1 PORT OF MIAMI TUNNEL PROJECT Highlights & Where we are today! FEBRUARY 12, 2014 FTBA CONSTRUCTION CONFERENCE

2 PROJECT PARTNERS Public Sponsors 90% Equity Partner Contractor 10% Equity Partner Operator Federal Support

3 OVERVIEW OF PROJECT COST Overall Project Cost $1.2B Design & Construction Cost $663.5M $100M during Construction consisting of 4 defined milestone payments: 1 st Milestone - $20m Tunnel Design Complete (Paid) 2 nd Milestone - $40m TBM at work in 1 st Bore (Paid) 3 rd Milestone - $25m TBM at work in 2 nd Bore (Paid) 4 th Milestone - $15m Substantial Completion of MacArthur Causeway $350M at Final Acceptance of Construction Total Milestone Payments = $450M Concessionaire compensated through Milestone payments during construction period Availability payments during operating period ($32.5M adjusted for inflation)

4 PUBLIC-PRIVATE PARTNERSHIP OVERVIEW Concessionaire will design, build, finance, operate and maintain (DBFOM) tunnel for 35 years Design and construction - first 55 months Operation and maintenance - remaining 30 years and 5 months through facility hand-back No tolls

5 PROJECT BENEFITS American Airlines Arena Bayside Marketplace Provide a direct connection between the Seaport, Airport and the Interstate Highway System Maintain PortMiami as the county s second leading economic generator Relieve congested downtown Miami streets of Port passenger and cargo traffic, improving safety as trucks also traverse areas of pedestrian activity Facilitate ongoing and future development plans in and around downtown Miami

6 SCOPE OF WORK MacArthur Cswy Bridge Widening Shifting of EB MacArthur Cswy Twin tunnels under Government Cut Modification of Dodge Island Roadway System

7 MACARTHUR CAUSEWAY BRIDGE WIDENING Interior Widening for additional traffic lanes to tunnel continue Work on Piers 16, 17, 18 & 19 as well as demo of site establishment Pier Construction (10 segments cut into existing walls to splice reinforcement with #11 rebar for erection of the piers

8 TUNNEL BORING MACHINE EB & WB BREAK-IN, BREAKOUT & TUNNEL Mining of the Eastbound Tunnel began on November 11, 2011 and was completed on July 31, 2012 (751 Rings & 4,186 LF) Mining of the Westbound Mining began October 29, 2012 and was completed on May 6, 2013 (745 Rings & 4,152 LF)

9 BORED TUNNEL TYPICAL SECTIONS Two 12 Travel Lanes 2-6 Shoulders on both sides 2-2 Maintenance Walkway in each Tunnel Internal Diameter of Tunnel is 37 Spacing between Tunnels varies from 21 & 60

10 CUT & COVER TYPICAL SECTIONS

11 Tunneling Profile Section & Cross Passages Tunnels are approximately 4200 ft. long +40 ft. under the bottom of Government Cut & approximately 120 ft. below the surface at deepest point 5% Grade 5 cross passages

12 CROSS PASSAGES CONSTRUCTION CROSS PASSAGE LENGTHS CP1 15 ft. CP2 36 ft. CP ft. CP4 43 ft. CP ft. Five cross passages, or emergency exits, are being built between the two tunnels. Cross passages are approximately 700 feet Cross passages 1, 4 and 5 are not underneath the channel and were pretreated from ground surface using cutter-soil mixing panels that form a grouted block of soil and were excavated. Cross passages 2 and 3, which go underneath Biscayne Bay, were treated with a brine to freeze the ground and excavated.

13 CROSS PASSAGES GROUND FREEZING PROCESS 44 freezing pipes were installed Estimated freeze time once brine installed at -22 F was 40 days. A small cooling unit was installed in the second tunnel to cool the lining segments and ensure efficient closing of ice ring. Steel support frame was installed to prevent movements of the first tunnel due to ice pressures. Steel door was installed as fail safe to be closed in case of an emergency during excavation.

14 CROSS PASSAGES MECHANICAL AND ELECTRICAL INSTALLATION

15 CURRENT INTERIOR VIEW OF TUNNEL

16 CONCEPTUAL INTERIOR VIEW OF TUNNEL Aluminum Architectural Panels will be installed as final finish Installation of internal structures and Mechanical- Electrical-Plumbing-Fire (MEPF) continue to be installed in both tunnels including fire main piping, electrical conduits and cabling, junction boxes and ITS equipment.

