Park County Public Works Department 1246 CR 16 P.O. Box 147 Fairplay, Colorado (office), (fax) SCOPE OF WORK

Size: px
Start display at page:

Download "Park County Public Works Department 1246 CR 16 P.O. Box 147 Fairplay, Colorado (office), (fax) SCOPE OF WORK"

Transcription

1 Park County Public Works Department 1246 CR 16 P.O. Box 147 Fairplay, Colorado (office), (fax) SCOPE OF WORK Contractor to verify ALL distances/dimensions stated herein. A. PROJECT DESCRIPTION A. Various Roads Park County is soliciting bid proposals from qualified companies to provide chip and seal hardsurfacing and related construction services on various County roads. These roads are as follows: The surface treatment type on each road will be as follows: CR 43, ½ inch maintenance chip, miles (107,139 SY) from US HWY 285 to intersection of CR 47 CR 43A, 2 pin ¾ inch followed by ½ inch,.5 miles (7,627 SY) from US HWY 28 to intersection of CR43 CR 74, 3/8 maintenance chip 2.5 miles (35,200 SY) from Jeffco/Park County Line to gate at end of County Road. CR 68, ½ inch maintenance chip miles (18,234 SY) from US HWY 285 to end of chip. o Depending on budget availability, the County may add up to 1 additional mile to this project) Any existing striping pattern(s) will need to be recorded by and transferred onto wooden lath that will be installed on both sides of the roads by the contractor prior to commencement of surface work so as to enable duplication of the currently existing pattern. Current centerline location of roadway will remain centerline location of roadway when complete. Contractor will furnish all materials unless stated otherwise. Park County reserves the right to select the option or options and bids that provide the most benefit to the County, or to reject all bids. 1

2 II. QA/QC Inspection and testing will be completed for construction per CDOT. Contractor will provide their own QC and Park County will provide QA for the County. III. SURFACE TREATMENT, SUB-BASE & PAVEMENT DESIGN Surface treatment will consist of a either single or double pin applications of Chip and Seal (see above) utilizing CRS-2P or CRS-2R emulsion. All roadway areas will consist of a hardsurface mat twenty-four feet (24 ) in width. Driveway aprons will match existing widths and lengths will be twenty feet or to edge of ROW, whichever is less for any triple application. IV. HARDSURFACING OPERATIONS Contractor will inspect, approve and accept the base course and final grade of the road immediately prior to placement of any hardsurfacing materials. Contractor will, prior to placement of any materials, determine that the materials meet the specifications and also that they are of the proper composition. Additionally, where asphalt is used and the new hardsurfacing meets existing hardsurface, a tack coat application must be applied. Roadway edges will be such that the edges look uniform, without any weaving in and out. V. CONSTRUCTION STAKING Contractor will be responsible for any/all construction staking needed. Absolutely no work will be performed outside of the County right-of-way or the County s easement. VI. WIDTH OF ROADWAY Roadway hardsurface width will be twenty-four feet (24 ). VII. DAILY CLEANUP 2

3 Contractor will be responsible for daily cleanup of debris throughout project. VIII. CONNECTING END OF PROJECT TO EXISTING Where projects begin/end and meet an existing hardsurface, contractor will perform what is needed (such as milling) to assure a smooth transition between new hardsurface and existing hardsurface. Each joint will be smooth and gentle when finished. IX. SIGNAGE Contractor must remove existing signage that interferes with their work and must reset any signage that was removed. Contractor will be billed and agrees to pay for any signs damaged in that process. X. METHOD OF HANDLING TRAFFIC At no time will any road be closed to through traffic. Contractor must supply County with a traffic control plan that is in compliance with all requirements of the MUTCD, latest edition. There will be no exceptions to this requirement. All adjacent property owners should be kept apprised of what is happening. At no time will business or property owners be kept from entering their property. XI. EQUIPMENT STAGING AREAS Contractor may utilize Park County right-of-way for staging purposes. Park County may, but is not required to, find others as projects progress. XII. HAUL ROUTES TBD XII. WARRANTY All work done will be guaranteed for a period of not less than one (1) year from the date of Probationary Acceptance. This includes materials and workmanship. County will hold bonds until such time as final acceptance takes place. XIV. PROJECT TIME FRAME Contractor will need to provide to the County a proposed schedule, listing activities as well as critical path items. Contractor will take weather, 3

4 material delays and any other instances that could delay the project into account. Contractor will supply County with a finish date of work. This contract time will not be extended. Contractor must allow enough time to finish project, as liquidated damages will accrue on any items past the contracted time frame. XV. REVISION OF SECTION 108 LIQUIDATED DAMAGES Section 108 of the CDOT Standard Specifications is hereby revised for this project as follows: In subsection delete the first paragraph and replace with the following: Failure to Complete Work on Time. A daily charge will be made against the Contractor for each calendar day, including free time that any work remains uncompleted after the elapse of contract time. This daily charge will be deducted from any money due the Contractor. This deduction will not be considered a penalty, but as liquidated damages. In subsection , delete the schedule of liquidated damages and replace with the following: Original Contract Amount ($) To And From More Than Including Liquidated Damages per Calendar Day ($) 0 100, , , , , ,000 1,000, ,000,000 2,000,000 1,259 2,000,000 4,000,000 1,514 4,000,000 10,000,000 1,984 10,000,000 '''''' 1,984 plus 217 Per Each Additional 1,000,000 Contract Amount or Part Thereof Over 10,000,000 XVI. ACCEPTANCE PROBATIONARY ACCEPTANCE PROCESS Once construction is complete, the contractor will request a probationary acceptance inspection. The letter shall designate a contact person for the contractor including an address and a telephone number. 4

