COMPETENCY ANALYSIS PROFILE General Carpenter 403A. (All unshaded skill sets must be demonstrated/completed)

Size: px
Start display at page:

Download "COMPETENCY ANALYSIS PROFILE General Carpenter 403A. (All unshaded skill sets must be demonstrated/completed)"

Transcription

1 COMPETENCY ANALYSIS PROFILE General Carpenter 403A (All unshaded skill sets must be demonstrated/completed) PROTECT SELF AND OTHERS Apply safety legislation Use personal protective equipment Apply safety measures in the shop and on the job site Apply prescribed procedures at an accident or a hazard Apply fire safety practices ladders Set up ladders Work on ladders Maintain ladders Use rigging equipment Use swing stages Use powered elevated work plat Use spiders and bosun chairs OPERATE TOOLS AND EQUIPMENT Use hand tools Operate portable power tools Operate stationary power tools and equipment Design jigs and templates Use pre-fabricated and fabricated jigs and templates

2 ESTABLISH BUILDING PROCEDURES Perform traderelated calculations Prepare sketches Uses plans and sketches Communicate with co-workers, supervisors and other tradespersons Apply trade-related written and spoken information Establish procedures for installing premanufactured materials or equipment Manage work site Estimate material PREPARE SITE FOR BUILDING Prepare site for layout Lay out buildings according to plot and foundation plans Lay out piling and caissons for foundations and shore protection Install piling and caissons for foundations and shore protection Install shoring for trench, road and building stabilization Prepare ground for preserved wood foundation (PWF) and slab on grade Install underpinning Plan access and egress on job site

3 EXECUTE FORM WORK Lay out embedded steel embedded steel Install embedded steel Lay out footing footing Install footing Lay out for columns, piers and capitals for columns, piers and capitals Install for columns, piers and capitals Lay out wall wall Install wall Lay out templates to receive dowels and anchor bolts Build templates to receive dowels and anchor bolts Lay out beam and girder beam and girder Install beam and girder Lay out shoring shoring Install shoring Lay out suspended slab Install suspended slab Lay out slab-ongrade Install slab-ongrade Lay out stair stair Install stair Lay out for ramps and runways for ramps and runways Install for ramps and runways Lay out slip slip Install slip Lay out various movable wall form various movable wall form

4 EXECUTE FORM WORK - Cont d Install various movable wall form Lay out to encase structural steel Build to encase structural steel Install to encase structural steel Lay out insulated concrete insulated concrete Install insulated concrete Strip concrete Perform slump test on concrete Re-shore completed structures Store Place concrete Consolidate concrete Finish concrete Control rate of curing concrete Lay out locations of pre-cast and pre-stressed concrete Install pre-cast and prestressed concrete Lay out grout grout Install grout

5 FRAME FLOORS AND WALLS Lay out preserved wood foundation (PWF) preserved wood foundation (PWF) Install preserved wood foundation (PWF) Lay out floor Install floor Lay out walls for platform-style walls for platform-style Install walls for platform-style Lay out walls for balloon-style walls for balloon-style in Install walls for balloon-style Lay out energyefficient Lay out modular factory prefabricated units modular factory prefabricated units Install modular factory prefabricated units acoustic fire cavity and party walls Frame allowances for building services and utilities

6 FRAME ROOFS AND CEILINGS Lay out equal slope roofs equal pitch roofs Install equal pitch roofs Lay out ceiling joists and backing Install ceiling joists and backing Lay out unequal pitch roofs unequal pitch roofs Install equal and unequal pitch roofs Lay out preengineered sitebuilt preengineered sitebuilt Lay out manufactured Install manufactured Lay out a roof system for dormer openings dormer openings Install dormer openings Lay out dormers dormers Install dormers Lay out a roof system for skylight openings skylight openings Install skylight openings Lay out flat roofs flat roofs Install flat roofs Lay out ornamental roofs ornamental roofs Install ornamental roofs Install roof substrate

7 CONSTRUCT HEAVY FRAMING Lay out heavy floor heavy floor Install heavy floor and lay floor planking Lay out wood post and beam wood post and beam Install wood post and beam Lay out roof frame for post and beam structure roof frame for post and beam structure Install roof frame for post and beam structure Lay out wall fill-in for post and beam structure wall fillin for post and beam structure Install wall fill-in for post and beam structure Lay out timber timber Install timber Lay out position of on a wall Lay out ramps, runways, chutes, splash-boards, and bents (trestles) ramps, runways, chutes, splash-boards, and bents (trestle) Install ramps, runways, chutes, splash-boards, and bents (trestles) Lay out pole barns pole barns

