1 Hang-On Platform Version 1.1 Inspection Handbook 1
2 BUILDSAFE Contents INSPECTION CHECKLISTS 3 INSPECTION CHECKLISTS 4 SIGNAGE 5 SIGNAGE 6 FIXING DETAIL / Connection 7 FIXING DETAIL / Connection 8 platform 9 platform 10 platform 11 platform 12 platform 13 platform 14 rail 15 Summary 16 2
3 INSPECTION CHECKLISTS Use the Installation checklist provided below to conduct installation audits, make sure that you reference the content in the handbook for further information. If further information is required please contact Buildsafe. Questions which are not applicable put N/A in Yes field buildsafe.net.au HANG-ON INSTALLATION CHECKLIST 12/02/15 Construc on Company: Site Address: Installer (name on the Handover Cer ficate): Buildsafe Inspection Checklist should be used only by competent individuals. If the Installation does not look or feel structural DO NOT access the Installation, if this is the case the installation needs to be locked out by the principle contractor preventing use/access. If issues are identified with the installation or further information is required please contact Buildsafe to arrange for appropriate measures to be taken. ITEM YES NO SIGNAGE 1 Is there a Light Duty Pla orm sign a ached at the first access bay on the Hang-On system? 2 Is there an Access Point sign located at the access point on the Hang-On system? 3 Has the "Handover Cer ficate" been posi oned at the access point? FIXING DETAIL / CONNECTION 4 Has the system been installed outside of Electrical No Go / Exclusion Zones? Are all screws present in the hanger assembly? Hanger installed internal (of wall): Minimum 4 in foot, 1 in head Hanger installed external (of wall): Minimum 1 in foot, 2 5 in hook over top plate 6 Are all pins present in the knuckles? (Bo om, Middle and Top) PLATFORM 7 Is there a safe access to the working pla orm for all trades? 8 Is the maximum spacing between internal rail and the external face of the structure less than 225mm? 9 Is the maximum span of standards / transoms less than 3.6m? 10 Are the planks at the right height below the roof / gu er line for its intended use and pitch of roof? ( 26 = 1000mm, >26 <35 = 300mm) 11 Is the maximum distance of planks can levered to a non-returning corner less than 1150mm? 12 Is the maximum span of the suppor ng lower planks on a can levered corner less than 1450mm? 13 Have all plank tabs been ghtened so the planks are secure and si ng flush? 14 Are all step ups less than 500mm? If not, has a stop end been installed to eliminate the fall hazard? ITEM YES NO 15 Have back braces been used on this install, if so have the back brace floor plates been secured with two L-pins? Page 1 of 2 BRANCH ACCESS GROUPS AUTHOR/AUTHORISED REVISION DATE GLOBAL Admin / Manager / Office / Sales / Field / Yard / VIP B.Ceprnja 2 12/02/15 3
4 INSPECTION CHECKLISTS buildsafe.net.au RAIL 16 Are all cams on Supa and corner posts locked down? 17 Are rail joiners u lised on all internal and external corners of internal rail and on straight runs with an overlap is greater than 500mm? 19 If Hang-On runs into a scaffold system, is the rail joined to the scaffolding? 18 Is rail straight and plumb throughout the installa on? 20 Are rail stop ends present at the end of a straight run of pla orm? ACCESS AND EGRESS 21 Is there a safe access and egress point to the Hang-On system? Addi onal Comments: Person Conduc ng Inspec on : Date of Inspec on : Page 2 of 2 BRANCH ACCESS GROUPS AUTHOR/AUTHORISED REVISION DATE GLOBAL Admin / Manager / Office / Sales / Field / Yard / VIP B.Ceprnja 2 12/02/15 4
5 SIGNAGE 1. Is there a Light Duty Platform sign attached at the first access bay on the Hang-On system? 2. Is there an Access Point sign located at the access point on the Hang-On system? 3. Has the Handover Certificate been positioned at the access point? Handover Certificate must be completed and fixed in a pouch next to the Access Point. If the Hang-On Platform has been altered or re-installed a new Handover Certificate must be issued. Light Duty Platform Sign > Handover Certificate Access Point Sign Handover Certificate next to or below the Access Point sign. 5
6 SIGNAGE The Hang-On Platform install requires signage to be considered compliant and also for marketing purposes. Buildsafe takes great pride in the products we offer which is why all installations must have a Buildsafe sign installed. We want the world to know who we are and what we do. Hang-On Platform installation requires the following signs to be displayed; Access Point signs must be attached to the frame of the building in front of the Access Point. Light Duty Working Platform sign must be attached to Handrail directly at the point of access. Scaffold Incomplete Sign must be attached when the Hang-On Platform is deemed incomplete and dangerous to use. Elevator Acess Gate Sign must be attached next to a material access point. Large Buildsafe Sign is to be hung in the most visible location. 6
7 FIXING DETAIL / Connection 4. Has the system been erected within the Electrical No Go Zone for power lines? NO GO / EXCLUSION ZONES VICTORIA Domestic/low voltage power lines Less than 4.6m horizontally and 5m vertically. Industrial/high voltage power lines Less than 8m all round. QUEENSLAND Domestic/low voltage power Less than 3m all round. Industrial/high voltage power lines Less than 6m all round. NSW Any work within 4m of ALL power lines need referral to the network operator for any special conditions which need to be complied with. 5. Are all screws present in the hanger assembly? Hanger installed internal (of wall): Minimum 4 in foot, 1 in head Hanger installed external (of wall): Minimum 1 in foot, 2 in hook over top plate. The Hook of the Uni-Head retracted and fixed with 2 x 50mm screws into the top plate. Foot is secured in place with 2 x 50mm screws into the floor and 2 x 50mm into the bottom plate. Uni Head is secured to the frame by fixing 2 x 50mm screws into the top plate. There will be 55mm of the lower slot showing if the Pin is bearing at the bottom of the slot above. Foot is secured in place with 2 x 50mm screws into the floor and 2 x 50mm into the bottom plate. 7
