1 BID ADDENDUM #04 (BID # ) Greenwich Public Schools District Wide Renovations WMS Curtainwall Replacement 290 Greenwich Avenue Greenwich, CT Date: December 23rd, 2013 This Addendum is to provide answers to questions recieved and modifies the original bidding documents issued for bid on November 19, 2013 and consists of seventy-seven (77) 8 1/2 x 11 pages. Questions Recieved: Q.1: A.1: Q.2: Some frames show curtainwall details at the head and window at the sill. RE W-26/A732. Window type W-26 should be referencing curtainwall details on A733/1&2, and A738/81. W-10 on A731 shows vertical detail 36. Detail 36 on A735 is a jamb detail. Please clarify. A.2: Vertical detail 36 on A731 should be changed to show Detail 33 on A735 Q.3: Where do we include the allowance on the bid form? A.3: The construction allowance is included on the bid form, on page 2. Q.4: Section Item 1.2 C B Attached makes reference to testing. Please advise the extent of this testing. A.4: The extent of the testing will be to ensure the curtainwall system is installed as per manufacturers quality and standards requirements. Q.5: This spec indicates A report of the presence of asbestos is on file for review and use. Can you provide this report? If this is the AHERA 3 year re-inspection it will not satisfy the regulations requiring inspections for asbestos prior to renovation. A.5: Section Asbestos Abatment has been included in this addendum. Q.6 Have the caulks/glazing/substrates affected by this project been tested for PCB as required for funding by the CT SFU? If not will we be providing unit prices for caulk/glazing/substrate removal if required? A.6: Please see Section Asbestos Abatement included in this addendum. Q.7: Drawing A001 Note R31 indicates that abatement of pipe insulation will likely be required. Will this be bid by unit price?

2 Q.8: Specification Section references Asbestos Abatement specified elsewhere in the documents, where can we find that information? A.8: Please see Section Asbestos Abatement included in this addendum. Q.9: A200 Note R1 refers to Abatement Documents, will there be an asbestos specification issued for this bid? A.9: Please see Section Asbestos Abatement included in this addendum. Q.10: A200 Note R15 refers to chalkboard and tackboards, is there asbestos glue related to these items? A.10: Please see Section Asbestos Abatement included in this addendum. Revisions to Project Specifications: 1. ADD Section Asbestos Abatement attached.

3 ASBESTOS REMOVAL SPECIFICATION 176/12ASB for 290 Greenwich Ave. Greenwich, CT at 1 Western Jr. Parkway Greenwich, CT prepared by ENVIRONMENTAL ASSESSMENTS & SOLUTIONS, Inc. 144 Euclid Ave. Ardsley, NY Section /15/12-1/07/12/ /13 01/09/13 1 Inspection Inspection Report Specification EAS, Inc.

4 ASBESTOS ABATE"MENT ENVIRONMENTAL ASSESSMENTS & SOLUTIONS, Inc. 144 Euclid Ave. Ardsley, NY (914) ; (914) (fax); (914) (cell) January 9, 2013 Mr. Ron Marten Director of Facilities 290 Greenwich Ave. Greenwich, CT Project: Site: Scope: Project ACMs: Project PCBs: 176/12ASB Western Middle School Curtainwall Replacement Project Asbestos Removal Specification Yes - Asbestos Removal Required No Dear Mr. Marten: Environmental Assessments & Solutions, Inc. has prepared an asbestos removal specification to address the asbestos containing materials (ACMs) identified during our pre-renovation inspection for the planned cutrainwall replacement project at Western Middle School. Please review our asbestos pre-renovation inspection report ASB dated 1/07/13. This specification assumes NO student occupancy during the asbestos work. The specification also assumes that all asbestos removal work will be conducted as exterior work using manual methods that do not render the asbestos materials friable or create any visible emissions during work. If there will be ANY student occupancy during this asbestos project, an Occupancy Variance will be required by CT State DPH prior to work commencement. If you have any questions, please do not hesitate to contact us. Sincerely, ENVIRONMENTAL ASSESSMENTS & SOLUTIONS, Inc. Charles Schwartz, MPH President Section EAS, Inc.

5 WESTERN :MIDDLE SCHOOL CURTAINW ALL REPLACEl'v.IENT PROJECT ASBESTOS ABATEl'v.IENT TABLE OF CONTENTS Part 1 - General Conditions: 1.1 Related Documents 1.2 Pre-Abatement Meeting 1.3 Pre-Abatement Submittals 1.4 Prior to Commencement of Work 1.5 Submittals During Abatement 1.6 Submittals at Completion of Abatement Part 2 - Project Specific Conditions: 2.1 Pre-Renovation Inspection Report 2.2 Scope of Work 2.3 Description of Work 2.4 Sequence of Work Part 3 - Materials & Equipment: 3.1 Materials 3.2 Tools and Equipment Part 4 - Work Methods: 4.1 Equipment Removal Procedures 4.2 Preparation of Work Area 4.3 Worker Decontamination Enclosure System 4.4 Separation of Work Areas from Occupied Areas 4.5 Maintenance of Enclosure Systems 4.6 Asbestos Removal 4.7 Inspection of Asbestos Projects 4.8 Order to Cease Activity 4.9 Clean-up Procedures 4.10 Reinstallation of Displaced Equipment 4.11 Disposal of Asbestos Waste 4.12 Additional Requirements Section EAS, Inc.

6 TABLE OF CONTENTS (continued) Part 5 - Air Monitoring: Air Monitoring During Work 5.2 Milestone Inspections 5.3 Initial Clearance Testing (Interior Projects) 5.4 Post Abatement Clearance Requirements (Interior Projects) 5.5 Analysis & Reporting Results 5.6 Action Criteria 5.7 Contractor Air Monitoring & Analysis Part 6 - Other Environmental Issues: Lead Paint 6.2 PCBs Part 7 - Contractor's Qualification Statement: Qualification Statement (must be completed and submitted with bid) Part 8 - Asbestos Abatement Drawings: 73 Part 9 - Appendices: 74 I. II. III. IV. EMSL Analytical Asbestos Bulk Sample Lab Order EMSL Analytical Asbestos Bulk Sample Lab Order EMSL Analytical Asbestos Bulk Sample Lab Order YORK Analytical PCB Bulk Sample Lab Order 12L0586 Section EAS,Inc.

7 PART 1 - GENERAL CONDITIONS 1.1 RELATED DOCUMENTS SECTION A. Review the asbestos drawings developed by Environmental Assessments & Solutions, Inc. for further information. If a conflict between the drawings and specifications exists, the more stringent of the two shall apply. B. Drawings and general provisions of the contract, including General and Supplementary Conditions and other Division Specification sections developed by the project's Architect - Fuller D'Angelo P.C. apply to the work of this section. C. The Contractor shall be responsible for reviewing all drawings and specifications. All asbestos removal required shall be included in the base bid. Contractor shall coordinate the removal of asbestos containing materials with other trades as part of this specification and base bid work, no extra charge shall apply. D. The Contractor shall be responsible for reviewing the Asbestos Pre-Renovation Inspection report which is included in the Asbestos Removal Specification. This Asbestos Pre-Renovation Inspection report must be provided to all contractors and their sub-contractors. All contractor and sub-contractor employees must be made aware of the presence and type of asbestos containing materials identified during this inspection to ensure that such materials are not accidently disturbed. E. The completed Contractor's Qualification Statement must be submitted with the bid. Section EAS, Inc.

8 1.2 PRE-ABATEMENT MEETING SECTION ASBESTOS ABATEJv1ENT A. The Architect, Construction Manager, Asbestos Consultant, General Contractor, Asbestos Contractor, School District (Owner) Representative upon receipt, review and substantial approval of all pre-abatement submittals and upon verification that all material and equipment required for the project are available to the contractor, will arrange for pre-abatement meeting between the abatement contractor, construction manager, abatement design consultant and the Owner representatives. The purpose of the meeting is to discuss any aspects of the submittals needing clarification and to discuss any aspects of the project execution and the sequence of operations. The abatement contractor shall be prepared to provide any supplemental evidence and information to the Owner's Representative pertaining to any aspects of the submittals or the materials or equipment. This meeting will be held no later than 5 days prior to scheduled commencement. Upon satisfactory resolution of any outstanding items, the Owner's representative will issue a written order to proceed to the asbestos contractor. No asbestos work shall be initiated prior to the written order to proceed. The Contractor's failure to provide the submittals in accordance with the above shall not relieve the Contractor of his responsibility to complete the work in the time frame specified. Section EAS,Inc.

9 1.3 PRE-ABATEMENT SUBMITTALS SECTION A. Detailed site specific work plan for the entire project reflecting contract documents and the phasing and schedule requirements outlined. B. Provide evidence ofa current State of Connecticut Asbestos Contractor License and Insurance Certificate acceptable to Town of Greenwich. C..Name, location and phone number of the Asbestos Waste Hauler and Landfill. D. Provide written notification to local health, fire and / or safety authorities indicating the asbestos work to be performed and any other notifications required by the specifications. E. Notification of asbestos abatement to the Department of Public Health on the prescribed form 10 days before work commencement F. Notification of asbestos disposal to Department of Environmental Protection, if asbestos waste is to be disposed of in Connecticut. G. A site specific plan for emergencies that may require modification or abridgement of decontamination or work area isolation procedures. H. Asbestos training and certification documentation for all on-site personnel, including original and refresher and current CT State and EPA AHERA certification. I. OSHA medical and fit test certification for all on-site personnel Section EAS,Inc.

