1 1 MEP Design Standards & Equip Cuts NYP BEST PRACTICES Presentation for GC/CM Retreat 2014
2 We Put Patients First Agenda 2 Disclaimer Consultant Engineer & Commissioning Agent May 2012 Edition NYP Revised Requirements 2014 NYC Building Code Highlights Building Resiliency Code Highlights Equipment Selection Process Locating the Design Standards on the Portal Updating and Maintaining
3 3 3 DISCLAIMER The purpose of this document is to provide the design engineer with the guidelines for HVAC, electrical, plumbing, fire protection, fire alarm, nurse call, commissioning and controls, specified herein on NYPH campuses. This does not substitute the design engineer s specifications for each project but provides the basis of the standards, which the design engineer shall follow. The final responsibility for the design of the specific project resides with the design engineer of record.
4 Consultant Engineer and Cx Responsibilities 4 FDC-E FO FDC Campus Master Engineer (One per Campus) Commissioning Agent (Two per Campus) Project Design Engineer (Individual Project) Tasks Capacity Police - Assesses the capacity impact of project designs to existing MEP systems Focused on Strategic Planning and Design Criteria for MER s and Risers. Updating and maintaining existing MEP riser and distribution documents Specifies Capacities and Performance Requirements Funded by Infrastructure Program Management Project Police Focused on MEP Performance related to project installation Reviews Basis of Design Requirements with OFO and Project Design Engineer O&M, equipment warranty, start up and preventative maintenance to insure proper project close outs. Provide Measurement and Verification to Campus Engineer Funded by Specific Project Engineer of Record - Focused on design of Individual Project Provides load information to OFD-E and Campus Engineer Provides Basis of Design for project based on Owner Requirements for review by Commissioning Agent and OFO Funded by Specific Project
5 MASTERFORMAT divisions to latest CSI nomenclature: 5 NYP Design Specifications May 2012 Edition Mechanical Division 15 to Division 23 Plumbing Division 15 to Division 22 Fire Protection Division 15 to Division 21 Electrical Division 16 to Division 26 Added Sections include: Equipment Cuts Commissioning/Energy Compliance Guidelines Building Specific Checklist Updated to meet the latest 2008 NYC Building Code & 2010 FGI requirements.
6 Mechanical Division 23 6 NYP Design Specifications Update 2014 Highlights NYP Requirements All air systems requiring humidification must include clean steam generators Standardized controls packages for mechanical equipment Electrical Division 26 Requirements for GFI Circuit Breakers to be installed in lieu of GFI outlets in wet locations Plumbing Division 22 Revisions to the Plumbing Fixtures Review and update to meet the latest 2014 NYC Building Code & 2014 FGI requirements.
7 Mechanical Division 23 7 NYP Design Specifications Update 2014 Highlights 2014 NYC Building Code Wind bracing requirements for roof top equipment upgraded Permits utilizing 1968 Code fire and smoke damper requirements in 1968 Code or prior compliant buildings * Permits high temperature water systems similar to high pressure steam systems New requirements for high pressure gas piping systems and installations Clarifies CO detection requirements for Class E, I2 & I4 occupancies *must comply with the most stringent code
8 Plumbing Division 23 New plumbing fixture calculations for new construction 8 NYP Design Specifications Update 2014 Highlights 2014 NYC Building Code Allows plumbing fixture calculations in prior code buildings to be based on 1968 Building Code utilizing 1968 occupancy load calculations Back flow preventers on sewage mains (Resiliency) Fire Protection Division 22 Enhanced fire protection, smoke detection and life safety requirements in ambulatory health care facilities Emergency preparedness & planning requirements for non-fire emergencies to include power outages and medical emergencies Clarifies roof top access and obstructions
9 Local Laws in 2013 now part of 2014 Building Code: 80/2013 Capture Storm water to Prevent Flooding 9 NYP Design Specifications Update 2014 Highlights Building Resiliency Local Laws to Building Code 81/2013 Analyze Wind Risks 82/2013 Clarify Construction Requirements in Flood Zones 83/2013 Prevent Sewage Backflow 98/2013 Create Emergency Plans 99/2013 Remove Barriers to Elevating Building Systems 100/2013 Relocate and Protect Building Systems 101/2013 Prevent Wind Damage to Existing Buildings 108/2013 Add Hookups for Temporary Generators & Boilers 109/2013 Remove Barriers to Sidewalk Flooding 143/2013 Safeguard Toxic Materials Stored in Flood Zones
10 Equipment pre- approval process developed 10 with NYP Facilities Operations to standardize to improve maintenance and Equipment Selection Process reduce the number of spare parts Or Equal was eliminated from the recommended manufacturers when 3 or more manufacturers were listed. A handful of Proprietary equipment manufacturers such as: ASCO Automatic Transfer Switches were identified as NYPH Standards. Architects and Engineering Firms are to use selected NYP pre- approved Equipment from the Equipment Cut e-book that resides on the portal.