8 BUILD STAIRS Lay out straight straight Install straight Lay out landings for landings for Install landings for Lay out winder winder Install winder Lay out prefabricated prefabricated Install prefabricated Lay out newel posts, handrails and balustrades newel posts, handrails and balustrades Install newel posts, handrails and balustrades INSTALL DOORS, FRAMES AND HARDWARE Lay out frames and movable partitions. frames and movable partitions. Install frames and movable partitions Lay out door door Install door Lay out overhead doors, rollup shutters and roll-up doors Install overhead doors, rollup shutters and roll-up doors Lay out manual and electricalactivated hardware Install manual and electrical-activated hardware INSTALL WINDOWS Install exterior window Lay out interior windows interior windows Install interior windows

9 INSTALL EXTERIOR FINISHING MATERIALS Lay out exterior siding and trim siding Install siding trim Install exterior siding and trim Lay out cornice cornice Install cornice Lay out roof coverings, roof vents and flashing roof coverings, roof vents and flashing Install roof coverings, roof vents and flashing Lay out exterior decks exterior decks Install exterior decks INSTALL FINISHED MATERIALS TO WALLS AND CEILINGS Lay out wall and ceiling for finishes wall and ceiling for finishes Prepare wall and ceiling for finishes Install acoustic and thermal insulation and vapour barriers Apply energyefficient construction techniques Lay out wall and ceiling coverings wall and ceiling coverings Install wall and ceiling coverings Lay out suspended ceiling suspended ceiling Install suspended ceiling

10 INSTALL INTERIOR FINISHING MATERIALS AND HARDWARE Lay out vertical trim horizontal and vertical trim Install horizontal and vertical trim Lay out millwork millwork Install millwork Lay out prefabricated kitchens, bathrooms, vanities and countertops Install prefabricated kitchens, bathrooms, vanities and countertops Lay out wood, composite and other manufactured finished and unfinished floors and accessories, underlay, and special base preparations wood, composite and other manufactured finished and unfinished floors and accessories, underlay, and special base preparations Install wood, composite and other manufactured finished and unfinished floors and accessories, underlay, and special base preparations Lay out demountable wall demountable wall Install demountable wall Dismantle demountable wall Lay out arena seating arena seating Install arena seating Select materials to receive finishes Lay out interior hardware Install interior hardware

11 PERFORM LANDSCAPE AND SITE WORK Lay out fences, guard rails, blast walls, protective barriers, sound barriers and retaining walls fences, guard rails, blast walls, protective barriers, sound barriers and retaining walls Install fences, guard rails, blast walls, protective barriers, sound barriers and retaining walls Lay out benches and timber steps benches and timber steps Install benches and timber steps Lay out docks, piers, bridges and gazebos docks, piers, bridges and gazebos Install docks, piers, bridges and gazebos Lay out traffic and pedestrian control traffic and pedestrian control Install traffic and pedestrian control Lay out recreational site recreational site Install recreational site PERFORM RENOVATIONS Protect existing structures Remove interior finishes and exterior finishes Alter existing structures Lay out new structural new structural Install new structural

12 ERECT AND DISMANTLE SCAFFOLDS Lay out wood scaffolds wood scaffolds Install wood scaffolds Dismantle wood scaffolds Lay out sectional frame access sectional frame access Install sectional frame access Dismantle sectional frame access Lay out rolling rolling Dismantle rolling Lay out tube and clamp tube and clamp Install tube and clamp Dismantle tube and clamp Lay out system system Install system Dismantle system hanging scaffolds CUT AND WELD MILD STEEL Cut mild steel using quick cut, grinder, metal cutoff saw and reciprocating saw Set up oxy-fuel cutting equipment Cut mild steel with oxy-fuel equipment Set up shielded metal arc welding equipment Prepare for welding Weld with the shielded metal arc welding (SMAW) process

13 PROTECT THE ENVIRONMENT Reduce waste production Reuse materials Recycle waste materials Prevent toxic spills and emissions

Carpenter Level 2 Rev. September 2017

Carpenter Level 2 Rev. September 2017 Level 2 A5 Site Layout II Duration: 14 hours 7 hours 7 hours Upon completion of this unit the apprentice will demonstrate knowledge of site layout tools and equipment and their applications and procedures

More information

Apprenticeship and Industry Training

Apprenticeship and Industry Training 1. Apprenticeship and Industry Training Carpenter Apprenticeship Course Outline 002.1 (2015) INNOVATION AND ADVANCED EDUCATION CATALOGUING IN PUBLICATION DATA Apprenticeship and Industry Training: Carpenter

