Introduction. Definition Benefits Applications Costs/ROI Getting Started Examples Resources
|
|
- Aldous Bennett
- 6 years ago
- Views:
Transcription
1 Jeffrey Gee, AIA Vice President, General Manager Swinerton Management & Consulting Introduction Definition Benefits Applications Costs/ROI Getting Started Examples Resources NASA Ames Research Facility Net Zero LEED Platinum 1
2 National BIM Standard Definition - A Building Information Model (BIM) is a digital representation of physical and functional characteristics of a facility. As such it serves as a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle from inception onward. A basic premise of BIM is collaboration by different stakeholders at different phases of the life cycle of a facility to insert, extract, update or modify information in the BIM to support and reflect the roles of that stakeholder. The BIM is a shared digital representation founded on open standards for interoperability. The US National BIM Standard promotes the business requirement that this model be interoperable based on open standards. If business processes are changed the following benefits have been demonstrated: Better visualization by the Owner Elimination of conflicts, RFI s and change orders Significantly faster project delivery times Elimination of construction drawings and going straight to shop drawings Numerical controls passed directly from the model to fabrication Data collected during design & construction used for operations, sustainment and contingency planning Information flows when standards exist 2
3 Client and Project Team Process Management Design and Pre-Construction Analysis Constructability / Schedule Analysis Advanced Visualization Performance Based Value Engineering Clash Detection Post-Construction Maintenance & Operations Implementation of Campus Standards Autodesk Software Revit Architecture (design authoring) Revit Structure (design authoring) Revit MEP (design authoring) Ecotect (daylighting and energy analysis) NavisWorks Manage (clash detection/3d coordination) NavisWorks Freedom (free model viewer Bentley Software Microstation TriForma (design authoring) Google Software Google Sketchup (modeling software (no parametric data)) Solibri Software Solibri Model Checker BIM (model validation software) Synchro Software Synchro 4D (4D scheduling software) Tekla Software Tekla Structures (design authoring) Tekla Construction Tekla BIMsight (clash detection/3d coordination) Vico Software Vico Office (5D model based estimating) 3D Models Building models that provide the perception of depth 4D Models Combines 3D models with the appropriate scheduling data 5D Models Combines 3D models with the appropriate cost data nd (or 6D) Models Combines 3D models with the life cycle management data 3
4 Building Systems Coordination Architectural / Structural, MEPF Clash Detection Construction Sub-Trade Coordination 4D Modeling Model Based Construction Simulation Project and Manpower Scheduling 5D Modeling Model-based Quantity Take-offs and Estimating Performance Based Value Engineering nd (6D) Modeling Energy Life Cycle and Daylighting Performance Modeling Virtual As-Builts with Hyperlinked product data, warranties, O&Ms, and manufacture's web sites 4
5 2D 3D 4D 5D nd Client Decision Making Design & Engineering PreConstruction / Estimating Scheduling Constructability Analysis Construction Coordination Post Construction Define milestones and enter Actual Costs per Cost Type The Actual Cost input is used for the integrated Earned Value Analysis in 5D 5
6 Earlier Decisions are Less Expensive BIM modeling costs vary based on several factors: Purpose of modeling effort Phase of project design Level of detail of the model Number of updates to the model As rule of thumb BIM modeling will range between.1% to.5% of the project construction value Conservatively BIM can save projects 3% to 5% of the construction value 6
7 Overall savings in MEPF coordination of $184,940 as a result of shorter meetings and reduced downtime from travel Avoidance of 450 RFI/COs through model constructability review Average cost of major change order is $10k means a cost avoidance of approx. $4,500,000 Cost of modeling the Ritz Carlton approx. $285,000 Modeling ROI = $4.4 Million BIM Project Execution Planning Guide This BIM Project Execution Planning Guide is a product of the BIM Project Execution Planning buildingsmart alliance (bsa) Project. The bsa is charged with developing the National Building Information Modeling Standard (NBIMS). This guide was developed to provide a practical manual that can be used by project teams for designing their BIM strategy and developing a BIM Project Execution Plan. The core modeling and information exchange concepts are developed to complement the long term goals of the bsa in the development of a standard that can be implemented throughout the AECOO Industry to improve the efficiency and effectiveness of BIM implementation on projects. The Model Progression Specification Identification of the BIM author (also referred to as the Model Component Author). It should be noted that in the early phases of a project, BIM objects may be created by one party at a lower LOD as a placeholder, and at later phases, then may be replaced by a higher LOD object created by the party responsible for the actual design. A description of the file formats used by the modelers to deliver the BIM, as well as the software applications and their version number used to create the BIM. A description of the appropriate uses (and decisions) that can be made based on the project phase and LOD of the BIM. A description of what LOD a particular BIM object is required to use for a particular phase of the project. A description of the Level of Detail (LOD) for model objects based on UniFormat assemblies. There are five defined levels of detail for BIM models (defined as 100, 200, 300, 400, and 500). 7
8 8
9 The Content Plan is the Rosetta Stone of a BIM Model Identifies what objects were modeled UniFormat ID of model objects Tools used to model the object LOD of Objects LBS of model Protocols Document Discrepancy Reports Clash Reports Drawing Change Reports Virtual RFIs 9