5 The letter shall include this statement signed by the contractor: I hereby affirm that the public Road Improvements for (Name of subdivision, road, or project) have been constructed in substantial compliance with the construction plans provided by Park County. The letter containing this certification statement shall be accompanied by independent test verification by a Colorado registered professional engineer. Such verification shall consist of acceptable destructive or nondestructive tests an evaluation report based on those tests, which substantiate compliance to the accepted plans. ACCEPTANCE INSPECTION SCHEDULING Once the county receives a probationary acceptance inspection request, the county will inspect the improvement, within ten (10) working days after notice and, if the improvements are in substantial compliance with the plans and specifications, shall accept such improvements. This shall constitute Probationary Acceptance of the improvements. NOTIFICATION OF DEFICIENCIES Within ten (10) working days following an acceptance inspection, the County shall provide the contractor a written list of deficiencies for the public improvements. These deficiencies must be re-certified by the applicant as a condition of the County granting Probationary Acceptance. RE-INSPECTIONS When the Contractor completes the repairs according to the deficiency list previously provided, a re-inspection may be scheduled by calling the county. GRANTING PROBATIONARY ACCEPTANCE The County will grant Probationary Acceptance based on re-inspection for compliance with the written deficiency list previously provided to the Contractor. If new deficiencies are found, either in quality or extent of construction, the Contractor shall be notified in writing that these new deficiencies shall be corrected as a condition of final acceptance. Probationary Acceptance will not be delayed by discovery of new deficiencies. The County shall issue written notice either granting or withholding probationary acceptance within ten (10) working days of the acceptance reinspection. If acceptance is denied, deficiencies shall be explicitly delineated. The probationary acceptance letter shall specify the date on which the Contractor is eligible to request Final Acceptance. 5

6 The one-year warranty period starts once Probationary Acceptance is granted. During the one-year warranty period, the contractor shall be responsible for all corrective or preventative maintenance as requested by the Park County Public Works in writing, to ensure that all improvements are without defects for the one-year warranty period. Such maintenance shall commence within thirty (30) calendar days after receipt of said written request (weather permitting). FINAL ACCEPTANCE After the one-year warranty period as outlined in the contract and the Probationary Acceptance documents have been met, the contractor may request Final Acceptance, within ninety (90) days but not less than thirty (30) days prior to expiration of warranty. The County will then inspect the road improvements, and shall notify the contractor in writing within ten (10) working days of inspection of either non-acceptance or final acceptance. If the improvements are not acceptable, the reasons for non-acceptance shall be stated in writing and corrective measures shall be taken by the contractor to a compliance schedule prescribed by the County after consultation with the contactor. During the field inspection a listing of items requiring remedial action (punch list) will be prepared. This list of items shall be issued to the Contractor within ten (10) working days of completing the inspection. Upon satisfactory completion of this final inspection, the Park County Public Works shall issue a Final Acceptance Certificate within ten (10) working days of the reinspection. All bonds held by Park County will be released only after Final Acceptance. 6

7 MATERIAL SPECIFICATIONS Material specifications are as follows: EMULSION: CRS-2P or CRS-2R Polymerized cationic rapid set emulsified asphalt (CRS-2P) shall be an emulsified blend of polymerized asphalt, water, and emulsifiers. The asphalt cement shall be polymer modified prior to emulsification and shall contain a minimum of 3% styrene-butadiene-styrene (SBS) block copolymer by weight of asphalt cement. The emulsion, standing undisturbed for a minimum of 24 hours, shall show no milky white separation, but shall be smooth and homogeneous throughout. The emulsion shall be pump able and suitable for application through a distributor truck. The CRS-2P shall conform to the following specifications: Test on Emulsion Minimum Maximum Test Method Viscosity, Saybolt-Furol, 50 C (122 F), seconds AASHTO T59 Storage Stability Test, 24-hr., % 1.0 AASHTO T59 Demulsibility, 0.02N CaCl 2, % 40 AASHTO T59 Particle Charge Test Positive AASHTO T59 Sieve Test, % 0.10 AASHTO T59 Distillation: Oil Distillate, by Volume of Emulsion, % 3.0 AASHTO T59 Residue, % 65 AASHTO T59 Test on Residue Minimum Maximum Test Method Penetration, 25 C (77 F), 100g, 5 sec AASHTO T49 Solubility in Trichloroethylene, % 97.5 AASHTO T44 Toughness, 25 C (77 F), in-lb 70 CPL 2210 Tenacity, 25 C (77 F), in-lb 45 CPL 2210 Latex Modified Emulsion: Latex Modified Cationic Rapid Set emulsion (CRS-2R) shall be an emulsified blend of asphalt, water, emulsifiers, and latex polymer. The emulsion shall contain a minimum of three percent (3.0%) styrene-butadiene latex rubber (SBR) solids by weight of asphalt cement. The SBR polymer dispersion shall be co-milled during the emulsification process such that a bi-continuous polymer-asphalt network is formed upon curing of the finished emulsion. The emulsion shall be pump able and suitable for application through a distributor truck. The emulsified asphalt shall conform to the following requirements: 7

