1 1 MEP Design Standards & Equip Cuts NYP BEST PRACTICES Presentation for GC/CM Retreat 2014

2 We Put Patients First Agenda 2 Disclaimer Consultant Engineer & Commissioning Agent May 2012 Edition NYP Revised Requirements 2014 NYC Building Code Highlights Building Resiliency Code Highlights Equipment Selection Process Locating the Design Standards on the Portal Updating and Maintaining

3 3 3 DISCLAIMER The purpose of this document is to provide the design engineer with the guidelines for HVAC, electrical, plumbing, fire protection, fire alarm, nurse call, commissioning and controls, specified herein on NYPH campuses. This does not substitute the design engineer s specifications for each project but provides the basis of the standards, which the design engineer shall follow. The final responsibility for the design of the specific project resides with the design engineer of record.

4 Consultant Engineer and Cx Responsibilities 4 FDC-E FO FDC Campus Master Engineer (One per Campus) Commissioning Agent (Two per Campus) Project Design Engineer (Individual Project) Tasks Capacity Police - Assesses the capacity impact of project designs to existing MEP systems Focused on Strategic Planning and Design Criteria for MER s and Risers. Updating and maintaining existing MEP riser and distribution documents Specifies Capacities and Performance Requirements Funded by Infrastructure Program Management Project Police Focused on MEP Performance related to project installation Reviews Basis of Design Requirements with OFO and Project Design Engineer O&M, equipment warranty, start up and preventative maintenance to insure proper project close outs. Provide Measurement and Verification to Campus Engineer Funded by Specific Project Engineer of Record - Focused on design of Individual Project Provides load information to OFD-E and Campus Engineer Provides Basis of Design for project based on Owner Requirements for review by Commissioning Agent and OFO Funded by Specific Project

5 MASTERFORMAT divisions to latest CSI nomenclature: 5 NYP Design Specifications May 2012 Edition Mechanical Division 15 to Division 23 Plumbing Division 15 to Division 22 Fire Protection Division 15 to Division 21 Electrical Division 16 to Division 26 Added Sections include: Equipment Cuts Commissioning/Energy Compliance Guidelines Building Specific Checklist Updated to meet the latest 2008 NYC Building Code & 2010 FGI requirements.

6 Mechanical Division 23 6 NYP Design Specifications Update 2014 Highlights NYP Requirements All air systems requiring humidification must include clean steam generators Standardized controls packages for mechanical equipment Electrical Division 26 Requirements for GFI Circuit Breakers to be installed in lieu of GFI outlets in wet locations Plumbing Division 22 Revisions to the Plumbing Fixtures Review and update to meet the latest 2014 NYC Building Code & 2014 FGI requirements.

7 Mechanical Division 23 7 NYP Design Specifications Update 2014 Highlights 2014 NYC Building Code Wind bracing requirements for roof top equipment upgraded Permits utilizing 1968 Code fire and smoke damper requirements in 1968 Code or prior compliant buildings * Permits high temperature water systems similar to high pressure steam systems New requirements for high pressure gas piping systems and installations Clarifies CO detection requirements for Class E, I2 & I4 occupancies *must comply with the most stringent code

8 Plumbing Division 23 New plumbing fixture calculations for new construction 8 NYP Design Specifications Update 2014 Highlights 2014 NYC Building Code Allows plumbing fixture calculations in prior code buildings to be based on 1968 Building Code utilizing 1968 occupancy load calculations Back flow preventers on sewage mains (Resiliency) Fire Protection Division 22 Enhanced fire protection, smoke detection and life safety requirements in ambulatory health care facilities Emergency preparedness & planning requirements for non-fire emergencies to include power outages and medical emergencies Clarifies roof top access and obstructions

9 Local Laws in 2013 now part of 2014 Building Code: 80/2013 Capture Storm water to Prevent Flooding 9 NYP Design Specifications Update 2014 Highlights Building Resiliency Local Laws to Building Code 81/2013 Analyze Wind Risks 82/2013 Clarify Construction Requirements in Flood Zones 83/2013 Prevent Sewage Backflow 98/2013 Create Emergency Plans 99/2013 Remove Barriers to Elevating Building Systems 100/2013 Relocate and Protect Building Systems 101/2013 Prevent Wind Damage to Existing Buildings 108/2013 Add Hookups for Temporary Generators & Boilers 109/2013 Remove Barriers to Sidewalk Flooding 143/2013 Safeguard Toxic Materials Stored in Flood Zones

10 Equipment pre- approval process developed 10 with NYP Facilities Operations to standardize to improve maintenance and Equipment Selection Process reduce the number of spare parts Or Equal was eliminated from the recommended manufacturers when 3 or more manufacturers were listed. A handful of Proprietary equipment manufacturers such as: ASCO Automatic Transfer Switches were identified as NYPH Standards. Architects and Engineering Firms are to use selected NYP pre- approved Equipment from the Equipment Cut e-book that resides on the portal.