8 FIXING DETAIL / Connection 6. Are all pins present in the knuckles? (Bottom, Middle and Top) Below is a photo showing the Knuckle installed to the Standard supporting the Transom. The Knuckle must have 3 security Pins installed, they are circled below in white. The Pins are critical to the safety of the Hang-on System and ensure the Hanger set up is structural. Note: There is a 4th pin once the transom is installed. 8
9 platform 7. Is there a safe access to the working platform for all trades? Look to identify safe and unobstructed access point for tradeperson to get on to of off the platform. 8. Is the maximum spacing between internal rail and the external face of the structure less than 225mm? Less than 225mm. 9
10 platform 9. Is the maximum span of standards / transoms less than 3.6m? 3.6 m max 10
11 platform 10. Are the planks at the right height below the roof / gutter line for its intended use and pitch of roof? ( 26 = 1000mm, >26 <35 = 300mm) Is the rail installed at the correct height for the application? (min 900mm above projected roof line). 900mm min to the top rail where that rail is horizontally less than 1m from the roof edge (d) (i) Catch Platform for less than 26 0 Posts may be vertical or incline away from roof as illustrated to a maximum angle of 26 0 Intersection of the projected roofline & a line vertically below the centre of the top rail 100mm Max (k) The platform deck shall have a clear minimumidth of 450mm - 2 plank (675mm planks in QLD. No obstructions are permitted above the platform serface (a) (b) Catch Platform for greater than 26 (c) Distance between platform and bottom edge of bottom rail must be no less than 150mm & no greater than 275mm Spread loads between two wall studs and/or bottom plate For a roof pitch not greater than 26 0,where it is intended to locate a platform below the roof edge. The platform shall be located at a distance not greater 1m (d) Distance from cladding to platorm less than or equal to 225mm (g) Distance between roof line & top rail no less than 900mm & no greater than 1100mm (h) (i) Bottom Rails or toeboard as appropriate (c) Platform Deck (a) (b) 450mm nominal max. Between all rails. (j) Distance between platform and bottom rail must be no less than 150mm and no greater than 275mm (c) For a roof pitch greater than 0 26, the platform must be no greater than 300mm below the roof edge (e) Distance from cladding & platform less than or equal to 225mm (g) 11
12 platform 11. Is the maximum distance of planks cantilevered to a non-returning corner less than 1150mm? 12. Is the maximum span of the supporting lower planks on a cantilevered corner less than 1450mm? Cantilever Returning Corner The maximum combined length of "B" & "A" is 2900 mm. ("A"cannot exceed 1450 mm) 2900mm All cantilevered Planks must be supported over 2 Transoms and nonreturning spans can span 1150mm max. Maximum cantilever 1450 mm = Minimum. "Back Span" 2900 mm. The "Back Span" must be a Minimum of 2 x the cantilever. If the cantilever of "A" is reduced to 900mm The allowable maximum cantilever of "B" would be 2000 mm. "A" A 1450mm Max Cantilever Canterliver "A" Distance from Transom to outside line or returning Planks The maximum span for the supporting (Lower Planks) is 1450 mm. 2125mm "B" B 1450mm Max Cantilever Canterliver 250mm minimum Overhang The maximum span for the supported (Upper Planks) is 1450 mm "B" Distance from Transom to inside line or returning Planks. 250mm minimum Overhang In the case of a 3 Plank system (675 mm wide) the maximum cantilever for the supported Planks is 1450 mm mm = 2125 mm. 12
13 platform 13. Have all plank tabs been tightened so the planks are secure and sitting flush? Hang-On System walk way is constructed out of aluminum planks, the Planks are supported by the transom and secured using Plank Tabs and Plank Locks as shown below. High setting - Two Planks. Low setting - One Plank. Plank Tab is tight and secured. Plank Lock needs to be installed on every 2nd trasom from start of every run. 13
14 platform 14. Are all step ups less than 500mm? If not, has a stop end been installed to eliminate the fall hazard? All step ups and downs in the platform height must be no greater than 500mm, if greater than 500mm there needs to be a stop end barrier to prevent a fall from height. 15. Have back braces been used on this install, if so have the back brace floor plates been secured with two L-pins? The Back Brace Setup is unique to Buildsafe in that it enables the Hanger to have no structural bearing on the wall and doesn t require the Floor Plate to be secured to the floor joists. Minimum Distance of 2.0m between the wall frame and the Floor Plate. Uni Head is not resting against the top plate. approx 5-10mm. Plate Tie with a Hanger less than 500mm away. Plate Ties are to be installed on all corners that are internal to the house. Foot Plate secured and attached the bottom hook of the Back Brace. 14
