Strategies for Meeting California s High Performance Attics and Walls Prescriptive requirements in California s 2016 Building Energy Efficiency

Size: px
Start display at page:

Download "Strategies for Meeting California s High Performance Attics and Walls Prescriptive requirements in California s 2016 Building Energy Efficiency"

Transcription

1 Strategies for Meeting California s High Performance Attics and Walls Prescriptive requirements in California s 2016 Building Energy Efficiency Standards by Steve Easley, Steve Easley & Associates Inc.

2 Introduction High Performance Attics (HPA) and High Performance Walls (HPW) became prescriptive requirements in California s 2016 Building Energy Efficiency standards on January 1, These new standards have created challenges for the state s homebuilding industry, which faces a post-recession shortage of skilled labor, and limited experience with construction techniques necessary for code compliance. Workforce Instruction for Standards and Efficiency (WISE) is a training and education program designed to support the transition of California s new residential buildings towards HPA and HPW construction practices. Funded by the California Energy Commission s Electric Program Investment Charge Program, (EPIC) WISE is designed to help accelerate learning and implementation of high performance building by training workers and providing a platform for the exchange of best practices and solutions from industry experts. There have been significant changes in the energy standards that have reduced energy transfer and as a result reduced the drying potential of building assemblies. Long lasting structures require thoughtful integration of building product selection and best practices for building design and material installation. A significant goal of the WISE program is to educate the building industry to design and construct homes that are: 1. Durable and long lasting 2. Healthy to inhabit 3. Energy efficient and comfortable to live in To achieve these goals and create high performing homes it is important that industry professionals utilize sound principals of building science in each step of the design and construction process. Building science is the understanding of the interworking relationships between climate and the various products, assemblies and systems in a structure and how those relationships impact energy use, comfort, indoor air quality and building longevity. Homes are constructed from thousands of pieces put together by hundreds of people so there are many opportunities for errors and omissions that can negatively impact the durability, energy performance and the comfort of homes. There are also many approaches, processes and technologies that can lead to a highperformance home. 2

3 It is the goal of this commentary to illustrate and address the various technologies and techniques to meet California s prescriptive requirements for achieving HPAs, ducts in conditioned space and HPWs. This report is not intended to evaluate, recommended or censure specific manufactures or products. It is designed to educate the industry about: 1. Building science assessments regarding the HPA and HPW strategies. 2. Constructability 3. Benefits and challenges for HPA and HPW technologies Prescriptive Requirements: High Performance Attics (HPA) Figure1: Prescriptive Requirements for Roof Ceiling Insulation Rational for High Performance Attics and Ducts in Conditioned Space In most California homes the HVAC systems are in attics. This common practice has a large energy penalty because attics in warm weather can reach temperatures of over 130 degrees. HVAC ductwork insulation has much lower R-values, R-8, than attic insulation. If the attic temperature is 130 degrees and the air flowing through the ductwork is 55 degrees there is a 75-degree temperature difference between the conditioned air in the ductwork and the surrounding attic. This results in significant heat gain from reradiated solar energy in the summer and heat loss in the winter. 3

4 For example, if the surface area of R-8 ductwork in a 130 degree attic is 650 square feet the energy penalty in BTU s per hour = (Area x Temperature Difference)/Rvalue. BTUH = (650 x 75) /8 = 6,094 BTUH, or (1/2 ton) of cooling energy. (A ton of air conditioning = 12,000 BTUH. If a home has a 3-ton, (36,000) BTUH air conditioning system the energy penalty would be slightly over a 15%. This energy loss is further compounded by duct air leakage, which can draw 130 F or more of air into the system requiring the system to work much harder. The rationale for high performance attics is to reduce the attic temperature to as close as feasible to the ambient outdoor air temperature thus saving significant amounts of energy. The CEC Prescriptive Requirements Offer Three Solution Strategies 1. HPA-A: Option A Insulation Above the Roof Deck Sheathing or Rafters Option A utilizes an insulation system that has been used on flat, commercial roof decks for decades with good success. The procedure is to construct a standard vented attic with an additional layer of continuous insulation above and in contact with the roof deck, or on the bottom side of the roof deck over the rafters/trusses to reduce attic temperature. See Fig When the insulation is installed above the roof rafters it is directly in contact with the roof deck. An air gap between the roofing material and the continuous insulation can help reduce attic temperatures by convective cooling of the roofing materials. The code recognizes this and requires less insulation when an air gap is employed. This air gap can be furring or designed into the roofing material. Requirements: R-6 when an air gap is present R-8 when no air gap is present Radiant Barrier R-38 insulation above the ceiling lid A ventilated attic 4

5 Figure 2: Option A Continuous Rigid Insulation Above Roof Decking OSB Over and Under Continuous Rigid Insulation, Vented Attic Source: Building Science Corp. Figure 3: Nail Base Rigid insulation One Sided (One Sided Structural Insulated Panel SIP) Vented Attic 5

6 Figure 4: Asphalt Shingles and Furring Strips Installed With Above Deck Insulation Figure 5: Wedged Insulation Placed below Tile With No Air Gap 6

7 Climate Zone Requirements for Option A In general, option A is a solution in the climates zones where cooling is a significant use of energy. Climate zones 1-3 and 5-7 are predominately heating climates so this option is not requirred. Figure 6: Climate Zone Requirements for Option A Building Science Commentary HPA-A At first glance it seems illogical to place insulation above an already insulated and vented attic space. In conventional attics, the attic space temperature is significantly warmer on sunny days because the intense energy from the sun is absorbed in the roofing materials. This energy is then conducted through the roofing assembly and reradiated into the attic space which creates attic space temperatures of 130 F. or more. Placing secondary insulation, usually rigid foam panels, above the roof deck sheathing, or above the rafters, reduces the heat transfer of reradiated solar energy into the attic. This reduction of reradiated energy helps reduce attic temperatures to ambient outdoor temperatures, which are far lower than traditionally vented and insulated attics. Condensation at the underside of the roof deck is not a concern because the interior moisture is removed via traditional attic ventilation. The code states that if there is an air gap between the roofing materials and the roof deck (i.e. concrete roof tiles, or furring) the code allows for an R-6 instead of R-8 because the airspace provides ventilation under the roof deck, which enhances convective cooling of the roofing materials. For example, if standard asphalt shingles are applied directly over the roof deck sheathing, in a configuration that has 7

8 no air space, R-8 rigid insulation is required. An acceptable alternative to rigid insulation is insulated shingles or roofing products, which work using the same building science principles. All HPA-A strategies require a radiant barrier: typically foil covered roof decking facing the attic interior. The radiant barrier s low emissivity properties further reduce the radiation of heat into the attic space because shiny surfaces have difficult time re-radiating (emitting) energy. Figure 7: Example of An Insulated Roofing product HPA-A Constructability The HPA-A strategies do not impose foreign constructability issues. There are a variety of product choices in the market place. Many of these strategies have been used for decades and when properly installed do not pose any durability concerns. Additional labor and materials are required (except the insulating shingle approach) due the addition of rigid foam, potentially additional roof deck sheathing and wider trim boards at fascia and gable ends to cover the additional thickness of the system. Some roofing product manufacturers require a structural sheathing product directly below and in contact with their roofing products for support, which will require additional labor and materials. HPA-A does not impose significant scheduling issues. The roofing or framing contractor can install the insulation. Note: Rigid insulation can be placed above the roof rafters but below the roof deck. See Fig. 3. This approach still requires a radiant barrier which could be foil covered foam rated as a radiant barrier, free from logos that would impact its emissivity. An alternative would be to drape a radiant barrier under the ridged insulation but over the rafters (shinny side facing down). This would require an additional cost for the 8

9 radiant barrier material and labor. Benefits: Reduces attic temperatures and HVAC cooling loads No change to air handler locations Rigid insulation installation is straight forward and easy to install Concerns: May require 2 layers of sheathing and additional fastener costs & labor Ventilation strategy required for air space with roofing tile in addition to attic ventilation Requires radiant barrier strategy Foam board installed over rafters require a separate radiant barrier product Extra thickness can create fascia and rake trim detail challenges and expense 2. HPA-B: Option B Insulation Below the Roof Deck Sheathing Between Framing Option B is likely to appear counter intuitive as mentioned in the building science commentary HPA-A above. The process is to construct a standard vented attic with an additional layer of insulation on the underside of roof deck sheathing to reduce heat transfer into the attic therefore reducing attic temperatures. An air gap between the roofing material and the roof deck can help reduce attic temperatures by convective cooling of the roofing materials. The code recognizes this and requires less insulation when an air gap is employed. This air gap can be furring or designed into the roofing material. Requirements: R-13 when an air gap is present R-18 when no air gap is present R-38 insulation above the ceiling lid A ventilated attic 9

