/1994 TOS/TO For use with Pavement Marking items.

More information

Design and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation

Design and Construction of Concrete Overlays. By: James K. Cable, P.E. Cable Concrete Consultation Design and Construction of Concrete Overlays By: James K. Cable, P.E. Cable Concrete Consultation PCC OVERLAY AGENDA Current design & construction features What is needed in a PCC overlay set of plans?

More information

Lesner Bridge Replacement

Lesner Bridge Replacement Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A Construction Camera has been installed to view images of the bridge construction. Images are updated on

More information

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE The Existing Roadway Condition Assessment Report (ERCAR) should include the evaluation of all elements against new construction criteria.

More information

Designer Supplement: AS-2-15 Approach Slab Installation January 16, 2015

Designer Supplement: AS-2-15 Approach Slab Installation January 16, 2015 1 Overview: The purpose of Standard Bridge Drawing, AS-2-15, is to address details of approach slabs not previously addressed in the AS-1-81 Standard Bridge Drawing. Specifically, the drawing was initiated

More information

Procedure No: (SP) Effective: August 28, 2002 Responsible Office: Division of Finance and Forecasting INFRASTRUCTURE CAPITALIZATION PROCEDURE

Procedure No: (SP) Effective: August 28, 2002 Responsible Office: Division of Finance and Forecasting INFRASTRUCTURE CAPITALIZATION PROCEDURE Approved : Procedure No: 210-003(SP) Effective: August 28, 2002 Responsible Office: Division of Finance and Forecasting Julie Ray, Deputy Director Division of Finance and Forecasting INFRASTRUCTURE CAPITALIZATION

More information

Service life extension of existing precast concrete girders

Service life extension of existing precast concrete girders Concrete Repair, Rehabilitation and Retrofitting II Alexander et al (eds) 29 Taylor & Francis Group, London, ISBN 978--415-4685-3 Service life extension of existing precast concrete girders D.I. Banic,

More information

BRIDGE INSPECTION REPORTS 101. Protecting Your Bridge Inventory for the Future Jason Kelly, PE

BRIDGE INSPECTION REPORTS 101. Protecting Your Bridge Inventory for the Future Jason Kelly, PE BRIDGE INSPECTION REPORTS 101 Protecting Your Bridge Inventory for the Future Jason Kelly, PE >> Presentation Overview Program History Data Collection Reporting Sufficiency Rating 5/26/2016 Bridge Inspection

More information

Bridge Preventative Maintenance.Act now before this happens to you! Keith Cooper, P.E. Local Bridge Program Manager

Bridge Preventative Maintenance.Act now before this happens to you! Keith Cooper, P.E. Local Bridge Program Manager Bridge Preventative Maintenance.Act now before this happens to you! Keith Cooper, P.E. Local Bridge Program Manager 1 Local Bridge Program Asset Management for Local Bridges 2008 started approving Rehabilitation

More information

Grade-Separated Trail Crossings How Do We Get Over There?

Grade-Separated Trail Crossings How Do We Get Over There? Grade-Separated Trail Crossings How Do We Get Over There? 2008 National Trails Symposium Rory Renfro, Alta Planning + Design Scott Belonger, Loris and Associates Peter Loris, Loris and Associates PRESENTATION

More information

Scoping & Design Project Level. By Robert J. Blight Principal Engineer Pavement Management & Technology

Scoping & Design Project Level. By Robert J. Blight Principal Engineer Pavement Management & Technology Scoping & Design Project Level Data Collection & Analysis By Robert J. Blight Principal Engineer Pavement Management & Technology Goals Share process Provide knowledge Identify key data Feedback Reliable

More information

BRIDGE CONSTRUCTION APPROACHES

BRIDGE CONSTRUCTION APPROACHES SYNTHESIS ON THE USE OF ACCELERATED BRIDGE CONSTRUCTION APPROACHES FOR BRIDGE REHABILITATION By: Meghan Cronin July 29 th, 2016 Outline 2 Introduction Deck Joints Decks Girders Piers and Columns Abutments

