Mr. Eric Ryffel, Manager October 5, 2015 Sanibel Beach Club 626 Nerita Street Sanibel Island, Florida 33957

Size: px
Start display at page:

Download "Mr. Eric Ryffel, Manager October 5, 2015 Sanibel Beach Club 626 Nerita Street Sanibel Island, Florida 33957"

Transcription

1 TRC Worldwide Engineering Restoration & Inspection, LLC Fairway Lakes Drive Fort Myers, Florida Phone: (239) F: (239) C.O.A. No Mr. Eric Ryffel, Manager October 5, 2015 Sanibel Beach Club 626 Nerita Street Sanibel Island, Florida RE: SANIBEL BEACH CLUB - REAR LANAI CONDITIONS Dear Mr. Ryffel: On August 27, 2015 as requested, representatives from this office conducted limited visual observations and mechanical sounding of the (32) lanais at the (8) two-story buildings of the Sanibel Beach Club, located at 626 Nerita Street, Sanibel Island, Florida. The purpose of this inspection was to gather information that would enable us to render an opinion concerning possible deterioration and make remedial recommendations. Neither our observations nor this report is intended to cover hidden defects, hazardous materials, mechanical, electrical, or architectural features. Neither architectural nor structural record drawings were available for reference. Based on our observations, it appears the upper lanais are constructed of precast concrete slabs reinforced with pre-stressed bonded tendons with a cast in place concrete topping. The upper decks are supported by concrete beams, columns and masonry bearing walls. The lower lanais appear to be cast in place concrete slabs reinforced with steel bars. The following is a list of observations made during the conditions survey: 1. The balconies have an existing membrane coating that is deteriorated and has been worn through at several areas exposing bare concrete below (Photo #1 & 4), has started to crack through at several areas from delamination (Photo #14) and has been penetrated through by unprotected lanai furniture legs (Photo #2). 2. At several of the ground floor balconies, longitudinal cracks are noted that telegraph through the deck coating onto the slab surface (Photos #10 & 11). 3. Sections of standing water on the balconies were noted at Unit 4A, Unit 4D and other random Units (Photo #3 & 9). 4. At Unit 8B, the screen enclosure is missing several fasteners along the perimeter frame and is coming loose (Photos #6 & 7), in general the balcony screen enclosures finishes have been heavily deteriorated due to environmental and UV exposure and is peeling or faded to bare Aluminum (Photos #8 & 13). 5. Hollow sounding areas were detected in the concrete topping on the upper lanai floors as well as at the lower lanai slab surfaces. Such unsound areas are designated by diagonal hatching and a notation S/# on the attached field notes. This designation is an indication of a Concrete Spall which requires repair. Some areas of slab surface

2 Sanibel Beach Club REAR LANAI CONDITIONS October 5, 2015 Page Two spalling were noted adjacent to sliding glass door tracks such as Unit 5C (Photo #15), where the sliding glass door will need to be removed to allow for proper cleaning and treatment of corrosion on the steel reinforcing. 6. Areas of cracked and hollow stucco were noted on the exterior or corner columns at Units 2A, 2B and other selected Units at the A & B stacks (Photos #5 & 16). 7. A spalled and cracked slab edge was identified at Unit 6C (Photos #12 & 17). The condition survey performed at the (32) balconies as described herein consisted of visual observations and manual sounding of concrete, stucco and balcony deck surfaces noting areas lacking positive rebound and/or yielding a hollow echo that are indicative of concrete spalling, delaminating stucco, or slab surface spalling. Spalled slab surface areas were identified visually as raised sections below the coating and were detected as hollow areas during mechanical sounding. Areas of cracked and hollow stucco were noted at several of the buildings on the exterior corner columns that should be addressed as they are allowing for moisture infiltration beneath. Several of the slab surface spalls are located adjacent to sliding glass door tracks, which will require the removal of the door and the installation of temporary protection to perform repairs. This is required to adequately excavate concrete up to clean sections of steel reinforcing to allow for proper abrasive preparation providing durable repairs less susceptible to future delamination from corrosion of the steel continuing along the bar. Due to the regulations currently in place by the City of Sanibel Island Building Department, it is no longer possible to reinstall the existing Sliding Glass doors once removed as the Building Department now calls for them to be replaced with impact resistant rated glass. It has been recommended that corrosion mitigation anodes be utilized at the concrete repair locations due to the age of the structure and the chlorides in the atmosphere from the surrounding environment that have permeated the concrete over time. The condition of the steel reinforcing in the concrete at the spalled areas cannot be anticipated until excavation, therefore it is our professional opinion that corrosion mitigation anodes be considered to ensure to mitigate the corrosion of reinforcing and provide sound repairs. We recommend that corrosion deteriorated concrete sections should be excavated by power tools back to sound material to allow abrasive blast cleaning steel reinforcing bars free of rust and coating with an epoxy-cement bonding agent prior to forming and placing new low permeability micro-concrete mix with integral corrosion inhibiting admixture. Corrosion mitigation anodes shall be utilized at repair locations where needed based upon the condition of the exposed steel reinforcing. Any areas of hollow stucco identified shall be repaired by stripping down to bare concrete and reapplying stucco to a uniform finish to match the existing area. Based on our observations, it appears that lanai deck coatings are failing at most of the buildings, most of which will likely be disturbed by the surface repairs. Some of these