10 1.4 PRIOR TO COMMENCEMENT OF WORK WESTERN :MIDDLE SCHOOL CURT AINW ALL REPLACEMENT PROJECT A. Prior to beginning work, the Owner's Representative, Construction Manager, Architect, Asbestos Consultant, General Contractor and Asbestos Contractor shall make a visual inspection of each work area and list all pre-existing damage to building components. Contractor will submit a list which shall include all damaged areas not included to be repaired under this contract and include a narrated video tape. A copy of this video tape is to be furnished to the Owner's Representative. The Contractor and their subcontractors will be held responsible for any other damaged incurred within the work area during the project. The Contractor shall inform the Owner's Representative in advance as to when the inspection will take place. The videotape must be submitted to the Owner's Representative before any work activity will be permitted. B. Post signs in an around the work area to comply with OSHA. Also post one copy of OSHA Asbestos, EPA NESHAPS, CT State DPH, CT State DEP, EPA AHERA regulations. C. Post the following in the clean room of the Worker Decontamination Enclosure and Contractor staging area: 1. Copy of the Contractor's License 2. Contact list including name, address and phone numbers, emergency service providers and after hours contact information for Contractor representative and site Supervisor. 3. Entry / exit log for each work area of the asbestos project. Section EAS, Inc.

11 1.5 SUBMITTALS DURlNG ABATEMENT A. The contractor shall maintain a daily log at the job site documenting the dates and times of meetings as well as the attendees and purpose for the meetings, all persons entering / exiting:asbestos work areas, daily work activity, special or unusual events such as barrier breaching, equipment failures, emergencies and any cause for stop of work, air monitoring tests, submit completed daily log which must include number of bags removed from containment each day (when applicable) or the number of waste containers leaving the property with asbestos waste and persomlel air monitoring results to Owner's Representative. Submit the logs daily and the OSHA air sample results when posted at the job site to the to the Asbestos Consultant. 1.6 SUBMITTALS AT COMPLETION OF ABATEMENT A. Submit copies of all transport manifests, trip tickets and disposal receipts for all asbestos waste materials removed from the work area during the abatement process. The Contractor shall submit to the Owner's Representative any and all documentation requested. At which time, the Owner's Representative shall assemble a project report consisting of the daily field notes and the documentation of events during abatement including the waste shipment record signed by the operator of the licensed landfill. The project report shall include a certificate of completion, dated and signed by an authorized representative of the Contractor and shall be submitted within 30 days of project completion. Section EAS, Inc.

12 PART 2 - PROJECT SPECIFIC CONDITIONS: 2.1 PRE-RENOVATION INSPECTION REPORT WESJERN IvIIDDLE SCHOOL ASBESTOSABAJEMENT Section EAS, Inc.

13 CURT~ALLREPLACEMENTPROffiCT ENVIRONMENTAL ASSESSMENTS & SOLUTIONS, Inc. 144 Euclid Ave. Ardsley, NY (914) ; (914) (fax); (914) (cell) January 7, 2013 Mr. Ron Matten Facility Director 290 Greenwich Ave. Greenwich, CT Project: Site: Scope: Inspection Date: Inspectors: Report Status: ACMs: PCBs: 178/12ASB Western Middle School Curtainwall Replacement Project - Pre-Renovation Asbestos Inspection 12/15/ /13 Charles Schwartz Final Yes No Dear Mr. Matten: Enclosed is our report of the asbestos pre-renovation inspection conducted at Western Middle School to support the curtainwall replacement project. The planned renovation project involves the replacement ofthe entire curtain wall system including panels, windows, frames and doors from the Administration Wing, Classroom M & U Wing, Gymnasium & Auditorium Wing and Bridge. The West Wing was not included in this inspection. All asbestos - containing materials (ACMs) which may be disturbed must be properly removed prior to construction. Refer to the Asbestos Removal Specification for the School's Curtainwall Replacement project. If you have any questions, or require additional information, do not hesitate to contact us. Sincerely, ENVIRONMENTAL ASSESSMENTS & SOLUTIONS, Inc. Charles Schwartz, MPH President Section EAS, Inc.

14 TABLE OF CONTENTS CURTAlNW ALL REPLACEMENT PROJECT ASBESTOS PRE-RENOVATION INSPECTION REPORT CURT~ALLREPLACEMENTPROJECT I. Pre-Renovation Inspection Report 1. Executive Summary 2. Inspection Procedures 3. Removal Considerations II. Asbestos Bulk Sample Results Tables: 1. Administration Wing 2. Classroom M & U Wing 3. Gymnasium & Auditorium Wing 4. Bridge III. PCB Sample Results Table: 1. Administration Wing Section EAS, Inc.

15 I. PRE-RENOVATION INSPECTION REPORT 1. Executive Summary: CURTAJNW ALL REPLACEMENT PROJECT Charles Schwartz of Environmental Assessments & Solutions, Inc. conducted a pre-renovation asbestos inspection at the Western Middle School on 12/15/12, 01105/13 and 01107/13. The purpose of the inspection was to determine whether building materials, contractors might come in contact with, disturb or remove during the course of the curtainwall replacement project, are asbestos containing materials (ACMs). This report provides information concerning asbestos containing materials identified at this school and the procedures used to identify these materials. The inspection also involved the collection of curtainwall caulk materials for PCB analysis. The scope of the pre-renovation inspection included the curtainwall system and materials at the curtainwall including panels, windows, frames, doors and miscellaneous interior materials such as pipe elbow insulation, ceiling tiles and music room transite wall panels at the curtainwall from the following school building areas: 1. The Administration Wing 2. The Classroom M & U Wing 3. The Gymnasium & Auditorium Wing 4. The Bridge Our scope of work included a visual inspection, review of available asbestos inspection reports and other documents as well as bulk sampling for asbestos and PCBs and laboratory analysis of collected samples. This asbestos report contains the results of all samples which were analyzed. This inspection involved the collection and laboratory analysis of samples to supplement the school's Asbestos Inspection and Management Plan. Other hazardous materials including but not limited to lead in paint were not included in tills inspection. Furthermore, the investigation was limited to building materials that might be directly damaged during this renovation project only. Section EAS,Inc.

16 1. Executive Summary (continued): Asbestos - Containing Material (ACM) means material composed of asbestos of any type and in an amount greater than one (1) percent (%) by weight, either alone or mixed with other fibrous or non-fibrous material. State and Federal Regulations require asbestos containing materials (ACMs) be removed in compliance with specific control measures prior to demolition, renovation or other activities which may disturb them. The following materials were sampled and determined to be asbestos - containing materials (ACMs): A. Administration Wing: 1. Curtainwall System Asbestos - Containing Materials: a. Caulk (beige and soft) associated with metal frames at mullions under metal covers (visible from inside the building after the mullion covers are removed) b. Tar sealant (black, soft and sticky) associated between panels and metal frames (visible from inside the building) 2. Non-Curtainwall System Asbestos - Containing Materials: 1. Radiator pipe elbow cementitious packing insulation (located at floor between the curtainwall and radiators inside the building) Section EAS, Inc.

17 1. Executive Summary (continued): The following materials were sampled and determined to be asbestos - containing materials (ACMs) (continued): B. Classroom M & U Wing: 1. Curtainwall System Asbestos - Containing Materials: a. Caulk (beige and soft) associated with metal frames at mullions under metal covers (visible from inside the building after the mullion covers are removed) b. Tar sealant (black and soft) associated between panels and. metal frames (visible from inside the building) c. Caulk (beige and soft) between curtainwall and metal columns (located on the West Wing side ofthe Classroom Wing outside the building) 2. Non-Curtainwall System Asbestos - Containing Materials: a. Pipe elbow cementitious packing insulation (located above hung ceiling inside the building) Section EAS, Inc.

18 1. Executive Summary (continued): The following materials were sampled and determined to be asbestos - containing materials (ACMs): C. Gymnasium & Auditorium Wing: 1. Curtainwall System Asbestos - Containing Materials: a. Caulk (beige and brittle) on seams of curtainwall panels (visible from outside the building) b. Caulk (beige and brittle) between brick walls and curtainwall mullions and door frames (visible from outside the building) c. Glaze (white and brittle) between window glass and metal frames (visible from outside and inside the building) 2. Non-Curtainwall System Asbestos - Containing Materials: D. Bridge: a. Pipe elbow cementitious packing insulation (located above hung ceiling inside the building) b. Transite acoustical walls panels in the three (3) music rooms (located inside the building) 1. Curtainwall System Asbestos - Containing Materials: a. Caulk materials on the curtain wall system are presumed asbestos - containing materials (ACM) unless tested and proven negative by laboratory analysis. 2. Non-Curtainwall System Asbestos - Containing Materials: Not applicable. Section EAS, Inc.