8 Tests on CRS-2R Emulsion Minimum Maximum Test Method Test Method Viscosity, Saybolt Furol, 50 C, sec, (a) ASTM D 244 AASHTO T-59 Storage Stability Test, 24-h, % (a) 1.0 ASTM D 6930 AASHTO T-59 Demulsibility, 35 ml, 0.8% Dioctyl Sodium Sulfosuccinate, % 40 ASTM D 6936 AASHTO T-59 Particle Charge Test Positive ASTM D 244 AASHTO T-59 Sieve Test, % (a) 0.1 ASTM D 6933 AASHTO T-59 Distillation: (b) AASHTO T 59 AASHTO T-59 Oil Distillate, by Volume of Emulsion, % 3.0 AASHTO T 59 AASHTO T-59 Residue, % 65 AASHTO T 59 Tests on Residue (b) Penetration, 25 C, 100g, 5s, dmm ASTM D 5 AASHTO T-49 Dustility, 4 C, 5 cm/min, cm 40 ASTM D 113 AASHTO T-51 Solubility in Trichloroethylene, % 97.5 ASTM D 2042 AASHTO T-53 Toughness, in-lb 90 ASTM D 5801 AASHTO D5801 Tenacity, in-lb 60 ASTM D 5801 AASHTO D5801 Certificates of Analysis shall be submitted upon request and must show that the specifications listed above have been met. The source of the base asphalt, polymer, additives, and supplier shall not change during the course of construction. Emulsion for Prime Coat The emulsion shall be pump able and suitable for application through a distributor truck. The emulsion shall be circulated before used in not used within 24 hours. The emulsified asphalt shall conform to the following requirements: Property Requirement AASHTO Test No. Viscosity, Saybolt Furol, at T59 50 C (122 F), s Residue, % 65% min. T59 to 260 C (500 F) Oil Distillate by Volume, % 7% min, T59 Tests on Residue from Distillation: Solubility in 97.5 min. T44 Trichloroethylene, % Certificates of Analysis shall be submitted upon request and must show that the specifications listed above have been met. The source of the base asphalt, polymer, additives, and supplier shall not change during the course of construction. 8

9 Aggregate Cover Coat Material: Aggregate for Cover Coat Material (2011 Standard Specifications for Road and Bridge Construction). Aggregate for cover coat material shall be crushed stone, crushed slag, crushed gravel, or natural gravel. Aggregates shall be composed of clean, tough, durable fragments free from an excess of flat, elongated, soft or disintegrated pieces and free from fragments coated with dirt or other objectionable matter. In addition, the aggregate should be clean and free from dirt, excess fines and other deleterious substances. It should not be coated with dust or contain clay or silt. Gradation Requirements (percent passing) Sieve 1/2" Chip 3/8 Chip Size 3/4" Chip 3/4" 100 1/2" /8" No No The aggregate shall have maximum loss of 35% when tested with the LA Abrasion procedure as defined by AASHTO T96. 9

10 CONSTRUCTION REQUIREMENTS MATERIAL APPLICATION RATES Materials ¾ ½ 3/8 CRS-2P Gallon / SY Gallons / SY Gallons / SY Fog Seal 0.15 Gallons / SY 0.15 Gallons / SY 0.15 Gallons / SY Cover Coat Aggregate lbs / SY lbs / SY lbs / SY The specific emulsion and cover aggregate application rate shall be determined using factors such as surface temperature, traffic volume, existing road conditions and time of year. The Contractor may alter the application rate at any time during the course of the construction upon approval by the Project Manager. Weather Limitations: The Chip Seal shall not be applied when the pavement is moist or when the weather is or may be detrimental. Detrimental weather is defined as rain showers, cool temperatures, moist pavements, threat of rain showers or other factors which could affect the performance of the Chip Seal construction. Chip Seal shall be applied only when the road surface temperature is 60 and the ambient temperature is 50 F and rising. 10

CAPE SEAL SPECIFICATIONS

CAPE SEAL SPECIFICATIONS CAPE SEAL SPECIFICATIONS DESCRIPTION The Contractor shall furnish all labor, equipment, material, supplies, environmental protection, no parks, raised markers, signage, traffic control, secondary sweeping,

More information

ITEM 25 CHIP SEAL MATERIALS 2 A. Non-Polymer Modified Asphalt Emulsion (Fog Seal) 2 B. Polymer Modified Asphalt Emulsion Binder 2

ITEM 25 CHIP SEAL MATERIALS 2 A. Non-Polymer Modified Asphalt Emulsion (Fog Seal) 2 B. Polymer Modified Asphalt Emulsion Binder 2 ITEM 25 CHIP SEAL 25.1 DESCRIPTION 2 25.2 MATERIALS 2 A. Non-Polymer Modified Asphalt Emulsion (Fog Seal) 2 B. Polymer Modified Asphalt Emulsion Binder 2 25.3 AGGREGATES 3 25.4 MIX DESIGN 4 25.5 EQUIPMENT

More information

SUPPLEMENTAL SPECIFICATION HIGH PERFORMANCE CHIP SEAL

SUPPLEMENTAL SPECIFICATION HIGH PERFORMANCE CHIP SEAL May 21, 2008 HIGH PERFORMANCE CHIP SEAL 411 High Performance Chip Seal 411.1 Description High Performance Chip Seal is a high macro-texture surface treatment that is applied in a continuous operation.

More information

Recommended Performance Guideline For Chip Seal

Recommended Performance Guideline For Chip Seal ISSA A165 Issued November 2012 Recommended Performance Guideline For Chip Seal A165 NOTICE It is not intended or recommended that this guideline be used as a verbatim specification. It should be used as

More information

SPECIFICATIONS FOR NEW WORK CHIP SEAL

SPECIFICATIONS FOR NEW WORK CHIP SEAL SPECIFICATIONS FOR NEW WORK CHIP SEAL 1.0 DEFINITIONS The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. The term Designee shall mean an employee

More information

Special Provision for Hot-Mix Asphalt Prime Coat

Special Provision for Hot-Mix Asphalt Prime Coat All Regional Engineers Omer M. Osman, P.E. Special Provision for Hot-Mix Asphalt Prime Coat July 25, 2014 This special provision was developed by the Bureau of Materials and Physical Research to improve

More information

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007 Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION March 22, 2007 Description: This work consists of furnishing and applying asphalt rubber binder followed by an application of treated cover aggregate

More information

S-1 (2356) BITUMINOUS SEAL COAT REVISED 9/26/07 SP Mn/DOT 2356 is deleted and replaced by the following:

S-1 (2356) BITUMINOUS SEAL COAT REVISED 9/26/07 SP Mn/DOT 2356 is deleted and replaced by the following: S-1 (2356) BITUMINOUS SEAL COAT REVISED 9/26/07 SP2005-136 Mn/DOT 2356 is deleted and replaced by the following: S-1.1 DESCRIPTION Construct a seal coat on a prepared surface. A seal coat is the application

More information

SPECIFICATIONS FOR DOUBLE CHIP SEAL

SPECIFICATIONS FOR DOUBLE CHIP SEAL SPECIFICATIONS FOR DOUBLE CHIP SEAL 1.0 DEFINITIONS The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. The term Designee shall mean an employee

More information

SPECIFICATIONS FOR SAND SEAL

SPECIFICATIONS FOR SAND SEAL SPECIFICATIONS FOR SAND SEAL 1.0 DEFINITIONS The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. The term Designee shall mean an employee of the

More information

Section 508. CHIP SEALS Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal.

Section 508. CHIP SEALS Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal. 508.01 Section 508. CHIP SEALS 508.01 Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal. 508.02 Materials. Use materials meeting the following.

More information

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method

Extraction and Sieve Analysis ( µm minus) Forming Marshall Specimens, Field Method 3.56 COLD IN-PLACE RECYCLING 3.56.1 GENERAL This specification covers the requirements for Cold In-Place Recycling (CIR) which consists of reclaiming the existing asphalt pavement; sizing the reclaimed

More information

The GREENBOOK 2015 Standard Specifications for Public Works Construction

The GREENBOOK 2015 Standard Specifications for Public Works Construction 203-3.4.4 Rubberized Polymer Modified Emulsion (RPME). 203-4.4.4.1 General. RPME shall consist of a mixture of emulsified asphalt, crumb rubber, and latex. RMPE shall contain between 0.55 pounds per gallon

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION During the early 1960s, the Virginia Department of Transportation undertook a program to upgrade aggregate materials. The Department felt this was necessary since the highway construction

More information

Section 505. CHIP SEALS

Section 505. CHIP SEALS Section 505. CHIP SEALS 505.01. Description. This work consists of preparing the pavement surface and providing and placing a single chip seal, double chip seal, or shoulder chip seal. 505.02. Materials.

More information

50 C (122 F) (1) - - Settlement, 5 days, % Storage Stability Test, 24 hours, % 1 max. 1 max. 1 max. 1 max. 1 max.

50 C (122 F) (1) - - Settlement, 5 days, % Storage Stability Test, 24 hours, % 1 max. 1 max. 1 max. 1 max. 1 max. State: New York Date: 3/14/13 Field Engineer: Zoeb Zavery Materials: Re: Section 702-Bituminous Materials Web Address: www.dot.ny.gov Contact Info: zzavery@dot.state.ny.us New York Table 1: Requirements

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 321216 - ASPHALT PAVING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Town of Wascott Advertisement for Bids ROAD MAINTENANCE PROJECTS

Town of Wascott Advertisement for Bids ROAD MAINTENANCE PROJECTS Advertisement for Bids ROAD MAINTENANCE PROJECTS Notice is hereby given by the Town of Wascott, Douglas County, WI, that it will receive sealed bids for crack routing and sealing, chip seal coating, and

More information

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE 1.0 DEFINITIONS The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. The term Designee

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase.

The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase. SECTION 20.22 LEVELING COURSE Article 22.1 General The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase. Article

More information

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings SECTION 32 12 36 SEAL COATS PART 1 GENERAL 1.1 RELATED WORK A. Section 31 10 00: Site Preparation B. Section 32 12 00: Flexible Paving C. Section 32 17 23 01: Traffic Striping and Pavement Markings 1.2

More information

SECTION 20 INDEX PAVING FABRIC 1. SCOPE OF WORK MATERIAL REQUIREMENTS CONSTRUCTION AND INSTALLATION REQUIREMENTS...

SECTION 20 INDEX PAVING FABRIC 1. SCOPE OF WORK MATERIAL REQUIREMENTS CONSTRUCTION AND INSTALLATION REQUIREMENTS... SECTION 20 INDEX PAVING FABRIC 1. SCOPE OF WORK... 20-2 2. MATERIAL REQUIREMENTS... 20-2 3. CONSTRUCTION AND INSTALLATION REQUIREMENTS... 20-2 4. METHOD OF MEASUREMENT... 20-5 20-1 SECTION 20 PAVING FABRIC

More information

MISSISSIPPI DEPARTMENT OF TRANSPORTATION

MISSISSIPPI DEPARTMENT OF TRANSPORTATION MISSISSIPPI DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION NO. 907-405-6 CODE: (SP SUBJECT: Micro-Surfacing Section 405, Micro-Surfacing, is hereby added to and made a part of the 2004 Edition of the Mississippi

More information

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio. Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio. General Conditions Scope: It is the intent of these specifications

More information

SECTION FLEXIBLE PAVING

SECTION FLEXIBLE PAVING SECTION 321200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Include GENERAL CONDITIONS and applicable parts of Division 1 as part of this Section. B. Examine all Drawings and other Sections of the Specifications

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL

City of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL January 2000 Page 1 of 10 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 APPROVALS PART 2 PRODUCTS 2.01 CEMENT 2.02 WATER The General Conditions of the Contract,

More information

MIDLAND COUNTY ROAD COMMISSION

MIDLAND COUNTY ROAD COMMISSION MIDLAND COUNTY ROAD COMMISSION BID FORM Sealed Proposals will be received at the office of the Board of Road Commissioners, County of Midland, at 2334 N. Meridian Road, Sanford, Michigan, 48657, until:

More information

Attachment 10 Detailed Specifications Group IFB (Revised December 8, 2017) Fine and Coarse Aggregates (Statewide)

Attachment 10 Detailed Specifications Group IFB (Revised December 8, 2017) Fine and Coarse Aggregates (Statewide) Attachment 10 Detailed Specifications Group 33700 IFB 23097 (Revised December 8, 2017) Fine and Coarse Aggregates (Statewide) GROUP 33700 FINE AND COARSE AGGREGATES Page 2 of 14 CONTENTS REFERENCES:...