3 Sanibel Beach Club REAR LANAI CONDITIONS October 5, 2015 Page Three failures appear to have been caused by abrasions to the deck surface that penetrated through the coating down the bare concrete, while others appear to be age related. The longitudinal cracks on the ground floor slabs appear to be from erosion of the soil beneath, thus the slab is shifting for stability. Erosion underneath the lower ground floor lanais may be compensated for by drilling through the slab at a uniform grid spacing and injecting a high density water blown foam to fill in the voids. The transverse cracks between the supported slab and slab on grade should be stitched with near surface mounted rods set into shallow grooves saw cut into the deck surface across the construction joint at regular interval and epoxy grouted flush. The settled slab on grade at the outer ends may be chipped reinforced and poured back to match the level of the inner supported slab. As discussed prior, the balconies had an existing waterproofing membrane coating applied (base coat and top coat) on the decks; through visual inspection it is unclear what the age is of the existing membrane coating. In general, the membrane coating consists of a top coat and a base coat, the top coat provides the visible finish for aesthetics and protection of the base coat from deterioration from UV and weathering exposure. The base coat generally has an expected service life of 10 years, as long as the top coat is not compromised, while the top coat is to be replenished every 5 years. Due to the condition of the existing membrane coating on the decks and the concrete slab surface repairs to be carried out, it is recommended that all of the balconies be stripped to bare concrete and have a new base coat and top coat membrane system applied. Doing so would ensure the future protection of the balcony slabs from moisture and chlorides from the environmental exposure, thus maintaining the service life of the concrete. Due to the extensive areas of ponding water that were identified on some balconies during the survey from either low spots on the deck or from obstructions at the edge preventing drainage, we also have recommended that deck surface profiling be applied to balconies when the slab has been prepared to bare substrate and prior to the application of a new membrane coating system. This would be achieved by water testing of the decks to layout profiling that will provide adequate sloping for runoff and reduce standing water deposits. This will ensure that standing water on the balcony will no longer be an issue as it is detrimental to the service life of the waterproofing coating. The waterproof membrane system to be specified should include an acrylic urethane catalyzed finish coat for ease of cleaning and enhanced durability against wearing, sunlight. It should be understood that maintenance of the completed membrane system should be carried out using cleaners, primers and coatings from single source manufacturer to ensure future compatibility. During the conditions survey of the balconies, it was noted that the screen enclosures are missing several fasteners at some locations. As such, some of the frames were loose and were pulling away from the concrete that they were originally anchored into. This is important to note since Aluminum screen enclosures are used not only for the screening, but also serve as a safety barrier (railing) at the edge of the balcony. It was unclear during the inspection what

4 Sanibel Beach Club REAR LANAI CONDITIONS October 5, 2015 Page Four the age is of the existing screen enclosures, however, they show signs of heavy finish deterioration where it is both peeling and chipping, or has been wore completely through at some areas. Failures in aluminum coating could lead to increased oxidation of aluminum, especially at fastener locations where there are dissimilar materials. This corrosion would result in reduction in strength of connections that would not be readily apparent. The weakened connections may not be capable of resisting code required railing loads which would be required for the safety barrier. Hence, it is critical that the screen enclosures frames, finish, and connections be maintained in good condition and that there are periodic inspections of the railings. Based upon our observations of the existing screen enclosures, the unapparent age of the frames, and the above noted issues with missing fasteners and water lodging on the decks from lack of drainage provisions, TRC would recommend that the screen enclosures be replaced as soon as practically possible. The new screens would incorporate a 1/8 gap with PVC spacers between the fasteners and filter material between the slab and Aluminum channel to allow for adequate drainage of water from the deck. The removal of the existing screen enclosures during the restoration would allow for complete waterproofing beyond the screens and over the slab edge for complete concrete protection and new sealant dipped fasteners will ensure sufficient anchorage to the concrete with protection of the mounting holes drilled into the concrete from moisture intrusion. RECOMMENDATIONS Given the acceleration of current steel corrosion and exposure to the surrounding environmental conditions, performing the concrete repairs as soon as possible at the balconies would reduce the future scope of work as less concrete excavation will be required to clean existing reinforcing steel and reduce further delamination. Following the concrete repairs on the slab surface, stabilization of the balcony slabs on grade and removal of the screen enclosures, it is recommended that a new waterproofing membrane coating system be applied for future protection of the slab from moisture. We feel that proceeding as such would consolidate mobilization costs, promote future protection of the concrete, and ensure a uniform finish of the stacks. We recommend the following: 1. Removal and replacement of specified Sliding Glass Doors (as per City of Sanibel requirement) with temporary protection installed as noted to provide access for repairs. 2. Removal of the existing Aluminum screen enclosures and replacement with new screens following the completion of all repairs and application of new waterproofing deck coating.

