1 M-DCPS MASTER SPECIFICATION GUIDELINES TABLE OF CONTENTS (TOC) Division 2 SITEWORK Last Revised Soil Boring Data (Create for each site) (01/04) Demolition (Create for each existing building) (01/04) Building Demolition (01/04) Selective Demolition (Reroofing) (01/04) Removals (01/04) Earthwork (01/04) Excavating, Backfilling, and Compaction for Utilities (01/04) Soil Treatment (01/04) Asphaltic Concrete Paving (01/04) Portland Cement Concrete Paving (01/04) Concrete Sidewalks, Straight Curbs, Curbs, Gutters, and Wheel Stops (01/04) Hard Court/Running Track Construction (01/04) Liquefied Petroleum Gas (LPG) Distribution System (01/04) Pavement Marking (01/04) Water Systems (01/04) Storm Drainage System (01/04) Waste Disposal System (01/04) Sanitary Sewer System (01/04) Sanitary Force Main (01/04) Lift Station (01/04) Waste Water Drainage System (01/04) Poured-in-Place Rubberized Surface for Playground Areas (03/14) Synthetic Grass Surfacing for Play Areas (07/09) Irrigation System (01/04) Chain Link Fences and Gates (04/09) Steel Fences and Gates (01/04) Signage (01/04) Primary Play Area Equipment (05/13) Playground Equipment (01/04) Running Track Surface (01/04) Site and Street Furnishings (01/04) Shelters (01/04) Landscaping (01/04) Tree Relocation (01/04) Tree and Plant Protection (01/04) Sodding (01/04) Project No. SPECIFICATION GUIDELINES TOC - 1
2 Division 3 CONCRETE Concrete Formwork (01/04) Concrete Reinforcement (01/04) Cast-In-Place Concrete (01/04) Cast-In-Place Concrete (Small Projects) (01/04) Concrete Testing (01/04) Concrete Topping (01/04) Lightweight Insulating Concrete (01/04) Shotcrete (01/04) Post Tensioned Concrete (01/04) Structural Precast Concrete (01/04) Precast Prestressed Concrete Joists and Beams (01/04) Precast Prestressed Concrete Sections (01/04) Architectural Precast Concrete (01/04) Tilt-up Precast Concrete Sandwich Panels (01/04) Tilt-up Precast Concrete (01/04) Grout (01/04) Division 4 MASONRY Concrete Unit Masonry (07/08) Concrete Unit Masonry (Unreinforced Only) (07/08) Glass Unit Masonry (02/08) Masonry Patchwork (01/04) Division 5 METALS Structural Steel (01/04) Steel Joists (01/04) Steel Deck (01/04) Light Gage Metal Framing (01/04) Metal Fabrications (01/04) Metal Handrails and Railings (03/10) Steel Framed Equipment Supports (02/08) Expansion Joint Covers (01/04) Division 6 WOOD AND PLASTICS Carpentry (01/04) Wood Treatment (01/04) Architectural Woodwork (01/04) Project No. SPECIFICATION GUIDELINES TOC - 2
3 Division 7 THERMAL AND MOISTURE PROTECTION Fluid Applied Waterproofing (01/04) Fluid Applied Waterproof Wall Coating (01/04) Building Insulation (01/04) Spray-applied Fire Resistive Materials (01/04) Vapor and Radon Retarder (07/08) Asphalt Shingles (01/04) Clay Barrel Tile Roofing (For Historical Repair Projects only) (01/04) Clay Spanish "S" Tile Roofing (01/04) Clay Flat Tile Roofing (For Repair Projects only) (01/04) Concrete Tile Roofing (01/04) Roofing Assembly (09/08) Roof Assembly Special Warranty Forms (09/08) Roof Assembly Lightweight Insulating Concrete (02/09) Roof Assembly Modified Bitumen Roofing (05/10) Fully Adhered Thermoplastic Sheet Roofing (01/04) Roof Assembly Steel Blocking and Sheet Metal (02/09) Roof Assembly PVC Rainleaders to Storm Sewer (02/09) Roof Assembly Supports for Rooftop Equipment (02/09) Roof Assembly Hatches and Smoke Vents (02/09) Roof Assembly Edge Guards (02/09) Firestopping and Smoke Sealing (12/08) Joint Sealers (01/04) Division 8 DOORS AND WINDOWS Steel Doors and Frames (01/04) Wood Doors (01/04) Access Panels (01/04) Insulated Overhead Coiling Doors (01/04) Overhead Coiling Doors (12/08) Accordion Folding Doors (01/04) Steel Windows (01/04) Aluminum Windows (01/04) Door Hardware (11/09) Glass and Glazing (01/04) Division 9 FINISHES Plastered Ceiling Suspension Systems (01/04) Metal Studs, Metal Lath, Suspension Ceilings, Plaster, and Stucco (01/04) Gypsum Wallboard (01/04) Project No. SPECIFICATION GUIDELINES TOC - 3
