UPCOMING DESIGN & CONSTRUCTION PROJECTS 2 nd Quarter 2018 (Project & Construction Management)
|
|
- Archibald Crawford
- 6 years ago
- Views:
Transcription
1 UPCOMING DESIGN & CONSTRUCTION PROJECTS 2 nd Quarter 2018 (Project & Construction Management)
2 DESIGN PHASE PROJECTS
3 Manchester - Rehabilitation and Repair of Wharf 2 Structural concrete repair, fender replacement, pile replacement, and geotechnical rehabilitation. Design Time Frame NIGP Codes Small Business Opportunities PHA Contact 2nd Qtr nd Qtr Consultants Contractors Structural Concrete Repair Fender Replacement Pile Driving Steel Rebar Concrete forming Striping Photography Eddy Kharrazi ekharrazi@poha.com
4 Turning Basin - Design Repairs and Inspection of the Storm Water Sewer System Determine existing conditions of the storm water sewer system. Develop design repair plans and specs for construction bid. Design Time Frame NIGP Codes Small Business Opportunities PHA Contact 2nd Qtr th Qtr Consultants Contractors Site Preparation Storm Water Systems Jessica Shambra jshambra@poha.com
5 CONSTRUCTION PHASE PROJECTS
6 Barbours Cut - Expansion of Gate Facilities This design objective is to increase the gate capacity to handle anticipated future growth at this terminal. 2nd Quarter Site Preparation Demolition Earthwork Alvin Jackson ajackson@poha.com
7 Barbours Cut - Rehabilitation of Wharf 3 The wharf will be upgraded in order to support 100 feet gauge dock cranes and to accommodate larger ships. This project consists of the upgrade of 1000 feet of wharf, a new stevedore support building, structural elements, high mast pole lighting, and electrical infrastructure required to power three new dock cranes. 3rd Qtr th Qtr Material Testing Surveying Storm Water Controls Photography Chain Link Fence Security Electrical Signs and Paint Striping Bill Aguirre baguirre@poha.com
8 Barbours Cut - Lash Dock Demolition The project consists of the demolition of the Lash Dock located at the East End of Barbours Cut Terminal. The work includes the removal of all concrete structures such as decks and piles and dredging. 2nd Qtr rd Qtr Photography Demolition of Structures Concrete Traffic Barriers Barge Services Bill Aguirre baguirre@poha.com
9 BCT - Rehabilitation of Container Yard C1N and C2N The scope of work includes the construction of approximately 20 acres of concrete pavement for storage of containers as well as traffic lanes to maintain circulation into and around storage areas. 1st Qtr nd Qtr Demolition Concrete Grading Excavation Barbara H. Smith bhsmith@poha.com
10 Bayport - Construct Rail Spur ( PTRA Track South Bayport) Construction of approximately 6500 track feet of rail at the Bayport Terminal. This rail will cross State Highway (SH) 146 and connect the existing rail from Strang Rail line to within 900 feet of the Container Freight Station (CFS) Road in the Bayport Intermodal Facility. This project will also include clearing, grubbing, drainage, rail crossings, signalization, and perhaps a sound wall, if required. 3rd Qtr rd Qtr Clearing Brush Storm Water Controls Flagman Traffic Controls Surveying Photography Material Testing Rail Roads Alvin Jackson ajackson@poha.com
11 Install Fender System at Wharf Nos. 1 & 2 at CARE Terminal Project will remove the existing fenders and install new fenders at Wharf 1 & 2 at the CARE Terminal. 4th Qtr st Qtr Fender Replacement Pile Diving Alvin Jackson ajackson@poha.com