17 WATSON ISLAND PORTAL CONSTRUCTION

18 DODGE ISLAND PORTAL CONSTRUCTION

19 WATSON & DODGE ISLANDS PORTAL DESIGN Tunnel Portal construction continues and will house the Flood Gates which come down in the event of a storm to prevent flooding of tunnels

20 WATSON & DODGE ISLAND SUPPORT BUILDINGS CONSTRUCTION Both buildings structural elements are complete Mechanical, Electrical & Plumbing (MEP) as well as finishes for buildings continue to be installed Installation of building ventilation, sprinkler system and electrical (switchboards & cabling), as well as fire alarms are under works

21 SUPPORT BUILDINGS CONSTRUCTION

22 Dodge Island Roadway Improvements EB & WB Port Boulevard was shifted to Final Condition South Cruise Boulevard was completed New Truck Bridge was partially open to one lane Construction continues on internal roadways

23 PROJECT SCHEDULE July 31, 2012 Completion of eastbound tunnel May 6, 2013 Completion of westbound tunnel Spring 2014 Completion of Dodge Island roadway improvements May 19, 2014 Substantial Completion - Port of Miami Tunnel opens to traffic, O&M Period begins August 18, 2014 Final Completion As of 2/12/14 - Construction Days to Date: 1552 of 1765 (55 months) = 87.9% of Design-Build

24 Questions?

Hampton Roads Bridge-Tunnel Expansion Feasibility Study. Design Considerations

Hampton Roads Bridge-Tunnel Expansion Feasibility Study. Design Considerations Hampton Roads Bridge-Tunnel Expansion Feasibility Study Tunnels Design Considerations The proposed location for the new tunnel crossing is about 250 feet away from the existing westbound tunnel. This matches

More information

3.6 Construction Methods

3.6 Construction Methods Exhibit 144: Birchmount Stop Layout West Don River Bridge - Girders are adequate to accommodate LRT right-of-way and required deck widening. Supplementary support or deck strengthening may be required

More information

Getting. Dodge. in and outa

Getting. Dodge. in and outa Getting in and outa Dodge Visitors from Florida Atlantic University s Geomatics Engineering program being escorted into the starting box by tunnel surveyors and coauthors Mael Le Coq and Robert Loane,

More information

INTERNATIONAL DESIGN & CONSTRUCTION

INTERNATIONAL DESIGN & CONSTRUCTION INTERNATIONAL DESIGN & CONSTRUCTION 40 September 2013 ROADS&BRIDGES Sea and seismicity Istanbul Strait Tunnel overcomes unique set of risks By Sanja Zlatanic, P.E., and Nasri Munfah, P.E. Contributing

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update March 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: March 1, 2014

More information

Hampton Roads Bridge-Tunnel

Hampton Roads Bridge-Tunnel December 19, 2008 Hampton Roads Bridge-Tunnel Expansion Feasibility Study Final Report With Tunnel and Bridge Information Provided by PB Americas and Moffatt and Nichol Prepared by: Hampton Roads Bridge-Tunnel

More information

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV NORTH SHORE CONNECTOR TUNNELS AND STATION SHELL LIGHT RAIL PROJECT PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV North Shore Connector Alignment 7300 lf Extension to existing 25 mile system 18 Contracts $435

More information

HUDSON TUNNEL PROJECT

HUDSON TUNNEL PROJECT HUDSON TUNNEL PROJECT NORTH BERGEN COMMUNITY MEETING Lido Restaurant 2600 Tonnelle Avenue North Bergen, NJ January 30, 2018 6:00-8:00 PM Agenda Project Overview Construction Activities in North Bergen

More information

6 Preliminary Assessment of Construction Method and Constructability Issues

6 Preliminary Assessment of Construction Method and Constructability Issues 6 Preliminary Assessment of Construction Method and Constructability Issues 6.1 Construction Approach Appendix C includes conceptual designs of the alternatives discussed below. Generally, the conceptual

More information

Elizabeth River Tunnels Project. ASHE October Technical Meeting ERT Project Overview October 8, 2015