4 09310 Ceramic Tile (01/04) Quarry Tile (01/04) Acoustical Ceilings (01/04) Acoustical Wall and Ceiling Treatment (01/04) Hardwood Strip Flooring System (01/04) Resilient Sheet Flooring (09/08) Resilient Tile Flooring (07/08) Resilient Floor Covers (01/08) Seamless Quartz Flooring and Base (01/08) Tile Carpeting (05/10) Sheet Carpeting (10/09) Painted of Unpainted Surfaces (01/04) Painting of Previously Painted Surfaces (01/04) Paint, Putty, and Caulking Materials Form (01/04) Epoxy Resin Wall Finish (01/04) Textured Coatings (01/04) Division 10 SPECIALTIES Markerboards and Tackboards (01/10) Bulletin and Display Cabinets (09/08) Display Cases (02/09) Solid Plastic Toilet Partitions (01/04) Cubicle Curtains and Track (01/04) Wall Louvers (01/04) Architectural Screens (01/04) Electric Hand Dryers (09/08) Flagpoles (01/04) Identifying Devices (12/12) Lockers (01/04) Fire Extinguishers (01/04) Walkway Covers (01/04) Metal Canopies (01/04) Relay Collection Mailbox (03/11) Wire Mesh Doors and Partitions (01/04) Operable Partitions (01/04) Shelving (Utility/Storage) (01/04) Toilet Room Accessories (01/04) Division 11 EQUIPMENT Book Theft Detection System (01/04) Theater Curtains and Tracks (01/04) Stage Fire Curtain and Rigging (01/04) Project No. SPECIFICATION GUIDELINES TOC - 4
5 11110 Washers and Dryers (01/04) Projection Screens (01/04) Insulated Cold Storage Rooms (Foamed-in-Place Insulated Panels)(01/04) Custom Fabricated Equipment (04/11) Cooking Equipment (08/11) Serving Line Equipment and Units (01/04) Food Prep, Holding, and Dispensing Equipment (01/04) Utility Distribution Systems (01/04) Utility Distribution and Canopy Ventilating Systems (01/04) Food Service Shelving (01/04) Residential Kitchen Equipment (01/04) Gymnasium Physical Education Equipment (01/04) Gymnasium Scoreboards (01/04) Gymnasium Wall Padding (01/04) Spray Booths (01/04) Kilns (01/04) Dust Collection System (01/04) Laboratory Casework and Equipment (01/04) Division 12 FURNISHINGS Library Shelving (01/12) Window Treatment (01/04) Fixed Molded Plastic Seating (elementary and middle schools) (01/04) Fixed Upholstered Seating (high schools) (11/10) Telescoping Bleachers (01/04) Division 13 SPECIAL CONSTRUCTION Greenhouses (01/04) Fabric Shade Structures for Playground Areas (03/14) Solar Heating System (01/04) Intercom and Clock Raceway System (11/13) Telecommunications Raceway System (11/13) Intercom and Clock Systems (11/13) Sound Reinforcement System (03/14) Gymnasium Sound Reinforcement System (03/14) Television/Radio Frequency Systems (01/04) Wireless Clock/Tone Generator System (01/04) Energy Management System (EMS) (10/13) Intrusion Detection System (03/14) Access Control Systems (03/14) Project No. SPECIFICATION GUIDELINES TOC - 5
6 Division 14 CONVEYING SYSTEMS Hydraulic Elevators (02/09) Wheelchair Lifts (01/04) Division 15 MECHANICAL General Provisions (10/13) Codes and Standards (03/14) General Completion (10/13) Identification (10/13) Mechanical Support Devices (10/13) Supports, Anchors, and Seals (01/04) Tanks (01/04) Mechanical Systems Insulation (03/14) Vibration Isolation (10/13) Fire Protection (General Requirements) (01/04) Fire Pump and Controls (01/04) Automatic Fire Sprinkler System (01/04) Kitchen Hood and Duct Fire Suppression System (01/04) Standpipe and Hose Systems (01/04) Piping (Plumbing) (12/09) Drains and Cleanouts (01/04) Piping Specialties (Plumbing) (01/04) Hot, Chilled, and Condensing Water Piping Specialties (HVAC) (01/04) Plumbing Fixtures, Trim, and Supports (01/04) Water Heaters (01/04) Fuel Oil System (Plumbing) (01/04) Wet Automatic Fire Sprinkler Systems (01/04) Piping (HVAC) (03/14) Valves, Hangers, and Specialties (03/14) Pumping Equipment (HVAC) (10/13) Water Treatment (10/13) Horizontal Fire Tube Boilers (01/04) Kitchen Refrigeration Equipment (10/13) Air Cooled Condensing Units (10/13) Centrifugal Water Chillers (10/13) Rotary Screw Water Chillers (10/13) Induced Draft Cooling Towers (10/13) Roof Mounted Single Packaged Air-Conditioning Units (10/13) Refrigeration System Safety Equipment (02/14) Unit Heaters (10/13) Unit Ventilators (10/13) Project No. SPECIFICATION GUIDELINES TOC - 6