5 Sanibel Beach Club REAR LANAI CONDITIONS October 5, 2015 Page Five 3. Repair of deteriorated concrete sections from reinforcing steel corrosion (incorporating the utilization of corrosion mitigation anodes if deemed necessary based on steel reinforcing condition) including the repair of hollow stucco areas. 4. Removal of existing deck coating system, preparation of decks to bare concrete substrate and application of deck surface profiling on prepared balconies to remediate ponding water locations shifting water off the balcony surface and application of new waterproofing membrane coating at all balconies. 5. Touch up painting at the balconies where repaired are to be carried out to achieve a uniform finish at all locations. We have prepared four preliminary opinion of probable costs to account for each stack of the repair scope based on our observations and recommendations in this report. Each opinion of probable cost includes budget quantities of concrete repair and related work items corresponding to the repairs contained within each balcony group. In providing these opinions of probable construction costs, it should be understood that we have no control over costs or the price of labor, equipment or materials, or over methods of pricing used by Contractors, and that the opinion of probable construction cost provided herein was made on the basis of our qualifications and experience. We make no warranty, expressed or implied as to the accuracy of such opinion as compared to bid or actual costs. Painting of the entire balcony interiors and exteriors has not been included in the opinion of probable cost as that scope is routine maintenance that should be anticipated by the normal reserve schedule and only touch up at specific repair sites will be required to maintain a uniform finish. However, TRC does recommend the Association consider performing the balcony repairs proposed herein in conjunction with painting these balcony interiors to consolidate mobilization and overhead costs that could be redundant expenses if done separately. LIMITATIONS This correspondence is intended to communicate a summary of findings at the completion of the first phase of work in anticipation that TRC will continue to provide structural engineering services in relation to the concrete repairs. As a result, this report is not a final engineering document and should be considered as preliminary in the fact that additional structural analysis and design may be required to provide any final construction documents nor is this intended to serve as testimony to any perceived deficiencies. Due to the limited scope of our investigation, we cannot attest to the structure s compliance with obsolete building codes or previously accepted construction techniques. This report does not cover hidden defects, mechanical, electrical or architectural features.

6

7

8

9

10

11 TRC Worldwide Engineering Restoration & Inspection, LLC Fairway Lakes Drive Fort Myers, Florida Phone: (239) F: (239) C.O.A. No Photo Exhibit Sanibel Beach Club : 15FTM626 Photo #1 Photo #2

12 Photo #3 Photo #4

13 Photo #5 Photo #6

14 Photo #7 Photo #8

15 Photo #9 Photo #10

16 Photo #11 Photo #12

17 Photo #13 Photo #14

18 Photo #15 Photo #16

19 Photo #17

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

Tile on Existing. Viewpoint

Tile on Existing. Viewpoint Viewpoint Tile on Existing Exterior Reinforced Concrete BalconieS By Steven C. Turner Exterior reinforced concrete balconies are often covered by tile set in mortar beds with grouted joints. These installations

More information

Table of Contents. List of Drawings

Table of Contents. List of Drawings SCOPE OF WORK Hastings Stadium Exhibition Park, 81 London Road, Guelph, Ontario Structural and Maintenance Remedial Work Prepared For City of Guelph City Hall, 1 Carden Street, Guelph, ON N1H 3A1 Prepared

More information

A M E R I C A N A R C H I T E C T U R A L M A N U F A C T U R E R S A S S O C I A T I O N

A M E R I C A N A R C H I T E C T U R A L M A N U F A C T U R E R S A S S O C I A T I O N A M E R I C A N A R C H I T E C T U R A L AAMA 2410-13 Standard Practice for Installation of Windows with an Exterior Flush Fin Over an Existing Window Frame M A N U F A C T U R E R S A S S O C I A T I

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

Structural Assessment Live Fire Training Building. FSCJ South Campus Jacksonville, Florida. Florida State College at Jacksonville

Structural Assessment Live Fire Training Building. FSCJ South Campus Jacksonville, Florida. Florida State College at Jacksonville Structural Assessment Live Fire Training Building FSCJ South Campus Jacksonville, Florida Florida State College at Jacksonville November 21, 2011 Report of a Structural Assessment of Live Fire Training

More information

Surface Repair Using Form-and- Pour Techniques

Surface Repair Using Form-and- Pour Techniques ACI RAP Bulletin 4 American Concrete Institute Advancing concrete knowledge FIELD GUIDE TO CONCRETE REPAIR APPLICATION PROCEDURES Surface Repair Using Form-and- Pour Techniques Surface Repair Using Form-and-Pour

More information

SKYLINE HOUSE CONDOMINIUM 3711 SOUTH GEORGE MASON DRIVE FALLS CHURCH, VIRGINIA

SKYLINE HOUSE CONDOMINIUM 3711 SOUTH GEORGE MASON DRIVE FALLS CHURCH, VIRGINIA SKYLINE HOUSE CONDOMINIUM 3711 SOUTH GEORGE MASON DRIVE FALLS CHURCH, VIRGINIA BALCONY CARE & MAINTENANCE GUIDELINES SK&A Project No. 09%620%06 Updated June 14, 2012 Prepared By SMISLOVA, KEHNEMUI & ASSOCIATES,

More information

SECTION PANEL SIGNAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION PANEL SIGNAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 10 14 23 - PANEL SIGNAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

CSI SECTION MAINTENANCE OF CONCRETE Repair & Resurfacing with Rapid Hardening, High Strength, Low-Shrink, Non-Metallic Cementitious Materials

CSI SECTION MAINTENANCE OF CONCRETE Repair & Resurfacing with Rapid Hardening, High Strength, Low-Shrink, Non-Metallic Cementitious Materials CSI SECTION 03 01 00 MAINTENANCE OF CONCRETE Repair & Resurfacing with Rapid Hardening, High Strength, Low-Shrink, Non-Metallic Cementitious Materials EDITOR NOTE: The following guideline specification

More information

EVALUATION & REPAIR OF CORROSION DAMAGED ROOF LIFT SLAB WITH WIRE POST-TENSIONING SYSTEM (BUTTON HEADS)

EVALUATION & REPAIR OF CORROSION DAMAGED ROOF LIFT SLAB WITH WIRE POST-TENSIONING SYSTEM (BUTTON HEADS) EVALUATION & REPAIR OF CORROSION DAMAGED ROOF LIFT SLAB WITH WIRE POST-TENSIONING SYSTEM (BUTTON HEADS) (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 1 of 23 The following presentation discusses

More information

Application Instructions for Dryvit Backstop NT For Use Beneath Claddings Other Than Dryvit EIFS

Application Instructions for Dryvit Backstop NT For Use Beneath Claddings Other Than Dryvit EIFS Application Instructions for Dryvit Backstop NT For Use Beneath Claddings Other Than Dryvit EIFS CHECKLIST PRIOR TO THE INSTALLATION OF BACKSTOP NT - SMOOTH AND TEXTURE Project Conditions Maximum storage

More information

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how?