More information

G2-0 LIST OF ACTIVE MTODs

G2-0 LIST OF ACTIVE MTODs G2-0 LIST OF ACTIVE MTODs DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings Apr 1, 1994 Jan 4, 1994 TOS/TO For use with Pavement Marking items. DIVISION 200- GRADING 219.101 Light Duty Straw

More information

Application Study on Elastomer Expansion Joint in Heavy Haul Railway

Application Study on Elastomer Expansion Joint in Heavy Haul Railway Journal of Civil Engineering and Architecture 9 (2015) 1047-1053 doi: 10.17265/1934-7359/2015.09.004 D DAVID PUBLISHING Application Study on Elastomer Expansion Joint in Heavy Haul Railway Leran Wang,

More information

REHABILITATION AND UPGRADING OF A HERITAGE LISTED TIMBER TRUSS BRIDGE

REHABILITATION AND UPGRADING OF A HERITAGE LISTED TIMBER TRUSS BRIDGE REHABILITATION AND UPGRADING OF A HERITAGE LISTED TIMBER TRUSS BRIDGE Keith Crews Professor of Structural Engineering & Assoc Dean University of Technology Sydney, Australia keith.crews@uts.edu.au Keith

More information

Guidelines for Checking Final Design Bridge Plans

Guidelines for Checking Final Design Bridge Plans MNDOT BRIDGE OFFICE Guidelines for Checking Final Design Bridge Plans Edited by the MnDOT Bridge Office ES ESS Committee February 2018 Disclaimer: This document is meant to be used as a checklist for the

More information

Executive Summary. Champlain Bridge Approach Spans Edge Girder Condition Assessment and Rehabilitation Requirements.

Executive Summary. Champlain Bridge Approach Spans Edge Girder Condition Assessment and Rehabilitation Requirements. Executive Summary "Les Ponts Jacques Cartier et Champlain Incorporée" (PJCCI) requested that Buckland & Taylor (B&T) study the overall condition of the approach span edge girders of the Champlain Bridge

More information

Alligator Cracking. Light. Medium. High

Alligator Cracking. Light. Medium. High Alligator Cracking Description: A series of interconnecting cracks caused by fatigue failure on the asphalt concrete surface under repeated traffic loading. Causes: Loads in excess of the current pavement

More information

Management of Half Joints in RTA Bridges Amie Nicholas, Project Engineer, NSW Roads and Traffic Authority

Management of Half Joints in RTA Bridges Amie Nicholas, Project Engineer, NSW Roads and Traffic Authority Management of Half Joints in RTA Bridges Amie Nicholas, Project Engineer, NSW Roads and Traffic Authority SYNOPSIS In recent years, there has been heightened concern over the performance of half joints

More information

Bridge Replacement Study (Phase 1)

Bridge Replacement Study (Phase 1) Bridge Replacement Study (Phase 1) San Martin Boulevard over Riviera Bay Bridge Project Number 154371 Prepared For: Engineering & Technical Support Division Department of Environment & Infrastructure,

More information

CONTINUOUSLY REINFORCED CONCRETE AND UNPAVED ROADS CONDITION SURVEY FIELD MANUAL PUBLICATION 343 APRIL 2017 PUB 343 (4-17)

CONTINUOUSLY REINFORCED CONCRETE AND UNPAVED ROADS CONDITION SURVEY FIELD MANUAL PUBLICATION 343 APRIL 2017 PUB 343 (4-17) CONTINUOUSLY REINFORCED CONCRETE AND UNPAVED ROADS CONDITION SURVEY FIELD MANUAL PUBLICATION 343 APRIL 2017 PREPARED BY: BUREAU OF MAINTENANCE AND OPERATIONS ASSET MANAGEMENT DIVISION P.O. Box 3437 HARRISBURG,

More information

Chapter 11 Culverts and Bridges

Chapter 11 Culverts and Bridges Chapter 11 Culverts and Bridges Contents 1.0 Introduction... 1 2.0 General Design... 1 2.1 Design Criteria... 1 2.2 Design Flows... 1 2.3 Permitting and Regulations... 1 2.4 Aesthetics and Safety... 2

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Bridge Project/Plan Authorization and Approval Authority SPECIFIC SUBJECT:

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update March 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: March 1, 2014

More information

ROADSIDE SAFETY BARRIER ELEMENTS Module 3

ROADSIDE SAFETY BARRIER ELEMENTS Module 3 2 ROADSIDE SAFETY BARRIER ELEMENTS Module 3 3 Roadside Design Options 4 Expected Crash Reduction of Relocation of Fixed Objects Source: NCHRP Report 500, Vol 6, Exhibit V-26 Purpose of Safety Barriers

More information

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Electrical Work. NOV Embankments Over Swamps and Compressible Soils GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification

More information

Bijan Khaleghi, Ph, D. P.E., S.E.