Elizabeth River Tunnels Project. ASHE October Technical Meeting ERT Project Overview October 8, 2015 Elizabeth River Tunnels Project ASHE October Technical Meeting ERT Project Overview October 8, 2015 Project Location: Hampton Roads, VA ERT Project Scope New, two-lane, WB tunnel Rehab and lifesafety improvements

More information

Hudson River Tunnels, Mega Projects, and Risk A Designer s Perspective

Hudson River Tunnels, Mega Projects, and Risk A Designer s Perspective Purdue Geotechnical Society Workshop Digging Deep April 8, 2011 Hudson River Tunnels, Mega Projects, and Risk A Designer s Perspective David Chapman, P.E. Lachel & Associates, Inc. Morristown, NJ Hudson

More information

Funding was provided by the City of New York via the Hudson Yards Infrastructure Corporation and Hudson Yards Development Corporation.

Funding was provided by the City of New York via the Hudson Yards Infrastructure Corporation and Hudson Yards Development Corporation. FACT SHEET GENERAL INFORMATION The project extends the existing No.7 Line subway service via a 1.5 mile extension from Times Square to the new 34 Street Hudson Yards station located at West 34th Street

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014

More information

Mega Projects at WSDOT

Mega Projects at WSDOT Mega Projects at WSDOT Managing multiple projects in major urban corridors LINEA LAIRD, WSDOT ASSISTANT SECRETARY ENGINEERING & OPERATIONS Presentation to Oregon State Legislature Congestion Work Group

More information

introduction Introduction to Bridge and Tunnel Engineering Characteristics of ideal bridge Ideal location Factors affecting bridge type Classification

introduction Introduction to Bridge and Tunnel Engineering Characteristics of ideal bridge Ideal location Factors affecting bridge type Classification 1 introduction Introduction to Bridge and Tunnel Engineering A structure constructed over an obstacle to provide the passage Road bridge movement of traffic See NRS 2045 Cross drainage structure span greater

More information

Large Diameter Highway Tunnels

Large Diameter Highway Tunnels Large Diameter Highway Tunnels Richard Prust Towards a solution Need Feasibility Whole-life cost Corridors for through trips SR-99 carries a significant proportion of total through trips SR-99 corridor

More information

THE KOSCIUSZKO BRIDGE PROJECT. The New York State Department of Transportation. Page 1

THE KOSCIUSZKO BRIDGE PROJECT. The New York State Department of Transportation. Page 1 THE KOSCIUSZKO BRIDGE PROJECT The New York State Department of Transportation Page 1 THE KOSCIUSZKO BRIDGE PROJECT Constructed 70 years ago, the existing Kosciusko Bridge serves more than 160,000 vehicles

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update January 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

FTBA 2018 Construction Conference Major Projects Update

FTBA 2018 Construction Conference Major Projects Update FTBA 2018 Construction Conference Major Projects Update Bill Jones, P.E. FDOT District 7 Director of Transportation Development 1 2 3 FUNDED PROJECTS Howard Frankland Bridge Industry Forum September 2018

More information

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates November 29, 2017 Charles W. Stark Executive Project Director Silver Line: Phase 2 Station Tour Phase 1 Phase 1 Cost Summary Expenditures (May

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Downtown Corridor USC Galen Center November 13, 2007 Project Summary 8.6 mile corridor from 7th/Metro to Culver City 1.3 miles shared with Metro Blue Line 10 stations,

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM ADA Central, Contract 3 DBNUM: 15419 / UPC: 154190 This contract will bring projects into compliance with current ADA design requirements that could

More information

Pattullo Bridge Replacement Project. Cost Report

Pattullo Bridge Replacement Project. Cost Report Pattullo Bridge Replacement Project Cost Report January 2018 Cost Report Page i TABLE OF CONTENTS 1 PURPOSE... 1 2 BASIS FOR THE ESTIMATE... 2 2.1 Scope of the Works... 2 2.2 Scope of Capital Costs...

