1 DRAINAGE SOLUTIONS SINCE 1908 SURFACE DRAINAGE Installation Guide ARMTEC.COM

2 RECYFIX PRODUCTS RECYFIX trench drain systems are available in a wide range of load class ratings and grate options. They are constructed from high grade PP (polypropylene) making them extremely durable, lightweight and virtually unbreakable. These pre-assembled, lightweight trench drain units are easy to handle and simple to install with pre-molded lateral and vertical connections, as well as tongue and groove ends to ensure perfect alignment. They withstand frost, de-icing salt and UV radiation and are highly chemical resistant. Their torsion resistant rib design ensures stability and secure anchoring to concrete. RECYFIX products are made from recycled material and certified to the International Standard EN TOOLS AND EQUIPMENT The following tools and equipment may be required for a typical installation: Levelling and Alignment String-line Pipe laser and spirit level Theodolite Cutting and Drilling Drill and drill bits (core, steel, hole saw) Hand saw, jig-saw, angle grinder/disc cutter (cutting disks for plastic material) Cutting/trimming knife Excavation and Installation Excavator (required for longer runs) Shovel Compactor (vibratory plate compactor) Ready-mixed concrete Concrete vibrating rod Rubber mallet and wooden block Trowel Wrench and screw drivers Flexible sealant HEALTH AND SAFETY Potential hazards include Cuts to hands or abrasive damage Dust inhalation from grinding or cutting activities Potential for small fragment propulsion during grinding and cutting activities Potential for generation of sparks during cutting of grates (flammable materials should be kept away from work area) EN 1433 CERTIFIED The following personal protection equipment is recommended when handling polypropylene products: Gloves Eye protection, dust mask/respirator, hard hat Protective clothing. 2 VISIT ARMTEC.COM FOR MORE INFORMATION

3 INSTALLATION SEQUENCE BEDDING METHOD The following procedures relate to a continuous trench installation. Before starting the installation, the contractor shall have in hand the correct Installation Drawing according to the model and size of the trench drain, the loading requirement and the surface finish. STEP 1 Trench Excavation 1.1 Excavate the trench to accommodate the RECYFIX modular catch basin and trench drain units. Remove all loose material. Take account of the following dimensions and requirements: Catch basin and trench drain dimensions Depth of concrete base Width of concrete encasement Dimensions of trench or form-work/shuttering system (if any) Working room Invert levels of underground pipework Finished surface level 1.2 A blinding layer of concrete may be placed within the trench base to provide a level and clean environment. The trench drain concrete base will be installed on top of the blinding layer. 1.3 Prepare the string-line or survey equipment to establish correct alignment and level. Ensure the catch basin and trench drain top edge will sit 3 to 5 mm beneath the finished surface level. 1.4 Level the ground and compact well. Ground compaction should be in accordance with structural engineering static calculations and local standards/regulations. ARMTEC DRAINAGE SOLUTIONS 3

4 STEP 2 Concrete Base Installation 2.1 Install the concrete base (depth dimension according to load class). Refer to HAURATON Installation Drawing for dimensions. 2.2 The concrete encasement width and concrete base depth dimensions for the RECYFIX modular catch basin are generally the same as for the trench drain installation. They are dependent on the project application and load class requirement for the specific location on site. 2.3 The concrete base can be applied as semi-dry (low-slump) or wet-mix (high-slump) concrete, depending on project requirements and load class. Semi-Dry Base (Low Slump) The modular catch basin and trench drain units can be bedded directly on semi-dry concrete. Wet-Mix Base (High Slump) If a wet-mix concrete base is applied, this should be given adequate time to cure fully. The modular catch basin and trench drain units will be bedded on mortar. 4 VISIT ARMTEC.COM FOR MORE INFORMATION