10 Not only can the BIM model provide accurate visualization of the design intent, but we have accurate information of every architectural element as well as structural & MEPF elements Cut-aways and renderings help client understand construction issues 10
11 Coordination meetings now taking place via GoToMeeting sessions and Navisworks Subtrades work from their offices Meetings are shorter 1½ to 2 hours vs. 4 to 5 hours in the traditional 2D process PDF digital signatures of coordinated drawings Overall savings of $184,940 as a result of shorter meetings and reduced downtime from travel 11
12 Ritz Carlton at NorthStar Lake Tahoe Subtrades Coordination 3D Coordination resulted in fewer field conflicts and modifications As coordinated via the model As currently being installed in the field Graphisoft model created in-house by SF Estimators Model will be used to analyze concrete schedule using Lines-of- Balance scheduling software 12
13 The vertical work in the 2 pour sequence causes an uneven flow of work between the of work. The 3 pour sequence provides a better flow and completes the work 10 weeks earlier. 2 POUR SEQUENCE 3 POUR SEQUENCE Project Complete 12/31/07 Project Complete 03/13/08 The Swinerton contracted Vico Services to deliver Virtual Construction Services for the 719 Ash Hotel & Residences project located in San Diego, CA. The proposed building contains three stories of mixed use office/retail/restaurant space, 16 stories of guest suites and condominiums, and three stories of underground parking. The structure is primarily cast-in-place reinforced concrete with structural steel supporting the penthouse roof. The exterior finish contains panel and plaster systems, glazed curtain wall and aluminum window systems. This scope of Virtual Construction services on this project is limited to architectural and structural building systems only. Interior construction and finishes are limited to framed walls and ceiling elements, interior doors, and stairs. The project was divided into three phases for delivery. Phase 1: 3D Model, Constructability Analysis, Rendered Images Phase 2: Knowledge Database, Modelbased Quantity Report and Estimate Phase 3: Schedule Optimization and 4D Construction Simulation 13
14 14
15 15
16 Prototype Project Target Large and Complex Projects Science Buildings Medical Centers Complex Renovations Establish BIM Standards Engage Facility, A&E, GC and Sub Trade Partners Define goals, uses for the model, integration/change campus processes What are our BIM standards? Who maintains the standards? Who hosts the BIM model? Are the Facility standards loaded into the BIM platform? Is our BIM solution integrated into the Institution s Enterprise system? Should it be? Is our culture capable of greater collaboration, teamwork and sharing of information? 16
17 17
18 Los Angeles Community College District Penn State BIM Execution Planning Guide Resource AEC Bytes AGC BIM Forum All Things BIM BIM Journal Building.CO.UK BuildingSmart Alliance CADBIM USACE Digital Design Georgia Tech The Laiserin Letter MindShift Smart BIM Stanford CIFE UC Berkeley P 2 SL Vico Software What program are you using at you institution for: Space Management Maintenance & Operations Energy Management 18
19 Variety of software applications Various protocols No industry standards The Cloud BIM Models sent to the cloud Revit Tekla Others 360 Glue Download to FM Systems, Maximo, Johnson Controls 19
20 SMC YouTube Video Start with the Vision and the desired end results Build your BIM standard with the end in mind Specify your BIM standards to the design and construction Team Decide on who host s the model Execute At project completion, included in your specification laptop/tablets/seat licenses, maintenance 20
21 Thanks! Jeffrey Gee, AIA Vice President, General Manager Swinerton Management & Consulting 260 Townsend Street San Francisco, CA Tel: Cell: FAX: Concord, CA Los Angeles, CA Oakland, CA Sacramento, CA San Diego, CA San Francisco, CA 21
Building Information Modeling to Facilities Information Management and Beyond
Building Information Modeling to Facilities Information Management and Beyond Meghan Ruffo, Thomas Koltoniak, & Geoffrey Coon Carolinas HealthCare System Join the conversation #AU2016 Class summary Carolinas
More informationBack to Where We Once Belonged FM Global s road to SlimBIM
Back to Where We Once Belonged FM Global s road to SlimBIM By Thomas A. Gay Assistant Vice President FM Global - Engineering Plan Services Past Chair Board of Direction buildingsmart alliance Vice Chair
More information- DATA REQUIREMENTS BIM
UHS BIM Protocol S E C T I O N 1 - DATA REQUIREMENTS BIM authoring software: The design team is required to use parametric BIM authoring software for creation of models that include all geometry, physical
More informationBenefits of Employing BIM on Unique Designs: Art Gallery of Alberta. Bob Walker Ledcor Construction Limited Edmonton, Alberta May 2011
Benefits of Employing BIM on Unique Designs: Art Gallery of Alberta Bob Walker Ledcor Construction Limited Edmonton, Alberta May 2011 The Evolution of the new Art Gallery of Alberta Ledcor Construction
More informationBIM for Contractors: Kickin It Off the Right Way
BIM for Contractors: Kickin It Off the Right Way David Epps Manager Building Information Modeling Holder Construction Company John Mack VDC / BIM Dept. Manager Herrero Contractors, Inc. John Mack VDC /
More informationFIVE WAYS YOUR MOVE TO A BIM WORKFLOW PAYS OFF
ARCHITECTURE & BUILDING ENGINEERING AEC COLLECTION EBOOK FIVE WAYS YOUR MOVE TO A BIM WORKFLOW PAYS OFF Get started > 01 02 03 04 05 DELIVER HIGHER- QUALITY WORK OPERATE MORE EFFICIENTLY EXPAND YOUR BILLABLE
More informationAT THE FOREFRONT OF THE CONSTRUCTION INDUSTRY WITH BUILDING INFORMATION MODELING (BIM): THE CHALLENGES
AT THE FOREFRONT OF THE CONSTRUCTION INDUSTRY WITH BUILDING INFORMATION MODELING (BIM): THE CHALLENGES 19 th October 2016 BY: IR. SHARIFAH AZLINA RAJA KAMAL What is BIM? WHAT IS BIM? TECHNOLOGY? SOFTWARE?