11 11 Locating MEP Standards and Equipment Cuts on Portal
12 12 Updating and Maintaining the Design Specifications and Equipment Cuts We encourage all stakeholders to provide updates and suggestions through FDC-E, including: FDC-Project teams & A/E Design Firms FO Directors, Managers and Shop personnel FDC-E will be responsible for the updating of the Standard Standards will be maintained on a 3-year cycle Changes in sections will be highlighted at each cycle
Commissioning at NYP. Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015
1 Commissioning at NYP Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015 Presentation Agenda 2 What is Commissioning Why Commission? Developing NYP s Commissioning Program
More informationMission Critical Commissioning for Healthcare Facilities
Mission Critical Commissioning for Healthcare Facilities Steven R. Rusty Ross SSRCx, LLC Synopsis Healthcare Facilities serve a critical and unique mission. Few facilities delivered by the construction
More informationThule Prototype BIM Manual for Dormitories. February 5, 2010
Thule Prototype BIM Manual for Dormitories February 5, 2010 TABLE OF CONTENTS INTRODUCTION Executive Summary 2 Goals 2 Scope and Use 2-4 Program Assumptions Kit of Parts GUIDELINE INTEGRATION Site Design
More informationAttachment 04 Substantial and Final Completion Approval Form. Project Description Project # Date of Completion Permit # Project Manager Phone #
UCF Design, Construction, and Renovation Standards Attachment 04 Substantial and Final Completion Approval Form Project Description Project # Date of Completion Permit # Phone # Intent: This Substantial
More informationA/E REVIEW CHECKLIST STEAM GENERATION
A/E REVIEW CHECKLIST STEAM GENERATION Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural,
More informationA/E Design Deliverable Checklist
A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic
More informationA/E Design Deliverable Checklist
A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic
More informationApplication for Commercial Plan Review and Building Permit. Address:
City of Warrenton 200 West Booneslick Warrenton, MO 63383 : 636-456-3535 Fax: 636-456-1336 www. war r ent o n- mo.org Application for Commercial Plan Review and Building Permit PERMIT# Purpose: Commercial
More information600 - Phase C Intermediate Review Checklist for the Architect- Engineer
600 Phase C Intermediate Review Checklist for the Architect Engineer This checklist is to be used by the ArchitectEngineer during Phase C of the Project and shall be included in the Intermediate Review
More informationFEMA P-1019 Emergency Power Systems for Critical Facilities. ASFPM May 4, 2017 David K Low, PE DK Low & Associates
FEMA P-1019 Emergency Power Systems for Critical Facilities ASFPM May 4, 2017 David K Low, PE DK Low & Associates FEMA P-1019 FEMA P-1019 A critical facility that is fully compliant with the minimum building
More informationCODE COMPLIANCE PLAN REVIEW PROCEDURES
CODE COMPLIANCE PLAN REVIEW PROCEDURES 1. All construction for state agencies on state-owned or state leased-purchased properties or facilities are to submit design documents for code compliance plan reviews
More informationElement D Services Plumbing
Fixtures PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses plumbing fixtures, trim and associated accessories. Refer to MD Anderson Cancer Center Master Construction Specification Sections for additional
More informationBrown University Updated March 11, 2013 Facilities Design & Construction Standards
SECTION 01 17 90 UTILITY & CRITICAL SYSTEM CONNECTIONS AND INTERRUPTIONS PART 1 - GENERAL 1.1 SUMMARY: A. Brown University operates and maintains extensive campus and building utilities and distribution
More informationENHANCING RESILIENCE IN BOSTON A Guide for Large Buildings and Institutions. Boston Green Tourism May 21, 2015
ENHANCING RESILIENCE IN BOSTON A Guide for Large Buildings and Institutions Boston Green Tourism May 21, 2015 Report Context Climate Action Plan Action-Item GRC Preparedness Recommendations ABC Priority
More informationMinnesota State Colleges and Universities. South Central College. Request for Proposals for Commissioning Agent. STEM and Healthcare Renovation
Minnesota State Colleges and Universities South Central College Request for Proposals for Commissioning Agent STEM and Healthcare Renovation Date: 12/18/2017 ADDENDUM #1 1. The Sign-In sheet for the voluntary
More informationRepair or replace section of driveway, approach, or sidewalk that are a trip hazard.
