1 Displacement ventilation best practices Displacement ventilation (DV) is a low-velocity, non-turbulent cooling system for commercial buildings that is not always fully understood. Learn when and where these DV systems can be best used. BY STEVEN M. DAILEY, PE, LEED AP, Harley Ellis Devereaux, Southfield, Mich. Learning objectives Examine the important, yet not always apparent, best practices of displacement ventilation systems. Classify the architectural and mechanical best practices of designing such systems. While underfloor air distribution (UFAD) and displacement ventilation (DV) have had a place in industrial and commercial service for many years now, how many designs have been completed and operated with that if I only knew about that feeling while commissioning the system? DV is a delivery system where non-turbulent air is delivered at or near floor level at higher temperatures than overhead mixing-type systems. It achieves its cooling effects for occupants by the cooler air at floor level contacting the heat sources (people or equipment) in the room, allowing a thermal plume rising at the heat source and it is the driving force in transferring heat from the source via the plume. The heat is carried up to a higher stratified level at the ceiling of the space being cooled, then returned to the air handler from this higher level. All this is accomplished at a very low velocity, typically at 40 ft/min, providing a comfortable, non-turbulent environment. Where DV is often provided from a raised floor system, it should not be confused with a UFAD system common in office buildings and data centers, with this type of system being generally turbulent (highly mixing) in nature. A UFAD system, while sharing aspects of DV, has different design objectives not shared with DV systems. DV systems offer benefits of modularity and flexibility in the workplace, reduced energy costs, reduced particulate contaminates in the occupied spaces, and individual user control of the workplace ventilation. A DV system is a good choice if: The contaminants are warmer and/ or lighter than the room air Supply air is cooler than the room air The room height is 9 ft or more Low noise levels are desired. Consideration of a traditional overhead mixing-supply system may be more advantageous if: Ceiling heights are 8 ft or lower Disturbances to room airflow are strong Contaminants are colder and/or denser than the ambient air Cooling loads are high and radiant cooling is not an option. DE-1 Consulting-Specifying Engineer OCTOBER
2 Considerations in designing a DV system include early upfront coordination with all design trades (architectural, mechanical, electrical, and structural) in addition to consideration of the construction of the facility itself. Only a contractor highly experienced in DV projects (particularly in a raised-floor delivery) should be selected. The contractor selected should present its own list of best practices in the bid submission for the contract. The quality of construction is paramount to the success of such a system. Note that DV is typically not the low-first-cost solution for a facility. Total mixing Architectural best practices If a raised floor system, the floor system should be chosen carefully with minimal leakage and quality seals fixed to the supports, without the ability for the seals to become dislodged if the floor panels are removed and replaced. Whereas DV can be accomplished without a raised floor, the cost of air-distribution material (minimal compared to above-floor delivery) in a raised floor is attractive, and the system is aesthetically concealed. The costs of a quality flooring system may run $8/sq ft to $10/sq ft. Underfloor DV systems are ideal for the open-floor-plan layout. Open-floor plans lend themselves to flexibility and renovation in the future. The engineer should plan for multiple air-delivery systems (e.g., 5,000 cfm to 8,000 cfm) throughout the floor plate creating multiple control zones. This not only adds a tighter degree of temperature control throughout the open space, but helps maintain compliance with ASHRAE Standard 90.1: Energy Standard for Buildings Except Low-Rise Residential Buildings for fanpower limitation. With similar sized and model air handlers, serviceability will be standardized through interchangeable parts (belts, fans, filters, etc.). Redundancy has now been built into the floor s systems by allowing the other units to ramp up temporarily to compensate for a down-blower unit. The use of vertical fan units in lieu of horizontal units can reduce floor space. Enclosed-space floor Figure 1: In this comparison of systems, the overhead mixing (top) uses supply air in the total volume space. Underfloor displacement ventilation (middle) crawls along the floor to reach heat sources. Turbulent underfloor air distribution (bottom) sends jets of air to mix with air from the floor. Courtesy: Price Industries plans require independent terminal zone control and dedicated ventilation measurement and control, more so than the open-floor space scenario, adding cost. If the floor space is comprised of mostly smaller offices or enclosed spaces, careful consideration should be given to a fully ducted centralized supply unit or an overhead mixing system instead. An open-floor layout aesthetically lends itself to an open-ceiling appearance. Whereas the Price Industries Engineering Guide to Displacement Ventilation indicates that a 9-ft ceiling height is minimum, remember how a DV system works: Colder air is introduced at floor level, it warms as the air rises across the heat source in a vertical fashion, and it Consulting-Specifying Engineer OCTOBER 2015 DE-2