19 1. Executive Summary (continued): SECTION WESTERN IvIIDDLE SCHOOL CURT AlNW ALL REPLACEMENT PROJECT The following materials were determined to be non asbestos - containing materials (non ACMs): A. Ceiling tiles which were tested during this inspection. B. Floortiles (all replacement including mastic following historical asbestos abatement). C. Other visible exposed caulk materials not listed above which were tested during this inspection (refer to the Asbestos Inspection Report Bulk Sample Results Tables contained herein). However, if previously inaccessible suspect asbestos materials such as caulks or adhesives become exposed during renovation, they must be assumed asbestos or be tested by the Asbestos Consultant to rule out asbestos. The following asbestos - containing materials (ACMs) will be abated by Greenwich School District prior to the commencement of the curtainwall replacement work as the project may cause disturbance to these asbestos - containing materials: A. Pipe elbow cementitious packing insulation between the radiators and curtainwall in the Administration Wing B. Pipe elbow cementitious packing insulation above the hung ceiling near the curtainwall in the Classroom M & U Wing C. Pipe elbow cementitious packing insulation located near the curtainwall in the Gymnasium / Auditorium Wing D. Transite acoustical wall panels located on or adjoining the curtainwall in the Gymnasium / Auditorium Wing in the two (2) music classrooms and office. Section EAS, Inc.

20 2. Asbestos Inspection Procedures: Work conducted by EAS, Inc. was performed in accordance with industry standard of care and in compliance with applicable regulations and guidelines including Environmental Protection Agency Asbestos Hazard Emergency Response Act (EPA AHERA) and Connecticut State Department of Public Health (CT DPH). The asbestos survey procedure consists of a visual inspection of building materials to locate and identify suspect ACBM which may be impacted by the renovation project. Bulk samples are collected at EAS' s discretion and submitted for analysis. Sampling was core to the substrate. Each sample area was cleaned following the sampling. Photographs were taken of representative sample locations and building material conditions. The investigation, was however limited and therefore performed in a representative manner. No representation is made that the areas inspected do not contain concealed asbestos containing materials. In general 2-3 samples of each homogenous material were collected unless materials were patches or in very small quantities. Samples were analyzed by EMSL Analytical, Inc.. - NY, NY. All samples were submitted directly to an independent accredited laboratory with the sample chain of custody forms. All samples were analyzed by PLM via the EPA 600 / R -93/116 method. Some samples, if inconclusive by PLM, may also have been analyzed by the TEM Gravimetric Reduction method. Representative caulk samples were also subjected to PCB analysis. Samples were submitted in glass jars on blue ice. Samples were prepped by EPA method 3550B and analyzed in accordance with Reference Method EPA SW by York Analytical Laboratories, Inc. - Stratford, CT Section EAS, Inc.

21 3. Asbestos Removal Considerations: A. An asbestos removal project is required to address caulk and sealant materials associated with the curtainwall system in the Administration Wing, Classroom M & U Wing and Bridge as well as caulk and glaze materials associated with the Gymnasium & Auditorium Wing This work must be conducted by a licensed asbestos abatement contractor. All panels, windows and frames containing or contaminated by asbestos - containing materials (ACMs) are to be disposed of as asbestos - containing material (ACM) waste. Additionally, any caulk remaining on brick after the curtainwall is removed at the Gymnasium & Auditorium Wing must be cleaned off as an asbestos containing material. B. Prior to commencement of the curtainwall replacement project, Greenwich School District shall conduct asbestos abatement of pipe elbow cementitious packing insulation and transite acoustical wall panels, as needed, to prevent disturbance to these asbestos - containing materials. C. Our pre-renovation inspection was limited to the curtainwall replacement project and associated scope. Suspect building materials which may become exposed during the replacement project that were not tested must be assmned to be asbestos - containing materials (ACMs) and handled accordingly or tested to prove that they do not contain asbestos. D. Any field conditions which differ from this Inspection Report or Asbestos Material Removal Specification should immediately be brought to the attention of the Asbestos Consultant, LEA Designated Person and I or Construction Manager. E. Close coordination will be required between the asbestos removal contractor and curtainwall replacement contractor as this project involves asbestos material removal. F. CT State DPH must be notified on the proscribed form by the Asbestos Contractor prior to commencement of asbestos activities. Section EAS,Inc.

22 3. Asbestos Removal Considerations (continued): G. F or the purposes of the Inspection Report and Removal Specification, it is assumed that there will be NO children present in the building for the duration of asbestos activities. Ifthis changes, approval must be granted by CT State DPH prior to asbestos work commencement and additional work procedures will apply. H. All asbestos removal and related asbestos work must be conducted by a licensed asbestos contractor following proper project control and cleanup procedures. I. A licensed Asbestos Project Monitor / Inspector will be retained by the Greenwich School District to conduct visual inspection, ambient air sampling, clearance inspections and documentation activities as part of this asbestos project. J. Prior to this project's commencement, the contractor will be provided with a copy of this Asbestos Pre-Renovation Inspection Report and the Asbestos Removal Specification. The contractor must also attend a walkthrough meeting where the project is discussed in detail. The school district's LEA Designated Person and the school district's Asbestos Consultant will conduct inspections to ensure compliance with the asbestos specification and applicable regulations. K. Under no circumstance should asbestos be disturbed without proper notification, isolation, containment and clean-up procedures. If unplanned disturbance does occur, asbestos debris must be properly cleaned by an asbestos contractor following appropriate notifications and using appropriate controls as specified in the Asbestos Removal Specification. L. Manual removal methods will be required to keep asbestos material nonfriable during removal and prevent visible emissions. Section EAS,Inc.

23 3. Asbestos Removal Considerations (continued): M. All asbestos material waste and materials contaminated by asbestos are to be disposed of as asbestos waste with an Asbestos Waste Manifest for each shipment to prove proper hauling and disposal. N. Lead paint testing was not conducted. The contractor is responsible for proper worker protection, clean-up and waste disposal. O. PCBs were not detected in bulk sampling conducted at this School. Section EAS, Inc.

24 4. Qualifications: Charles Schwartz is licensed as an Asbestos Consultant - Inspector / Management Planner ( expo 3/ ), Project Designer ( expo ) and Project Monitor ( expo 3/ ) by CT State DPH. Charles Schwartz attended his most recent Asbestos Refresher training for Inspector / Management Planner on 1/13/2011 (certificate # ), Project Monitor on 2116/2011 (certificate # ) and Project Designer on 1117/2011 (certificate # ) at QuES&T in Wappingers Falls, NY. EMSL Analytical is accredited as An Approved Environmental Laboratory - Asbestos Bulk by CT State DPH (PH-0170 expo 9/30/13), US NIST NVLAP ( expo 6/30/13) and AIHA llilap (102581). YORK Analytical Laboratories, Inc. is an Approved Environmental Laboratory by CT State DPH (PH-0723). Section EAS, Inc.

25 APPENDIX II TABLE 1 (page 1 of 2) ASBESTOS BVLK SAMPLE RESVL TS ADMINISTRATION WING ORDER#/ SAMPLE # / / / / / / / / / 5-2 LOCATION MATERIAL APPEARANCE A-23 Office - Inside office at floor Pipe elbow Friable between curtainwall and radiator cementitious insulation A-23 Office - Inside office Ceiling tile (lxl spline) No glue daubs A-26 Office - Inside office Ceiling tile (lxl spline) No glue daubs A-23 Office - Inside office under Curtainwall caulk Beige & soft cover to metal frame at mullion A-26 Office - Inside office under Curtainwall caulk Beige & soft cover to met!!l frame at mullion A-23 Office - Inside office under Curtainwall caulk Beige & hard cover to metal frame at mullion A-26 Office - Inside office under Curtainwall caulk Beige & hard cover to metal frame at mullion A-23 Office - Outside building Window glaze White & hard between glass & metal A-26 Office - Outside building Window glaze White & hard between glass & metal ASBESTOS LAB RESULT ASBESTOS None Detected None Detected ASBESTOS ASBESTOS None Detected None Detected None Detected None Detected Refer to the chain of custody forms and laboratory analytical reports sampled on 12114/12, sampled on 115/13 and sampled on 117/13 for additional information. Analysis Method = PLM via EPA 600 / R-93/116. ASBESTOS = Asbestos - Containing Material (ACM). Section EAS, Inc.

26 APPENDIXll TABLE 1 (page 2 of 2) ASBESTOS BULK SAMPLE RESULTS ADMINISTRATION WING CURT~ALLREPLACEMENTPROJECT ORDER#/ SAMPLE # / / / / / / 11-4 LOCATION MATERIAL APPEARANCE A-23 Office - Outside building Curtainwall caulk Black & soft exposed on metal sill A-26 Office - Outside building Curtainwall caulk Black & soft exposed on metal sill A-23 Office - Outside building under Curtainwall caulk White & hard AC unit foam insert on frame A-26 Office - Outside building under Curtainwall caulk White & hard AC unitfoam insert on frame Teacher Lounge - Inside classroom Curtainwall tar sealant Black, soft & between panel & window sticky Principal's Office - A-26 - Inside Curtainwall tar sealant Black, soft & classroom between panel & window sticky ASBESTOS LAB RESULT None Detected None Detected None Detected None Detected ASBESTOS ASBESTOS Refer to the chain of custody forms and laboratory analytical reports sampled on , sampled on 1/5/13 and sampled on for additional information. Analysis Method = PLM via EPA 600 / R-93/116. ASBESTOS = Asbestos Containing Material CACM). Section EAS, Inc.