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how? SECTION 08360 SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Glazed Aluminum

More information

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate Colphene BSW Training and Application Guide Colphene BSW Waterproofing Membrane. 1. Prepare substrate Substrate must be structurally sound. Surface must be free of voids, spalled areas, loose aggregate,

More information

STRUCTURAL ASSESSMENT OBSERVATION REPORT

STRUCTURAL ASSESSMENT OBSERVATION REPORT Consulting Engineers THORSON BAKER & Associates, Inc. 3030 West Streetsboro Road (330) 659-6688 phone Richfield, Ohio 44286 (330) 659-6675 fax www.thorsonbaker.com STRUCTURAL ASSESSMENT OBSERVATION REPORT

More information

Protective Coatings for Underground Utility Concrete Structures. By: John E. Davis Inside Sales & Marketing Specialist: Sauereisen, Inc.

Protective Coatings for Underground Utility Concrete Structures. By: John E. Davis Inside Sales & Marketing Specialist: Sauereisen, Inc. Protective Coatings for Underground Utility Concrete Structures By: John E. Davis Inside Sales & Marketing Specialist: Sauereisen, Inc. As our cities and municipalities grow older, the utility and wastewater

More information

Florock Seamless Flooring Systems

Florock Seamless Flooring Systems Architectural Specification FloroCrete RT Rake/Trowel Urethane Mortar 3/16-1/4 (4.5-6.0 mm) Floor Resurfacing System Part 1: General 1.01 System Description A. System I Skid-Resistant Finish Resurfacing

More information

PERM-FLEX ASSEMBLY DIRECT APPLICATION TO CEMENTITIOUS SUBSTRATES MANUFACTURERS SPECIFICATION / SECTION 09960

PERM-FLEX ASSEMBLY DIRECT APPLICATION TO CEMENTITIOUS SUBSTRATES MANUFACTURERS SPECIFICATION / SECTION 09960 STUC-O-FLEX PERM-FLEX ASSEMBLY DIRECT APPLICATION TO CEMENTITIOUS SUBSTRATES MANUFACTURERS SPECIFICATION / SECTION 09960 PART 1 - GENERAL 1.01 DESCRIPTION Provide all labor, materials and equipment necessary

More information

STRUCTURAL CONDITION ASSESSMENT

STRUCTURAL CONDITION ASSESSMENT STRUCTURAL CONDITION ASSESSMENT ALLEN JAY ROCK GYM 1201 FAIRFIELD ROAD HIGH POINT, NC Prepared for: Prepared by: Guilford County Schools 617 West Market Street Greensboro, NC Adrian S. Durham, PE, SE,

More information

1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.

1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards. WOOD FLOORING GENERAL INFORMATION 1.1 This section applies to factory finished wood strip flooring. 1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards. 1.3

More information

SECTION RESINOUS FLOORING or SECTION QUARTZ FLOORING

SECTION RESINOUS FLOORING or SECTION QUARTZ FLOORING SECTION 09 67 23 RESINOUS FLOORING or SECTION 09 67 26 QUARTZ FLOORING PART 1 - GENERAL 1.1 SUMMARY (Specification writer shall add, delete or amend, as deemed necessary) A. Provide all labor, materials,

More information

SECTION 07530CP EPDM MEMBRANE ROOFING

SECTION 07530CP EPDM MEMBRANE ROOFING PART 1 GENERAL 1.1 SUMMARY SECTION 07530CP EPDM MEMBRANE ROOFING A. Section includes: 1. Adhered membrane roofing and flashing 2. Mechanically fastened roof insulation 3. Walkway pads 1.2 ARCHITECTURAL

More information

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 075423 - THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including Division 00 Bidding Requirements and other Division

More information

PAYING ATTENTION TO DETAIL by Bob Cusumano

PAYING ATTENTION TO DETAIL by Bob Cusumano PAYING ATTENTION TO DETAIL by Bob Cusumano Painting contractors are often required to install caulk or sealant in exterior joints. Too often, the sealant is simply gunned into the joint until it s filled

More information

STUCCO FAILURES and REMEDIATION Roger G. Morse AIA

STUCCO FAILURES and REMEDIATION Roger G. Morse AIA STUCCO FAILURES and REMEDIATION Roger G. Morse AIA Morse Zehnter Associates Rensselaer Technology Park 165 Jordan Road Troy, NY 12180 rgmorse@mzaconsulting.com Florida Environment Hot Humid High ground

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

Florock Seamless Flooring Systems

Florock Seamless Flooring Systems Architectural Specification FloroBuild PT/ HT Epoxy Mortar ¼ Power Trowel or Hand Trowel Flooring System Part 1: General 1.01 System Description A. Roller-applied 100% solids, penetrating epoxy primer

