MULTIFLEX Girder slab formwork. Assembly Instructions for Standard Application

Size: px
Start display at page:

Download "MULTIFLEX Girder slab formwork. Assembly Instructions for Standard Application"

Transcription

1 MULTIFLEX Girder slab formwork Assembly Instructions for Standard Application Edition 11/2007

2

3 Content Page Overview 1 Introduction 2 Product features 2 Intended use 2 Safety instructions 3 A Assembly and Dismantling A1 Storage and transport 4 A2 MULTIFLEX components Formlining and girder 5 Props and propheads 6 Tripod and erection bar 7 A3 Shuttering 8-9 A4 Striking A5 Guardrails and setting of stopend 12 B Application B1 General instructions 13 B2 Calculation of slab formwork (example) VT 20/VT B3 Application example 16 B4 Beams with UZ Beam bracket 40 and UZ Perforated Rail 17 with slab stopend angle 18 B5 Design tables C Product Overview Legend Visual Check Hints Important Site Tips safety instructions

4 Overview 6 3 1a 1b a Main beam 1b Cross beam 2 Crosshead 3 Clawhead 4 Prop 5 Tripod 6 Formlining 1

5 Introduction These assembly instructions describe the standard usage of the flexible MULTIFLEX slab formwork system together with PERI VT 20 girders. At the beginning, there is information on the product and its utilisation as well as general and safety references. In Part A the intended use, as of a standard situation, is presented. Part B contains details on system application, and design tables for prop spacing, formlining and accessories. Information on appropriate props can be found in the PERI Design Tables Formwork Technology. Additional details for forming with PERI GT 24 girders are contained in Part A and B. The individual system components are listed in the product overview together with their article numbers. Dimensions without any unit of measurement are in cm. If you have any questions, please contact your local PERI representative. Product features The MULTIFLEX slab formwork is a girder formwork system which is suitable for every ground plan and different heights, depending on the type of support used. Depending on the slab thickness, assembly can be carried out using three girder combinations: Combination 1: VT 20 / VT 20 Combination 2: VT 20 / GT 24 Combination 3: GT 24 / GT 24 Main beam and connected cross beams form a grid to accommodate the formlining sheets. The main beams are positioned in the supporting heads of props. Intended use Individual components: formlining sheets PERI VT 20 girder and GT 24 lattice girder crosshead as non-tilting supporting heads of formwork clawhead for intermediate support erection bar for girder assembly from below tripod / MRK frame as erection aid. Support: PERI slab props and shoring system. Additional guidelines In particular, this includes at the present time industrial safety regulations (BetrSichV) technical regulations for industrial safety (TRBS) PERI product information PERI design tables formwork technology PERI MULTIPROP / PEP PERI slab edge trestle AW PERI UZ beam PERI construction site equipment Stripping Cart ASW 465 Pallets and stacking devices Approval for PERI girders Type tests for slab props These Assembly Guidelines contain instructions for the correct handling and intended use of the PERI MULTIFLEX slab formwork system. Safety instructions and load specifications must be observed at all times. Special permission must be given by PERI if the formwork is to be used for other applications other than it has been designed for together with supplementary assembly instructions. Basically, only materials in perfect condition may be used. The safety and environmental regulations of each country where this product is used must be observed at all times. The product is intended for commercial use only. These assembly guidelines, PERI offer and implementation plans as well as other PERI product information do not replace specific construction site work and assembly instructions. 2

6

7 Safety Instructions These assembly instructions are directed at those persons who work with PERI MULTIFLEX. Non-observance of the safety instructions and assembly guidelines can lead to accidents and damage to materials. General information The basis of the MULTIFLEX system is an all-sided horizontal and non-moveable positioned slab formwork! This is given with peripheral walls and beams cast in advance. Otherwise the transfer of horizontal loads must be ensured in accordance with DIN 4421 through other measures undertaken on site (e.g. bracing)! If bracing is required for cantilevers, this must be friction-locked assembled! For supporting pre-fabricated slab elements, manufacturer s references and installation instructions must be observed! The correct working loads for props and girders is ensured with the help of PERI design tables and the respective building authority approval. The safe and secure installation of the bracing as well as assembly of the shoring (including tripod, crosshead and clawhead) are to be described in detail in the contractor`s assembly instructions! Responsibilities of the contractor: 1. The contractor must ensure that the PERI and all other required instructions are at the user s disposal. 2. All persons working with the product must be familiar with the content of these instructions and safety information. 3. Persons who cannot or have difficulty in reading and understanding these instructions must inform and then be fully briefed by the contractor. 4. The contractor has to ensure that assembly, adjusting and dismantling, moving as well as correct use of the product is supervised by trained and authorised personnel. 5. The contractor is obliged to provide all prerequisites to ensure compliance with applicable safety regulations. General Safety Information: 1. MULTIFLEX slab formwork components are to be checked before every use for signs of damage! Damaged parts are to be replaced by PERI original components! 2. When erecting the MULTIFLEX, ensure that all load effects are safely transferred! The formwork must remain in a horizontal and non-moveable position! 3. MULTIFLEX must be assembled on a flat, clean and sufficiently loadbearing surface! 4. Stability must be guaranteed at all times! 5. Never remove safety installations! 6. Do not exceed any given permissible loads! 7. Safe working areas are required at all times for assembly, adjusting, dismantling and moving of the formwork equipment 8. Safe access to all working areas must be in place! 9. Working areas must be made secure against falling! 10. Safe conditions for forming must be available at all times! Appropriate safety precautions are to be in place during unfavourable weather conditions e.g. secure formwork against lifting! Site personnel must not enter jeopardized areas! 11. Striking takes place only when the concrete has sufficiently hardened and site management has given the go-ahead! 12. When striking, use tools which do not damage the MULTIFLEX components! Do not pull away components with the crane! 13. When striking, do not compromise the stability of shoring and formwork components! 14. Only transport components with hoisting gear if suitable attaching means are available! 15. The weight of the components must not exceed the permissible load capacity of the lifting gear! 16. Remove lifting equipment from a lowered formwork component or unit only when it is in a stable position! 17. Store and transport components and pallets in a safe and secure manner avoiding any unintentional change of position! Do not throw any components! Maintenance instruction for formlining Immersion vibrator with rubber cap minimises damage to the formlining. Take care when placing heavy objects on formlining. Use timbers where necessary and be aware of load bearing capacity. Use reinforcement spacers with a large bearing area to minimise indentations. 3

8 A1 Storage and Transport PERI Instructions for Use: Pallets! BGR 500 operated by equipment - Pallets and stacking devices are attached by means of suitable and reliable lifting equipment to all four designated lifting eyes! Secure components in the ring pallets against moving! (e.g. tension belt or steel band) Storage Fig.1a Stacked materials and pallets must be protected against effects of the weather, e.g. secure formlining against lifting. Store and transport MULTIFLEX components in craneable PERI ring pallets and PERI crate pallets, see also A3 / A4. Alternatively, stack girders and formlining using edge protection and stored on timbers. 10 Fig.1b Transport Load-bearing capacity! PERI ring pallets and crate pallets are suitable for crane and fork-lift operations. Lifting equipment must be attached to all four lifting eyes 10. They can also be moved using the PERI pallet lifting trolley. Both containers can be lifted using both the long and short sides. For safe transportation, the length of the lifting forks must be adjusted accordingly. Move stacks by means of suitable lifting gear. Fig.1c Fig.1d 4

9 A2 Components Formlining PERI multi-layered sheeting 21 mm (Beto), 62.5 x 2.50 m, Fig. 2 3-Ply plywood 21mm or other plywood sheeting, depending on requirements, see PERI plywoods. In the PERI design tables and slide charts, the 3-S plywood sheet has been taken into consideration. If other sheeting is used, the deflection of the plywood used must be statically checked regarding the deflection tolerances, see PERI design tables. Fig.2 20 Formwork girders Using the VT 20K high-grade web girder Fig. 3a Fig.3a 8 perm. Q = 11.0 kn perm. M = 5.0 knm l Y = 4290 cm4 Using the GT 24 lattice girder Fig. 3b As standard, the GT 24 lattice girder is supported in the girder nodes. Due to the node configuration, the GT 24 has various permissible loads: support in the girder nodes Fig. 4a support outside of the girder node area, Fig. 4b Fig.3b perm.q D = 14.0 kn perm.q Z = 13.0 kn perm.m = 7.0 knm l Y =8000 cm4 Q D = perm. shear force for compression strut Q Z = perm. shear force for diagonal tie The permissible loads must also be maintained when supporting in the end areas. Fig. 4a + 4b For calculating slab formwork with GT 24 lattice girders see PERI design tables or PERI slide charts 16,3 perm. A = 14 kn perm. Q D / perm. Q D perm. Q D perm. Q Z perm. A = 28 kn perm. M ST = 7.0 knm Fig.4a 16,3 perm. A = 13 kn perm. Q Z / perm. Q Z perm. Q Z perm. Q D perm. A = 20 kn perm. M ST = 4.0kNm Fig.4b With clawhead 24 S or 24 L, GT 24 girders can also be supported outside of the node area with a maximum bearing load of 28 kn on the girder. Fig. 5 Fig.5 perm. A = 28 kn perm. Q D =14kN perm. M ST = 7.0 knm 5