More information

Atlantic Workforce Partnership. Curriculum Standard CARPENTER. Version: 2016 Revised: N/A. Atlantic Apprenticeship

Atlantic Workforce Partnership. Curriculum Standard CARPENTER. Version: 2016 Revised: N/A. Atlantic Apprenticeship Atlantic Workforce Partnership Curriculum Standard CARPENTER Version: 2016 Revised: N/A Atlantic Apprenticeship Preface This Atlantic Apprenticeship Curriculum Standard is intended to assist instructional

More information

Appendix 3G Wood First Matrix

Appendix 3G Wood First Matrix Appendix 3G Wood First Matrix Project Co will use wood in the Design of the Acute Care Facility in accordance with the following table, using wood where it is marked as subject to any comments set out

More information

WORK PROCESSES SCHEDULE ACOUSTICAL CARPENTER SPECIALIST O*NET/SOC CODE: RAIS CODE: 0861

WORK PROCESSES SCHEDULE ACOUSTICAL CARPENTER SPECIALIST O*NET/SOC CODE: RAIS CODE: 0861 WORK PROCESSES SCHEDULE ACOUSTICAL CARPENTER SPECIALIST O*NET/SOC CODE: 47-2081.01 RAIS CODE: 0861 The following schedule is an example of work experience (OJT) and training considered necessary to develop

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

National Craft Assessment and Certification Program S P E C I F I C A T I O N S National Craft Assessment and Certification Program S P E C I F I C A T I O N S Industrial Carpentry V5 TBD Focus Statement An industrial carpenter erects concrete forms, plumb, level and to grade; places

More information

2003 International Residential Building Code

2003 International Residential Building Code 2003 International Residential Building Code Section R305 Ceiling Height Habitable rooms, hallways, corridors, bathrooms, toilet rooms, laundry rooms and basements shall have a ceiling height of not less

More information

CARPENTRY. Fundamentals Level One. Competencies / Objectives MODULE ORIENTATION TO THE TRADE

CARPENTRY. Fundamentals Level One. Competencies / Objectives MODULE ORIENTATION TO THE TRADE National Center for Construction Education & Research 3600 NW 43rd St, Bldg G, Gainesville, FL 32606 Tel: (352) 334-0920 Fax: (352) 334-0931 E-mail: info@nccer.org CARPENTRY Competencies / Objectives Fundamentals

More information

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2) Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction

More information

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017 Premier Inn, Wilson Street, Middlesbrough, TS1 1AE Site progress report February 2017 Site set up Currently 4 weeks in to the build the site has been cleared and hoardings have been erected. Welfare cabins

More information

Davis Frame Co., Inc. Construction Budget Considerations

Davis Frame Co., Inc. Construction Budget Considerations Davis Frame Co., Inc. Construction Budget Considerations ITEM BID 1 BID 2 BID 3 MISCELLANEOUS COSTS Surveying Building Permit Engineering Fees Interest on Construction Loan Property Taxes Hazard & Liability

More information

Steps in Building a Shed

Steps in Building a Shed Steps in Building a Shed The design and location of your new shed will depend on how it will be used - a shed for storing tools will be much simpler than one you intend to use as a small shop. For example,

More information

DIVISION 05 METALS Commissioning of Metals STRUCTURAL METAL FRAMING Structural Steel Framing

DIVISION 05 METALS Commissioning of Metals STRUCTURAL METAL FRAMING Structural Steel Framing DIVISION 05 METALS 05 00 00 METALS 05 01 00 Maintenance of Metals 05 01 10 Maintenance of Structural Metal Framing 05 10 20 Maintenance of Metal Joists 05 10 30 Maintenance of Metal Decking 05 10 40 Maintenance

More information

Appendix A WORK PROCESS SCHEDULE AND RELATED INSTRUCTION OUTLINE

Appendix A WORK PROCESS SCHEDULE AND RELATED INSTRUCTION OUTLINE Appendix A WORK PROCESS SCHEDULE AND RELATED INSTRUCTION OUTLINE Appendix A WORK PROCESS SCHEDULE OCCUPATION TITLE: CARPENTER O*NET-SOC CODE: 47-2031.00 RAPIDS CODE: 0067 This schedule is attached to and

More information

SOL UTIONS LIVING SOLUTIONS LIVING SOLUTIONS

SOL UTIONS LIVING SOLUTIONS LIVING SOLUTIONS Buyer s Guide HOMES 1300 985 110 LIVING SUPPORT SOLUTIONS 2 BCDS0868 Contents Just imagine the space you can create 4 More reasons to choose SmartSpace 8 SmartSpace Project Planner 9 Design your SmartSpace