More information

ADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA

ADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA ADDENDUM NO. 1 FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA Bids to be received until 2:00 p.m., local time, July 9, 2012 SPECIFICATIONS Delete Section 00 41 53 Bid Unit Price in

More information

SECTION 3: SUB BASE AND BASE COURSES

SECTION 3: SUB BASE AND BASE COURSES SECTION 3: SUB BASE AND BASE COURSES Page i TABLE OF CONTENTS SECTION 3: SUB BASE AND BASE COURSES i SECTION 3.01 MATERIALS FOR SUB-BASE AND BASE COURSES 1 3.01.01 SCOPE 1 3.01.02 GENERAL 1 3.01.03 GRANULAR

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING)

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING) S312EM2-1110 VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LATEX MODIFIED EMULSION TREATMENT (MICRO-SURFACING) August 10, 2010 I. DESCRIPTION This work shall include furnishing and placing

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782 Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782 Members of the Red Fox Run Property Owner s Association, Inc. Attached are the guidelines of the Architectural Review Committee

More information

WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS

WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALL ITEMS MUST BE COMPLETED BY CONTRACTOR CALL NUMBER CONTRACTOR S NAME CONTRACTOR S FEIN BID AMOUNT DBE GOAL (%) WV LICENSE NUMBER CONTRACTOR

More information

ITEM P-631 REFINED COAL TAR EMULSION WITH ADDITIVES, SLURRY SEAL SURFACE TREATMENT

ITEM P-631 REFINED COAL TAR EMULSION WITH ADDITIVES, SLURRY SEAL SURFACE TREATMENT 9/30/2009 AC 150/5370-10E ITEM P-631 REFINED COAL TAR EMULSION WITH ADDITIVES, SLURRY SEAL SURFACE TREATMENT 631-1.1 GENERAL. This item shall consist of a mixture of refined coal tar emulsion, mineral

More information

Section 504. MICRO-SURFACING

Section 504. MICRO-SURFACING 504.01 Section 504. MICRO-SURFACING 504.01. Description. This work consists of preparing existing pavement and providing and placing a micro-surfacing mixture. 504.02. Materials. Provide materials in accordance

More information

SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING

SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING 402.1 Description. This work shall consist of placing, spreading and compacting a bituminous mixture as shown on the plans or as directed by the engineer.

More information

CRACK ROUTING AND SEALING And CHIP SEAL COATING BIDS 2012

CRACK ROUTING AND SEALING And CHIP SEAL COATING BIDS 2012 CRACK ROUTING AND SEALING And CHIP SEAL COATING BIDS General Inmation Bidders Sealed bids must be received by 12:00 Noon, Monday, April 23, at the Wascott Town Hall as stated in the public notice and advertisement

More information

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2 CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2 7.1. GENERAL.... 2 7.1.1. Inspection Restriction Dates.... 2 7.1.2. Complete Improvements.... 2 7.1.3. Public Improvements.... 2 7.1.4. Warranty

More information

Townline Road Middle Village Road then south 4800 feet.

Townline Road Middle Village Road then south 4800 feet. 05/10/2017 Townline Road Middle Village Road then south 4800 feet. Project: Project Stations: 0.91 miles of asphalt wedging and 2 inch HMA Paving, gravel 0+00 P.O.B. Middle Village Road shoulders, and

More information

2016 ACHD Supplemental Specifications to the ISPWC. ACHD QC-QA Procedure

2016 ACHD Supplemental Specifications to the ISPWC. ACHD QC-QA Procedure SECTION 100 General Conditions Add the following: 2016 ACHD Supplemental Specifications to the ISPWC Ada County Highway District Quality Control and Quality Assurance Procedure Definitions Quality Assurance

More information

Cement Stabilized Soil (CSS) (Portland cement)

Cement Stabilized Soil (CSS) (Portland cement) Cement Stabilized Soil (CSS) (Portland cement) 1.0 DESCRIPTION. This specification shall govern the process known as Cement Stabilized Soil (CSS). CSS consists of mixing the existing base, subbase and

More information

INVITATION TO BID ON TOWN PAVING PROJECTS

INVITATION TO BID ON TOWN PAVING PROJECTS INVITATION TO BID ON TOWN PAVING PROJECTS Offers shall be clearly labeled Paving Bid and submitted to: Town of Madison Paving Bid Attn: Tim Curtis, Town Manager 26 Weston Ave Madison, ME 04950 Bid opening:

More information

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas.

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas. SECTION 1300 - ASPHALTIC CONCRETE PAVEMENT 1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas. 1302 GENERAL. Pavement shall be constructed to the lines, grades,

More information

SECTION BITUMINOUS CONCRETE PAVEMENT

SECTION BITUMINOUS CONCRETE PAVEMENT SECTION 321216 BITUMINOUS CONCRETE PAVEMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Chip Sealing The Nuts and Bolts. Thomas J. Wood Research Project Supervisor MN/DOT

Chip Sealing The Nuts and Bolts. Thomas J. Wood Research Project Supervisor MN/DOT Chip Sealing The Nuts and Bolts Thomas J. Wood Research Project Supervisor MN/DOT Why do we do Pavement Preservation? The Answer is? To keep new pavements new longer! Is Pavement Preservation Cost Effective

More information

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES AGGREGATE BASES PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, accessories, and equipment necessary

More information

CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS

CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS CHAPTER 500 STREET PAVEMENTS, CURB, GUTTER AND SIDEWALK CONSTRUCTION SPECIFICATIONS The following list of Standard Documents defines the methods, materials, and testing to be utilized when designing and