7 15838 Electrical Duct Heater (10/13) Dedicated Outdoor Air Units (03/14) Air Handling Units (10/13) Air Moving Equipment (10/13) Variable Air Volume Terminals (10/13) Air Curtains (10/13) Air Filtration Equipment (10/13) Commercial Kitchen Hoods (03/14) Ductwork (03/14) Fume Hood Exhaust Duct (03/14) Controls and Instrumentation (01/04) Duct Accessories (03/14) Outlets (HVAC) (03/14) HVAC Control System (01/04) Point Schedule (01/04) Tests (HVAC) (03/14) Testing and Balancing (03/14) Commissioning of HVAC (10/13) Division 16 ELECTRICAL Codes and Standards (03/14) Basic Materials and Methods (10/13) Raceways and Conduits (10/13) Wire and Cable (01/04) Outlet, Pull, and Junction Boxes (03/14) Floor Boxes (03/14) Wiring Devices (03/14) Motor Power and Control Wiring (03/14) Motor Starter Combination Type (03/14) Terminal Cabinets (03/14) Automatic Transfer Switch (10/13) Electrical Site Utilities (03/14) Switchboard (10/13) Metering and Sub-Metering (01/04) Disconnect Switches (03/14) Grounding (10/13) Dry-Type Transformers (10/13) Panelboards (10/13) Overcurrent Protective Devices (01/04) Motor Control Center (03/14) Lighting Fixtures and Lamps (03/14) Exterior Lighting (03/14) Stage Lighting Fixtures (01/04) Stage Lighting Fixtures (01/04) Project No. SPECIFICATION GUIDELINES TOC - 7
8 16533 Stage Lighting Fixtures (01/04) Stage Lighting Fixtures (01/04) CCTV Production Studio Lighting Fixtures (01/04) Standby Emergency Electrical Generator (CNG/LPG) (10/13) Battery Powered Emergency LED Lighting Units (03/14) Lightning Protection System (03/14) Surge Protection Devices (03/14) Fire Alarm Detection System (10/13) Stage Lighting Control Equipment (01/04) Stage Lighting Control Equipment (01/04) Stage Lighting Control Equipment (01/04) Stage Lighting Control Equipment (01/04) CCTV Production Studio Lighting Control Equipment (01/04) Stage Lighting Rigging (Counterweight) (01/04) Stage Lighting Rigging (Pipe Grid) (01/04) END OF TABLE OF CONTENTS Project No. SPECIFICATION GUIDELINES TOC - 8
M-DCPS MASTER SPECIFICATION GUIDELINES TABLE OF CONTENTS (TOC) Division 2 SITEWORK Last Revised
M-DCPS MASTER SPECIFICATION GUIDELINES TABLE OF CONTENTS (TOC) Division 2 SITEWORK Last Revised 02011 Soil Boring Data (Create for each site) (05/15) 02050 Demolition (Create for each existing building)
More informationTable of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities
Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)
More informationLEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies
MasterFormat LEVEL TWO NUMBERS AND TITLES Introductory Information 00001 Project Title Page 00005 Certifications Page 00007 Seals Page 00010 Table of Contents 00015 List of Drawings 00020 List of Schedules
More informationBILL NO. 1 GENERAL ITEMS. Item No. Description Lump Sum Prices Excluding HST
Page 1 SECTION 00 72 00 - GENERAL CONDITIONS BILL NO. 1 GENERAL ITEMS 1 Bonds... $ 2 Insurance... $ 3 Permits and fees... $ 4 Warranty certificates... $ 5 Supervision... $ SECTION 01 32 17 - SCHEDULE 6
More informationConcrete. Conveying Systems. Doors, Windows & Interiors
Concrete Concrete : Cast-in-Place Concrete Concrete : Cementitious Decks Concrete : Concrete Accessories Concrete: Concrete Block & Brick Concrete : Concrete Coring & Sawing Concrete : Concrete Curing
More informationSPACE TYPE: OUTSIDE PARKING (STRUCTURE)
SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.
