SECTION STORM DRAIN

Size: px
Start display at page:

Download "SECTION STORM DRAIN"

Transcription

1 PART 1 - GENERAL 1-01 SECTION INCLUDED A. Furnishing and installing storm drainage facilities, including pipe, cleanout, manhole structures and inlet structures RELATED SECTIONS A. Division 00 Contract General Conditions. B. Section Temporary Facilities. C. Section Clearing and Demoloition. D. Section Soil Materials. E. Section Trench Excavation and Backfilling. F. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specifications sections, apply to the work of this section REFERENCES A. ANSI/ASTM C76 Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe. B. ANSI/ASTM C443 Joints for Circular Concrete Sewer and Culvert Pipe, using rubber gaskets. C. ANSI/ASTM C478 Precast Reinforced Concrete Manhole Sections. D. California Test Method No. 216 (Dry Method) SUBMITTALS A. Submit under provisions of Division 00 Contract General Conditions. B. Certificates of compliance for material. C. Product Data: Provide data indicating pipe, accessories, and associated equipment to be furnished. D. Manufacturer s Installation Instructions: Indicate special procedures required to install products supplied COORDINATION A. Coordinate work with Owner personnel. B. Verify that the location of existing utilities have been indicated at work site by utility authorities and Owner personnel. CHILDREN S WATER PLAY AREA PAGE 1

2 AGE IMPROVEMENTS 1-06 EXISTING UTILITIES A. The Engineer has indicated on the plans the location of all known existing utility facilities within the work area. The location of said facilities shall be considered approximate only, until exposed by the Contractor. B. Service laterals have been shown where information was available. The location of said facilities shall be considered approximate only, until exposed by the Contractor. C. Contractor shall verify all utilities within the work area, including using hand method. Contractor shall protect all existing utilities not designated to be removed. D. Maintain all existing utility mains and service lines in constant service during construction of the work PROJECT RECORD DOCUMENTS: A. Submit under provisions of Section B. Accurately record actual locations of utilities encountered. PART 2 - PRODUCTS 2-01 MATERIALS A. Reinforced Concrete Pipe for pipe larger than 12 : ANSI/ASTM C76, Class 4, with rubber gasket joints per ANSI/ASTM C443. B. Storm drainage sewer pipeline shall by polyvinyl chloride (PVC) pipe for storm sewer conforming to ASTM designation 3034, SDR 35 for pipe 12 or less. C. Storm drain manhole, frame and cover shall be as per detail drawing. D. Cast in Place Concrete: Per Section E. Mortar: Composed of one part, by weight, Portland cement (Type II low alkali per ASTM C150), 2 parts, by weight, sand, and water. F. Storm drain inlets shall be Dura Drain P-6, or approved equal. G. Soil Fill for Concrete Pipe Bedding Envelope: Type B or C per Section H. Cleanout shall be constructed as per detail drawing. IMPROVEMENTS CHILDREN S WATER PLAY AREA SUMMARY OF WORK PAGE 2 09/12/14

3 PART 3 - EXECUTION 3-01 EXAMINATION A. Verify site conditions. Locate, identify, and protect existing above and below grade utilities from damage PREPARATION A. Protect all improvements not authorized for removal. B. Employ equipment and methods appropriate to the work site. C. Identify location of proposed storm drainage facilities to be constructed. Expose connection points to existing system. D. Protect excavated areas from drainage inflow, and provide drainage to all excavated areas. Dewater as necessary. E. Comply with safety requirements as they pertain to excavations, per Section /3-01C EXCAVATION A. Excavate soil required to locate existing utilities and install the work, use hand method as necessary in congested area. B. Employ equipment and methods appropriate to the work site. C. Cut trenches just wide enough to enable installation and proper backfill and do not interfere with 45 degree bearing splay of foundations. When excavating through tree roots, cut roots by hand. D. Excavate trenches to provide the minimum cover required. E. Excavate trenches, pits, or holes bottoming in hardpan to a minimum of 6 inches below the grade for the bottom of the pipe and any couplings. F. In all trenches or excavation sites where a firm foundation is not encountered, such as soft, spongy, or otherwise unsuitable material, remove the material to a minimum of 12 inches, or to a depth determined by the Engineer, below the bottom of the proposed pipe or structure. G. Stockpile excavated material to be returned to trench adjacent thereto in location, which will not be detrimental to existing improvements, or pedestrian or vehicular traffic. Remove unsuitable or excess materials not being used, from site INSTALLATION AND BEDDING OF PIPE A. Install the pipe and fittings to the lines and grades shown on the construction plans. B. Install pipe and fittings in accordance with the manufacturer s recommendations. CHILDREN S WATER PLAY AREA PAGE 3

