1 1993 Specifications CSJ s , etc. & , etc. SPECIAL SPECIFICATION 3504 Septic Tank System 1. Description. This Item shall govern for all materials, equipment and labor necessary for the installation of Septic Tank System and all associated piping, fittings and appurtenances. Installation of the Septic Tank System shall be conducted by a qualified licensed system installation Contractor. The Contractor shall comply with the requirements of all laws, ordinances, rules and regulations of federal, state and local authorities. The Contractor shall provide documentation, which is acceptable to the Engineer, that they are experienced and qualified in Septic Tank System installation. All personnel shall be trained and experienced in the system installation practices and safety precautions. 2. Materials. (1) Summary. (a) This Section includes sewage disposal systems consisting of the following: 1. Concrete septic tanks and manholes. 2. Septic tank filters. 3. Automatic sump pumps. 4. Control panels. 5. Distribution pipes and fittings. 6. Leaching pipes and fittings. 7. Absorption trench fill materials. 8. Absorption field materials. 9. Valves. (b) Refer to Sections included in the Special Specification, Toll Plaza Facility : 1. Division 15 Section Sanitary Waste and Vent Piping for sewer piping from buildings and structures to septic tank system. 2. Division 15 Section Sump Pump for sewage pumps selected for distribution to absorption fields. (2) Definitions. (a) Absorption Field. Subsurface wastewater disposal process. (b) Absorption Trench. System of leaching pipes and filtering materials installed in trenches for wastewater disposal
2 (c) Distribution Piping. Solid pipe and pipe fittings installed with tight joints between septic tank and other septic tank system structures to, but not including, leaching piping. (d) Leaching Piping. Perforated pipe and pipe fittings or plain pipe with open joints in absorption field. (e) PVC. Polyvinyl chloride. (3) Submittals. (a) Product Data. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes as specified on the plans for the following: 1. Concrete septic tanks and manholes. 2. Septic tank filters. 3. Automatic sump pumps. 4. Control panels. 5. Distribution pipes and fittings. 6. Leaching pipes and fittings. 7. Absorption trench fill materials. 8. Absorption field materials. 9. Valves. (b) Shop Drawings. Include manhole openings, covers, pipe connections, and accessories for the following precast, reinforced-concrete structures: 1. Concrete septic tank. 2. Concrete manholes. (c) Coordination Drawings. Show piping, underground structures, and other utilities. Indicate size and invert elevations of piping and structures. (d) Permits. Contractor shall submit an approved On-Site Sewage Facility (OSSF) permit from Williamson County and Cities Health District. (4) Project Conditions. 3. Products. (a) Existing Utilities. Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated: 1. Notify Engineer not less than two days in advance of proposed utility interruptions. 2. Do not proceed with utility interruptions without Engineer's written permission. (1) Precast Concrete Septic Tanks and Manholes. (a) Description. Septic tank, 1500 gallon three-compartment tank with a 400-gallon first compartment, 600 gallon second compartment and 500 gallon pump chamber, precast reinforced-concrete tank and covers, designed for structural loading
3 according to ASTM C 890 and made according to ASTM C 1227, or as described on the plans, or as directed by the Engineer. (b) Description. Manhole, precast reinforced-concrete sections according to ASTM C478, or as specified on the plans, with approved ring and cover. Include manhole over each septic tank compartment top as directed by the Engineer. (c) Inlet and Outlet Access. 15-in. diameter as described on the plans or as directed by the Engineer. (d) Backfill. Select backfill type III fill, or 3/8 in. washed river pea gravel, or as shown on the plans, or as directed by the Engineer. (2) Septic Tank Filters. (a) Description. Septic tank outlet filters, removable filter that restricts discharge solids to specified size and has access from surface for service. Zabel A-1801 Filter or approved equal. (3) Automatic Sump Pumps. (a) Description. Automatic submersible effluent pump. Barnes SP hp Pump or approved equal. (b) Unit Size. Same as tank outlet pipe size, unless otherwise indicated. (4) Control Panels. (a) Description. Control panel with audio/visual high water alarm, separated fused disconnect for alarm circuit and pump circuit. GP-2115 control panel or approved equal. Properly mounted to pressure treated pole or to building. (5) Distribution Pipes and Fittings. (a) Refer to Special Specification, Toll Plaza Facility Division 15 Sanitary Waste and Vent Piping, Part 3 Execution Article for identification of systems where piping materials specified below are used. (b) PVC Sewer Pipe and Fittings. ASTM D 3034, SDR 26, non-perforated, for solvent-cement or elastomeric gasket joints. 