27 APPENDIXll TABLE 2 (page 1 of 2) ASBESTOS BULK SAMPLE RESULTS CLASSROOM M & U WING CURT~ALLREPLACEMENTPROJECT WESTERN JvIIDDLE SCHOOL ORDER#/ SAMPLE # / / / / / / / / 3-2 LOCATION MATERIAL APPEARANCE Science class M-l - Outside building Curtainwall caulk Beige & soft between mullion cover & wall system Science class M-3 - Outside building Curtainwall caulk Beige & soft between mullion cover & wall system Front of bldg near main ent. - Outside Curtainwall caulk Beige & soft bldg between mullion cover & brick Front of bldg near main ent. - Outside Curtainwall caulk Beige & soft bldg between mullion cover & brick Science Class M-l - Outside building Curtainwall caulk Beige & soft between curtainwall & concrete base Bathroom M-15 - Outside building Curtainwall caulk Beige & soft between curtainwall & concrete base Boiler room - Outside building on Curtainwall caulk Beige & soft curtainwall & vertical metal column Cafeteria 2 - Outside building on Curtainwall caulk Beige & soft curtainwall & vertical metal column ASBESTOS LAB RESULT None Detected None Detected None Detected None Detected None Detected None Detected ASBESTOS ASBESTOS Refer to the chain of custody forms and laboratory analytical reports sampled on 12/14112, sampled on 1/5/13 and sampled on 1/7/13 for additional information. Analysis Method = PLM via EPA 600 / R-93/U6. ASBESTOS = Asbestos - Containing Material CACM). Section EAS,Inc.

28 APPENDIXll TABLE 2 (page 2 of 2) ASBESTOS BULK SAMPLE RESULTS CLASSROOM M & U WING CURT~ALLREPLACEMENTPROJECT ORDER#/ SAMPLE # / / / / / 11-5 LOCATION MATERIAL APPEARANCE Boiler room - Outside building on Curtainwall caulk Beige & soft stone sill at ground & curtainwall Custodian office - Outside building on Curtainwall caulk Beige & soft stone sill at ground & curtainwall Cafeteria #2 G-12 - Outside building Curtainwall caulk Beige & soft on stone sill at ground & curtaillwall Science class U-1 - Inside classroom Curtainwall tar sealant Black, soft & between panel & window sticky Science class U-6 - Inside classroom Curtainwall tar sealant Black, soft & between panel & window sticky Cafeteria # 2 G-12 - Inside cafeteria Curtainwall tar sealant Black, soft & between panel & window sticky ASBESTOS LAB RESULT None Detected None Detected None Detected ASBESTOS ASBESTOS ASBESTOS Refer to the chain of custody forms alld laboratory analytical reports sampled on , sampled on 1/5113 and sampled on 1/7/13 for additional information. Analysis Method = PLM via EPA 600 / R-93/116. ASBESTOS = Asbestos - Containing Material CACM). Section EAS,Inc.

29 APPENDIX II TABLE 3 ASBESTOS BULK SAMPLE RESULTS (page 1 of 2) GYMNASIUM & AUDITORIUM WING CURT~ALLREPLACEMENTPROJECT ORDER#/ SAMPLE # / / / / / / / / 8-2 LOCATION MATERIAL APPEARANCE Music class E-20 - Outside building Curtainwall caulk Beige & brittle Curtainwall panel horizontal seam Music class E-17 - Outside building Curtainwall caulk Beige & brittle Curtainwall panel horizontal seam Music class E-17 - Outside building Curtainwall caulk Beige & brittle Between brick & curtain wall mullion Wood class C-09 - Outside building Curtainwall caulk Beige & brittle Between brick & curtain wall mullion Music class E-20 - Outside building Curtainwall caulk Beige & brittle Curtainwall panels on vertical & horizontal edges Music class E-17 - Outside building Curtainwall caulk Beige & brittle Curtainwall panels on vertical & horizontal edges Music class E-20 - Outside building Window glaze White & brittle Window glass to metal frames Music class E-17 - Outside building Window glaze White & brittle Window glass to metal frames ASBESTOS LAB RESULT ASBESTOS ASBESTOS ASBESTOS ASBESTOS None Detected None Detected ASBESTOS ASBESTOS Refer to the chain of custody forms and laboratory analytical repolis sampled on , sampled on 1/5/13 and sampled on 1/7/13 for additional information. Analysis Method = PLM via EPA 600 / R-93/U6. ASBESTOS = Asbestos - Containing Material (ACM). Section EAS, Inc.

30 APPENDIX II TABLE 3 ASBESTOS BULK SAMPLE RESULTS (page 2 of 2) GYMNASIUM & AUDITORIUM WING CURT~ALLREPLACEMENTPROJECT ORDER # 1 SAMPLE # LOCATION MATERIAL APPEARANCE Art room E-1 - Inside classroom Curtainwall caulk Beige & brittle on metal panel seam under window where exterior wall is concrete Music class E-20 - Inside classroom Curtainwall caulk Beige & brittle on metal panel seam under window where exterior wall is concrete Music class E-20 - Inside classroom Transite acoustical wall White, hard & on exterior wall at window panel brittle Music class E-17 - Inside classroom Transite acoustical wall White, hard & on interior wall at window panel brittle ASBESTOS LAB RESULT None Detected None Detected ASBESTOS ASBESTOS Refer to the chain of custody forms and laboratory analytical reports sampled on , sampled on 115/13 and sampled on 1/7/13 for additional information. Analysis Method = PLM via EPA R-93/U6. ASBESTOS = Asbestos - Containing Material CACM). Section EAS, Inc.

31 APPENDIX II TABLE 4 ASBESTOS BULK SAMPLE RESULTS BRIDGE WESTERN :MIDDLE SCHOOL CURT AINW ALL REPLACEMENT PROJECT ORDER#/ SAMPLE # LOCATION MATERIAL APPEARANCE ASBESTOS LAB RESULT NA Bridge Curtainwall caulk --- Presumed Asbestos Testing may be conducted to prove caulk material is not asbestos. Section EAS, Inc.

32 APPENDIXID TABLEt PCB BULK SAMPLE RESULTS CURT~ALLREPLACEMENTPROJECT ORDER#/ SAMPLE # 12L L L LOCATION MATERIAL APPEARANCE Administration Wing Curtainwall caulk Beige & soft A-23 Office - Inside office under cover to metal frame at mullion Administration Wing Curtainwall caulk Beige & hard A-23 Office - Inside office under cover to metal frame at mullion Administration Wing Window glaze White & hard A-23 Office - Outside building between glass & metal PCB LAB RESULT None Detected None Detected None Detected 12L L Administration Wing Curtainwall caulk Black and soft A-23 Office - Outside building exposed on metal sill Administration Wing Curtainwall caulk White, hard & A-23 Office - Outside building brittle under AC foam board insert None Detected None Detected Refer to the chain of custody form and laboratory analytical report 12L0586 report date 12/21112 for additional information. Sample prep method: EPA Method 3550B. Sample analysis method: EPA SW PCBs = Polychorinated Biphenyls.. Section EAS, Inc.

33 2.2 SCOPE OF WORK A. The work specified herein includes all labor, materials and equipment needed to complete all demolition, removal, cleaning and disposal of all non-asbestos materials and debris as required for gaining access to asbestos containing materials indicated on drawings, addendum's and / or herein called for in this Asbestos Removal Specification. The demolition of non-asbestos materials shall be treated, handled, removed and disposed of as asbestos regulated materials whenever there is evidence or concern that such materials may be contaminated by asbestos or the removal of such materials would cause vibration or disturbance of asbestos - containing materials. B. The Asbestos Consultant shall determine whether work causes asbestos, assumed asbestos or asbestos debris to be disturbed. If so, work shall be conducted as asbestos work not demolition. C. The Contractor shall be responsible for the following general requirements: 1. Obtain and post all permits as required. 2. Provide, erect, and maintain all planking, scaffolding, shoring, barricades, and warning signs as requested to complete the scope of work for this project, including hard wall tunnels to allow building occupants to safely exit the building 3. Unless otherwise specified, all equipment, fixtures, piping and debris resulting from demolition and not scheduled to be saved and reinstalled shall become the property of the Contractor and removed from the premises and properly disposed of. 4. Material or equipment to be reset shall be removed with the utmost care to prevent damage of any kind. All material to be reused shall be stored in the existing building, but not in the asbestos work area. Any such items deemed contaminated with asbestos shall be cleaned by the Contractor if not porous until acceptable to the Owner's Representative. Section EAS,Inc.