12 JacintoPort Repair of Deck & Back Up Pavement on Wharf Nos. 1, 2 & 3 This project consists of repairing existing holes in the deck at JacintoPort Terminal. 4th Qtr st Qtr Structural Concrete Repair Steel Rebar Concrete Forming Striping Jessica Shambra jshambra@poha.com
13 Rehabilitation of Transit Shed Floor at Wharf No. 46 at Turning Basin Terminal Repair of top floor slab of the transit shed. 3rd Qtr nd Qtr Concrete and Rebar Excavation Barbara H. Smith
14 Turning Basin North - Wharf 11, 12 and 13 Damage Repair This project consists of repairing damage to piles, shear walls and structural members of the wharfs. 4th Qtr st Qtr Structural Concrete repair Steel Rebar Concrete forming Striping Photography Eddy Kharrazi ekharrazi@poha.com
15 Turning Basin North - Splash Zone Painting 2018 Painting and preservation of splash zone area. 3rd Qtr nd Qtr Water blasting Painting Sandblasting Ural Thompson uthompson@poha.com
16 Turning Basin - Transit Sheds Roof Repair Roof removal and replacement for Transit Sheds 30/31 4th Qtr st Qtr Roofing Site Clearing Waste and Remediation Ural Thompson uthompson@poha.com
17 Turning Basin North - Ramp Road 7 Speed Gate This project will demolish the entire building structure, slab, pool, pool deck, parking lot to grade on the existing site. 3rd Qtr th Qtr Security Systems Electrical Communications Alvin Jackson ajackson@poha.com
18 Turning Basin - Bi-Annual Rail and Switch Replacement Repairs or replaces rail and rail switches throughout the Turning Basin Terminal 1st Qtr th Qtr Rail and Ballast Concrete and Rebar Rail Switches Drainage Alvin Jackson ajackson@poha.com
19 Turning Basin - Demolition of Seafarers Building This project will demolish the entire building structure, slab, pool, pool deck, parking lot to grade on the existing site. 3rd Quarter Hauling Photography Demolition Alvin Jackson ajackson@poha.com
20 Turning Basin - Rehabilitation and Repair of Wharf 9 Structural concrete repair, fender replacement, and geotechnical rehabilitation. 1st Qtr st Qtr Structural Concrete Repair Fender Replacement Pile Driving Steel Rebar Concrete forming Striping Photography Eddy Kharrazi ekharrazi@poha.com
Electrical Work. NOV Embankments Over Swamps and Compressible Soils
GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification
More informationPortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant
PortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant Quick Facts PortMiami is located in Miami-Dade County, one of the most diverse, multilingual populations in the U.S. making
More informationTEXAS PORTS STRATEGIC MISSION PLAN & PORT CAPITAL PROGRAM. November 16, 2016 November Transportation Commission Workshop November 16, 2016
TEXAS PORTS STRATEGIC MISSION PLAN & PORT CAPITAL PROGRAM November 16, 2016 Texas Ports Strategic Mission Plan Section 55.007 of the Texas Transportation Code requires the Port Authority Advisory Committee
More informationSTATE AID GUIDE FOR: Updated: December 16, 2005
STATE AID GUIDE FOR: Updated: December 16, 2005 1. AFTER THE FACT RIGHT OF WAY DEPARTMENT OF MINNESOTA TRANSPORTATION 2. MISCELLANEOUS AFTER THE FACT Traffic Signals, Lighting, Retaining Walls, Sidewalk,
More informationI-91 Viaduct Public Information Briefing