10 Figure 8: Vented Attic Below Deck Insulation With Insulation Stopper with air gap below roofing Climate Zone Requirements for Option B In general, Option B is a solutions in the climates zones where cooling is a sinifiicant use of of energy. Climate zones 1-3 and 5-7 are predominately heating climates so these option are not requirred. 10

11 Figure 9: Climate Zone Requirements for Option B Building Science Commentary HPA-B differs from HPA-A in that the secondary insulation is placed below the roof deck sheathing and between attic framing. At first glance, like HPA-A, HPA-B, it seems illogical to place a secondary layer of insulation above an already insulated and vented attic space. In conventional attics, the attic space temperature is significantly warmer on sunny days because the intense energy from the sun is absorbed in the roofing materials. This energy is then conducted through the roofing assembly and reradiated into the attic space which creates attic space temperatures of 130 F. or more. Placing insulation, batts, netted blown fiberglass, spray fiber or spray foam, directly below the roof deck reduces the heat transfer of radiated solar energy into the attic. This reduction of reradiated energy helps reduce attic temperatures to ambient outdoor temperatures, which are far lower than traditionally vented and insulated attics. Generally, with HPA-B condensation at the underside of the roof deck is not a concern because the interior moisture is removed via traditional attic ventilation. However; to avoid potential condensation issues it should be noted that with HPA-B more careful attention to designing and installation of attic ventilation is important in the colder climate zones like 14 and 16 when using vapor open insulation like batts or netted and blown and open cell spray foam insulation. Note the Compliance Manual states you need a vapor retarder (VR) in 14 and 16 but does not specify if its walls and ceilings. Check with CEC on if they mean attics and on final wording The Tittle 24 code states that if there is an air space between the roofing materials and the roof deck (i.e. concrete roof tiles, or furring) the code allows for an R-13 instead of R-18 because the airspace provides ventilation under the roofing, which enhances convective cooling. For example, if standard flat shingles are applied 11

12 directly over the roof deck sheathing in a configuration that has no air space R-18 insulation is required. The HPA-B strategies require no radiant barrier. For radiant barriers to be effective the shiny surface of the barrier needs to face an open air space of 1 inch or greater. If insulation is in contact with the radiant barrier it losses its emissive properties and becomes ineffective. Figure 10: HPA-B An Example of Un-faced Batt Insulation Under the Roof Deck Sheathing. 12

13 Figure 11: Placement of Insulation Below Roof Deck HPA-B Constructability There are a variety of product choices in the market place. All HPA-B strategies can pose material, labor and scheduling changes. Additional costs for labor and materials are likely. The under roof insulation is usually installed after roof deck inspection and underlayment and before mechanical, electrical and interior ceiling gypsum board is installed. HBA-B may require return visits from the insulation contractor to correct insulation defects caused from other trade contractors work. These defects are normally corrected with the insulator returns to install the wall insulation. Spray foam installation requires that installers are protected and that only protected installers be in the building during application. HPA-B requires more attention to designing and installation of attic ventilation in the colder climate zones like 3,11, 14 and 16 when using vapor open insulation like batts or netted and blown and open cell spray foam insulation. Vapor retarders may be required. Benefits: Reduces attic temperatures and HVAC cooling loads No change to air handler locations Installation is straight forward and simple to install May be less expensive than rigid foam board Concerns: Requires one or more job site visits to complete Ventilation strategy required for air gap with roofing tile in addition to attic ventilation No radiant barrier, no radiant barrier benefit 13

14 Careful attention to insulation installation quality Careful attention to insulation vapor barrier and placement and moisture control detailing Most products do not provide continuous insulation over roof framing Spray foam installation requires that installers are personally protected and that only protected installers be in the building during application Option C Ducts in Conditioned Space Requirements: Air handler and ducts to be in conditioned space Radiant barrier to be installed (climate zone dependent) R-30/38 installed at ceiling (climate zone dependent) A ventilated attic Figure 12: Climate Zone Requirements for Option C Ducts in Conditioned Space Most all building science and energy experts agree that placing HVAC and duct distribution systems in conditioned space is the best practice for energy efficiency, comfort building longevity. Numerous studies have documented average energy savings at 15-20%. Typically, when systems are designed to go into conditioned spaces they are better engineered and deliver greater comfort in addition the energy. Both air handler and ductwork need to be in conditioned spaces. 14

15 Figure 13: Three Basic Strategies To Achieve Ducts in Conditioned Space: 1. Dropped Ceilings, Soffits. Often for esthetic reasons designers will create dropped or tray ceilings as a design element. These soffits are ideal locations for ductwork. The air handler can be located in an interior closet. It very cost effective to make space for ducts to these soffits. Figure14: Example of dropped ceiling used to house ductwork as design element Source, Steve Easley 15

16 Figure 15: Detail of dropped ceiling used to house ductwork. 2. Open Web Trusses, Between Floors. This requires preplanning the ducts runs during the design phase and coordination with mechanical system and structural designers to ensure adequate depth of floor trusses and space for ducts. A combination of the truss approach and utilizing open web joists or floor trusses between floors can be a cost-effective option. Figure. 16: I-Joists With Pre-Engineered Cut Outs for Duct Runs. Source Georgia Pacific 16

17 3. Plenum or Scissors Trusses to House HVAC Equipment. Figure 17: Two truss designs that can accommodate air handler and ductwork. Figure 18: Plenum Trusses, A Rigid Air Barrier Material to Be Installed And Sealed On All Four Sides. 17

18 Figure 19: Example of a scissors truss utilized to house mechanical equipment and ductwork. Note radiant barrier sheathing used to separate conditioned space from the attic above. Source Chitwood Energy Services Building Science Commentary for Ducts in Conditioned Space From a building science perspective, there are no negatives, when designed and installed correctly, for putting ducts in conditioned space. In fact, it makes a home better not only for energy efficiency and occupant comfort but also for moisture management and indoor air quality. Traditionally, supply ducts located in unconditioned spaces that leak can create negative pressures on the inside of the home that can cause combustion appliances like fireplaces or water heaters to back draft combustion by-products into the home, negatively impacting indoor air quality. These negative pressures can also draw in outdoor moisture. Return air duct leakage located outside of conditioned space can cause the envelope to be under a positive pressure that can force interior, moisture laden air to exfiltrate through cracks and gaps in the envelope. In winter this air leakage can dampen the inside surfaces of exterior sheathing and framing potentially leading to mold and decay. Keeping ducts in conditioned spaces reduces the potential for 18

19 these pressure differentials. In general, ducts in soffits are subject to tighter turns, which creates greater static pressure thus reducing airflow. Ducts located in soffits usually need to fit in smaller spaces so careful design and installation is critical. Ducts that are placed in dropped ceilings and soffits work best with centrally located equipment. This produces shorter runs and reduced friction thus lower static pressure. Use ACCA Manual T for grill selection for proper airflow. It is unlikely that traditional stamped metal grills will be the best choice. The placement of supply and return register location is important as well face velocity for adequate mixing of room air. Good design and pre-planning are important. Even though ductwork is in conditioned spaces it is still important to seal and test for duct leakage and proper airflow. This will ensure the proper amount of heated or cooled air will be effectively delivered to each room helping to provide the intended comfort. Constructability for Ducts in Conditioned Space Placing ducts to conditioned spaces requires up front planning and coordination to be successful. The builder, architect, and mechanical contractor all need to collaborate in the design and construction approaches at the design stage. The designer/builder needs to know the size of the ductwork and the HVAC designer needs to know the space limitations of the structure and framing to design and install a system that is cost effective to build and yet delivers the desired performance and comfort. It is logical that builders will select an approach using a combination of the above approaches that best work for a given home design. With thoughtful planning and design engineering, ducts in conditioned space, can be a more cost effective and higher performing, than the other high performance attic options. When utilizing the boxed or scissors truss approach be aware that service access to replace or repair equipment is required. This may cause aesthetic design issues. Most of the strategies presented work best with a centrally located furnace. This allows easier access to dropped ceilings and vertical chases etc. In addition, shorter duct runs result in more efficient and quieter airflow. 19

20 Select direct vent furnace or heat pumps to negate the need for combustion air. Never locate the air handler in the garage or outside conditioned space. Sound control is a concern for interior located air handlers. Both noise and vibration noise should be addressed. Select quiet equipment and installation techniques to control noise and vibration. Consider sound insulation and solid core doors. Benefits and Challenges Dropped Ceiling and Ducts between Floors Strategy Benefits: Simple to implement, nothing new to learn, no code issues Builders are already using soffits for architectural features for kitchens, baths and bedrooms Allows for centrally located air handler, shorter duct runs, better performance Framing and drywall are relatively inexpensive Easy to integrate with furnace closets for servicing equipment Concerns: Requires up front planning and coordination with designer HVAC contractor and trades. If used with a centrally located furnace room additional cost for direct vent furnace and sound control measures Needs minimum ceiling height of 9 feet Requires careful duct inspection before drywall is installed Scheduling of trades can be complicated Supplying air to areas with vaulted ceilings is complicated Benefits and Challenges of plenum truss and scissor truss strategy Benefits: Trusses can be designed to easily accommodate equipment and duct work No code issues Does not increase building height, can work with 8-foot ceilings Builders are already using trusses in a variety of configurations Truss framing is relatively inexpensive compared to other HPA options Trusses plenums can be designed to specific size requirements of the HVAC system Allows for centrally located air handler, shorter duct runs, better performance 20