4 AGE IMPROVEMENTS C. Lay all pipe with bell end of pipe upgrade from structure to structure. D. Excavate suitable bell holes in the bedding material, so that the bells do not bear on the subgrade or bedding. E. Ensure that all joints are watertight. F. Bed concrete pipe in Type B or C soil envelope, and compact to a minimum of 85 percent relative compaction. Place and compact the bedding material under, around and over the pipe, filling the trench cavity and extending from the bottom of the trench (4 inches below the outside bottom of the pipe barrel) to a level 12 inches above the outside top of the pipe barrel INSTALLATION OF AGE STRUCTURES AND APPURTENANCES A. Install storm drainage structures as indicated on the construction plans, in accordance with the manufacturer s recommendations, and as specified herein. B. Construct cast-in-place concrete per Section C. Key top of poured-in-place concrete bases for structures to receive the tongue of precast riser sections. D. Joint precast manhole and structure riser sections with a minimum thickness of ½ inch of mortar per Section /2-01G to make a watertight joint. Neatly point the inside and outside of the joint. Set sections plumb. E. Construct cleanout per detail drawing BACKFILLING TO FINISH GRADE AND FINISH GRADING A. Backfill from bottom of the trench to pipe grade with Type B and C soil. B. After installation of pipes and appurtenances and backfill of pipe bedding material. C. Backfill trenches above pipe bedding material and to within 6 inches of finish subgrade with Type A, B, & C soils. Compact all soil backfill not exceeding 8 inches in uncompacted thickness. Maintain optimum moisture content of fill materials. D. Backfill final 6 inch thickness to finish subgrade in areas to receive concrete, asphaltconcrete, aggregate base, or other non-vegetative surface improvement, with Type B or C soils. E. Backfill final 6 inch thickness to finish subgrade in areas to receive sod, other vegetation, or bare soil with Type A soil. F. Obtain 85 percent relative compaction of backfill from bottom of backfill to a level of 2 feet below finish subgrade, and obtain minimum of 95 percent relative compaction of backfill in top 2 feet below finish subgrade, in areas to receive concrete, asphalt-concrete, aggregate base, or other non-vegetative surface improvement. G. Obtain minimum of 85 percent relative compaction of backfill in areas to receive sod, other vegetation, or bare soil. IMPROVEMENTS CHILDREN S WATER PLAY AREA SUMMARY OF WORK PAGE 4 09/12/14

5 3-07 TOLERANCES A. Pipe laying tolerances: 1. Above grade: Not to exceed 1/4 inch above planned grade. 2. Below grade: Not to exceed ½ inch below planned grade. 3. Alignment: Not to exceed 2 inches from planned alignment, if gradual and regular over a distance of 20 feet. B. Structure finish grade tolerance: Within ¼ inch of planned grade, but must match adjacent improvements FIELD QUALITY CONTROL A. Field inspection and testing will be performed as per Section B. Compaction testing of bedding and backfill will be performed in accordance with ASTM D C. If tests indicate work does not meet specified requirements, re-compact, or remove and replace, and retest. END OF SECTION CHILDREN S WATER PLAY AREA PAGE 5

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

***************************************************************************************************************

*************************************************************************************************************** 02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. SECTION 33 05 13 MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. B. Related Sections: 1. Section 03 20 00 - Concrete

More information

***************************************************************************************************************

*************************************************************************************************************** 02735 WASTE WATER DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 22 14 00 ***************************************************************************************************************

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES SECTION 02215 EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES PART 1 - GENERAL 1.1 DESCRIPTION: This section includes materials, testing, and installation of earthwork for excavations, fills, and