More informationBuilding Information Modeling (BIM) Execution Plan
10/19/2017 for [Stanford Project Name] [Stanford Project Number] Developed by [Primary A/E] TABLE OF CONTENTS USE OF THE BIM EXECUTION PLAN... 3 1. PROJECT INFORMATION... 3 2. PROJECT SCHEDULE AND MILESTONES...
More informationBIM BUILDING INFORMATION MODELLING. UNDERSTANDING ITS FUNCTION IN THE FUTURE OF THE ARCHITECTURAL PROFESSION.
BIM BUILDING INFORMATION MODELLING. UNDERSTANDING ITS FUNCTION IN THE FUTURE OF THE ARCHITECTURAL PROFESSION. Ar Chan Seong Aun. Immediate Past President PAM 2015-2016 CONTENT 1.WHAT IS BIM 2.BENEFITS
More informationCRC-CI Project EP National BIM Guidelines and Case Studies
CRC-CI Project 2007-002-EP National BIM Guidelines and Case Studies Tom Fussell - Team Leader Executive Director and Chief Architect, QLD Department of Public Works Scott Beazley - Project Manager BIM
More informationPandya Paragkumar U Civil Engineering Graduate Student Lamar University
BUILDING INFORMATION MODELING AND SUSTAINABILITY Pandya Paragkumar U Civil Engineering Graduate Student Lamar University Dr.Enno Ed Koehn, P.E., F.ASCE Professor, Civil Engineering Department Lamar University
More informationAIA 2009 BIM AWARDS. Category B: Design/Delivery Process Innovation Using BIM
Introduction AIA 2009 BIM AWARDS Category B: Design/Delivery Process Innovation Using BIM Project: UNIVERSITY OF COLORADO - DENVER HEALTH SCIENCE CENTER RESEARCH COMPLEX II Owner s Statement Architect
More informationBronx Mental Health Redevelopment Project
Bronx Mental Health Redevelopment Project Residential Village Bronx Campus Transitional Living Residences, Haven House Horizon House, and Studio Apartments BIM Orientation December 20, 2012 1 Bronx Mental
More informationRE-USE AND REPURPOSING OF UNDERUTILIZED BUILDINGS: STRATEGIC PLANS FOR COMPETITIVE RESEARCH ENVIRONMENTS
RE-USE AND REPURPOSING OF UNDERUTILIZED BUILDINGS: STRATEGIC PLANS FOR COMPETITIVE RESEARCH ENVIRONMENTS INTRODUCTIONS SETTING THE STAGE CASE STUDY: PRINCETON UNIVERSITY 01 INTRODUCTIONS Liz Cook AIA,
More informationGlobal Building Information Modeling (BIM) Market: Size, Trends & Forecasts ( ) May 2016
Global Building Information Modeling (BIM) Market: Size, Trends & Forecasts (2016-2020) May 2016 Global Building Information Modeling (BIM) Market Report Scope of the Report The report titled Global Building
More informationTeaming with BIM Do the rewards outweigh the risks?
British Columbia Construction Roundtable Seminar on: Teaming with BIM Do the rewards outweigh the risks? Sheryl Staub-French, PhD, PEng Associate Professor, Civil Engineering University of British Columbia
More informationGIS + BIM = Integrated Project Penn State
524 GIS + BIM = Integrated Project Delivery @ Penn State David E. GOLDBERG, Robert J. HOLLAND and Scott W. WING 1 Introduction In 2007, at the American Society of Landscape Architects Conference in San
More informationIV.E.8 - BIM Standards
Contents 1. General... 3 1.1. Strategy & Objective... 3 1.2. Road Map... 4 2. Process... 7 2.1. Start... 7 2.2. Plan... 9 2.3. Execute... 12 2.4. Monitor... 14 2.5. Close-out... 16 3. Execution... 19 3.1.