11 11 Locating MEP Standards and Equipment Cuts on Portal

12 12 Updating and Maintaining the Design Specifications and Equipment Cuts We encourage all stakeholders to provide updates and suggestions through FDC-E, including: FDC-Project teams & A/E Design Firms FO Directors, Managers and Shop personnel FDC-E will be responsible for the updating of the Standard Standards will be maintained on a 3-year cycle Changes in sections will be highlighted at each cycle

Commissioning at NYP. Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015

Commissioning at NYP. Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015 1 Commissioning at NYP Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015 Presentation Agenda 2 What is Commissioning Why Commission? Developing NYP s Commissioning Program

More information

Mission Critical Commissioning for Healthcare Facilities

Mission Critical Commissioning for Healthcare Facilities Mission Critical Commissioning for Healthcare Facilities Steven R. Rusty Ross SSRCx, LLC Synopsis Healthcare Facilities serve a critical and unique mission. Few facilities delivered by the construction

More information

Thule Prototype BIM Manual for Dormitories. February 5, 2010

Thule Prototype BIM Manual for Dormitories. February 5, 2010 Thule Prototype BIM Manual for Dormitories February 5, 2010 TABLE OF CONTENTS INTRODUCTION Executive Summary 2 Goals 2 Scope and Use 2-4 Program Assumptions Kit of Parts GUIDELINE INTEGRATION Site Design

More information

Attachment 04 Substantial and Final Completion Approval Form. Project Description Project # Date of Completion Permit # Project Manager Phone #

Attachment 04 Substantial and Final Completion Approval Form. Project Description Project # Date of Completion Permit # Project Manager Phone # UCF Design, Construction, and Renovation Standards Attachment 04 Substantial and Final Completion Approval Form Project Description Project # Date of Completion Permit # Phone # Intent: This Substantial

More information

A/E REVIEW CHECKLIST STEAM GENERATION

A/E REVIEW CHECKLIST STEAM GENERATION A/E REVIEW CHECKLIST STEAM GENERATION Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural,

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Application for Commercial Plan Review and Building Permit. Address:

Application for Commercial Plan Review and Building Permit. Address: City of Warrenton 200 West Booneslick Warrenton, MO 63383 : 636-456-3535 Fax: 636-456-1336 www. war r ent o n- mo.org Application for Commercial Plan Review and Building Permit PERMIT# Purpose: Commercial

More information

600 - Phase C Intermediate Review Checklist for the Architect- Engineer

600 - Phase C Intermediate Review Checklist for the Architect- Engineer 600 Phase C Intermediate Review Checklist for the Architect Engineer This checklist is to be used by the ArchitectEngineer during Phase C of the Project and shall be included in the Intermediate Review

More information

FEMA P-1019 Emergency Power Systems for Critical Facilities. ASFPM May 4, 2017 David K Low, PE DK Low & Associates

FEMA P-1019 Emergency Power Systems for Critical Facilities. ASFPM May 4, 2017 David K Low, PE DK Low & Associates FEMA P-1019 Emergency Power Systems for Critical Facilities ASFPM May 4, 2017 David K Low, PE DK Low & Associates FEMA P-1019 FEMA P-1019 A critical facility that is fully compliant with the minimum building

More information

CODE COMPLIANCE PLAN REVIEW PROCEDURES

CODE COMPLIANCE PLAN REVIEW PROCEDURES CODE COMPLIANCE PLAN REVIEW PROCEDURES 1. All construction for state agencies on state-owned or state leased-purchased properties or facilities are to submit design documents for code compliance plan reviews

More information

Element D Services Plumbing

Element D Services Plumbing Fixtures PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses plumbing fixtures, trim and associated accessories. Refer to MD Anderson Cancer Center Master Construction Specification Sections for additional

More information

Brown University Updated March 11, 2013 Facilities Design & Construction Standards

Brown University Updated March 11, 2013 Facilities Design & Construction Standards SECTION 01 17 90 UTILITY & CRITICAL SYSTEM CONNECTIONS AND INTERRUPTIONS PART 1 - GENERAL 1.1 SUMMARY: A. Brown University operates and maintains extensive campus and building utilities and distribution

More information

ENHANCING RESILIENCE IN BOSTON A Guide for Large Buildings and Institutions. Boston Green Tourism May 21, 2015

ENHANCING RESILIENCE IN BOSTON A Guide for Large Buildings and Institutions. Boston Green Tourism May 21, 2015 ENHANCING RESILIENCE IN BOSTON A Guide for Large Buildings and Institutions Boston Green Tourism May 21, 2015 Report Context Climate Action Plan Action-Item GRC Preparedness Recommendations ABC Priority