34 2.2 SCOPE OF WORK (continued) SECTION D. It shall be the responsibility ofthe Contractor to protect and preserve in operating condition all utilities traversing the building and site. Damage to any utility due to work under this contract shall be repaired to the satisfaction of the Owner at no cost to the Owner. E. It shall be the responsibility of the Contractor to protect landscaping plants, trees and flowers from damage caused by contractor equipment, materials and work methods. Damage to landscaping due to work under this contract shall be repaired or replaced to the satisfaction of the Owner at no cost to the Owner unless the owner calls for the removal oflandscaping plants, trees and flowers. F. The Owner will retain an Asbestos Consultant - Project Monitor for the School District's own interests. The Project Monitor shall be on site during asbestos work as directed by the Owner. The Consultant shall not conduct any testing for the Contractor. G. Deviations from this Specification or accompanying Drawings require the Owner's written approval. H. The Contractor shall supply all labor, materials, equipment services, insurance (including asbestos insurance) and incidentals which are necessary to perform the work in accordance with applicable governmental regulations and these specifications. I. The Contractor shall provide and install fire extinguishers at each decontamination enclosure and in each work area. J. During the progress of work, various areas of the building may be occupied by others. The Abatement Contractor will be responsible for verifying interior conditions prior to the commencement of any work and documenting any damage or previous condition that may affect new work. Any additional damage, which occurs during construction, will be the responsibility of the Contractor to be corrected at no charge to the Owner. Section EAS, Inc.

35 2.2 SCOPE OF WORK (continued) SECTION K. The Contractor is responsible for posting proper notifications, barriers and signs that may be required to prevent access of unauthorized persons to areas undergoing asbestos removal activities. L. The Contractor shall be responsible for all isolation barriers to separate the exterior work area from the interior of the building for the duration of asbestos work. The isolation barriers may be constructed out of plastic sheeting sealed in place from the underside of the deck above the ceiling tiles to the floor surface including walls in a manner that is air-tight and prevents dust intrusion. To allow access onto the work area side of the isolation barrier from the inside of the building, zippers or other equivalent methods may be used. Zippers may be reused from room to room. M. There is no Alternative Work Practice (A WP) or Occupancy Variance required for this asbestos abatement project in order for compliance with regulations. Convenience A WPs intended to save the Contractor money but which are not needed to comply with regulations, are the Contractor's responsibility. Convenience A WPs must still be prepared by a CT State DPH licensed Asbestos Project Designer and be reviewed and approved by the Asbestos Consultant before their approval for use at this asbestos abatement project. N. If it is determined that an Occupancy Variance is required for this project because of child occupancy in the school building during the asbestos project, it is the Contractor's responsibility to comply with ALL conditions of the Approved Occupancy Variance as part of their base bid price. Section EAS, Inc.

36 2.2 SCOPE OF WORK (continued) SECTION CURT~ALLREPLACEMENTPROJECT O. All asbestos work must be conducted as exterior work with air-tight and dust isolation -tight barriers in place separating the work area from the interior of the school building. The isolation barrier must be sealed from the underside of the roof deck to the floor and to walls. Ceiling tiles must be removed to gain access to the underside of the roof. The ceiling tiles may be removed as non-asbestos. P. All asbestos work must be conducted by hand tools as apposed to power tools to ensure they remain non-friable. The use of power tools to cut or grind asbestos will render the asbestos material friable and increase the likeli1lood of visible emissions. Visible emissions will require the use of full negative pressure containments with HEP A equipped negative air units to contain asbestos debris and dust to prevent visible emissions with manometers to verify the negative pressure reading. Section EAS, Inc.

37 2.3 DESCRIPTION OF WORK SECTION WESTERN Iv1IDDLE SCHOOL A. The asbestos removal work required for this project consists ofthe removal and disposal of: 1. Administration Wing: a. Curtainwall System Asbestos - Containing Materials: 1. Caulk (beige and soft) associated with metal frames at mullions under metal covers (visible from inside the building after the mullion covers are removed) 2. Tar sealant (black, soft and sticky) associated between panels and metal frames (visible from inside the building) All curtainwall components contaminated by asbestos materials must be disposed of as asbestos waste. 2. Classroom M & U Wing: a. Curtainwall System Asbestos - Containing Materials: 1. Caulk (beige and soft) associated with metal frames at mullions under metal covers (visible from inside the building after the mullion covers are removed) 2. Tar sealant (black and soft) associated between panels and metal frames (visible from inside the building) 3. Caulk (beige and soft) between curtainwall and metal columns (located on the West Wing side of the Classroom Wing outside the building) All curtainwall components contaminated by asbestos materials must be disposed of as asbestos waste. Section EAS, Inc.

38 2.3 DESCRIPTION OF WORK (continued) A. The asbestos removal work required for this project consists of the removal and disposal of (continued): 3. Gymnasium & Auditorium Wing: a. Curtainwall System Asbestos - Containing Materials: 1. Caulk (beige and brittle) on seams of curtainwall panels (visible from outside the building) 2. Caulk (beige and brittle) between brick walls and curtainwall mullions and door frames (visible from outside the building) 3. Glaze (white and brittle) between window glass and metal frames (visible from outside and inside the building) All curtainwall components contaminated by asbestos materials must be disposed of as asbestos waste. 4. Bridge: a. Curtainwall System Asbestos - Containing Materials: 1. Caulk materials on the curtain wall system are presumed asbestos - containing materials (ACM) unless tested and proven negative by laboratory analysis. All curtainwall components contaminated by asbestos materials must be disposed of as asbestos waste. Section EAS, Inc.

39 2.3 DESCRIPTION OF WORK (continued) B. The following materials were determined to be non asbestos - containing materials (non ACMs) and therefore need not be removed or disposed of as asbestos: 1. Ceiling tiles which were tested during this inspection. 2. Floor tiles (all replacement including mastic following historical asbestos abatement) 3. Other visible exposed caulk materials not listed above which were tested during this inspection (refer to the Asbestos Inspection Report Bulk Sample Results Tables contained herein). However, if previously inaccessible suspect asbestos materials such as caulks or adhesives become exposed during renovation, they must be assumed asbestos or be tested by the Asbestos Consultant to rule out asbestos. C. The following asbestos - containing materials (ACMs) will be abated (removed) by Greenwich School District prior to the commencement of the curtainwall replacement work as the project may cause disturbance to these asbestos - containing materials: 1. Pipe elbow cementitious packing insulation between the radiators and curtainwall in the Administration Wing 2. Pipe elbow cementitious packing insulation above the hung ceiling near the curtainwall in the Classroom M & U Wing 3. Pipe elbow cementitious packing insulation located near the curtainwall in the Gymnasium / Auditorium Wing 4. Transite acoustical wall panels located on or adjoining the curtainwall in the Gymnasium / Auditorium Wing in the two (2) music classrooms and office. Section EAS, Inc.

40 2.3 DESCRlPTION OF WORK (continued) D. The Architect's curtainwall replacement specifications and drawings should be carefully consulted for a specific listing of existing work areas for curtainwall removal. If there is conflict between the Asbestos Consultant and Architects drawings or specifications regarding component removal - the Architects drawings and specifications take precedence. E. All curtainwall components including windows, frames and panels containing asbestos or contaminated by asbestos shall be disposed of as asbestos regulated waste. No open waste containers are permitted for storage on site. Open waste containers must be sealed end of shift with hard covering wrapped with 2 layers of plastic sheeting or tarps to render air tight, water tight and secure. F. No asbestos debris in soil was observed during the inspection. If soil, walkways, building interiors are not effectively isolated and protected from asbestos debris and asbestos contamination is confmned by visual inspection and / or testing during or following work, the Contractor shall be responsible for all associated clean-up / decontamination / replacement costs. G. Work areas where asbestos components are being removed without abrasive abatement / cleaning methods that would render the asbestos materials friable may do so without negative pressure containments as long as visible emissions or uncontrolled dust / debris is not generated. H. Work areas where asbestos components are not removed in a non-friable condition and where abrasive abatement / cleaning methods such as but not limited to grinding must do so with negative pressure containments. 1. Any loss of negative pressure / containment breech into the interior of the school shall be handled as a fiber release episode and containment, pressurization, cleanup and testing shall be conducted in accordance with EPA AHERA, CT State DPH and the Asbestos Consultant's directives. Air testing, bulk testing, dust testing and / or visual inspection may be conducted by the Asbestos Consultant to determine whether the fiber release episode occurred. Section EAS, Inc.

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22 Page 1 of 22 Asbestos Survey Project Summary Pursuant to your request; Environmental, Inc., has performed an Asbestos Building Survey on 8/13/2014 and limited to the above referenced location. The Interior/Exterior/Roof

More information

Limited Asbestos Demolition Survey

Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Former Fire Station Facility 25 to 45 S. Orlando Avenue Cocoa Beach, Florida Client: City of Cocoa Beach Public Works Department 1600

More information

FACILITY ASBESTOS MANAGEMENT PLAN

FACILITY ASBESTOS MANAGEMENT PLAN WASHINGTON ADVENTIST UNIVERSITY DEPARTMENT OF PUBLIC SAFETY DIVISION FACILITY ASBESTOS MANAGEMENT PLAN TAKOMA PARK CAMPUS REVIEWED and APPROVED BY: Patrick Farley WAU- V.P. of Finance Steven Lapham WAU-Executive

More information

ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps)

ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps) Los Rios Community College District Sacramento City College ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps) GENERAL This addendum forms a part

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Rowan University Asbestos Management Program

Rowan University Asbestos Management Program Rowan University Asbestos Management Program Table of Contents I. Introduction II. Regulatory Compliance III. Department Responsibilities for Asbestos A. EHS (Safety Specialist Staff) B. EHS (Asbestos

More information

TSI SAMPLE MANAGEMENT PLANNER INITIAL. Training Services International, Inc. Qualifications & Functions

TSI SAMPLE MANAGEMENT PLANNER INITIAL. Training Services International, Inc. Qualifications & Functions MANAGEMENT PLANNER INITIAL Asbestos Training Course Federal Edition Training Services International www.training.com What management planning qualifications exist? How do I become certified to perform

More information

HERRON Enterprises USA, Inc.