10 A2 Components Slab props Do not exceed the permissible load specifications! For other support systems, individual load specifications must be taken into consideration! All loads resulting from the MULTIFLEX slab formwork must be safely transferred into the ground or slab. PERI support systems steel tube props 4a: PEP aluminium props 4b: MULTIPROP (MP), Fig. 6 shoring towers: MP, PERI UP, PD 8, ST 100 For prop loads, see PERI design tables 4a 4b Fig.6 Supporting heads of formwork Providing stable support for one or two girders and as intermediate support for individual girders. Examples With self-locking coupling at end of girder or on girder joint: crosshead 20/24S 2a, alternative: lowering head 20/24 2b with pins and cotter pins 2a 4 The supporting heads of formwork fit all standard slab props with 40 mm hole diameters. For intermediate support: clawhead 24S 3a clawhead 16/20S 3b Fig. 7 Assembly: 1. Position head on endplate of prop. 2b 3a 3b Fig.7 2. Engage self-locking coupling and check functionality, Fig. 8 or without selflocking coupling, secure head with pins and cotter pins. 3. Position props. The girders can now be accommodated. Dismantling: Release coupling or remove pins and take off head. a + b 40 mm Pay attention to lowering requirements when aligning the props. (min. 4 cm). Fig.8 6

11 A2 Components Formwork assembly Three girder combinations 1. Plywood sheet 21 mm Cross beam VT 20 Main beam VT 20 h = 42 cm, Fig. 9a Plywood sheet 21 mm Cross beam VT 20 Main beam GT 24 h = 46 cm, Fig. 9b 3. Plywood sheet 21 mm Cross beam GT 24 Main beam GT 24 h = 50 cm, Fig. 9c Fig.9a Fig.9b 50 Fig.9c Assembly aids Universal tripod as erection aid for all round and square slab props. Through the swivel-mounted base plates, the tripod can be erected in corners and against straight walls. Fig. 10a Fig.10a ø mm Erection bar for installing and dismantling of girders and formlining. erection bar GT/VT, for VT 20 and GT 24 girders, Fig.10b assembly bar 24 for GT 24 girders, Fig.10c Fig.10b Fig.10c Brace clamp for round slab props. Fig.10d for shuttering heights > 3.0 m for assembly of diagonal bracing Fig.10d Stripping cart e.g. PERI Stripping Cart ASW 465 Fig.10e Fig.10e MULTIPROP Frame MRK for forming heights > 3.0 m for bracing of MP props. Fig.10f Fig.10f 7

12 A3 Erection 1 40 mm 2 Turn the prop so that the G-hook can be operated. Attach crosshead or clawhead to prop and engage (with self-locking coupling) Secure other types of support systems by means of pins and cotter pins: Alternative to crosshead: Lowering Head 20/24 for simple and easy lowering. 2a Position crosshead props on flat and load-bearing ground. Secure with tripods (erection aid). Horizontal loads from the shuttering procedure can only be transferred for shuttering heights up to approx. 3.0 m. 2b Shuttering height > 3.0 m with MULTIPROP props: Brace props by means of MRK frames (erection aid). See type test and MULTIPROP assembly instructions for more information. Shuttering height > 3.0 m with steel tube support: e.g. PERI PEP: diagonal bracing must be mounted as an erection aid. 8

13 A3 Erection 3 4 VT 20 VT 20 VT 20 VT 20 min.15 min.15 min.15 min.15 min.15 x. Prop spacing c Main beam spacing b Position crosshead props. Mount main girders from below by means of erection bar. One or two main beams can be accommodated in each crosshead without any risk of tilting. 5 Position secondary girder from below by means of erection bar. Align cross beams in such a way so that the plywood sheeting joints always rest on a cross beam or a pair of girders. Girder overlap: VT 20 min. 15 cm at both ends GT 24 min cm at both ends 6 c Risk of falling! Mount guardrails before shuttering according to valid guidelines! Secure cross beam against tilting. Install plywood sheeting and secure with nails. Level formwork and spray, e.g. with PERI Bio Clean. Caution: risk of slipping! Mount intermediate props with claw heads on girders using prop spacing c. Extend props according to the length. GT 24 girders, see A2. Risk of tilting! Ensure load effects are safely transferred!* *see safety instructions "General Safety information" The MULTIFLEX slab formwork can be now be used in accordance with permissible load requirements. Pallets in position on the erection area ready to be used during striking operations 9

14 A4 Striking Observe striking time! Dismantle intermediate props and store in pallets. In cases of immediate re-use, the heads remain attached to the props! Lower all secondary girders by approx. 4 cm*. Begin lowering and removal of props with larger prop spans in the centre of the slab. 4 5 Dismantle plywood sheets and remaining cross beams store in pallets. Plywood must be accurately stacked in order to clean the sheet edges Dismantle main girders and store in pallets. * Observe permissible prop loads! If the formwork is not dismantled, it could lead to overloading the props when concreting the slab for the next floor. 10

15 A4 Striking 2a 3 4 Alternative to No. 2 Lower lowering head by means of hammer blow = 4 cm. Push back wedge to starting position ready for next use and fix tight with a hammer blow Tip the secondary girders onto their sides and remove from below by means of the assembly bar and store in pallets. Secondary girder located under plywood joints remain in position. 6 7 Dismantle crosshead props and store in pallets. In cases of immediate re-use, the heads remain attached to the props! Before the first and any additional use, spray the plywood sheet edges, e.g. with PERI BIO Clean. This facilitates shuttering and striking procedures and helps to protect the sheet. 11

16 A5 Guardrails and setting of stopend scaffold components supplied by the contractors must conform to valid safety regulations! load effects must be safely transferred! see safety instructions "General Information" Guardrails * on slab edges with slab tables The edge of the building is secured by means of PERI table modules. Fig. 11 See also assembly instructions for table modules. Fig.11 during casting segment with slab edge trestle AW see B5 for static value Assembly The Stopend Angle 11 can be attached in girder s length direction as well as at 90 to the girder: 8 wire pins ø 3.1 x 65, (6 pins at front, 2 pins at rear, Item. no ) with clamp for attaching to the girder or timber insert handrail post AW 12 and nail rear end. Fig.12 with Stopend Angle AW, Fig.12a with panel formwork and Stopend Angle AW, Fig.12b Fig Fig.12a with slab stopend bar 105 and handrail post HSGP, see B5 for static value. Fig See PERI construction site equipment brochure for additional setting of stopends Fig.12b max *Guardrails as a minimum, timber components must correspond to Sort Class S10 according to DIN 4074 and be marked with a U symbol! secure guardrail boards with wire pins or screws! Fig.12b min 10 Fig.13 max

17 B1 General Instructions Static-relevant instructions regarding the use of slab formwork Provided on-site assurance can be given that values of the slab thickness along with the spacing of the secondary and main beams do not fall below those specified in the tables, and no additional loads are imposed as a result of the formwork being out of plumb etc., the formwork girders satisfy all the criteria for classification in Support Scaffold Group III. As a rule, the loads acting only have to be increased by the group factor according to DIN 4421 for the support structure, which can mainly be classified in Group I or II. Conditions for classifying the support structure in Support Scaffold Group I Conditions for classifying the support structure in Support Scaffold Group II Classification in Group I is possible for erection heights of up to 5.00 m spans of up to 6.00 m vertical, uniformly distributed loads of up to 8 kn/m 2 uniformly distributed line loads from beams and downstands, and the like, of up to 15 kn/m Drawings are not required. Proof of stability is only required if there is insufficient expertise available for assessment purposes. proof of stability for all important structural components and their connections required to prevent collapse. Analyses may be carried out with the simplifications described in Section contained in DIN 4421 drawings: general arrangement drawings which clearly show the ground plans and sections of the construction. Presentation of the most important details is necessary. The loads acting are to be multiplied by the group factor of 1.25 The loads acting are to be multiplied by the group factor of