Bijan Khaleghi, Ph, D. P.E., S.E. 0 Submission date: July, 0 Word count: 0 Author Name: Bijan Khaleghi Affiliations: Washington State D.O.T. Address: Linderson Way SW, Tumwater WA 0 INTEGRAL BENT CAP FOR CONTINUOUS PRECAST PRESTRESSED

More information

MSE Walls Problems and Solutions

MSE Walls Problems and Solutions MSE Walls Problems and Solutions Peter Narsavage, P.E. Foundation Engineering Coordinator Ohio Department of Transportation Office of Structural Engineering ODOT Geotechnical Workshop April 11, 2006 Problems

More information

Table of Contents. July

Table of Contents. July Table of Contents 36.1 General... 3 36.1.1 Bridge or Culvert... 3 36.1.2 Box Culvert Size Restrictions... 4 36.1.3 Stage Construction for Box Culverts... 4 36.2 Dead Loads and Earth Pressure... 5 36.3

More information

DEVELOPING DETERIORATION MODELS FOR NEBRASKA BRIDGES

DEVELOPING DETERIORATION MODELS FOR NEBRASKA BRIDGES DEVELOPING DETERIORATION MODELS FOR NEBRASKA BRIDGES Nebraska Department of Roads (NDOR) Project Number: SPR-P1(11) M3 July 11 DEVELOPING DETERIORATION MODELS FOR NEBRASKA BRIDGES Nebraska Department of

More information

Bridge Inspection Manual. Revised July 2002 by Texas Department of Transportation (512) all rights reserved

Bridge Inspection Manual. Revised July 2002 by Texas Department of Transportation (512) all rights reserved Bridge Inspection Manual Revised July 2002 by Texas Department of Transportation (512) 416-2055 all rights reserved Bridge Inspection Manual July 2002 Manual Notices Manual Notice 2002-1 To: From: Manual:

More information

SIDEWALK & RAILING REPLACEMENT BOARD OF ED BUILDING

SIDEWALK & RAILING REPLACEMENT BOARD OF ED BUILDING PROJECT: 25 E 5 S SALT LAKE CITY, UTAH 84111 CODE ANALYSIS APPLICABLE CODES 675 E. 5 S. Suite 4 DFCM PROJECT NUMBER: 182782 DFCM CONTRACT NUMBER: 18793 STRUCTURAL ENGINEER: REAVELEY ENGINEERS + ASSOCIATES

More information

SCHEDULE THREE TECHNICAL PROPOSAL SUBMISSION REQUIREMENTS

SCHEDULE THREE TECHNICAL PROPOSAL SUBMISSION REQUIREMENTS SCHEDULE THREE TECHNICAL PROPOSAL SUBMISSION REQUIREMENTS Each Technical Proposal (Volume A of Package 2 of the Proposal) should address each of the items and requests for information described in this

More information

APPENDIX B ABC STRUCTURES DESIGN GUIDE

APPENDIX B ABC STRUCTURES DESIGN GUIDE APPENDIX B ABC STRUCTURES DESIGN GUIDE The Cohos Evamy Partners TABLE OF CONTENTS Page No. DISCLAIMER... I 1. STRUCTURAL DESIGN GUIDELINES... 1 2. GENERAL REQUIREMENTS (FIGURE B.2, STEP 1)... 1 3. GENERAL

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014

More information

CHAPTER 12 MICHIGAN DESIGN MANUAL BRIDGE DESIGN REHABILITATION PROJECTS REHABILITATION PROJECTS SCOPE OF REHABILITATION PROJECTS

CHAPTER 12 MICHIGAN DESIGN MANUAL BRIDGE DESIGN REHABILITATION PROJECTS REHABILITATION PROJECTS SCOPE OF REHABILITATION PROJECTS CHAPTER 12 REHABILITATION PROJECTS 12.00 REHABILITATION PROJECTS 12.01 SCOPE OF REHABILITATION PROJECTS 12.01.01 Structures Carrying Pedestrian Traffic 12.01.02 Historic Bridges 12.02 GEOMETRIC CRITERIA

More information

BRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E.

BRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E. BRIDGE DESIGN MANUAL UPDATES Jamie F. Farris, P.E. October 2015 Table of Contents 1 BDM Chapter 2 Limit States and Loads 2 BDM Chapter 3 Superstructure Design 3 BDM Chapter 4 Substructure Design 4 Questions

More information

Bridge Development Update

Bridge Development Update Bridge Development Update Rebecca Curtis, PE Michigan Department of Transportation Bridge Management Engineer 2014 Michigan Bridge Conference Bridge Development Update Load Rating Plan of Corrective Action

More information

Parapet/railing terminal walls shall be located on the superstructure.

Parapet/railing terminal walls shall be located on the superstructure. GENERAL INFORMATION: This section of the chapter establishes the practices and requirements necessary for the design and detailing of deck slab extensions at abutments. For general requirements and guidelines

More information

Ageing and Life extension for structures. David Galbraith Ocean Structures / Sigma Offshore

Ageing and Life extension for structures. David Galbraith Ocean Structures / Sigma Offshore Ageing and Life extension for structures David Galbraith Ocean Structures / Sigma Offshore 1 PSA Seminar 19 November 2008 What is different for structures Additional ageing mechanisms and other changing

More information

550 Surface Treatments

550 Surface Treatments Table of Contents 550 Surface Treatments... 550-1 550.1 Introduction... 550-1 551 Crack Sealing... 550-1 551.1 Project Selection... 550-1 551.2 Design Considerations... 550-1 552 Chip Sealing... 550-2

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Bridge Safety Inspections SPECIFIC SUBJECT: Inventory and Inspection Requirements

More information

Pavement Surface Evaluation and Rating Presentation. City of Oberlin Public Works Department July 5, 2011

Pavement Surface Evaluation and Rating Presentation. City of Oberlin Public Works Department July 5, 2011 Pavement Surface Evaluation and Rating Presentation City of Oberlin Public Works Department July 5, 2011 Causes of Pavement Deterioration Environmental : weathering and aging Structural: repeated traffic

More information

Folsom Lake Crossing by Hans Strandgaard, Alex Harrison, Jeff Aldrich, and Jeff Thomure, CH2M HILL

Folsom Lake Crossing by Hans Strandgaard, Alex Harrison, Jeff Aldrich, and Jeff Thomure, CH2M HILL Design and Construction Folsom Lake Crossing by Hans Strandgaard, Alex Harrison, Jeff Aldrich, and Jeff Thomure, CH2M HILL View of the Folsom Dam and the canyon just upstream of construction. The area

More information

Design, fabrication and construction of Railway Bridge over Södertälje canal

Design, fabrication and construction of Railway Bridge over Södertälje canal NSCC2009 Design, fabrication and construction of Railway Bridge over Södertälje canal Michael B. Thulstrup 1, Mattias Nilsson 2, Robert Hällmark 3 & Jens P. Nielsen 4 1 Project Manager, MT Højgaard a/s,

More information

GEOTECHNICAL LRFD DESIGN

GEOTECHNICAL LRFD DESIGN Chapter 8 GEOTECHNICAL LRFD DESIGN Final SCDOT GEOTECHNICAL DESIGN MANUAL August 2008 Table of Contents Section Page 8.1 Introduction... 8-1 8.2 LRFD Design Philosophy... 8-2 8.3 Limit States... 8-3 8.4

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1% CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE EXAM ID: I1 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 6% 0101. Project Administration 1% Verify that

More information

Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options

Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options A local utility company issued a Request for Proposal to our university s capstone design class for structural improvements

More information