HERRON Enterprises USA, Inc. Phone (303) 763 9639 To: City of Montrose / Mr. Mark Armstrong HERRON Project No.: 1120145 Job No.: Verbal Location: Multiple Buildings, 950 and 970 Chipeta Rd., Montrose, CO 81403 Dates of Service: November

More information

LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT. for

LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT. for LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT for Michigan State University Physical Plant Division Engineering and Architectural Services Department

More information

July 13, 2011 TTL Project No NESHAP Asbestos and Limited Hazardous Materials Survey Report 500 North Congress Street Ypsilanti, Michigan

July 13, 2011 TTL Project No NESHAP Asbestos and Limited Hazardous Materials Survey Report 500 North Congress Street Ypsilanti, Michigan July 13, 2011 TTL Project No. 7615.02 Ms. Paula Boase Downriver Community Conference Brownfield Consortium 15100 Northline Road Southgate, Michigan 48195 Dear Ms. Boase: NESHAP Asbestos and Limited Hazardous

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California November 12, 2014 Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240 RE: Pre-Renovation Asbestos Survey Report 5862 Rupert Avenue, Marysville, California

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

Learn Charter School Excel Campus

Learn Charter School Excel Campus ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2270

More information

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM Revised January 2017 Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Introduction 1 Scope 1 Policy Statement

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Asbestos Survey Report

Asbestos Survey Report Asbestos Survey Report Downtown Duluth Old City Hall Block Buildings for renovation 3087 Main Street, 3097 Main Street, New Dawn Theater, 3530 W. Lawrenceville Street, Old City Hall/Church Duluth, Georgia

More information

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work: 125 Syndicate Avenue, Thunder Bay, Ontario Page 1 of 5 Part 1 General 1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:.1 Removing asbestos-containing transite

More information

ASBESTOS INSPECTION REPORT Completed in accordance with 40 CFR, and (a)(4)

ASBESTOS INSPECTION REPORT Completed in accordance with 40 CFR, and (a)(4) ASBESTOS INSPECTION REPORT Completed in accordance with 40 CFR, 763.86 and 763.85(a)(4) Assessment Completed for Clint Moore, ASLA Planning, Research and Development City of Florence 324 West Evans Street

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Asbestos Management Program April 27, 2017

Asbestos Management Program April 27, 2017 Asbestos Management Program April 27, 2017 1. INTRODUCTION 1.1. Purpose Indiana University Environmental Health and Safety (IUEHS) has developed this Program to identify practices and procedures for the

More information

PROJECT NO REPORT TO CITY OF STRATFORD ASBESTOS CONTAINING MATERIALS SURVEY ROW HOUSES STRATFORD, ONTARIO CONDUCTED BY:

PROJECT NO REPORT TO CITY OF STRATFORD ASBESTOS CONTAINING MATERIALS SURVEY ROW HOUSES STRATFORD, ONTARIO CONDUCTED BY: PROJECT NO. 1197 REPORT TO CITY OF STRATFORD ON ASBESTOS CONTAINING MATERIALS SURVEY ROW HOUSES STRATFORD, ONTARIO CONDUCTED BY: 1099 KINGSTON ROAD, SUITE 260 PICKERING, ONTARIO L1V 1B5 Tel: (416) 410-4333

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

PRE-DEMOLITION ASBESTOS SURVEY Curtis Park Ballpark and Pool 1901 NW 24 Avenue Miami, FL 33125

PRE-DEMOLITION ASBESTOS SURVEY Curtis Park Ballpark and Pool 1901 NW 24 Avenue Miami, FL 33125 PRE-DEMOLITION ASBESTOS SURVEY Curtis Park Ballpark and Pool 1901 NW 24 Avenue Miami, FL 33125 Prepared For: City of Miami Capital Improvements & Transportation Program 444 SW 2 nd Avenue, 8 th Floor Miami,

More information

Office of Design & Construction State University Plaza Albany, New York

Office of Design & Construction State University Plaza Albany, New York Instructions: Consultant should meet with the Campus and Fund at the work area(s) prior to completing this Checklist. At least two (2) meetings are required, one prior to Schematic Phase submission and

More information

Bid Package# 500 Org. 046 Fred Florence Middle School Org. 164 Anson Jones Elementary School

Bid Package# 500 Org. 046 Fred Florence Middle School Org. 164 Anson Jones Elementary School ADDENDUM No. 002 For Bid Package# 500 Org. 046 Fred Florence Middle School Org. 164 Anson Jones Elementary School DALLAS INDEPENDENT SCHOOL DISTRICT September 24, 2014 The following items modify the Project

More information

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02 BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02 Department Title: Safety Department Page: 2 Department Title: Safety Department Page:

More information

ST. LUKE CATHOLIC ELEMENTARY SCHOOL

ST. LUKE CATHOLIC ELEMENTARY SCHOOL ST. LUKE CATHOLIC ELEMENTARY SCHOOL Final 2017 ACM Re-Assessment Report Project Location: 345 Albright Road Hamilton, ON Prepared for: Hamilton Wentworth Catholic District School Board 57 Stuart Street

More information

SUMMARY OF BID ITEMS

SUMMARY OF BID ITEMS Addendum 4 Request for Information Village of North Palm Beach Contractor Solicitation Roof Replacement Library & Public Works Facility Invitation for Bids Bid Opening October 9, 2014 3:00 PM E.S.T. Following

More information

AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY

AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY ASBESTOS CONTROL PROGRAM September 22, 2006 Table of Contents 1.0 Introduction... 4 2.0 Purpose and Applicability... 4 3.0 Roles and Responsibilities... 5 3.1

More information

Project Monitoring & Air Sampling

Project Monitoring & Air Sampling Project Monitoring & Air Sampling 1. Qualifications of Air Sampling Personnel. The project air sampling shall be conducted by an asbestos project air sampling technician who has been trained in the selected

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

PRE-DEMOLITION ASBESTOS INSPECTION REPORT FOR VACANT RESIDENCE 326 NE 7 TH TERRACE OCALA, FLORIDA. Prepared for

PRE-DEMOLITION ASBESTOS INSPECTION REPORT FOR VACANT RESIDENCE 326 NE 7 TH TERRACE OCALA, FLORIDA. Prepared for ENVIRONMENTAL SERVICES, LLC PRE-DEMOLITION ASBESTOS INSPECTION REPORT FOR VACANT RESIDENCE 326 NE 7 TH TERRACE OCALA, FLORIDA Prepared for CITY OF OCALA REVITILIZATION STRATEGIES-CODE ENFORCEMENT DIVISION

More information

Asbestos & Lead Based Paint Assessment City of Anderson 220 Wardlaw Street Anderson, South Carolina 29624

Asbestos & Lead Based Paint Assessment City of Anderson 220 Wardlaw Street Anderson, South Carolina 29624 Asbestos & Lead Based Paint Assessment City of Anderson 220 Wardlaw Street Anderson, South Carolina 29624 Prepared for: City of Anderson Community Development Department 601 South Main Street Anderson,

More information

DIVISION 02 SELECTIVE DEMOLITION

DIVISION 02 SELECTIVE DEMOLITION DIVISION 02 SELECTIVE DEMOLITION SECTION 02 41 19 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Demolition and removal of selected portions of a building.

More information

PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278

PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278 PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278 PREPARED FOR: Mr. Roberto Aguirre City of San Francisco DPW, SAR, BCM 1680 Mission Street San Francisco, California PREPARED

More information

EPA s Lead Program Rule At-A-Glance

EPA s Lead Program Rule At-A-Glance EPA s Lead Program Rule At-A-Glance FLOW CHART 1: Do the Requirements Apply to the Renovation? If you will be getting paid to do work that disturbs painted surfaces in a pre-1978 home, apartment building,

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2059

More information

REMOVAL AND DISPOSAL OF MATERIALS CONTAINING LEAD. A. General provisions of the Contract, including General and Supplementary Conditions.

REMOVAL AND DISPOSAL OF MATERIALS CONTAINING LEAD. A. General provisions of the Contract, including General and Supplementary Conditions. 028333 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. General provisions of the Contract, including General and Supplementary Conditions. B. Contract Drawings. 1.2 SUMMARY A. The lead removal work is in support

More information

UI Procedures for Asbestos Management

UI Procedures for Asbestos Management UI Procedures for Asbestos Management The University of Iowa Rev.10/22/08, 10/15/09 These procedures apply to employees and contractors involving the identification, work on, removal, or repair of asbestos-containing

More information

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for. SSOE, Inc Wilshire Drive Suite 260 Troy, Michigan 48084

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for. SSOE, Inc Wilshire Drive Suite 260 Troy, Michigan 48084 POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT for SSOE, Inc. 1050 Wilshire Drive Suite 260 Troy, Michigan 48084 at Michigan State University Physics Astronomy Building (Now Psychology) East

More information

CLASS I AND II ABATEMENT PROJECT SUBMITTALS

CLASS I AND II ABATEMENT PROJECT SUBMITTALS 5.1 Pre-Work Submittals CLASS I AND II ABATEMENT PROJECT SUBMITTALS Abatement contractors shall submit the following in a bound notebook to AU or our designated representative at the mandatory pre-construction

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-381X

More information

Asbestos Management Program

Asbestos Management Program ENVIRONMENTAL HEALTH & SAFETY Reed College 3203 Southeast woodstock boulevard Portland, Oregon 97202-8199 Asbestos Management Program Effective Date: 6/16/2009 Revision Dates or Last Date: 2/2016 I. Purpose...