More information

STATE PREFERENTIAL PROPERTY TAX ASSESSMENT PROGRAM

STATE PREFERENTIAL PROPERTY TAX ASSESSMENT PROGRAM GEORGIA DEPARTMENT OF NATURAL RESOURCES (DNR) - HISTORIC PRESERVATION DIVISION (HPD) PART A PRELIMINARY CERTIFICATION Section I Property and Owner Information STATE PREFERENTIAL PROPERTY TAX ASSESSMENT

More information

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST This list is provided as a guide to help you understand the information that must be contained on the construction drawings. This list is not all-inclusive of all building codes but is used as a general

More information

NEW CONSTRUCTION ADDENDUM TO COA APPLICATION

NEW CONSTRUCTION ADDENDUM TO COA APPLICATION NEW CONSTRUCTION ADDENDUM TO COA APPLICATION Property Owner Address City, ST Zip Phone Fax Street Address Tax Parcel Historic ID C N P F I HPC HDC Staff Project Description: Check all that apply. Primary

More information

Building Systems and Design Elements included in SliDeRulE

Building Systems and Design Elements included in SliDeRulE Building Systems and Design Elements included in SliDeRulE No. System Subsystem Design Element 1.1.1 Foundation Deep Foundation Steel H-pile 1.1.2 Foundation Deep Foundation Steel pipe pile 1.1.3 Foundation

More information

Smarter. Safer. Leaner.

Smarter. Safer. Leaner. Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter

More information

Walking-Working Surfaces

Walking-Working Surfaces Walking-Working Surfaces 29 CFR Part 1910 Subpart D Presented by: ETTA, OSH Division 919-807-2875 Objectives 29 CFR 1910, Subpart D In this course, we will discuss the following: Hazards Definitions General

More information

INTERIOR FINISHES CHAPTER 8

INTERIOR FINISHES CHAPTER 8 CHAPTER 8 INTERIOR FINISHES SECTION 801 GENERAL 801.1 Scope. Provisions of this chapter shall govern the use of materials used as interior finishes, trim and decorative materials. 801.1.1 Interior finishes.

More information

RESIDENTIAL BUILDING PLAN REQUIREMENTS

RESIDENTIAL BUILDING PLAN REQUIREMENTS CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us RESIDENTIAL BUILDING PLAN REQUIREMENTS

More information

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT 1 East Franklin Street Phone: 301-790-4163 Third Floor Hagerstown, MD 21740 Fax: 301-791-2650 BUILDING PERMIT APPLICATION FOR RESIDENTIAL ACCESSORY

More information

SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC Permit Requirements

SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC Permit Requirements SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC. 320-226.5189 www.101developmentresources.com While every attempt has been made to insure the correctness of this handout, no guarantees are made to its accuracy

More information

Concrete. Conveying Systems. Doors, Windows & Interiors

Concrete. Conveying Systems. Doors, Windows & Interiors Concrete Concrete : Cast-in-Place Concrete Concrete : Cementitious Decks Concrete : Concrete Accessories Concrete: Concrete Block & Brick Concrete : Concrete Coring & Sawing Concrete : Concrete Curing

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012)

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012) Gaines Charter Township 8555 Kalamazoo Ave SE Caledonia MI 49316 PH: 616 698-6640 Fax: 616 698-2490 www.gainestownship.org Building Department Statement of Special Inspections Michigan Building Code 2012

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION HANGERS AND SUPPORTS FOR PLUMBING SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Elevated Slab Sequence

Elevated Slab Sequence Elevated Slab Sequence The following group of photos shows the sequence for installa4on of a one- way elevated slab. (Slab & Beam with Reinforcing & Post- Tensioning) Columns Placed & Form Support (Scaffolding)

More information

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1%

CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE 01. GENERAL ADMINISTRATION 6% Project Administration 1% CALIFORNIA COMMERCIAL BUILDING INSPECTOR CONTENT OUTLINE EXAM ID: I1 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 6% 0101. Project Administration 1% Verify that

More information

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM ARCHITECTURAL SPECIFICATIONS MANUFACTURER: InterBlock LLC PO Box 1123, Sheboygan, WI 53082 Phone Number 920-207-7234 SECTION 03100 STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM PART 1 GENERAL 1.01 Summary

More information

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION SUPPORTS AND ANCHORS

OSU PROJECT NO PAGE 1 02 NOV 2006 SECTION SUPPORTS AND ANCHORS OSU PROJECT NO. 30-04-15 PAGE 1 PART 1 GENERAL 1.1 WORK INCLUDED A. Supports and anchors for piping systems and equipment. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. The provisions of Section 15050, Basic