1. Solvent Cement. ASTM D Gaskets. ASTM F 477, elastomeric seal. (6) Leaching Pipes and Fittings. (a) Refer to Special Specification, Toll Plaza Facility Division 15 Sanitary Waste and Vent Piping, Part 3 Execution Article for identification of systems where piping materials specified below are used. (b) PVC Sewer Pipe and Fittings. ASTM D 2729, perforated, for solvent-cement joints. 1. Solvent Cement. ASTM D
4 (c) Non-Vehicular-Traffic-Area Cleanouts. PVC pipe and fittings, ASTM D 3034, SDR 26, nonperforated, for solvent-cement or elastomeric gasket joints. Include PVC threaded cleanout plug. (d) Vehicular-Traffic-Area Cleanouts. ASME A M; with round, flanged, cast-iron housing and secured, scoriated, medium-duty loading class, cast-iron cover. Include cast-iron ferrule and countersunk brass cleanout plug. (7) Absorption Trench Fill Materials. (a) Filtering Material. 3/8 to 1 in. of one uniform size of washed crushed stone, or 3/8 in. washed river pea gravel, or as directed by the Engineer. (b) Filter Mat. Geotextile woven or spun filter fabric, in 1 or more layers, for minimum total unit weight of 3 oz./sq. yd. (8) Absorption Field Materials. (a) Fill Material. 6 to 8 in. of sandy loam, or as shown on the plans, or as directed by the Engineer. (b) Vegetation Cover. Seed or hydromulch with perennial grasses or a mixed variety as described under Item 164 Seeding for Erosion Control, or as shown on the plans, or as directed by the Engineer. No shrubs or trees. (9) Valves. 4. Execution. (a) Description. 2 in. brass gate valve with 6 in. PVC valve box and cover, or as shown on the plans, or as directed by the Engineer. (b) Description. 1-1/4 in. pressure adjustment valve, or as shown on the plans, or as directed by the Engineer. (1) Examination. (a) Survey the area for septic tank system installation. Locate and mark existing utilities, underground structures, and aboveground obstructions before beginning and avoid disruption of and damage to services. (b) Examine soil structure, materials, and conditions. (c) Proceed with installation only after unsatisfactory conditions have been corrected. (2) Preparation. (a) Clean exposed surfaces of tanks and other structures and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion. (3) Earthwork
5 (a) Excavating, Trenching, and Backfilling for Distribution Pipes and Fittings are specified in Item 400, Excavation and Backfill for Structures : 1. Stockpile topsoil for possible reuse in finish grading without intermixing with other excavated material. Stockpile materials away from edge of excavation and do not store within drip line of remaining trees. 2. Backfill with approved materials in a manner approved by the Engineer. 3. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust. (b) Excavating and Backfilling for Septic Tanks are specified in Item 400, Excavation and Backfill for Structures : 1. Excavate sufficient width and length for tanks to a depth determined by tank inlet and outlet elevations. Provide level bottom. 2. Backfill with approved materials in a manner approved by the Engineer. (c) Excavating and Backfilling for Absorption Fields are specified in Item 400, Excavation and Backfill for Structures : 1. Excavate trenches a minimum 12 in. in width and 14 in. in depth, minimum, for a single pipe. 2. Backfill absorption trenches immediately with approved backfill materials to the elevations and grades as shown on the plans, or as directed by the Engineer. (4) Identification. (a) Arrange for installation of green warning tape directly over piping (including absorption field piping), at outside edges of underground structures, and at outside edges of absorption fields. (b) Use detectable warning tape over piping, over edges of underground structures, and over edges of absorption fields. (5) Septic Tank Installation. (a) Install precast concrete septic tanks level according to ASTM C 891. (6) Piping Applications. (a) Use pipes, fittings, and joining methods, for all piping sizes, according to the following applications: 1. Install solid piping and fittings to connect septic tank with leaching pipes. 2. Install leaching piping and fittings. Install leaching pipe with perforations at bottom. (7) Pipe Joint Construction and Piping Installation. (a) Join and install solvent-cement-type PVC pipe and fittings according to ASTM D 2855 and ASTM F 402. (b) Join gasketed PVC pipe and fittings with elastomeric seals according to ASTM D