21 Concerns: Requires up front planning and coordination with truss designer, HVAC contractor and trades If used with a centrally located furnace room additional cost for direct vent furnace and sound control measures Plenum needs air barrier containment and sealing before equipment is installed Service access needs to be provided may create aesthetic issues Requires careful duct inspection before drywall is installed Scheduling of trades can be complicated Supplying air to areas with vaulted ceilings can be complicated 3. High Performance Sealed Attic HPSA High performance sealed attics is another approach to reduce attic temperatures. They are not covered in the prescriptive approach and therefore requires performance approach modeling. It is important to know that HPSA s do not qualify for ducts in conditioned space. Requirements: Complete air sealing between attic space and exterior Code minimum insulation levels underside of roof deck Could use rigid insulation above roof deck, foam board or structural insulated panels (SIPS) Sealed combustion furnace or a heat pump Gable end walls to be insulated Attic ventilation not needed or allowed 21

22 Figure 20: An example of an un-vented, sealed attic spray foam installation applied to the roof deck sheathing Building Science Commentary for HPSA Sealed or unvented attics have been recognized by various building codes since Sometimes they are referred to as conditioned attics. California HPSA s do not qualify for ducts in conditioned space. Unvented attics offer significant energy savings particularly when HVAC systems and ductwork are located in the attic. In addition, they eliminate the need to air seal the all ceiling penetrations from can lights, electrical and mechanical systems that lead to the attic. Cautionary note: some fire codes my require air sealing between the attic and the living spaces. How non-vented, sealed attics work: Codes require traditional attics to be ventilated to remove moisture from the interior of homes as well as vent excess attic heat in warm weather. In cold weather, when moisture vapor piggybacks air exfiltration into the attics from the interior living spaces, it can rise and condense on the cold, un-insulated attic surfaces. Traditional attic ventilation removes this moisture. In unvented, sealed attics, moisture, heat gain and losses are controlled in three ways: insulation, insulation location and air sealing. 22

23 The insulation is relocated from the traditional attic floor to the bottom of the roof deck sheathing and gable walls. In winter the roof sheathing, gable end walls, now insulated, are warmer and therefore above the dew point where condensation is unlikely to occur. Typically, the attic space in homes with unvented, sealed attics are within 2-5 F of the conditioned living space temperature. The result is the space is essentially the same temperature as the conditioned living spaces. Therefore; the moisture stays in a vaporous state thus little chance for condensation or excessive surface relative humidity. Warmer surfaces have lower surface relative humidity. When surface relative humidity is at or above 70% that surface is more prone to support fungal growth. This assumes the interior relative humidity is with in normal range of 30-55%. Popular insulation materials for unvented sealed attics are: Closed cell spray foam, can be used in any climate Open cell spray foam, typically warmer climates Netted and blown and spray fiberglass, vapor retarder per manufacturer specifications SIPS, Any Climate Code minimum insulation levels required regardless of insulation type 23

24 Figure 21: HPSA. An example of a sealed attic with netted and blown fiberglass installation applied to the roof deck sheathing and gable end walls. Fig. 22: HPSA. Section view of a sealed attic with netted and blown fiberglass installation applied to the roof deck sheathing and gable end walls. 24

25 Figure 23: Structural Insulated Panel HPSA Constructability Insulating and air sealing unvented attics can impact construction schedule and costs. Unvented attics require thoughtful selection of insulation materials to match the right materials to the severity of the climate. In colder climates vapor open insulations can allow moisture vapor to permeate through the insulation where it can condense on roof decking and lead to moisture problems. Follow manufactures recommendations for the vapor retarders and their location. When selecting materials and systems for unvented attics it is important to understand how moisture impacts building materials and the mechanisms of moisture movement. Wood has hygrometric properties, meaning it can absorb and release water. This absorption and drying cycle is not a problem if the wetting rate of the wood does not exceed the drying rate. If the wood gains moisture and contains enough moisture to support fungal growth and if the surface relative humidity is in the 70% range and 25

26 air temperature, approximately 30 F to 120 F, decay fungi can grow and deteriorate the wood. When wood gets wet it expands and when it dry s it shrinks. This expansion and contractions can also impact the longevity and the dimensional stability of construction materials. Moisture moves as a liquid and vapor. Moisture vapor is transported on air currents such as air leaks in the building envelope. This is why air sealing is so important. Stopping the airflow stops the vast majority of moisture flow. All manufacturers of unvented attic insulation products stress the importance of diligent attention to air sealing at the roof plane. Why vapor retarders? Moisture also moves by diffusion. Diffusion is the process of moisture vapor moving from wetter areas to dryer areas by permeating through building materials. Moisture movement by diffusion is caused from differences in humidity and temperature between conditioned and unconditioned spaces. Vapor retarders prevent or reduce this moisture movement to protect the building materials from moisture flow by diffusion. Some manufactures have vapor barrier product recommendations by climate. In colder climates zones that experience cold or freezing temperatures (and humid climates) moisture vapor can permeate though vapor open insulation and wet and/or condense on the roof deck sheathing above and the insulation. The insulation reduces the inward drying potential. Moisture build up can lead to decay. In cold climate zones, vapor retarders or vapor closed insulation, like closed cell spray foam, would be recommended. Generally closed cell foam greater than 2 inches thick is considered a Class II vapor retarder, which is less than 1 perm. (Check for the code and manufacturer specifications for vapor retarder requirements by climate zone). Vapor retarders and low permeability insulation products reduce moisture flow by diffusion through the insulation thus can reduce the potential for moisture damage. Open cell spray foam is not recommended in cold climates. Closed cell foam products can be used in all climate zones. Fiberglass insulation products are also an option but pay diligent attention to the manufacturer s instructions regarding installation and the use of vapor retarders by climate zone and make sure those recommendations are in sync with local codes. When using netted blown fiberglass insulation follow the manufacturers recommendations for the use of vapor retarders and any ventilation air requirements, as some require 50 cfm per 1000 sq. ft. of floor area, air from the supply air ducting. 26

27 In warmer climate zones, vapor open products like open cell spray foam and netted, or sprayed fiberglass, can be used because temperatures of attic building materials are usually warm enough to prevent condensation from moisture diffusion through the insulation. When using Structural Insulated Panels (SIPS) be sure to follow the manufactures recommendation regarding vapor retarders. In all sealed, unvented attics careful attention to manufacturers recommendations and inspection is required. Complete air sealing between the attic and the exterior is essential for building durability and energy savings. Do not air seal at the attic floor as the attic floor is not the thermal boundary. *This may conflict with fire codes so be sure to investigate local code requirements. Spray foam installation requires that installers are personally protected and that only protected installers be in the building during application. Use only certified applicators. Benefits: Reduces attic temperatures and HVAC cooling loads Provides continuous insulation over roof framing No change to air handler locations No need to air seal attic floor* No attic ventilation required Experienced contractor base available Concerns: Could be more expensive than other options No radiant barrier, no radiant barrier benefit Vapor open products, requires careful attention to insulation vapor barrier and placement and moisture control detailing Some products require supply air into the attic space Requires sealed combustion furnace or a heat pump Spray foam installation requires that installers are personally protected and that only protected installers be in the building during application Temperatures below 40 F can impact scheduling 27

28 Prescriptive Requirements for High Performance Walls Figure 24: Prescriptive Wall U-Factor Requirements A high-performance wall for Package A climate zones 1-5 and 8-16 requires an overall U- factor of and in climate 6-7. U- Factor is a measure of how much energy a material or an assembly conducts. R-value is the resistance to heat flow. A U-factor of.25 equals an R-value of 4, a U-factor of.5 equals an R-value of 2 and so on. U-factor is for the entire wall assembly not just the cavity. U factor is the amount of energy conducted in BTUH per sq. ft. per degree of temperature difference between indoors and outdoors. Designers can choose a variety of assemblies that meet or exceed these requirements. This report outlines and accesses a variety of assemblies that meet the 2016 Package A requirements. Rational for High Performance Walls Most residential buildings in California, and the United States, have framing factors of 25% for 16-inch on center framing and 22% for 24-inch on center framing. This means that per thousand square feet of window less wall surface area 250 to 220 square feet of that wall is only insulated to R-value of the wall framing. 2x4 and 2x6 28