City of Gibraltar Pre-Sale Inspection Report Checklist FLATWORK: Repair or replace section of driveway, approach, or sidewalk that are a trip hazard. EXTERIOR PROPERTY: Fences/Sheds/Retaining walls: Repair,
More informationSTATE UNIVERSITY CONSTRUCTION FUND
STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant
More informationStorm Preparedness & Hazard Mitigation for Post-Sandy Red Hook, Brooklyn, NY Deborah Mills, CFM Dewberry Consultants, LLC.
Storm Preparedness & Hazard Mitigation for Post-Sandy Red Hook, Brooklyn, NY Deborah Mills, CFM Dewberry Consultants, LLC. Agenda Introduction to the Project Red Hook, Brooklyn Sandy s Impact Hazard Risks
More informationUNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011
UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011 CONTENTS A. PURPOSE B. DESIGNATED RESPONSIBILITIES C. DEFINITIONS D. PROJECT SUBMITTAL PROCEDURE E. REQUIREMENTS
More informationFACILITIES MANAGEMENT
FACILITIES MANAGEMENT Planning, Design & Construction March 7, 2013 Re: Request for Proposals- Commissioning Services Mayflower Hall Permanent Flood Recovery & Mitigation (UI# 0200201) University of Iowa
More informationCode Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)
Code Requirements for Existing Buildings R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS) was established in 1945 and currently
More informationAPPENDIX C - PRECONSTRUCTION MEETING AGENDA
APPENDIX C - PRECONSTRUCTION MEETING AGENDA (For projects in Duluth, use alternate Appendix KK) Project Name: Project Number: Date: This outline has been prepared so that everyone involved in the project
More informationPermit Application. Building - Electrical - Mechanical - Plumbing - Sign. Project Address: Building and Safety Permit Service Center
Permit Application Last Revised 2/06/7 Building - Electrical - Mechanical - Plumbing - Sign Building and Safety Permit Service Center Project APN: Valuation: The valuation used in computing the building
More informationSUNY Hospitals & A Healthier New York. Capital Briefing March 1, 2013
SUNY Hospitals & A Healthier New York Capital Briefing March 1, 2013 Profile of SUNY Capital Programs Square Footage (in millions) 18.9 20.5 58.5 3.3 Educational Facilities Residence Halls Hospitals Community
More information4. Number of drawings required: ( ) Locations of nearest streets
CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us COMMERCIAL BUILDING PLAN REQUIREMENTS
More informationTEXAS A&M ENGINEERING
TEXAS A&M ENGINEERING 312 Jack K. Williams Administration Building I 3126 TAMU I College Station, Texas 77843-3126 M. Katherine Banks, Ph.D., P.E. Vice Chancellor and Dean of Engineering Director, Texas
More informationBUILDING PERMIT APPLICATION
TOWN OF LEICESTER 132 Main Street Post Office Box 197 Leicester, New York 14481 Phone: (585) 382-3231 FAX: (585) 382-9766 BUILDING PERMIT APPLICATION All Town of Leicester property owners are required
More informationBUILDING CODES & DESIGN CRITERIA
BUILDING CODES & DESIGN CRITERIA Adopted Building Codes: 2006 International Building Code (IBC) 2006 International Residential Code (IRC) 2006 International Mechanical Code (IMC) 2006 International Plumbing
More informationDESIGN DEVELOPMENT PHASE
UNIVERSITY OF MICHIGAN DESIGN DELIVERABLES FEBRUARY 2012 As part of the deliverables for formal UM review at each of the major phases of design listed below, the Design Professional shall submit this "Design
More informationControls Master Planning Process leads to Campus-Wide BAS Upgrade. 11 February 2015