More information

CONTENTS. Using Advanced CAD to Create 2D and 3D Objects in Chief Architect 1. Introduction..2

CONTENTS. Using Advanced CAD to Create 2D and 3D Objects in Chief Architect 1. Introduction..2 CONTENTS SECTION 1 Using Advanced CAD to Create 2D and 3D Objects in Chief Architect 1 Introduction..2 CHAPTER 1 THE BASIC EDIT TYPES 3 Steps: Working with the Different Edit Types...3 Can You Do It?...11

More information

The Cabin Shell Series

The Cabin Shell Series The Cheyenne 1,512 sq ft 1.5 Story 3 Bedrooms 2 Bathrooms Effective June 2014 The Cheyenne DOWNSTAIRS UPSTAIRS EXAMPLE FINISH STANDARD FLOORPLAN Options Pricing Description Retail UoM Deck Wood Floor -

More information

SECTION STEEL DECKING

SECTION STEEL DECKING SECTION 05 31 00 STEEL DECKING SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Refer to Section 05 36 00, COMPOSITE METAL DECKING for floor

More information

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER THE CORPORATION OF THE MUNICIPALITY OF SOUTH HURON 322 Main Street South, P.O. Box 759, Exeter, Ontario N0M 1S6 PHONE: (519) 235-0310 FAX: (519) 235-3304 TOLL FREE: 1-877-204-0747 WEBSITE: www.southhuron.ca

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The General Conditions, Special Conditions and Division 1 through Division 22 as set forth in

More information

THE UNIVERSITY OF ALABAMA AT BIRMINGHAM (UAB) BIRMINGHAM, ALABAMA

THE UNIVERSITY OF ALABAMA AT BIRMINGHAM (UAB) BIRMINGHAM, ALABAMA Print Form THE UNIVERSITY OF ALABAMA AT BIRMINGHAM (UAB) BIRMINGHAM, ALABAMA PROJECT NAME/NO: Bartow Arena Roof Replacement 617 13th Street South Birmingham, AL STANDING ADDENDUM NO. 1 MINORITY BUSINESS

More information

A 16' x 28' Cottage with two lofts and a bedroom addition. Plans can be modified for simple or expanded layouts.

A 16' x 28' Cottage with two lofts and a bedroom addition. Plans can be modified for simple or expanded layouts. A 16' x 28' Cottage with two lofts and a bedroom addition. Plans can be modified for simple or expanded layouts. Here is a very livable small house. The main house section is 16' wide by 28' long with

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Steel pipe hangers and supports. 2. Metal framing systems. 3. Thermal-hanger shield inserts. 4. Fastener systems.

More information

INTERIOR FINISHES CHAPTER 8

INTERIOR FINISHES CHAPTER 8 CHAPTER 8 INTERIOR FINISHES SECTION 801 GENERAL 801.1 Scope. Provisions of this chapter shall govern the use of materials used as interior finishes, trim and decorative materials. 801.2 Interior wall and

More information

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 13686.00 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 230529-1 SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 1.1 SUMMARY A. Section Includes: 1. Metal pipe hangers and supports.

More information

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc. Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc. Franklin County Septic & Zoning permit application: A septic and zoning permit is required for residential or commercial

More information

Daytona Beach Pier Building Renovation Jun 2010

Daytona Beach Pier Building Renovation Jun 2010 SECTION 15060 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

The City of Winnipeg SECTION ST. VITAL LIBRARY RENOVATION PROJECT 6 FERMOR AVE. Page 1 of 5

The City of Winnipeg SECTION ST. VITAL LIBRARY RENOVATION PROJECT 6 FERMOR AVE. Page 1 of 5 The City of Winnipeg SECTION 05 50 00 METAL FABRICATIONS ST. VITAL LIBRARY RENOVATION PROJECT 6 FERMOR AVE. Page 1 of 5 Part 1 General 1.1 REFERENCES.1 American Society for Testing and Materials International,

More information

The Homeowner s Building Application Checklist for Constructing a Residential Addition

The Homeowner s Building Application Checklist for Constructing a Residential Addition The Homeowner s Building Application Checklist for Constructing a Residential Addition This checklist provides homeowners a summary of the Building Permit submission requirements for constructing a residential

More information

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies MasterFormat LEVEL TWO NUMBERS AND TITLES Introductory Information 00001 Project Title Page 00005 Certifications Page 00007 Seals Page 00010 Table of Contents 00015 List of Drawings 00020 List of Schedules

More information

Residential Building Inspections

Residential Building Inspections Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Wall Panels. Structural wall panel. Architectural wall panel. Cladding wall panel. Sandwich wall panel