More information

SECTION ALUMINUM WINDOWS

SECTION ALUMINUM WINDOWS SECTION 08520 ALUMINUM WINDOWS PART 1 - GENERAL 1.01 SUMMARY A. Section includes: 1. Storefront systems and aluminum framed glass doors. 2. Hardware, fasteners, accessories, filler pieces, etc., required

More information

Engine Bay Floors Floor Resurfacing 4000

Engine Bay Floors Floor Resurfacing 4000 Engine Bay Floors Floor Resurfacing 4000 P.O. Box 341 Macungie, PA 18062 610.530.7710 800.573.9198 www.enginebayfloors.com 1.1 SUBMITTALS Flooring Specification SECTION 1 GENERAL A. Product Data: Submit

More information

TILE TILE

TILE TILE 09300 - TILE 09300-1 PART ONE: GENERAL 1.1 Description TILE 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance with the requirements

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

Integral Waterproofing

Integral Waterproofing BCBEC Luncheon June 14, 2012 Integral Waterproofing Presented by Joel Schwartz, P.Eng, FEC, BEP Background Case study of two large high-rise projects at False Creek in Vancouver, BC Case Study 1: Site

More information

SPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket

SPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket 1993 Specifications CSJ 0331-04-045 SPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket 1. Description. This Item shall govern for the furnishing, installing and energizing a sacrificial

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

MANUFACTURER S (SHORT FORM) SPECIFICATION / SECTION

MANUFACTURER S (SHORT FORM) SPECIFICATION / SECTION STUC-O-FLEX - ELASTOMERIC ACRYLIC FINISH APPLICATION TO PORTLAND CEMENT PLASTER / CONCRETE RENDER MANUFACTURER S (SHORT FORM) SPECIFICATION / SECTION 09220-09 24 00 PART 1-GENERAL SCOPE: Manufacturer's

More information

SECTION COMMON WORK RESULTS FOR CONCRETE SSPECIALTY COATINGS

SECTION COMMON WORK RESULTS FOR CONCRETE SSPECIALTY COATINGS SECTION 03 05 00 COMMON WORK RESULTS FOR CONCRETE 09 97 00 SSPECIALTY COATINGS Weld Crete ************************************************************************************************************************

More information

FLUID APPLIED WATERPROOFING

FLUID APPLIED WATERPROOFING SECTION 07120 FLUID APPLIED WATERPROOFING PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03300 - Cast-In-Place Concrete. 2. 09200 - Metal Studs, Metal Lath, Suspension Ceilings, Plaster, and Stucco.

More information

SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE. Product. Scope. Appraisal No. 811 [2013] Appraisal No. 811 (2013) Amended 28 August 2017

SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE. Product. Scope. Appraisal No. 811 [2013] Appraisal No. 811 (2013) Amended 28 August 2017 SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE Amended 28 August 2017 BRANZ Appraisals Technical Assessments of products for building and construction. Sika (NZ) Ltd PO Box 19 192 Avondale Auckland 1746

More information

Broadcast Parking Garage System

Broadcast Parking Garage System AIA Specification Part 1 General Broadcast Parking Garage System 1.01 Work Included A. All work to be provided in this section shall include material, labor, and equipment necessary to furnish the complete

More information

Concrete Parking Garage Degradation

Concrete Parking Garage Degradation Concrete Parking Garage Degradation Concrete Parking Garage Degradation With proper care and maintenance, the life of a concrete parking garage can span several decades. The integrity and strength of structural

More information

Section PANEL SIGNAGE

Section PANEL SIGNAGE Section 10 14 23 PANEL SIGNAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including FDOT DIVISION I GENERAL REQUIREMENTS & COVENANTS Specification Sections,

More information

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building

May 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building May 8, 2017 ADDENDUM #1 IFB 17-082 Resin Floor System For Highway Department Central District Building Addendum #1 is being issued to offer an alternate resin flooring system. 096700 FLUID-APPLIED FLOORING

More information

SECTION MANUFACTURED ROOF EXPANSION JOINTS

SECTION MANUFACTURED ROOF EXPANSION JOINTS SECTION 07 71 29 - MANUFACTURED ROOF EXPANSION JOINTS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Aluminum Component Pipe Railings

Aluminum Component Pipe Railings 1 SECTION 05 7360 ALUMINUM COMPONENT PIPE RAILINGS PART 1 GENERAL 1.01 SECTION INCLUDES A. Aluminum component pipe handrails and railings. 1.02 RELATED REQUIREMENTS A. Section 02 9000: Landscaping: Installation

More information

Surface Repair Using Form-and-Pour Techniques

Surface Repair Using Form-and-Pour Techniques RAP-4 www.concrete.org Surface Repair Using Form-and-Pour Techniques Reported by ACI Committee E 706 Brian F. Keane * Chairman J. Christopher Ball H. Peter Golter Jay H. Paul Floyd E. Dimmick, Sr. Bob

More information

A Design-Build Project: Repairing the Courthouse Square Complex

A Design-Build Project: Repairing the Courthouse Square Complex A Design-Build Project: Repairing the Courthouse Square Complex Cracked drywall in office building Cracked basement walls Separated columns at expansion joint Source: http://djcoregon.com/news/2010/07/22/salem-government-building-unsound-being-vacated/

More information

ST. JOHNS COUNTY ARCH. PROJ. NO SECTION PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

ST. JOHNS COUNTY ARCH. PROJ. NO SECTION PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 10530 PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION RESILIENT SHEET FLOORING

SECTION RESILIENT SHEET FLOORING SECTION 09 65 16 RESILIENT SHEET FLOORING SPEC WRITER NOTE: Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1.