3 Displacement ventilation accumulates at the top of the space at a much higher temperature where it is then returned. A 9-ft lay-in ceiling height, with a 3- to 4-ft-high plenum space above, may accomplish this adequately, but what about the open-ceiling scenario? A 13- to 14-ft-high floor-to-deck height is recommended for the open-ceiling configuration. Return air should either be ducted to the air-supply blowers spaced throughout the floor, or point returns can be used as high as possible from each blower system as long as the distance from the return inlet to the exterior wall is no more than 40 ft to 50 ft. This point-return layout should be analyzed to ensure noise is not transmitted from the fan room into the space, with consideration of using silencers to mitigate possible noise. In either ceiling scenario, provide insulation on a floor deck above a DV-serviced floor. An uninsulated floor deck will allow heat in the stratified hot air to migrate to the floor above. This can cause nuisance higher temperatures in the floor above in a traditional overhead mixing system, and can wreak havoc in attempting to control an underfloor DV system if above such a DV system below. Insulation types such as foam, board, or batt are economical and effective when used for a concealed, droppedceiling plenum, but an open-ceiling system may require a more attractive solution. Experience has lent to using an epoxy spray-on mixture that, while more costly than traditional insulating materials (approximately $3.80/sq ft at 30-mil to 35-mil thickness), provides an R-0.08 insulating value, is paintable, and does not disrupt the appearance or texture of the finished deck. It certainly is not as effective as traditional insulating materials, but provides some insulating value with a clean finish. Figure 2: Multiple air handlers located on a floor space (at left) is an effective supplyair strategy. Service clearance is important in design consideration (right). Courtesy: Harley Ellis Devereaux Open-communicating stairways between floors should be avoided. The supply air, delivered at floor level in a DV system, is colder than the median room temperature and crawls across the floor and right down the stairwell. A glassed-in enclosure with a door at the landing is an alternative to help contain the supply air on the floor it is serving. Column enclosures should start at the floor slab and extend through the panel with the floor panel sealed to the column enclosure. The enclosure should have an airtight seal at the top and bottom. Construction tightness with a raisedfloor system is very important; without positive seals at the top and bottom of a column enclosure, the whole assembly could act as an air duct allowing the pressurized supply air to escape the underfloor plenum. Wet areas designed within a raisedfloor area should be identified early in the design as monuments, and the floor slab height raised to match the proposed raised floor height. Any moisture spilled into a plenum from a kitchen or toilet area could breed biological growth unwanted in any airstream delivery system. Raise the height of the slab in these areas and supply with low-mounted wall-type DV diffusers. If solid slab, avoid floor-sill exterior glass. Raise fenestration above the floor at least a foot and seal the foot or knee wall extremely well. In a raised-floor design, use a second plenum wall construction immediately adjacent to the exterior wall that can effectively stop infiltration (or exfiltration) from the plenum. Considerations of operable sash areas in a DV-supplied building are complex. If an operable sash is a desirable aspect to your design, limit the areas to small enclosed spaces, rather than open-floorplan areas; carefully seal the floor, walls, and ceiling above and below the raised floor (if present); and provide high-quality, very tightly sealed, shut-off dampers (automatically actuated based on sash switches) within metal transfer ducts to effectively isolate these areas from the rest of the DV system. DE-3 Consulting-Specifying Engineer OCTOBER
4 Exterior wall Interior wall Through exterior walls to outside Slab edges at perimeter Through conduits and junction boxes Wall bases and penetrations Figure 3: Sealing underfloor plenum space is important to maintain supply air pressure to outlets. Courtesy: Price Industries A thermograph study of the enclosure of the building is highly recommended prior to the fit-out of the mechanical systems during the enclosure construction phase. The thermograph, performed on the building s enclosure using temporary air delivery, will identify trouble spots on the building enclosure that could hinder a raised-floor plenum performance. This is especially critical if the discussion is made to retrofit an existing building with a DV system. Mechanical best practices A thorough commissioning process is essential for a DV system. All trades should be involved in the commissioning process. It should be identified that the contractor is responsible for the tightness of the plenum, sealing every single penetration through the raised floor tile and through the slab/structure. Sealing should be carefully observed through the construction process, especially in the core, mechanical rooms, electrical rooms, etc. Remember, this system is not a lowfirst-cost solution and offers performance obstacles if not constructed correctly. Figure 4: A sill-isolation wall can aid in eliminating infiltration. Courtesy: Harley Ellis Devereaux Consulting-Specifying Engineer OCTOBER 2015 DE-4
5 Displacement ventilation All floor penetrations must be carefully sealed around an insulated duct at each penetration in a raised-floor system. If solid-slab (non-raised floor) is chosen, coordinate with the architect whether supply air will be ducted from ceiling space below the floor slab or within the same floor level from above. Supply air ducts to the DV diffusers are recommended to come from above in the same floor space. Allow for chases or thickened wall profiles at each drop. Do not place diffusers where items such as rack storage (or file cabinets) or other obstacles will block the airflow from reaching the heat sources (building occupants). Consider final furniture layouts (if known) early in your layout, wall space isn t always available or close enough to the occupants. Raised-floor systems are advantageous because of the flexibility to place the floor outlet at the occupant s location. Final furniture location is not as important in the raised-floor scenario at the early design stage. The final furniture layout is seldom known at an early design stage (or could Locate the perimeter zones and the heating elements far enough so as not to mix with interior cooling zones. change soon after occupancy). Establish load-based criteria for how many outlets should be provided per control zone. Indicate cubic foot/minute range per outlet, document it on drawings, and instruct the contractor to install immediately prior to move-in. Airflow balancing and adjustments should be made during the commissioning phase. Specify a number of spare floor panels (generally 5% additional of anticipated outlets), with precut holes accepting the specified floor outlets. Most floor diffuser