Wall Panels. Structural wall panel. Architectural wall panel. Cladding wall panel. Sandwich wall panel Wall Panels Structural wall panel Architectural wall panel Cladding wall panel Sandwich wall panel Wall Panels Assorted styles and colours Reveals and other patterns Painted finish Bolted, welded and knife

More information

LINCOLN COUNTY REQUIRED INSPECTIONS (Last updated August 23, 2017)

LINCOLN COUNTY REQUIRED INSPECTIONS (Last updated August 23, 2017) LINCOLN COUNTY REQUIRED INSPECTIONS (Last updated August 23, 2017) It is the responsibility of the permit applicant to notify the building inspector when the work is ready for inspection. To request an

More information

Reliant Holdings Ltd Safety Management System

Reliant Holdings Ltd Safety Management System Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 7 Purpose The purpose of this program is to prevent injuries due to falls from elevated work areas and ensure employees

More information

THE STRATA UNIT May 25, 2008

THE STRATA UNIT May 25, 2008 THE STRATA UNIT May 25, 2008 Over the years, we have been asked time and time again from our experience as a cost consultant and a project manager from both a restoration and renovation point of view What

More information

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the

More information

INTERIOR FINISHES CHAPTER 8

INTERIOR FINISHES CHAPTER 8 CHAPTER 8 INTERIOR FINISHES SECTION 801 GENERAL 801.1 Scope. Provisions of this chapter shall govern the use of materials used as interior finishes, trim and decorative materials. 801.2 Interior wall and

More information

AISC Steel & Timber Research for High-Rise Residential Buildings

AISC Steel & Timber Research for High-Rise Residential Buildings AISC Steel & Timber Research for High-Rise Residential Buildings Final Report December 4 th, 2017 SOM Designed Benchmark Concrete Building Skidmore, Owings, and Merrill, LLP 2017 224s Michigan Avenue Suite

More information

Project #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50

Project #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50 Project #1139 Budget #82 $ Budgeted $ Billed to Date $ Paid to Date $ Due 210,087.68 120,979.20 120,979.20 77,158.50 Deposit Paid Deposit Due Phase I: Project Programming and Research $ Budgeted $ Billed

More information

Project Address: Name of Person Completing Form:

Project Address: Name of Person Completing Form: Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties

More information

STRUCTURAL ABBREVIATIONS S-001 GENERAL NOTES CONCRETE MASONRY NOTES DESIGN NOTES SOF NSWG-10 UAS SUPPORT FACILITY FY 2016 MILCON P-225

STRUCTURAL ABBREVIATIONS S-001 GENERAL NOTES CONCRETE MASONRY NOTES DESIGN NOTES SOF NSWG-10 UAS SUPPORT FACILITY FY 2016 MILCON P-225 GENERAL NOTES DESIGN NOTES (CONTINUED) FOUNDATION NOTES STRUCTURAL ABBREVIATIONS CONCRETE MASONRY NOTES DESIGN NOTES S-001 CONCRETE NOTES COLD-FORMED STEEL FRAMING NOTES PRE-ENGINEERED METAL BUILDING NOTES

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

RESIDENTIAL CONSTRUCTION New Dwellings and Additions How to Obtain a Building Permit For RESIDENTIAL CONSTRUCTION New Dwellings and Additions MIAMI COUNTY, KANSAS CODE SERVICES DEPARTMENT 201 South Pearl Street, Suite 201 Paola, Kansas 66071-1777 Phone:

More information

One and Two Family Additions

One and Two Family Additions One and Two Family Additions An addition to a house, duplex, garage, or an accessory structure requires a building permit prior to performing any construction. Building Department & Permit Office Mon-Fri

More information

INTERNSHIP REPORT GOUTHAM.J

INTERNSHIP REPORT GOUTHAM.J INTERNSHIP REPORT GOUTHAM.J M.E Structural Engineering SNS College of Technology, Coimbatore Mail : tcegoutham@gmail.com TEEMAGE PRECAST IN College Road, 1st Cross Street, Tirupur 641602. TamilNadu, India.

More information

SoftWall Partitions and Curtains

SoftWall Partitions and Curtains SoftWall Partitions and Curtains The Ultimate in Cost- Effective Flexibility An Excellent Alternative to Rigid Wall Construction An Excellent Alternative Soper s Softwall Enclosures are easy to install,

More information

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION Permit No. 175 Beaver Drive, P.O. Box 486 DuBois, PA 15801 Phone: 814-375-1111 Fax: 814-375-1117 Toll Free: 855-PENNSAF LOCATION OF PROPOSED

More information

St. Louis County Department of Public Works Division of Code Enforcement. When is a Building Permit required for Residential Projects?