More information

Lesner Bridge Replacement

Lesner Bridge Replacement Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A Construction Camera has been installed to view images of the bridge construction. Images are updated on

More information

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016 Rt. 29 Solutions Project Delivery Advisory Panel February 18, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Feb

More information

6.2.2 Environmental Consequences and Mitigation Measures

6.2.2 Environmental Consequences and Mitigation Measures 6.2 6.2.1 Introduction The existing conditions, regulatory setting, and methods of analysis for transportation under CEQA are described in Chapter 3, NEPA and CEQA Analysis. Impacts that would result from

More information

I-74 Corridor in the Quad Cities A State of the Art Design

I-74 Corridor in the Quad Cities A State of the Art Design I-74 Corridor in the Quad Cities A State of the Art Design Mid-Continent Transportation Research Symposium August 16-17, 2017 Presented By: Norm McDonald, Iowa DOT State Bridge Engineer PRESENTATION OUTLINE

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions) FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant

More information

Final Recommendations Identification of Improvements, Strategies, and Solutions

Final Recommendations Identification of Improvements, Strategies, and Solutions Identification of Improvements, Strategies, and Solutions Prepared by: December 2015 TABLE OF CONTENTS 1. Introduction... 1 1 2. Freight Policy Recommendations... 2 1 3. Freight Infrastructure Recommendations...

More information

Section 13. Guidelines for the Design of Ground Mounted Sign Supports

Section 13. Guidelines for the Design of Ground Mounted Sign Supports Section 13 BDC11MR-04 13.1 Introduction Highway signs fall into two main categories, which are subdivided as follows: 1. Overhead Signs a. Sign Bridge Structures (GO) b. Sign Cantilever Structures (GO)

More information

Santa Clara Valley Transportation Authority Board of Directors. General Manager, Nuria I. Fernandez

Santa Clara Valley Transportation Authority Board of Directors. General Manager, Nuria I. Fernandez 8.1.C Date: Current Meeting: Board Meeting: December 6, 2017 December 7, 2017 December 7, 2017 BOARD MEMORANDUM TO: Santa Clara Valley Transportation Authority Board of Directors THROUGH: General Manager,

More information

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016 Overall project Johnson County Gateway Interchange Project Improvements 87th Street The $288 million Phase 2 DesignBuild project starts construction this spring, with completion by December 31, 2016 Phase

More information

McGraw Hill Yearbook of Science & Technology Traffic Operations and Structures: : Tampa's Reversible Express Lanes

McGraw Hill Yearbook of Science & Technology Traffic Operations and Structures: : Tampa's Reversible Express Lanes McGraw Hill Yearbook of Science & Technology 00 Traffic Operations and Structures: : Tampa's Reversible Express Lanes Journal: McGraw Hill 00 Yearbook of Science & Technology Manuscript ID: draft Manuscript

More information

4th International Engineering and Construction Conference - July 28, 2006

4th International Engineering and Construction Conference - July 28, 2006 4th International Engineering and Construction Conference - July 28, 2006 BOX-JACKING - A USEFUL CONSTRUCTION TOOL By Anthony Lynn, Berkeley Engineering Company, Inc. Box jacking is jacking a large precast

More information

I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings. Tier II June 11 th & 13 th, 2012

I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings. Tier II June 11 th & 13 th, 2012 I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings Tier II June 11 th & 13 th, 2012 Agenda Introduction & Background Study Area Purpose & Need Project Status Tier Methodology & Tier I Evaluation

More information

Transbay Program Phase 2 Downtown Rail Extension (DTX) Tunnel Options Study Briefing

Transbay Program Phase 2 Downtown Rail Extension (DTX) Tunnel Options Study Briefing Transbay Program Phase 2 Downtown Rail Extension (DTX) Tunnel Options Study Briefing April 2018 Study Purpose and Goals Initiated to address concerns about impacts resulting from cut-and-cover construction

More information

Transportation Modeling Tools. Rainer Dronzek November 3, 2006

Transportation Modeling Tools. Rainer Dronzek November 3, 2006 Transportation Modeling Tools Rainer Dronzek November 3, 2006 Presenter Info BSEE, Bradley University Institute of Industrial Engineers simulation Ask the Expert Simulation Solutions Conference chair and

More information

PortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant

PortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant PortMiami Rail Intermodal and Bascule Bridge Rehabilitation Project TIGER II Grant Quick Facts PortMiami is located in Miami-Dade County, one of the most diverse, multilingual populations in the U.S. making

More information

I-35W Retaining Wall Design Exhibit A - Draft Scope of Work

I-35W Retaining Wall Design Exhibit A - Draft Scope of Work Background MnDOT, Metro Transit, Hennepin County, and the City of Minneapolis are in the process of developing a project for Interstate 35W between 43 rd Street in Minneapolis and 15 th Street in Minneapolis.