More information

SECTION FACILITY SANITARY SEWERS

SECTION FACILITY SANITARY SEWERS SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 02630 - STORM DRAINAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown

More information

D. Removal of existing storm sewerage pipe and drainage structures.

D. Removal of existing storm sewerage pipe and drainage structures. SECTION 33 40 00 - PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplemental Conditions, Division B and other Division 1 Specifications

More information

Summary of the 2011 Changes

Summary of the 2011 Changes The following is a list of amendments to the Residential Site Improvement s, N.J.A.C. 5:21, adopted in 2011. The Notice of Adoption of these changes appeared in the New Jersey Register on May 16, 2011.

More information

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with

More information

SECTION PIPE & PIPE FITTINGS PART 1 GENERAL

SECTION PIPE & PIPE FITTINGS PART 1 GENERAL SECTION 02610 PIPE & PIPE FITTINGS PART 1 GENERAL 1.01 DESCRIPTION A. This Section includes the material and bedding requirements for all pipe and pipe fittings for underground pressure and non-pressure

More information

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.

More information

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.

More information

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections. SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sanitary Sewer Gravity Mains B. Sanitary Sewer Force Mains C. Sanitary Sewer Services 1.02 DESCRIPTION OF WORK A. Construct sanitary sewer gravity

More information

SECTION UTILITY MANHOLES AND STRUCTURES

SECTION UTILITY MANHOLES AND STRUCTURES SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1 March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural

More information

DIVISION 4 SANITARY SEWERS AND STORM DRAINS

DIVISION 4 SANITARY SEWERS AND STORM DRAINS DIVISION 4 SANITARY SEWERS AND STORM DRAINS 401 PIPE AND FITTINGS FOR SANITARY SEWERS AND STORM DRAINS...1 401.01.00 MATERIALS... 1 401.01.01 CERTIFICATION OF MATERIALS... 1 401.01.02 PIPE... 1 401.01.02A

More information

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation. SECTION 312333 TRENCHING AND BACKFILLING PART 1 - GENERAL 1.1 SUMMARY A. Excavate trenches for new electric and telephone conduits, gas lines, and their appurtenances from at least 5 feet outside the building

More information

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. PART 1 - GENERAL 1.1 DESCRIPTION A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section 01300 Record

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 221313 - FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

CHAPTER 6. Sanitary Sewer

CHAPTER 6. Sanitary Sewer CHAPTER 6 Sanitary Sewer A. Introduction All proposed developments, subdivisions, and buildings must have a properly designed and constructed sanitary sewer collection system. The system shall provide

More information

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 401 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 401.01 SCOPE 401.02 REFERENCES 401.03 DEFINITIONS

More information

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS. SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract

More information

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CS 3-01 GENERAL: A. The foundation, bedding and backfill for all trenches shall conform with the requirements of the City Standard

More information

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE BE IT ORDAINED by the Town Council of the Town of Plainville: SECTION 1. SUBDIVISIONS. All subdivisions hereinafter developed within

More information

Construction Inspection Checklists

Construction Inspection Checklists III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments

More information

901 - PIPE SEWERS COMPLETE IN PLACE

901 - PIPE SEWERS COMPLETE IN PLACE 901 - PIPE SEWERS COMPLETE IN PLACE 901.01 Description 901.02 Materials and Material Handling 901.03 Excavation 901.04 Limits as to Width of Trench 901.05 Unauthorized Excavation 901.06 Subgrade 901.07

More information

1. B16.1 Cast Iron Pipe Flanges and Flanged Fittings, Class C 111 Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings

1. B16.1 Cast Iron Pipe Flanges and Flanged Fittings, Class C 111 Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings SECTION 33 34 00 SANITARY FORCE MAIN PART 1 GENERAL 1.1 SCOPE OF WORK A. This section specifies the requirements for furnishing and installing sanitary force main and appurtenances. The pipe shall be of

More information

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES PART 1 GENERAL 1.01 SCOPE A. This work shall consist of the underground construction of a pipeline across the state right-ofway, or other facility as indicated on the plans and as

More information

Concrete Pipe Joints Your Best Choice

Concrete Pipe Joints Your Best Choice Frequently Asked Questions Q. Are joints covered by National Standards? A. Yes. There are ASTM and AASHTO standards for concrete products joints. The various standards are discussed in this publication.