5 STEP 3 Modular Catch Basin Installation: Prepare Pipe Connection 3.1 Install the modular catch basin first and trench drain units afterwards. Lay units back (upstream) from the modular catch basin (downstream) position. 3.2 Select the correct pipe diameter. The RECYFIX modular catch basin includes a series of pre-formed pipe connectors (with pre-formed spigots in various diameters) integral within the body of the box (at various locations). 3.3 Remove knock-out sections of plastic material from the modular catch basin by core drill. STEP 4 Modular Catch Basin Installation: Bedding and Adjustment 4.1 Embed the RECYFIX modular catch basin onto the concrete base (semi-dry concrete or mortar bed). 4.2 Adjust catch basin in position with the string line using a rubber mallet. 4.3 Once the correct height and position is achieved, secure the RECYFIX modular catch basin with a concrete haunch around the base of the unit. STEP 5 Modular Catch Basin Installation: Fit the Pipe-Work 5.1 Apply sealing grease/flexible sealant to the selected pipe spigot on the RECYFIX modular catch basin. 5.2 Connect pipe-work to the spigot (push-fit/flexible adapter, other). STEP 6 Modular Catch Basin Installation: Finite Adjustment 6.1 If not already secured in place (with concrete haunch) the RECYFIX modular catch basin can be adjusted at this stage. 6.2 Make finite adjustments to make sure the catch basin is in the proper position with the string line. Adjust if necessary with a rubber mallet or by adding more concrete/mortar beneath the modular catch basin. ARMTEC DRAINAGE SOLUTIONS 5

6 STEP 7 Secure the Modular Catch Basin and Pipe-Work: Apply the Concrete Haunch 7.1 Apply the concrete haunch around the base of the modular catch basin and connected pipe-work to secure these firmly in position. 7.2 Install trench drain units once the RECYFIX modular catch basin is secured in its correct position and the concrete haunch is dry (cured). STEP 8 Trench Drain Unit Installation 8.1 Lay trench drain units up-stream using the outlet position as the starting point and working backwards. 8.2 Lay trench drains with arrow (direction of flow) pointing towards the outlet. 8.3 Connect trench drain units using the vertical sliding action with male-female tongue-and-groove joints. 8.4 Bed units on a semi-dry concrete (or mortar) base and adjusted to the correct line and level. Finite adjustment to suit line and level can be made with a rubber mallet or by adding more concrete/mortar beneath the trench drain unit. 8.5 Apply the concrete haunch (semi-dry/low-slump concrete) to fix trench drain units securely in place once installed in the correct position. 6 VISIT ARMTEC.COM FOR MORE INFORMATION

7 STEP 9 Modular Catch Basin and Trench Drain Installation: Back Fill 9.1 Allow the concrete haunch around the modular catch basin and trench drain installation to dry (cure) adequately before final backfilling and surface finishing occurs. Paving Units Asphalt Surface STEP 10 System Installation: Install Sub-Base Material and Surface Finishing 10.1 Install the adjacent sub-base material beside the trench drain installation as per the HAURATON Installation Drawing. Ensure sub-base material is well compacted to avoid settlement Compact ground to achieve the project s structural engineering static calculations and to meet local standards/regulations Ensure the finish grade of the trench drain top edge sits 3 to 5 mm beneath the finished surface level. Paving Units Asphalt Surface ARMTEC DRAINAGE SOLUTIONS 7

8 INSTALLATION SEQUENCE PATTY METHOD The Patty method involves the installation of concrete pads (patties) along the ground/trench base on which RECYFIX trench drain units are supported. This method allows concrete to be poured under and around the trench drain body in one operation during the main concrete pour. STEP 1 Prepare Ground and Install Outlet 1.1 Prepare the ground or trench base along which the trench drain will be installed. 1.2 Prepare the string-line or survey equipment to establish correct alignment and level. Ensure the modular catch basin and trench drain top edge will sit 3 to 5 mm beneath the finished surface level. 1.3 Install the outlet point first. 1.4 Set the RECYFIX modular catch basin or trench drain with vertical/horizontal outlet on concrete bed at the correct height. Refer to previous section Install modular catch basin Steps 3 to Connect and seal pipe-work within the outlet/trench drain unit. STEP 2 Install Concrete Pads (Patties) 2.1 Install concrete pads (patties) of semi-dry (low slump) concrete at intervals along the ground/trench base. Pads (patties) should be positioned at both ends of each trench drain unit. 2.2 Use pads (patties) to support and raise trench drain units above the ground/ trench base at the appropriate height (at the trench drain concrete base depth dimension). Refer to the HAURATON Installation Drawings. 2.3 Clean trench drain joints to ensure they are free of dirt or concrete slurry. 2.4 Apply flexible sealant within trench drain joint sealant groove if required. 8 VISIT ARMTEC.COM FOR MORE INFORMATION