More information

Series - 1

Series - 1 SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word

More information

SECTION BRICK MASONRY ASSEMBLIES

SECTION BRICK MASONRY ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Face brick. 2. Mortar and grout. 3. Ties and anchors. 4. Miscellaneous masonry accessories. 1.2 SUBMITTALS A. Product Data: For each type

More information

SECTION CONCRETE PAVING SLABS SET IN MORTAR

SECTION CONCRETE PAVING SLABS SET IN MORTAR SECTION 32 14 13.16 CONCRETE PAVING SLABS SET IN MORTAR (1995 MasterFormat Section 02784) Note: This guide specification for the U.S. is for paving slabs mortared to a concrete base and grouted joints

More information

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein.

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein. SECTION 10530 - EXTRUDED ALUMINUM WALKWAY COVERS PART I - GENERAL.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division

More information

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.

A. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section. SECTION 03 01 30 MAINTENANCE OF CAST-IN-PLACE CONCRETE SECTION 03 01 40 MAINTENANCE OF PRECAST CONCRETE SECTION 03 01 50 MAINTENANCE OF CAST DECKS AND UNDERLAYMENT SECTION 03 01 60 MAINTENANCE OF GROUTING

More information

A. ASTM C 150 Standard Specification for Portland Cement. B. ASTM C 595 Standard Specification for Blended Hydraulic Cements.

A. ASTM C 150 Standard Specification for Portland Cement. B. ASTM C 595 Standard Specification for Blended Hydraulic Cements. TECHNICAL SPECIFICATIONS SEWER MANHOLE REHABILITATION SYSTEM WITH A PROTECTIVE CEMENT LINER AND HIGH BUILD EPOXY COATING (As Provided by Standard Cement Materials) FOREWORD The following specification

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072

More information

Architectural Single-Hung Aluminum Window Series L701T SH-AW130 GUIDE SPECIFICATION

Architectural Single-Hung Aluminum Window Series L701T SH-AW130 GUIDE SPECIFICATION Architectural Single-Hung Aluminum Window Series L701T SH-AW130 GUIDE SPECIFICATION Section 08520 Aluminum Windows PART 1: WORK INCLUDED A. The conditions of the contract and applicable sections of Division

More information

SPECIFICATIONS: Architectural Aluminum Railings

SPECIFICATIONS: Architectural Aluminum Railings PART ONE: GENERAL 1.1 SUMMARY SPECIFICATIONS: Architectural Aluminum Railings A. Work in this section includes custom and standard Interior and Exterior aluminum railings and guardrails. 1.2 PERFORMANCE

More information

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage. DELTA -DRAIN Section 07 10 00 Dampproofing and Waterproofing PART 1 GENERAL 1.1 SECTION INCLUDES A. Below grade drainage sheets. B. Plaza deck and planter drainage sheets. 1.2 RELATED SECTIONS A. Section

More information

DIVISION 04 MASONRY. Section Title Number MASONRY Maintenance of Masonry Masonry Mortaring Masonry Accessories

DIVISION 04 MASONRY. Section Title Number MASONRY Maintenance of Masonry Masonry Mortaring Masonry Accessories 04 00 00 MASONRY 04 01 00 Maintenance of Masonry 04 01 20 Maintenance of Masonry 04 05 13 Masonry Mortaring 04 05 23 Masonry Accessories 04 20 00 UNIT MASONRY 04 21 00 Clay Unit and Brick Veneer 04 22

More information

Countertops and Cabinets

Countertops and Cabinets Countertops and Cabinets 5.1 Laminated countertop has developed a bubble. Laminated countertops shall not have localized bumps or swells. Countertops not meeting the acceptable performance condition shall

More information

PECORA-DECK TRAFFIC COATING SYSTEMS

PECORA-DECK TRAFFIC COATING SYSTEMS PECORA-DECK TRAFFIC COATING SYSTEMS SERVICE. PERFORMANCE. RESULTS. Traffic Coating and Sealants You Can Trust Pecora offers a full line of traffic coatings and sealants that help protect wearing surfaces

More information

Alply CLASSIC WALL Architectural Insulated Panel Wall System

Alply CLASSIC WALL Architectural Insulated Panel Wall System SECTION 07 42 13 INSULATED METAL WALL PANELS ALPLY Insulated Panels Alply CLASSIC WALL Architectural Insulated Panel Wall System PART 1 / GENERAL 1.1 SYSTEM DESCRIPTION A. Smooth, non-embossed steel, insulated

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers. SECTION 05 31 13 STEEL FLOOR DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification

More information

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 Part 1 General 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified,

More information

FIVE STAR PRODUCTS, INC. (800)

FIVE STAR PRODUCTS, INC.  (800) FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 1 of 12 DESIGN-A-SPEC GUIDELINES FIVE STAR STRUCTURAL CONCRETE V/O CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS

More information

SECTION mil thickness COLD FLUID-APPLIED WATERPROOFING

SECTION mil thickness COLD FLUID-APPLIED WATERPROOFING SECTION 07 14 16 CCW-MIRASEAL @ 120 mil thickness COLD FLUID-APPLIED WATERPROOFING PART 1 - GENERAL 1.1 SECTION INCLUDES: Installation of waterproofing membrane on surfaces indicated on drawings, consisting

More information

Evaluation, Restoration and Protection of Sandstone Façade on a Historic Building The Boston Building Denver, CO Presenter: Leo Whiteley