Controls Master Planning Process leads to Campus-Wide BAS Upgrade 11 February 2015 Agenda BAS Overview / Benefits Case Study Confidential Energy Company, Illinois Integrated Master Planning Approach Stakeholder
More informationFull-Scope Commissioning for High-Quality Buildings
Full-Scope Commissioning for High-Quality Buildings Pieter L. van der Mersch, PE, QCxP University of Colorado Boulder 21 st National Conference on Building Commissioning AIA Quality Assurance The Building
More informationMinimum Standards for Building Occupancy. Safety Resources
Minimum Standards for Building Occupancy 2017 Safety Resources Contents 1 Purpose... 1 2 Applicable To... 1 3 Scope... 1 4 Definitions... 1 5 Training... 2 6 Safety... 2 7 Equipment and Materials... 2
More informationFlorida Army National Guard Construction Facilities Management Office. Scope of Work:
Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines October 2008 Scope of Work: To provide complete design for the renovation/alterations
More informationInterior Architects, P.C REV 2 CONCEPTUAL ESTIMATE. Brooklyn Heights Library, Brooklyn Public Library, Brooklyn, NY GARDINER AND THEOBALD INC FOR: AT:
REV 2 CONCEPTUAL ESTIMATE FOR: Interior Architects, P.C Brooklyn Heights Library, Brooklyn Public Library, Brooklyn, NY AT: BY: GARDINER AND THEOBALD INC Issued: 6/20/2013 BROOKLYN HEIGHTS LIBRARY, BROOKLYN
More informationSystems Commissioning Table of Contents
Systems Commissioning Table of Contents C NC NA I. General II. Commissioning III. Mechanical Systems A. Testing, Adjusting, and Balancing B. Piping IV. Electrical Systems A. Load Balancing B. Electrical
More informationMinnesota Healthcare Engineers Association, Fall Conference. Bob Dehler, P.E. Engineering Program Manager September 14, 2017
Minnesota Healthcare Engineers Association, Fall Conference Bob Dehler, P.E. Engineering Program Manager September 14, 2017 Categories of Rehabilitation Work in Healthcare Facilities Bob Dehler, P.E. robert.dehler@state.mn.us
More informationREQUEST FOR ARCHITECTURAL AND ENGINEERING DESIGN SERVICES DRUMLIN DINING HALL RENOVATION. University of Wisconsin-Whitewater.
REQUEST FOR ARCHITECTURAL AND ENGINEERING DESIGN SERVICES DRUMLIN DINING HALL RENOVATION University of Wisconsin-Whitewater March 2008 Project No. 08B21 TABLE OF CONTENTS PAGE Table of Contents... 2 Project
More informationIECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST
IECC 2015 with Hawaii Amendments COMMERCIAL DESIGN CHECKLIST ENVELOPE REQUIREMENTS Project: Date: Instructions RECOMMENDED: List performance values, note exceptions that were applied, or provide other
More informationCODE REQUIREMENTS FOR BUILDING COMMISSIONING SCOTT WEAVER, PE, QCXP, LEED AP BD+C DIRECTOR, COMMISSIONING DECEMBER 1, 2017
CODE REQUIREMENTS FOR BUILDING COMMISSIONING SCOTT WEAVER, PE, QCXP, LEED AP BD+C DIRECTOR, COMMISSIONING DECEMBER 1, 2017 OVERVIEW The recent adoption by the Centers for Medicaid and Medicare Services
More informationUNIVERSITY OF ALASKA FAIRBANKS DIVISION 14 - CONVEYING EQUIPMENT DESIGN STANDARDS SECTION
PART 1 - GENERAL 1.01 Elevator manufacturer to provide equipment and installation warranty and maintenance services for at least one year after acceptance. This requires routine monthly inspection, emergency
More informationA/E REVIEW CHECKLIST STRUCTURAL
A/E REVIEW CHECKLIST STRUCTURAL Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines: Site and Landscape, Architectural, Structural, Plumbing,
More informationA. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).