9 STEP 3 Install Trench Drain Units 3.1 Lower trench drain unit into position on concrete pads (patties). 3.2 Connect (join) trench drain units using a vertical sliding action. Lower successive trench drain units into place (downwards) along the jointing-groove of the trench drain unit that is already installed. Male/female end profiles have a tongue-and-groove joint design. Male End Lowered 3.3 Trench drain units can be adjusted by adding or removing semi-dry concrete and/or by gently tapping with a rubber mallet. 3.4 When trench drain units are correctly positioned, additional concrete should be haunched around the trench drain units at the location of the concrete pads (patties). Ensure that trench drain concrete anchors (within the trench drain body) are covered with concrete to secure the trench drain installation. Final Position ARMTEC DRAINAGE SOLUTIONS 9

10 STEP 4 Install Successive Trench Drain Units 4.1 The contractor should work back from the outlet position until the next outlet/access point is reached, using the same method. Trench drain units installed from outlet position 4.2 Allow haunched concrete pads (patties) to cure sufficiently before the main pour of concrete takes place. 4.3 Pour concrete under and around the trench drain units using a vibrating rod to ensure concrete fills all voids. 4.4 Refer to the HAURATON Installation Drawings for concrete encasement dimensions and installation detail in relation to the finished surface material. 10 VISIT ARMTEC.COM FOR MORE INFORMATION

11 SURFACE FINISHING For most project applications the finished surface level (concrete encasement/ asphalt/block paving) should finish 3 to 5 mm above the top-edge of the trench drain to achieve efficient drainage and to provide protection to the trench drain system and grate. It is recommended that strong construction tape is fitted to trench drain grates to prevent concrete slurry, asphalt or site debris from entering the system during installation. Concrete Pavement Installation (A15 F900; EN 1433; 2002) Refer to the HAURATON Installation Drawings for further information regarding concrete encasement dimensions, expansion joints and steel reinforcement (if required). Longitudinal Expansion Joint as specified by Design Engineer Crack Control Joints as Specified by Design Engineer. Crack Control Joints need to be located where trenches are joined together. Trench Drain Concrete Encasement: Refer to HAURATON Installation Drawings for specification and dimensions relative to load class Concrete Pavement Concrete Wearing Course Base Course Material Frost Resistant Sub Base ARMTEC DRAINAGE SOLUTIONS 11

12 Asphalt Surface Installation (A15 C250; EN 1433; 2002) Cold bituminous joint compound applied at interface between trench drain edge and asphalt surface Tack coat applied on concrete surfaces at interface between asphalt and trench drain concrete encasement Asphalt Wearing Course Trench Drain Concrete Encasement (haunched): Refer to HAURATON Installation Drawings for specification and dimensions relative to load class Asphalt Binder Course and Bituminous Base Course Frost Resistant Sub Base Block Paving Installation (A15 B125; EN 1433; 2002) Longitudinal Expansion Joint will be required if joints between paving units are mortar filled Paving Units Sand Filled Joints Trench Drain Concrete Encasement: Refer to HAURATON installation Drawings for specification and dimensions relative to load class Paving Unit Bedding Base Course Material Frost Resistant Sub Base 12 VISIT ARMTEC.COM FOR MORE INFORMATION

13 INSPECTION AND MAINTENANCE Regular inspections and maintenance of trench drain systems are necessary for proper functioning. The frequency depends on the local environment and operating conditions but the system should be inspected and maintained at least every 12 months. Frequency Refer to HAURATON for a detailed Inspection and Maintenance document. Inspection Systems should be checked for damage, blockage or settlement. Inspection of the system should include: Trench drain and edge-frame housings Concrete encasement and adjacent surfaces Modular catch basin and sediment buckets Grates and locking mechanisms FLUSHING PROCEDURE 1. Remove grates at the start of the trench drain run and at the RECYFIX modular catch basin (1). In most cases it will only be necessary to remove single grates at intervals along the trench drain run to allow access for flushing the system clean. 2. Remove sediment bucket from outlet box (2). The sediment bucket can remain in place during the first power-wash flushing in order to collect additional solid matter and prevent it from entering underground pipe-work. ARMTEC DRAINAGE SOLUTIONS 13