More informationGoldwater North Harlem, NY. New York Building Congress Healthcare Committee Presentation
Goldwater North Harlem, NY New York Building Congress Healthcare Committee Presentation Agenda Welcome / Introductions Safety Moment Project Overview / Purpose Project Scope Performance Measures Project
More informationINTEGRATED LIFECYCLE MANAGEMENT BIM/VDC REQUIREMENTS IMPLEMENTATION PLAN
INTEGRATED LIFECYCLE MANAGEMENT BIM/VDC REQUIREMENTS IMPLEMENTATION PLAN Manual for VDC, BIM/VDC and Lifecycle Data for design and construction projects at UNC Charlotte. February 2018 Integrated Lifecycle
More informationRetrofitting + BIM Improving Performance. Retrofitting for Energy Performance Brisbane 1 February 2012
Retrofitting + BIM Improving Performance Retrofitting for Energy Performance Brisbane 1 February 2012 We shape a better world Bridging both worlds - A unique blend of technical expertise and commercial
More informationIntegrated Practice and Collaboration
Integrated Practice and Collaboration The Cronkite Experience SUNDT CONSTRUCTION Terry Abair HDR ARCHITECTURE Michael Jackson Case Study THE CRONKITE EXPERIENCE Content: The Challenge The Pursuit Team
More informationBIM M Masonry Wall Project and Revit Guide BIM FOR MASONRY MISSION STATEMENT
BIM M Masonry Wall Project and Revit Guide November 13, 2015 BIM FOR MASONRY Jamie L. Davis, PE, LEED AP BIM-M Initiative MUD LOD for Masonry Modeling Limitations The Guide Contractors/ Downstream Use
More informationBIM Competency Delivers Competitive Advantages
Volume 9, Number 2 Summer 2014 The official publication of the PHCC Wisconsin Association and Master Plumbers/Heating & Cooling Contractors of Wisconsin BIM Competency Delivers Competitive Advantages INSIDE:
More informationBIM EXECUTION PLAN PROJECT INFORMATION PROJECT NUMBER
PROJECT NAME BIM EXECUTION PLAN PROJECT INFORMATION CLIENT PROJECT NAME PROJECT NUMBER XX XXXXX XX XXXXX XXXXXXXXXXXXXXXXXXXXXXXXX DATE XXXXXXXX 2016 PROJECT LOCATION & ADDRESS XXXXX, XXXXX. INTRODUCTION...
More information4D Modeling: Applications and Benefits
4D Modeling: Applications and Benefits Martin Fischer Assoc. Prof., Stanford University Director, CIFE Founder, Common Point Technologies, Inc. The big idea: Build virtually before building in reality.
More information2008 Building Information Modeling AEC Statewide BIM Adoption Survey
A PRESENTATION FOR THE 2009 TEXAS COLLEGE & UNIVERSITY FACILITIES CONFERENCE BUILDING INFORMATION MODELING PER-CONFERENCE WORKSHOP SURVEY SPONSORS AIA HOUSTON BIM COMMITTEE TEXAS SOCIETY OF ARCHITECTS
More informationRealizing Complex Design Through BIM The Louisiana State Museum and Sports Hall of Fame
The Louisiana State Museum and Sports Hall of Fame Location: Natchitoches, Louisiana Category: A: BIM Excellence Type: New Construction Site Area: 36,500 sq. ft. GSF Total: 27,000 sq. ft NAA Total: 18,900
More informationTripla ensures sustainable growth and expansion for Helsinki
Tripla ensures sustainable growth and expansion for Helsinki Main image place OPEN BIM helps the development of this gigantic mixed use project in Helsinki, Finland. Project name: Tripla Location: Helsinki,
More informationA Presentation on. BIM Implementation for Construction Projects and Developer
A Presentation on BIM Implementation for Construction Projects and Developer About Welcome to the world of CSoft Services! CSoft is a Norwegian company with a unique skillset of engineering design using
More informationSustainable Design Services
Point. Advisory Sustainable Design Services Building Information Modeling (BIM) Step 1. Download.bimar App p on Google Play or scan the QR code. Step 2. Point device at cover to view it in 3D augmented
More informationStreaming BIM Lifecycle Information. Murray Hestley, Whiting-Turner Construction Eric Nulton, Penn State University
Streaming BIM Lifecycle Information Murray Hestley, Whiting-Turner Construction Eric Nulton, Penn State University The Associated General Contractors of America (AGC) is a Registered Provider with The
More informationBenjamin D. Hall Interdisciplinary Research Building
Benjamin D. Hall Interdisciplinary Research Building Design. Build. Operate. Maintain. 2007 BIM AWARDS AIA Technology in Architectural Practice Table of Contents ARCHITECT S STATEMENT DESCRIPTIVE DATA
More informationPlease comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at
Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.pdf when using this file. Thank you. Welcome to the 5 th Meeting
More informationAnaheim Regional Transportation Intermodal Center (ARTIC) 2014 AIA TAP / BIM Awards
Anaheim Regional Transportation Intermodal Center (ARTIC) 2014 AIA TAP / BIM Awards Project Overview The Anaheim Regional Transportation Intermodal Center (ARTIC) combines the heritage and civic importance
More informationTurning Steel into (LEED) Platinum
Turning Steel into (LEED) Platinum By Scott Wolf, AIA, LEED AP, and Tom Hicks, S.E., P.E., LEED AP How using BIM facilitated an efficient design process and a highly sustainable project. { What is LOTT?