I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 10 December 18, 2017 Agenda Welcome Update on Construction Activities (Full Beneficial Use) Next:
More informationCIRCLE K SUB-CONTRACTOR BID FORM
CIRCLE K SUB-CONTRACTOR BID FORM Store No: 3308 Address: 8985 Will Clayton Pkwy Date: Bid Due September 17, 2014 Sub Contractor: Trade CONSTRUCTION TAX Construction Tax EXCAVATION / DIRT WORK Cut / Fill
More informationRAIL-HWY PROJECT DEVELOPMENT GUIDE AND
RAIL-HWY PROJECT DEVELOPMENT GUIDE AND New procedures for Railroad Right-of-Entry Agreements & Bid Documents (SP Item 007) Bridge Division Webinar - July 18, 2013 GUIDE TO RAILROAD PROJECT DEVELOPMENT
More informationDIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS
OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006
More informationCompleted. Project. Melbourne High School. Comprehensive Additions and Renovations
Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project
More informationItem Name Description Unit of Measure Mobilization Per WSDOT Lump Sum
Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of
More informationSection 4 - Design and Construction Overview
Section 4 - Design and Construction Overview 4-1 Building Architecture/Enclosure The Pearland Recreation Center and Natatorium houses a recreation center and natatorium as shown in Figures 4-1.1 First
More informationVIRGINIA UTILITY PROTECTION SERVICE, INC. Title: Ticket Entry - Work Type List Working Document
Printed copies are for reference only. Please refer to the electronic copy for the latest version. Purpose: To provide instructions for editing the work type list through Newtin administrator accounts
More information1420 Miner Street Des Plaines, IL P: desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS)
1420 Miner Street Des Plaines, IL 60016 P: 847.391.5380 desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS) Five sets of stamped plans and specifications (six sets if food establishment),
More informationTOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:
TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be
More informationAAPA Facilities and Engineering Seminar. Robert Tolsma PE, PPM, D.PE Division Manager Atkins North America San Diego, CA Oct 22, 2015
AAPA Facilities and Engineering Seminar Robert Tolsma PE, PPM, D.PE Division Manager Atkins North America San Diego, CA Oct 22, 2015 Realizing the Value of Port Infrastructure Reinvestment Through Life
More information1. FROM (Bidder): (Name)
Tender No. [ ] Tender Forms Page 1 1. FROM (Bidder): (Name) (Address) TO: Alberta Transportation, Strategic Procurement Branch Main Floor, Twin Atria Building 4999 Avenue 5000 Edmonton, Alberta, T6B 2X3
More informationI-405 Sepulveda Pass Widening Project. Community Advisory Committee Meeting June 24, 2010
I-405 Sepulveda Pass Widening Project Community Advisory Committee Meeting June 24, 2010 1 MWD LA-29 Project Drilling to install beams for shoring to support excavation at Sunset Bl and Church Ln 2 MWD
More informationBNSF RAILWAY COMPANY
BNSF RAILWAY COMPANY GUIDELINES FOR PREPARATION OF BRIDGE DEMOLITION & REMOVAL PLAN OVER THE BNSF RAILWAY OFFICE OF DIRECTOR BRIDGE ENGINEERING KANSAS CITY, KANSAS August 21, 2008 INDEX ITEM PAGE I. General
More informationSOLUTIONS FOR THE BUILT WORLD. Assess & Prioritize. Keys to Asset Management. Carl J. Larosche, PE.