More information

Metro Purple Line Extension

Metro Purple Line Extension metro.net/works Metro Purple Line Extension Construction Fact Sheet summer 2013 building the stations Construction at each station is estimated to take five to seven years. The station is a large box,

More information

Tunnel. Immersed Tunnels

Tunnel. Immersed Tunnels Tunnel Tunnels are underground spaces, usually, in a tubular shape with substantial lengths. They can either be man-made or natural and can be used as passageways, storages, carriageways and utility ducts.

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2013 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

REHABILITATION PACKAGE 4-a

REHABILITATION PACKAGE 4-a 4-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 4-a Rehab option 4-a is a rehabilitation package whereby all spans of the existing steel truss structure would be rehabilitated and strengthened.

More information

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce Project Team D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce D6 Design Project Manager Ali Toghiani, P.E. CEI: AIM Engineering and Surveying Francis Chin,

More information

Glenmore Causeway Upgrades Project. Calvin T. McClary, P. Eng., Manager, Transportation Engineering, ISL Engineering and Land Services Ltd.

Glenmore Causeway Upgrades Project. Calvin T. McClary, P. Eng., Manager, Transportation Engineering, ISL Engineering and Land Services Ltd. Glenmore Causeway Upgrades Project Calvin T. McClary, P. Eng., Manager, Transportation Engineering, ISL Engineering and Land Services Ltd. Paper prepared for presentation At the Bridges - Links to a Sustainable

More information

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Michigan Department Of Transportation 3703C (11/06) 1 Materials 1.1 Pipe SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Page 1 of 5 The type of pipe used for the pipe jacking method shall be capable

More information

Crossrail and our international tunnelling expertise

Crossrail and our international tunnelling expertise Crossrail and our international tunnelling expertise Analyst briefing Thursday 1 October 2015 Neil Thomas Managing director Water, Ground and Environment Crossrail Crossrail Crossrail has one purpose to

More information

The Gateway Expressway FTBA Conference. February 2-3, 2017

The Gateway Expressway FTBA Conference. February 2-3, 2017 The Gateway Expressway FTBA Conference February 2-3, 2017 256996-1 SR 686 (Roosevelt Blvd.) at CR 611 (49th St. N) PD&E 256866-1 Segment 2A 256997-1 SR 686 (Roosevelt Blvd.) from 49th St. Bridge to north

More information

Evergreen Line Rapid Transit Project

Evergreen Line Rapid Transit Project Evergreen Line Rapid Transit Project Burnaby, Port Moody, and Coquitlam, BC Completed in December 2016 Canadian Consulting Engineering Awards 2017 Project Category: B. Transportation Canadian Consulting

More information

Promoters. Presentation. Tunnel. Tim Smart Head of Engineering & Operations. 20 th October

Promoters. Presentation. Tunnel. Tim Smart Head of Engineering & Operations. 20 th October Promoters Tunnel Presentation Tim Smart Head of Engineering & Operations 20 th October 2014 1 Tunnel Briefing Agenda 1. Why tunnel? 2. Operational aspects of tunnels 2.1 Safety requirements 2.2 Noise and

More information

Implementing Asset Management: WSDOT s Experience

Implementing Asset Management: WSDOT s Experience Implementing Asset Management: WSDOT s Experience 6 th National Conference on Transportation Asset Management Aaron Butters, P.E. Systems Analysis and Program Development Manager November 2, 2005 1 Highway

More information

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions City Utilities operates the largest municipally-owned wastewater collection and treatment system in Indiana. The system serves 161 square miles and includes 1,014 miles of sanitary sewer lines, 365 miles

More information

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc. Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on

More information

CROSSRAIL INFORMATION PAPER D8 TUNNEL CONSTRUCTON METHODOLOGY

CROSSRAIL INFORMATION PAPER D8 TUNNEL CONSTRUCTON METHODOLOGY CROSSRAIL INFORMATION PAPER TUNNEL CONSTRUCTON METHODOLOGY This paper sets out the proposed Crossrail tunnel construction strategy and methodology. It will be of particular relevance to those in the vicinity