outlet manufacturers can provide both a polymer-based outlet for lighter loads such as normal walking, or aluminum construction for heavier rolling loads such as carts or rolling furniture systems. Consider pencilproof and/or high-heel-proof openings. Always select an outlet with a collector cup under the outlet ring. It is not desirable to collect a 32-oz soda (or two) in the plenum space. Carefully select a displacement-type outlet, rather than a turbulent diffuser that would throw the air too high and cause a mixing effect. Manually controlled floor-mounted outlets can be cost-effective for large open spaces, allowing the occupants to customcontrol their comfort zone. Floor outlets should be specified with minimal limiting controls to ensure minimum ventilation rates are provided. In perimeter heating, place fan-powered variable-air-volume (VAV)-controlled heating terminals around the perimeter of the space within the raised floor in areas where access can be afforded (hallways or traffic paths) located out from under proposed furniture locations. Locate the perimeter zones and the heating elements far enough so as not to mix with interior cooling zones. A perimeter zone is typically 15 ft from the exterior glass with no Figure 5: Direct jets of air to remote terminal intakes at the perimeter. Courtesy: Price Industries DE-5 Consulting-Specifying Engineer OCTOBER
6 occupants within these 15 ft. Ductwork from the terminal unit to the floor outlets is required for this system. Extending duct from the underfloor discharge to within 10 ft to 15 ft of the intake to the terminal units will ensure enough air will reach these terminal boxes. Hard duct can be cumbersome to maneuver under a raised floor with the support stanchions associated with such a system. Flexible fabric ducts can be very forgiving in routing around the obstacles of floor supports. Alternately, condition the perimeter zone via linear troughs using either electric or hydronic heating elements. The natural convection from the troughs coupled with a night-setback control strategy (activating heating elements without air-terminal activation) can add efficiency to the overall system. Wall-mounted displacement diffusers with heating elements should be used in perimeter zones for solid-slab systems. Overhead radiant panels may not be as effective as air-based systems in the floor, but such water-based systems are generally more energy-efficient than air-based delivery systems. A finned-tube radiator integrated into the top of a wall-mounted DV outlet is a common configuration. Smaller enclosed spaces, such as conference rooms, require independent VAVbox control serving those spaces, with minimum settings to provide required ventilation rates and occupancy sensors to minimize or shut off air delivery when not in use. The decentralized air-handling blower units in the floor plenum spaces should be compact and accessible. Key components of the units are a supply fan with variable-speed control, primary cooling coil, MERV 8 filters (used with prefilters), control dampers for outside air and return air, and smoke detectors. A key component would be a bypass heating coil that performs the following: Keeps the plenum from super-cooling in a low-load condition Allows humidity control and keeps the plenum supply air from condensing. Figure 6: Enclosed spaces or perimeter zones require individually controlled terminal units. Courtesy: Price Industries Humidity control is an important design consideration in DV because ventilation of outdoor air can account for 50% to 80% of the building moisture load itself, and the occupants generate a lot of moisture. It is important not to let excess moisture into a plenum floor space to prevent unwanted biological growth. Over-ventilating the space with unnecessary outside air amounts is not a good practice in DV. An overhead mixing system is normally designed to induce the outside air into the entire volume of the space. An important aspect of DV is the ventilation air is designed for the breathing-zone space of the occupancy. Because of the buoyant aspect of the displacement delivery near or at the floor, it effectively moves contaminants up and away from the occupants, to the high-return grilles. Per the Engineering Guide to Displacement Ventilation: Typically, mixed-ventilation systems have an average effectiveness of e=0.9. DV systems have a ventilation effectiveness of at least e=1.2, and have the potential for greater ventilation effectiveness when used in combination with a dedicated outdoor air system and radiant heating/cooling systems. Best practice in any DV system lends itself to using a dedicated outdoor air system (DOAS). This provides measured, preconditioned outdoor air to the air blowers throughout the facility using DV. Drying the outdoor air first in the DOAS can aid in control of a desired 30% relative humidity (RH, or less) in the plenum space. By using a total enthalpy wheel in the DOAS (with or without a desiccant wheel for humidity removal) is a very efficient method of energy saving in a DV system. If these best practices are followed with careful design, a DV system can provide flexibility, excellent indoor air quality, energy efficiency, and redundancy that can fit the needs of most open-space occupancies. Steven M. Dailey is a principal and the mechanical engineering discipline leader at Harley Ellis Devereaux. Consulting-Specifying Engineer OCTOBER 2015 DE-6
DISPLACEMENT VENTILATION
DISPLACEMENT VENTILATION D3 OVERVIEW The fundamental approach to displacement ventilation utilizes the natural buoyancy forces created by the convective flows from heat sources in the space. As supply
More informationUnderf loor For Schools
The following article was published in ASHRAE Journal, May 2008. Copyright 2008 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. It is presented for educational purposes
More informationEvaluation of Underfloor Air Distribution
McCarran International Airport Terminal 3 L as Vegas, NV Evaluation of Underfloor Air Distribution and Displacement Ventilation Systems The Pennsylvania State University AESenior ThesisPresentation, Spring
More informationMEP's Letter of Assurance
MEP's Letter of Assurance Instructions Multifamily Residential WELL Certification is determined by onsite Performance Verification and documentation, including Letters of Assurance from the appropriate
More informationChilled Beams. The new system of choice?