SOLUTIONS FOR THE BUILT WORLD Assess & Prioritize Keys to Asset Management Carl J. Larosche, PE www.wje.com Presentation Outline The Case for Asset Management Executive Decision-making Element-based Inspection
More informationJANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25
General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO
More informationAlternative No. 1 Total Cost DRAFT
OPINION OF PROBABLE PROJECT COSTS SUMMARY OF ALL THREE ALTERNATIVE ALIGNMENTS Item Description Alternative No. 1 Total Cost Alternative No. 2 Total Cost Alternative No. 3 Total Cost Design Phase 1. Preliminary
More informationNCDOT Overview. Nick Tennyson, Chief Deputy Secretary March 4, 2015
NCDOT Overview Nick Tennyson, Chief Deputy Secretary March 4, 2015 Overview Major Functions of DOT Board of Transportation Highway System Overview Construction- Road Building Process Operations and Maintenance
More informationVirginia Department of Transportation. Tabulation of Bids. Counties: REPLACE SUPERSTRUCTURE OVER NORFOLK SOUTHERN RR
Page 1 of 14 0010 00100 MOBILIZATION 0020 00101 CONSTRUCTION SURVEYING (CONSTRUCTION) 0030 00110 CLEARING AND GRUBBING 0040 00120 REGULAR EXCAVATION 0050 00126 EARTHWORK 0060 00140 BORROW EXCAVATION ACRE
More informationDIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012
2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include
More informationI-91 Viaduct Public Information Briefing
I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 9 September 13, 2017 Agenda Welcome and Presenter Introductions Update on Construction and Demolition
More informationDulles Corridor Metrorail Project Phase 1 & Phase 2 Updates
Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates November 29, 2017 Charles W. Stark Executive Project Director Silver Line: Phase 2 Station Tour Phase 1 Phase 1 Cost Summary Expenditures (May
More informationBIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample
BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS Project Name: Address: Owner: Phone/Fax/Email: Architect / General Contractor Name: : BID DEADLINE DATE: SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME:
More informationCITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)
CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY 42141 Phone: (270) 651-3921 Fax: (270) 651-9553 Permit # Filing Date: Total Fee: Property Property Owner: Subdivision: Lot #
More informationBids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)
General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER
More informationTable of Contents for Guide Specifications
Table of Contents for Guide Specifications 01270A Measurement and Payment 01355A Environmental Protection 01356A Storm Water Pollution Prevention Measures 01421 Basic Storm Water Pollution Prevention Plan
More informationProject Type: Drainage and Storm Systems
580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install
More informationSECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION
820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing
More informationPort Authority of Guam
Port Authority of Guam An Inside Look at the Port Authority of Guam Presented to the: United Nations Economic & Social Commission for Asia and the Pacific High Level Meeting on Strengthening Inter- Island
More informationHUDSON TUNNEL PROJECT
HUDSON TUNNEL PROJECT NORTH BERGEN COMMUNITY MEETING Lido Restaurant 2600 Tonnelle Avenue North Bergen, NJ January 30, 2018 6:00-8:00 PM Agenda Project Overview Construction Activities in North Bergen
More informationAREAWIDE BRIDGE REPLACEMENT AND REHABILITATION
CECIL COUNTY 2018 TRANSPORTATION IMPROVEMENT PROGRAM AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION DESCRIPTION: On-going program to provide major upgrades to state owned bridges that are structurally
More informationProject #1139 Budget #82. $ Budgeted $ Billed to Date $ Paid to Date $ Due 210, , , ,158.50
Project #1139 Budget #82 $ Budgeted $ Billed to Date $ Paid to Date $ Due 210,087.68 120,979.20 120,979.20 77,158.50 Deposit Paid Deposit Due Phase I: Project Programming and Research $ Budgeted $ Billed
More informationAviation Capital Construction Program Update
Aviation Capital Construction Program Update 2012 Completed Projects 2013 Active Projects Bern Seals Program Manager Parsons Management Consultants April 2013 0 Discussion Agenda Program Safety Performance
More informationNORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA
NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA PURPOSE AND SCOPE These criteria modify and supplement the applicable sections of the AREMA Manual of Recommended Practice in connection
More informationProperty Offering. Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711
Property Offering Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711 Executive Summary We are pleased to present an outstanding cold storage opportunity in Evansville, Indiana. Built in
More informationCategorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation
Categorical Exclusion Programmatic Agreement Between the Federal Highway Administration And the Indiana Department of Transportation Introduction The Indiana Department of Transportation (INDOT) and the
More information2.0 PROJECT DESCRIPTION
2.0 PROJECT DESCRIPTION The following section provides a description of the Project, including construction and temporary works necessary for the Project to proceed. Prior to describing the various Project
More informationJacksonville Port Authority Blount Island Marine Terminal Rail Improvements Jacksonville, Florida
Jacksonville Port Authority Blount Island Marine Terminal Rail Improvements Jacksonville, Florida By: Bryan K. Haye, Senior Project Manager; Michael J. Shostak, P.E., Vice President; and Clinton C. Lalla,
More informationREQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES
REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will
More informationDulles Corridor Metrorail Project Phase 1 & Phase 2 Updates
Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates June 30, 2017 Charles W. Stark Executive Project Director Phase 2 Station Tour 2 Phase 1 Phase 1 Cost Summary Quarter Expenditures (Feb, Mar,
More informationSECTION UNCLASSIFIED EXCAVATION AND GRADING
SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on
More informationBuilding/Zoning Permit Fee Structure
SECTION A - Calculation of Fees 1. Square Foot Basis The square footage shall be calculated on the out-to-out dimensions of the building or structure and shall include all areas, whether finished or unfinished,
More informationREQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.