16450 GROUNDING ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 05 26 An optional keynote to the
More informationThe following is required for a complete permit submittal for each unit.
P: (847)810-3503 OR (847)810-3503/3521, F: (847)615-4383 NEW MULTI-FAMILY DWELLING OR COMMERCIAL PERMIT REQUIREMENTS The following is required for a complete permit submittal for each unit. NEW MULTI-FAMILY
More informationReceived by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:
HENDRY COUNTY BUILDING, LICENSING & CODE ENFORCEMENT POST OFFICE BOX 2340 * 640 SOUTH MAIN STREET * LABELLE, FLORIDA 33975 * (863) 675-5245 * FAX: (863) 674-4194 1100 OLYMPIA ST CLEWISTON, FLORIDA 33440
More informationCOMMERCIAL PLANS SUBMITTAL CHECKLIST For Commercial and Multi-family (3 or more units) Building Permit Applications
COMMERCIAL PLANS SUBMITTAL CHECKLIST For Commercial and Multi-family (3 or more units) Building Permit Applications Building Permit Application (3 rd Page MUST be signed & notarized by Owner!) Plans can
More information: Plan Review and Project Services
01 34 10: Plan Review and Project Services November 7th, 2014 Contact Information Tony Schifiliti, Consultant Engineer Office: 781-440-8630 Cell: 617-771-2350 Anthony.Schifiliti@fmglobal.com George Schork,
More informationCodifying Resiliency
Codifying Resiliency LEED s new resiliency pilot credits Living Cities Forum, Halifax September 12, 2016 Ryan Zizzo Technical Director MASc, PEng, LEED AP ND $ Billion Economic Impacts Catastrophic Insurable
More informationOpening a New Hospital: A Case Study Healthcare Commissioning and the Authority Having Jurisdiction
Opening a New Hospital: A Case Study Healthcare Commissioning and the Authority Having Jurisdiction Matthew Tunnard, PE, CCP, LEED AP, Senior Engineer Horizon Engineering Associates, LLP AIA Quality Assurance
More informationCONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability
01352 Sustainable Design Requirements This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications
More informationCONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST
CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Contract Documents Review Package. Provide a written explanation for any omissions. The following items,
More informationWARWICK TOWNSHIP Dept. of Planning & Zoning
For Warwick Township Use Only WARWICK TOWNSHIP Dept. of Planning & Zoning 1733 Township Greene, Jamison, PA 18929 : (215) 343-6100 www.warwick-bucks.org Check #: Check Amount: Received by: BUILDING PERMIT
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 01 3100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationRESIDENTIAL BUILDING REQUIREMENTS
RESIDENTIAL BUILDING REQUIREMENTS Residential Building Requirements This is an informational booklet with some of the general residential construction requirements taken from the codes adopted by Campbell
More informationCode Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)
Code Requirements for Existing Buildings R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617) 523-8227 www.rwsullivan.com R.W. Sullivan Engineering (RWS) was established in 1945 and currently
More informationStandard Plan Review - Project Submittal Checklist
Standard Plan Review - Project Submittal Checklist DATE: PROJECT ADDRESS: PROJECT MANAGER: RETURN TO PM WITH CORRECTIONS 2 nd INTAKE APPOINTMENT Submit the following requirements, as applicable, at the
More informationPermit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:
Permit Requirements: Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install,
More informationResidential Sewer Backup Prevention Program
City of Wheaton Residential Sewer Backup Prevention Program Please Note: The City reserves the right to modify the policies, procedures and rules of this program or discontinue the program in its entirety