15 rail 16. Are all cams on Supa and corner posts locked down? 17. Are rail joiners utilised on all internal and external corners of internal rail and on straight runs with an overlap is greater than 500mm? 18. Is the rail straight and plumb throughout the installation? Rail Joiner Rail runs straight and is plumb Rail is secured into the Supa Post Rail Supports by the Cam locking system. Unlocked Locked 19. If Hang-On runs into a scaffold system, is the rail joined to the scaffolding? The system needs to be tied into the scaffold if there is a prexisting scaffold system, this ensures that risks such as falling from height are eliminated, the system will be tied in at the rail section and the planks will run into the prexisting scaffold decks. 20. Are rail stop ends present at the end of a straight run of platform? Where the system is installed without returning corners and is not tied into a prexisting scaffold installation a stop end needs to be installed. 21. Is there a safe access and egress point to the Hang-On system? The system needs to have clear and unobstructed access on and off the platform from tools, materials and rubbish, this must be maintained for the duration of the hire period of the system. 15
16 Summary Use the following summary point as a guide when conducting the inspection: There is a Light Duty Platform sign attached at the first access bay on the Hang-On system. There is an Access Point sign located at the access point on the Hang-On system. The Handover Certificate has been positioned at the access point. The system has been installed outside of The Electrical No Go / Exclusion Zones. All screws are present in the hanger assembly? Hanger installed internal (of wall): Minimum 4 in foot, 1 in head Hanger installed external (of wall): Minimum 1 in foot, 2 in hook over top plate. All pins are present in the knuckles? (Bottom, Middle and Top). there is safe access to the working platform for all trades. The maximum spacing between internal rail and the external face of the structure are less than 225mm. The maximum span of standards / transoms are less than 3.6m. The planks are at the right height below the roof / gutter line for its intended use and pitch of roof? ( 26 = 1000mm, >26 <35 = 300mm). The maximum distance of planks cantilevered to a non-returning corner are less than 1150mm. The maximum span of the supporting lower planks on a cantilevered corner are less than 1450mm. All plank tabs have been tightened so the planks are secure and sitting flush. All step ups are less than 500mm? If not, has a stop end been installed to eliminate the fall hazard. Back braces have been used on this install, if so have the back brace floor plates been secured with two L-pins? All cams on Supa and corner posts are locked down. Rail joiners areutilised on all internal and external corners of internal rail and on straight runs with an overlap is greater than 500mm. If Hang-On runs into a scaffold system, is the rail joined to the scaffolding? Rail is straight and plumb throughout the installation. Rail stop ends are present at the end of a straight run of platform. There is a safe access and egress point to the Hang-On system. 16
17 17
Safety on Heights: Our Policy
11/17/14 Safety on Heights: Our Policy Only volunteers over the age of 18 are allowed to work on heights of more than six feet off the ground. This includes all work on scaffolds. Only volunteers who are
More informationReliant Holdings Ltd Safety Management System
Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 7 Purpose The purpose of this program is to prevent injuries due to falls from elevated work areas and ensure employees
More informationUniversal Panels & Accessories
Universal Panels & Accessories Erection Procedures INTRODUCTION Use common sense when working with Scaffold Your Safety is our #1 Concern Universal Scaffolds are designed with your safety in mind every
More informationSAFE WORK METHOD STATEMENT
SWMS 002 Erect / Dismantle Single Bay Towers and/or Multiple Bay Towers Page of 9 ABN: 40 088 478 399 This SWMS has been prepared and authorised by OLDFIELDS ACCESS PTY LTD ACN: 088 478 399 Date: Issue
More informationTANK REPAIRS INCLUDING SCRAP DISPOSAL SCAFFOLDING JOBS
:- 1. Erect Metallic Scaffolding (including supply of all Scaffolding materials like Pipes, Planks, Clamps, Pins, Ladder arrangements), wherever required inside / outside the Tanks etc. as per instructions
More informationChapter 7. Roof Framing
Chapter 7. Roof Framing 7.1 ROOFING PREP WORK 7.2 INSTALLING ROOF TRUSSES 7.3 INSTALLING PORCH TRUSSES 7.4 SHEATHING ROOF 7.5 INSTALLING SUB-FASCIA 7.6 BUILDING AND INSTALLING SCUTTLE BOX 7.7 INSTALLING
More informationSCAFFOLDS Revision No: 3
PAGE 1 OF 6 1.0 PURPOSE/ SCOPE To communicate the safety requirements for the erection, inspection and safe use of scaffolds. Compliance with these requirements will assure employee safety while working
More informationSCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC Permit Requirements
SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC. 320-226.5189 www.101developmentresources.com While every attempt has been made to insure the correctness of this handout, no guarantees are made to its accuracy
More informationPanel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT
IMPORTANT SAFETY INFORMATION FOR USERS OF THE REECHCRAFT, BRACING SYSTEM PLEASE READ BEFORE USE Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT UK Edition 1.3 26/11/2012 1 TABLE OF CONTENTS
More informationConfiguration. User Guide. Version: Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES
Configuration User Guide Version: 2018.0 Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES Contents Introduction... 1 Create a new project... 2 Open the configuration...