REQUEST FOR TENDER - SERVICES 1. PURPOSE AND SCOPE This specification is intended to govern the supply of all labour, materials and equipment for the dismantling, demolition of a single dwelling on the
More informationUNINCORPORATED JACKSON COUNTY BUILDING PERMITS
UNINCORPORATED JACKSON COUNTY BUILDING PERMITS May, 2014 Department of Public Works Planning and Environmental Health PREFACE The purpose of this manual is to provide an overview of the procedures to apply
More informationThis guide only applies for sewer assets up to and including 225mm diameter.
INTRODUCTION This guide only applies for sewer assets up to and including 225mm diameter. These guidelines (subject to change) provide an outline of the requirements which need to be considered when planning
More informationGREENE COUNTY - SR 221(J10) # PROPOSAL:$11.76 PLANS:$ X18:$ X36:$47.10
ASSOCIATED PENNSYLVANIA CONSTRUCTORS Update January 3, 2018 GREENE COUNTY - SR 221(J10) #105392 PROPOSAL:$11.76 PLANS:$4.18 12X18:$5.13 24X36:$47.10 The description and location of the project is as follows:
More informationRe: PW Appendix 3 - Part 8
Demolish S/W DVP ramp, FGE WBL (including Logan Ramp), Don River bridge WB, and existing LSB WBL Construct new S/W DVP ramp, FGE WBL ramp, Don River bridge WB, and remaining portion of LSB WB roadwork.
More informationQUEEN ALEXANDRA COMMUNITY CENTRE
BRICK REPOINTING AND NEW BARRIER FREE RAMP 180 BARNARDO AVENUE PETERBOROUGH, ON. ARCHITECTURAL A1 A1 A2 SITE PLAN AND DEMOLITION NOTATION NEW CONSTRUCTION DETAIL PLANS AND SECTIONS NEW CONSTRUCTION SECTION
More informationPanama City Marina City of Panama City, Florida
Panama City Marina City of Panama City, Florida MARINA BULKHEAD ASSESSMENT October 3, 2011 Prepared For: Prepared By: 543 Harbor Boulevard, Suite 204 Destin, Florida 32541 DRAFT - 12/19/2011 Panama City
More informationPermit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:
Permit Requirements: Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install,
More informationDesign-Build Capital Infrastructure Project
Design-Build Capital Infrastructure Project US$60 Million Project Duration 2012 Responsible for drainage systems and construction QA-QC oversight and project documentation and as-built review and acceptance.