More information

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating

More information

Item P-629 Thermoplastic Coal Tar Emulsion Surface Treatments Micro-Surface Type A

Item P-629 Thermoplastic Coal Tar Emulsion Surface Treatments Micro-Surface Type A Item P-629 Thermoplastic Coal Tar Emulsion Surface Treatments Micro-Surface Type A DESCRIPTION 629-1.1. This item shall consist of an application of a Thermoplastic Resin Coal Tar Emulsion Micro- Surface,

More information

County of Park PARK COUNTY WYOMING PRIVATE SOURCE GRAVEL POWELL AREA PRODUCE TO STOCKPILE REQUEST FOR QUOTE

County of Park PARK COUNTY WYOMING PRIVATE SOURCE GRAVEL POWELL AREA PRODUCE TO STOCKPILE REQUEST FOR QUOTE PUBLIC WORKS DEPARTMENT Brian J. Edwards, PE Park County Engineer Road & Bridge and Engineering 527-8520 or 754-8520 PARK COUNTY, WYOMING ORGANIZED 1911 ORIGINAL PARK COUNTY COURTHOUSE CODY, WYOMING COMPLETED

More information

Aggregate Specifications

Aggregate Specifications Qualified Aggregate Technician Kentucky Specifications Aggregate Specifications State, FHWA, FAA, Contractor Kentucky Transportation Cabinet 107 Aggregate Size Designations Nominal Maximum Size The largest

More information

BSS 200 Synthetic Track Surfacing System System Specifications

BSS 200 Synthetic Track Surfacing System System Specifications BSS 200 Synthetic Track Surfacing System System Specifications G.3 - Bidder: FieldTurf USA, Inc. Part I - General 1.1 - Scope The synthetic surfacing contractor shall furnish all labor, materials, equipment,

More information

BID PACKAGE AND SPECIFICATIONS FOR ASPHALT PAVING CITY OF LAFAYETTE

BID PACKAGE AND SPECIFICATIONS FOR ASPHALT PAVING CITY OF LAFAYETTE BID PACKAGE AND SPECIFICATIONS FOR ASPHALT PAVING CITY OF LAFAYETTE EXHIBIT A TECHNICAL SPECIFICATIONS ASPHALT OVERLAY CITY OF LAFAYETTE 2 ROADWAY CONSTRUCTION A-01 Modifications To Tennessee Department

More information

Statewide Implementation of the SPG Specification for Chip Seal Binders in Service

Statewide Implementation of the SPG Specification for Chip Seal Binders in Service Statewide Implementation of the SPG Specification for Chip Seal Binders in Service TxDOT Implementation Project 5-6616 Darren Hazlett, Jerry Peterson Amy Epps Martin, Edith Arambula Tom Freeman, Jon Epps

More information

SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG):

SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG): SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG): ARHM-GG shall conform to the provisions for Type "A" asphalt concrete in Section 39, "Asphalt Concrete," of the State Standard Specifications

More information

BID # REPAIR AREA OF PARKING LOT DAMAGED BY WATER LINE LEAK SECTION C TECHNICAL SPECIFICATIONS OWNER

BID # REPAIR AREA OF PARKING LOT DAMAGED BY WATER LINE LEAK SECTION C TECHNICAL SPECIFICATIONS OWNER BID # 14-47 REPAIR AREA OF PARKING LOT DAMAGED BY WATER LINE LEAK SECTION C TECHNICAL SPECIFICATIONS OWNER Board of Trustees Middlesex County College 2600 Woodbridge Avenue P.O. Box 3050 Edison, New Jersey

More information

DIVISION 300 BASES AND GRANULAR SURFACES SECTION 301 LIME TREATED SUBGRADE

DIVISION 300 BASES AND GRANULAR SURFACES SECTION 301 LIME TREATED SUBGRADE DIVISION 300 BASES AND GRANULAR SURFACES SECTION 301 LIME TREATED SUBGRADE 301 301.01 Description. This item shall consist of treating the existing subgrade with water and lime according to these specifications

More information

DIVISION 40 ASPHALT SURFACING

DIVISION 40 ASPHALT SURFACING JOINT BASE ELMENDORF-RICHARDSON STANDARD CONSTRUCTION SPECIFICATIONS DIVISION 40 ASPHALT SURFACING 2015 Rev.001 714 FOURTH AVENUE, SUITE 100 FAIRBANKS, ALASKA PO Box 74040 FAIRBANKS, AK 99707 (907) 455-1500

More information

PERMIT TO EXCAVATE IN HIGHWAY CHESHIRE, CONNECTICUT

PERMIT TO EXCAVATE IN HIGHWAY CHESHIRE, CONNECTICUT PERMIT TO EXCAVATE IN HIGHWAY CHESHIRE, CONNECTICUT PERMIT # DATE: Name Of Applicant Address City, State, Zip ( ) Fax: ( ) Email Telephone Number permit faxed (date) permit emailed (date) Permission is

More information

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS The City of Blue Springs hereby adopts Section 2200 of the Kansas City Metropolitan Chapter of APWA Construction and Material

More information

MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS

MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 1004 NOVEMBER 2012 MATERIAL SPECIFICATION FOR AGGREGATES - MISCELLANEOUS TABLE OF CONTENTS 1004.01 SCOPE 1004.02 REFERENCES 1004.03 DEFINITIONS

More information

SECTION HIGH DENSITY MINERAL BOND

SECTION HIGH DENSITY MINERAL BOND SECTION 32 01 13.68 HIGH DENSITY MINERAL BOND PART 1 GENERAL 1.1. SECTION INCLUDES A. Mineral aggregate and asphalt binder slurry spread as a high density mineral bond seal coat over a roadway surface.