18 B2 Calculation of Slab Formwork (example) Example with slide chart VT 20/VT 20 Slab thickness: d = 20 cm Clear room height: h = 2.80 m Main and cross beams: VT 20 Plywood: 21 mm, 62.5 x 250 cm Slab thickness d [m] Loading q [kn/m 2 ] 0,20 7,1 Permissible main beam spacing b [m] Existing prop load F [kn] Cross beam spacing a [m] 0,75 0,625 0,50 b a Pre-selection Pre-selection makes it possible for the user subject to the available girder lengths to more effectively plan the utilisation of the MULTIFLEX with regards to the available prop loadbearing capacity and building geometry. From: permissible prop spacing possible main beam spacing (when using the GT 24 girder as cross beam, pay attention to the 30 cm node arrangement) available prop load Prop spacing c [m] 0,60 0,90 1,20 1,50 1,80 2,10 2,40 2,52 10,7 2,68 11,4 2,89 12,3 2,52 16,1 2,68 17,1 2,89 18,5 2,52 21,5 2,60 22,0 2,60 22,0 2,07 22,0 2,07 22,0 2,07 22,0 1,60 22,0 1,60 22,0 1,60 22,0 1,22 22,0 1,22 22,0 1,22 22, c Loading: according to DIN 4421 Deflection: limited to I/500 Basis for calculation is a three-ply sheet, 21 mm, with E = 7500 N/mm 2 (saturated) and permissible B = 6.5 N/mm 2 (saturated). Plywood The 3-S plywood has been considered in the slide chart. PERI Beto: see table, right. If another type of plywood is used, the cross beam spacing must be adapted accordingly, see B5 Plywood Chart. Max. slab thickness: PERI Beto Size of plywood 62.5 cm x 2.50 m 4 fields 5 fields Cross beam Max. slab spacing [cm] thickness [cm] Cross beam spacing a Plywood support, Fig.14 (dependent on slab thickness and size of plywood sheet used, see B5 Plywood Chart) 62,5 62,5 62,5 Fig.14 Cross beam spacing: 62.5 cm See B5 for static values. 2. Main beam spacing b Cross beam support, Fig.15 Max. permissible span for cross beams according to the slide chart: 2.07 m Main beam spacing: 2.00 m (selected, dependent on room geometry) 2,00 m Fig.15 14

19 B2 Calculation of Slab Formwork (example) 3. Prop spacing c Main beam support, Fig.16 Prop spacing: 1.50 m 4. Prop load Specification for the slide chart: 22.0 kn Through the selection of the main beam spacing of b = 2.00 m, this results in a prop load of F = 22 kn x 2.00 m = 21.3 kn 2.07 m to be transferred. H Now select a slab prop (PEP, MULTIPROP) corresponding to the extension length H with permissible prop load = 21.3 kn. The respective standards are used for the support construction. 1,50 m 1,50 m 1,50 m Fig.16 PERI slide chart for girder combinations: VT 20 / VT 20 GT 24 / VT 20 GT 24 / GT 24 Example with PERI design tables According to the selected girder combination, calculations for the MULTIFLEX slab formwork are carried out using the tables in B5. Depending on the slab thickness, the selected cross beam spacing and plywood sheet result in the main beam and prop spacings. Fig. 17 b a c Fig.17 15

20 B3 Application Example Overview with edge tables Fig. 18 The basis of the MULTIFLEX is an all-sided horizontal and non-moveable positioned slab formwork! This is given with peripheral walls and beams cast in advance. Otherwise the transfer of horizontal loads must be ensured in accordance with DIN 4421 through other measures undertaken on site (e.g. bracing)! Fig.18 VT 20: min. d 15 cm, max. 30 cm GT 24: min. d 16.3 cm, max. 30 cm Overview of starting bay Fig.19 max. 30 Fig.19 16

21 B4 Beams UZ beam system for beams up to h = 80 cm consisting of: UZ Beam Bracket 40 15a UZ perforated rail 15b no formwork ties up to h = 80 cm cross-sections are to be continuously formed girders or timbers can be used as bottom formwork side or bottom formwork can also be formed with PERI TRIO elements UZ perforated rails can be joined together for extra-wide beams 15a 15b Fig.20 b Max. beam widths with side form width b = 10 cm 1 x UZ perforated rail 80 = 45 cm 2 x UZ perforated rail 80 = 135 cm 1 x UZ perforated rail 129 = 95 cm Fig. 20 See B5 for permissible widths of influence. Examples 1. Side form with one or two 2 GT 24s (vertical) Fig. 21a Fig.21a 2.Side form with two or three VT 20s (horizontal) Fig. 21b Fig.21b 3. Packing of formwork bottom Fig. 21c Fig.21c 17

22 B4 Beams Stopend Angle AW for beams up to h = 60 cm the stopend angle 11 can be nailed to the plywood (22 mm) as stopend up to h = 40 cm larger widths of influence and heights are possible with the clamp, see B5 side formwork can be formed using horizontal TRIO, DOMINO or HANDSET elements 11 guardrails must be mounted according to valid regulations! load effects must be safely transferred! see safety instructions "General Information" Examples 1. Edge beam: stopend nailed to table module, Fig. 22a Fig.22a 2. Beam with Domino elements, Fig. 22b 3. Stopend angle with clamp 11a, Fig. 22c Assembly See A5, stopend angle AW Used plywood sheets can be used for the working areas. 11a Fig.22b Fig.22c 18

23 19

24 B5 Design tables Plywood Type of plywood Thickness [mm] Veneers E-modulus [N/mm 2 ] parallel/crosswise perm. [N/mm 2 ] parallel/crosswise Fin Ply 21 Birch 8560/ /12.4 Fin Ply, Maxi 20 Birch 7500/ /10.5 Fin Ply, USA 19 / 3 /4 Birch 6180/ /11.5 Fin Ply 18 Birch 8730/ /12.2 PERI Birch 21 Birch 8560/ /12.4 PERI Birch, USA 19 / 3 /4 Birch 9170/ /13.6 Combi Mirror 21 Birch/Conifer Ply. 8560/ /6.8 PERI Beto 21 Birch/Conifer Ply. 6610/ /8.5 PERI Beto, USA 19 / 3 /4 Birch/Conifer Ply. 6610/ /10.6 PERI Beto 18 Birch/Conifer Ply. 6680/ /8.7 PERI Spruce 21 Conifer Plywood 5240/ /7.0 As-Ply 21 Plywood 1) 1) 3-Ply Plywood 27 Spruce 8000/ /1.5 3-Ply Plywood 21 Spruce 8000/ /1.3 Lake Pine 20,5 Plywood 1) 1) Arauco Pine 21 Pine 1) 1) FinNa-Ply 21 Conifer Plywood 7910/ /5.0 1) No information possible because of large differences. The static/mechanical values given in the tables refer, according to information from the manufacturers, to a moisture content of 15%. But GSV stipulate the values of moisture content as 20%. The values for the Modulus of Elasticity are therefore to be reduced by a factor of and the values for the permissible tension by a factor of The fibres of the face veneer span in the direction of the first length shown for the plywood size. Solid timber Softwood, Sorting Class S10 E-modulus [N/mm 2 ] parallel/crosswise perm. [N/mm 2 ] parallel/crosswise 10 With a timber moisture content of 20% only the permissible tension according to DIN 1052 is to be reduced by

25 B5 Design tables 21 mm Plywood The modulus of elasticity and the permissible tension is based on the grade and moisture content of the plywood (see page 20) q L 4 Maximum deflection f = E I Maximum Moment M = q L 2 (valid for at least 3 bays) L L L L L L L f f E = 3000 N/mm 2 E = 4000 N/mm 2 E = 5000 N/mm 2 E = 6000 N/mm 2 E = 7000 N/mm 2 E = 8000 N/mm cm 70 cm 65 cm 60 cm 55 cm 50 cm 45 cm = 13 N/mm 2 40 cm SPAN L = 11 N/mm 2 = 9 N/mm 2 35 cm Deflection f [mm] Wall formwork Slab formwork = 7 N/mm2 = 5 N/mm2 30 cm 25 cm Concrete pressure q [kn/m 2 ] Slab Thickness d [cm]

26 B5 Design tables MULTIFLEX GT 24 Girders as slab beams Slab thickness [m] Loading q* [kn/m 2 ] Secondary beam spacing a [m] Perm. span for main girder Prop spacing c [m] Slab thickness [m] Loading q* [kn/m 2 ] Secondary beam spacing a [m] Perm. span for main girder Prop spacing c [m]

27 B5 Design tables MULTIFLEX GT 24 Girders as slab beams Slab thickness [m] Loading q* [kn/m 2 ] Secondary beam spacing a [m] Perm. span for main girder Prop spacing c [m] * Loading to DIN 4421: Formwork load g = 0.40 kn/m 2 Concrete load b = 26 kn/m 3 x d (m) Live load p = 0.20 x b 1.5 p 5.0 kn/m 2 Total load q = g + b + p The deflection has been limited to l/500. Main girder support at node intersections. Secondary girders assumed single span. Table values mean the following: 2.87 Perm. main beam spacing b [m] 28.0 Existing prop load [kn] b Main beam spacing b Secondary beam spacing a a a a Beam length Item no. 0.90m m m m m m m m m m m m m m m m m m c c c Prop spacing 23