Chilled Beams The new system of choice? Presented By: Kevin M. Pope P.E. Jason Leffingwell Hammel Green And Abrahamson, Inc. and Ken Bauer, P.E., LEED AP Butters-Fetting Co., Inc. History of Chilled Beams
More informationASHRAE 62.2: What s New in 2016
ASHRAE 62.2: What s New in 2016 Rick Karg 2016 Residential Energy Dynamics, LLC What We Will Talk About Overview of mechanics of 62.2-2016. Logic behind the Standard. Sizing local ventilation (exhaust-only).
More informationLEED And Your Indoor Environment
LEED And Your Indoor Environment An overview of LEED v3 and Indoor Air Quality David McCauley, CIE Council Certified Indoor Environmentalist ACAC CIE #1008005 USGBC's Mission To transform the way buildings
More informationIECC Commercial Significant Changes Summary Tier I
2009-2015 IECC Commercial Significant Changes Summary Tier I The first change is in the layout of the book. Instead of having Chapters 1-3 that applied to all projects and then having Chapter 4 Residential
More informationLEED v4 Building Design and Construction Quiz #8 EQ
LEED v4 Building Design and Construction Quiz #8 EQ 1. Which of these is considered an unoccupied space? [Choose three] A. School classroom B. Mechanical room C. Meeting room D. Locker room E. Restroom
More informationYORK UNITIZED ENERGY RECOVERY VENTILATOR (ERV) Superior air-flow 300 6,200 CFM
YORK UNITIZED ENERGY RECOVERY VENTILATOR (ERV) Superior air-flow 300 6,200 CFM YORK UNITIZED ENERGY RECOVERY VENTILATORS Regardless of building type or rating system, today s building must be as energy
More informationDate Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection
Slab on Grade & Basements: A capillary break is installed on top of all footings Slab / Pre-Drywall / Thermal Inspection A minimum of 4" of clean or washed gravel (0.5" diameter or greater) is placed over
More informationEnergy Efficiency: Designing Wood-Frame Buildings for Occupant Comfort
Please add relevant logo here Energy Efficiency: Designing Wood-Frame Buildings for Occupant Comfort Presented by: Peter J. Arsenault, FAIA, NCARB, LEED-AP Disclaimer: This presentation was developed by
More informationInsulation, Fireblocking, Draftstopping and Crawl Space Requirements REVISION DATE: JANUARY 2017
City of Republic Community Development Department Insulation, Fireblocking, Draftstopping and Crawl Space Requirements REVISION DATE: JANUARY 2017 Insulation Requirements Insulation (2012 IRC Section R302.10.1):
More informationCrawl Space Moisture Control
Crawl Space Moisture Control Crawl space foundations are found in many homes. Typically, these foundation types are equipped with operable vents designed to provide ventilation for moisture control. Unfortunately,
More informationAchieving acoustical standards in the classroom Study of HVAC systems and classroom acoustics
Achieving acoustical standards in the classroom Study of HVAC systems and classroom acoustics Trane believes the facts and suggestions presented here to be accurate. However, final design and application
More informationQuestar ThermWise Duct Technical Specifications
Questar ThermWise Duct Technical Specifications 1. Introduction and Scope: This document sets forth the specifications for duct sealing and duct insulation in accordance to Questar ThermWise Weatherization
More informationIECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST
IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST ENVELOPE REQUIREMENTS Project: Date: Instructions RECOMMENDED: List performance values, note exceptions that were applied, or provide other
More informationWHITE PAPER. HVLS Industrial Fans Evaluation Guide: 7 Defining Application Design Factors That Will Add Up to a Smart Investment
WHITE PAPER 7 Defining Application Design Factors That Will Add Up to a Smart Investment 2 Contents Introduction 3 Factor #1: 4 Establish your goals early to ensure the right results later. Determine what
More information2001 National Workshop on State Building Energy Codes July th, 2001 Burlington, Vermont
2001 National Workshop on State Building Energy Codes July 16-19 th, 2001 Burlington, Vermont A Systems Engineering Approach to the Design of Energy and Resource Efficient Homes Presented By: Mark LaLiberte
More informationHardin County Planning and Development Commission
Location by Climate Zone: Hardin County (per Table N1101.2), and the entire state of Kentucky is located in Climate Zone 4, the HDD is 4000 to 4999. Building Requirements; Building Thermal Envelope The
More informationMSC Guidelines for Review of Ventilation System Plans
K. B. FERRIE, CDR, Chief, Hull Division Purpose: This Plan Review Guideline (PRG) explains the requirements for seeking plan approval of ventilation systems from the Marine Safety Center (MSC) for most
More informationMcCarran International Airport Terminal 3
McCarran International Airport Terminal 3 The Pennsylvania State University Architectural Engineering Senior Thesis Final Report Evaluation of Underfloor Air Distribution and Displacement Ventilation Systems
More informationChapter 2: Foundation
Chapter 2: Foundation Crawlspace [V502.1.2] [V502.1.2] [V502.1.3] Vents. Vents in the crawlspace help keep floor insulation and floor framing dry. Crawlspace vents also reduce the potential for radon buildup
More informationA. This Section includes ceiling- and wall-mounted diffusers, registers, grilles and louvers.