More information

Asbestos/Lead Paint Survey

Asbestos/Lead Paint Survey Asbestos/ Survey At: Camp Lejeune Bldg. 500 Repair Indoor Physical Fitness Center Prepared for: The Walker Group Architecture Inc. PO Box 541 New Bern, NC 28563 PEI Project No.: Walker Group Project No.:

More information

ARTICLE 4: ASBESTOS CONTROL STANDARDS

ARTICLE 4: ASBESTOS CONTROL STANDARDS ARTICLE 4: ASBESTOS CONTROL STANDARDS SECTION 4.01 ASBESTOS DEFINITIONS Adopted 06/08/95 (818) Revised 02/12/98 (863), 07/13/00 (918), 09/26/02 (978), 02/27/03 (987), 03/26/09 (1148) (a) AHERA BUILDING

More information

Asbestos & Lead Based Paint Assessment City of Anderson 225 Caughlin Avenue Anderson, South Carolina 29624

Asbestos & Lead Based Paint Assessment City of Anderson 225 Caughlin Avenue Anderson, South Carolina 29624 Asbestos & Lead Based Paint Assessment City of Anderson 225 Caughlin Avenue Anderson, South Carolina 29624 Prepared for: City of Anderson Community Development Department 601 South Main Street Anderson,

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-3013

More information

AHERA ASBESTOS INSPECTION & MANAGEMENT PLAN. for. Grounds Building 3644 Lee Road Shaker Heights, Ohio

AHERA ASBESTOS INSPECTION & MANAGEMENT PLAN. for. Grounds Building 3644 Lee Road Shaker Heights, Ohio AHERA ASBESTOS INSPECTION & MANAGEMENT PLAN for Grounds Building 3644 Lee Road Shaker Heights, Ohio March 2017 CONTENTS OF INSPECTION REPORT AND MANAGEMENT PLAN PART I BUILDING INSPECTION/REINSPECTION

More information

1. Sign-in sheet from the Pre-Proposal Conference on April 19, 2017 at Atherton Elementary.

1. Sign-in sheet from the Pre-Proposal Conference on April 19, 2017 at Atherton Elementary. DATE: April 20, 2017 ARLINGTON INDEPENDENT SCHOOL DISTRICT 1203 W. Pioneer Parkway Arlington, Texas 76013 ADDENDUM II FROM: Tammy Craig Director Purchasing RE: CSP 17-79 Amos & Atherton Elementary Renovations

More information

Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall

Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall July 3, 2007 REPORT: Full Building Survey TO: Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall FROM: Bryan

More information

Asbestos Survey. Site: Prepared for: Edmundson Elementary School Grayland Avenue, Norwalk, CA 90650

Asbestos Survey. Site: Prepared for: Edmundson Elementary School Grayland Avenue, Norwalk, CA 90650 Asbestos Survey Site: Edmundson Elementary School 15121 Grayland Avenue, Norwalk, CA 90650 Prepared for: Norwalk-La Mirada Unified School District 12820 Pioneer Boulevard, Norwalk, CA 90650 October 24th,

More information

ADDENDUM # 1 To: File IFB for: 24 Gus Garcia Demolition and Reconstruction

ADDENDUM # 1 To: File IFB for: 24 Gus Garcia Demolition and Reconstruction 818 S. FLORES ST. SAN ANTONIO, TEXAS 78204 www.saha.org Procurement Department ADDENDUM # 1 To: File 1601-909-62-4465 - IFB for: 24 Gus Garcia Demolition and Reconstruction Please note the following change:

More information

Asbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina

Asbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina Asbestos Containing Materials Assessment 631 Fulton Avenue Spartanburg, South Carolina Prepared for: Northside Development Group 410 Magnolia Street Spartanburg, South Carolina Prepared by: Apex Environmental

More information

Assessment Completed by: Asbestos Inspections, LLC 4686 Pee Dee Highway Conway, South Carolina (843)

Assessment Completed by: Asbestos Inspections, LLC 4686 Pee Dee Highway Conway, South Carolina (843) ASBESTOS INSPECTION REPORT 1814 PRINCE STREET 2-STORY Georgetown, South Carolina Asbestos Inspections, LLC Project # 2017-48 Performed in general accordance with SCDHEC regulation 61-86.1 along with OSHA

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2207

More information

Asbestos-Containing Material and Hazardous Material Survey Summary Report

Asbestos-Containing Material and Hazardous Material Survey Summary Report Asbestos-Containing Material and Hazardous Material Survey Summary Report Site: Haas Park Fieldhouse PS1757 2404 North Washtenaw Street Chicago, Illinois 60647 Survey Date: January 15, 2010 PBCC Project

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Asbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager

Asbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager Asbestos Management Plan Program originated: 02/2000 Last updated: 6/2015 Wendel Reece University Safety Manager TABLE OF CONTENTS I. Introduction II. Purpose III. Operations and Maintenance Asbestos Related

More information

Asbestos Inspection Cover Letter

Asbestos Inspection Cover Letter Asbestos Inspection Cover Letter Date Issued: January 27, 2016 Site Name/Location Residential Structure 4 Cauthen Street Rock Hill, South Carolina Asbestos Inspection Performed For Hank Williams Right

More information

FINAL REPORT. Asbestos-Containing Building Material Assessment

FINAL REPORT. Asbestos-Containing Building Material Assessment FINAL REPORT Asbestos-Containing Building Material Assessment Toronto Catholic District School Board Nativity of Our Lord Catholic School 35 Saffron Crescent Etobicoke, Ontario PROJECT NO. 1025760 PROJECT

More information

ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL

ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL Project #: 13916 ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL Prepared for: Sheila Miller Director, Department of Health and Safety Memorial University of Newfoundland

More information

LIMITED ASBESTOS-CONTAINING BUILDING MATERIALS SURVEY. Wal-Mart # Highway 51 North Ripley, TN ATC Project Number

LIMITED ASBESTOS-CONTAINING BUILDING MATERIALS SURVEY. Wal-Mart # Highway 51 North Ripley, TN ATC Project Number LIMITED ASBESTOS-CONTAINING BUILDING MATERIALS SURVEY Wal-Mart #0097 628 Highway 51 North Ripley, TN 38063 ATC Project Number 30.75300.0612 Prepared for: Wal-Mart Stores, Inc. Ms. Vicki Ingram Store Planning

More information

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit: TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be

More information

APPENDIX C SAMPLE ASBESTOS ABATEMENT SPECIFICATION

APPENDIX C SAMPLE ASBESTOS ABATEMENT SPECIFICATION APPENDIX C SAMPLE ASBESTOS ABATEMENT SPECIFICATION The following appendix includes information and standard drawings that are diagrammatic and are used only to convey intent. Guidelines for Use of Sample

More information

HOTEL SANDFORD. C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated.

HOTEL SANDFORD. C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated. SECTION 024119 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION UNIT PRICES. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION UNIT PRICES. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 012200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

ASBESTOS, PCB CAULKING & UNIVERSAL WASTE SURVEY REPORT

ASBESTOS, PCB CAULKING & UNIVERSAL WASTE SURVEY REPORT ASBESTOS, PCB CAULKING & UNIVERSAL WASTE SURVEY REPORT HUNTER COLLEGE - Hunter High School and Hunter Elementary School (The Campus Schools) HVAC UPGRADE 71 EAST 94 th STREET NEW YORK, N.Y. 10128 PREPARED

More information

PROPOSED PILOT PROGRAM WORK PLAN FOR THE REMOVAL OF ALUMINUM COLUMN COVERS AND FASCIA WITH NON-FRIABLE ACM CAULKING MATERIAL

PROPOSED PILOT PROGRAM WORK PLAN FOR THE REMOVAL OF ALUMINUM COLUMN COVERS AND FASCIA WITH NON-FRIABLE ACM CAULKING MATERIAL PROPOSED PILOT PROGRAM WORK PLAN FOR THE REMOVAL OF ALUMINUM COLUMN COVERS AND FASCIA WITH NON-FRIABLE ACM CAULKING MATERIAL At 130 Liberty Street New York, New York Lower Manhattan Development Corporation

More information

ASBESTOS MANAGEMENT PLAN PROCEDURE

ASBESTOS MANAGEMENT PLAN PROCEDURE ADMINISTRATIVE PROCEDURE Approval Date January 2011 Review Date 2016 Contact Person/Department Superintendent of Business Replacing All Previous Procedures Page 1 of 6 Identification BU-3565 ASBESTOS MANAGEMENT