28 B5 Design tables MULTIFLEX VT 20K Girders as slab beams Slab thickness [m] Loading q* [kn/m 2 ] Secondary beam spacing a [m] Perm. span for main girder Prop spacing c [m] Slab thickness [m] Loading q* [kn/m 2 ] Secondary beam spacing a [m] Perm. span for main girder Prop spacing c [m]

29 B5 Design tables MULTIFLEX VT 20K Girders as slab beams Slab thickness [m] Loading q* [kn/m 2 ] Secondary beam spacing a [m] Perm. span for main girder Prop spacing c [m] * Loading to DIN 4421: Formwork load g = 0.40 kn/m 2 Concrete load b = 26 kn/m 3 x d (m) Live load p = 0.20 x b 1.5 p 5.0 kn/m 2 Total load q = g + b + p The deflection has been limited to l/500. Secondary girders assumed single span. Table values mean the following: 2.25 Perm. main beam spacing b [m] 22.0 Existing prop load [kn] Beam length Item no. 1.45m m m m m m m m m m m Main beam spacing b b a Secondary beam spacing a a a c c c Prop spacing 25

30 B5 Design tables MULTIFLEX Secondary Girder: GT 24 / Main Girder: 2x GT 24 Slab thickness [m] Loading q* [kn/m 2 ] Secondary beam spacing a [m] Perm. span for main girder Prop spacing c [m] Slab thickness [m] Loading q* [kn/m 2 ] Secondary beam spacing a [m] Perm. span for main girder Prop spacing c [m] * Load to DIN 4421: Dead load g = 0.40 kn/m 2 Concrete load b = 26 kn/m 3 x d (m) Live load p = 0.20 x b 1.5 p 5.0 kn/m 2 Total load q = g + b + p Main girder spacing b b a Secondary girder spacing a a a The deflection has been limited to 1/500. Main girder support at node intersections. Secondary girders assumed single span. Table values mean the following: 3.17 perm. spacing of main girders [m] 56.0 actual prop load [kn] One GT 24 is sufficient as main girder when prop loads < 28.0 kn Prop spacing c c 26

31 B5 Design tables MULTIFLEX Secondary Girder: VT 20K / Main Girder: 2x VT 20K Slab thickness [m] Loading q* [kn/m 2 ] Secondary beam spacing a [m] Perm. span for main girder Prop spacing c [m] Slab thickness [m] Loading q* [kn/m 2 ] Secondary beam spacing a [m] Perm. span for main girder Prop spacing c [m] * Load to DIN 4421: Dead load g = 0.40 kn/m 2 Concrete load b = 26 kn/m 3 x d (m) Live load p = 0.20 x b 1.5 p 5.0 kn/m 2 b b Main girder spacing a a a a = Secondary girder spacing Total load q = g + b + p The deflection has been limited to 1/500. Secondary girders assumed single span. Table values mean the following: 2.58 perm. spacing of main girders [m] 44.0 actual prop load [kn] One VT 20K is sufficient as main girder when prop loads < 22.0 kn Prop spacing c c 27

32 B5 Design tables Edge formwork Formwork bracket-2, Slab Stopend Bar 105, Stopend Sleeve 15 Formwork Bracket-2 Permissible spacings [m] depending on the slab depth and overhang. f d Slab thickn. d Overhang f [m] [m] The above values relate to the load capacity of the formwork bracket. Depending on the formlining smaller spacings may be required. The maximum anchor tension force is 6.5 kn and the shear force 5.3 kn. Slab Stopend Bar 105 Permissible spacings [m] depending on the slab depth. d Slab thickness d [m] Allowing for load on the handrail post Not allowing for load on the handrail post The maximum deflection at the top has been limited to 3 mm. The maximum anchor tension force is 6.5 kn. Stopend Sleeve 15 Concrete strength required depending on the anchor tension force. Anchor tens. Z [kn] * Concrete strengths required [N/mm 2] Z * maximum permissible anchor tension force for stopend sleeve 15 28

33 29

34 B5 Design tables Beam UZ beam formwork Permissible width [m] of load that may be carried by UZ 40 beam bracket depending on the depth of the beam and slab Beam depth: h [m] Slab thickness: d [m] Version 1 2 Version 1 2 Version 1 2 Version 1 2 Version 1 2 Version 1 2 1x GT 24 2x VT 20 1x GT 24 2x VT 20 2x GT 24 2x VT 20 2x GT 24 2x VT 20 2x GT 24 3x VT 20 2x GT 24 3x VT *1.05 * *1.05 *1.35 *0.75 * *1.00 *1.25 *0.70 * *0.95 *1.15 *0.65 * *0.90 *1.05 *0.60 *0.80 The maximum deflection is 1/500 Version 1: Side form with one or two GT 24s (vertical) h d h d Version 2: Side form with two or three VT 20s (horizontal) *) Timber on end in the UZ 40 beam bracket is 10 x 8 cm (rather than 8 x 8 cm) The above values relate to the load capacity of the UZ 40 beam bracket, the upright 8x8 cm timbers and the secondary girders shown on the drawings. Depending on the formlining used, additional secondary girders may be needed. Separate structural calculations must be provided to show the sub-structure can carry the imposed loads. The equivalent load (V/100) acting horizontally and the pressures arising on one side (eg the edge beam) are to be taken by a restraint provided by the client. Version 3: Packing for the beam soffit formwork d h d = slab depth h = beam depth 30

35 B5 Design tables Beam AW Stopend Angle Permissible width [m] of load that can be carried by AW stopend angle depending on the depth of slab and beam, and type of fixing. Height of side form work h [m] nailing on clamping nailing on clamping nailing on clamping nailing on clamping SKY- plywood. timber timber SKY- plywood. timber timber SKY- plywood. timber timber SKY- plywood. timber timber DECK* 21 mm girder girder DECK* 21 mm girder girder DECK* 21 mm girder girder DECK* 21 mm girder girder Slab thickness d [m] Height of side form work h [m] Substructure Substructure Slab thickness d [m] nailing on clamping nailing on clamping nailing on clamping SKY- plywood. timber timber SKY- plywood. timber timber SKY- plywood. timber timber DECK* 21 mm girder girder DECK* 21 mm girder girder DECK* 21 mm girder girder Separate structural calculations must be provided to show the sub-structure is adequate to carry the loads arising. The equivalent load (V/100) acting horizontally and the pressure arising on one side (eg edge beam) are to be taken by a restraint provided by the client. Nail with eight 3.1 mm dia nails (6 at the front and 2 at the back) * The AW safety handrail post must not be used on SKYDECK panels. 1. Slab stopend 2. Slab with edge beam 3. Slab with T-beam h d h h 31

36 Weight kg Item no. GT 24 Girder German Approval Certificate No. Z Perm. Shear Force Q D = 14,0kN* * Q D = Permiss. shear force on compression struts Perm. Shear Force Q Z = 13,0kN** **Q Z = Permiss. shear force on tension struts Perm. Bending Moment M = 7,0kNm Moment of Inertia l y = 8000cm Nominal Lengths 0,60m RF 4, ,90m 5, ,20m 7, To simplify handling the most 1,50m 8, common GT 24 Girders are 1,80m 10, colour coded for length. 2,10m 12, ,40m 14, brown 2,70m 15, grey 3,00m 17, blue 3,30m 19, red 3,60m 21, green 3,90m 23, ,20m 24, ,50m 26, ,80m 28, ,10m 30, ,40m 31, ,70m 33, ,00m 35, GT 24 Special Lengths 5,90/m ,00-17,80m Girder Joint Girder end Girder joint = standard joint spacing End Protection Cap GT 24, galv. 0, For protecting timber chord of girder against being sawn off accidentally. 32

37 Weight kg Item no. VT 20K Girder With steel end caps. German Approval Certificate No. Z perm. Q = 11,0kN perm. M = 5,0kNm l y = 4290cm Nominal lengths 1,45m 8, ,15m 12, ,45m 14, ,65m 15, ,90m 17, ,30m 19, ,60m 21, ,90m 23, ,50m 26, ,90m 28, ,90m 34, Cutting Cost VT Girder VT 16K Girder* German Approval Certificate No. Z Perm. Shear Force Q = 8,5kN Perm. Bending Moment M = 3,5kNm Moment of Inertia l y = 2420cm * is no longer produced Nominal Lengths 2,45m 11, ,90m 13, ,30m 15, ,60m 16, ,90m 17, ,90m 22, ,90m 27, Cutting Cost VT Girder