29 wood studs have R-values of 4.38 and This is well below the R-value of the stud cavity. To remedy these thermal bridging energy losses, Title-24 Package A prescriptive requirements, have instituted requirements for walls to have exterior insulation. This practice is not new and in fact 1 inch thick foam panels are currently being used under 3/8-inch-thick stucco by a number of builders in California. When greater than one inch thick exterior insulation is specified this creates conditions where, window manufacturers and some cladding manufactures, are concerned about the structural integrity of the system. For example, many window manufacturers set the maximum nailing distance from the window flange to the sheathing of one inch. Their concern is that windows floating on foam insulation greater than 1 inch thick will have too much weight and distance from the nail fin and the fasteners can deflect nails and the nailing fins deform resulting in a window failure. Exterior insulation approaches must accommodate these installation requirements. Building Durability and Building Science Related Issues for High Performance Walls Compared to High Performance Attic approaches High Performance walls have fewer building science related concerns. There are two major issues that need to be addressed when selecting an exterior insulation. 1. Managing moisture a. Weather barrier system and location b. Window and penetrations flashing 2. Structural attachment of windows for adequate support a. Providing structural support b. Exterior insulation location Managing Moisture: Careful water and moisture management is critical to reduce the potential for moisture damage and building enclosure failures. Many of the popular exterior insulation products are not vapor permeable. As a result there is reduced drying capacity of the assembly. Water that infiltrates the exterior cladding can get trapped behind these products. If the wetting rate exceeds the drying rate, structural decay can occur. All cladding systems leak. It s not a matter of if the cladding will leak but when the cladding will leak. Preventing the leaks and proper management of water intrusion is vital for long-term performance and durability. 29

30 When selecting HPW (high performance wall) solutions always employ these key strategies in design and construction to reduce moisture related problems: Deflect: Create designs that deflect water away from the enclosure. The better your designs deflect water the less water you have to drain and dry. Drain: Design walls systems that have the capacity to drain water away from the wall assembly and not trap water in the wall system. The better the wall system drains the less you have to dry. Use drain wraps and rain screens. Figure25: Ancient Reference to the Value of Rain Screen Wall Systems Drying: Design a wall system that has the capacity to dry to reduce moisture build up and potential for decay. The better the system dries the less impact moisture has on the life of the system. Durable materials: specify materials that can deal with moisture cycles without premature decay. Proper interior humidity control and ventilation is also required to prevent excessive moisture vapor drive from the interior to the exterior. The reduced drying capacity of the HPA assemblies can increase moisture levels of wood sheathing and framing if interior moisture is not controlled. It s important to follow ASHRAE 62.2 for mechanical fresh air ventilation as well as utilizing adequate spot ventilation in 30

31 kitchen and baths for moisture control. Exterior Insulation can also reduce the potential for decay and create a more durable wall system. Increasing the exterior insulation outboard the framing and sheathing creates a warmer wall cavities and framing thus lower surface relative humidity, which in turn, reduces mold and decay potential. The window and window flashing manufactures trade organizations, FMA/AAMA/ WDMA have developed window flashing standards when using insulating sheathing that instruct on flashing procedures and how to integrate window, door, and other penetrations with weather resistive barrier for sound water management. Most window manufactures require builders to follow these installation standards to comply with window and door warrantees. These organizations have based these flashing standards on the ASTM E2112 window and door flashing standards which have been in place for over two decades and are considered the standard of care for the industry. These standards are based on an experienced building science foundation and are key to building structures that are durable and long lasting. These standards are our guide for selecting approaches to HPW s. Figure 26: FMA/AAMA/WDMA Summary of Installation Methods 31

32 Approaches to Structural Attachment and Flashing Of Windows Windows mounted on Rough Opening Extension Support Elements, (ROESE)also known as bucks that act as spacers to accommodate the exterior insulation thickness and provide a solid nailing surface for window attachment Windows mounted directly to the wood sheathing, behind exterior insulation, before or after the weather resistive barrier (WRB) Windows mounted to structural or composite sheathing or with exterior insulation behind the and adhered to structural sheathing or structural Insulated panels (SIPs) Benefits and Concerns for Selecting HPW Assemblies Approach 1. Exterior Insulation Installed Over Wood Sheathing FMA/AAMA/WDMA Method A Figure 27: FMA/AAMA/WDMA Method A 32

33 Benefits: Simple concept, insulating sheathing can be installed directly over wood sheathing Window is in line with exterior insulating sheathing plane so no significant change in window flashing sequence except buck installation Window in line with exterior sheathing plane so no changes in siding integration or sequence Concerns: Potential for water to get sandwiched between insulating sheathing and wood sheathing with little drying potential increasing the risk of decay Thermal bridging at window buck Additional materials and labor for bucks. There are insulating bucks available to reduce thermal bridging at bucks. Bucks need to be sealed to wood sheathing Approach 2. Exterior insulation installed over WRB which is installed over wood sheathing, FMA/AAMA/WDMA Method B Figure 28: FMA/AAMA/WDMA Method B. Method B describes a window that will be installed into a buck, and the FPIS is exterior to the WRB. 33

34 Benefits: WRB over the wood sheathing provides protection. Drainage wrap type products are recommended to facilitate drainage. Window in line with exterior sheathing plane so minor changes in siding integration or sequence This method employs liquid applied and/or self-adhered flashing, either flashing system is acceptable. Typically, the buck is protected with fluid applied flashings in additional to window flashings if the bucks are made of wood. Concerns: All water management takes place behind the exterior insulation requiring careful attention to flashings integrate provide proper shingling of water adequate drainage paths out of the wall. Requires additional labor to apply fluid applied flashing in over wood bucks and window rough opening. Perforated building wraps may allow water to dampen wood sheathing. Foam plastic insulation (FPI) can inhibit drying increasing the risk of decay Additional costs for flashings and drainage wrap products Bucks need to sealed to wood sheathing Additional materials and labor for bucks. There are insulating bucks available to reduce thermal bridging at bucks. Approach 3. Exterior Insulation Installed Over WRB Which Is Installed Over Wood Sheathing, FMA/AAMA/WDMA Method C Bucks This system relies on deeper window/door profiles or trim to cover the exterior insulation. Essentially the windows and doors are recessed into the all system. 34

35 Figure 29: FMA/AAMA/WDMA Method C Benefits: WRB over the wood sheathing provides protection. Drainage wrap type products are recommended to facilitate drainage. Window in line with wood sheathing plane so no change in window flashing sequence No additional materials and labor for bucks. Insulating sheathing covers all opaque wall area thus less thermal bridging. Concerns: Likely that the window will be recessed in the opening and the insulating sheathing will protrude proud of the window resulting in cladding installation challenges and additional potentially costly trim details. (Not an issue with stucco cladding) All water management takes place behind the exterior insulation requiring careful attention to drainage paths. Additional costs for drainage wrap products 35

36 Approach 4. Composite Structural Insulating Sheathing Composite structural sheathing uses a fiberglass reinforced composite skin over closed cell ridged foam insulation. Thickness ranges form 1-1/8 to 2-1/8 R- values 6-12 can be applied over wood or metal studs. Figure 30: Example of Composite Structural Sheathing Benefits: Easy installation with screw gun, one insulated structural sheathing product. No change in window/door, flashing installation procedures Hi R-value, may negate the need for 2x6 wall framing Durable, skin does not support fungal growth or decay 8-2, 9-2 and 10-2 sheathing sizes add significantly to wind loading capabilities by fastening to the top plate framing member Often can be installed and left unfinished for up to 180 days No thermal bucks required Concerns: Weather barrier system relies on multi-step process of sealants and tapes that require attention to providing clean dry surfaces. All joints require sealant and flashing tape over the sealant. Components costly and labor intensive compared to traditional WRB s and flashings. Cost may be prohibitive 36

37 Approach 5. Exterior Insulation Installed/Adhered Behind Wood Sheathings This approach uses ridged foam, some products laminated to the back of OSB sheathing, to create an insulated nail base sheathing. Sheathing thickness with insulation ranges from 1 to 2. R-values Benefits: Easy installation with one insulated structural sheathing product May include a protective skin, more durable than standard OSB Often can be installed and left unfinished for up to 180 days No change windows, WRB, flashing and cladding installation procedures No thermal bucks required Concerns: May not be approved for all seismic zones Weather barrier system relies tape like flashing that requires careful attention during installation and providing clean dry surfaces. Overdriven fasteners can compromise water hold out. If flashing tape fails water issues likely as there is no redundancy to the system. Figure 31: Example of Nail Base Insulating Sheathing. 37

38 Approach 6. Structural Insulated Panels (SIPS) Sips have been in use for residential buildings for over 50 years with great success. SIPS panel systems are very fast to construct, Are energy efficient, very air tight and almost far less thermal bridging. Figure 32: Example of a SIPS Wall Panel Benefits: Almost eliminates thermal bridging Reduced construction times Simple to install, no special tools High air tightness levels No change windows, WRB, flashing and cladding installation procedures Concerns: Moisture resistance, if the OSB decays so does structural integrity Requires accurate foundations Requires pre-planning 38