14 3. Visually inspect the trench drain system. 4. Direct a high pressure water hose with reverse jetters into the trench drain system from the RECYFIX modular catch basin or downstream end (1) up to the upstream end of the system. 5. Pull back the hose down the line flushing the debris and sediments towards the catch basin. Water pressure to be set between 90 to 120 bar (1300 to 1750 psi). 6. Remove the sediments and debris using a vactor truck. Larger items can be removed by hand. 7. Clean sediment buckets and pipe-connections. 8. Remove debris in grate slots/openings using a screwdriver or pressure washer. 9. Remove dirt from trench drain angle-frame housings and locking mechanisms. 10. Perform necessary repairs. Worn and/or broken components should be replaced. 11. Remove cleaning equipment. 12. Replace sediment buckets. 13. Perform final flush of the trench drain system with clean water to ensure free flow. 14. Apply light oil to metal locking bolts/bars. 15. Lock grates securely into position with bolt heads secured beneath the top of the grate surface. 14 VISIT ARMTEC.COM FOR MORE INFORMATION

15 DISCLAIMER: 09/2017 Armtec takes reasonable and due care when compiling product information for use within marketing and technical documents. Any guidance, recommendations or advice provided regarding HAURATON products and systems is given without guarantees, as conditions relating to the use and installation of products and systems is beyond the control and influence of the company. The customer has the final responsibility to ensure the suitability of the system regarding its use and application for their project. Armtec reserves the right to make changes to products, system designs and company information without notice. This document has been issued subject to withdrawal without prior notice. Images, photos, illustrations and specification details are not binding regarding their detail. ARMTEC DRAINAGE SOLUTIONS 15

16 Solutions for a Better World Armtec is a leading provider of infrastructure solutions that deliver social, environmental and economic benefits for an ever-changing world ARMTEC ARMTEC.COM Drawings and product details are for information and/or illustrative purposes only, and may vary. Please contact your local Armtec representative for the most current product information. SURFACE DRAINAGE / INSTALLATION GUIDE PROD-C02-G15_OTH E

SMITH/ACO DRAINAGE SYSTEMS

SMITH/ACO DRAINAGE SYSTEMS SMITH/ACO DRAINAGE SYSTEMS Commercial Trench Drains EXPANSION JOINT TO ENGINEER S DETAIL CONCRETE BEDDING L ACO DRAIN Site Installation Manual 1 Polymer Concrete Drain Systems SMITH CUSTOMER DRIVEN SINCE

More information

ACO DRAIN Site Installation Manual Polymer Concrete Drain Systems

ACO DRAIN Site Installation Manual Polymer Concrete Drain Systems EXPA ENG ACO DRAIN Site Installation Manual Polymer Concrete Drain Systems Re-order DL016 2 Getting Started ACO Drain consists of a full range of modular channels with captive grates; Systems include catch

More information

Guidelines to installing the ACO Sport range of products

Guidelines to installing the ACO Sport range of products SYNTHETIC SU POROUS OR NON-P Installation ASPHALT WEARING COURS ASPHALT BASE COURSE CONCRETE COMPACTED STONE BASE COMPACTED SUBGRAD AILER 4" MIN 4" MIN 4" MIN Guidelines to installing the ACO Sport range

More information

Linear Drainage ZF806 ZF812

Linear Drainage ZF806 ZF812 Linear Drainage ZF806 ZF812 Fiberglass Trench Installation Instructions ZF806 Accessories 6" [152mm] Wide Fiberglass Trench Drain System Below are some of the ZF806 trench drain components typical to an

More information

Zurn Z886. 6" Perma-Trench. Installation Instructions

Zurn Z886. 6 Perma-Trench. Installation Instructions Zurn Z886 6" Perma-Trench Installation Instructions Z886 Accessories 6" [152mm] Wide Trench Drain System Below are the components of the Z886 trench drain typical to an installation. Check your order to

More information

Zurn Z874. Trench Drain System. Installation Instructions

Zurn Z874. Trench Drain System. Installation Instructions Zurn Z874 Trench Drain System Installation Instructions Z874 Accessories Trench Drain System Below are the components of the Z874-X trench drain typical to an installation. Check your order to verify you

More information

Construction Specification for Utility Adjustments

Construction Specification for Utility Adjustments Engineering & Construction Services Division Standard Specifications for Road Works TS 4.50 September 2017 for Utility Adjustments Table of Contents TS 4.50.01 SCOPE... 2 TS 4.50.02 REFERENCES... 2 TS