38 MULTIFLEX and Accessories Weight kg Item no. Crosshead 20/24 S, galv. 3, Required diameter of hole in the With self-locking coupling. endplate of the prop ø 40mm. Providing stable support for single or twin GT 24 or VT 20K Girders. Girder overlap at both ends of at least 163mm in the case of the GT 24, 15cm with VT 20K. ø ø Crosshead 20/24, galv 3, Without self-locking coupling. Accessories: Pin ø 14x107, galv. 0, Cotter Pin FS 4/1, galv. 0, Clawhead 24 S, galv. 1, Required diameter of hole in the With self-locking coupling. endplate of the prop ø 40mm. For supporting the GT 24 Girder at any location without nailing. Clawhead 24 L, galv. 1, Without self-locking coupling. Accessories: Pin ø 14x107, galv. 0, Cotter Pin 4/1, galv. 0, With clawhead 24 S or 24 L, girders GT 24 can even be supported outside the node points with max. reaction at supports of 28kN being taken by the girder. 34

39 Weight kg Item no. Crosshead 16 S, galv.* 3, Required diameter of hole in the With self-locking coupling. endplate of the prop ø 40mm. Providing stable support for single or twin VT 16K Girders. Cantilever of Girders at each end min. 150mm. * is no longer produced ø Crosshead 16, galv.* 2, Without self-locking coupling. * is no longer produced Accessories: Pin ø 14x107, galv. 0, Cotter Pin 4/1, galv. 0, Clawhead 16/20 S, galv. 1, Required diameter of hole in the With self-locking coupling. endplate of the prop ø 40mm. For supporting the VT 20K or VT 16K Girder at any location without nailing. Clawhead 16/20, galv. 0, Without self-locking coupling. Accessories: Pin ø 14x107, galv. 0, Cotter Pin 4/1, galv. 0,

MULTIFLEX The flexible girder slab formwork for all ground plans and slab thicknesses up to 1.00 m. Product Brochure

MULTIFLEX The flexible girder slab formwork for all ground plans and slab thicknesses up to 1.00 m. Product Brochure MULTIFLEX The flexible girder slab formwork for all ground plans and slab thicknesses up to 1.00 m Product Brochure Content System advantages of the MULTIFLEX 3 The flexible girder slab formwork for every

More information

PERI PD 8 The cost-effective shoring for slab tables and high loads

PERI PD 8 The cost-effective shoring for slab tables and high loads PERI PD 8 The cost-effective shoring for slab tables and high loads Edition 06/2010 PERI GmbH Formwork Scaffolding Engineering P.O. Box 1264 89259 Weissenhorn Germany Tel +49 (0)7309.950-0 Fax +49 (0)7309.951-0

More information

Allround Scaffolding. Layher Allround Bridging System Instructions for Assembly and Use. Modular truss system for wide spans

Allround Scaffolding. Layher Allround Bridging System Instructions for Assembly and Use. Modular truss system for wide spans Layher Allround Bridging System Instructions for Assembly and Use Modular truss system for wide spans Certification according to DIN ISO 9001/EN 29 001 by TÜV-CERT Allround Scaffolding } CONTENT 1. Introduction...3

More information

Circular formwork Radius Technical Instruction Manual

Circular formwork Radius Technical Instruction Manual Circular formwork Radius Technical Instruction Manual Product features Radius is a circular formwork that allows adjustable radii. Pre-assembled standard panels with powder-coated steel profiles provide

More information

ALBLItZ 70 S INSTRUCTION FOR ERECTION AND USE

ALBLItZ 70 S INSTRUCTION FOR ERECTION AND USE ALBLItZ 70 S INSTRUCTION FOR ERECTION AND USE Approval No. Z-8.1-864 Standard Version (as of ) C O N T E N T S 1. General...1 2. Erecting the scaffold...3 2.1 General requirements...3 2.2 Erecting the

More information

P: F: Resi-Ply FORMING SYSTEM BY DAYTON SUPERIOR

P: F: Resi-Ply FORMING SYSTEM BY DAYTON SUPERIOR Resi-Ply FORMING SYSTEM BY DAYTON SUPERIOR Resi-Ply System The Resi-Ply forming system is a 1 1 thick plywood with steel backing bars designed especially for residential foundations and low industrial

More information

Contents of my presentation

Contents of my presentation 1 Design and Techniques for Safety in High Rise Buildings- Focus on Temp. Structures-Formwork Dr. Kumar Neeraj Jha Department of Civil Engineering Indian Institute of Technology Delhi Email: knjha@civil.iitd.ac.in

More information

SKYDECK Panelized Slab Formwork The proven aluminium panelized slab formwork with fast shuttering times. Product Brochure

SKYDECK Panelized Slab Formwork The proven aluminium panelized slab formwork with fast shuttering times. Product Brochure SKYDECK Panelized Slab Formwork The proven aluminium panelized slab formwork with fast shuttering times Product Brochure Content In the focus 2 The main system components System overview 16 SKYDECK at

More information

distribution Modular Scaffolding

distribution Modular Scaffolding Modular Scaffolding Modular scaffolding PDM Universal scaffolding system plettac-pl PDM Application A characteristic feature of plettac PDM system is the use of wedge joint which provides quick and safe

More information

Conergy SolarFamulus II

Conergy SolarFamulus II Conergy SolarFamulus II Installation manual www.conergy.com Table of Contents Table of Contents SolarFamulus II for universal use on flat roofs 1 Introduction 1 1.1 Short description 1 1.2 Intended use

More information

Building construction

Building construction Transport equipment Storage equipment Civil engineering Building construction Mobile fence Event Road construction Road construction Building construction Building construction - pages 64-87 Formwork prop

More information

Universal Panels & Accessories

Universal Panels & Accessories Universal Panels & Accessories Erection Procedures INTRODUCTION Use common sense when working with Scaffold Your Safety is our #1 Concern Universal Scaffolds are designed with your safety in mind every

More information

HANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity

HANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity HANDSET WALL FORM Quick Assembly - can be built using only a hammer Reduced weight increases productivity Unsurpassed flexibility in design and availability of panels for a wide variety of applications

More information

SECTION PLATE CONNECTED WOOD TRUSSES

SECTION PLATE CONNECTED WOOD TRUSSES SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:

More information

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK DIVISION 03 CONCRETE SPECIFICATION 031000: FORMS AND FORMWORK PART 1.0 GENERAL 1.1 DESCRIPTION The work of this specification includes furnishing of all labor, materials, equipment and incidentals to install,

More information

MGF TECHNICAL FILE MGF 400 SERIES STRUT. Description. Product Notes.

MGF TECHNICAL FILE MGF 400 SERIES STRUT. Description. Product Notes. Description Highly versatile, simple to assemble, heavy duty, modular bracing strut system designed primarily to be used as intermediate struts with MGF hydraulic bracing systems. The system can also be

More information

built build to slabs SLABFORM

built build to slabs SLABFORM uilt build to slabs slabform SLABS Company Projects Products It is a modular system of formworks in aluminium for the execution of monolithic or lightened concrete slabs cast in place. is a fully It

More information

Elevated Slab Sequence

Elevated Slab Sequence Elevated Slab Sequence The following group of photos shows the sequence for installa4on of a one- way elevated slab. (Slab & Beam with Reinforcing & Post- Tensioning) Columns Placed & Form Support (Scaffolding)

More information

R-Group Finland Oy. REA Lifting Inserts Technical Manual According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved

R-Group Finland Oy. REA Lifting Inserts Technical Manual According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved R-Group Finland Oy REA Lifting Inserts Technical Manual According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved 10.2.2017 2 Table of Contents 1 DESCRIPTION OF THE SYSTEM...

More information

Smarter. Safer. Leaner.

Smarter. Safer. Leaner. Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter

More information

Layher Aluminium Lattice Beams. Information and User Guide. Aluminium Lattice Beam 750 (Product Code 4903XXX)

Layher Aluminium Lattice Beams. Information and User Guide. Aluminium Lattice Beam 750 (Product Code 4903XXX) Layher Aluminium Lattice Beams Information and User Guide Aluminium Lattice Beam 450 (Product Code 4902XXX) Aluminium Lattice Beam 750 (Product Code 4903XXX) Table of Contents Page 1 Introduction 2 2 General

More information

Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT

Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT IMPORTANT SAFETY INFORMATION FOR USERS OF THE REECHCRAFT, BRACING SYSTEM PLEASE READ BEFORE USE Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT UK Edition 1.3 26/11/2012 1 TABLE OF CONTENTS

More information

built build to FORMWORKS CLIMBING, RETAINING WALLS, SPECIAL

built build to FORMWORKS CLIMBING, RETAINING WALLS, SPECIAL uilt build to FORMWORKS Company Projects Products CLIMBING SYSTEMS Pilosio s CLIMBING SYSTEM with mechanical handling enable vertical construction joints to be created in succession without the aid of

More information

User information 10/2011. Method statement. en-gb. Dokamatic table The Formwork Experts

User information 10/2011. Method statement. en-gb. Dokamatic table The Formwork Experts 10/2011 User information 999767002 en-g Method statement Dokamatic table 9767-307-01 Introduction User information Dokamatic table tion Introduc- by Doka Industrie GmbH, -3300 mstetten 2 999767002-10/2011

More information

UNI Roof Catalogue CTG001-

UNI Roof Catalogue CTG001- UNI Roof Catalogue Foreward DESSA offers efficient lightweight temporary roofing, encapsulation solutions, aluminium lattice girders and safety products. DESSA s unique and distinctive aluminium solutions

More information

FrameFast Shoring System

FrameFast Shoring System FrameFast FrameFast Shoring System The FrameFast shoring system is engineered for maximum strength, labor productivity and reuse capabilities. FrameFast components feature high strengthto-weight ratios.