39 Requires pest protection May be more costly Approach 7. High-Performance Structural Foam Wall System The high-performance structural foam wall assembly is a wall system combines medium density closed cell spray foam (ccspf) for cavity insulation and rigid foam panels installed over the framing. This system utilizes the adhesive characteristics of spray ccspf to bond the foam cavity insulation to the framing and the exterior insulating sheathing, creating a near monolithic structural and insulation system. Windows, doors, weather barrier wraps, flashings and cladding are installed with traditional industry practices. The bond that occurs between the ccspf, the framing, and the continuous rigid insulation can provide code-compliant wind and seismic structural load resistance without the use of OSB sheathing. Benefits: Hi R-value, can negate the need for 2x6 wall framing Very durable, not impacted by moisture or decay No change windows, WRB, flashing and cladding installation procedures Can add OSB sheathing over the foam panels for greater structural and Seismic performance Concerns: Likely more costly than traditional systems Requires a certified spray foam contractor Workers other than ccspf cannot be in the structure while ccspf is applied. 39

40 Approach 8: Insulated Siding Products There are currently no products exist that have a high enough R-value to meet the prescriptive requirements of the code unless combined with ccspf. Figure 33: Example of Cement Board Siding with Backside Insulation. Approach 9: Insulated House Wrap This product consists of a fibrous insulation laminated to a breathable house wrap. This provides an R-5 insulation to be installed in at the same time as the WRB. The product is compressible so additional insulating battens are required to achieve a continuous insulation rating. 40

41 Figure 34: Example of Insulating Housewrap Benefits: Breathable Water, air barrier, and exterior insulation in one product Concerns: Additional Labor and materials battens Battens are expensive 41

Feature Zone IECC 2009 IECC

Feature Zone IECC 2009 IECC Feature Zone 3 2006 IECC 2009 IECC Window U factor 0.65 0.50 Skylight U factor 0.65 0.65 Window SHGC 0.40 0.30 Ceiling R value 30 30 Wood frame R value 13 13 Mass wall R value 1 5 5/8 Floor R value 19

More information

INSTALLING WATER-RESISTIVE BARRIERS & FLASHING

INSTALLING WATER-RESISTIVE BARRIERS & FLASHING INSTALLING WATER-RESISTIVE BARRIERS & FLASHING IN A TWO-LAYER STUCCO APPLICATION Fortifiber Building Systems Group provides this guide to assist installers by demonstrating a two-layer installation of

More information

2001 National Workshop on State Building Energy Codes July th, 2001 Burlington, Vermont

2001 National Workshop on State Building Energy Codes July th, 2001 Burlington, Vermont 2001 National Workshop on State Building Energy Codes July 16-19 th, 2001 Burlington, Vermont A Systems Engineering Approach to the Design of Energy and Resource Efficient Homes Presented By: Mark LaLiberte

More information

10 Steps to Save Energy in Your House

10 Steps to Save Energy in Your House 10 Steps to Save Energy in Your House Sealing and insulating your home is one of the most cost-effective ways to make your home more comfortable and energy efficient. You can do it yourself. In this chapter,

More information

FMA / AAMA / WDMA Installation Committee Update. Jim Katsaros / DuPont Building Innovations FMA Installation Committee April 24, 2012

FMA / AAMA / WDMA Installation Committee Update. Jim Katsaros / DuPont Building Innovations FMA Installation Committee April 24, 2012 FMA / AAMA / WDMA Installation Committee Update Jim Katsaros / DuPont Building Innovations FMA Installation Committee April 24, 2012 Topics for discussion. Review & Update on FMA/AAMA/WDMA Window & Door

More information

2013 COMMERCIAL PRODUCTS

2013 COMMERCIAL PRODUCTS 2013 COMMERCIAL PRODUCTS EXPLORE GEOMETRY AND SPACE WITHOUT COMPROMISING BUILDING ENVELOPE PERFORMANCE Commercial design considerations come with very specific challenges that can t be addressed with just

More information

Insulation Technologies and Installation Specifications for Better Energy Performance of Commercial Buildings

Insulation Technologies and Installation Specifications for Better Energy Performance of Commercial Buildings Insulation Technologies and Installation Specifications for Better Energy Performance of Commercial Buildings Wood Products Council is a Registered Provider with The American Institute of Architects Continuing

More information

Questar ThermWise Duct Technical Specifications

Questar ThermWise Duct Technical Specifications Questar ThermWise Duct Technical Specifications 1. Introduction and Scope: This document sets forth the specifications for duct sealing and duct insulation in accordance to Questar ThermWise Weatherization

More information

Incorporating Insulating Sheathing into the Design of the Thermal and Moisture Management System of the Building Enclosure

Incorporating Insulating Sheathing into the Design of the Thermal and Moisture Management System of the Building Enclosure Incorporating Insulating Sheathing into the Design of the Thermal and Moisture Management System of the Building Enclosure Peter Baker, Building Science Corporation ABSTRACT With rising utility cost, concerns

More information

Hardin County Planning and Development Commission

Hardin County Planning and Development Commission Location by Climate Zone: Hardin County (per Table N1101.2), and the entire state of Kentucky is located in Climate Zone 4, the HDD is 4000 to 4999. Building Requirements; Building Thermal Envelope The

More information

Moisture Considerations for Insulated Building Assemblies

Moisture Considerations for Insulated Building Assemblies PHRC Webinar Series Tuesday, November 10, 2015 @ 1pm Description Moisture Considerations for Insulated Building Assemblies Brian Wolfgang Housing Systems Specialist One critical design consideration in

More information

CHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION

CHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION Chapter 1: Overview of Energy Efficient Construction 1 CHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION Chapter 1 is a quick reference guide that discusses the key components and features of energy

More information

INSULATION OWENS CORNING INSULATION PRODUCTS IN THIS SECTION:

INSULATION OWENS CORNING INSULATION PRODUCTS IN THIS SECTION: OWENS CORNING PRODUCTS What exactly is an insulating system? The answer starts with the role insulation plays in your home. All insulating products are based on a single basic principle: heat moves from

More information

Boulder City NV Prepared by (Print Name) Signature Date

Boulder City NV Prepared by (Print Name) Signature Date City of Boulder City Community Development Department Building & Safety Division 401 California Avenue Boulder City, NV 89005-2600 702-293-9282 (Main Line) 702-293-9392 (Fax) 2009 International Energy

More information

Low-cost Construction for High-energy Savings. Brian J. Wimmer Construction Manager Rochester Area Habitat for Humanity

Low-cost Construction for High-energy Savings. Brian J. Wimmer Construction Manager Rochester Area Habitat for Humanity Low-cost Construction for High-energy Savings Brian J. Wimmer Construction Manager Rochester Area Habitat for Humanity construction@rahh.org Objectives: 1. Control air & moisture in high-performance, low-cost

More information

PREP + INSULATION. DISCLAIMER: These tools are for illustrative purposes only and

PREP + INSULATION. DISCLAIMER: These tools are for illustrative purposes only and PREP + INSULATION HOME ENERGY UPGRADES What every contractor needs to know. Copyright 2012 Advanced Energy. All Rights Reserved 103 HOME ENERGY UPGRADES Prep + Insulation Contents Air sealing is a challenging

More information

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210)

Quality Inspection 8618 London Heights San Antonio, TX Phone: (210) Quality Inspection 8618 London Heights San Antonio, TX 78254 Phone: (210) 240-0476 PRE DRYWALL INSPECTION REPORT Prepared For: DELETED (Name of Client) Concerning: DELETED, San Antonio, TX 78258 (Address

More information

2006 INTERNATIONAL ENERGY CONSERVATION CODE

2006 INTERNATIONAL ENERGY CONSERVATION CODE 2006 INTERNATIONAL ENERGY CONSERVATION CODE DOCUMENTATION Code Change No: EC28-06/07 Original Proposal Sections: IECC: 202, 402.5, 402.5.1 (New), Table 402.5.1 (New), 402.5.2 (New), 402.5.3 (New), 402.2.8,

More information

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco

More information

Throughout the balance of this paper the terms attic and roof will and can be used interchangeably.