6 (c) Install distribution PVC piping according to ASTM D (d) Install leaching PVC piping according to ASTM D 2321 and ASTM F 481. (8) Absorption Field Installation. (a) Filtering Material. Place a supporting layer of filtering material over the compacted trench base to a compacted depth not less than 12 in. below bottom of pipe, or as shown on the plans. (b) Install distribution piping at a minimum slope of 1% and a maximum slope as determined by the Engineer. (c) Install leaching piping solidly bedded in filtering material, with full bearing for each pipe section throughout its length. Maintain pipe alignment with no slope, or as directed by the Engineer. 1. Install perforated pipe with perforations down and joints tightly closed. Install collars and couplings as required. 2. Install elbow fittings with tight joints. 3. Place additional filtering material as needed and as directed by the Engineer. (d) Install filter mat over filter material before backfilling. (e) Place layers of sandy loom topsoil above area. Provide grass seed or hydromulch with perennial grasser or a mixed variety or as shown on the plans. Provide side slope and tie slope toe smoothly into existing grade as shown on the plans or as directed by the Engineer. (f) Install distribution piping at a minimum slope of 1% and a maximum slope as directed by the Engineer. (9) Cleanout Installation. (a) Install cleanouts and extension from piping to cleanout at grade as indicated. Use 4 in. PVC pipe with threaded PVC cap. Set top of cleanout 2 in. above surrounding grade. (b) Install cleanouts and extension from piping to cleanout at grade as indicated. Set cleanout housing and cover in concrete block 18 by 18 by 12 in. deep, unless location is in concrete pavement. Set top of cleanout 1 in. above surrounding grade or flush with grade if installed in pavement. (c) Refer to Special Specification, Toll Plaza Facility Division 3 Section Cast-in- Place Concrete for formwork, reinforcement, and concrete. (10) Connections. (a) Connect sanitary sewerage piping to septic tank. (b) Connect piping between septic tank system structures and absorption fields. (11) Field Quality Control
7 (a) System Tests. Perform testing of completed septic tank system piping and structures according to authorities having jurisdiction. (b) Additional Tests. Fill underground structures with water and let stand overnight. If water level recedes, locate and repair leaks and retest. Repeat tests and repairs until there is no leakage. (c) Williamson County and Cities Health District Inspections. The Contractor shall coordinate with Williamson County and Cities Health District for the required construction inspections and final acceptance inspection. (12) Cleaning. (a) Clear interior of piping and structures of dirt and other superfluous material as work progresses. (b) Maintain swab or drag in piping, and pull past each joint as it is completed. Place plugs in ends of uncompleted pipe at end of workday or when work stops. 5. Measurement. This Item will be measured by the each, installed, complete in place, made fully operational and tested in accordance with this special specification or as directed by the Engineer. 6. Payment. The work performed and the materials furnished in accordance with this Item and measured as provided under Measurement will be paid for at the unit price bid for Septic Tank System. This price shall be full compensation for furnishing, placing and testing all materials and equipment, seeding, and for all tools, labor, shop drawings, documentation, and incidentals necessary to complete the work
SECTION FACILITY SANITARY SEWERS
SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 221313 - FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationPASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017
SECTION 02630 - STORM DRAINAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationA. This Section includes sanitary waste and vent piping inside the building and to locations indicated.
SECTION 221316 SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationA. This Section includes subdrainage systems for foundations and underslab areas. A. Product Data: For each type of drainage panel indicated.