More information

SECTION 904 AGGREGATES

SECTION 904 AGGREGATES SECTION 904 AGGREGATES 904.01 Aggregates. Aggregates shall consist of natural or manufactured materials produced from but not limited to limestone, dolomite, gravels, sandstones, steel furnace slag (SF),

More information

Item 20 ASPHALT PAVEMENT MATERIALS

Item 20 ASPHALT PAVEMENT MATERIALS Item 20 ASPHALT PAVEMENT MATERIALS 20.1 DESCRIPTION 3 A Definition of Terms 3 B Contractor Process Control 3 20.2 MATERIALS 4 A Aggregate 4 B Reclaimed Asphalt Pavement (RAP) 6 Quality of RAP 6 Process

More information

SECTION ASPHALT PAVING

SECTION ASPHALT PAVING SECTION 32 12 16 SPEC WRITER NOTE: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

Special Provision No. 305S02 January 2016

Special Provision No. 305S02 January 2016 GRANULAR SEALING - Item No. Special Provision No. 305S02 January 2016 Amendment to OPSS 305, March 1998 OPSS 305, March 1998, Construction Specification for Granular Sealing is deleted in its entirety

More information

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY Guidance on restoration of City Rights-of-Way Public Works Department Directors Office 747 Market Street Suite 408 Tacoma, WA 98402 253-591-5525 Right-of-Way

More information

BIO-AQUIFER STORM SYSTEM

BIO-AQUIFER STORM SYSTEM BIO-AQUIFER STORM SYSTEM Specifications for Construction PART 1 GENERAL 1.01 SECTION INCLUDES A. Providing labor, materials, tools and equipment to furnish and install a permeable concrete paving stone

More information

SECTION Stabilizer Apache Warning Track Mix for baseball or softball field surfacing

SECTION Stabilizer Apache Warning Track Mix for baseball or softball field surfacing Stabilizer Solutions, Inc. 33 S. 28 th St. Phoenix, AZ 85034 800-336-2468 (Fax) 602-225-5902 Website: stabilizersolutions.com E-Mail: info@stabilizersolutions.com SECTION 1 STABILIZER APACHE WARNING TRACK

More information

BID INSTRUCTIONS. Montour County Courthouse Retaining Wall Repair Project

BID INSTRUCTIONS. Montour County Courthouse Retaining Wall Repair Project BID INSTRUCTIONS Montour County Courthouse Retaining Wall Repair Project The Montour County Commissioners are receiving bids for the Courthouse Retaining Wall Repair Project. The parking lot is located

More information

Recommended Specifications For Portland Cement Pervious Pavement

Recommended Specifications For Portland Cement Pervious Pavement Recommended Specifications For Portland Cement Pervious Pavement Foreword Portland Cement Pervious Concrete Pavements have become increasingly popular as a method to meet water quality water run off regulations

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCESA / NASA UFGS-32 11 10 (August 2008) --------------------------- Preparing Activity: USACE Superseding UFGS-32 11 10 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

Bid Requirements Chip Seal & Fog Seal

Bid Requirements Chip Seal & Fog Seal 3-7-18 Bid Requirements The Roscommon County Road Commission (RCRC) will receive sealed bids until 2:00 p.m. on Wednesday, April 4th, 2018. (Bids will be opened at 2:00 p.m. for tabulation and review.

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PRICE ADJUSTMENTS ON PERFORMANCE GRADE ASPHALT BINDERS

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PRICE ADJUSTMENTS ON PERFORMANCE GRADE ASPHALT BINDERS MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PRICE ADJUSTMENTS ON PERFORMANCE GRADE ASPHALT BINDERS CFS:TRC 1 of 6 APPR:KPK:JWB:06-06-16 FHWA:APPR:06-07-16 a. Description. This special provision

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

Everything you need to know about Chip Seals and Fog Seals

Everything you need to know about Chip Seals and Fog Seals 1 Everything you need to know about Chip Seals and Fog Seals March 22-24, 2016 Nashville, TN www.worldofasphalt.com Preventive maintenance treatments Time or traffic Rehabilitate 1 The right treatment

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

BSS 50 Synthetic Track Surfacing System Specifications

BSS 50 Synthetic Track Surfacing System Specifications BSS 50 Synthetic Track Surfacing System Specifications Part 1 - General 1.1 - Scope The synthetic surfacing contractor shall furnish all labor, materials, equipment, supervision, and services necessary

More information

Section 409. Chip and Fog Seals

Section 409. Chip and Fog Seals Section 409 Chip and Fog Seals PRECONSTRUCTION: Obtain from the contractor the supply sources for the chips, blotter material (if needed) and asphalt to be used on the project. Ensure the results of compatibility

More information

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS April 1, 2009 CITY OF PORTSMOUTH Public Works Department Bid #54-09 2009 Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS This Addendum forms part of the original document marked Bid #54-09 2009

More information

BASE CONSTRUCTION MATERIALS A Aggregate

BASE CONSTRUCTION MATERIALS A Aggregate BASE CONSTRUCTION 2211 AGGREGATE BASE 2211.1 DESCRIPTION This work consists of placing aggregate base. 2211.2 MATERIALS A Aggregate... 3138 Provide the class of aggregate as required by the contract. 2211.3

More information

CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT

CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 304 NOVEMBER 2016 CONSTRUCTION SPECIFICATION FOR SINGLE AND DOUBLE SURFACE TREATMENT TABLE OF CONTENTS 304.01 SCOPE 304.02 REFERENCES 304.03 DEFINITIONS

More information

MATERIAL SPECIFICATION FOR AGGREGATES - BASE, SUBBASE, SELECT SUBGRADE, AND BACKFILL MATERIAL

MATERIAL SPECIFICATION FOR AGGREGATES - BASE, SUBBASE, SELECT SUBGRADE, AND BACKFILL MATERIAL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 1010 NOVEMBER 2013 MATERIAL SPECIFICATION FOR AGGREGATES - BASE, SUBBASE, SELECT SUBGRADE, AND BACKFILL MATERIAL TABLE OF CONTENTS 1010.01 SCOPE