Throughout the balance of this paper the terms attic and roof will and can be used interchangeably. Understanding Attic Ventilation Attics or roofs can be designed and constructed to be either vented or unvented in any hygro-thermal zone (Map 1). The choice of venting or not venting is a design and construction

More information

Insulation Technologies and Installation Specifications for Better Energy Performance of Commercial Buildings

Insulation Technologies and Installation Specifications for Better Energy Performance of Commercial Buildings Insulation Technologies and Installation Specifications for Better Energy Performance of Commercial Buildings WoodWorks West Wood Products Council is a Registered Provider with The American Institute of

More information

(Project Location) (your firm's name)

(Project Location) (your firm's name) SECTION 07 21 00 THERMAL INSULATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including the Conditions of the Contract and Division 01 Specification Sections

More information

2006 Building Science Press All rights of reproduction in any form reserved.

2006 Building Science Press All rights of reproduction in any form reserved. building science.com 2006 Building Science Press All rights of reproduction in any form reserved. Building Science Digest 102 Understanding Attic Ventilation 2006-10-26 by Joseph Lstiburek Abstract: Attics

More information

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection Slab on Grade & Basements: A capillary break is installed on top of all footings Slab / Pre-Drywall / Thermal Inspection A minimum of 4" of clean or washed gravel (0.5" diameter or greater) is placed over

More information

Lock In Energy Savings For Life

Lock In Energy Savings For Life Lock In Energy Savings For Life AN ENVIRONMENTALLY FRIENDLY HOME IS A GREAT BENEFIT FOR YOU, YOUR FAMILY AND THE ENVIRONMENT. TAKE AN ACTIVE ROLE IN HELPING REDUCE GREENHOUSE GASES, THUS SLOWING THE EFFECTS

More information

IRC 2012 Key Changes

IRC 2012 Key Changes IRC 2012 Key Changes Overview of changes between the 2009 and 2012 IRC A Webinar Provided by The Pennsylvania Housing Research Center November 4, 2011 Presented by Mike Turns; Associate Director, PHRC

More information

Building Enclosure Details and Assemblies for Wood-Frame Buildings

Building Enclosure Details and Assemblies for Wood-Frame Buildings Building Enclosure Details and Assemblies for Wood-Frame Buildings COLIN SHANE M.ENG., P.ENG. ASSOCIATE, SENIOR PROJECT MANAGER RDH BUILDING SCIENCES INC. NOVEMBER 19, 2015 Disclaimer: This presentation

More information

Crawl Space Moisture Control

Crawl Space Moisture Control Crawl Space Moisture Control Crawl space foundations are found in many homes. Typically, these foundation types are equipped with operable vents designed to provide ventilation for moisture control. Unfortunately,

More information

1 Exam Prep Prov Module: Thermal and Moisture Protection Questions and Answers

1 Exam Prep Prov Module: Thermal and Moisture Protection Questions and Answers 1 Exam Prep Prov Module: 27203-13 Thermal and Moisture Protection Questions and Answers 1. The R-value is a measure of the ability of a material to. A. Resist the passage of moisture B. Resist heat conduction

More information

2010 National Building Code Adoption and Associated Process Changes

2010 National Building Code Adoption and Associated Process Changes Building Inspection City of Moncton 655 Main Street Moncton, NB E1C 1E8 Phone: (506) 856-4375 Fax: (506) 856-4348 Bulletin No. 14 From: Randy Richard Date: February 9, 2015 Subject: 2010 National Building

More information

When R-Value Doesn t Measure Up

When R-Value Doesn t Measure Up C. J. Schumacher B.Tech (Arch.Sci.), B.A.Sc.(Civ.Eng.), M.A.Sc.(Bldg.Sci.) When R-Value Doesn t Measure Up NESEA Building Energy10 Outline Why R-Values? Heat, Temperature & Heat Flow Insulating Materials

More information

Why Control Heat flow? How to Control Heat Flow? Thermal Performance. Modes of heat transfer: Thermal Control: Insulation & Thermal Bridges

Why Control Heat flow? How to Control Heat Flow? Thermal Performance. Modes of heat transfer: Thermal Control: Insulation & Thermal Bridges Fundamentals Insulation and Thermal Bridges June 13-14, 2012 Why Control Heat flow? Joseph Lstiburek, Ph.D., P.Eng John Straube, Ph.D., P.Eng 2012 Thermal Control: Insulation & Thermal Bridges 1. Occupant

More information

Construction Report NYSERDA Residential Performance Challenge

Construction Report NYSERDA Residential Performance Challenge Construction Report NYSERDA Residential Performance Challenge WELYTOK TOWNHOMES October 2014 Submitted to: NYSERDA 17 Columbia Circle Albany, NY 12203 Submitted by: HOMEPIC Team CDH Energy Corp. PO Box

More information

Inspection of New One- and Two- Family Dwellings

Inspection of New One- and Two- Family Dwellings Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Inspection of New One- and Two- Family Dwellings Planning and Development

More information

Energy-efficient weatherization

Energy-efficient weatherization Energy-efficient weatherization For your home 4326 02/14 Puget Sound Energy P.O. Box 97034 Bellevue, WA 98009-9734 pse.com/myrebates Weatherize your way to comfort In this guide 4 Understanding weatherization

More information

The Role of Control Layers in Building Enclosure Design

The Role of Control Layers in Building Enclosure Design The Role of Control Layers in Building Enclosure Design COLIN SHANE M.ENG., P.ENG. ASSOCIATE, SENIOR PROJECT MANAGER OCTOBER 13, 2016 Disclaimer: This presentation was developed by a third party and is

More information

Building Science Fundamentals Thermal Control: Insulation & Thermal Bridges May 29-30, Straube buildingscience.com 1 of 24

Building Science Fundamentals Thermal Control: Insulation & Thermal Bridges May 29-30, Straube buildingscience.com 1 of 24 Fundamentals Thermal Control: Insulation & Thermal Bridges May 29-30, 2013 Straube buildingscience.com 1 of 24 Fundamentals Thermal Control: Insulation & Thermal Bridges May 29-30, 2013 Straube buildingscience.com

More information

Thermal Bridging in Residential Construction

Thermal Bridging in Residential Construction PHRC Webinar Series Tuesday, May 12, 2015 @ 1pm Thermal Bridging in Residential Construction Brian Wolfgang Housing Systems Specialist Pennsylvania Housing Research Center 219 Sackett Building University

More information

Zack LeRoy Panel Pros Inc., Keene, NH (800)

Zack LeRoy Panel Pros Inc., Keene, NH (800) Introductions Moderator Zack LeRoy Panel Pros Inc., Keene, NH zack@panelpros.com (800) 721-7075 Introductions Engineering for SIPs Paul Malko Foard Panel, Inc., West Chesterfield, NH paul@foardpanel.com

More information

HPW Protocol Reference Manual

HPW Protocol Reference Manual 1 HPW Protocol Reference Manual Change Log: UPDATED BY DATE UPDATED VERSION UPDATE DETAILS 2 Table of Contents: HIGH PERFORMANCE WALL ASSEMBLY... 4 THERMAL SPECIFICATION... 4 REQUIREMENTS FOR HPW INSULATION...

More information

COMPOSITE CLADDING FOR RAIN SCREEN APPLICATIONS

COMPOSITE CLADDING FOR RAIN SCREEN APPLICATIONS COMPOSITE CLADDING FOR RAIN SCREEN APPLICATIONS WATER AND THE BUILDING ENVELOPE Water intrusion is one of the leading causes of construction-related call-backs and litigation. Wind-driven rain and high

More information

Improve Energy Efficiency and Air Sealing in Above-Grade Walls

Improve Energy Efficiency and Air Sealing in Above-Grade Walls Improve Energy Efficiency and Air Sealing in Above-Grade Walls United States. Residential Energy Efficiency Ranks Highest Second only to the mortgage, a family s home heating and cooling payments represent

More information

NEXT GENERATION HIGH PERFORMANCE WALLS

NEXT GENERATION HIGH PERFORMANCE WALLS CONSTRUCTION GUIDE NEXT GENERATION HIGH PERFORMANCE WALLS CLIMATE ZONES 3-5 PART 2: 2X4 Walls with 1" 1.5" Exterior Insulative Sheathing V. Kochkin and J. Wiehagen Home Innovation Research Labs June 2017

More information

Smart Vapor Retarders

Smart Vapor Retarders CertainTeed Smart Vapor Retarders Insulation B UILDING S CIENCE SMART VAPOR RETARDERS: A TECHNOLOGY PRIMER For years, builders have relied on a dual climate-zone classification for the placement of vapor

More information

California Building Envelope Solutions

California Building Envelope Solutions California Building Envelope Solutions Attics & Walls October 2017 What s New in 2016 Title 24 Attics High Performance Attic New prescriptive requirements Roof deck insulation in many CZs Walls High Performance

More information

Encapsulated, Sealed & Closed Crawlspace Installation Manual

Encapsulated, Sealed & Closed Crawlspace Installation Manual YourCrawlSpace, Inc. 1007 Johnni4 Dodds Blvd. Mt. Pleasant, SC 29464 Toll Free: 877-44-CRAWL (27295) Local: (843) 593-1115 Encapsulated, Sealed & Closed Crawlspace Installation Manual Copyright 2017 Your