More information

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY Section Includes: 1. Pipe and fittings. 2. Drain Basin. 3. De-chlorination tablet feeder. 4. Non-pressure transition couplings.

More information

BAYFILTER SPECIFICATIONS

BAYFILTER SPECIFICATIONS PART 1.00 GENERAL 1.1 DESCRIPTION BAYFILTER SPECIFICATIONS A. The BayFilter system s internal components manufacturer selected by the Contractor and approved by the Engineer, shall furnish all labor, materials,

More information

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems. NORTH MARIN WATER DISTRICT STANDARD SPECIFICATIONS SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS PART 1 GENERAL 1.01 DESCRIPTION This section includes materials and installation of ductile-iron pipe and

More information

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014 1 0 1 0 1 0 1 SECTION 1. TRENCHING BASED ON DFD MASTER SPECIFICATION DATED // P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all work, materials, labor, equipment,

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 33 3400 STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS

More information

ITEM 464 REINFORCED CONCRETE PIPE

ITEM 464 REINFORCED CONCRETE PIPE ITEM 464 REINFORCED CONCRETE PIPE 464.1. Description. This Item shall govern for furnishing and installing all concrete pipe and materials and for constructing precast concrete pipe culverts or precast

More information

CONCRETE PIPE JOINTS, YOUR BEST CHOICE

CONCRETE PIPE JOINTS, YOUR BEST CHOICE CONCRETE PIPE JOINTS, YOUR BEST CHOICE www.concretepipe.org FREQUENTLY ASKED QUESTIONS Q. Are joints covered by National Standards? A. Yes. There are ASTM and AASHTO standards for concrete products joints.

More information

ONE PIPE LENGTH MAX (REFER TO 1/4"/FT SLOPE (MIN) 5'-0" (MIN) OR 4" LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4"x6" REFER TO TYPICAL EXCAVATION,

ONE PIPE LENGTH MAX (REFER TO 1/4/FT SLOPE (MIN) 5'-0 (MIN) OR 4 LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4x6 REFER TO TYPICAL EXCAVATION, VENT CAP (MUSHROOM TYPE) SOLID CAP EXIST GRADE MIN BUILDING REFER TO NOTE #4 MIN CONCRETE SIDEWALK CURB OR EDGE OF SIDEWALK STREET CLEANOUT (REFER TO NOTE #3) VENT PIPE 4" PVC 6" PVC CLEANOUT CONCRETE

More information

SECTION GRAVITY IRRIGATION PIPELINES RUBBER GASKETED REINFORCED CONCRETE PIPE (RGRCP)

SECTION GRAVITY IRRIGATION PIPELINES RUBBER GASKETED REINFORCED CONCRETE PIPE (RGRCP) SECTION 02513 GRAVITY IRRIGATION PIPELINES RUBBER GASKETED REINFORCED CONCRETE PIPE (RGRCP) PART 1 GENERAL 1.01 SECTION INCLUDES A. Irrigation pipeline, as herein specified, consists of installing pipe

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

STANDARDS RESOLUTION NO ADOPTED JANUARY 17, 1995

STANDARDS RESOLUTION NO ADOPTED JANUARY 17, 1995 ORO LOMA SANITARY DISTRICT 2600 GRANT AVENUE, SAN LORENZO, CA 94580 STANDARDS RESOLUTION NO. 2730 ADOPTED JANUARY 17, 1995 Revised June 2014 DIRECTORS: Roland J. Dias, President Laython N. Landis, Vice

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19-1 19-1.01 Exploratory Excavation... 19-1 19-1.02 Trench... 19-1 19-1.02.AStorm Drain Pipe...