More information

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS

SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS Delete this Section in its entirety and replace with the following: SECTION 905 TRAFFIC SIGNS, STRIPING AND RAISED MARKERS 905-1 DESCRIPTION: This

More information

SECTION 301 SELECTED MATERIAL SUBBASE DESCRIPTION

SECTION 301 SELECTED MATERIAL SUBBASE DESCRIPTION 301 SECTION 301 SELECTED MATERIAL SUBBASE DESCRIPTION 301.01.01 GENERAL A. This work shall consist of excavating and placing selected granular materials in one or more courses for subbase in accordance

More information

Section 25 Aggregate Subbase

Section 25 Aggregate Subbase Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION A. GRANULAR

More information

Asphalt Technology Division

Asphalt Technology Division Chandra Akisetty, Division Chief 443-572-5051 Rebeccah Smith, Assistant Division Chief Field Operations 443-572-5112 Robert Voelkel, Assistant Division Chief Laboratory 443-572-5113 Asphalt Additives Anti-Strip

More information

ITEM 302 AGGREGATES FOR SURFACE TREATMENTS

ITEM 302 AGGREGATES FOR SURFACE TREATMENTS ITEM 302 AGGREGATES FOR SURFACE TREATMENTS 302.1. Description. This Item shall govern for aggregates and precoated aggregates used in the construction of surface treatments. 302.2. Materials. (1) Aggregates.

More information

AMENDMENTS TO OPSS 914 (SEPT 88) CONSTRUCTION SPECIFICATION FOR WATERPROOFING BRIDGE DECKS ASPHALTIC MEMBRANE 1

AMENDMENTS TO OPSS 914 (SEPT 88) CONSTRUCTION SPECIFICATION FOR WATERPROOFING BRIDGE DECKS ASPHALTIC MEMBRANE 1 Works and Emergency Services CITY OF TORONTO TS 914 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 AMENDMENTS TO OPSS 914 (SEPT 88) CONSTRUCTION SPECIFICATION FOR WATERPROOFING

More information

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING

507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL SECTION 507 SLURRY SEAL AND MICRO-SURFACING 507 SLURRY SEAL AND MICRO-SURFACING 1 of 8 CATEGORY 500 PAVING SECTION 507 SLURRY SEAL 489 DELETE: SECTION 507 SLURRY SEAL in its entirety. INSERT: The following. SECTION 507 SLURRY SEAL AND MICRO-SURFACING

More information

MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL

MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1001 NOVEMBER 2013 MATERIAL SPECIFICATION FOR AGGREGATES - GENERAL TABLE OF CONTENTS 1001.01 SCOPE 1001.02 REFERENCES 1001.03 DEFINITIONS 1001.04 DESIGN

More information

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION

CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION 700.00 MATERIALS 701.00 PORTLAND CEMENT CONCRETE. This Specification covers all materials, classification, mix designs, proportioning and testing of portland cement concrete. All concrete except that used

More information

2014 Capital Project Phase 3 Grand Island Central School District Cannon Design Project No SECTION PAVING PART 1 - GENERAL

2014 Capital Project Phase 3 Grand Island Central School District Cannon Design Project No SECTION PAVING PART 1 - GENERAL SECTION 321200 - PAVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. The Contractor for this work shall be held to have read all of the Bidding Requirements, the Proposal Forms, the General Conditions of

More information

PERMEABLE ARTICULATING CONCRETE BLOCK (P-ACB) SPECIFICATION FOR PARKING LOTS, DRIVEWAYS, ALLEYS AND ROADWAYS

PERMEABLE ARTICULATING CONCRETE BLOCK (P-ACB) SPECIFICATION FOR PARKING LOTS, DRIVEWAYS, ALLEYS AND ROADWAYS PERMEABLE ARTICULATING CONCRETE BLOCK (P-ACB) SPECIFICATION FOR PARKING LOTS, DRIVEWAYS, ALLEYS AND ROADWAYS PART 1: GENERAL A. Definitions Contract Documents the Contract Documents establish the rights

More information

Standard Practice for High Friction Surface Treatment for Asphalt and Concrete Pavements AASHTO Designation: PP XX-13

Standard Practice for High Friction Surface Treatment for Asphalt and Concrete Pavements AASHTO Designation: PP XX-13 Standard Practice for High Friction Surface Treatment for Asphalt and Concrete Pavements AASHTO Designation: PP XX-13 American Association of State Highway and Transportation Officials 444 North Capitol

More information

SPECIFICATIONS Sodium Chloride (Bulk Road Salt)

SPECIFICATIONS Sodium Chloride (Bulk Road Salt) SPECIFICATIONS Sodium Chloride (Bulk Road Salt) CONTRACT SCOPE/OVERVIEW: This Collective No. CN00037341 (identified here and in the other documents as the Contract ) will cover the requirements of Commonwealth

More information

BIO-AQUIFER STORM SYSTEM

BIO-AQUIFER STORM SYSTEM BIO-AQUIFER STORM SYSTEM Specifications for Construction (Section 02780) PART 1 GENERAL 1.01 SECTION INCLUDES A. Providing labor, materials, tools and equipment to furnish and install a permeable concrete

More information

ITEM 340 DENSE-GRADED HOT-MIX ASPHALT (METHOD)

ITEM 340 DENSE-GRADED HOT-MIX ASPHALT (METHOD) ITEM 340 DENSE-GRADED HOT-MIX ASPHALT (METHOD) 340.1. Description. Construct a pavement layer composed of a compacted, dense-graded mixture of aggregate and asphalt binder mixed hot in a mixing plant.

More information