More information

Plan Check & Field Inspection Guide

Plan Check & Field Inspection Guide Plan Check & Field Inspection Guide 1992 MEC, 1993 MEC, and 1995 MEC Inside This Guide Plan Check Field Inspection Plan Check Building plans and specifications must be submitted with each building application

More information

WALL PROTECTION VIDEOS PROJECT GALLERY INSTALL GUIDES TECH SUPPORT. BenjaminObdyke.com (800)

WALL PROTECTION VIDEOS PROJECT GALLERY INSTALL GUIDES TECH SUPPORT. BenjaminObdyke.com (800) WALL PROTECTION Wall Protection Solutions from Benjamin Obdyke Water will find a way in. Most building scientists not only believe this fact, but also agree that the best way to avoid issues caused by

More information

Knauf Makes It Easy to Insulate

Knauf Makes It Easy to Insulate BI-CL-03 10-06 Knauf Insulation GmbH One Knauf Drive Shelbyville, IN 46176 Sales and Marketing (800) 825-4434, ext. 8300 Technical Support (800) 825-4434, ext. 8212 Customer Service (866) 445-2365 Fax

More information

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures. SECTION 06 12 00 STRUCTURAL INSULATED PANELS ------------------------------------------------------------------------------------------------------------ PART 1- GENERAL ----------------------------- 1.1

More information

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018) BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018) PERMIT SUBMITTAL CHECKLIST: Signed and completed Building Permit application form. A separate Electrical permit is required from

More information

Introducing TJ Insulated Structural Framing Components

Introducing TJ Insulated Structural Framing Components #TJ-9009 SPECIFIER S GUIDE TJ INSULATED HEADERS, RIM BoaRD, AND CORNERS Introducing TJ Insulated Structural Framing Components Helps meet the 2011 Federal Energy Star Homes and 2009 International Energy

More information

EcoTouch Insulation with PureFiber Technology

EcoTouch Insulation with PureFiber Technology PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.

More information

Energy Efficiency: Designing Wood-Frame Buildings for Occupant Comfort

Energy Efficiency: Designing Wood-Frame Buildings for Occupant Comfort Please add relevant logo here Energy Efficiency: Designing Wood-Frame Buildings for Occupant Comfort Presented by: Peter J. Arsenault, FAIA, NCARB, LEED-AP Disclaimer: This presentation was developed by

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

2

2 1 2 3 4 5 Spray foam insulation has outstanding insulation properties when compared to traditional insulation materials. It can be an important tool in designing and installing a well-sealed, energy-efficient

More information

The Role of Control Layers in Building Enclosure Design

The Role of Control Layers in Building Enclosure Design The Role of Control Layers in Building Enclosure Design COLIN SHANE M.ENG., P.ENG., P.E. ASSOCIATE, SENIOR PROJECT MANAGER RDH BUILDING SCIENCE INC. SEPTEMBER 14, 2016 Disclaimer: This presentation was

More information

Integrated Air & Water Barrier Systems

Integrated Air & Water Barrier Systems Integrated Air & Water Barrier Systems Presented by [ Jeff Presenter s Key, Georgia-Pacific Name ] Wood Products AIA Course: GP-FF-WRBAB Credit Designation: LU HSW Please add relevant logo here Disclaimer:

More information

Carpenter Level 2 Rev. September 2017

Carpenter Level 2 Rev. September 2017 Level 2 A5 Site Layout II Duration: 14 hours 7 hours 7 hours Upon completion of this unit the apprentice will demonstrate knowledge of site layout tools and equipment and their applications and procedures

More information

MOISTURE CONDITIONS IN WALLS AND CEILINGS OF A SIMULATED OLDER HOME DURING WINTER

MOISTURE CONDITIONS IN WALLS AND CEILINGS OF A SIMULATED OLDER HOME DURING WINTER MOISTURE CONDITIONS IN WALLS AND CEILINGS OF A SIMULATED OLDER HOME DURING WINTER USDA FOREST SERVICE RESEARCH PAPER FPL 290 1977 U.S. DEPARTMENT OF AGRICULTURE FOREST SERVICE FOREST PRODUCTS LABORATORY

More information

Condi1oned A3cs and Crawlspaces. Making the Decision. Find This Presenta1on. Helpful Informa1on. page/

Condi1oned A3cs and Crawlspaces. Making the Decision. Find This Presenta1on. Helpful Informa1on. page/ Condi1oned A3cs and Crawlspaces Making the Decision Find This Presenta1on Helpful Informa1on h@p://www.kenergy.us/code- page/ It will be posted under 2009 IECC Learning Objec1ves Helpful Informa1on 1.

More information

Radon Vent Pipe System. Labeling Performance Indicators

Radon Vent Pipe System. Labeling Performance Indicators Section 6 Radon Vent Pipe Labeling Performance Indicators Radon Vent Pipe System Connected after sub-grade system installed Pipe cannot be trapped Provide space in chases Support at each floor level Discharge

More information

Vapour Diffusion for Residential Construction. Canada and Northern USA VAPOUR DIFFUSION FOR RESIDENTIAL CONSTRUCTION CANADA AND NORTHERN USA

Vapour Diffusion for Residential Construction. Canada and Northern USA VAPOUR DIFFUSION FOR RESIDENTIAL CONSTRUCTION CANADA AND NORTHERN USA VAPOUR DIFFUSION FOR RESIDENTIAL CONSTRUCTION CANADA AND NORTHERN USA Vapour Diffusion for Residential Construction Canada and Northern USA Brookfield Homes, Niagara, Ontario VAPOUR DIFFUSION FOR RESIDENTIAL

More information

Chapter 1: Compliance

Chapter 1: Compliance Chapter 1: Compliance [101] Who Must Comply? All new residential construction must comply with the Washington State Energy Code (WSEC). Exceptions. Exempt from envelope requirements but needing to comply

More information

Air Infiltration & Insulation

Air Infiltration & Insulation Control of Air Flow as Part of Thermal Insulation Manufacturer s Instructions to Achieve Energy Efficiency of Any Building Address the role of insulation in a home Today s Presentation Review common types

More information

Structural. Orientation of the Home. Northeast Oklahoma REC s Energy Efficient Tips for Home Builders

Structural. Orientation of the Home. Northeast Oklahoma REC s Energy Efficient Tips for Home Builders Northeast Oklahoma REC s Energy Efficient Tips for Home Builders Structural Orientation of the Home An easy way to maximize a home s energy efficiency is to place it properly on the site in the beginning.

More information

Attic Insulation. Student Guide

Attic Insulation. Student Guide Basic Weatherization - Conservation Measures & Efficiency Student Guide Basic Weatherization - Conservation Measures & Efficiency Student Outline 1. Introduction [1] 2. Purpose of Insulation [1] a. R-value

More information

SAN MIGUEL COUNTY & TOWN OF MOUNTAIN VILLAGE BUILDING DEPARTMENTS PRESCRIPTIVE ENERGY CODE & GREEN BUILDING STANDARD

SAN MIGUEL COUNTY & TOWN OF MOUNTAIN VILLAGE BUILDING DEPARTMENTS PRESCRIPTIVE ENERGY CODE & GREEN BUILDING STANDARD SAN MIGUEL COUNTY & TOWN OF MOUNTAIN VILLAGE BUILDING DEPARTMENTS PRESCRIPTIVE ENERGY CODE & GREEN BUILDING STANDARD The Prescriptive Energy Code & Green Building Standard requirements for San Miguel County

More information

Michigan Energy Code Training and Implementation Program

Michigan Energy Code Training and Implementation Program Michigan Energy Code Training and Implementation Program 1.0 Hour Advanced Program Course Number 16201 Residential Energy Air Sealing School of Planning, Design & Construction Michigan State University

More information

Building Enclosure Detailing for Balconies

Building Enclosure Detailing for Balconies Building Enclosure Detailing for Balconies COLIN SHANE M.ENG., P.ENG., P.E. PRINCIPAL, SENIOR PROJECT MANAGER RDH BUILDING SCIENCE INC. JUNE 2017 Disclaimer: This presentation was developed by a third

More information

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM Installed in Pre-engineered Steel Buildings Provides Lowest Cost Construction Method for CORROSIVE AND WET Environments PREFERRED SOLUTIONS, INC.