ZGF Partnership Page 1 of 7 SECTION 33 46 00 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes subdrainage systems for foundations and underslab areas. 1.2 SUBMITTALS A. Product Data: For each type
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 22 1316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
More information***************************************************************************************************************
02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************
More informationB. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.
SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution
More informationSECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS
SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY Section Includes: 1. Pipe and fittings. 2. Drain Basin. 3. De-chlorination tablet feeder. 4. Non-pressure transition couplings.
More informationSECTION STORM DRAIN
PART 1 - GENERAL 1-01 SECTION INCLUDED A. Furnishing and installing storm drainage facilities, including pipe, cleanout, manhole structures and inlet structures. 1-02 RELATED SECTIONS A. Division 00 Contract
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES
Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle
More informationSEPTIC TANK CONSTRUCTION GUIDELINES
SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic
More informationGUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS
UTAH COUNTY HEALTH DEPARTMENT Div. of Environmental Health 151 South University Avenue, Provo 84601 (801) 851-7525 FAX 851-7521 GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS This is intended to
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 33 3400 STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More information***************************************************************************************************************
02735 WASTE WATER DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 22 14 00 ***************************************************************************************************************
More informationCHAPTER 6. Sanitary Sewer
CHAPTER 6 Sanitary Sewer A. Introduction All proposed developments, subdivisions, and buildings must have a properly designed and constructed sanitary sewer collection system. The system shall provide
More informationMASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING
SECTION 221316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following soil and waste, sanitary drainage and vent piping inside the building: 1. Pipe, tube,
More informationSECTION FOUNDATION DRAINAGE
SECTION 33 41 13 SPEC WRITER NOTES: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section
More informationSECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION
820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing
More informationDARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES
SECTION 15420 DRAINAGE AND VENT SYSTEMS PART 1 DESIGN DIRECTIVES 1.1 DESIGN CRITERIA A. All cleanouts above finished (accessible and non-accessible) ceilings shall be extended to the floor above. B. Do
More informationITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS
ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing
More informationDaytona Beach Pier Building Renovation Jun 2010
SECTION 15150 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationSPECIFICATION FOR PIPE CULVERT CONSTRUCTION
SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.
More informationOn-lot System Component Requirements
On-lot System Component Requirements All system components used with an on-lot system employing an Eljen GSF System must meet either the requirements of Title 25, Chapter 73 or the Eljen GSF Listing. The
More informationSECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation
SECTION 33 40 00 STORM DRAINAGE UTILITIES 1. PART 1 GENERAL 1.1 RELATED WORK A. Section 31 23 00: Excavation and Fill B. Section 32 00 01: Site Restoration and Rehabilitation C. Special Conditions for
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY PHASE II
SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
More informationTHIS IS A COURTESY COPY OF THIS RULE. ALL OF THE DEPARTMENT S RULES ARE COMPILED IN TITLE 7 OF THE NEW JERSEY ADMINISTRATIVE CODE.
(f) The minimum requirements for construction, materials and foundations of grease traps shall be the same as those required for septic tanks, as prescribed in N.J.A.C. 7:9A-8.2. (g) The inlet and outlet
More information1. B16.1 Cast Iron Pipe Flanges and Flanged Fittings, Class C 111 Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings
SECTION 33 34 00 SANITARY FORCE MAIN PART 1 GENERAL 1.1 SCOPE OF WORK A. This section specifies the requirements for furnishing and installing sanitary force main and appurtenances. The pipe shall be of
More informationNew Fulton State Hospital Energy Control Center and Services Building (ECC/SVC) Project Number: M
SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION POLYVINYL CHLORIDE (PVC) WATERLINE
SECTION 02632 POLYVINYL CHLORIDE (PVC) WATERLINE PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required, and install polyvinyl chloride (PVC) waterline,
More informationSECTION A1 EXCAVATION AND BACKFILL GENERAL
SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such
More informationSECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES
SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 22 1319 - SANITARY WASTE PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationSECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)
SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density
More informationSITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013
WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown
More informationSECTION FOUNTAINS
PART 1 - GENERAL SECTION 13121 FOUNTAINS 1.1 SUMMARY A. Section includes design and complete installation of decorative fountains complete as shown on Drawings and as specified, including: 1. Equipment
More informationDrainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.