More information

Standards for Testing and Rating Shoring Equipment

Standards for Testing and Rating Shoring Equipment ANSI/SSFI SH300-2007 American National Standard Standards for Testing and Rating Shoring Equipment Scaffolding, Shoring & Forming Institute, Inc. Sponsor: Scaffolding, Shoring & Forming Institute, Inc.

More information

Aluma EasySet Continuing Innovation from Aluma S ystems

Aluma EasySet Continuing Innovation from Aluma S ystems Product Sheet Aluma EasySet Aluma Systems Concrete Construction Aluma EasySet Continuing Innovation from Aluma S ystems Introduction With more than 35 years of experience in shoring and formwork, Aluma

More information

Sales Hire Erections

Sales Hire Erections LTD www.scafhire.ie Sales Hire Erections Scaffolding Specialists Company History Since its modest inception in 1980 Scafhire Ltd has progressed to a position of very high prominecnce and respectability

More information

Upright Frame Selection Guide K-1000 is today s best teardrop pallet rack value. NOTES: K-1000 Selective Upright Capacity (pounds)

Upright Frame Selection Guide K-1000 is today s best teardrop pallet rack value. NOTES: K-1000 Selective Upright Capacity (pounds) Pallet rack K-1000 K-1000 the strength and torsion resistance of closed column construction with the compatibility of teardrop design. Speedrack K-1000 VERSATILITY K-1000 offers a wide range of accessories

More information

PD 8 Shoring System The cost-effective shoring for slab tables and high leg loads. Product Brochure Edition 05/2017

PD 8 Shoring System The cost-effective shoring for slab tables and high leg loads. Product Brochure Edition 05/2017 PD 8 Shoring System The cost-effective shoring for slab tables and high leg loads Product Brochure Edition 05/2017 Content System advantages 5 PD 8 Shoring System 6 Quickly and continuously adaptable 8

More information

TAKING YOU TO NEW HEIGHTS IN SAFETY... kwikstage

TAKING YOU TO NEW HEIGHTS IN SAFETY... kwikstage limited one bay kwikstage stair unit user guide One Bay Stair Tower used in conjunction with Kwikstage System Scaffolding and designed to conform to all current British and European Standards. With only

More information

Adjustable Pallet Racking Installation Guide

Adjustable Pallet Racking Installation Guide Adjustable Pallet Racking Installation Guide Read this Guide thoroughly before commencing assembly and retain for future reference. Installation plans and design drawings should be strictly adhered to.

More information

Noetop is a versatile, robust integrated formwork panel system. The basic panels incorporate the strongbacks and

Noetop is a versatile, robust integrated formwork panel system. The basic panels incorporate the strongbacks and NOEtop Noetop is a versatile, robust integrated formwork panel system. The basic panels incorporate the strongbacks and walers into one timber faced panel. The panel range provides economic forming with

More information

CUPLOK SGB CUPLOK SGB Group

CUPLOK SGB CUPLOK SGB Group CUPLOK USER S MANUAL CONTENTS Page Introduction 5 The CUPLOK locking procedure 6 CUPLOK safety information 7 General site safety 9 Core components 11 Scaffold system components 12 Ancillary components

More information

R-Group Finland Oy. RTA, RWTL and RWTS Lifting anchors Design instructions

R-Group Finland Oy. RTA, RWTL and RWTS Lifting anchors Design instructions R-Group Finland Oy RTA, RWTL and RWTS Lifting anchors Design instructions According to Eurocodes, EU Machinery directive 2006/42/EC and VDI/BV-BS 6205 CE Approved 28.12.2016 2 Table of contents 1 DESCRIPTION

More information

Renovation of Buildings using Steel Technologies (ROBUST)

Renovation of Buildings using Steel Technologies (ROBUST) Renovation of Buildings using Steel Technologies (ROBUST) RFCS Project RFSR-CT-2007-0043 WP 4.2 Renovation of roofs using open trusses in light steel C sections Date: 2009 Author: Mark Lawson SCI, Silwood

More information

STANDARD PRACTICE INSTRUCTION

STANDARD PRACTICE INSTRUCTION STANDARD PRACTICE INSTRUCTION DATE: March 1, 2001 SUBJECT: Scaffolding Safety Program. REGULATORY STANDARDS: 29 CFR 1910.28 Safety Requirements For Scaffolding. 29 CFR 1910.29 Manually Propelled Mobile

More information

APPLICATION GUIDE PERFORM WITH PRECISION

APPLICATION GUIDE PERFORM WITH PRECISION APPLICATION GUIDE PERFORM WITH PRECISION APPLICATION GUIDE TABLE OF CONTENTS A Word about Safety...1 General Shoring Safety Rules... 2 Single and Independent Post Shore System Safety Rules... 4 General

More information

CONCRETE FORMWORK CHECKLIST AT SITE

CONCRETE FORMWORK CHECKLIST AT SITE CONCRETE FORMWORK CHECKLIST AT SITE Concrete formwork is a temporary supporting structure for concrete when it is placed at the construction site to keep the concrete in position and shape till it gets

More information

FORMWORK PROCEDURES MANUAL CONTENTS Isometric Profile of MFE System Formwork 3 SECTION (1) - PRE-CONCRETE ACTIVITIES 1. Receipt Of Equipment On Site 2

FORMWORK PROCEDURES MANUAL CONTENTS Isometric Profile of MFE System Formwork 3 SECTION (1) - PRE-CONCRETE ACTIVITIES 1. Receipt Of Equipment On Site 2 FORMWORK PROCEDURES MANUAL ALL RIGHTS RESERVED. NO PART OF THIS PUBLICATION MAY BE REPRODUCED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS, INCLUDING PHOTOCOPYING AND RECORDING, WITHOUT THE WRITTEN PERMISSION

More information

BY DAYTON SUPERIOR. FormRight FORMING SYSTEM

BY DAYTON SUPERIOR. FormRight FORMING SYSTEM BY DAYTON SUPERIOR FormRight FORMING SYSTEM System Design The FormRight concrete forming system is a modular design suitable in handset or gangform applications. Modular versatility Panels come in 23 different

More information

Allround Scaffolding. Propping Technical Brochure. The universal system for everyday and engineered scaffolding solutions

Allround Scaffolding. Propping Technical Brochure. The universal system for everyday and engineered scaffolding solutions Propping Technical Brochure The universal system for everyday and engineered scaffolding solutions made of galvanised steel or aluminium General construction approval Z-8.22-64 Quality management certified

More information

DEPAUL UNIVERSITY. Scaffolding Program. Environmental Health & Safety. April 2017

DEPAUL UNIVERSITY. Scaffolding Program. Environmental Health & Safety. April 2017 DEPAUL UNIVERSITY Scaffolding Program Environmental Health & Safety April 2017 1 TABLE OF CONTENTS SECTION PAGE NO. 1.0 PURPOSE 2 2.0 SCOPE 2 3.0 SCAFFOLDING ERECTOR 2 4.0 GENERAL 2 5.0 WOOD SCAFFOLDING

More information

Contents DESIGNER S STRUCTURAL PRODUCTS GUIDE. Tegral Purlins & Rails

Contents DESIGNER S STRUCTURAL PRODUCTS GUIDE. Tegral Purlins & Rails DESIGNER S STRUCTURAL PRODUCTS GUIDE Introduction Contents Tegral Purlins & Rails Zeta Purlins & Rails Zeta Purlins page 8 Zeta Rails page 15 Zeta Purlin & Rail Cleats page 22 Zeta 2 Purlins & Rails Zeta

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

Speedlock Pallet Racking

Speedlock Pallet Racking Assembly specification These instructions are to assemble Dexion Speedlock Pallet Racking which conforms with the specifications below. Frame heights not more than 4800mm Frame depths 840mm Not less than

More information

User Guide MEGALITE 01FDL34

User Guide MEGALITE 01FDL34 User Guide MEGALITE 01FDL34 IMPORTANT: Any safety provisions as directed by the appropriate governing agencies must be observed when using our products. The pictures in this brochure are snapshots of situations

More information

DeckFast DAYTONSUPERIOR.COM FORMING. Shoring System

DeckFast DAYTONSUPERIOR.COM FORMING. Shoring System DeckFast Shoring System FORMING DeckFast is a highly productive, two component slab form system. It is as simple and quick as erecting two components to provide a ready to pour slab surface. American Owned