More informationHILLSBOROUGH TOWNSHIP CODE ENFORCEMENT
HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT SAMPLE GUIDE FOR RESIDENTIAL DECKS revised 7 16 Call before you dig! 1 800 272 1000 New Jersey One Call. Utility Mark Out. THIS GENERIC GUIDE IS NOT ALL INCLUSIVE
More informationSection 8. Walking/Working Surfaces. 8.1 Objective. 8.2 Roles and Responsibilities. 8.3 General Requirements. Competent Person
International Environmental Health and Safety (IEHS) Section 8 Walking/Working Surfaces 8.1 Objective The Walking/Working Surfaces program has been developed for IEHS and project employees working on site,
More informationSafe Work Procedure for installation of
Safe Work Procedure for installation of external cladding This procedure has been formulated to cover safe systems of work for the installation of external cladding. This instruction will be used to reduce
More informationScaffolding and Raised Platforms
Standard Operating Procedures Scaffolding and Raised Platforms Last Modified: JAN 2013 1 of 7 Scaffolding and Raised Platforms I Purpose To provide a guideline for personnel who work around or on stationary
More informationCITY OF FRUITLAND DIVISION OF PLAN REVIEW & PERMITTING DECK GUIDE. This design guide assumes all lumber to be pressure-treated Southern Pine.
City of Fruitland Building Inspections 208 South Division Street Fruitland, Maryland 21826 410.548.2804 CITY OF FRUITLAND DIVISION OF PLAN REVIEW & PERMITTING DECK GUIDE GENERAL NOTES This design guide
More informationIntroduction. Estimated length: 30 minutes Audience: construction workers
Introduction Scaffold User Training Welcome! The purpose of this Click Safety course is to provide instruction for basic safety provisions when using scaffolds in construction activities. Estimated length:
More informationReferences. EM , Sections 22 OSHA 29CFR (Subpart L ) UFGS [Latest] ANSI A
References EM385-1-1, Sections 22 OSHA 29CFR 1926.450 (Subpart L ) UFGS-01 35 29[Latest] ANSI A10.8-1988 What Is A Scaffold? An elevated, temporary work platform Three basic types: Supported scaffolds
More informationSCAFFOLDING PROCEDURE
SCAFFOLDING PROCEDURE 1 Table of Contents 1 PURPOSE... 3 2 PROGRAM COMPLIANCE... 3 3 SCOPE... 3 4 DEFINITIONS... 3 5 RESPONSIBILITES... 4 6 SCAFFOLD INSPECTION... 5 7 SCAFFOLD USE... 5 8 SCAFFOLD REQUIREMENTS...
More informationWORKING AT HEIGHT PROCEDURE
Page 1 of 8 AL-Yamama Engineering Company HSSE Department (s) WORKING AT HEIGHT PROCEDURE Page 1 of 8 Page 2 of 8 Introduction Work at height is any work activity that is performed where the work is to
More informationNEBOSH International Certificate in Construction Safety and Health Unit ICC1 MANAGING AND CONTROLLING HAZARDS IN INTERNATINAL CONSTRUCTION ACTIVITIES
NEBOSH International Certificate in Construction Safety and Health Unit ICC1 MANAGING AND CONTROLLING HAZARDS IN INTERNATINAL CONSTRUCTION ACTIVITIES element 10: WORKING AT HEIGHT - HAZARDS AND RISK CONTROL
More informationDEPAUL UNIVERSITY. Scaffolding Program. Environmental Health & Safety. April 2017
DEPAUL UNIVERSITY Scaffolding Program Environmental Health & Safety April 2017 1 TABLE OF CONTENTS SECTION PAGE NO. 1.0 PURPOSE 2 2.0 SCOPE 2 3.0 SCAFFOLDING ERECTOR 2 4.0 GENERAL 2 5.0 WOOD SCAFFOLDING
More informationBP OIL -- TOLEDO REFINERY
BP OIL -- TOLEDO REFINERY Document Type: Procedure Refinery Wide Procedure No.: SAF 076 Effective Date: 3/31/17 Scaffold Procedure Revision No.: 8 Owner: E. Stewart / N. Weber Authorized By: Chris Conley
More informationSales Hire Erections
LTD www.scafhire.ie Sales Hire Erections Scaffolding Specialists Company History Since its modest inception in 1980 Scafhire Ltd has progressed to a position of very high prominecnce and respectability
More informationAssessment. Challenge Assessment for Restricted Certificate of Competence. Advanced Scaffolding Elementary Scaffolding.