More informationSection: TABLE OF CONTENTS Temporary Facilities. 04.A General B Access and Haul Roads
Section 4 TABLE OF CONTENTS Temporary Facilities Section: Page 04.A General... 4-1 04.B Access and Haul Roads... 4-3 4-i SECTION 4 Temporary Facilities 04.A General. 04.A.01 Plans for the layout of temporary
More informationInstallation of RMG Cranes at Intermodal Rail Yard ABSTRACT INTRODUCTION
1 ABSTRACT Installation of RMG Cranes at Intermodal Rail Yard Louis A. Klusmeyer, MASCE, PE, SE 1 Project Manager, BergerABAM, 1301 Fifth Avenue, Suite 1200, Seattle, WA 98101; PH (206) 357-5600, email:
More informationADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012
ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle
More informationCOMMUNITY BOARD EIGHT
SECOND AVENUE SUBWAY PROJECT COMMUNITY BOARD EIGHT PROJECT UPDATE SEPTEMBER 26, 2011 Scope: SECOND AVENUE SUBWAY - PHASE 1 Tunnels from 92 nd St to 63 rd St Stations at 96 th St, 86 th St, 72 nd St and
More information15.8 Multipurpose Terminal Project Preparing Alternative Terminal Plans
15.8 Multipurpose Terminal Project 15.8.1 Preparing Alternative Terminal Plans As mentioned in Section 15.4, it is required to build a multipurpose terminal with six (6) 14-meter-deep berths and spacious
More informationSPACE TYPE: OUTSIDE PARKING (STRUCTURE)
SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.
More informationAbington Memorial Hospital Abington, PA. Project Description
Project Description Project Description Project Background The expansion is a seven story, 360,000 SF addition with a total project cost of $98 million. Construction began in February 2003 and the project
More informationSOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY
SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY Ryers Station Improvement Project Robert L. Lund, Jr., PE Assistant General Manager Engineering, Maintenance and Construction Division David J. Sands,
More informationM I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)
BID TABULATION SUMMARY JOB 940094 PAGE 1 STATE PROJECT NO. 162-080-04 BIDS RECEIVED UNTIL 11:00 A.M. ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BETWEEN 2ND STREET NORTH AND 15 STREET NORTH IN ST.
More informationThis is the title of the proposed project. A CIP contract or project number will be assigned to the projects as funding is established.
BUILDING PROJECTS PROJECT DESCRIPTIONS The CIP includes a general list of projects scheduled during each of the five years of the program, followed by detailed project sheets arranged by project category,
More informationMarbella Isles Homeowners Association, Inc.
REQUEST FOR ARCHITECTURAL REVIEW Please Note: There is a $25.00 non-refundable processing fee for all requests. The application will not be processed if it is not included with application. Make check
More informationOutreach Meeting September 29, 2016
Outreach Meeting September 29, 2016 Introductions Project Overview Heavy Civil GC/CM Process S/DBE Goals Bid Package Breakdown SDBE Opportunities Working w/kiewit-hoffman E130 is initial section of Eastlink
More informationTEMPORARY FACILITIES
04.A GENERAL SECTION 4 TEMPORARY FACILITIES 04.A.01 Plans for the layout of temporary construction buildings, facilities, fencing, and access routes and anchoring systems for temporary structures shall
More informationRebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.
FEMA 50% RULE - SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT/DAMAGE Z101-0410 NOTICE TO PROPERTY OWNERS Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES
Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle
More informationSeward Chamber of Commerce Update
Seward Chamber of Commerce Update Safety Briefing Introductions Project Vision Our Stakeholders Review of Information Gathered Next Steps Questions and Answers Project Team Project Management/Engineering
More informationChapter 2. Description of Proposed Action(s) and Alternatives