More information

Constructability Guidelines

Constructability Guidelines Constructability Guidelines The Constructability Guidelines offer a list of items that should be considered by Constructability function personnel during the Concept Development Phase through the Final

More information

Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan

Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan West Rail Tsing Kwai Tunnel Location of major Tunnel Portal West Rail Tsing Kwai Tunnel Construction Features -

More information

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information

HIGH MAST CAMERA POLE ASSEMBLY GENERAL

HIGH MAST CAMERA POLE ASSEMBLY GENERAL 10-3.24 HIGH MAST CAMERA POLE ASSEMBLY GENERAL The Contractor must furnish and install the following equipment for high mast camera pole assembly as described herein and as shown on the plans: 1. Camera

More information

HANDHOLES, PULLING VAULTS AND JUNCTION BOXES

HANDHOLES, PULLING VAULTS AND JUNCTION BOXES Handholes and pulling vaults perform several important functions: Provide drainage for the conduit system so that freezing water does not damage the conduit or wires. Provide a location for bending the

More information

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates June 30, 2017 Charles W. Stark Executive Project Director Phase 2 Station Tour 2 Phase 1 Phase 1 Cost Summary Quarter Expenditures (Feb, Mar,

More information

INTERSTATE CORRIDOR PLANNING

INTERSTATE CORRIDOR PLANNING INTERSTATE CORRIDOR PLANNING Prioritization of Corridor Studies July 29, 2015 Importance of the Interstate System Texas is an integral part of the national interstate system. The interstate system provides

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

MATERIAL ALLOWANCES AND UNIT PRICES

MATERIAL ALLOWANCES AND UNIT PRICES PART 1 - GENERAL 1.1 SECTION INCLUDES ADDITIONS AND RENOVATIONS TO WEST YORK AREA HIGH SCHOOL - #1231 SECTION 012200 MATERIAL ALLOWANCES AND UNIT PRICES A. Measurement and payment criteria applicable to

More information

SELECTION OF TUNNEL METHODS. By: Dr. Gary S. Brierley

SELECTION OF TUNNEL METHODS. By: Dr. Gary S. Brierley SELECTION OF TUNNEL METHODS By: Dr. Gary S. Brierley Successful Tunnel Design 2 Produce a satisfactory finished facility for no more money and in no more time than is required for the existing ground conditions.

More information

Forsyth County Procurement

Forsyth County Procurement July 7, 2017 Forsyth County Procurement Donna Kukarola, CPPO, CPPB, Procurement Director ADDENDUM #2 BID 17-63-3150 For: Providing all labor, materials and equipment for the construction of the Brookwood

More information

Bonner Bridge Replacement Update:

Bonner Bridge Replacement Update: Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner

More information

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project Memorandum Date: January 15, 2014 To: CC: From: Subject: Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project Paul Danielson, P.E. Project Manager, Southwest Light Rail

More information

Brooklyn Station Construction Open House

Brooklyn Station Construction Open House Brooklyn Station Construction Open House November 16, 2011 Tonight s Agenda 6:00 pm Open House 6:30 pm Presentation Introduction Ron Endlich, North Link Deputy Project Director Louise Little, Greater University

More information

Manufacturing Facilities Proposal

Manufacturing Facilities Proposal Manufacturing Facilities Proposal Construction proposal To assist business owners with expansion projects, Wisconsin Public Service has compiled information and renderings of common building types in business

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four DISTRICT FOUR PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Four. In fiscal years 2014 and 2015, current Turnpike projects total over $127

More information

SECTION 1101 TRAFFIC SIGNALS AND APPURTENANCES END OF SECTION

SECTION 1101 TRAFFIC SIGNALS AND APPURTENANCES END OF SECTION SECTION 1101 SIGNALS AND APPURTENANCES PART 1 GENERAL 1.4 SUBMITTALS E. Submit warranty for all supplied material and workmanship for a period of two years from final acceptance. The warranty must state

More information

Get In, Get Out, Stay Out!