St. Louis County Department of Public Works Division of Code Enforcement. When is a Building Permit required for Residential Projects? St. Louis County Department of Public Works Division of Code Enforcement When is a Building Permit required for Residential Projects? BUILDING CONSTRUCTION WORK A Building Permit is required to construct,

More information

Residential fall protection

Residential fall protection Data Sheet 751 Rev. Oct. 2016 Residential fall protection This data sheet includes multi-level residences and similar structures, with and without basements. This is a best practice guide to highlight

More information

GETTING STARTED... 2 YOUR LIST OF PRODUCTS... 2 WHAT THAT LIST BECOMES... 2 PRODUCTS CREATED AS ENVISIONEER ELEMENTS... 3

GETTING STARTED... 2 YOUR LIST OF PRODUCTS... 2 WHAT THAT LIST BECOMES... 2 PRODUCTS CREATED AS ENVISIONEER ELEMENTS... 3 Creation Using a custom Envisioneer database allows you to apply your real world products to each of your Envisioneer designs and estimates. We will create for you an openly configurable database of your

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT Page 220529-1 SECTION 220529 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

DETAIL DRAWINGS. RASTRA is a stay-in-place insulated concrete. form that is structurally strong, energy-efficient,

DETAIL DRAWINGS. RASTRA is a stay-in-place insulated concrete. form that is structurally strong, energy-efficient, DETAIL DRAWINGS RASTRA is a stay-in-place insulated concrete form that is structurally strong, energy-efficient, soundproof, resistant to fire, high wind, mold and rodents and is made from 85% recycled

More information

SECTION HANGERS AND SUPPORTS PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section.

SECTION HANGERS AND SUPPORTS PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section. 1.01 RELATED DOCUMENTS SECTION 15060 HANGERS AND SUPPORTS PART 1 - GENERAL A. Drawings and Division 1 Specification Sections, apply to this Section. 1.02 SUMMARY A. This Section includes hangers and supports

More information

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges. STANDARD BRIDGE & CULVERT COMPONENTS Alberta Bridge Inventory In Alberta there are about 13,300 bridges. Types of bridges in Alberta: Standard bridges 3521 (26%) Bridge size culverts 8348 (63%) Major bridges

More information

Totaling approximately 617,000

Totaling approximately 617,000 Totaling approximately 617,000 sq. ft, the mixed-use Embassy Suites hotel development is among the largest of several newly built hotels in the business district adjoining New York s bustling Wall Street

More information

Applying for Permits to build a new house in Linn County

Applying for Permits to build a new house in Linn County Planning & Development Linn County, Iowa Building Division Linn County Building Code Residential Guidelines Single Family Dwellings Page 1 of 4 Applying for Permits to build a new house in Linn County

More information

Project s fiche INOV. Frisomat Case study project's fiche INOV

Project s fiche INOV. Frisomat Case study project's fiche INOV Project s fiche INOV Clear Flatro building 49 metres long The Flatro industrial building in Villers-le-Bouillet measures 15 metres by 49 metres and is 6 metres high. The building rests on concrete plinths

More information

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco

More information

Section Safety Section Cleanup. None Required

Section Safety Section Cleanup. None Required January 2000 Page 1 of 6 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED SECTIONS PART 2 PRODUCTS The General Conditions of the Contract, General Requirements, and Supplemental

More information

References. EM , Sections 22 OSHA 29CFR (Subpart L ) UFGS [Latest] ANSI A

References. EM , Sections 22 OSHA 29CFR (Subpart L ) UFGS [Latest] ANSI A References EM385-1-1, Sections 22 OSHA 29CFR 1926.450 (Subpart L ) UFGS-01 35 29[Latest] ANSI A10.8-1988 What Is A Scaffold? An elevated, temporary work platform Three basic types: Supported scaffolds

More information

Loseke Technologies, Inc. p r e s e n t s

Loseke Technologies, Inc. p r e s e n t s p r e s e n t s A Tour of PrecisionPlus Building Software for the Future Introduction would like to take this opportunity to thank you for your interest in PrecisionPlus, the leading metal building design,

More information

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 29 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply

More information

Mobile Light No HABS No. ALA-780 (Middle Bay Light) Middle of Mobile Bay ' Mobile County ' Alabama HABS ALA, U9-M0BI, 116-

Mobile Light No HABS No. ALA-780 (Middle Bay Light) Middle of Mobile Bay ' Mobile County ' Alabama HABS ALA, U9-M0BI, 116- Mobile Light No. 6639 HABS No. ALA-780 Middle of Mobile Bay ' Mobile County ' Alabama HABS ALA, U9-M0BI, 116- WRITTEN HISTORICAL AND DESCRIPTIVE DATA Historic American Buildings Survey.^pr. Office of Archeology