More information

Minnesota State Colleges and Universities. South Central College. Request for Proposals for Commissioning Agent. STEM and Healthcare Renovation

Minnesota State Colleges and Universities. South Central College. Request for Proposals for Commissioning Agent. STEM and Healthcare Renovation Minnesota State Colleges and Universities South Central College Request for Proposals for Commissioning Agent STEM and Healthcare Renovation Date: 12/18/2017 ADDENDUM #1 1. The Sign-In sheet for the voluntary

More information

Repair or replace section of driveway, approach, or sidewalk that are a trip hazard.

Repair or replace section of driveway, approach, or sidewalk that are a trip hazard. City of Gibraltar Pre-Sale Inspection Report Checklist FLATWORK: Repair or replace section of driveway, approach, or sidewalk that are a trip hazard. EXTERIOR PROPERTY: Fences/Sheds/Retaining walls: Repair,

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant

More information

Storm Preparedness & Hazard Mitigation for Post-Sandy Red Hook, Brooklyn, NY Deborah Mills, CFM Dewberry Consultants, LLC.

Storm Preparedness & Hazard Mitigation for Post-Sandy Red Hook, Brooklyn, NY Deborah Mills, CFM Dewberry Consultants, LLC. Storm Preparedness & Hazard Mitigation for Post-Sandy Red Hook, Brooklyn, NY Deborah Mills, CFM Dewberry Consultants, LLC. Agenda Introduction to the Project Red Hook, Brooklyn Sandy s Impact Hazard Risks

More information

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011 UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011 CONTENTS A. PURPOSE B. DESIGNATED RESPONSIBILITIES C. DEFINITIONS D. PROJECT SUBMITTAL PROCEDURE E. REQUIREMENTS

More information

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT FACILITIES MANAGEMENT Planning, Design & Construction March 7, 2013 Re: Request for Proposals- Commissioning Services Mayflower Hall Permanent Flood Recovery & Mitigation (UI# 0200201) University of Iowa

More information

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) Code Requirements for Existing Buildings R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS) was established in 1945 and currently

More information

APPENDIX C - PRECONSTRUCTION MEETING AGENDA

APPENDIX C - PRECONSTRUCTION MEETING AGENDA APPENDIX C - PRECONSTRUCTION MEETING AGENDA (For projects in Duluth, use alternate Appendix KK) Project Name: Project Number: Date: This outline has been prepared so that everyone involved in the project

More information

Permit Application. Building - Electrical - Mechanical - Plumbing - Sign. Project Address: Building and Safety Permit Service Center

Permit Application. Building - Electrical - Mechanical - Plumbing - Sign. Project Address: Building and Safety Permit Service Center Permit Application Last Revised 2/06/7 Building - Electrical - Mechanical - Plumbing - Sign Building and Safety Permit Service Center Project APN: Valuation: The valuation used in computing the building

More information

SUNY Hospitals & A Healthier New York. Capital Briefing March 1, 2013

SUNY Hospitals & A Healthier New York. Capital Briefing March 1, 2013 SUNY Hospitals & A Healthier New York Capital Briefing March 1, 2013 Profile of SUNY Capital Programs Square Footage (in millions) 18.9 20.5 58.5 3.3 Educational Facilities Residence Halls Hospitals Community

More information

4. Number of drawings required: ( ) Locations of nearest streets

4. Number of drawings required: ( ) Locations of nearest streets CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us COMMERCIAL BUILDING PLAN REQUIREMENTS

More information

TEXAS A&M ENGINEERING

TEXAS A&M ENGINEERING TEXAS A&M ENGINEERING 312 Jack K. Williams Administration Building I 3126 TAMU I College Station, Texas 77843-3126 M. Katherine Banks, Ph.D., P.E. Vice Chancellor and Dean of Engineering Director, Texas

More information

BUILDING PERMIT APPLICATION

BUILDING PERMIT APPLICATION TOWN OF LEICESTER 132 Main Street Post Office Box 197 Leicester, New York 14481 Phone: (585) 382-3231 FAX: (585) 382-9766 BUILDING PERMIT APPLICATION All Town of Leicester property owners are required

More information

BUILDING CODES & DESIGN CRITERIA

BUILDING CODES & DESIGN CRITERIA BUILDING CODES & DESIGN CRITERIA Adopted Building Codes: 2006 International Building Code (IBC) 2006 International Residential Code (IRC) 2006 International Mechanical Code (IMC) 2006 International Plumbing