SECTION 23 37 13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationSECTION AIR DUCT CLEANING
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:
More informationOptimizing Indoor Environments for Occupant Satisfaction. Presented by: Kelli Goldstone April 2016
Optimizing Indoor Environments for Occupant Satisfaction Presented by: Kelli Goldstone April 2016 Outline Function of HVAC Thermal Comfort Air Distribution Radiant Heating / Cooling Case Study Function
More information5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationDyno Test Rooms Professional Chassis, Engine & Specialty Test Rooms for the PowerSports & Product Testing Market
INC s Professional Chassis, Engine & Specialty Test Rooms for the PowerSports & Product Testing Market Proven performance Contains noise and removes exhaust Rugged modular steel panel construction Safe
More informationConstruction Indoor Air Quality (IAQ) Management Plan
Denver School of Science & Technology Middle School 2000 Valentia Street Denver, CO 80238 Telephone: 303-643-5775 Main Fax: 303-673-5776 Construction Indoor Air Quality (IAQ) Management Plan Denver School
More informationPRODUCTS DISPLACEMENT VENTILATION ADVANCING THE SCIENCE OF AIR DISTRIBUTION. Redefine your comfort zone.
A I R D I S T R I B U T I O N PRODUCTS C O R E 04 ADVANCING THE SCIENCE OF AIR DISTRIBUTION DISPLACEMENT VENTILATION Redefine your comfort zone. www.titus-hvac.com Rethink what air management systems can
More informationIs Yours? Homes Across Missouri are Being Built to the Latest National Energy Efficiency Standards
Homes Across Missouri are Being Built to the Latest National Energy Efficiency Standards Is Yours? A home buyers guide to the energy efficiency requirements of the 2012 International Energy Conservation
More information780 CMR: 9 th Edition Massachusetts State Building Code. Presented to: BSA Codes Committee. DATE: January 20, 2016
780 CMR: 9 th Edition Massachusetts State Building Code Presented to: BSA Codes Committee DATE: January 20, 2016 This course is registered with AIA CES for continuing professional education. Credit(s)
More informationACBC Floor Mounted Active Beam
Floor Mounted Active Beam The Price Floor Mounted Active Beam,, is designed for occupant comfort. It provides high cooling and heating capacities while simultaneously supplying ventilation air from a DOAS
More informationBoulder City NV Prepared by (Print Name) Signature Date
City of Boulder City Community Development Department Building & Safety Division 401 California Avenue Boulder City, NV 89005-2600 702-293-9282 (Main Line) 702-293-9392 (Fax) 2009 International Energy
More informationInsight. The Hollow Building. By Joseph W. Lstiburek, Ph.D., P.Eng., Fellow ASHRAE
Insight The Hollow Building An edited version of this Insight first appeared in the ASHRAE Journal. By Joseph W. Lstiburek, Ph.D., P.Eng., Fellow ASHRAE Buildings today are hollow and multilayered with
More informationGeneral Specifications for HVAC System Cleaning
General Specifications for HVAC System Cleaning Part 1 Special Provisions 1.01 Qualification of the HVAC System Cleaning Contractor (A) Membership: The HVAC system cleaning contractor shall be a member
More informationNew Montgomery County Elementary School. Construction Indoor Air Quality Management Plan IEQc3.1 IAQ Plan During Construction
New Montgomery County Elementary School Construction Indoor Air Quality Management Plan IEQc3.1 IAQ Plan During Construction LEED certification promotes environmentally friendly buildings and sites through
More informationWEST VIRGINIA UNIVERSITY ALUMNI CENTER Morgantown, West Virginia
TECHNICAL REPORT I ASHRAE STANDARDS 62.1 AND 90.1 COMPLIANCE EVALUATION 8/29/08 WEST VIRGINIA UNIVERSITY ALUMNI CENTER Morgantown, West Virginia GREGORY SMITHMYER PENN STATE UNIVERSITY ARCHITECTURAL ENGINEERING
More informationDIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...
DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General Requirements
More informationA/E Design Deliverable Checklist
A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic
More informationPREP + INSULATION. DISCLAIMER: These tools are for illustrative purposes only and
PREP + INSULATION HOME ENERGY UPGRADES What every contractor needs to know. Copyright 2012 Advanced Energy. All Rights Reserved 103 HOME ENERGY UPGRADES Prep + Insulation Contents Air sealing is a challenging
More informationIntelliPak Ton and IntelliPak II Ton Rooftops
IntelliPak 20-130 Ton and IntelliPak II 90-150 Ton Rooftops Subject: Indoor Sound Issued by: Clarksville Large Commercial Unitary June 2008 RT-PRB022-EN Table of Contents Engineering Bulletin....................................................