More information

UNIVERSITY OF BOLTON WESTERN INTERNATIONAL CENTRE FZE. BEng (HONS) CIVIL ENGINEERING SEMESTER ONE EXAMINATION 2015/2016

UNIVERSITY OF BOLTON WESTERN INTERNATIONAL CENTRE FZE. BEng (HONS) CIVIL ENGINEERING SEMESTER ONE EXAMINATION 2015/2016 OCD59 UNIVERSITY OF BOLTON WESTERN INTERNATIONAL CENTRE FZE BEng (HONS) CIVIL ENGINEERING SEMESTER ONE EXAMINATION 2015/2016 ADVANCED STRUCTURAL ANALYSIS AND DESIGN MODULE NO: CIE6001 Date: Tuesday 12

More information

PERI allows Saudi Arabian stock exchange to climb

PERI allows Saudi Arabian stock exchange to climb PERI allows Saudi Arabian stock exchange to climb The King Abdullah Financial District, Riyadh, Saudi Arabia Schalung Gerüst Engineering Rudolf-Diesel-Straße 89264 Weißenhorn Deutschland Tel.: +49 (0)7309.950-0

More information

Erection manual. Tube-Lock Concept. van Thiel United b.v Page: 1 of 15

Erection manual. Tube-Lock Concept. van Thiel United b.v Page: 1 of 15 Erection manual Tube-Lock Concept 2013-02 Page: 1 of 15 Contents Subject Page Illustration of Tube-Lock Concept 3 Parts of Tube-Lock concept 4 Legislation 5 Erecting a Tube-Lock Concept scaffold 6 Technical

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

Safety on Heights: Our Policy

Safety on Heights: Our Policy 11/17/14 Safety on Heights: Our Policy Only volunteers over the age of 18 are allowed to work on heights of more than six feet off the ground. This includes all work on scaffolds. Only volunteers who are

More information

SigmaJoint. The Ultimate Joint J. Armouring & Load Transfer Systems. Metallic Leave-In-Place Contraction & Day Joints for INDUSTRIAL CONCRETE FLOORS

SigmaJoint. The Ultimate Joint J. Armouring & Load Transfer Systems. Metallic Leave-In-Place Contraction & Day Joints for INDUSTRIAL CONCRETE FLOORS SigmaJoint Metallic Leave-In-Place Contraction & Day Joints for INDUSTRIAL CONCRETE FLOORS TYPE - D TYPE - O The Ultimate Joint J Armouring & Load Transfer Systems SigmaJoint Introduction Joints are unavoidable

More information

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan

More information

storage solutions Averys group PAL RACK The high quality pallet storage system for goods of all sizes and weights.

storage solutions Averys group PAL RACK The high quality pallet storage system for goods of all sizes and weights. storage solutions Averys group PAL RACK The high quality pallet storage system for goods of all sizes and weights. CONVENTIONAL PALLET RACKING The Stow Pal Rack system consists of a full range of basic

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use Mobile access and working towers in accordance with: HD 1004; DIN 4422, Part 1 (Version 8/92) Working platform 2.8 x 2.8 m and 2.8 x 1.95 m Max. working height: in closed rooms 13.95 m, outdoors 10.0 m

More information

NEBOSH International Certificate in Construction Safety and Health Unit ICC1 MANAGING AND CONTROLLING HAZARDS IN INTERNATINAL CONSTRUCTION ACTIVITIES

NEBOSH International Certificate in Construction Safety and Health Unit ICC1 MANAGING AND CONTROLLING HAZARDS IN INTERNATINAL CONSTRUCTION ACTIVITIES NEBOSH International Certificate in Construction Safety and Health Unit ICC1 MANAGING AND CONTROLLING HAZARDS IN INTERNATINAL CONSTRUCTION ACTIVITIES element 10: WORKING AT HEIGHT - HAZARDS AND RISK CONTROL

More information

BASIC SCAFFOLDING KNOWLEDGE QUESTIONS

BASIC SCAFFOLDING KNOWLEDGE QUESTIONS Garnsworthy Square 46, 62 & 64 Garnsworthy St Springvale rth Victoria 3171 Updated on 22/02/08 STC105 Name BASIC SCAFFOLDING KNOWLEDGE QUESTIONS THE PROFESSIONAL Scaffold Tools Scaffold Belts Couplers

More information

HT 20plus. Formwork timber beams. Facts on formwork timber beams: Contents. Product standard. Wood types. Beam height. Weight.

HT 20plus. Formwork timber beams. Facts on formwork timber beams: Contents. Product standard. Wood types. Beam height. Weight. Formwork timber beams Facts on formwork timber beams: Contents Wood types Spruce / Fir Beam height 20 cm Lengths Lengths up to 10 m Product standard Technical approval certificate Z-9.1-146 Weight 4,6

More information

PERI. PERI UP Rosett Flex Working Scaffold 100 with Deck UDI. Assembly Instructions for Standard Configuration

PERI. PERI UP Rosett Flex Working Scaffold 100 with Deck UDI. Assembly Instructions for Standard Configuration UP Rosett Flex Working Scaffold 100 with Deck UDI Assembly Instructions for Standard Configuration Edition 08/2008 UP Rosett Flex Working Scaffold 100 with Deck UDI Contents Overview Introduction General

More information

Product overview:

Product overview: Product overview: The diagram gives an overview of the dimensions, and therefore the spectrum of structural performance, of the different types of Kielsteg elements. Structural performance: Thanks to their

More information

EcoAs Technical Instruction Manual

EcoAs Technical Instruction Manual Technical Instruction Manual Product features EcoAs is a small-sized, versatile and adaptable formwork system and most suitable for contractors involved in structural and civil engineering projects. EcoAs

More information

BoSS Climalite Camera and lighting tower

BoSS Climalite Camera and lighting tower Contents Safety First Safety First Quantity Schedules Toeboard 2 9 13 33 INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative purposes only. User guides are also

More information

Lattice Beam User Guide USG001-

Lattice Beam User Guide USG001- Lattice Beam User Guide Foreword DESSA offers efficient lightweight temporary roofing, encapsulation solutions, aluminium lattice girders and safety products. DESSA s unique and distinctive aluminium

More information

COLUMN SHOES HPKM, PPKM, PEC

COLUMN SHOES HPKM, PPKM, PEC COLUMN SHOES HPKM, PPKM, PEC Version 9/2007 (Update 7/2009) Replaces brochure /2006 HPKM, PPKM, PEC -column shoes Benefits of Peikko -column joints Saves time, costs and materials Easy and fast adjustments

More information

SpeedyScaf System. Layher SpeedyScaf System. Catalogue Edition Quality management certified according to ISO 9001:2008 by German TÜV-CERT

SpeedyScaf System. Layher SpeedyScaf System. Catalogue Edition Quality management certified according to ISO 9001:2008 by German TÜV-CERT C o m p l e t e. Quality management certified according to ISO 9001:2008 by German TÜV-CERT S a f e. 8102.253 Q u i c k. Catalogue Edition 01.04.2012 SpeedyScaf System Layher SpeedyScaf System u Contents

More information

h Installation Manual

h Installation Manual h Installation Manual 1 General Information The installation of HOBAS GRP Pipes is subject to applicable standards and guidelines such as EN 1610 and ISO/ TS 10465-1. Correct installation always requires

More information

HALFEN HLB LOOP BOX Z-HLB-M50 13-E CONCRETE

HALFEN HLB LOOP BOX Z-HLB-M50 13-E CONCRETE HALFEN HLB LOOP BOX Z-HLB-M50 13-E CONCRETE Translation of the General Certificate of Approval Approval Office: German Institute for Construction Engineering (Deutsches Institut für Bautechnik DIBt) Kolonnenstrasse

More information

LAYHER SPEEDYSCAF SYSTEM CATALOGUE

LAYHER SPEEDYSCAF SYSTEM CATALOGUE LAYHER SPEEDYSCAF SYSTEM CATALOGUE Edition 04.2013 8102.254 Quality management certified according to ISO 9001:2008 by German TÜV-CERT Layher QUALITY MADE BY LAYHER // Main plant in Eibensbach // Plant

More information

APPENDIX B. LOAD FRAME. This Appendix will describe the philosophy in the design and operation of the loading system.