More information

SECTION UTILITY MANHOLES AND STRUCTURES

SECTION UTILITY MANHOLES AND STRUCTURES SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

TF-14. TF-14 Installation Guide

TF-14. TF-14 Installation Guide TF-14 Trench Drain Forming System Installation Manual TF-14 Installation Guide P.O. Box 837 # 259 Murdock Road # Troutman, NC 28166 Tel (704) 528-9806 # Fax (704) 528-5478 Toll free in the U.S., Canada,

More information

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows. 403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage

More information

ZURN INDUSTRIES, INC., FLO-THRU DIV.,

ZURN INDUSTRIES, INC., FLO-THRU DIV., FLO-THRU TM ZURN INDUSTRIES, INC., FLO-THRU DIV., 2855 Girts Road, Jamestown, NY 14701 Phone: 716/665-1132, Fax: 716/665-1135, World Wide Web: www.zurn.com In Canada: ZURN INDUSTRIES LIMITED, 3544 Nashua

More information

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation SECTION 33 40 00 STORM DRAINAGE UTILITIES 1. PART 1 GENERAL 1.1 RELATED WORK A. Section 31 23 00: Excavation and Fill B. Section 32 00 01: Site Restoration and Rehabilitation C. Special Conditions for

More information

Installation Instructions

Installation Instructions EconoDrain Trench Forming System Installation Instructions MultiDrain We Drain Your Site, Not Your Budget MultiDrain Systems, Inc. P.O. Box 88, Barium Springs, NC 28010 (704) 508-1010 or Toll Free 800-433-1119

More information

Underground Exhaust System

Underground Exhaust System Operation and Maintenance Manual Underground Exhaust MONOXIVENT - SOURCE CAPTURE SYSTEMS - info@ Oct. - 2015 Underground Duct Construction Standards 1. Dig trench depth to allow for minimum distance from

More information

NOVEMBER 2016 GRANDWALL. retaining walls installation guide

NOVEMBER 2016 GRANDWALL. retaining walls installation guide NOVEMBER 2016 GRANDWALL retaining walls installation guide RETAINING WALL INSTALLATION GUIDE RETAINING WALL information Austral Masonry Grandwall retaining wall blocks are an ideal choice for retaining

More information

ACO Civicline CL. Line drainage. ACO product catalogue ACO Civicline CL

ACO Civicline CL. Line drainage. ACO product catalogue ACO Civicline CL ACO ACO product catalogue ACO Introduction ACO Civicline system overview ACO Civicline is a channel drainage system for light to medium duty traffic applications up to load class C 250 according to EN

More information

BioPrism Solid Surface

BioPrism Solid Surface Please read all instructions before installing products. STORAGE & HANDLING: Check for damage that may have occurred during transit. Keep receptor flat on pallet, as it was shipped, until ready to install.

More information

ACO Construction & Building Products

ACO Construction & Building Products ACO Construction & Building Products Sur face Drainage and Building Elements ACO SPORT System 3000 Product Brochure Slotted Athletic Track and Field Drainage System Ideal for High School and Amateur Stadiums

More information

Silva Cell. Silva Cell Two-Deep Installation Instructions. Helping Trees Live in the Urban Environment

Silva Cell. Silva Cell Two-Deep Installation Instructions. Helping Trees Live in the Urban Environment Silva Cell T r e e R o o t G u i d e s Silva Cell Two-Deep Installation Instructions Helping Trees Live in the Urban Environment Silva Cells frames and decks should at no time be cut, drilled into, or

More information

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1 March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural

More information

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. SECTION 33 05 13 MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. B. Related Sections: 1. Section 03 20 00 - Concrete

More information

ACO Construction & Building Products

ACO Construction & Building Products ACO Construction & Building Products Sur face Drainage and Building Elements ACO SPORT System 3000 Product Brochure Slotted Athletic Track and Field Drainage System Ideal for High School and Amateur Stadiums

More information

AUGUST 2017 HASTINGS. retaining walls installation guide

AUGUST 2017 HASTINGS. retaining walls installation guide AUGUST 2017 HASTINGS retaining walls installation guide RETAINING WALL INSTALLATION GUIDE RETAINING WALL information Austral Masonry retaining wall blocks are an ideal choice for retaining walls in gardens,