More informationBuilding Systems and Design Elements included in SliDeRulE
Building Systems and Design Elements included in SliDeRulE No. System Subsystem Design Element 1.1.1 Foundation Deep Foundation Steel H-pile 1.1.2 Foundation Deep Foundation Steel pipe pile 1.1.3 Foundation
More informationTHE UNIVERSITY OF ALABAMA AT BIRMINGHAM (UAB) BIRMINGHAM, ALABAMA
Print Form THE UNIVERSITY OF ALABAMA AT BIRMINGHAM (UAB) BIRMINGHAM, ALABAMA PROJECT NAME/NO: Bartow Arena Roof Replacement 617 13th Street South Birmingham, AL STANDING ADDENDUM NO. 1 MINORITY BUSINESS
More informationCompany s Formal/Legal Name: US Mail Address: 9 Digit US Mail City: US Mail State: US Mail Zip: -
Notes: FACILITIES SMALL WORKS ROSTER APPLICATION Thurston County Central Services Department Special Projects Division 2000 Lakeridge Drive SW, Olympia, WA 98502-6045 (360) 786-5497 PLEASE PRINT OR TYPE
More informationDEPARTMENT OF VETERANS AFFAIRS VHA MASTER SPECIFICATIONS. TABLE OF CONTENTS Section
DEPARTMENT OF VETERANS AFFAIRS VHA MASTER SPECIFICATIONS TABLE OF CONTENTS Section 00 01 10 DIVISION 00 - SPECIAL SECTIONS DATE 00 01 15 List of Drawing Sheets 07-15 00 11 21 Request for Proposal to Design
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS
USACE / NAVFAC / AFCEC / NASA UFGS-09 06 00 (May 2009) Change 1-11/13 ----------------------------- Preparing Activity: USACE Superseding UFGS-09 06 90 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationSPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)
SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM) Construction Criteria The unit costs for the Physical Fitness Center (Exercise Room) space type are based on the construction quality and design features in
More informationRUWAIS HOUSING COMPLEX PHASE IV CIVIL & ELECTROMECHANICAL WORKS
AL NASR SCOPE OF WORKS: Construction of water storage tank consisting of: 3 Water storage tanks 2,641,721 gal of 42 m diameter and 7.65 m each 2300 m³ of concrete 2450 m² of water proofing external 4300
More informationBuildingAdvisor.com Estimating Checklist
BuildingAdvisor.com Estimating Checklist GENERAL REQUIREMENTS Plans and specifications Plan review Permits: Zoning, building, environmental, other Survey Impact fee Administrative costs Financing costs
More informationCOOLIDGE SENIOR HIGH SCHOOL
INITIAL YEAR BUILT 1940 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1240 ENROLLMENT 2008 652 WARD 4 PROPOSED PROGRAM CAPACITY 1100 Site Plan COOLIDGE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationConstruction Cost Estimate - DRAFT
Construction Cost Estimate - GATRA / Town of Plymouth Plymouth Intermodal Transit Center Plymouth, MA Prepared for: Fennick McCredie Architecture 65 Franklin Street, Boston, MA 02110 June 3, 2015 Project
More informationPROFESSIONAL DESIGN MANUAL INDEX
PROFESSIONAL DESIGN MANUAL INDEX DIVISION A--GENERAL PROJECT REQUIREMENTS... A2-A15 A.1 INTRODUCTION... A-2 A.2 CODES COMPLIANCE (VERIFY CITY REQUIREMENTS)... A-5 A.3 SPECIAL SUBSURFACE AND LAND CONDITIONS...
More informationCHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC
CHARTRES COURT 713-868 - 7226 5023 Washington Avenue Houston, Texas 77007 ChartresCourtHouston.com CHARTRES COURT LLC Features Open floor concept living/dining with spacious island kitchen Great master
More informationProject #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50
Project #1139 Budget #82 $ Budgeted $ Billed to Date $ Paid to Date $ Due 210,087.68 120,979.20 120,979.20 77,158.50 Deposit Paid Deposit Due Phase I: Project Programming and Research $ Budgeted $ Billed
More informationA/E Design Deliverable Checklist
A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic
More informationSECTION BASIC ELECTRICAL MATERIALS AND METHODS
SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:
More informationC P A. Presented By Jason G. Smith, CCM, LEED AP. Founder and Principal of Construction Analysis and Planning, LLC
C P A CONSTRUCTION ANALYSIS AND PLANNING, LLC Presented By Jason G. Smith, CCM, LEED AP Founder and Principal of Author of Construction Management: Subcontractor Scopes of Work 1 Division of work: Primary
More informationProposal Request (attachment to AIA Form G709)
Proposal Request (attachment to AIA Form G09) PR No: PR-0 Date: January, 06 Project: Great Work Montessori School Owner: Great Work Inc. Architect: Cuningham Group Copy To: File DESCRIPTION OF WORK The
More informationCompleted. Project. Melbourne High School. Comprehensive Additions and Renovations
Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project
More informationBuilding Inspection Report
Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941
More informationLASALLE - BACKUS EDUCATION CAMPUS
INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationDavis Frame Co., Inc. Construction Budget Considerations
Davis Frame Co., Inc. Construction Budget Considerations ITEM BID 1 BID 2 BID 3 MISCELLANEOUS COSTS Surveying Building Permit Engineering Fees Interest on Construction Loan Property Taxes Hazard & Liability
More informationTHE CONSTRUCTION SUPERVISOR
City of Aurora Building Inspections 15151 E Alameda Pkwy Aurora, CO 80012 (303) 739-7420 THE CONSTRUCTION SUPERVISOR When a building permit has been issued for any construction within the City, the Supervisor
More informationClassification of Property
Classification of Property This list is not all inclusive. For assets not shown or for questions, please contact the Wake County Revenue Department for assistance at (919) 856-5400. Real Personal Description
More information(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS **************************************************************************
USACE / NAVFAC / AFCEC / NASA UFGS-02 42 91 (May 2010) ------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS SECTION TABLE
More informationOFFICE OF EDUCATIONAL FACILITIES FLORIDA BUILDING CODE SECTION 423 APPLICATION MATRIX
423.1 Scope: Public educational facilities 423.2 Public schools and community colleges general requirements 423.2.1 Owner 423.2.2 Exemption from local requirements 423.2 Code enforcement 423.3.1 School
More informationGC s Subcontractor QA/QC Plan Sample
GC s Subcontractor QA/QC Plan Sample Include your Subcontractors in your Project Quality Control Plan Show your clients your seamless approach to controlling subcontractor quality on their project Contact:
More informationBIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample
BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS Project Name: Address: Owner: Phone/Fax/Email: Architect / General Contractor Name: : BID DEADLINE DATE: SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME:
More informationTraining Certification Categories
Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and
More informationAtlantic Builders Saratoga Woods Included Features Classic Series Single Family Homes Included Features - Bridgewater II, Griffin, Ashland, Chelsey
Classic Series Single Family Homes Included Features - Bridgewater II, Griffin, Ashland, Chelsey Exterior Features Professionally Designed Landscape Package Sod Lawns; Partial Front, Side, and Rear Two
More informationJohn T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619
E 8th St Chicago, IL 19 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope
More informationA/E Design Deliverable Checklist
A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic
More informationDivision II Contractors
Division II Contractors (d) "Sheet metal contractor" means a contractor whose services are unlimited in the sheet metal trade and who has the experience, knowledge, and skill necessary for the manufacture,
More informationBILL NO. 1 GENERAL ITEMS. Item No. Description Lump Sum Prices Excluding HST
Page 1 of 31 SECTION 00 72 00 - GENERAL CONDITIONS BILL NO. 1 GENERAL ITEMS 1 Bonds... $ 2 Insurance... $ 3 Permits and fees... $ 4 Supervision... $ SECTION 01 32 17 - SCHEDULE 5 90 day schedule -... $
More informationGENERAL PLAN REVIEW REQUIREMENTS
GENERAL PLAN REVIEW REQUIREMENTS Cover Letter A letter (or an authorized pre-printed form) authorizing CCIS to perform the Plan Review is required. CCIS performs plan reviews for the ICC International
More informationGreen Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING
Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING WWW.STOPWASTE.ORG New Addition Consider the following green remodeling options in a new addition.