More information

DESIGN DEVELOPMENT PHASE

DESIGN DEVELOPMENT PHASE UNIVERSITY OF MICHIGAN DESIGN DELIVERABLES FEBRUARY 2012 As part of the deliverables for formal UM review at each of the major phases of design listed below, the Design Professional shall submit this "Design

More information

Controls Master Planning Process leads to Campus-Wide BAS Upgrade. 11 February 2015

Controls Master Planning Process leads to Campus-Wide BAS Upgrade. 11 February 2015 Controls Master Planning Process leads to Campus-Wide BAS Upgrade 11 February 2015 Agenda BAS Overview / Benefits Case Study Confidential Energy Company, Illinois Integrated Master Planning Approach Stakeholder

More information

Full-Scope Commissioning for High-Quality Buildings

Full-Scope Commissioning for High-Quality Buildings Full-Scope Commissioning for High-Quality Buildings Pieter L. van der Mersch, PE, QCxP University of Colorado Boulder 21 st National Conference on Building Commissioning AIA Quality Assurance The Building

More information

Minimum Standards for Building Occupancy. Safety Resources

Minimum Standards for Building Occupancy. Safety Resources Minimum Standards for Building Occupancy 2017 Safety Resources Contents 1 Purpose... 1 2 Applicable To... 1 3 Scope... 1 4 Definitions... 1 5 Training... 2 6 Safety... 2 7 Equipment and Materials... 2

More information

Florida Army National Guard Construction Facilities Management Office. Scope of Work:

Florida Army National Guard Construction Facilities Management Office. Scope of Work: Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines October 2008 Scope of Work: To provide complete design for the renovation/alterations

More information

Interior Architects, P.C REV 2 CONCEPTUAL ESTIMATE. Brooklyn Heights Library, Brooklyn Public Library, Brooklyn, NY GARDINER AND THEOBALD INC FOR: AT:

Interior Architects, P.C REV 2 CONCEPTUAL ESTIMATE. Brooklyn Heights Library, Brooklyn Public Library, Brooklyn, NY GARDINER AND THEOBALD INC FOR: AT: REV 2 CONCEPTUAL ESTIMATE FOR: Interior Architects, P.C Brooklyn Heights Library, Brooklyn Public Library, Brooklyn, NY AT: BY: GARDINER AND THEOBALD INC Issued: 6/20/2013 BROOKLYN HEIGHTS LIBRARY, BROOKLYN

More information

Systems Commissioning Table of Contents

Systems Commissioning Table of Contents Systems Commissioning Table of Contents C NC NA I. General II. Commissioning III. Mechanical Systems A. Testing, Adjusting, and Balancing B. Piping IV. Electrical Systems A. Load Balancing B. Electrical

More information

Minnesota Healthcare Engineers Association, Fall Conference. Bob Dehler, P.E. Engineering Program Manager September 14, 2017

Minnesota Healthcare Engineers Association, Fall Conference. Bob Dehler, P.E. Engineering Program Manager September 14, 2017 Minnesota Healthcare Engineers Association, Fall Conference Bob Dehler, P.E. Engineering Program Manager September 14, 2017 Categories of Rehabilitation Work in Healthcare Facilities Bob Dehler, P.E. robert.dehler@state.mn.us

More information

REQUEST FOR ARCHITECTURAL AND ENGINEERING DESIGN SERVICES DRUMLIN DINING HALL RENOVATION. University of Wisconsin-Whitewater.

REQUEST FOR ARCHITECTURAL AND ENGINEERING DESIGN SERVICES DRUMLIN DINING HALL RENOVATION. University of Wisconsin-Whitewater. REQUEST FOR ARCHITECTURAL AND ENGINEERING DESIGN SERVICES DRUMLIN DINING HALL RENOVATION University of Wisconsin-Whitewater March 2008 Project No. 08B21 TABLE OF CONTENTS PAGE Table of Contents... 2 Project

More information

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST

IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST ENVELOPE REQUIREMENTS Project: Date: Instructions RECOMMENDED: List performance values, note exceptions that were applied, or provide other

More information

CODE REQUIREMENTS FOR BUILDING COMMISSIONING SCOTT WEAVER, PE, QCXP, LEED AP BD+C DIRECTOR, COMMISSIONING DECEMBER 1, 2017

CODE REQUIREMENTS FOR BUILDING COMMISSIONING SCOTT WEAVER, PE, QCXP, LEED AP BD+C DIRECTOR, COMMISSIONING DECEMBER 1, 2017 CODE REQUIREMENTS FOR BUILDING COMMISSIONING SCOTT WEAVER, PE, QCXP, LEED AP BD+C DIRECTOR, COMMISSIONING DECEMBER 1, 2017 OVERVIEW The recent adoption by the Centers for Medicaid and Medicare Services