Assessment Challenge Assessment for Restricted Certificate of Competence Advanced Scaffolding Elementary Scaffolding Student Name Process for Challenge Assessment for Restricted Certificate of Competence
More informationBASIC SCAFFOLDING KNOWLEDGE QUESTIONS
Garnsworthy Square 46, 62 & 64 Garnsworthy St Springvale rth Victoria 3171 Updated on 22/02/08 STC105 Name BASIC SCAFFOLDING KNOWLEDGE QUESTIONS THE PROFESSIONAL Scaffold Tools Scaffold Belts Couplers
More informationContents DESIGNER S STRUCTURAL PRODUCTS GUIDE. Tegral Purlins & Rails
DESIGNER S STRUCTURAL PRODUCTS GUIDE Introduction Contents Tegral Purlins & Rails Zeta Purlins & Rails Zeta Purlins page 8 Zeta Rails page 15 Zeta Purlin & Rail Cleats page 22 Zeta 2 Purlins & Rails Zeta
More informationH 12 Heavy Duty Modern Tripod 8 Seat Swing Heavy Duty Hangers
Page 1 IMPORTANT Please retain this instruction sheet in your files. It contains important replacement parts information. All equipment should be installed in accordance with these instructions. It is
More informationBP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 7
Safety Manual Page 1 of 7 Scaffolds 1. Purpose This policy establishes the basic safety requirements and safe work practices for the erection, use, inspection, movement, and dismantling of scaffolding.
More informationThe original WACO RED premium frame scaffolding and shoring systems.
The original WACO RED premium frame scaffolding and shoring systems. 2 WACO Premium Frame Scaffolding and Shoring System Used by thousands of the industry s top contractors and professionals, Waco Red
More informationMETHOD STATEMENT First Fix Joinery
North West Facilities Ltd 17-18 Gaerwen Industrial Gaerwen Isle of Anglesey LL60-6HR Tel: 01248-422555 Fax: 01248-422556 Mobile: 07891-557581 Project/Contract CCG Contractor Apollo Property Services Group
More informationSTANDARD PRACTICE INSTRUCTION
STANDARD PRACTICE INSTRUCTION DATE: March 1, 2001 SUBJECT: Scaffolding Safety Program. REGULATORY STANDARDS: 29 CFR 1910.28 Safety Requirements For Scaffolding. 29 CFR 1910.29 Manually Propelled Mobile
More informationWalking-Working Surfaces
Walking-Working Surfaces 29 CFR Part 1910 Subpart D Presented by: ETTA, OSH Division 919-807-2875 Objectives 29 CFR 1910, Subpart D In this course, we will discuss the following: Hazards Definitions General
More informationSystems Scaffold Tubular Scaffold Access Unit Installation Instructions
Systems Scaffold Tubular Scaffold Access Unit Installation Instructions 2 Tubular Scaffold Access Unit Installation Instructions LTUB7 Galvanized: 24.1 lb Label 7112A0003 NOTICE Please read and follow
More informationLEGAL SUPPLEMENT 43. to the Government Gazette of Mauritius No. 13 of 8 February 2014
LEGAL SUPPLEMENT 43 to the Government Gazette of Mauritius No. 13 of 8 February 2014 Government Notice No. 16 of 2014 THE OCCUPATIONAL SAFETY AND HEALTH ACT Regulations made by the Minister under section
More informationCARROLL COUNTY BUREAU OF PERMITS AND INSPECTIONS RESIDENTIAL CODE COMPLIANCE GUIDELINES FOR DECKS
CARROLL COUNTY BUREAU OF PERMITS AND INSPECTIONS RESIDENTIAL CODE COMPLIANCE GUIDELINES FOR DECKS Code Reference: Chapter 97, Code of Public Local Laws and Ordinances of Carroll County and The International
More informationLayher. Keder Roof and Keder Hall. More Possibilities. The Scaffolding System. Layher Keder Roof and Keder Hall Instructions for Assembly and Use
Layher Keder Roof and Keder Hall Instructions for Assembly and Use Certification as per DIN ISO 9001/EN 29 001 by TÜV-CERT Keder Roof and Keder Hall Layher More Possibilities. The Scaffolding System. CONTENTS
More informationDECK PLANS City Of Grand Rapids Building Safety Division
DECK PLANS City Of Grand Rapids Building Safety Division 218-326-7601 www.grandrapidsmn.org This handout is intended only as a guide and is based in part on the 2007 Minnesota State Building Code, Grand
More informationScaffold Inspection Procedures for the Competent Person. Merle Errthum
Scaffold Inspection Procedures for the Competent Person Merle Errthum 2014 an elevated work platform. What is a Scaffold? What Is A Scaffold? An elevated, temporary work platform Three basic types: Supported
More informationSCAFFOLDING - Part 2 SELF INSPECTION CHECKLIST
OPTIONAL INFORMATION Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: SCAFFOLDING - Part 2 Instructions: This checklist covers some of the regulations issued
More informationOpen-Web Trusses. Including Red-L, Red-W, Red-S, Red-M and Red-H Trusses. Design Flexibility. Outstanding Strength-to-Weight Performance
Open-Web Trusses Including Red-L, Red-W, Red-S, Red-M and Red-H Trusses Download your free copy at RedBuilt.com. Specify Open-Web trusses for your next project using RedSpec single-member sizing software.
More informationScaffolding Update Including TG20:13 2 years on NEW SG4:15. Ray Johnson BSc Joint Managing Director
Scaffolding Update Including TG20:13 2 years on NEW SG4:15 Ray Johnson BSc Joint Managing Director Impact of TG20:13 A new set of guidance, not merely a revision Changes are far reaching, effecting most
More informationGuideline for the erection of Supaloc Steel Trusses Pre- Delivery preparation by the supplier Installing Supaloc Steel roof trusses...