More informationQualifying Process for Handyman Online Qualifying Questions. Name: Street Address: City: State: Zip Code. Home Phone: Cell Phone: Address:
Qualifying Process for Handyman Online Qualifying Questions Please type in your answers and email to info@pittsburghsbestremodeling.com or print out this form and write in your answers and fax to 412-829-1664
More informationArbor Heights Elementary School. Concrete for South Building Foundation Stem Walls
Arbor Heights Elementary School Concrete for South Building Foundation Stem Walls Arbor Heights Elementary School Workers Placing Concrete for South Building Foundation Stem Walls Arbor Heights Elementary
More informationSECTION COOLING TOWER
PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue
More informationLECKIE ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationEvergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program
Evergreen Project Implementation Plan Instructions Low Income Housing Tax Credit Program The following table provides a brief description of the documentation that will be required of successful LIHTC
More informationCost Estimate Details
C 0131 1 Inadequate Parking Construct or Expand Parking Lots $67,000 F 0132 1 Inadequate Drop Off Zone Widen Sidewalk, Construct Pathway and $77,000 Canopy RR 0132 2 No Landings at Classroom Exits Construct
More informationGeneral Conditions 39,522 5, ,292 26,050 75,921 1, Labor hours
Basic Edition Standard Estimate Report Page 1 Name 1000 General Conditions 1107 Professional Consultant 10 Surveying 1.00 day 600.000 /day 600 - - - - - - 600 Professional Consultant 600 600 8.00 hours
More informationREQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES
REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will
More informationPLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS
PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS NOTE: Building Code compliance is the obligation of design professionals and/or contractors. Plan review and inspection guidelines are to be used to ensure
More informationCIRCLE K SUB-CONTRACTOR BID FORM
CIRCLE K SUB-CONTRACTOR BID FORM Store No: 3308 Address: 8985 Will Clayton Pkwy Date: Bid Due September 17, 2014 Sub Contractor: Trade CONSTRUCTION TAX Construction Tax EXCAVATION / DIRT WORK Cut / Fill
More informationCheldelin Middle School
Facility Information Address: 987 NE Conifer Blvd Corvallis Site Size: Building Area: Construction Date: Improved Parking: Grade Levels Served: Regular Classrooms: Portable Classrooms: Sept. 2007 Enrollment:
More informationSPACE TYPE: ENHANCED OFFICE
SPACE TYPE: ENHANCED OFFICE Construction Criteria The unit costs for Enhanced Office space types are based on the construction quality and design features in the following table. This information has been
More informationProperty Condition Assessment
Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072
More informationJane Addams Elementary School S Avenue H Chicago, IL 60617
00 S Avenue H Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationCSI MASTER FORMAT 2012 SAMPLE COST CODES
CSI MASTER FORMAT 2012 SAMPLE COST CODES CSI MASTER FORMAT 2012 SAMPLE COST CODES 1. This document is intended to serve as a general guideline for Standard Cost Code setup for a small to mid size General
More information2 Main School Building BLDG-124A Building Purpose Building Area Administrative, Classrooms, Cafeteria and Gymnasium 61,905 SF Inspection Date June 28-
1 Metz Elementary School Site Summary Address 84 Robert Martinez Jr. Austin, TX 78702 Number of Permanent Campus Facilities 1 Original Year of Construction 1993 Total Campus Building Area (combined) 61,905
More informationSchool Without Walls
INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationTENANT CRITERIA MANUAL INSERT PHOTO HERE
G TENANT CRITERIA MANUAL GREENWOOD MALL INSERT PHOTO HERE General Growth Properties, Inc. 110 N. Wacker Drive Chicago, IL 60606 (312)-960-5000 Tenant shall supply and install an electrical meter
More informationDESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards
Laboratory Standards These criteria include general planning guidelines. They are intended for use of Designers during the design phases of the project. Planning Assumptions Overview In order to maximize
More informationCONSTRUCTION AND RENOVATION FUNDED BY THE CFI EXAMPLE OF A DETAILED COST ALLOCATION METHOD
CONSTRUCTION AND RENOVATION FUNDED BY THE CFI EXAMPLE OF A DETAILED COST ALLOCATION METHOD March 2009 CONSTRUCTION AND RENOVATION FUNDED BY THE CFI Prepared For: CANADA FOUNDATION FOR INNOVATION 230 QUEEN
More informationThe facility is approximately 439,350 square feet, located on a acre parcel on Wood Dale Road in Wood Dale, Illinois. 439,350 Square Feet
1.0 DESIGN SPECIFICATIONS 1.1 Size of Building and Tract: The facility is approximately 439,350 square feet, located on a 21.86-acre parcel on Wood Dale Road in Wood Dale, Illinois. 1.2 Size of Building
More informationFacility Improvements
CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation
More informationThe parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.