More information

UNIVERSITY OF ALASKA FAIRBANKS DIVISION 14 - CONVEYING EQUIPMENT DESIGN STANDARDS SECTION

UNIVERSITY OF ALASKA FAIRBANKS DIVISION 14 - CONVEYING EQUIPMENT DESIGN STANDARDS SECTION PART 1 - GENERAL 1.01 Elevator manufacturer to provide equipment and installation warranty and maintenance services for at least one year after acceptance. This requires routine monthly inspection, emergency

More information

A/E REVIEW CHECKLIST STRUCTURAL

A/E REVIEW CHECKLIST STRUCTURAL A/E REVIEW CHECKLIST STRUCTURAL Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing,

More information

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL). 16450 GROUNDING ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 05 26 An optional keynote to the

More information

The following is required for a complete permit submittal for each unit.

The following is required for a complete permit submittal for each unit. P: (847)810-3503 OR (847)810-3503/3521, F: (847)615-4383 NEW MULTI-FAMILY DWELLING OR COMMERCIAL PERMIT REQUIREMENTS The following is required for a complete permit submittal for each unit. NEW MULTI-FAMILY

More information

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE: HENDRY COUNTY BUILDING, LICENSING & CODE ENFORCEMENT POST OFFICE BOX 2340 * 640 SOUTH MAIN STREET * LABELLE, FLORIDA 33975 * (863) 675-5245 * FAX: (863) 674-4194 1100 OLYMPIA ST CLEWISTON, FLORIDA 33440

More information

COMMERCIAL PLANS SUBMITTAL CHECKLIST For Commercial and Multi-family (3 or more units) Building Permit Applications

COMMERCIAL PLANS SUBMITTAL CHECKLIST For Commercial and Multi-family (3 or more units) Building Permit Applications COMMERCIAL PLANS SUBMITTAL CHECKLIST For Commercial and Multi-family (3 or more units) Building Permit Applications Building Permit Application (3 rd Page MUST be signed & notarized by Owner!) Plans can

More information

: Plan Review and Project Services

: Plan Review and Project Services 01 34 10: Plan Review and Project Services November 7th, 2014 Contact Information Tony Schifiliti, Consultant Engineer Office: 781-440-8630 Cell: 617-771-2350 Anthony.Schifiliti@fmglobal.com George Schork,

More information

Codifying Resiliency

Codifying Resiliency Codifying Resiliency LEED s new resiliency pilot credits Living Cities Forum, Halifax September 12, 2016 Ryan Zizzo Technical Director MASc, PEng, LEED AP ND $ Billion Economic Impacts Catastrophic Insurable

More information

Opening a New Hospital: A Case Study Healthcare Commissioning and the Authority Having Jurisdiction

Opening a New Hospital: A Case Study Healthcare Commissioning and the Authority Having Jurisdiction Opening a New Hospital: A Case Study Healthcare Commissioning and the Authority Having Jurisdiction Matthew Tunnard, PE, CCP, LEED AP, Senior Engineer Horizon Engineering Associates, LLP AIA Quality Assurance

More information

CONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability

CONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability 01352 Sustainable Design Requirements This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications

More information

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Contract Documents Review Package. Provide a written explanation for any omissions. The following items,

More information

WARWICK TOWNSHIP Dept. of Planning & Zoning

WARWICK TOWNSHIP Dept. of Planning & Zoning For Warwick Township Use Only WARWICK TOWNSHIP Dept. of Planning & Zoning 1733 Township Greene, Jamison, PA 18929 : (215) 343-6100 www.warwick-bucks.org Check #: Check Amount: Received by: BUILDING PERMIT

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

RESIDENTIAL BUILDING REQUIREMENTS

RESIDENTIAL BUILDING REQUIREMENTS RESIDENTIAL BUILDING REQUIREMENTS Residential Building Requirements This is an informational booklet with some of the general residential construction requirements taken from the codes adopted by Campbell

More information

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) Code Requirements for Existing Buildings R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS) was established in 1945 and currently

More information

Standard Plan Review - Project Submittal Checklist

Standard Plan Review - Project Submittal Checklist Standard Plan Review - Project Submittal Checklist DATE: PROJECT ADDRESS: PROJECT MANAGER: RETURN TO PM WITH CORRECTIONS 2 nd INTAKE APPOINTMENT Submit the following requirements, as applicable, at the

More information

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department: Permit Requirements: Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install,

More information

Residential Sewer Backup Prevention Program

Residential Sewer Backup Prevention Program City of Wheaton Residential Sewer Backup Prevention Program Please Note: The City reserves the right to modify the policies, procedures and rules of this program or discontinue the program in its entirety