Chapter 2 Description of Proposed Action(s) and Alternatives 2-1 2.0 2.1 INTRODUCTION The Port of Seattle (Port), in partnership with the Northwest Seaport Alliance (NWSA), is proposing the Terminal 5
More informationFederal Project No.: NONE
Schedule of Items Page: 2 0001 BASE BID- STA. 10+00-23+00 0010 513 00100 0020 517 00101 MOBILIZATION LUMP SUM LUMP SUM CONSTRUCTION SURVEYING (CONSTRUCTION) 0030 301 00110 LUMP SUM LUMP SUM CLRING AND
More informationNew Reclaim Tunnel at Coal Fired Plant
Omaha SAME Post Monthly Meeting 10 July 2014 New Reclaim Tunnel at Coal Fired Plant By: Steve Morrissette Zapata Incorporated Omaha, NE Coal Fired Power Plant Generating capacity: 2,090 megawatts base
More informationG2-0 LIST OF ACTIVE MTODs
G2-0 LIST OF ACTIVE MTODs DIVISION 100 - ABBREVIATIONS 101.070 Legend - Pavement Markings Apr 1, 1994 Jan 4, 1994 TOS/TO For use with Pavement Marking items. DIVISION 200- GRADING 219.101 Light Duty Straw
More informationBUILDING DEPARTMENT GUIDE TO RESIDENTIAL BUILDING PERMITS
271 Sandwich St. South Amherstburg, Ontario N9V 2A5 Website: www.amherstburg.ca Phone: 519-736-5408, Fax: 519-736-7111 BUILDING DEPARTMENT GUIDE TO RESIDENTIAL BUILDING PERMITS www.amherstburg.ca January
More informationCITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION Edition
CITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION PURPOSE, INTENT AND INTERPRETATION OF SPECIFICATIONS The purpose of these Specifications is to establish, where applicable, minimum acceptable standards
More informationAttachment D-1: Civil/Structural Scope of Work
Attachment D-1: Civil/Structural Scope of Work Project: Location: Targa Sound Renewable Fuels Project Tacoma, WA Prepared by: NORWEST ENGINEERING Consulting Engineers 4110 N.E. 122 nd Avenue, Portland,
More informationPITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008
BT-1 of 7 Clearing and Grubbing L.S. $50,000.00 $50,000.00 $5,335.00 $5,335.00 $14,560.00 $14,560.00 $20,000.00 $20,000.00 $10,600.00 $10,600.00 Class 1 Excavation 4300 C.Y. $20.00 $86,000.00 $15.00 $64,500.00
More informationBNSF Memphis Intermodal Facility
(Word Count 4,817 without figures) BNSF Memphis Intermodal Facility Trent Hudak, Director of Engineering BNSF Railway Company 4515 Kansas Ave., Kansas City, KS 66106 Phone 913.551.4435 Fax 913.551.4077
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,
More informationCONSTRUCTION AND RENOVATION FUNDED BY THE CFI EXAMPLE OF A DETAILED COST ALLOCATION METHOD
CONSTRUCTION AND RENOVATION FUNDED BY THE CFI EXAMPLE OF A DETAILED COST ALLOCATION METHOD March 2009 CONSTRUCTION AND RENOVATION FUNDED BY THE CFI Prepared For: CANADA FOUNDATION FOR INNOVATION 230 QUEEN
More informationGrowth In Container Volumes
US GDP and TEU Trade: 1980-2005 600 Recession Total US TEUs 500 US GDP 400 300 200 100 0 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002
More information2013 R-1 Building Permit Package For Additions, Decks, Fences & Garages
2013 R-1 Building Permit Package For Additions, Decks, Fences & Garages Table of Contents Application for Building Permit 3 Sewer Connection Permit.. 4 Water Connection Permit... 5 Application for Utility
More informationTRB Summer Conference June 15-18, 2008 Baltimore, Maryland DOT Practices for the Identification and Abatement of Asbestos in Bridges - TxDOT
TRB Summer Conference June 15-18, 2008 Baltimore, Maryland DOT Practices for the Identification and Abatement of Asbestos in Bridges - TxDOT Rodney Concienne, P.G. Terry Dempsey, P.G. Pollution Prevention
More informationCarpinteria Avenue Bridge Replacement Project Description Introduction
Carpinteria Avenue Bridge Replacement Project Description Introduction The City of Carpinteria is proposing to replace the existing Carpinteria Avenue Bridge over Carpinteria Creek (Br. No. 51C 0172) with
More informationCherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12
SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and