EAST LYME HIGH SCHOOL Located at 30 Chester Field Road, East Lyme, Connecticut 06333, the High School s original structure was built in 1967. An addition and alterations occurred in 1973. The building
More informationDesign & Construction Standards, Revised January
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationProperty Offering. Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711
Property Offering Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711 Executive Summary We are pleased to present an outstanding cold storage opportunity in Evansville, Indiana. Built in
More informationFACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017
FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 SDSU requests approval of this Facility Design Plan for renovation and addition to Harding
More informationCODE COMPLIANCE PLAN REVIEW PROCEDURES
CODE COMPLIANCE PLAN REVIEW PROCEDURES 1. All construction for state agencies on state-owned or state leased-purchased properties or facilities are to submit design documents for code compliance plan reviews
More informationToronto Community Housing Executive Summary 2016/2017. BCA Report. Sample House High FCI
BCA Report Porfolio Development Size Construction TCHC - All Op Units Scattered Units (CHU 20),005 Sq.Ft. 925 Floor Above Grade 2 Divisional Units Page of 43 Description This dwelling unit is a detached
More informationRODINNÉ DOMY STODŮLKY. Standards
RODINNÉ DOMY STODŮLKY Standards BUILDING Floors in residential rooms Entrance hall Kahrs Linnea 3-layer veneer floor, 3-parquet, finished with a moulding, a selection from natural oak and bleached oak
More informationDivision 09 FINISHES TABLE OF CONTENTS
Division 09 FINISHES TABLE OF CONTENTS 09 1000 GENERAL... 3 A. RELATED SECTIONS... 3 B. MAINTENANCE OF FINISHES... 3 C. PUBLIC AREAS... 3 D. CUTTING AND PATCHING... 3 E. CLEANING... 3 F. RECOMMENDED FLOORING
More informationLOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN
INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS
More information1 BASE HOME CONSTRUCTION SPECIFICATIONS: TOWNHOMES 5-13-2015 Note: Specifications noted below may change based on selected options. Verify upgrades from the base specifications with the option sheets and
More informationJames B Farnsworth Elementary School 5414 N Linder Ave Chicago, IL 60630
Linder Ave Chicago, IL 030 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationReceived by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:
HENDRY COUNTY BUILDING, LICENSING & CODE ENFORCEMENT POST OFFICE BOX 2340 * 640 SOUTH MAIN STREET * LABELLE, FLORIDA 33975 * (863) 675-5245 * FAX: (863) 674-4194 1100 OLYMPIA ST CLEWISTON, FLORIDA 33440
More informationAdditions and Renovations to Saint Robert Bellarmine Parish Center and Narthex 9/16/14 Outline Design Development Specification
Additions and Renovations to Saint Robert Bellarmine Parish Center and Narthex 9/16/14 Outline Design Development Specification Division 1 Division 2 Division 3 Construction Type Type III B, Not suppressed,
More informationStructural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)
Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction
More informationWILKINSON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1976 BUILDING AREA 144,900 SF CURRENT PROGRAM CAPACITY 508 ENROLLMENT 2008 451 WARD 8 PROPOSED PROGRAM CAPACITY 600 Site Plan WILKINSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationGUIDELINES FOR SANITARY DESIGN AND CONSTRUCTION OF MILK PRODUCTS PLANTS (rev )
Milk and Dairy Food Safety Branch 1220 N Street, Sacramento, CA 95814 GUIDELINES FOR SANITARY DESIGN AND CONSTRUCTION OF MILK PRODUCTS PLANTS (rev. 10-20-2011) The outline below lists sanitary requirements
More informationCONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST
CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Contract Documents Review Package. Provide a written explanation for any omissions. The following items,
More informationUNC Charlotte Residence Hall Phase X. Bid Results February 16, Alternate #7A Pinehall Brick Pavers. Alternate #6A Tile Student Bath
Trade Package Base Bid P and P BOND Alternate #1: drop off canopy Alternate #2: bike rack canopies Alternate #3: courtyard Alternate #4 Unit Door Alternate #5 Solid Surface Alternate #6A Bath Alternate
More informationSECTION HVAC INSULATION
PART 1 GENERAL 1.1 SUMMARY SECTION 23 07 00 HVAC INSULATION A. Section Includes: 1. Ductwork insulation. 2. Duct liner. 3. Insulation jackets. 4. Equipment insulation 5. Piping system insulation. 6. Insulation