Guidelines for the Safe Erection of Supaloc roof trusses October 2012 CONTENTS Guideline for the erection of Supaloc Steel Trusses... 4 Pre- Delivery preparation by the supplier... 5 Main Roof Truss Bracing
More informationScaffolding Safety. Scaffolding
Scaffolding Safety Scaffolding 1926.450 - Scope, Application Covers all scaffolds used in workplaces Does not apply to crane or derrick suspended personnel platforms, which are covered by 1926.550(g) Aerial
More informationAnchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi
STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel
More informationDocument Number: HSE Created: February 21, 2013 SCAFFOLDING. Author: A Holland
Document Number: HSE33-001 Created: February 21, 2013 SCAFFOLDING Author: A Holland MAPP Construction - Corporate 344 Third Street Baton Rouge, LA 70801 (225) 757-0111 MAPP Construction - Houston 11511
More informationSECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.
SECTION 02830 CHAIN LINK FENCES AND GATES (GALVANIZED) 1.0 GENERAL 1.1 Section Includes A. Fence framework, fabric, gates, and accessories. B. Excavation for post bases; concrete footing for posts. C.
More informationOSHA Rules for Scaffolding
OSHA Rules for Scaffolding A) Objectives: 1. 2. 3. Don t let the scaffold fall. Don t fall off the scaffold. Don t let the material fall off the scaffold. Name of Competent Person: Name of Qualified Person:
More informationGeneral Requirements Yes N/A 1. Is the designer qualified for the proposed work?
DECKS BUILDING PERMIT REQUIREMENTS May 216 Below is a checklist outlining the requirements to obtain a building permit to construct a deck for a single detached, semi-detached, duplex or townhouse dwelling
More informationDate Issued: June 2010 Revision Date: February 2013 Review Date: February 2016 Revision #
SUNCOR ENERGY PRODUCTS DISTRIBUTION TERMINAL OPERATING MANUAL STANDARD OPERATING PROCEDURE SAFEWORK PRACTICES Date Issued: June 2010 Revision Date: February 2013 Review Date: February 2016 Revision # 2013-01
More informationErection manual. Tube-Lock Concept. van Thiel United b.v Page: 1 of 15
Erection manual Tube-Lock Concept 2013-02 Page: 1 of 15 Contents Subject Page Illustration of Tube-Lock Concept 3 Parts of Tube-Lock concept 4 Legislation 5 Erecting a Tube-Lock Concept scaffold 6 Technical
More informationAPPLICATION GUIDE PERFORM WITH PRECISION
APPLICATION GUIDE PERFORM WITH PRECISION APPLICATION GUIDE TABLE OF CONTENTS A Word about Safety...1 General Shoring Safety Rules... 2 Single and Independent Post Shore System Safety Rules... 4 General
More informationAt last! Construction bracing made easy...
At last! Construction bracing made easy...... a fast, smart and simple system with a range of applications THE SMART BRACING SYSTEM There are many situations in building with a need for the bracing of
More informationSmarter. Safer. Leaner.
Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter
More informationHATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES
HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES A deck/patio permit is required for all construction including decks, renovation of existing decks/patio, paver patios, and retaining walls (over 30 inches).
More informationCEILING & WALL SYSTEMS
CEILING & WALL SYSTEMS Axiom Perimeter Trim Commercial Ceilings and Walls Solutions Guide Axiom Perimeter Trim AXIOM Trim The Axiom family of products provide functional and visual options in ceiling design.
More informationCLIMA AGR. Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE
CLIMA AGR Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE Contents Safety First Safety Checklist Quantity Schedules Assembly and Dismantling Procedure Toe Boards
More informationInstallation Guide for Domestic Decking in Recycled Plastic
Daisy Mill (Gate 3), Unit B Daisy Street, Waterside Colne, Lancashire, BB8 8ER T: 01282 861325 E: sales@kedeltrade.co.uk W: www.kedeltrade.co.uk Installation Guide for Domestic Decking in Recycled Plastic
More informationINSPECTION GUIDELINES: JOIST AND UNDERFLOOR COMBO
Joist and Underfloor Combo Page 1 of 7 Revision Date: 10/02/2017 DEVELOPMENT SERVICES BUILDING INSPECTION INSPECTION GUIDELINES: JOIST AND UNDERFLOOR COMBO INSPECTION CODE: 212, 213 SCOPE: RESIDENTIAL
More informationTAMPA ELECTRIC COMPANY ENERGY SUPPLY SCAFFOLD PROGRAM
TABLE OF CONTENTS TITLE PAGE # PURPOSE / INTRODUCTION 1 RESPONSIBILITY 2 EMPLOYEE TRAINING AND DOCUMENTATION 3-4 PERIODIC PROGRAM EVALUATION 4 GENERAL SCAFFOLD ERECTING/DISASSEMBLING REQUIREMENTS 5-7 SCAFFOLDING
More informationInstallation Manual. Orion. TL-3 Steel Barrier. VHD (v2)
Installation Manual Orion TL-3 Steel Barrier VHD (v2) 300914 Table of Contents Orion Introduction.......... 3 Limitations & Warnings. 4 Before Installation..... 3 System Design & Design Considerations
More informationScaffolding Procedures
Procedures Purpose It is the purpose of this company in issuing these procedures to further ensure a safe workplace based on the following formal, written procedures for scaffold work. Application This
More informationTIMBER BARNS AND GARAGES
CURRENT PRICE LIST TIMBER BARNS AND GARAGES TIMBER MINI BARNS Due to demand we offer some great value Mini Barns complete with stable fronts and partitions allowing you to work under cover at all times.