Get In, Get Out, Stay Out! Get In, Get Out, Stay Out! FHWA Accelerated Bridge Construction Program By Gary Jakovich, P.E. Senior Bridge Engineer, FHWA Virginia Concrete Conference Richmond, VA March 6-7, 2007 Federal Highway Administration

More information

D7: TUNNEL CONSTRUCTION AND METHODOLOGY

D7: TUNNEL CONSTRUCTION AND METHODOLOGY HIGH SPEED TWO INFORMATION PAPER D7: TUNNEL CONSTRUCTION AND METHODOLOGY This paper outlines the proposed tunnelling methodology. It will be of particular interest to those potentially affected by the

More information

Stabilization of Running Granular Soils in TBM Alignment with Sodium Silicate Grout

Stabilization of Running Granular Soils in TBM Alignment with Sodium Silicate Grout Stabilization of Running Granular Soils in TBM Alignment with Sodium Silicate Grout Brendan P. Harkins 1, E.I.T.; Dominic M. Parmantier 2, M. ASCE, P.E. 1 Project Engineer, Condon-Johnson & Associates,

More information

CONSTRUCTION CHALLENGES WITH CUTTER SOIL MIXING IN POROUS

CONSTRUCTION CHALLENGES WITH CUTTER SOIL MIXING IN POROUS CONSTRUCTION CHALLENGES WITH CUTTER SOIL MIXING IN POROUS LIMESTONE AT THE PORT OF MIAMI TUNNEL Charles W. Bartlett, P.E., Malcolm Drilling Co., Miami, Florida, USA Nicholas J. Turus, E.I., Malcolm Drilling

More information

Chapter 4 Bridge Program Drawings

Chapter 4 Bridge Program Drawings Chapter 4 Bridge Program Drawings Section 4.10-Bridge Railing Introduction Steel bridge railing and concrete bridge barrier rail are installed along the edge of the bridge roadway to keep errant vehicles

More information

A new elevated pathway provides safe passage for pedestrians and cyclists near one of the Windy City s premier tourist destinations.

A new elevated pathway provides safe passage for pedestrians and cyclists near one of the Windy City s premier tourist destinations. A new elevated pathway provides safe passage for pedestrians and cyclists near one of the Windy City s premier tourist destinations. The BACKBONE of the Lakefront BY JOHANN F. AAKRE, S.E., P.E., AND JANET

More information

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo. Pipe Jacking/Microtunnelling Dr. Mark Knight Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo 1 New Installations New Installations Non-Steering Methods Steering Methods

More information

In Service Replacement of Box Girder Bottom Slab

In Service Replacement of Box Girder Bottom Slab In Service Replacement of Box Girder Bottom Slab WSDOT Bridge No. 5/537S - Span 11 Craig R. Boone, P.E., S.E. Lynn Peterson Secretary of Transportation 2015 Western Bridge Engineers Seminar Reno, Nevada

More information

Aviation Capital Construction Program Update

Aviation Capital Construction Program Update Aviation Capital Construction Program Update 2012 Completed Projects 2013 Active Projects Bern Seals Program Manager Parsons Management Consultants April 2013 0 Discussion Agenda Program Safety Performance

More information

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors Dulles Corridor Metrorail Project Phase 2, Package A Capital Rail Constructors: Quarterly Update to MWAA Board of Directors Keith Couch Capital Rail Constructors January 2018 Agenda 1. Safety 2. Schedule

More information

Clearview Parkway LA 3152 Stage 0 Feasibility Study and Environmental Inventory

Clearview Parkway LA 3152 Stage 0 Feasibility Study and Environmental Inventory Clearview Parkway LA 3152 Stage 0 Feasibility Study and Environmental Inventory Public Information Meeting Thursday, February 21, 2008 6:30 p.m., Eastbank Council Chambers, Yenni Building Project Sponsors

More information

DURISOL PRECAST NOISE BARRIERS PRODUCT GUIDE

DURISOL PRECAST NOISE BARRIERS PRODUCT GUIDE PROVIDING SOLUTIONS SINCE 1908 DURISOL PRECAST NOISE BARRIERS PRODUCT GUIDE ATTRACTIVE, SOUND-ABSORPTIVE WALLS MADE OF DURABLE, FIELD-PROVEN DURISOL MATERIAL VISUAL APPEAL PANEL AND POST DESIGN ACOUSTICAL

More information

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison T E C H N I C A L M E M O R A N D U M US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison PREPARED FOR: Mn/DOT District 7 PREPARED BY: CH2M HILL DATE: March 27, 2007 This technical