More information

Report of. Asbestos Survey

Report of. Asbestos Survey Report of Asbestos Survey of Curtis Block and Marlowe Buildings 14501, 14505, 14509, 14511 & 14515 Detroit Avenue and 1412 Marlowe Avenue Lakewood, Ohio 44107 Prepared for City of Lakewood 12650 Detroit

More information

ASBESTOS & HAZARDOUS MATERIALS INSPECTION

ASBESTOS & HAZARDOUS MATERIALS INSPECTION ASBESTOS & HAZARDOUS MATERIALS INSPECTION of Thaddeus Stevens Elementary School 822 Crucible Street Pittsburgh, Pennsylvania 15220 Prepared for Facilities Division Pittsburgh Public Schools 1305 Muriel

More information

Dale Livingston, Asbestos Group, Environmental Health and Safety, 153 U-Tech Building, 2331 University Avenue S.E., Minneapolis, MN 55414

Dale Livingston, Asbestos Group, Environmental Health and Safety, 153 U-Tech Building, 2331 University Avenue S.E., Minneapolis, MN 55414 July 5, 2007 REPORT: Full Building Survey TO: Linda McCracken-Hunt, Project Development, 400 Shops Building Fay Thompson, Department of Environmental Health and Safety, Director Tim Nelson, Facilities

More information

ASBESTOS & HAZARDOUS MATERIALS INSPECTION

ASBESTOS & HAZARDOUS MATERIALS INSPECTION ASBESTOS & HAZARDOUS MATERIALS INSPECTION of Homewood Montessori School 7100 Hamilton Avenue Pittsburgh, Pennsylvania Prepared for Facilities Division Pittsburgh Public Schools 1305 Muriel Street 15203-1513

More information

Limited Hazardous Materials Survey Report

Limited Hazardous Materials Survey Report Limited Hazardous Materials Survey Report Contra Costa Community College Applied Arts Building Chiller Replacement Project 2600 Mission Bell San Pablo, California RGA Project No: R1167404 June 29, 2016

More information

Asbestos and Lead Considerations in Construction Projects. Sean Purcer Senior Consultant Anthony Price Senior Consultant

Asbestos and Lead Considerations in Construction Projects. Sean Purcer Senior Consultant Anthony Price Senior Consultant Asbestos and Lead Considerations in Construction Projects Sean Purcer Senior Consultant Anthony Price Senior Consultant Who We Are History Founded in 1990 by Environmental, Health and Safety (EHS) managers

More information

Management Plan For Asbestos

Management Plan For Asbestos Management Plan For Asbestos Bemidji Area Schools Management Plan for Asbestos Table of Contents Annual Review Form 1.0 Purpose... 1 2.0 Responsibilities... 1 3.0 Determination of Employee Exposure...

More information

Façade Characterization Report

Façade Characterization Report Preliminary Façade Characterization Report Remediation and Deconstruction of Fiterman Hall, 30 West Broadway, New York, New York Prepared for: Dormitory Authority of the State of New York & The City University

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS **************************************************************************

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** USACE / NAVFAC / AFCEC / NASA UFGS-02 42 91 (May 2010) ------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS SECTION TABLE

More information

Report No: ACM October 29, 2012

Report No: ACM October 29, 2012 PbO3 ENVIRONMENTAL INCORPORATED TESTING & SVC. CO. Report No: ACM-0223-10-29-12-022 October 29, 2012 Client: Lunacon Construction Group 16890 South Dixie Highway Miami, Florida 33157 Attn: Ozzie Gomez

More information

THE HOUSING AUTHORITY OF THE BOROUGH OF HIGHLAND PARK 242 SOUTH SIXTH AVENUE, HIGHLAND PARK, NJ PHONE (732)

THE HOUSING AUTHORITY OF THE BOROUGH OF HIGHLAND PARK 242 SOUTH SIXTH AVENUE, HIGHLAND PARK, NJ PHONE (732) THE HOUSING AUTHORITY OF THE BOROUGH OF HIGHLAND PARK 242 SOUTH SIXTH AVENUE, HIGHLAND PARK, NJ 08904 PHONE (732)572-4420 February 10, 2017 Window Replacements at Samuel J Kronman Building and Park Terrace

More information

ASBESTOS INSPECTION AND LEAD TESTING REPORT FOR INSPECTORS. For

ASBESTOS INSPECTION AND LEAD TESTING REPORT FOR INSPECTORS. For ASBESTOS INSPECTION AND LEAD TESTING REPORT FOR CITY OF ROCK HILL 150 Johnston Street Rock Hill, SC 29731 (803) 448-3351 LOCATION Vacant Building 302 Sidney Street Rock Hill, South Carolina INSPECTION

More information

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control NAVSEA STANDARD ITEM ITEM NO: 009-10 DATE: 18 NOV 2016 CATEGORY: I 1. SCOPE: 1.1 Title: Asbestos-Containing Material (ACM); control 2. REFERENCES: 2.1 29 CFR 1915.1001, Occupational Safety and Health Standards

More information

Abatement Scope of Work and Project Requirements for Library Painting Project Bay Shore Library Bret Harte Library Dana Library Long Beach, California

Abatement Scope of Work and Project Requirements for Library Painting Project Bay Shore Library Bret Harte Library Dana Library Long Beach, California for Bay Shore Library Bret Harte Library Dana Library Background Information Site/Building Owner: City of Long Beach Site Contact: The City of Long Beach Public Works Department, 333 West Ocean Blvd. Long

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-0027

More information

PROPERTY FACT SHEET Former Northview Heights School

PROPERTY FACT SHEET Former Northview Heights School 5168 Campbells Run Road, Su. 204 Pittsburgh, PA 15205 PROPERTY FACT SHEET Former Northview Heights School 310 Mt. Pleasant Road, Pittsburgh, PA 15214 Tax Parcel: 077-C-245 Year Built: 1962/1966 Year Closed:

More information

SOUND ENVIRONMENTAL SOLUTIONS, Inc.

SOUND ENVIRONMENTAL SOLUTIONS, Inc. SOU ENVIRONMENTAL SOLUTIONS, Inc. Indoor Air Quality Industrial Hygiene Safety Training Environmental Compliance October 13, 2011 Mr. John Kaniss Construction Manager Pacific Lutheran University Tacoma,

More information

Asbestos & Lead-Based Paint Survey Report Fort Gordon Gate 1 AAFES Station Augusta, Georgia S&ME Project No

Asbestos & Lead-Based Paint Survey Report Fort Gordon Gate 1 AAFES Station Augusta, Georgia S&ME Project No Asbestos & Lead-Based Paint Survey Report Fort Gordon Gate 1 AAFES Station Augusta, Georgia S&ME Project No. 1419-15-020 Prepared for: Marshall Waters Woody Associates 1736 E. Sunshine Street, #311 Springfield,

More information

Land Reclamation Site Siting and Application Guidelines

Land Reclamation Site Siting and Application Guidelines Department of Environment and Local Government Land Reclamation Site Siting and Application Guidelines Rationale In an effort to reduce the cost associated with the transportation of demolition wastes,

More information

Asbestos Containing Building Material Survey

Asbestos Containing Building Material Survey Former 55 th Street South Trust Bank - ACBM Survey Asbestos Containing Building Material Survey Former South Trust Bank Property 9 55 th Street South Birmingham, AL Submitted to: Kelleigh Gamble Housing

More information

Washington University Asbestos Operations and Maintenance Plan

Washington University Asbestos Operations and Maintenance Plan 1. Purpose 2. Asbestos Washington University Asbestos Operations and Maintenance Plan 1.1. The purpose of this Asbestos Operations and Maintenance (O&M) Plan is to minimize the potential for exposure to

More information

DESIGNATED SUBSTANCES REPORT

DESIGNATED SUBSTANCES REPORT Replacement of Hangers Doors Ottawa, Ontario Page 1 of 4 PART 1 GENERAL 1.1 Regulatory Requirements.1 The following Designated Substances Report (DSR) was prepared in order to meet the owners or engineer

More information

TABLE OF CONTENTS 4. PREPARATION, COMMUNICATIONS, AND CONTROLS

TABLE OF CONTENTS 4. PREPARATION, COMMUNICATIONS, AND CONTROLS TABLE OF CONTENTS SECTION PAGE NO. 1. INTRODUCTION... 1-1 1.1 Background... 1-1 1.2 Conceptual Site Model... 1-1 1.3 Plan Organization... 1-2 1.4 Certification... 1-3 2. SAMPLE COLLECTION, ANALYSIS, AND

More information

ADMINISTRATION CHAPTER 1

ADMINISTRATION CHAPTER 1 CHAPTER 1 ADMINISTRATION PART 1 SCOPE AND APPLICATION SECTION 101 SCOPE AND GENERAL REQUIREMENTS 101.1 Title. This code shall be known as the Florida Building Code, Energy Conservation, and shall be cited

More information

MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA TELEPHONE: FAX:

MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA TELEPHONE: FAX: MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA 16801 TELEPHONE: 814-231-3021 FAX: 814-231-3020 Checklist for Submission of APPLICATION for DEMOLITION PERMIT To obtain a permit for demolition