403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage
More informationVILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL
Page 312 VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS-12-01 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the IL ROUTE
More informationSECTION TRENCHING & BACKFILLING
SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications
More informationSTORM DRAINAGE CHAPTER 11
CHAPTER 11 STORM DRAINAGE SECTION 11 GENERAL 11.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. 11.2 Where required. All roofs,
More informationDIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012
2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include
More informationSANITARY SEWERAGE AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) AMERICAN RAILWAY ENGINEERING ASSOCIATION (AREA)
SANITARY SEWERAGE 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation
More informationPROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA
The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending
More informationSECTION WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING
SECTION 334701 - WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. The Contractor shall provide all labor, materials, tools, and equipment required
More informationFacility Sanitary Sewers
University of New Hampshire University of New Hampshire Scholars' Repository Division 22 Plumbing Chapter 5 Technical Construction and Renovation Standards 4-23-2015 221313 - Facility Sanitary Sewers Sandra
More informationCommonwealth of Massachusetts Title 5 Official Inspection Form Subsurface Sewage Disposal System Form - Not for Voluntary Assessments
Inspection results must be submitted on this form. Inspection forms may not be altered in any way. Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use
More informationSECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.
SECTION 33 05 13 MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. B. Related Sections: 1. Section 03 20 00 - Concrete
More informationMANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems
SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.
More informationSECTION STORM DRAINAGE AND STORMWATER MANAGEMENT
SECTION 322 - STORM DRAINAGE AND STORMWATER MANAGEMENT 322.01 DESCRIPTION Work includes all labor, material and equipment to construct storm drain systems and stormwater management facilities, including
More informationSample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction
Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction 1.00 DESCRIPTION 1.01 WORK INCLUDED: This work shall include the furnishing of all labor, equipment and materials necessary
More informationItem Name Description Unit of Measure Mobilization Per WSDOT Lump Sum
Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of
More informationResidential Sewer Backup Prevention Program
City of Wheaton Residential Sewer Backup Prevention Program Please Note: The City reserves the right to modify the policies, procedures and rules of this program or discontinue the program in its entirety
More informationSANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.
SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sanitary Sewer Gravity Mains B. Sanitary Sewer Force Mains C. Sanitary Sewer Services 1.02 DESCRIPTION OF WORK A. Construct sanitary sewer gravity
More informationCHAPTER 200 STORM SEWER CONSTRUCTION STANDARDS
CHAPTER 200 STORM SEWER CONSTRUCTION STANDARDS Storm Sewer System: 1. Detention/retention of stormwater runoff shall be provided in accordance with the requirements of the DuPage County Countywide Stormwater
More informationSECTION SANITARY WASTE INTERCEPTORS
SECTION 22 13 23 SANITARY WASTE INTERCEPTORS PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable
More informationCW 3530 MANUAL IRRIGATION SYSTEM TABLE OF CONTENTS
October 1990 CW 3530 MANUAL IRRIGATION SYSTEM TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Testing and Approval...1 5.3 Irrigation Pipe and Fittings...1
More informationSDR26 material is to be used as a minimum on all U-M projects.
BuildingName The Description of the Project P00000000 0000 DOCUMENTS SPECIFICATION DIVISION 33 NUMBER SECTION DESCRIPTION DIVISION 33 SANITARY SEWER UTILITIES SECTION 333100 - SANITARY SEWER END OF CONTENTS
More informationDRAINS AND CLEANOUTS. 1. Division 7 - Thermal and Moisture Protection Piping (Plumbing).