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

MATERIAL SPECIFICATION FOR CIRCULAR AND ELLIPTICAL CONCRETE PIPE

MATERIAL SPECIFICATION FOR CIRCULAR AND ELLIPTICAL CONCRETE PIPE ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 1820 NOVEMBER 2017 MATERIAL SPECIFICATION FOR CIRCULAR AND ELLIPTICAL CONCRETE PIPE TABLE OF CONTENTS 1820.01 SCOPE 1820.02 REFERENCES 1820.03 DEFINITIONS

More information

Fabrication and Installation Table of Contents

Fabrication and Installation Table of Contents Fabrication and Installation Table of Contents HDPE AQUASHIELD PRODUCTS 2 Fabrication and Installation 2 System Fabrication 3 Aqua-Swirl Installation 4 Step 1 Excavation and Bedding 4 Step 2 Pipe Connection

More information

A. This Section includes subdrainage systems for foundations and underslab areas. A. Product Data: For each type of drainage panel indicated.

A. This Section includes subdrainage systems for foundations and underslab areas. A. Product Data: For each type of drainage panel indicated. ZGF Partnership Page 1 of 7 SECTION 33 46 00 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes subdrainage systems for foundations and underslab areas. 1.2 SUBMITTALS A. Product Data: For each type

More information

SECTION IV. PIPELINE EXCAVATION AND BACKFILL

SECTION IV. PIPELINE EXCAVATION AND BACKFILL SECTION IV. PIPELINE EXCAVATION AND BACKFILL A. Description of Work B. Surface Types C. Backfill D. Surface Restoration A. DESCRIPTION OF WORK 1. Extent: Excavation of trenches for pipelines shall include

More information

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): 01 Providing and Fixing of CPVC pipes confirming to ASTM standard including all CPVC fittings like tees, elbows, bends, unions, coupling, reducer

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY PHASE II SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

SANITARY SEWERAGE AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) AMERICAN RAILWAY ENGINEERING ASSOCIATION (AREA)

SANITARY SEWERAGE AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) AMERICAN RAILWAY ENGINEERING ASSOCIATION (AREA) SANITARY SEWERAGE 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation

More information

SECTION FOUNDATION DRAINAGE

SECTION FOUNDATION DRAINAGE SECTION 33 41 13 SPEC WRITER NOTES: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and

More information

MATERIAL SPECIFICATION FOR CIRCULAR AND ELLIPTICAL CONCRETE PIPE

MATERIAL SPECIFICATION FOR CIRCULAR AND ELLIPTICAL CONCRETE PIPE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1820 NOVEMBER 2012 MATERIAL SPECIFICATION FOR CIRCULAR AND ELLIPTICAL CONCRETE PIPE TABLE OF CONTENTS 1820.01 SCOPE 1820.02 REFERENCES 1820.03 DEFINITIONS

More information

Subject: Use of Plastic Pipe for Storm Sewer and Culverts on Trunk Highways

Subject: Use of Plastic Pipe for Storm Sewer and Culverts on Trunk Highways Minnesota Department of Transportation Engineering Services Division Technical Memorandum No. 17-05-B-02 April 11, 2017 Technical Memorandum To: Electronic Distribution Recipients From: Nancy T. Daubenberger,

More information

TECHNICAL SPECIFICATIONS GRAVITY AND PRESSURE SEWER LINE AND MATERIALS

TECHNICAL SPECIFICATIONS GRAVITY AND PRESSURE SEWER LINE AND MATERIALS TECHNICAL SPECIFICATIONS GRAVITY AND PRESSURE SEWER LINE AND MATERIALS Scope of Work Work performed under this contract shall consist of furnishing and installing, complete and ready for service, the sewer

More information

1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe.

1. Initial Backfill: Backfill placed beside and over pipe in a trench, including haunches to support sides of pipe. 31 20 00 EXCAVATION, TRENCHING AND BACKFILLING SECTION 1 - GENERAL 1.1 SUMMARY A. This section includes grading, excavation trenching, dewatering and backfilling for pipeline installation, roadways, walkways,

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

SECTION XXXX POLYMER CONCRETE PUMP STATIONS

SECTION XXXX POLYMER CONCRETE PUMP STATIONS SECTION XXXX POLYMER CONCRETE PUMP STATIONS PART 1 GENERAL 1.1 SUMMARY A. This specification shall govern for the furnishing of all work necessary for installation of polymer concrete pump stations to