More information

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire Additional Instructions and Clarifications 1. Please review ARC 4496 before beginning the project identification

More information

DOUBLE-WIDE SUPPORT PIER PLAN (TYPICAL)

DOUBLE-WIDE SUPPORT PIER PLAN (TYPICAL) DOUBLE-WIDE SUPPORT PIER PLAN (TYPICAL) PERIMETER PIER SUPPORT @ OPENINGS I-BEAM PIER LOCATIONS - MAXIMUM END PIER SPACING ALLOWED MATE LINE PIER LOCATIONS - MAXIMUM END PIER SPACING ALLOWED MAX GAP ALLOWED

More information

ALL STEEL SHED FRAMES

ALL STEEL SHED FRAMES ALL STEEL SHED FRAMES ABOVE DISPLAY IS AN 8X8 PORTABLE STEEL SHED FRAME WITH FLOOR STRUTS ON 2 FT CENTER SPACING USING QUICK BUILD CONNECTORS - 3 DOOR IS PLACED IN SHORT WALL (configuration of steel may

More information

CONSTRUCTION AND RENOVATION FUNDED BY THE CFI EXAMPLE OF A DETAILED COST ALLOCATION METHOD

CONSTRUCTION AND RENOVATION FUNDED BY THE CFI EXAMPLE OF A DETAILED COST ALLOCATION METHOD CONSTRUCTION AND RENOVATION FUNDED BY THE CFI EXAMPLE OF A DETAILED COST ALLOCATION METHOD March 2009 CONSTRUCTION AND RENOVATION FUNDED BY THE CFI Prepared For: CANADA FOUNDATION FOR INNOVATION 230 QUEEN

More information

Colorado Chapter of the International Conference of Building Officials. Building Guide. The Colorado Chapter of the International

Colorado Chapter of the International Conference of Building Officials. Building Guide. The Colorado Chapter of the International Building Guide Colorado Chapter of the International Conference of Building Officials Colorado Building Chapter of the International Guide Code Council Single Family Residential One Story Detached Garage

More information

FACT SHEET #2 DECK INFORMATION

FACT SHEET #2 DECK INFORMATION Borough of Doylestown Building and Zoning Department 57 West Court Street, Doylestown, PA 18901 215.345.4140 FACT SHEET #2 DECK INFORMATION BACKGROUND The provisions of the PAUCC. ICC Property Maintenance

More information

Building Codes and Ordinances ARC 227

Building Codes and Ordinances ARC 227 Building Codes and Ordinances ARC 227 Week 6 Fire Resistive Construction 03.02.10 Instructor: Rick Staub, AIA Email: staub@pointonearchitects.com Phone: 860-434-7707 Fire Resistive Construction Passive

More information

Scaffolding. Safety Guide. STOP! Before you climb

Scaffolding. Safety Guide. STOP! Before you climb Scaffolding Safety Guide Printed FEB 2015 rebr. AUG 2016 Contents Safety Guide Disclaimer... 1 Safety Guide Objectives... 2 Roles & Responsibilities of Workplace Parties Employers, Supervisors, Workers...

More information

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity System Codes and Criteria Design Codes and Standards The design code used is the Wisconsin Administrative Code along with the State of Wisconsin Department of Commerce-Safety & Buildings Chapters Comm

More information

STANDARD PRACTICE INSTRUCTION

STANDARD PRACTICE INSTRUCTION STANDARD PRACTICE INSTRUCTION DATE: March 1, 2001 SUBJECT: Scaffolding Safety Program. REGULATORY STANDARDS: 29 CFR 1910.28 Safety Requirements For Scaffolding. 29 CFR 1910.29 Manually Propelled Mobile

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 DEFINITIONS

More information

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers. SECTION 05 31 13 STEEL FLOOR DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification

More information

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will

More information

CONSTRUCTION SMARTSCREEN

CONSTRUCTION SMARTSCREEN 6704 Level 1 Construction Trade Occupations - 325 + VAT (SS6704-LV1 ) Unit 102 - Construction Trade Occupations - Painting and Decorating Unit 103 - Construction Trade Occupations - Plastering Unit 104

More information

Alberta Construction Trade Definitions

Alberta Construction Trade Definitions Alberta Construction Trade Definitions 2014 1 of 114 Section Trade Scope Page 1 Introduction 4 2 Trade Associations 4 3 Building Information Modeling (BIM) 5 4 Commissioning 6 5 Piling - timber; pipe;

More information