More informationBIM Checklist. Introduction
Introduction This Building Information Modeling (BIM) Checklist is intended to be used as a guide for project stakeholders who are looking to implement BIM/VDC in a design-build project. Since integration
More informationThe benefits of reinventing the wheel BIM AND IPD BRING FUNDAMENTAL CHANGES TO ROLES IN A STRUCTURAL ENGINEERING FIRM
Page 1 of 5 The benefits of reinventing the wheel BIM AND IPD BRING FUNDAMENTAL CHANGES TO ROLES IN A STRUCTURAL ENGINEERING FIRM By Rick Oehmcke, S.E. Not that many years ago, few structural engineers
More informationImplementing Budget Solutions for Schools: Construction Cost and Scheduling Benefits of Using Wood
Disclaimer: This presentation was developed by a third party and is not funded by WoodWorks or the Softwood Lumber Board. Modern School Construction in the Pacific Northwest: Achieving Performance and
More informationMANHATTAN COLLEGE STUDENT COMMONS
MANHATTAN COLLEGE STUDENT COMMONS BUDGET CHECK USING GILBANE S COSTADVISOR MODEL OCTOBER 29, 2010 Introduction: Gilbane developed this CostAdvisor Model of the proposed new Manhattan College Student Commons
More informationCurrent Status of Building Information Modeling (BIM) Adoptability in the U.S. Electrical Construction Industry
Fifth International Conference on Construction in the 21 st Century (CITC-V) Collaboration and Integration in Engineering, Management and Technology May 20-22, 2009, Istanbul, Turkey Current Status of
More informationApplied Research Briefing on KPI and Smart Cities
Applied Research Briefing on KPI and Smart Cities Calvin Kam PhD, AIA, PE, LEED AP Adjunct Professor Center for Integrated Facility Engineering, Stanford University calvin.kam@stanford.edu Founder & CEO
More informationPhysical or Virtual? : Effectiveness of virtual mockups of building envelope systems
Physical or Virtual? : Effectiveness of virtual mockups of building envelope systems Minjung Maing 1 Introduction. Within the building design to construction process, mockups of some form will be used
More informationBIM V.1 Tables A1
APPENDIX FORMS: Note: All forms to be completed by project Architect/Engineer in conjunction with Illinois State University. APPENDIX B1: PROJECT INFORMATION 1. Owner: Illinois State University 2. Name:
More informationSYLLABUS 8/14/2012 CONE- 231 Construction Estimating Fall, 2012 Rev. 0. Course Syllabus. Fall, 2012
Course Syllabus Fall, 2012 COURSE DESCRIPTION This semester will be entirely focused on the application of BIM (Building Information Modeling) to the estimating process through the application of three
More informationVIRTUAL DESIGN & CONSTRUCTION, THE NEXT LEVEL OF COLLABORATION AND INTEGRATION 2016 Airport Construction Strategy Summit. Special Thanks To:
VIRTUAL DESIGN & CONSTRUCTION, THE NEXT LEVEL OF COLLABORATION AND INTEGRATION 2016 Special Thanks To: VIRTUAL DESIGN & CONSTRUCTION, THE NEXT LEVEL OF COLLABORATION AND INTEGRATION Overview Moderator:
More informationAIA Technology in Architectural Practice 2010 BIM Award A Cohesive Team: Integrating Technology The Medical Center
AIA Technology in Architectural Practice 2010 BIM Award A Cohesive Team: Integrating Technology The Medical Center Tableof Contents PROJECT DESCRIPTIONS & NARRATIVES Project Description 3 Project Manager
More informationXavier University s Facility Management BIM Integration A Case Study
Xavier University s Facility Management BIM Integration A Case Study Andy Burg and Chris Mealy / Messer Construction / 10/10/2012 Agenda Project Background Workflow How XU is leveraging data Best Practices/Lessons
More informationDAVID HOLLAND OPERATIONS AND CONSTRUCTION EXECUTIVE POSITIONING STATEMENT: EXECUTIVE SUMMARY AND OVERVIEW: SIGNIFICANT ACHIEVEMENTS
DAVID HOLLAND https://david-holland.format.com OPERATIONS AND CONSTRUCTION EXECUTIVE POSITIONING STATEMENT: Location: San Diego, CA Mobile: (949) 289-8613 Email: dholland360@yahoo.com To add value, and
More informationClick to edit Master title style
Click to edit Master title style The Impacts; Today & Tomorrow Charles Hixon Business Development Manager, Bergmann Associates Chair, TRB ABJ95 Sub-committee on VDC VDC - An Amalgam of Many Click to edit
More informationAbout us. 5D Initiative
PRESS RELEASE The 5D Initiative enters into a process of more intensive cooperation with Autodesk, Bentley, CCT, RIB and Tekla in order to develop new BIM software solutions that fit needs of European
More informationState of Tennessee Office of the State Architect {TN OSA) Building Information Modeling {BIM) Requirements. Version 1.0