Evaluation, Restoration and Protection of Sandstone Façade on a Historic Building The Boston Building Denver, CO Presenter: Leo Whiteley Circa 1910 Evaluation, Restoration and Protection of Sandstone Façade on a Historic Building The Boston Building Denver, CO Presenter: Leo Whiteley Boston Loft Building History On Southeast corner of 17

More information

Louis Armstrong New Orleans International Airport NOAB Project # North Terminal Development Program Phase 1

Louis Armstrong New Orleans International Airport NOAB Project # North Terminal Development Program Phase 1 Louis Armstrong New Orleans International Airport NOAB Project # 8910-01233 PART 1 - GENERAL SECTION 07 71 29 - MANUFACTURED ROOF EXPANSION JOINTS 1.1 RELATED DOCUMENTS A. Drawings and general provisions

More information

A. This Section includes resinous flooring systems with epoxy body coat(s).

A. This Section includes resinous flooring systems with epoxy body coat(s). SECTION 096723 - RESINOUS FLOORING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes resinous flooring systems with epoxy body coat(s). 1. Application Method: Troweled (Slurry, Seeded or Broadcast

More information

***************************************************************************************************************

*************************************************************************************************************** 03450 ARCHITECTURAL PRECAST CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 45 13 ***************************************************************************************************************

More information

***************************************************************************************************************

*************************************************************************************************************** 03410 STRUCTURAL PRECAST CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 41 00 ***************************************************************************************************************

More information

1.1 This Section includes surface preparation and the application of base coats, intermediate and topcoats.

1.1 This Section includes surface preparation and the application of base coats, intermediate and topcoats. PAINTING GENERAL INFORMATION 1.1 This Section includes surface preparation and the application of base coats, intermediate and topcoats. DESIGN REQUIREMENTS 2.1 Material Compatibility: a. Provide materials

More information

Table of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8

Table of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8 WISCONSIN PLACE RESIDENTIAL TECHNICAL ASSIGNMENT 2 OCTOBER 29, 2007 KURT KRASAVAGE THE PENNSYLVANIA STATE UNIVERSITY STRUCTURAL OPTION FACULTY ADVISOR: DR. ALI MEMARI 1 Table of Contents Table of Contents.2

More information

SPECIFICATIONS FOR AluSystems Aluminum Composite Panels Series 20 Dry Joint 1.00 GENERAL 1.01 RANGE OF WORK Section includes: Laminated panels and attachment systems for use as exterior cladding. A. Provide

More information

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 [08 33 13] COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Metal Counter

More information

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , & TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS Financial Project ID 429140-1-52-01, 429140-2-52-01 & 428267-1-52-01 The official record of this Technical Special Provision is the electronic file signed

More information

VAPROLIQUI-FLASH. Liquid Applied Waterproof Flashing Material INSTALLATION INSTRUCTIONS

VAPROLIQUI-FLASH. Liquid Applied Waterproof Flashing Material INSTALLATION INSTRUCTIONS VAPROLIQUI-FLASH Liquid Applied Waterproof Flashing Material OVERVIEW VaproLiqui-Flash is a liquid applied Waterproof Flashing material for window and door rough opening interfaces. It is designed for

More information

STORAGE AND TRANSPORTION

STORAGE AND TRANSPORTION Content 1. General & Notes 2. Substrate Processing 3. Panel Layout 4. Tools 5. Screws 6. Installation instructions 7. Cleaning 8. FAQS 8. MSDS General & Notes In comparison to natural or cast stone, Questone

More information

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770)

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770) Madewell Products Corporation December 2014 7561 Industrial Court Alpharetta, GA 30004 Office: (770) 475-8199 Fax: (770) 475-8167 Product Guide Specification SECTION 03935 RESTORATION MORTAR AND EPOXY

More information

Concrete Faced Insulated Perimeter Wall Panels. Durability. Sustainability. Energy Efficiency. Durable Finish & Superior Insulation in One Easy Step

Concrete Faced Insulated Perimeter Wall Panels. Durability. Sustainability. Energy Efficiency. Durable Finish & Superior Insulation in One Easy Step WallGUARD Concrete Faced Insulated Perimeter Wall Panels Durability. Sustainability. Energy Efficiency. Reduce heat loss & energy costs Protect perimeters from freeze-thaw cycling Recyclable & reusable

More information

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1% CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE EXAM ID: I1 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 6% 0101. Project Administration 1% Verify that

More information

Senturion TM III Wall System

Senturion TM III Wall System Senturion TM III Wall System TYPICAL DETAILS 1017666 1. Senturion III Wall System Application (Plan VIew) 2. Senturion III Wall System Application (Isometric View) 3. Aesthetic Groove (Plan VIew) 4. Insulation

More information

FIXED SERIES 6200 AAMA/WDMA/CSA 101/I.S.2/A Structural Performance: Thermal Break: Main Frame Depth: 3 1/4. Glazing Thickness (Maximum): 1

FIXED SERIES 6200 AAMA/WDMA/CSA 101/I.S.2/A Structural Performance: Thermal Break: Main Frame Depth: 3 1/4. Glazing Thickness (Maximum): 1 GUIDE SPECIFICATION Boyd Aluminum Manufacturing Company P.O. Box 1565 3248 E. Division Street Springfield, MO 65801-1565 800-737-2800 417-862-1232 fax boydaluminum.com FIXED SERIES 6200 AAMA/WDMA/CSA 101/I.S.2/A440-08