More informationThe Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma
LEED Green Building Certification The purpose of the LEED Green Building Rating is to provide a national standard that aims to improve environmental, health and economic performance of buildings using
More informationIRC 2012 Key Changes
IRC 2012 Key Changes Overview of changes between the 2009 and 2012 IRC A Webinar Provided by The Pennsylvania Housing Research Center November 4, 2011 Presented by Mike Turns; Associate Director, PHRC
More informationCrawl Spaces and Basements: Defining the Building Envelope
Crawl Spaces and Basements: Defining the Building Envelope Rich Jones: INCAA, Charlie Smith: Kentucky Housing Corporation, Albert McMahon: NYSWDA 1 By attending this session, participants will: Identify
More informationA LOOK INTO THE 2015 IECC RESIDENTIAL PROVISIONS. Presented by: Shaunna Mozingo, Colorado Code Consulting
A LOOK INTO THE 2015 IECC RESIDENTIAL PROVISIONS Presented by: Shaunna Mozingo, Colorado Code Consulting WHAT CAN WE EXPECT TO SEE? Some consensus on enough is enough for now - No real roll backs, no real
More informationMEP Engineer's Letter of Assurance
Instructions MEP Engineer's Letter of Assurance WELL Building Standard, Jan 2016 WELL Certification and WELL Core and Shell Compliance are determined by onsite Performance Verification and Documentation,
More informationSAN MIGUEL COUNTY & TOWN OF MOUNTAIN VILLAGE BUILDING DEPARTMENTS PRESCRIPTIVE ENERGY CODE & GREEN BUILDING STANDARD
SAN MIGUEL COUNTY & TOWN OF MOUNTAIN VILLAGE BUILDING DEPARTMENTS PRESCRIPTIVE ENERGY CODE & GREEN BUILDING STANDARD The Prescriptive Energy Code & Green Building Standard requirements for San Miguel County
More information15020 LABORATORIES. C. Section Building Automation and Control System Guidelines
15020 LABORATORIES PART 1: GENERAL 1.01 RELATED SECTIONS A. Section 01004 Energy Guidelines B. Section 01008 Energy Modeling Guidelines C. Section 15955 Building Automation and Control System Guidelines
More informationMilwaukee, WI. Darron Rempel
Application of Hydronic Radiant and Beam Systems ASHRAE Region IV Conference Milwaukee, WI May 14, 2010 Darron Rempel darronr@price hvac hvac.comcom Introduction Topics covered: o Theory of using water
More informationDESIGNING COMMERCIAL SUB-SLAB DEPRESSURIZATION SYSTEMS
DESIGNING COMMERCIAL SUB-SLAB DEPRESSURIZATION SYSTEMS Presented at the 2002 - AARST - 12 th Annual International Radon Symposium in Reno, Nevada Bill Brodhead WPB Enterprises, Inc., 2844 Slifer Valley
More informationANSI/ASHRAE STANDARD , METHODS OF TESTING CHILLED BEAMS
ANSI/ASHRAE STANDARD 200-2015, METHODS OF TESTING CHILLED BEAMS NEMIC 2017 Agenda 1. Foreword 2. Purpose & Scope 3. Definitions 4. Instrumentation & Facilities 5. Test Methods 6. Reporting 7. Normative
More informationFundamentals of Test & Balance for Engineers, Cx & Energy Providers Course Number: CXENERGY1619
AABC Commissioning Group AIA Provider Number 50111116 Fundamentals of Test & Balance for Engineers, Cx & Energy Providers Course Number: CXENERGY1619 Jim Hall, PE, TBE, CxA Systems Management & Balancing,
More informationInspection of New One- and Two- Family Dwellings
Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Inspection of New One- and Two- Family Dwellings Planning and Development
More informationARPAN JOHARI. Architect. 13/08/10 AW Design. Ahmedabad
ARPAN JOHARI. Architect THERMAL MASS Thermal mass (or thermal capacitance) is defined as the ability of a body to store heat THERMAL MASS Thermal mass is also known as Fabric Energy Storage, FES (The Concrete
More informationFEDERATION TOWER MOSCOW DIFFERENT ROOM CLIMATES UNDER ONE ROOF
FEDERATION TOWER MOSCOW DIFFERENT ROOM CLIMATES UNDER ONE ROOF Oliver Baumann 1, and Claudius Reiser 1/2 1 Ebert & Baumann Consulting Engineers, Washington, D.C. 2 Ebert-Ingenieure GmbH &Co. KG, Munich,
More informationBUILDING DESIGN FOR HOT AND HUMID CLIMATES IMPLICATIONS ON THERMAL COMFORT AND ENERGY EFFICIENCY. Dr Mirek Piechowski 1, Adrian Rowe 1
BUILDING DESIGN FOR HOT AND HUMID CLIMATES IMPLICATIONS ON THERMAL COMFORT AND ENERGY EFFICIENCY Dr Mirek Piechowski 1, Adrian Rowe 1 Meinhardt Building Science Group, Meinhardt Australia 1 Level 12, 501
More informationMEP's Letter of Assurance
MEP's Letter of Assurance Instructions WELL Certification is determined by onsite Performance Verification and documentation, including Letters of Assurance from the appropriate professionals overseeing
More informationOne and Two Family Additions
One and Two Family Additions An addition to a house, duplex, garage, or an accessory structure requires a building permit prior to performing any construction. Building Department & Permit Office Mon-Fri
More informationManitoba Energy Code for Buildings. Part 3 Building Envelope
Manitoba Energy Code for Buildings Part 3 Building Envelope Rick Marshall, P. Eng, LEED AP September 17, 2014 Manitoba Energy Code for Buildings (MECB) Training Day Part 3 - Scope Part 3 is concerned with
More informationAPPROVED. Acceptable to the code official for compliance with the provisions of the applicable Code or referenced Standard.