State of Tennessee Office of the State Architect {TN OSA) Building Information Modeling {BIM) Requirements Version 1.0 April 22, 2013 Table of Contents 1. Introduction...... 1 1.1. Mission of the TN OSA
More informationFacilities Management
Facilities Management October 6, 2017 THIS PAGE INTENTIONALLY LEFT BLANK University of South Florida BIM Guidelines and Standards Page 2 of 30 BIM Guidelines and Standards Table of Contents SECTION 1:
More informationApplication of Building Information Modeling Tool for Building Project
Application of Building Information Modeling Tool for Building Project Amol A. Metkari 1, Dr. A. C. Attar 2 1 PG Student, Department of Civil Engineering, Rajarambapu Institute of Technology, Sangli-415
More informationPRECAST HYBRID MOMENT FRAME
PRECAST HYBRID MOMENT FRAME Page 1 of 15 The Precast Hybrid Moment Frame System Summary The precast hybrid moment frame (PHMF) system represents the latest seismic-resistance technology (developed over
More informationBIM Services Assistance with Clash Detection Collaboration with Trades Framing Panel Elevations STRONGER
CL ARKDIETRICH engineering / bim services B I M P R OJ E C T I M P L E M E N TAT I O N STRONGER T H A N S T E E L. SM TURN TO CL ARKDIETRICH ENGINEERING / BIM SERVICES FOR YOUR NEXT SHOP DRAWINGS OR BIM
More informationBIM Design & Construction Requirements. Follow-up Seminar. September 10,
BIM Design & Construction Requirements Follow-up Seminar September 10, 2009 www.indiana.edu/~uao/iubim.html Opening Comments Two years ago Indiana University began the process of embracing the use of Building
More informationBIM ADOPTION AND IMPLEMENTATION FOR ENGINEERING & CONSTRUCTION INDUSTRY PRACTICES
BIM ADOPTION AND IMPLEMENTATION FOR ENGINEERING & CONSTRUCTION INDUSTRY PRACTICES ARIEF RAHMAN BIM MANAGER PP Construction & Investment INDONESIA M: +62 8128858162 W: www.pt-pp.com www.pt-pp.com AGENDA
More informationStrategies using Autodesk Navisworks. Doing it right the first time!
Strategies using Autodesk Navisworks Doing it right the first time! About Us Your Speakers Bill Tim Knittle, Bodor, H.T. Synergis Lyons, Engineering Contractors Design Engineers Solutions, AEC Bill Tim
More informationRFP Feasibility Design Services: Clinical Education & Assessment Center Expansion Questions & Answers: February 13 th, 2018
Question & Answer: #1 The RFP calls for a survey of the building to gain a comprehensive understanding of the existing building, utilities, building systems, occupancies and all existing conditions as
More informationExperiencing Interoperability of BIM in a Stadium Project in China
Experiencing Interoperability of BIM in a Stadium Project in China Cheng Zhang 1, Bo Liu 2, Guobin Gong 3 1) Lecturer, Department of Civil Engineering, Xi an Jiaotong-Liverpool University, Suzhou, Jiangsu,
More informationOffice of Physical Plant Case Study
The Pennsylvania State University Office of Physical Plant Case Study Methods used to analysis an owner organization for the planning of BIM implementation The Computer Integrated Construction Research
More informationTrends & Developments. Trends & Developments
Trends & Developments Martin Fischer Trends & Developments Interoperability is an important industry topic AISC e-construction roundtable, April 17, 2007 Everybody that does VDC plans to do more CIFE-CURT
More informationBIM-based Sustainability Analysis: An Evaluation of Building Performance Analysis Software
BIM-based Sustainability Analysis: An Evaluation of Building Performance Analysis Software Salman Azhar and Justin Brown Auburn University Auburn, Alabama Rizwan Farooqui Florida International University
More informationCATAMARAN TOWER - 1 Seef Area Plot 19, 20
STATUS REPORT NO 18 [As on September 30, 2017] This report is intended as a status report and covers only the activities completed till date, non-completed works and work-in-progress. A. Project Details
More informationABOUT BUILDINGSMART. Premium Corporate Partner. GCC BIM Market Report
In Association with ABOUT BUILDINGSMART BuildingSMART is a non-profit-making international organisation, structured in regional alliances that each represent a country or a group of countries. Every alliance
More informationPRODUCT TYPES. Canopies. Juliet Balconies. Wall/Green Screens. Balcony Guardrails. Stair Guardrails. Fencing/Gates
PRODUCT TYPES Canopies Juliet Balconies Wall/Green Screens Balcony Guardrails Stair Guardrails Fencing/Gates Suitable for both interior and exterior applications. Your product is not one of our Product
More informationA PERFORMANCE STUDY OF PROJECT SUSTAINABILITY: REDUCING CONSTRUCTION WASTE THROUGH BIM