More information

SECTION STORM DRAINAGE

SECTION STORM DRAINAGE SECTION 02630 STORM DRAINAGE PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplemental Conditions and Division 1 Specification Sections,

More information

SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO)

SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO) SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO) This guide specification for U.S. applications describes construction of bio-infiltration bump outs (or bioretention ) systems. From the surface down to the

More information

Construction Specification for Concrete Unit Pavers

Construction Specification for Concrete Unit Pavers Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS

More information

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT): SECTION 31 32 13.16 CEMENT STABILIZATION PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section pertains to the specifications for cement stabilization of sandy or silty soil and consists of pulverizing, addition

More information

New Fulton State Hospital Energy Control Center and Services Building (ECC/SVC) Project Number: M

New Fulton State Hospital Energy Control Center and Services Building (ECC/SVC) Project Number: M SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000

Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000 Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000 610S.1 This item shall govern the proper care and treatment of all trees and other vegetation

More information

SANITARY SEWER SYSTEM CONSTRUCTION STANDARD SPECIFICATIONS SECTION 130 SANITARY SEWER SYSTEM CONSTRUCTION

SANITARY SEWER SYSTEM CONSTRUCTION STANDARD SPECIFICATIONS SECTION 130 SANITARY SEWER SYSTEM CONSTRUCTION SANITARY SEWER SYSTEM CONSTRUCTION STANDARD SPECIFICATIONS SECTION 130 SANITARY SEWER SYSTEM CONSTRUCTION 130-1.01 Description All sanitary sewer system components and related items for new construction

More information

SECTION WATER DISTRIBUTION

SECTION WATER DISTRIBUTION SECTION 33 10 00 WATER DISTRIBUTION PART 1 GENERAL 1.01 SUMMARY 1.02 CODES A. Section Includes: 1. Underground water service piping, watermains and appurtenances. A. All work shall comply with the most

More information

TRENCH EXCAVATION AND BACKFILL

TRENCH EXCAVATION AND BACKFILL SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section 300 - Trench Excavation and Backfill TRENCH EXCAVATION AND BACKFILL PART - GENERAL.0 SECTION INCLUDES A. Trench Excavation

More information

PERMEABLE INTERLOCKING PAVERS

PERMEABLE INTERLOCKING PAVERS PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement

More information

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION NEW CASTLE COUNTY DEPARTMENT OF LAND USE ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION For Permanent Structures, pursuant to Delaware Pond Code 378 and Delaware Sediment and

More information

STANDARD CONSTRUCTION SPECIFICATIONS FOR SANITARY SEWERS DIVISION 50 INDEX

STANDARD CONSTRUCTION SPECIFICATIONS FOR SANITARY SEWERS DIVISION 50 INDEX STANDARD CONSTRUCTION SPECIFICATIONS FOR SANITARY SEWERS DIVISION 50 INDEX SECTION 50.01 GENERAL... 1 Article 1.1 Scope of Work... 1 Article 1.2 Applicable Standards... 1 Article 1.3 Surveys... 2 Article

More information

SECTION GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS

SECTION GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS SECTION 2100 - GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS The City of Lee s Summit hereby adopts Section 2100 of the Kansas City Metropolitan Chapter of APWA Construction

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

Construction Specification for Utility Adjustments

Construction Specification for Utility Adjustments Engineering & Construction Services Division Standard Specifications for Road Works TS 4.50 September 2017 for Utility Adjustments Table of Contents TS 4.50.01 SCOPE... 2 TS 4.50.02 REFERENCES... 2 TS

More information

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES SECTION 15420 DRAINAGE AND VENT SYSTEMS PART 1 DESIGN DIRECTIVES 1.1 DESIGN CRITERIA A. All cleanouts above finished (accessible and non-accessible) ceilings shall be extended to the floor above. B. Do

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

SECTION TRENCHLESS INSTALLATION

SECTION TRENCHLESS INSTALLATION SECTION 02250 PART 1 GENERAL 1.01 Section Includes A. Trenchless installation of casing pipe. B. Trenchless installation of carrier pipe. C. Open cut installation of casing pipe. 1.02 Description of Work