More information

Inside Why Spray polyurethane Foam insulation? All About Spray polyurethane Foam Book 1

Inside Why Spray polyurethane Foam insulation? All About Spray polyurethane Foam Book 1 Foam Book Inside Why Spray polyurethane Foam insulation? All About Spray polyurethane Foam Book 1 SUSTAIN THROUGH KNOWLEDGE Book 1: Why Spray Polyurethane Foam Insulation Book 2: SPF & Thermal Barrier

More information

CERTIFICATE OF FIELD VERIFICATION & DIAGNOSTIC TESTING (Page 1 of 8)

CERTIFICATE OF FIELD VERIFICATION & DIAGNOSTIC TESTING (Page 1 of 8) CERTIFICATE OF FIELD VERIFICATION & DIAGNOSTIC TESTING (Page 1 of 8) Builder or Installer Name Builder or Installer Contact Telephone Plan/Permit (Additions or Alterations) Number Compliance Method (Prescriptive)

More information

Perimeter Relief and Control Joints in Fire-Rated Gypsum Board

Perimeter Relief and Control Joints in Fire-Rated Gypsum Board Perimeter Relief and Control Joints in Fire-Rated Gypsum Board In multi-family residential construction, involving fire-rated assemblies stress relief in the firerated assemblies is important, but often

More information

2018 WEATHERIZATION SPECIFICATIONS MANUAL

2018 WEATHERIZATION SPECIFICATIONS MANUAL 2018 WEATHERIZATION SPECIFICATIONS MANUAL Prepared by: Lockheed Martin December, 2017 Table of Contents INTRODUCTION... 2 IN 1.0 Program Goals and Eligibility... 2 IN 1.1 Code Compliance... 2 IN 1.2 Post

More information

Fenestration Components: Mechanical Summary. Water heater energy factor: Ef Fuel type: Gas Electric Other

Fenestration Components: Mechanical Summary. Water heater energy factor: Ef Fuel type: Gas Electric Other This information must be on the drawing documents not attached to plans. The following Compliance statements must be on the drawings: 2009 International Energy Conservation Code Statement of acknowledgement

More information

Water Intrusion Into Buildings Forensic Investigations

Water Intrusion Into Buildings Forensic Investigations Water Intrusion Into Buildings Forensic Investigations How does water flow? Let me count the ways. Major building structural and operational failures are caused by three problems: water, water, and water.

More information

APPROVED. Acceptable to the code official for compliance with the provisions of the applicable Code or referenced Standard.

APPROVED. Acceptable to the code official for compliance with the provisions of the applicable Code or referenced Standard. Chapter 1 101.1 Title. These regulations shall be known as the North Carolina Energy Conservation Code as approved by the North Carolina Building Code Council on March 11, 2008, to be effective January

More information

Continuous Insulation Systems for Exterior Walls

Continuous Insulation Systems for Exterior Walls Continuous Insulation Systems for Exterior Walls High performance through sprayed-in-place foam insulation www.icynene.com Program Registration Icynene Inc. is a registered provider with The American Institute

More information

Insulating Basements: Part 1 Fundamentals

Insulating Basements: Part 1 Fundamentals The Pennsylvania Housing Research Center Insulating Basements: Part 1 Fundamentals Builder Brief: BB0510 Brian Wolfgang, PHRC Fellow INTRODUCTION The perception of a basement has changed significantly

More information

2012 IECC Residential with State Adopted Changes

2012 IECC Residential with State Adopted Changes 2012 IECC Residential with State Adopted Changes Salt Lake County Townships 385-468-6694 801-381-1449 bursenbach@slco.org bursenbach@yahoo.com BUILDING TALK 1 2 The Family of I-Codes International Building

More information

Insulating Exterior Assemblies : Batt, Blown / Spray, Board and Beyond

Insulating Exterior Assemblies : Batt, Blown / Spray, Board and Beyond Insulating Exterior Assemblies : Batt, Blown / Spray, Board and Beyond Batt Fiberglass Mineral Wool Cotton Wool Blown, Sprayed Fiberglass Spray Foam Cellulose Wool Board Polystyrene (XPS, EPS) Polyisocyanurate

More information

Weather Resistant Barrier

Weather Resistant Barrier Weather Resistant Barrier Welcome to CertainTeed For more than 100 years, homeowners and building professionals have trusted CertainTeed to provide the highest quality building products, and to continually

More information

Exterior Perspective, East End

Exterior Perspective, East End Interior Open Plan Private to Public Gradation Obstruction of Open Plan Exterior Perspective, East End University of Texas at Austin s intends to be an adaptable design using solar power as its inspiration.

More information

RETROFIT INSULATION in WOOD ROOFS

RETROFIT INSULATION in WOOD ROOFS NBI: A525.403 RETROFIT INSULATION in WOOD ROOFS ALASKA BUILDING RESEARCH SERIES HCM-01552 Introduction This publication is one of nine that has been translated from Norwegian. They are taken from a series

More information

Typical Finished Basement Details

Typical Finished Basement Details Albemarle County, Virginia Typical Finished Basement Details Based on the 2012 Virginia Residential Code Finished basements must be constructed in conformance with these details. For requirements, details

More information

DuPont. Tyvek Sheathing Membrane Installation Guidelines. Version 2. Canadian Version

DuPont. Tyvek Sheathing Membrane Installation Guidelines. Version 2. Canadian Version DuPont Tyvek Sheathing Membrane Installation Guidelines Helping you get the job done right Canadian Version Version 2 Table of Contents Applicable Products...2 Required Materials...2 Code Requirements...3

More information

2012 CLEAResult All rights reserved. Residential Energy Efficiency

2012 CLEAResult All rights reserved. Residential Energy Efficiency Residential Energy Efficiency Presenter Bio Jaymar Davis, PE, CEM, CLEP, CMVP, CEA Sr. Field Engineering Manager 10 Years experience in energy efficiency Johnson Controls, Kohler Co. Certifications: Licensed

More information

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING WWW.STOPWASTE.ORG New Addition Consider the following green remodeling options in a new addition.

More information

Administrative Changes

Administrative Changes Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings

More information

Michigan Energy Code Training and Implementation Program

Michigan Energy Code Training and Implementation Program Michigan Energy Code Training and Implementation Program 1.0 Hour Advanced Program Course Number 16202 Residential Energy Plan Review School of Planning, Design & Construction Michigan State University

More information

Building Enclosure Performance for Existing and New Buildings

Building Enclosure Performance for Existing and New Buildings Building Enclosure Performance for Existing and New Buildings 2015 HESNI Annual Conference Rick Ziegler, PE Industry Construction Defect Claims Building Envelope - 70% Plumbing - 12% Freezing - 4% Fire

More information

Insulation, Fireblocking, Draftstopping and Crawl Space Requirements REVISION DATE: JANUARY 2017

Insulation, Fireblocking, Draftstopping and Crawl Space Requirements REVISION DATE: JANUARY 2017 City of Republic Community Development Department Insulation, Fireblocking, Draftstopping and Crawl Space Requirements REVISION DATE: JANUARY 2017 Insulation Requirements Insulation (2012 IRC Section R302.10.1):

More information

THE GEORGIA ENERGY CODE: 2009 IECC + AMENDMENTS

THE GEORGIA ENERGY CODE: 2009 IECC + AMENDMENTS THE GEORGIA ENERGY CODE: 2009 IECC + AMENDMENTS For the Georgia Association of Home Inspectors Bourke Reeve ABOUT SOUTHFACE 1 EARTHCRAFT Regional Green Building Program HISTORY OF ENERGY CODES MEC 1992,

More information

Gold Bond BRAND Gypsum Sheathing

Gold Bond BRAND Gypsum Sheathing BRAND 09 06 29 16 00/NGC 43/NGC brand is a moisture-resistant sheathing installed on the outside of exterior framing as a substrate for exterior claddings. It is manufactured with a treated water-resistant

More information

Vertigo Cladding Board

Vertigo Cladding Board Installation guide Vertigo Cladding Board Geolam: a stunning alternative to wood cladding Vertigo is a composite wood cladding board requiring minimum maintenance. Durable and fade resistant, it will not

More information

Thermasheath -3. Insulation for the Building Envelope ROOF WALL SPECIALTY

Thermasheath -3. Insulation for the Building Envelope ROOF WALL SPECIALTY Insulation for the Building Envelope ROOF WALL SPECIALTY PRODUCT DESCRIPTION Rmax Thermasheath-3 is an energy-efficient thermal insulation board composed of a closed-cell polyisocyanurate (polyiso) foam

More information

Residential Building Inspections

Residential Building Inspections Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved

More information

HI-PERFORMANCE REFLECTIVE INSULATION. The most versatile insulation CONTRACTOR INFORMATION AND INSTALLATION GUIDE

HI-PERFORMANCE REFLECTIVE INSULATION. The most versatile insulation CONTRACTOR INFORMATION AND INSTALLATION GUIDE HI-PERFORMANCE REFLECTIVE INSULATION The most versatile insulation in the world Great energy savings for new construction and retrofit projects CONTRACTOR INFORMATION AND INSTALLATION GUIDE Table of Contents

More information

Presenter: Mr. Rob Orwig, P.E. Senior Forensic Engineer/Heartland Regional Manager

Presenter: Mr. Rob Orwig, P.E. Senior Forensic Engineer/Heartland Regional Manager Water Intrusion Presenter: Mr. Rob Orwig, P.E. Senior Forensic Engineer/Heartland Regional Manager CV Highlights: Lots of years of engineering experience 2-1/2 years with Donan Engineering Goals Identify