More informationSchedule T5. Tender Documents. This tender is for: Tender Documents: The documents issued for this tender include the following: Tender Schedules
Schedule T Tender Documents T This tender is for: Contract: Location: Tender Documents: Norrie Home 56 Hardinge Road The documents issued for this tender include the following: Tender Schedules Schedule
More informationKETTERING ICE ARENA STRUCTURAL & MEP STUDY
KETTERING ICE ARENA STRUCTURAL & MEP STUDY PREPARED BY: HEAPY ENGINEERING MECHANICAL ELECTRICAL COMMISSIONING TECHNOLOGY 1400 WEST DOROTHY LANE DAYTON, OHIO 45409-1310 HEAPY PROJECT NO. 2013-07046 MARCH,
More informationSTATE UNIVERSITY CONSTRUCTION FUND
STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant
More informationBOWIE LEARNING CENTER
BOWIE LEARNING CENTER Bowie Learning Center BUILDING DATA BOWIE LEARNING CENTER 900 North Elm St., Weatherford, TX 76086 Year Built 1936 No. of Buildings No. of Portables 0 Approx. Total Square Footage
More informationMODULAR BUILDING SPECIFICATIONS
Use Group A - Assembly B Business E Education I - Institutional Construction Type Type II Non Combustible Type V - Wood Floor 12 Outrigger Frame with Cross members Frame: 12 Perimeter Steel Main Beams
More informationAPPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST
City of North Royalton Mayor Robert A. Stefanik Community Development, Building Division Dan Kulchytsky Building Commissioner 11545 Royalton Road, North Royalton, OH 44133 Phone: 440-582-3000 Fax: 440-582-3089
More informationSECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping
SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of
More informationNew Homes Forestbrook Road. Yes, it s INCLUDED!
Sugar Mill is a Covenant Restricted Community. New Homes Forestbrook Road Yes, it s INCLUDED! Granite Countertops Ceramic Tile Kitchen Floors Front Brick Accents Upgraded Kitchen Cabinets Ceramic Tile
More informationEdouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com
Edouard Modern Living Made Easy uichomes.com - new construction - 3 stories + full basement - 4 bedrooms - 2.5 baths - 2,380 s.f. call 314.881.2333 or e-mail sales@uicstl.com PLAN NTS DECK 13' 0" X 12'-0"
More informationOffice of Design & Construction State University Plaza Albany, New York
Instructions: Consultant should meet with the Campus and Fund at the work area(s) prior to completing this Checklist. At least two (2) meetings are required, one prior to Schematic Phase submission and
More informationHISTORIC PLAN, FLOOR PLANS, AERIAL PHOTOS
1 Page 1 of 28 HISTORIC PLAN, FLOOR PLANS, AERIAL PHOTOS HISTORIC PLAN NOT TO SCALE NORTH 2 Page 2 of 28 SITE PLAN NOT TO SCALE NORTH 3 Page 3 of 28 BUILDING INSPECTION REPORT The assessment of site and
More informationBronx Mental Health Redevelopment Project
Bronx Mental Health Redevelopment Project Residential Village Bronx Campus Transitional Living Residences, Haven House Horizon House, and Studio Apartments BIM Orientation December 20, 2012 1 Bronx Mental
More informationBudget Estimate Basic Tenant Improvement
Building work rules, conditions and insurance: 1. Review the work rules. If they are not available no budget should be provided. 2. Hours available for construction 3. Insurance requirements 4. Entities
More information3D Home Improvement and Inspection Services, Inc
Property Inspection Report Cover Page ABC Disney Lane, Winter Garden FL, 34787 Inspection prepared for: John Doe Inspection Date: 7/15/2010 Time: 11:00 am Age: 6 Years Size: 3,378 LSF / 4,427 TSF Weather:
More informationApplication for Special Valuation STAFF REPORT OF FINDINGS
Application for Special Valuation STAFF REPORT OF FINDINGS Historic Name: Campbell Jones House Property Address: 1320 N Summit Blvd. Applicant: Dan & Annette Owens Date: Submitted 9/1/2017 MANAGEMENT AGREEMENT:
More informationTEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM. Form 15 Work Write-Up
TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS OFFICE OF COLONIA INITIATIVES TEXAS BOOTSTRAP LOAN PROGRAM Form 15 Work Write-Up Owner-Builder Applicant Owner-Builder Co-Applicant Physical Address: City,
More informationSECTION GYPSUM BOARD ASSEMBLIES
SECTION 09 21 16 GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.1 SECTION INCLUDES A. Metal stud wall and ceiling framing, 20 gauge. B. Metal channel suspended ceiling framing. C. Gypsum board. D. Gypsum sheathing.