More informationBronx Mental Health Redevelopment Project
Bronx Mental Health Redevelopment Project Residential Village Bronx Campus Transitional Living Residences, Haven House Horizon House, and Studio Apartments BIM Orientation December 20, 2012 1 Bronx Mental
More informationSustainable Building Operations & Upgrades
Sustainable Building Operations & Upgrades LEED for Existing Buildings 2010 Energy / Facilities Connections Conference Brightworks & Glumac Eric Baxter and Todd McGuire 12 May, 2010 The Value Proposition
More informationRevision Date: February 28,
FACILITY SERVICES - REQUIREMENTS FOR PLUMBING, FIRE PROTECTION, HVAC, AND ELECTRIC DOCUMENTS 2007 Edition, Published April, 2007, Revision Date: February 28, 2018 FS-1. SEPARATE DOCUMENTS REQUIRED.2 SEPARATION
More informationElement Z General Design Requirements Existing Facilities Information
Anderson Central 100B, PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G
More informationCommissioning: The Most Important Component of LEED. Rick Miller, PE, LEED AP. RNM Engineering, Inc. San Luis Obispo, CA
Commissioning: The Most Important Component of LEED by Rick Miller, PE, LEED AP RNM Engineering, Inc. San Luis Obispo, CA LEED and Commissioning EA Prerequisite Fundamental Commissioning of Building Energy
More informationThe following is required for a complete permit submittal for each unit.
P: (847)810-3502 OR (847)810-3503/3521, F: (847)615-4383 MULTI-FAMILY OR COMMERCIAL ADDITION OR ALTERATION PERMIT REQUIREMENTS The following is required for a complete permit submittal for each unit. MULTI-FAMILY
More informationProperty Condition Assessment (PCA) Checklist c:\users\joseph\documents\hhc\blog\pca cklist template.doc Friday, August 11, 2006
FORUM for Historic Harvard Property Assessment (PCA) Checklist c:\users\joseph\documents\hhc\blog\pca cklist template.doc Friday, August 11, 2006 The purpose of this document is to identify in checklist
More informationINTRODUCTION TO ELECTRICAL ENGINEERING IN THE CONSTRUCTION FIELD BY G. STECHER, P.E.
INTRODUCTION TO ELECTRICAL ENGINEERING IN THE CONSTRUCTION FIELD BY G. STECHER, P.E. TYPICAL BUILDING CONSTRUCTION PROJECTS BASE BUILDING BRAND NEW BUILDING, OUT OF THE GROUND INFRASTRUCTURE UPGRADE INFRASTRUCTURE
More informationRFP Feasibility Design Services: Clinical Education & Assessment Center Expansion Questions & Answers: February 13 th, 2018
Question & Answer: #1 The RFP calls for a survey of the building to gain a comprehensive understanding of the existing building, utilities, building systems, occupancies and all existing conditions as
More informationHow IBC-2009 seismic and wind loading standards apply to emergency standby power systems
TECHNICAL ARTICLE How IBC-2009 seismic and wind loading standards apply to emergency standby power systems Understanding provisions in the latest edition of the International Building Code is critical
More informationCALGREEN NON-RESIDENTIAL BUILDING Checklist
CALGREEN NON-RESIDENTIAL BUILDING Checklist REVISED 11/18/14 New non-residential buildings shall be designed to include the green building mandatory measures specified in this checklist. This checklist
More informationHOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS
St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the
More informationBackflow Preventer Tester Plumbing License Code Path
Backflow Preventer Tester Plumbing License Code Path P.A. 733 State Plumbing Act P.A. 230 State Construction Code Act P.A. 399, Part 14 Cross Connection Control Rules Michigan Plumbing Code International
More informationSFPUC Flooding Workshop Tuesday, February 9, 2016
Presenters: SFPUC Flooding Workshop Tuesday, February 9, 2016 Tommy Moala, Assistant General Manager, Wastewater Enterprise Stefani Harrison, Project Manager Photo: Dec 3, 2014 End of Cayuga Street 25-year