More informationREQUEST FOR PROPOSAL ARCHITECTURAL & ENGINEERING SERVICES OTTAWA COUNTY ROAD COMMISSION COOPERSVILLE AREA MAINTENANCE COMPLEX
REQUEST FOR PROPOSAL ARCHITECTURAL & ENGINEERING SERVICES OTTAWA COUNTY ROAD COMMISSION COOPERSVILLE AREA MAINTENANCE COMPLEX The Ottawa County Road Commission is seeking the submittal of written proposals
More informationConsulting Engineers. civil structural geo-environmental traffic flood risk renewable energy rail party wall & cdmc
Over 30 years successfully providing cost effective and innovative solutions for the built environment. www.jnpgroup.co.uk civil structural geo-environmental traffic flood risk renewable energy rail party
More informationJobsite Layout Considerations
1 Jobsite Layout Considerations The controlling contractor must consider many factors when laying out a site to support construction operations Site and building size and Equipment requirements configuration
More informationLump Sum L.S. (15") EA
Page of 6 ROADWAY ITEMS 000 000000000-N 800 MOBILIZATION Lump Sum L.S. 000 000000000-N 80 CONSTRUCTION SURVEYING 0003 009000000-N SP REINFORCED BRIDGE APPROACH FILL, STATION ************ (5+6.0) 000 0050000000-E
More informationjmt.com INNOVATIVE PROJECT DELIVERY Part of a diversified family of solutions
jmt.com INNOVATIVE PROJECT DELIVERY Part of a diversified family of solutions Markets Transportation Buildings & Facilities Water, Wastewater & Utilities About Us Founded in 1971, Johnson, Mirmiran & Thompson,
More informationPRESERVING LOUISIANA S INFRASTRUCTURE: US190 MISSISSIPPI RIVER BRIDGE
PRESERVING LOUISIANA S INFRASTRUCTURE: US190 MISSISSIPPI RIVER BRIDGE Overview 1. Project Objectives 2. Bridge Data 3. Timeline 4. Existing Condition 5. Sequence of Coating and Repair Operations 6. Major
More informationPLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port Engineer / Vice President
PLANNING, DESIGN, and REALIZATION OF AUTOMATED TERMINALS Ashebir Jacob P.E. Senior Port Engineer / Vice President 1 Moffatt & Nichol Founded in 1945 in Southern California to serve the U.S. Navy & the
More informationMAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3
MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT 2018.03 EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3 The following changes are made to the Proposal, Specifications, and Plans. PROPOSAL Proposal Sheets
More informationSS David L. Seago, P.E. Assistant Director of Construction Dallas District CST Conference
SS 1122 David L. Seago, P.E. Assistant Director of Construction Dallas District Guidance Document (SS 1122) Lists some of the main differences between previous specifications used and newly implemented
More informationODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS
B401: DELETED B402: DELETED B403: DELETED B404: STRUCTURE/CULVERT IDENTIFICATION SIGNS B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS B406: ITEM 514 - FIELD PAINTING, MISC.; REPAIR PAINTING
More informationMaine Turnpike Authority FINAL 4-year Capital Investment Plan ( )
Total preliminary Value for Project shown in initial year is for project duration. Projects have been listed in each year there are major Preliminary 4.8 Beech Ridge Road Underpass Repairs York $410,000
More informationTERMINAL 5 CARGO WHARF REHABILITATION, BERTH DEEPENING, AND IMPROVEMENTS PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT. Chapter 1. Summary 1-1 SUMMARY
Chapter 1 Summary 1-1 SUMMARY 1.0 SUMMARY 1.1 INTRODUCTION The Port of Seattle (the Port), in coordination with the Northwest Seaport Alliance (NWSA), is proposing the Terminal 5 Cargo Wharf Rehabilitation,
More informationAgenda. PRE-CONSTRUCTION PUBLIC MEETING September 18, 2014
Agenda Welcome FTA Full Funding Grant Agreement Update GLX Phase 1 Construction Update GLX Phases 2/2A, 3 & 4 Construction Contracts Upcoming Early Construction Work Construction Mitigation Night & Weekend
More information