A PERFORMANCE STUDY OF PROJECT SUSTAINABILITY: REDUCING CONSTRUCTION WASTE THROUGH BIM Mounir El Asmar, Ph.D., Assistant Professor, asmar@asu.edu School of Sustainable Engineering and the Built Environment,
More informationBRITTANY K. GIEL 7908 NW 2ND CT GAINESVILLE, FL PHONE: WEBSITE:
BRITTANY K. GIEL 7908 NW 2ND CT GAINESVILLE, FL 32607 PHONE: 352-339-0237 E-MAIL: b1357g@ufl.edu WEBSITE: http://plaza.ufl.edu/b1357g/ EDUCATION: EMPLOYMENT: Ph.D. in Design Construction and Planning in
More informationEcoDomus, Inc
www.ecodomus.com Introduction BIM Data Requirements & Guidelines COBie: Data Entry and Responsibility Matrix COBie: Quality Control BIM and BAS Integration: Use Cases Mobile BIM and Work Orders Asset View
More informationLATERAL DRIFT DESIGN IN COLD FORMED STEEL WALL SYSTEMS
1 LATERAL DRIFT DESIGN IN COLD FORMED STEEL WALL SYSTEMS Thomas Castle, S.E. 2 This presentation is published by the Cold-Formed Steel Engineers Institute ( CFSEI ). The information herein shall not constitute
More informationMore than 135 years of delivering landmark projects around the world
Company Profile More than 135 years of delivering landmark projects around the world About Us Drake & Scull International PJSC (DSI) is a regional market leader delivering world class quality projects
More informationPromoting better business outcomes through the use of BIM and digital technologies.
Promoting better business outcomes through the use of BIM and digital technologies. Introduction The Role of the BIM Manager Agenda 18:00 Introduction + BIM update by Mike Turpin, Innovating Futures 18:10
More informationA Comparative Analysis of Energy ModelingMethods for Commercial Buildings
Brigham Young University BYU ScholarsArchive All Theses and Dissertations 2013-07-11 A Comparative Analysis of Energy ModelingMethods for Commercial Buildings Spencer Mark Salmon Brigham Young University
More informationBIM enhances structural analysis regardless of project size. By Doug Fitzpatrick, P.E., LEED AP and Jeffrey Yoders
BIM enhances structural analysis regardless of project size By Doug Fitzpatrick, P.E., LEED AP and Jeffrey Yoders MARCH 2013 BIM enhances structural analysis regardless of project size By Jeffrey Yoders
More informationDelivering Better Buildings: THE RACE TO BIM
Case Study: The Design Büro Delivering Better Buildings: THE RACE TO BIM When the United Kingdom s Cabinet announced in 2011 that all government buildings must be delivered using Building Information Modeling
More informationDORMITORY BUILDINGS C & D
DORMITORY BUILDINGS C & D MANSFIELD UNIVERSITY, MANSFIELD PA WTW ARCHITECTS THESIS PROPOSAL JANUARY 9, 2013 MIKE MAHONEY The Pennsylvania State University Department of Architectural Engineering Construction
More informationSylvia Kendra Associate Director Facilities Knowledge Management. January 11, 2017
Developing a 3D Building Information Management Practice Sylvia Kendra Associate Director Facilities Knowledge Management January 11, 2017 Find Us On Line Google search: Smithsonian AE Center Or Full url:
More informationAECOsim Building Designer. Unrivaled Information Modeling for Multi-discipline Building Teams
AECOsim Building Designer Unrivaled Information Modeling for Multi-discipline Building Teams What Are the Barriers to Achieving Information Modeling ROI? The building industry is making the transition
More informationLife Cycle of BIM at the Port Authority
Life Cycle of BIM at the Port Authority Presenters Denise Berger, AIA Assistant Chief Engineer Operations Division Jorge Quiroz BIM/CAD Manager Engineering Solutions Sadia Janjua, LEED AP, PSP Senior Project
More informationBuilding Information Models
National Institute of Building Sciences National Building Information Model Standard Based on and supporting Industry Foundation Classes Information Delivery Manuals and International Framework for Dictionaries
More informationDYNAMIC PROTOTYPE BIM MANUAL FOR A FITNESS CENTER V1.0 November 21, 2011
DYNAMIC PROTOTYPE BIM MANUAL FOR A FITNESS CENTER V1.0 November 21, 2011 Developed by: Air Force Center for Engineering and the Environment Ralph Rick Sinkfield, YD-03, DAF Project Manager Email: ralph.sinkfield@us.af.mil
More informationBLOCKCHAINS IN CONSTRUCTION & INFRASTRUCTURE HELIUM ALLIANCE
BLOCKCHAINS IN CONSTRUCTION & INFRASTRUCTURE HELIUM ALLIANCE DISTRIBUTED DATABASES SUPPLY CHAINS, WHOLE LIFE COSTING & ASSET MANAGEMENT KEEPING COST OS UPDATED FOR NEW STANDARDS COST OS NRM 3 MODULE, RELEASED
More informationBuilding Information Modeling and what it means for the AV Industry. Prepared by Jon Melchin Director Architectural Business Development FSR, Inc.