More information2010 National Building Code Adoption and Associated Process Changes
Building Inspection City of Moncton 655 Main Street Moncton, NB E1C 1E8 Phone: (506) 856-4375 Fax: (506) 856-4348 Bulletin No. 14 From: Randy Richard Date: February 9, 2015 Subject: 2010 National Building
More informationSEWER SYSTEM DESIGN GUIDELINES
SEWER SYSTEM DESIGN GUIDELINES PART 1 GENERAL 1.1 GENERAL GUIDELINES A. The following sewer system design guidelines are based on Federal, State and Local health requirements, and the Berkeley County Water
More informationBuilding Commissioning
Building Commissioning Roles, Responsibilities, and Benefits 2010 ASHRAE Annual Meeting CxA WORKSHOP Saturday, June 26, 2010 Jim Magee, CxA, LEED-AP Facility Commissioning Group Overview Cx Advocacy, Economics,
More information2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA Phone:
2016 CALGREEN RESIDENTIAL CHECKLIST MANDATORY ITEMS City of San Carlos - Building Division 600 Elm Street, San Carlos, CA 94070 Phone: 650-802-4261 PURPOSE: The residential provisions of the 2016 CalGreen
More informationMobile Homes/Manufactured Homes
Mobile Homes/Manufactured Homes Permits, Installation, Inspections and Zoning Requirements Mendocino County Planning & Building Services Inland: 860 North Bush Street Ukiah, CA 95482 707-234-6650 Coastal:
More informationDEPARTMENT OF CODE ENFORCEMENT CITY OF NIAGARA FALLS, NEW YORK FEE SCHEDULE
DEPARTMENT OF CODE ENFORCEMENT CITY OF NIAGARA FALLS, NEW YORK 1/1/15 FEE SCHEDULE No permit shall be issued by the Director of Code Enforcement until fees hereinafter prescribed have been paid to the
More informationCITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION
1 PLAN INFORMATION Residential plans must be legible and capable of digital scanning. All sheets shall be the same size and distinctly labeled with a sheet title and number. The minimum dimension of the
More informationSHORING & UNDERPINNING 02250
Subsidiary of Hubbell Power Systems 210 North Allen St. Centralia, MO 65240 Phone: (573) 682-8414 Fax: (573) 682-8660 E-mail: hpscontact@hps.hubbell.com www.abchance.com This MANU-SPEC utilizes the Construction
More informationMinnesota Health Care Engineers Association
Minnesota Health Care Engineers Association Life Safety Code Potpourri Friday, May 1, 2015 Presenter: Bob Dehler, P.E., Engineering Program Manager, Minnesota Department of Health Minnesota Department
More informationKITCHEN REMODELS CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA (949)
CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA 92691 (949) 470-3054 KITCHEN REMODELS A permit is required for kitchen remodels that include removal and replacement
More informationSECTION SANITARY WASTE INTERCEPTORS
SECTION 22 13 23 SANITARY WASTE INTERCEPTORS PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-07 84 00 (May 2010) Change 1-08/13 ------------------------ Preparing Activity: USACE Superseding UFGS-07 84 00 (October 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationPLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS
PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS NOTE: Building Code compliance is the obligation of design professionals and/or contractors. Plan review and inspection guidelines are to be used to ensure
More informationIntroduction. Disclaimer. Table of contents
Updated July 18, 2012 Introduction The Cambridge Elevating Limited-Use / Limited-Application Elevator is designed to service schools, libraries, low rise, low occupancy commercial buildings, churches and
More informationHOLLOWAY HALL AUDITORIUM RENOVATION
HOLLOWAY HALL AUDITORIUM RENOVATION BID DOCUMENTS PROJECT MANUAL JANUARY 2, 2013 SALISBURY UNIVERSITY FACILITIES PLANNING AND CAPITAL PROJECTS 1101 CAMDEN AVENUE SALISBURY, MARYLAND 21801 DESIGN COLLECTIVE,