More informationConergy SolarFamulus II
Conergy SolarFamulus II Installation manual www.conergy.com Table of Contents Table of Contents SolarFamulus II for universal use on flat roofs 1 Introduction 1 1.1 Short description 1 1.2 Intended use
More informationThe following are details of the code requirements of the 2015 International Residential Code for single-story decks.
The following are details of the code requirements of the 2015 International Residential Code for single-story decks. The 2015 International Residential Code Section R507 contains additional information
More informationCopies of the written program may be obtained at Where are copies of this written plan kept? (Insert building/room, etc.).
Scaffolding Safety Procedures for Construction Purpose It is this company's purpose in issuing these procedures to further ensure a safe workplace based on the following formal, written procedures for
More informationScaffolding. Safety Guide. STOP! Before you climb
Scaffolding Safety Guide Printed FEB 2015 rebr. AUG 2016 Contents Safety Guide Disclaimer... 1 Safety Guide Objectives... 2 Roles & Responsibilities of Workplace Parties Employers, Supervisors, Workers...
More informationManagement Plan for Walking/Working Surfaces & Fall Protection (29 CFR , 23, 66 App.C; 29 CFR ) ISD #535
Management Plan for Walking/Working Surfaces & Fall Protection (29 CFR 1910.22, 23, 66 App.C; 29 CFR 1926.502) ISD #535 Health & Safety Office Maintenance Service Building 10 SE 9½ Street Rochester, MN
More informationCavity ShAftwall System
09 9 00/NGC Cavity shaftwall systems are non-load-bearing, -hour to -hour, fire-rated partitions constructed from one side used to enclose elevator shafts, stairs and mechanical shafts where the design
More informationDUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS
DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Purpose 1 Scope 1 Responsibilities 1 Scaffolding 2 Ladders
More informationP: F: Resi-Ply FORMING SYSTEM BY DAYTON SUPERIOR
Resi-Ply FORMING SYSTEM BY DAYTON SUPERIOR Resi-Ply System The Resi-Ply forming system is a 1 1 thick plywood with steel backing bars designed especially for residential foundations and low industrial
More informationCITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures
CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE - 268-5161 Residential Accessory Structures This information has been compiled for the benefit of any person
More informationINSULATION RETROFIT DESIGN ENERGY SOLUTIONS CENTRE YUKON GOVERNMENT
INSULATION RETROFIT DESIGN ENERGY SOLUTIONS CENTRE YUKON GOVERNMENT MAY 2009 prepared by N. A. JACOBSEN, P.Eng. CIVIL ENGINEERING CONSULTANT Whitehorse, Yukon ENERGY SOLUTIONS CENTRE YUKON GOVERNMENT MAY
More informationSPACE ONLY STAND FORM (To be filled by the Exhibitor)
SPACE ONLY STAND FORM (To be filled by the Exhibitor) FORM # 1 Company Name: Stand No.: Tel: Mobile: Fax: Website: We advise that the following contractor has been appointed to erect the above stand at
More informationCity of Hughson Building Safety Division 7018 Pine Street Hughson, CA (209)
City of Hughson Building Safety Division 7018 Pine Street Hughson, CA 95326 (209) 883-4054 RESIDENTIAL ATTACHED PATIO COVERS Patio covers are one story roofed structures not more than 12 feet above grade,
More informationOCCUPATIONAL HEALTH AND SAFETY ACT SCAFFOLDING REGULATIONS
c t OCCUPATIONAL HEALTH AND SAFETY ACT SCAFFOLDING REGULATIONS PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to October 28,
More informationOne and Two Family Additions
One and Two Family Additions An addition to a house, duplex, garage, or an accessory structure requires a building permit prior to performing any construction. Building Department & Permit Office Mon-Fri
More informationTAKING YOU TO NEW HEIGHTS IN SAFETY... kwikstage
limited one bay kwikstage stair unit user guide One Bay Stair Tower used in conjunction with Kwikstage System Scaffolding and designed to conform to all current British and European Standards. With only
More informationAgenda. Safety Decking Basics Decking Issues Felt Kick Out Flashing Fascia
Decking & Fascia Agenda Safety Decking Basics Decking Issues Felt Kick Out Flashing Fascia 2 Chapter 7 Tools & Materials Tools for Decking Hammer Measuring Tape Chalk Line Speed Square Utility Knife Circular
More informationFrameSAFE Site-Specific Fall Protection Plan Template. Instructions for Use DO NOT INCLUDE THIS PAGE IN YOUR MANUAL SAMPLE
FrameSAFE Site-Specific Fall Protection Plan Template Instructions for Use DO NOT INCLUDE THIS PAGE IN YOUR MANUAL Step 1: Complete Site-Specific Form Enter the site-specific information in the form on
More informationCUPLOK SGB CUPLOK SGB Group
CUPLOK USER S MANUAL CONTENTS Page Introduction 5 The CUPLOK locking procedure 6 CUPLOK safety information 7 General site safety 9 Core components 11 Scaffold system components 12 Ancillary components
More informationAdministrative Changes
Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings
More informationWe store: high. wide. deep. safe. Shelving racks. System C 50 single-tier multi-tier
We store: high. wide. deep. safe. Shelving racks System C 50 single-tier multi-tier With C 50 to a practice-oriented multi-tier and high rack The C 50 shelving rack is an especially efficient solution
More informationFACT SHEET #2 DECK INFORMATION
Borough of Doylestown Building and Zoning Department 57 West Court Street, Doylestown, PA 18901 215.345.4140 FACT SHEET #2 DECK INFORMATION BACKGROUND The provisions of the PAUCC. ICC Property Maintenance
More informationACE Jobsite Inspection Report Habitat for Humanity
For Internal Use Only Affiliate Name: Affiliate Address: Job Site Name: Job Site Address: Contact/Title: Phone: This report is the property of ACE USA and is for use only in conjunction with the sale of
More informationEXCEL MODULAR STANDARD SCAFFOLD COMPONENT TECHNICAL MANUAL
EXCEL MODULAR STANDARD SCAFFOLD COMPONENT TECHNICAL MANUAL EMSLC-TSM-1001 Engineering Approval: Lance Smith Manual Release Date: 04/25/2017 Release Authorization: ECN EMSLC-0191 Revision: AK TABLE OF
More informationShaftwall and Area Separation Wall Systems.