More information

Bronx Mental Health Redevelopment Project

Bronx Mental Health Redevelopment Project Bronx Mental Health Redevelopment Project Residential Village Bronx Campus Transitional Living Residences, Haven House Horizon House, and Studio Apartments BIM Orientation December 20, 2012 1 Bronx Mental

More information

Sustainable Building Operations & Upgrades

Sustainable Building Operations & Upgrades Sustainable Building Operations & Upgrades LEED for Existing Buildings 2010 Energy / Facilities Connections Conference Brightworks & Glumac Eric Baxter and Todd McGuire 12 May, 2010 The Value Proposition

More information

Revision Date: February 28,

Revision Date: February 28, FACILITY SERVICES - REQUIREMENTS FOR PLUMBING, FIRE PROTECTION, HVAC, AND ELECTRIC DOCUMENTS 2007 Edition, Published April, 2007, Revision Date: February 28, 2018 FS-1. SEPARATE DOCUMENTS REQUIRED.2 SEPARATION

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information Anderson Central 100B, PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G

More information

Commissioning: The Most Important Component of LEED. Rick Miller, PE, LEED AP. RNM Engineering, Inc. San Luis Obispo, CA

Commissioning: The Most Important Component of LEED. Rick Miller, PE, LEED AP. RNM Engineering, Inc. San Luis Obispo, CA Commissioning: The Most Important Component of LEED by Rick Miller, PE, LEED AP RNM Engineering, Inc. San Luis Obispo, CA LEED and Commissioning EA Prerequisite Fundamental Commissioning of Building Energy

More information

The following is required for a complete permit submittal for each unit.

The following is required for a complete permit submittal for each unit. P: (847)810-3502 OR (847)810-3503/3521, F: (847)615-4383 MULTI-FAMILY OR COMMERCIAL ADDITION OR ALTERATION PERMIT REQUIREMENTS The following is required for a complete permit submittal for each unit. MULTI-FAMILY

More information

Property Condition Assessment (PCA) Checklist c:\users\joseph\documents\hhc\blog\pca cklist template.doc Friday, August 11, 2006

Property Condition Assessment (PCA) Checklist c:\users\joseph\documents\hhc\blog\pca cklist template.doc Friday, August 11, 2006 FORUM for Historic Harvard Property Assessment (PCA) Checklist c:\users\joseph\documents\hhc\blog\pca cklist template.doc Friday, August 11, 2006 The purpose of this document is to identify in checklist

More information

INTRODUCTION TO ELECTRICAL ENGINEERING IN THE CONSTRUCTION FIELD BY G. STECHER, P.E.

INTRODUCTION TO ELECTRICAL ENGINEERING IN THE CONSTRUCTION FIELD BY G. STECHER, P.E. INTRODUCTION TO ELECTRICAL ENGINEERING IN THE CONSTRUCTION FIELD BY G. STECHER, P.E. TYPICAL BUILDING CONSTRUCTION PROJECTS BASE BUILDING BRAND NEW BUILDING, OUT OF THE GROUND INFRASTRUCTURE UPGRADE INFRASTRUCTURE

More information

RFP Feasibility Design Services: Clinical Education & Assessment Center Expansion Questions & Answers: February 13 th, 2018

RFP Feasibility Design Services: Clinical Education & Assessment Center Expansion Questions & Answers: February 13 th, 2018 Question & Answer: #1 The RFP calls for a survey of the building to gain a comprehensive understanding of the existing building, utilities, building systems, occupancies and all existing conditions as

More information

How IBC-2009 seismic and wind loading standards apply to emergency standby power systems

How IBC-2009 seismic and wind loading standards apply to emergency standby power systems TECHNICAL ARTICLE How IBC-2009 seismic and wind loading standards apply to emergency standby power systems Understanding provisions in the latest edition of the International Building Code is critical

More information

CALGREEN NON-RESIDENTIAL BUILDING Checklist

CALGREEN NON-RESIDENTIAL BUILDING Checklist CALGREEN NON-RESIDENTIAL BUILDING Checklist REVISED 11/18/14 New non-residential buildings shall be designed to include the green building mandatory measures specified in this checklist. This checklist

More information

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the

More information

Backflow Preventer Tester Plumbing License Code Path

Backflow Preventer Tester Plumbing License Code Path Backflow Preventer Tester Plumbing License Code Path P.A. 733 State Plumbing Act P.A. 230 State Construction Code Act P.A. 399, Part 14 Cross Connection Control Rules Michigan Plumbing Code International

More information

SFPUC Flooding Workshop Tuesday, February 9, 2016

SFPUC Flooding Workshop Tuesday, February 9, 2016 Presenters: SFPUC Flooding Workshop Tuesday, February 9, 2016 Tommy Moala, Assistant General Manager, Wastewater Enterprise Stefani Harrison, Project Manager Photo: Dec 3, 2014 End of Cayuga Street 25-year