SECTION 15421 DRAINS AND CLEANOUTS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. Division 7 - Thermal and Moisture Protection. 2. 15410 - Piping (Plumbing). 1.02 SUBMITTALS A. Product Data: Submit
More informationSECTION GRAVITY IRRIGATION PIPELINES RUBBER GASKETED REINFORCED CONCRETE PIPE (RGRCP)
SECTION 02513 GRAVITY IRRIGATION PIPELINES RUBBER GASKETED REINFORCED CONCRETE PIPE (RGRCP) PART 1 GENERAL 1.01 SECTION INCLUDES A. Irrigation pipeline, as herein specified, consists of installing pipe
More informationSECTION 501 GRAVITY SEWERS. U. No pipe length used shall be less than 5 feet.
SECTION 501 GRAVITY S PART 2 MATERIALS 2.1 PIPE SIZE, TYPE, AND STRENGTH D. Only concrete or polyvinyl chloride sewer pipe shall be used for sewer line construction unless otherwise approved by the City
More informationTRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)
PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without
More informationGWINNETT COUNTY STORM SEWER PIPE STANDARDS
1.0 Standard Specifications GWINNETT COUNTY STORM SEWER PIPE STANDARDS 1.1 Unless otherwise specifically set forth herein or in the Gwinnett County Standard Drawings, all of the materials, methods of the
More informationSECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS
SECTION 02620 PART 1 GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required to install High Density Polyethylene (HDPE) pressure pipe, fittings, and appurtenances
More informationSECTION UTILITY MANHOLES AND STRUCTURES
SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition
More informationA. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationOn-Site Leaching Chamber Specifications & Features. Design & Installation Manual Ohio
On-Site Leaching Chamber Specifications & Features Design & Installation Manual Ohio 1 This manual provides general design and installation information for use of Arc plastic leaching chambers in the State
More informationPIPE REHABILITATION. Comply with Division 1 - General Provisions and Covenants, as well as the following:
PIPE REHABILITATION PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sliplining Pipe B. Cured-in-place Pipe Lining C. Deformed/Reformed Pipe Lining D. Folded/Formed Pipe Lining E. Spot Repairs by Pipe Replacement
More informationSanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility:
Oklahoma Department of Environmental Quality Water Quality Division Phone: 405-702-8100 Construction Permitting Section 707 N. Robinson, OKC, OK 73102-6010 P.O. Box 1677, OKC, OK 73101-1677 Sanitary Sewer
More informationDRIP EMITTER SYSTEM STUDY GUIDE
DRIP EMITTER SYSTEM STUDY GUIDE Minimum Criteria for Pressurized Subsurface Absorption Fields Utilizing Emitters. Subsurface systems utilizing emitters may be used in lieu of conventional or other alternative
More informationGRAY WATER RECYCLING SYSTEMS
GRAY WATER RECYCLING SYSTEMS Note: Section P2601.2 of the International Residential Code requires all plumbing fixtures that receive water or waste to discharge to the sanitary drainage system of the structure.
More informationSECTION STORM UTILITY DRAINAGE PIPING
SECTION 33 41 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationContact the Jurisdictional Engineer for materials allowed by each jurisdiction.
Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the
More informationFabrication and Installation Table of Contents
Fabrication and Installation Table of Contents HDPE AQUASHIELD PRODUCTS 2 Fabrication and Installation 2 System Fabrication 3 Aqua-Swirl Installation 4 Step 1 Excavation and Bedding 4 Step 2 Pipe Connection
More informationSECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL
SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS
More information2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.
General: 1. Construct utilities in accordance to TWA approved plans and shop drawings. Any deviation from the approved plans shall be approved by the DEVELOPER S ENGINEER and TWA 2. A preconstruction meeting
More informationSection Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers
STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain
More informationSECTION PIPE & PIPE FITTINGS PART 1 GENERAL
SECTION 02610 PIPE & PIPE FITTINGS PART 1 GENERAL 1.01 DESCRIPTION A. This Section includes the material and bedding requirements for all pipe and pipe fittings for underground pressure and non-pressure
More informationB. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.
The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language
More informationA. BILL OF QUANTITIES FOR SANITARY SEWER
Note: Unit prices of BoQ items shall include the execution of all small and unforeseen works not covered by BoQ, but that are necessary to be carried out during construction for smooth process of works
More informationINDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2
INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...