Chapter 1 101.1 Title. These regulations shall be known as the North Carolina Energy Conservation Code as approved by the North Carolina Building Code Council on March 11, 2008, to be effective January
More informationAdvanced Ventilation for Residential applications FBC Res 2010.
Advanced Ventilation for Residential applications FBC Res 2010. Course Description Review of the Residential Ventilation requirements in the Florida Building Code, Residential 2010. I. Introduction Dean
More informationWP5.5: Product concepts for high efficiency step by step retrofits
WP5.5: Product concepts for high efficiency step by step retrofits Final presentation Product development 1. Aim of Product development 2. Summary of demand - what exists and what is needed 3. Meetings
More information1.02 Related Sections A. Section Heating, Ventilation and Air Conditioning (HVAC). C. Section Pneumatic and Electric Control HVAC.
PART 1: GENERAL 1.01 Section Includes A. Dual duct terminal units. B. Variable volume regulators. C. Integral damper motor operators. D. Integral controls. 1.02 Related Sections A. Section 23 00 00 Heating,
More informationRESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST
This list is provided as a guide to help you understand the information that must be contained on the construction drawings. This list is not all-inclusive of all building codes but is used as a general
More informationLock In Energy Savings For Life
Lock In Energy Savings For Life AN ENVIRONMENTALLY FRIENDLY HOME IS A GREAT BENEFIT FOR YOU, YOUR FAMILY AND THE ENVIRONMENT. TAKE AN ACTIVE ROLE IN HELPING REDUCE GREENHOUSE GASES, THUS SLOWING THE EFFECTS
More informationABSTRACT I. INTRODUCTION II. METHODS AND MATERIAL
2017 IJSRSET Volume 3 Issue 2 Print ISSN: 2395-1990 Online ISSN : 2394-4099 Themed Section: Engineering and Technology Chiller and AHU Design for A commercial Usage S M Azfar Hashmi, Mirza Muneer Baig,
More informationHCM UNIVERSITY OF ALASKA FAIRBANKS Building Challenges in Alaska UNIVERSITY OF ALASKA FAIRBANKS
HCM-00952 UNIVERSITY OF ALASKA FAIRBANKS UNIVERSITY OF ALASKA FAIRBANKS Building Challenges in Alaska INTRODUCTION Special considerations for building in Alaska are recommended that are normally not included
More informationPlanning for Biomed Facility Puts Energy Efficiency Under Microscope
Planning for Biomed Facility Puts Energy Efficiency Under Microscope Chilled beams, runaround-loop ERV system included May 19, 2014 By DAN VASTYAN, Common Ground, Manheim, Pa. HPAC Engineering Constructing
More informationCHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION
Chapter 1: Overview of Energy Efficient Construction 1 CHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION Chapter 1 is a quick reference guide that discusses the key components and features of energy
More informationApplication of Advanced Energy Technologies
GLOBALCON 2002 Philadelphia, Pennsylvania March 27, 2002 Application of Advanced Energy Technologies Michael K. West, Ph.D., P.E. Building Systems Scientist Advantek Consulting, Inc. www.advantekinc.com
More informationInsulation Technologies and Installation Specifications for Better Energy Performance of Commercial Buildings
Insulation Technologies and Installation Specifications for Better Energy Performance of Commercial Buildings Wood Products Council is a Registered Provider with The American Institute of Architects Continuing
More informationCan you Believe Energy Savings Forecasts
Can you Believe Energy Savings Forecasts By: Tony Woods Introduction Yes, says TonyWood. Especially when your project includes an upgrade to the building envelope. The relationship between high performance
More informationRhode Island Commercial Codes FAQs
Rhode Island Commercial Codes FAQs When does the new code go into effect? The new suite of building codes (including the new state energy conservation code, SBC-8) was adopted on July 1, 2013. A brief
More information1. Frozen food warehouses used solely for storage of Class I and II commodities where protected by an approved automatic sprinkler system.
Draft curtains are typically used in warehouses, aircraft hangars and large industrial plants to contain or channel smoke that rises to the ceiling in a fire. They can keep the smoke from rolling across
More informationQuality Control Inspection of Homes with Thermal Imaging
Quality Control Inspection of Homes with Thermal Imaging Sampling of Thermal Images collected during a study of construction quality of homes built recently in the five most populous parishes of Louisiana
More informationYou Can Help the Environment with Green Building Technology
Office Spaces Classrooms Casinos Call Centers You Can Help the Environment with Green Building Technology Office Space 2010 Total Quality Logistics 100,000 sq. ft. ASM Quick-Loc ESW Intelligent Office
More informationDesign & Construction Standards, Revised January
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationCore Building Advances: Introduction to Sustainable Building & Building Science
Core Building Advances: Introduction to Sustainable Building & Building Science Rob Howard & Mike Mongeon Habitat for Humanity International rhoward@habitat.org mmongeon@habitat.org Introductions Name
More informationMichigan Energy Code Training and Implementation Program
Michigan Energy Code Training and Implementation Program 1.0 Hour Advanced Program Course Number 16202 Residential Energy Plan Review School of Planning, Design & Construction Michigan State University
More information2012 Fiscal Impact International Mechanical Code
2012 Section No. 306.5 Item 2 2012 Code Information - bold text = new text found in 2012 strike out = text deleted and not found in the 2012 Equipment and appliances on roofs or elevated structures: Item
More informationB. ASHRAE 1991 HVAC Applications Handbook: Chapter 34--Testing, Adjusting and Balancing.
PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 230593 TESTING, ADJUSTING, AND BALANCING A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification
More informationEnergy-efficient weatherization
Energy-efficient weatherization For your home 4326 02/14 Puget Sound Energy P.O. Box 97034 Bellevue, WA 98009-9734 pse.com/myrebates Weatherize your way to comfort In this guide 4 Understanding weatherization
More informationA/E Design Deliverable Checklist
A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic
More informationBuilding & Fire Appeals Board
Building & Fire Appeals Board Date: March 10, 2016 Time: 3:30 p.m. - 5:00 p.m. Location: St Etienne Room City of Des Moines Armory Building 602 Robert D. Ray Drive Des Moines, Iowa 50309-1881 Summersfield
More informationGeneral Residential Code Requirements
Residential building code review will be based on compliance with the requirements of the Louisiana State Uniform Construction code in accordance with ACT 12 of the 2005 First Extraordinary Session of
More informationCorridor Pressurization System Performance in Multi-Unit Residential Buildings
Corridor Pressurization System Performance in Multi-Unit Residential Buildings Lorne Ricketts Student Member ASHRAE John Straube, PhD, P.Eng. Associate Member ASHRAE ABSTRACT Corridor pressurization based
More informationAIRCOOL VENTILATORS FURTHER INFORMATION
.................................................. CI/SfB (57.7) Xy Uniclass L7563 January 2015 FURTHER INFORMATION................................................................... Services Passivent
More informationDIVISION 11 - EQUIPMENT FOOD SERVICE EQUIPMENT LABORATORY FUME HOODS. A. Design Considerations
DIVISION 11 - EQUIPMENT 11400 FOOD SERVICE EQUIPMENT A. Design Considerations 1. The A/E shall use the services of a food service equipment specialist in preparation of kitchen areas and other food preparation
More informationUsing a Aerosol Sealant to Reduce Multifamily Envelope Leakage
Using a Aerosol Sealant to Reduce Multifamily Envelope Leakage Dave Bohac PE Director of Research Ben Schoenbauer Senior Research Engineer Jim Fitzgerald Senior Building Analyst Center for Energy and Environment
More informationCeiling Radiant Cooling Panels
2006, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc (wwwashraeorg) Published in ASHE Journal Vol 48, Oct 2006 For personal use only Additional reproduction, distribution,
More informationEncapsulated, Sealed & Closed Crawlspace Installation Manual
YourCrawlSpace, Inc. 1007 Johnni4 Dodds Blvd. Mt. Pleasant, SC 29464 Toll Free: 877-44-CRAWL (27295) Local: (843) 593-1115 Encapsulated, Sealed & Closed Crawlspace Installation Manual Copyright 2017 Your
More informationValent Packaged Rooftop Units A Fresh Choice for High-Percentage Outdoor Air Designs. Valent is a business of Unison Comfort Technologies.
Valent Packaged Rooftop Units A Fresh Choice for High-Percentage Outdoor Air Designs Valent is a business of Unison Comfort Technologies. When your HVAC system design calls for high-percentage or 100%
More informationMechanical Product Overview
Mechanical Product Overview The founding principles of Price have never changed business integrity, first class service, innovation and a commitment to people. PURPOSE BUILT FOR YOUR APPLICATION Whether
More informationOffice of Design & Construction State University Plaza Albany, New York
Instructions: Consultant should meet with the Campus and Fund at the work area(s) prior to completing this Checklist. At least two (2) meetings are required, one prior to Schematic Phase submission and
More informationINTERIOR ENVIRONMENT
CHAPTER 12 INTERIOR ENVIRONMENT > SECTION 1201 GENERAL 1201.1 Scope. The provisions of this chapter shall govern ventilation, temperature control, lighting, yards and courts, sound transmission, room dimensions,
More informationCommissioning for Energy Savings
Commissioning for Energy Savings Presented To: AEE / ASHRAE / USGBC 2013 Energy Expo St. Paul RiverCentre, St. Paul, Minnesota October 2, 2013 Presented By: Rebecca T. Ellis, PE LEED AP BD+C, CCP, CPMP
More informationRadon Vent Pipe System. Labeling Performance Indicators
Section 6 Radon Vent Pipe Labeling Performance Indicators Radon Vent Pipe System Connected after sub-grade system installed Pipe cannot be trapped Provide space in chases Support at each floor level Discharge
More informationEADQUARTERS. Thesis Revised Proposal. Stephanie Kunkel Mechanical Option
EADQUARTERS 707 N. Calvert St. Mechanical System Renovation Construction Management & Lighting/Electrical Breadths Stephanie Kunkel www.engr.psu.edu/ae/thesis/portfolios/2011/slk5061 Mechanical Option
More informationNEW HOMES PROGRAM 2017 PROGRAM GUIDE
NEW HOMES PROGRAM 2017 PROGRAM GUIDE Focus on Energy, Wisconsin utilities statewide program for energy efficiency and renewable energy, helps eligible residents and businesses save energy and money while
More information