THE NEW FACE OF DESIGN Building Information Modeling and what it means for the AV Industry Prepared by Jon Melchin Director Architectural Business Development FSR, Inc. Building Information Modeling BIM:Whatisit?
More informationBIM FOR SURVEYORS. Survey Economics State of recovery. Tracking Wildlife With a total station. Measuring a Meridian Time in 1700s Philadelphia
JUNE 2017 BIM FOR SURVEYORS Survey Economics State of recovery Tracking Wildlife With a total station Measuring a Meridian Time in 1700s Philadelphia A NEW MODEL FOR SURVEYORS As BIM moves into more projects
More informationNBS National BIM Survey 2011
NBS National BIM Survey 2011 NBS National BIM Survey: Participants What is your main discipline? 5% 1 2 25% 3 35% 4 45% 5 Architect Architectural Technologist Other (please specify) Quantity Surveyor Structural
More informationConstruction Update. May 2016
Construction Update May 2016 Project Western Zone Gridlines 1 to 10 Central Zone Gridlines 10 to 20 Eastern Zone Gridlines 20 to 35 Overview 1. Recent Activity 2. Upcoming Activity 3. Safety & Labor Statistics
More informationCIVIL ENGINEERING BENEFITS OF BIM. Helping Civil Engineers do more with BIM
CIVIL ENGINEERING BENEFITS OF BIM Helping Civil Engineers do more with BIM CIVIL ENGINEERING BENEFITS OF BIM WHAT S INSIDE: 1 BENEFITS Keep constructability top-of-mind Improve project margins Make better
More informationWorld Building Information Modeling (BIM) Market - Opportunities and Forecasts,
Published on Market Research Reports Inc. (https://www.marketresearchreports.com) Home > World Building Information Modeling (BIM) Market - Opportunities and Forecasts, 2015-2022 World Building Information
More informationContents. AIA 2009 BIM Awards Category A: Creating Stellar Architecture Using BIM Project: EDITH KINNEY GAYLORD CORNERSTONE ARTS CENTER
Introduction / Overview AIA 2009 BIM Awards Category A: Creating Stellar Architecture Using BIM Project: EDITH KINNEY GAYLORD CORNERSTONE ARTS CENTER Owner s Statement Architect s Statement Contractor
More informationParametric Library Components for BIM-based Curtain Wall Design Automation Module
33 rd International Symposium on Automation and Robotics in Construction (ISARC 2016) Parametric Library Components for BIM-based Curtain Wall Design Automation Module Beomjun Kim a and Sangyoon Chin b
More informationInternational Research Journal of Engineering and Technology (IRJET) e-issn: Volume: 03 Issue: 01 Jan p-issn:
Contribution Of Building Information Modeling (BIM) To Solve Problems In Architecture, Engineering and Construction (AEC) Industry and Addressing Barriers to Implementation of BIM Vinay Kushwaha Assistant
More information3D Virtual Master Campus Planning and Management
3D Virtual Master Campus Planning and Management Dr. Thomas Furlani Charles Hixon Best Practices The Eastern Regional Association of Physical Plant Administrators (ERAPPA) is a Registered Provider with
More informationSPACE TYPE: OUTSIDE PARKING (STRUCTURE)
SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.
More informationFigure i-1: The BIM Project Execution Planning Procedure. Building Information Modeling Project Execution Planning Guide
EXECUTIVE SUMMARY A Building Information Model (BIM) is a digital representation of physical and functional characteristics of a facility. 1 To successfully implement BIM, a project team must perform detailed
More informationSession 7 Part A Revit for Urban Design
Session 7 Part A Revit for Urban Design Class Description Revit for Urban Design will present a methodology that can enable project teams to quickly become efficient in a coordinated spatial environment
More informationAutodesk and the UK BIM Level 2 Mandate
Autodesk and the UK BIM Level 2 Mandate BIM Level 2 Mandate The UK Cabinet Office is in the midst of a multi-year effort to reform the way in which the UK government procures construction helping to ensure
More informationThe new Army hospital at Fort Benning is the U.S. Army Corps of Engineers first-ever design-build hospital project. Building.
The new Army hospital at Fort Benning is the U.S. Army Corps of Engineers first-ever design-build hospital project. Building up the Fort by Robert Wayne Stocks, P.E., Zachary Kates, P.E., and Kevin Macleod
More informationThule Prototype BIM Manual for Dormitories. February 5, 2010
Thule Prototype BIM Manual for Dormitories February 5, 2010 TABLE OF CONTENTS INTRODUCTION Executive Summary 2 Goals 2 Scope and Use 2-4 Program Assumptions Kit of Parts GUIDELINE INTEGRATION Site Design
More informationIntroducing an Advanced Building Information Modeling Course in Construction
Paper ID #17619 Introducing an Advanced Building Information Modeling Course in Construction Management Programs Dr. Yilei Huang, South Dakota State University Dr. Yilei Huang is an Assistant Professor
More information