More informationFS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm)
Wastewater Flow Distributor Technical Data Submittal Special Precautions Specifications Installation 24½" (62.2 cm) 12½" (31.8 cm) 24½" (62.2 cm) (30.5 cm) SUBMITTAL STANDARD: 4" plain end inlet/outlet
More informationPART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):
PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): 01 Providing and Fixing of CPVC pipes confirming to ASTM standard including all CPVC fittings like tees, elbows, bends, unions, coupling, reducer
More informationSECTION MEASUREMENT AND PAYMENT
SECTION 01025 - MEASUREMENT AND PAYMENT PART 1 - GENERAL 1.01. BASIS FOR MEASUREMENT AND PAYMENT Measurement and Payment will be made for only those items included in the Schedule of Unit Prices or Contract
More informationA. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms.
PART 1: GENERAL 1.01 Purpose A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationBASED ON DFD MASTER SPECIFICATION DATED 2/24/2014
1 0 1 0 1 0 1 SECTION 1. TRENCHING BASED ON DFD MASTER SPECIFICATION DATED // P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all work, materials, labor, equipment,
More informationHOLDING TANK PLANNING & INSTALLATION GUIDELINES
HOLDING TANK PLANNING & INSTALLATION GUIDELINES Under no circumstances is sewage from a holding tank to be discharged onto the surface of the ground or into groundwater or surface waters. TABLE OF CONTENTS
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain
More informationSECTION BASIC ELECTRICAL MATERIALS AND METHODS
SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:
More informationConstruction Inspection Checklists
III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments
More informationBMP 6.4.4: Infiltration Trench
BMP 6.4.4: Infiltration Trench An Infiltration Trench is a leaky pipe in a stone filled trench with a level bottom. An Infiltration Trench may be used as part of a larger storm sewer system, such as a
More informationPERMEABLE INTERLOCKING PAVERS
PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement
More informationWASTEWATER SYSTEM STANDARDS
8.1 SCOPE Wastewater pipelines and appurtenances shall be provided as shown on the plans and as specified herein. Clearing, grubbing, trench excavation and backfill, pipe material, valves, cutting and
More informationAttachment D-1: Civil/Structural Scope of Work
Attachment D-1: Civil/Structural Scope of Work Project: Location: Targa Sound Renewable Fuels Project Tacoma, WA Prepared by: NORWEST ENGINEERING Consulting Engineers 4110 N.E. 122 nd Avenue, Portland,
More informationStorm Drainage
University of New Hampshire University of New Hampshire Scholars' Repository Division 33 Utilities Chapter 5 Technical Construction and Renovation Standards 4-23-2015 334100 - Storm Drainage Sandra Hickey
More informationSERVICE LINES, METERS AND APPURTENANCES
AUGUST02 SECTION 02646 SERVICE LINES, METERS AND APPURTENANCES PART 1 - GENERAL 1.1 DESCRIPTION A. This section concerns materials and installation of corporation stops, curb stops, service lines, meters,
More informationDUKE UNIVERSITY CONSTRUCTION STANDARDS
1 33 40 00 Storm Drainage 1. Introduction A. Duke University is divided into the main areas of the Medical Center, West Campus, Central Campus, and East Campus. The University also includes the Washington
More informationGUIDELINES FOR SEPTIC SYSTEM DESIGN
GUIDELINES FOR SEPTIC SYSTEM DESIGN Single Family Residential For multi family or commercial buildings, Or If in the Oakdale area, contact the Department of Environmental Resources Regarding septic system
More informationDOCUMENT ADDENDUM No. 2
DOCUMENT ADDENDUM No. 2 PART 1 GENERAL 1.1 DOCUMENT INCLUDES A. Clarifications 1.2 CONSTRUCTION CONTRACT A. The Construction Contract is known as SU095 9 th Street and SU096 Downs Drive Storm Drain Projects.
More informationSummary of the 2011 Changes
The following is a list of amendments to the Residential Site Improvement s, N.J.A.C. 5:21, adopted in 2011. The Notice of Adoption of these changes appeared in the New Jersey Register on May 16, 2011.
More information