Shaftwall and Area Separation Wall Systems www.marinoware.com Marino\WARE S Fire Rated Wall Systems Quality that takes you to the top. Marino\WARE created its CT Shaftwall System, to be a flexible shaftwall
More informationSECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)
SECTION 13125 ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationIntroduction to the Trade
Lesson Plans for Module 31101-15 Introduction to the Trade Module 31101-15 introduces the scaffolding trade and its associated trade math, regulations, and standards; identifies commonly used scaffolding
More information4188 East Andrew Johnson Highway Morristown, TN
4188 East Andrew Johnson Highway Morristown, TN 37814 800-225-7814 education@precisionladders.com Super Simplex Disappearing Stairway Automatic Electric Disappearing Stairway Automatic Super Simplex FL
More informationTemporary Construction Loads Over I-Joist Roofs And Floors
T E C H N I C A L N O T E Temporary Construction Loads Over I-Joist Roofs And Floors Number J735C July 2012 During construction of light-frame structures it is common to see relatively heavy loads placed
More informationACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings
ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings Building Safety Department 400-2 nd Street South St. Cloud, MN 56301 (320) 255-7239 A building permit is required for any accessory
More informationColorado Chapter of the International Conference of Building Officials. Building Guide. The Colorado Chapter of the International
Building Guide Colorado Chapter of the International Conference of Building Officials Colorado Building Chapter of the International Guide Code Council Single Family Residential One Story Detached Garage
More informationConsequences Workers put in dangerous positions Fall
Legislations on Working at height 1 Inadequate Planning and provision for weather Misuse Unprotected edges and openings Structural elements incorrectly erected or installed Load insecurely attached These
More information(6) Crawl boards and ladders used for roof work shall be securely fastened over the ridge of the roof or be otherwise effectively anchored.
Newfoundland & Labrador - Terre-Neuve-et-Labrador Ladder Safety - Sécurité des échelles This material has been extracted from the Acts and Regulations of the Province to help students understand the subject.
More informationSpecial Provision No. 540S01 March OPSS 540, Construction Specification for Highway Fence, is deleted and replaced with the following:
HIGHWAY FENCE - Item No. BRACE PANELS - Item No. GATES - Item No. Special Provision No. 540S01 March 2006 AMENDMENT TO OPSS 540, MAY 1988 OPSS 540, Construction Specification for Highway Fence, is deleted
More informationCHAIN LINK FENCES AND GATES
SECTION 02831 CHAIN LINK FENCES AND GATES PART 1 GENERAL 1.01 SUMMARY A. Alternate Material for Fence Post and Framing Material: Where schedule 40 galvanized steel is specified, the following will be accepted:
More informationLINCOLN COUNTY REQUIRED INSPECTIONS (Last updated August 23, 2017)
LINCOLN COUNTY REQUIRED INSPECTIONS (Last updated August 23, 2017) It is the responsibility of the permit applicant to notify the building inspector when the work is ready for inspection. To request an
More information1 Man Mobile Aluminium Tower System
1 Man Mobile Aluminium Tower System Euro one, quick assembly, one person aluminum mobile tower Easy to erect and dismantle by one person with the base unit forming a trolley for fast storage and transportation.
More informationSpan 300 Instruction Manual
Span 300 Instruction Manual DESIGNATION SPAN300 Double Width EN 1004 3 8/12 XXCD SPAN 300 Single Width EN 1004 3 8/8 XXCD CEN designation of this instruction manual EN 1298 IM en Rev-00 WARNING NEVER STAND
More informationSAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS
SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS PERSONNEL DIVISION Revised 2002 CONTENTS Page 1 INTRODUCTION 1 2 APPLICATION 1 3 ERECTION AND INSPECTION 1 4 ERECTION 1 4.1 Before erection of tower
More information