More information

Commercial Remodel Permit

Commercial Remodel Permit Commercial Remodel Permit Zoning requirements Staff recommends always verifying the zoning requirements for your project before deciding to build. Warrensburg has eleven separate zoning districts, each

More information

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager Interstate 66 Widening from Gainesville to Haymarket RFQ Information Meeting January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager John C. Daoulas, P.E. APD Project Manager and POC Introduction

More information

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS PART 1 GENERAL 1.1 DESCRIPTION A. Temporary Utilities: Electricity, lighting, heating, cooling, ventilation, water, and sanitary facilities. B. Temporary Controls: Barriers, fencing, erosion control, exterior

More information

SCHEDULE G REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE INSTALLATION OF STREET LIGHTING

SCHEDULE G REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE INSTALLATION OF STREET LIGHTING SCHEDULE G REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE INSTALLATION OF STREET LIGHTING This is Schedule G of the District of Peachland Subdivision and Development Servicing Bylaw No. 1230, July,

More information

Highway Construction Program

Highway Construction Program Highway Construction Program Monthly Delivery Progress Report Watch List February 2017 This report focuses on Capital Highway Program projects, which have, or may have significant changes in scope, schedule,

More information

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 INTERCHANGE MODIFICATION REPORT FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 PREPARED BY: VIRGINIA DEPARTMENT OF TRANSPORTATION STAUNTON DISTRICT DECEMBER 13, 2006

More information

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

RESIDENTIAL CONSTRUCTION New Dwellings and Additions How to Obtain a Building Permit For RESIDENTIAL CONSTRUCTION New Dwellings and Additions MIAMI COUNTY, KANSAS CODE SERVICES DEPARTMENT 201 South Pearl Street, Suite 201 Paola, Kansas 66071-1777 Phone:

More information

Woodbine Station Upgrades

Woodbine Station Upgrades Community Update Danforth Mennonite Church 1 Easier Access Program Wide Committed to making all stations accessible by 2025 Almost half way there with 34 stations completed Working with the Advisory Committee

More information

SELLWOOD BRIDGE REPLACEMENT PROJECT

SELLWOOD BRIDGE REPLACEMENT PROJECT SELLWOOD BRIDGE REPLACEMENT PROJECT Eric Rau, PE David Goodyear, PE, SE, PEng, NAE BIOGRAPHY Eric Rau is a Senior Bridge Engineer for T.Y. Lin International with over fifteen years of experience. He has

More information

Construction of Bridges

Construction of Bridges Construction of Bridges Materials suitable for the Construction of Long-span Bridges 1. Stone in arch masonry 2. Steel in girder or box-section constructed in steel plates and standard sections 3. Steel

More information

The Aizhai Suspension Bridge is

The Aizhai Suspension Bridge is INTERNATIONAL DESIGN & CONSTRUCTION: BRIDGES Mountain grown Hilly terrain contributes mightily to China bridge By Yinbo Liu, Ph.D., P.E., Guoping Chen, Shulong He and Yongjian Zhang, Ph.D. Contributing

More information

ASSESSING THE IMPACT OF SECURITY MEASURES AT GATES OF SEAPORTS ON TRAFFIC OPERATION

ASSESSING THE IMPACT OF SECURITY MEASURES AT GATES OF SEAPORTS ON TRAFFIC OPERATION ASSESSING THE IMPACT OF SECURITY MEASURES AT GATES OF SEAPORTS ON TRAFFIC OPERATION Dr. Arun Chatterjee Professor Emeritus Dept of Civil & Environmental Engineering The University of Tennessee Knoxville,

More information

FINAL ENVIRONMENTAL IMPACT REPORT. CHAPTER ONE: EXECUTIVE SUMMARY with RESPONSES TO COMMENTS

FINAL ENVIRONMENTAL IMPACT REPORT. CHAPTER ONE: EXECUTIVE SUMMARY with RESPONSES TO COMMENTS FINAL ENVIRONMENTAL IMPACT REPORT SDCRAA # EIR-06-01 State Clearinghouse No. 2005091105 CHAPTER ONE: EXECUTIVE SUMMARY with RESPONSES TO COMMENTS Lead Agency: SAN DIEGO COUNTY REGIONAL AIRPORT AUTHORITY

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information