More information

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR EASEMENT NOTES:. EASEMENT LIMIT SHOWN AS PROVIDED BY. TESC NOTES:. CONTRACTOR SHALL DEVELOP TEMPORARY EROSION AND SEDIMENT CONTROL PLAN AND PROVIDE ONSITE CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL)

More information

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE SECTION 02632 POLYVINYL CHLORIDE (PVC) WATERLINE PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required, and install polyvinyl chloride (PVC) waterline,

More information

Special Provision No. 405F03 March 2005

Special Provision No. 405F03 March 2005 PIPE SUBDRAINS - Item No. VIDEO CAMERA INSPECTION Item No. Special Provision No. 405F03 March 2005 OPSS 405, February 1990, Construction Specification for Pipe Subdrains is deleted in its entirety and

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 811 CONDUIT AND DRAINAGE STRUCTURES

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 811 CONDUIT AND DRAINAGE STRUCTURES STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 811 CONDUIT AND DRAINAGE STRUCTURES January 18, 2013 811.01 Conduit Description 811.02 Conduit Materials 811.03 Conduit Definitions

More information

2.1 Backfill - General

2.1 Backfill - General 2.1 Backfill - General Excavations are made for the purpose of constructing bridge substructure elements, and consequently requiring competent backfill material. The backfill material must be adequately

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 804 EXCAVATION, TRENCHING AND BACKFILL

San Antonio Water System Standard Specifications for Construction ITEM NO. 804 EXCAVATION, TRENCHING AND BACKFILL ITEM NO. 804 EXCAVATION, TRENCHING AND BACKFILL 804.1 DESCRIPTION: This section shall govern the excavation, trenching, and backfilling for water, sanitary sewer, and recycle mains construction, unless

More information

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1 DIVISION 3: SEWER 3.1 DESIGN CRITERIA A. APPLICABILITY 1. These Design Standards shall govern all construction and upgrading of public sanitary sewer facilities in the City of Dundee and applicable work

More information

CHAPTER 300 SANITARY SEWER CONSTRUCTION STANDARDS

CHAPTER 300 SANITARY SEWER CONSTRUCTION STANDARDS CHAPTER 300 SANITARY SEWER CONSTRUCTION STANDARDS SECTION 300.01 GENERAL The standards and specifications found in this Chapter are for the materials and construction of sanitary sewers within the Village

More information

PRECAST CONCRETE ON-SITE WASTEWATER TANKS

PRECAST CONCRETE ON-SITE WASTEWATER TANKS PRECAST CONCRETE ON-SITE WASTEWATER TANKS OUTLINE Purpose Precast Advantage Design Goals Applicable Standards Structural Design Materials Production Watertightness Installation NPCA Plant Certification

More information

SANITARY GRAVITY SEWER LINES. A. Sanitary sewer lines, manholes, fittings, accessories, and bedding

SANITARY GRAVITY SEWER LINES. A. Sanitary sewer lines, manholes, fittings, accessories, and bedding PART 1 GENERAL 1.1 SECTION INCLUDES A. Sanitary sewer lines, manholes, fittings, accessories, and bedding B. Municipal sewer service connections and clean-out access C. Bore and jack casing D. Creek crossing

More information

SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation)

SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation) PART 1 GENERAL SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation) 1.01 SCOPE This specification includes the materials and procedures required for the internal sealing of the frame-chimney

More information

WASTEWATER SYSTEM STANDARDS

WASTEWATER SYSTEM STANDARDS 8.1 SCOPE Wastewater pipelines and appurtenances shall be provided as shown on the plans and as specified herein. Clearing, grubbing, trench excavation and backfill, pipe material, valves, cutting and

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-33 46 13 (April 2008) -------------------------- Preparing Activity: USACE Superseding UFGS-33 46 13 (July 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS References are

More information

GENERAL CONSTRUCTION

GENERAL CONSTRUCTION GENERAL CONSTRUCTION 1. All construction work shall be done in accordance with the current version of the Idaho Standards for Public Works Construction (ISPWC), the City of Meridian Supplemental Specifications

More information