More information

2010 National Building Code Adoption and Associated Process Changes

2010 National Building Code Adoption and Associated Process Changes Building Inspection City of Moncton 655 Main Street Moncton, NB E1C 1E8 Phone: (506) 856-4375 Fax: (506) 856-4348 Bulletin No. 14 From: Randy Richard Date: February 9, 2015 Subject: 2010 National Building

More information

SEWER SYSTEM DESIGN GUIDELINES

SEWER SYSTEM DESIGN GUIDELINES SEWER SYSTEM DESIGN GUIDELINES PART 1 GENERAL 1.1 GENERAL GUIDELINES A. The following sewer system design guidelines are based on Federal, State and Local health requirements, and the Berkeley County Water

More information

Building Commissioning

Building Commissioning Building Commissioning Roles, Responsibilities, and Benefits 2010 ASHRAE Annual Meeting CxA WORKSHOP Saturday, June 26, 2010 Jim Magee, CxA, LEED-AP Facility Commissioning Group Overview Cx Advocacy, Economics,

More information

2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA Phone:

2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA Phone: 2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA 94070 Phone: 650-802-4261 PURPOSE: The residential provisions of the 2016 CalGreen

More information

Mobile Homes/Manufactured Homes

Mobile Homes/Manufactured Homes Mobile Homes/Manufactured Homes Permits, Installation, Inspections and Zoning Requirements Mendocino County Planning & Building Services Inland: 860 North Bush Street Ukiah, CA 95482 707-234-6650 Coastal:

More information

DEPARTMENT OF CODE ENFORCEMENT CITY OF NIAGARA FALLS, NEW YORK FEE SCHEDULE

DEPARTMENT OF CODE ENFORCEMENT CITY OF NIAGARA FALLS, NEW YORK FEE SCHEDULE DEPARTMENT OF CODE ENFORCEMENT CITY OF NIAGARA FALLS, NEW YORK 1/1/15 FEE SCHEDULE No permit shall be issued by the Director of Code Enforcement until fees hereinafter prescribed have been paid to the

More information

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION 1 PLAN INFORMATION Residential plans must be legible and capable of digital scanning. All sheets shall be the same size and distinctly labeled with a sheet title and number. The minimum dimension of the

More information

SHORING & UNDERPINNING 02250

SHORING & UNDERPINNING 02250 Subsidiary of Hubbell Power Systems 210 North Allen St. Centralia, MO 65240 Phone: (573) 682-8414 Fax: (573) 682-8660 E-mail: hpscontact@hps.hubbell.com www.abchance.com This MANU-SPEC utilizes the Construction

More information

Minnesota Health Care Engineers Association

Minnesota Health Care Engineers Association Minnesota Health Care Engineers Association Life Safety Code Potpourri Friday, May 1, 2015 Presenter: Bob Dehler, P.E., Engineering Program Manager, Minnesota Department of Health Minnesota Department

More information

KITCHEN REMODELS CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA (949)

KITCHEN REMODELS CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA (949) CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA 92691 (949) 470-3054 KITCHEN REMODELS A permit is required for kitchen remodels that include removal and replacement

More information

SECTION SANITARY WASTE INTERCEPTORS

SECTION SANITARY WASTE INTERCEPTORS SECTION 22 13 23 SANITARY WASTE INTERCEPTORS PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-07 84 00 (May 2010) Change 1-08/13 ------------------------ Preparing Activity: USACE Superseding UFGS-07 84 00 (October 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS

PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS NOTE: Building Code compliance is the obligation of design professionals and/or contractors. Plan review and inspection guidelines are to be used to ensure

More information

Introduction. Disclaimer. Table of contents

Introduction. Disclaimer. Table of contents Updated July 18, 2012 Introduction The Cambridge Elevating Limited-Use / Limited-Application Elevator is designed to service schools, libraries, low rise, low occupancy commercial buildings, churches and

More information

HOLLOWAY HALL AUDITORIUM RENOVATION

HOLLOWAY HALL AUDITORIUM RENOVATION HOLLOWAY HALL AUDITORIUM RENOVATION BID DOCUMENTS PROJECT MANUAL JANUARY 2, 2013 SALISBURY UNIVERSITY FACILITIES PLANNING AND CAPITAL PROJECTS 1101 CAMDEN AVENUE SALISBURY, MARYLAND 21801 DESIGN COLLECTIVE,

More information

Volume II- Project Development Processes

Volume II- Project Development Processes Volume II- Project Development Processes This section outlines the procedures that are expected of capital projects at The University of Chicago. These requirements supplement the planning procedures required