More information

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu INSTALLATION INSTRUCTIONS Note: The following installation instructions are based off of ASTM E 1643 (Standard Practice for Installation of Water Vapor Retarders Used in Contact with Earth or Granular

More information

A Design Review of Waterproofing Codes

A Design Review of Waterproofing Codes A Design Review of Waterproofing Codes Section 1807 of Chapter 18 of the International Building Code addresses waterproofing under the section title of Dampproofing and Waterproofing. The section defines

More information

Building Envelope Systems Exam Learning Objectives

Building Envelope Systems Exam Learning Objectives Building Envelope Systems Exam Learning Objectives Roofing Nomenclature 1. Define the following roofing terms: low, flat, sloped, conventional, protected/inverted, hybrid, BUR, modified bitumen, PVC, TPO,

More information

Façade Improvement Specifications: 221 S. Lafayette, Greenville, MI. General Section:

Façade Improvement Specifications: 221 S. Lafayette, Greenville, MI. General Section: Façade Improvement Specifications:, Greenville, MI SEE ARCHITECTUAL RENDERINGS ATTACHED TO PROVIDE ADDITIONAL DETAIL: General Section: $ General Building Permit: Permit for working on project. Contact

More information

REFURBISHMENT Sika FerroGard -903 Plus THE UNIQUE MULTI-FUNCTIONAL SURFACE APPLIED CORROSION INHIBITOR FOR REINFORCED CONCRETE

REFURBISHMENT Sika FerroGard -903 Plus THE UNIQUE MULTI-FUNCTIONAL SURFACE APPLIED CORROSION INHIBITOR FOR REINFORCED CONCRETE THE UNIQUE MULTI-FUNCTIONAL SURFACE APPLIED CORROSION INHIBITOR FOR REINFORCED CONCRETE CORROSION IN REINFORCED CONCRETE STRUCTURES AGGRESSIVE INFLUENCES ON REINFORCED CONCRETE In reinforced concrete the

More information

Apparel Gallery Ltd.

Apparel Gallery Ltd. Apparel Gallery Ltd. 147-148, Norshinghpur, Asulia, Savar, Dhaka (23.929985N,90.304914E) 23 March 2014 1 2 Observations Building 1 Heavy loading due to raised floor area on Ground Floor 3 Building 1 Raised

More information

A. Submit product data sheets and literature verifying physical properties of materials.

A. Submit product data sheets and literature verifying physical properties of materials. I. GENERAL ACRYSHIELD ROOF MANAGEMENT SYSTEM Installation Guide Specification For Preserving EPDM Roofs 07500 Saving Money, Safeguarding the Environment One Roof at a Time. 1.01 SUMMARY A. Provide labor,

More information

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS

ODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS B401: DELETED B402: DELETED B403: DELETED B404: STRUCTURE/CULVERT IDENTIFICATION SIGNS B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS B406: ITEM 514 - FIELD PAINTING, MISC.; REPAIR PAINTING

More information

02800 SHADE STRUCTURES

02800 SHADE STRUCTURES 02800 SHADE STRUCTURES for PLAY AREAS ****************************************** SPECIFIER: The shade structure shall utilize a four point hypar system with four columns located a minimum of 10 feet from

More information

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Table of Contents 1. Title 2. Designation 3. List of Figures 4. Scope 5. Referenced

More information

By CTS Cement Manufacturing Corp.

By CTS Cement Manufacturing Corp. CSI SECTION 03 60 00 GROUTING 03 62 00 NON-SHRINK GROUTING 03 62 13 NON-METALLIC NON-SHRINK GROUTING High Flow, Non-Metallic, Multi-Purpose, Cementitious, Non-Shrink Grout EDITOR NOTE: The following guideline

More information

Historic Preservation DESIGN GUIDELINES

Historic Preservation DESIGN GUIDELINES CITY OF GRANBURY Historic Preservation DESIGN GUIDELINES 9. BUILDING EXTERIOR MATERIALS MASONRY: BRICK, STONE, TERRA COTTA, CONCRETE, STUCCO, AND MORTAR Commentary: Masonry features of brick cornices and

More information

Project Address: Name of Person Completing Form:

Project Address: Name of Person Completing Form: Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties

More information

Corium Brick Rainscreen System Specifications

Corium Brick Rainscreen System Specifications CORIUM BRICK RAINSCREEN SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. Work Included: The Work of this Section shall include but not be limited to the following: 1. Corium brick plates 2. Galvanized and coated

More information

Guideline Specification ACRYMAX ARS-1-C Reinforced Composite Elastomeric Membrane System for Concrete Roofs Fluid-Applied Roofing

Guideline Specification ACRYMAX ARS-1-C Reinforced Composite Elastomeric Membrane System for Concrete Roofs Fluid-Applied Roofing 221 Brooke Street Media, PA 19063 610-566-7470 Fax 610-891-0834 Website www.acrymax.com e-mail info@acrymax.com This document is intended to provide guidelines for the proper specification and application

More information

Beginning of the Course

Beginning of the Course Beginning of the Course Topics we will Cover What is Stucco? What does InterNACHI require? How to Identify Stucco Type. Primary Concerns Related to Stucco. How to Inspect during a Home Inspection. What

More information

Waterproofing MAINTAINING YOUR BOUNDARIES

Waterproofing MAINTAINING YOUR BOUNDARIES Waterproofing MAINTAINING YOUR BOUNDARIES BY KATHY DANFORTH L ocation, location, location isn t just a real estate issue. Water and dirt are essential to life, but entire industries are devoted to preventing

More information