APPENDIX B. LOAD FRAME. This Appendix will describe the philosophy in the design and operation of the loading system. APPENDIX B. LOAD FRAME This Appendix will describe the philosophy in the design and operation of the loading system. LOAD FRAME The large-scale gusset plate testing required a unique loading fixture. A

More information

ST7008 PRESTRESSED CONCRETE

ST7008 PRESTRESSED CONCRETE ST7008 PRESTRESSED CONCRETE QUESTION BANK UNIT-I PRINCIPLES OF PRESTRESSING PART-A 1. Define modular ratio. 2. What is meant by creep coefficient? 3. Is the deflection control essential? Discuss. 4. Give

More information

The difference is Guidance for the preparation of Deck Manufacturing Schedules

The difference is Guidance for the preparation of Deck Manufacturing Schedules The difference is Guidance for the preparation of Deck Manufacturing Schedules innovation, commitment, support. 2 Guidance for the preparation of Deck Manufacturing Schedules Minimum Requirements for Schedule

More information

Assembly and usage instructions. Z600 brace-free mobile scaffold

Assembly and usage instructions.  Z600 brace-free mobile scaffold Assembly and usage instructions www.zarges.de brace-free mobile scaffold towers Assembly and usage instructions 3 Table of contents 1. General information 4 1.1. Introduction 4 1.2. Manufacturer 4 1.3.

More information

POST-TENSIONING APPLICATION AND TECHNOLOGY. Moe Kyaw Aung

POST-TENSIONING APPLICATION AND TECHNOLOGY. Moe Kyaw Aung POST-TENSIONING APPLICATION AND TECHNOLOGY Moe Kyaw Aung Overview 1. Background 2. Basic Design Concept 3. Application and Benefits 4. Components of Post-tensioning System 5. Installation Process 6. Construction

More information

easy formwork system

easy formwork system easy formwork system Ponteggi Edilponte S.p.A. was created in 1963 in a small building in Povegliano Veronese. Thanks to the experience acquired in more than 40 years of activity in the national and international

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. GORBEL PRODUCT SPECIFICATIONS 2010 Gorbel, Inc., P.O., Box 593, Fisher, New York 14453-0593 PHONE: 800-821-0086, FAX: 585-924-6273; WEBSITE: www.gorbel.com November SECTION 41 22 31PRIVATE FREE STANDING

More information

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) SECTION 13125 ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

We store: high. wide. deep. safe. Shelving racks. System C 50 single-tier multi-tier

We store: high. wide. deep. safe. Shelving racks. System C 50 single-tier multi-tier We store: high. wide. deep. safe. Shelving racks System C 50 single-tier multi-tier With C 50 to a practice-oriented multi-tier and high rack The C 50 shelving rack is an especially efficient solution

More information

Bridge articulation No. 1.04

Bridge articulation No. 1.04 Bridge articulation Scope This Guidance Note gives advice on the selection of the articulation arrangements, the choice of bearing types and dispositions of bearings, for bridges where relative movement

More information

D D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4" x 4" x 3/8" Brace. C8 x 4.25 Strut. WT9 x 17.5.

D D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4 x 4 x 3/8 Brace. C8 x 4.25 Strut. WT9 x 17.5. Sign length minus Adjust to avoid interference with sign legend A Deck fascia A 6" Equal Equal 6" Sign length (L) varies 6 to 12 PLAN 0 CONNECTION (DECK FASCIA) Angle connection assembly F Face of concrete

More information

Contents. Tables. Notation xii Latin upper case letters Latin lower case letters Greek upper case letters Greek lower case letters. Foreword.

Contents. Tables. Notation xii Latin upper case letters Latin lower case letters Greek upper case letters Greek lower case letters. Foreword. Tables x Notation xii Latin upper case letters Latin lower case letters Greek upper case letters Greek lower case letters xii xiv xvi xvi Foreword xviii 1 Introduction 1 1.1 Aims of the Manual 1 1.2 Eurocode

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION HANGERS AND SUPPORTS FOR PLUMBING SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Configuration. User Guide. Version: Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES

Configuration. User Guide. Version: Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES Configuration User Guide Version: 2018.0 Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES Contents Introduction... 1 Create a new project... 2 Open the configuration...

More information

Demidec. cornish concrete products Demidec Flooring and Permanent Formwork

Demidec. cornish concrete products Demidec Flooring and Permanent Formwork Demidec cornish concrete products Demidec Flooring and Permanent Formwork Demidec What is Demidec? Demidec is a thin precast concrete plate, typically 60mm deep, although this can vary depending on the

More information

HIGH PERFORMANCE REINFORCEMENT PRODUCTS. Product Catalogue.

HIGH PERFORMANCE REINFORCEMENT PRODUCTS. Product Catalogue. HIGH PERFORMANCE REINFORCEMENT PRODUCTS Product Catalogue www.hrc-europe.com HRC and its product philosophy The use of T-headed bars in concrete structures has some remarkable benefits compared to the

More information

LAYHER ALLROUND SCAFFOLDING SHORING TG 60

LAYHER ALLROUND SCAFFOLDING SHORING TG 60 LAYHER ALLROUND SCAFFOLDING SHORING TG 60 Edition 05.2015 Ref. No. 8116.206 Quality management certified according to ISO 9001:2008 by German TÜV-CERT Allround Scaffolding LAYHER ALLROUND SCAFFOLDING THE

More information

1.2 ACTION AND INFORMATIONAL SUBMITTALS.1 Provide submittals in accordance with Section Submittal Procedures.

1.2 ACTION AND INFORMATIONAL SUBMITTALS.1 Provide submittals in accordance with Section Submittal Procedures. BID OPPORTUNITY NO. 253-2011 PAGE 1 OF 7 PART 1 GENERAL 1.1 REFERENCES.1 American Society of Mechanical Engineers (ASME).1 ASME B31.1, Power Piping, B31.3 Process Piping, B31.9 Building Services Piping..2

More information

SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series

SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series SUMMARY David Samuelson Steel joists are growing in recognition as being a very economical

More information

Council on Tall Buildings

Council on Tall Buildings Structure Design of Sino Steel (Tianjin) International Plaza Xueyi Fu, Group Chief Engineer, China Construction Design International 1 1 Brief of Project 2 Location: Tianjin Xiangluowan Business District

More information

HOLLOW CORE FLOORS SPEED AND STRENGTH

HOLLOW CORE FLOORS SPEED AND STRENGTH HOLLOW CORE FLOORS SPEED AND STRENGTH CONTENTS 2 3 4 5 7 8 9 10 12 13 14 INTRODUCTION PRECAST CONCRETE FLOORS T HE A DVANTAGES BISON HOLLOW CORE FLOORS BEARINGS FALSE CEILINGS AND SOFFIT FIXINGS BISON

More information

THE PERFORMANCE OF CONCRETE GROUND FLOOR SLAB REINFORCEMENT TO CONTROL SHRINKAGE CRACKING. D H Chisholm 1

THE PERFORMANCE OF CONCRETE GROUND FLOOR SLAB REINFORCEMENT TO CONTROL SHRINKAGE CRACKING. D H Chisholm 1 THE PERFORMANCE OF CONCRETE GROUND FLOOR SLAB REINFORCEMENT TO CONTROL SHRINKAGE CRACKING D H Chisholm 1 ABSTRACT In a typical residential concrete floor slab, the cast in strip footings on the slab perimeter

More information

Reliant Holdings Ltd Safety Management System

Reliant Holdings Ltd Safety Management System Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 7 Purpose The purpose of this program is to prevent injuries due to falls from elevated work areas and ensure employees

More information

ENGINEERED FORMWORK AND SCAFFOLDING SOLUTIONS

ENGINEERED FORMWORK AND SCAFFOLDING SOLUTIONS ENGINEERED FORMWORK AND SCAFFOLDING SOLUTIONS SPECIFICATIONS DESIGN GUIDES SPAN TABLES for NP FORM LVL11 Formwork Beams BOXXA Formboards for concrete boxing NP PLANK LVL Scaffold Planks NPIL/03/NOVEMBER

More information

FRANK Stremaform formwork elements

FRANK Stremaform formwork elements FRANK formwork elements technologies for the construction industry Applications Working joints working joints enable large structural elements to be formed in sections. The sequence of these working joints

More information

References. EM , Sections 22 OSHA 29CFR (Subpart L ) UFGS [Latest] ANSI A

References. EM , Sections 22 OSHA 29CFR (Subpart L ) UFGS [Latest] ANSI A References EM385-1-1, Sections 22 OSHA 29CFR 1926.450 (Subpart L ) UFGS-01 35 29[Latest] ANSI A10.8-1988 What Is A Scaffold? An elevated, temporary work platform Three basic types: Supported scaffolds

More information

WALL MOUNTED ARTICULATING JIB CRANE

WALL MOUNTED ARTICULATING JIB CRANE SECTION 14656 WALL MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and

More information

G.B.M. building equipments PONTEGGI. Parapetti Certifi cati SHUTTERING PANELS AND FORMWORK H20 BEAMS

G.B.M. building equipments PONTEGGI. Parapetti Certifi cati SHUTTERING PANELS AND FORMWORK H20 BEAMS Parapetti Certifi cati d ng equip SHUTTERING PANELS AND FORMWORK H0 BEAMS shuttering panels are high-quality, -ply wooden panels, made of spruce and fir wood acquired from sustainable forests. The panels

More information