More information

CROSS-CONNECTION CONTROL/BACKFLOW PREVENTION

CROSS-CONNECTION CONTROL/BACKFLOW PREVENTION 4.19.2018 CROSS-CONNECTION CONTROL/BACKFLOW PREVENTION In accordance with the Pennsylvania Department of Environmental Protection s Safe Drinking Water Act, Highridge Water Authority (HWA), hereby implements

More information

Telecommunication Spaces

Telecommunication Spaces Telecommunication Spaces October 19, 2016 Page 1 Revision History Telecommunication Spaces Standard Effective Date Email Version Contact Phone OIT-TS strevena@csustan.edu 1.0 Stan Trevena 209.667.3137

More information

NC State University OESAD GUIDELINES Contract Year

NC State University OESAD GUIDELINES Contract Year July 1, 2014 NC State University OESAD GUIDELINES Contract Year 2014-2016 I. Informal Projects A. Preface Based on the North Carolina Administrative Code (NCAC), Title 01, Subchapter 30D Section.0300 Selection

More information

Scope of Work Bid Package C-4 - West Polished Concrete

Scope of Work Bid Package C-4 - West Polished Concrete Scope of Work Bid Package C-4 - West Polished Concrete CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,

More information

APPENDIX A - Seismic Terms, Tables and Figures:

APPENDIX A - Seismic Terms, Tables and Figures: APPENDIX A - Seismic Terms, Tables and Figures: Seismic Design Force, (F p ) G-force that the unit must be able to withstand. This number is calculated using the factors described below. a S 0.4 P DS z

More information

REQUEST FOR PROPOSAL. Commissioning Services College of Pharmacy Building Construct New Facility University of Iowa #

REQUEST FOR PROPOSAL. Commissioning Services College of Pharmacy Building Construct New Facility University of Iowa # REQUEST FOR PROPOSAL Commissioning Services College of Pharmacy Building Construct New Facility University of Iowa # Addendum #1 Issued Wednesday, February 10, 2016 Changes: Item #01: Item #02: Section

More information

ORDINANCE #13-14-OA Fees. a. Building Subcode Fees:

ORDINANCE #13-14-OA Fees. a. Building Subcode Fees: ORDINANCE #13-14-OA AN ORDINANCE OF THE TOWNSHIP OF BERKELEY, COUNTY OF OCEAN, STATE OF NEW JERSEY AMENDING THE TOWNSHIP CODE OF THE TOWNSHIP OF BERKELEY, SO AS TO AMEND SECTION 11-1.3, ENTITLED FEES March

More information

SECTION SUSTAINABLILITY CERTIFICATION REQUIREMENTS - GREEN GLOBES

SECTION SUSTAINABLILITY CERTIFICATION REQUIREMENTS - GREEN GLOBES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 01 81 13.21 SUSTAINABLILITY CERTIFICATION REQUIREMENTS - GREEN GLOBES A. This section describes general requirements and procedures to comply with the Green Building

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

BUILDING A STRUCTURE IN THE FLOODPLAIN. IMPORTANT REQUIREMENTS Of Warren County Floodplain Management Ordinance

BUILDING A STRUCTURE IN THE FLOODPLAIN. IMPORTANT REQUIREMENTS Of Warren County Floodplain Management Ordinance BUILDING A STRUCTURE IN THE FLOODPLAIN When you apply for a zoning permit to build a home or other structure and it is determined your land is in the floodplain, the following procedures will apply: 1.

More information

MASTERFORMAT SPECIFICATION

MASTERFORMAT SPECIFICATION Contact: PFB Manufacturing, LLC Insulspan SIP Plant 9012 East US 223 Blissfield, MI, USA 49228-0026 Phone: 800.726.3510 Plasti-Fab Ltd. Head Office 100, 2886 Sunridge Way N.E. Calgary, AB Canada, T1Y 7H9

More information

ROUND LAKE AREA SCHOOLS DISTRICT 116: LIMITED COMMISSIONING GUIDELINES INTRODUCTION

ROUND LAKE AREA SCHOOLS DISTRICT 116: LIMITED COMMISSIONING GUIDELINES INTRODUCTION INTRODUCTION Commissioning (Cx) is a quality assurance process that works to ensure the design intent of a building is fully realized. It requires a systematic approach to review, verify, and document

More information

Chapter 3 DESIGN. C. Project Scope: The Designer may proceed only with the authorized scope of work. Scope changes must be approved by the OFD-PM.

Chapter 3 DESIGN. C. Project Scope: The Designer may proceed only with the authorized scope of work. Scope changes must be approved by the OFD-PM. Chapter 3 DESIGN 3.01 INTRODUCTION A. The Designer, in providing professional services for the project in accordance with the terms and conditions of the Owner/Designer Agreement, should adhere to the