More informationVolume II- Project Development Processes
Volume II- Project Development Processes This section outlines the procedures that are expected of capital projects at The University of Chicago. These requirements supplement the planning procedures required
More informationCROSS-CONNECTION CONTROL/BACKFLOW PREVENTION
4.19.2018 CROSS-CONNECTION CONTROL/BACKFLOW PREVENTION In accordance with the Pennsylvania Department of Environmental Protection s Safe Drinking Water Act, Highridge Water Authority (HWA), hereby implements
More informationTelecommunication Spaces
Telecommunication Spaces October 19, 2016 Page 1 Revision History Telecommunication Spaces Standard Effective Date Email Version Contact Phone OIT-TS strevena@csustan.edu 1.0 Stan Trevena 209.667.3137
More informationNC State University OESAD GUIDELINES Contract Year
July 1, 2014 NC State University OESAD GUIDELINES Contract Year 2014-2016 I. Informal Projects A. Preface Based on the North Carolina Administrative Code (NCAC), Title 01, Subchapter 30D Section.0300 Selection
More informationScope of Work Bid Package C-4 - West Polished Concrete
Scope of Work Bid Package C-4 - West Polished Concrete CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,
More informationAPPENDIX A - Seismic Terms, Tables and Figures:
APPENDIX A - Seismic Terms, Tables and Figures: Seismic Design Force, (F p ) G-force that the unit must be able to withstand. This number is calculated using the factors described below. a S 0.4 P DS z
More informationREQUEST FOR PROPOSAL. Commissioning Services College of Pharmacy Building Construct New Facility University of Iowa #
REQUEST FOR PROPOSAL Commissioning Services College of Pharmacy Building Construct New Facility University of Iowa # Addendum #1 Issued Wednesday, February 10, 2016 Changes: Item #01: Item #02: Section
More informationORDINANCE #13-14-OA Fees. a. Building Subcode Fees:
ORDINANCE #13-14-OA AN ORDINANCE OF THE TOWNSHIP OF BERKELEY, COUNTY OF OCEAN, STATE OF NEW JERSEY AMENDING THE TOWNSHIP CODE OF THE TOWNSHIP OF BERKELEY, SO AS TO AMEND SECTION 11-1.3, ENTITLED FEES March
More informationSECTION SUSTAINABLILITY CERTIFICATION REQUIREMENTS - GREEN GLOBES
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 01 81 13.21 SUSTAINABLILITY CERTIFICATION REQUIREMENTS - GREEN GLOBES A. This section describes general requirements and procedures to comply with the Green Building
More informationB. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.
SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution
More informationBUILDING A STRUCTURE IN THE FLOODPLAIN. IMPORTANT REQUIREMENTS Of Warren County Floodplain Management Ordinance
BUILDING A STRUCTURE IN THE FLOODPLAIN When you apply for a zoning permit to build a home or other structure and it is determined your land is in the floodplain, the following procedures will apply: 1.
More informationMASTERFORMAT SPECIFICATION
Contact: PFB Manufacturing, LLC Insulspan SIP Plant 9012 East US 223 Blissfield, MI, USA 49228-0026 Phone: 800.726.3510 Plasti-Fab Ltd. Head Office 100, 2886 Sunridge Way N.E. Calgary, AB Canada, T1Y 7H9
More informationROUND LAKE AREA SCHOOLS DISTRICT 116: LIMITED COMMISSIONING GUIDELINES INTRODUCTION
INTRODUCTION Commissioning (Cx) is a quality assurance process that works to ensure the design intent of a building is fully realized. It requires a systematic approach to review, verify, and document
More informationChapter 3 DESIGN. C. Project Scope: The Designer may proceed only with the authorized scope of work. Scope changes must be approved by the OFD-PM.
Chapter 3 DESIGN 3.01 INTRODUCTION A. The Designer, in providing professional services for the project in accordance with the terms and conditions of the Owner/Designer Agreement, should adhere to the