More information

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August Double Slide Rail August 2015 1 DOUBLE SLIDE RAIL INSTALLATION METHOD Introduction Slide rail shoring systems can be used for trenches up to 12m wide and 6m deep. Module length is determined by panels

More information

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS GUIDE FOR TIMBER AND CONCRETE FLOORS EDITION: APRIL 2016 IMPORTANT: This guide is for the installation of a Step Up shower base on a timber or concrete floor. If you require a walk in (flush with floor)

More information

ACO Construction & Building Products

ACO Construction & Building Products ACO Construction & Building Products Sur face Drainage and Building Elements ACO SPORT System 4000 Product Brochure Open Trench Drain System for Tracks, Sports Fields and Recreational Areas ACO SPORT System

More information

Perfect Manhole Installation Manual May 2012 Rev 8 Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints

Perfect Manhole Installation Manual May 2012 Rev 8 Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints Installation Manual 1 1 Introduction This manual gives guidance on how to install the CPM Group Perfect manhole system

More information

MODULAR ACOUSTIC FENCING INSTALLATION GUIDE

MODULAR ACOUSTIC FENCING  INSTALLATION GUIDE MODULAR ACOUSTIC FENCING WWW.QUICKBUILTSYSTEMS.COM.AU INSTALLATION GUIDE INTRODUCTION THE QUICKBUILT FENCE SYSTEM IS A SMARTLY DESIGNED MODULAR SYSTEM EASY AND FAST TO INSTALL AND COST EFFECTIVE. // THE

More information

Retaining Walls. Made Easy

Retaining Walls. Made Easy Retaining Walls Made Easy Retaining Walls Made Easy! Contents Page 1 Contents Page 2 Foreword Page 3 Demolition Page 3 Removal Vegetation Page 3 Excavation Page 4 Reinforcement Steel Page 6 Concreting

More information

SECTION FACILITY SANITARY SEWERS

SECTION FACILITY SANITARY SEWERS SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 02630 - STORM DRAINAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Glass Reinforced Concrete DRAINAGE CHANNELS

Glass Reinforced Concrete DRAINAGE CHANNELS Glass Reinforced Concrete DRAINAGE CHANNELS OVERVIEW PRODUCTS A 125 B 125 C 250 D 400 E 600 F 900 MINI A with -slot grating MINI B with mesh grating TOP 100 A-C with slotted galvanised steel grating and

More information

CW 3615 RIPRAP TABLE OF CONTENTS

CW 3615 RIPRAP TABLE OF CONTENTS December 2014 SPECIFICATION CW 3615 R4 CW 3615 RIPRAP TABLE OF CONTENTS 1. GENERAL CONDITIONS... 1 3. DESCRIPTION... 1 5. MATERIALS... 1 5.1 General... 1 5.2 Rock... 1 5.3 Random Stone Riprap... 1 5.4

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

***************************************************************************************************************

*************************************************************************************************************** 02735 WASTE WATER DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 22 14 00 ***************************************************************************************************************

More information

Precast Concrete Trench Drain Systems

Precast Concrete Trench Drain Systems Precast Concrete Trench Drain Systems HYDROblock - HYDROblock 100: 4 Internal Width - HYDROblock 200: 8 Internal Width - HYDROblock 300: 12 Internal Width One Piece Ductile Iron Trench Drain About SIGMA

More information

Construction Inspection Checklists

Construction Inspection Checklists III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments

More information

Retaining Wall Products

Retaining Wall Products Retaining Wall Products BCP Building Products 18 Kirkcaldy Street Bathurst NSW 2795 Phone 02 6331 2777 Fax 02 6331 6510 sales@bcpbuildingproducts.com.au www.bcpbuildingproducts.com.au Garden Lockstone

More information

Installation instructions. MEA Drainage systems

Installation instructions. MEA Drainage systems Preliminary remarks: The installation instructions given here are to be regarded as general information for the proper installation and operation of MEA channel systems. It is recommended that professional

More information

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.

SECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. PART 1 - GENERAL 1.1 DESCRIPTION A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section 01300 Record

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3 CITY OF TORONTO TS 3.65 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS 3.65.01 SCOPE...3 TS 3.65.02 TS 3.65.03 REFERENCES...3

More information

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate Colphene BSW Training and Application Guide Colphene BSW Waterproofing Membrane. 1. Prepare substrate Substrate must be structurally sound. Surface must be free of voids, spalled areas, loose aggregate,

More information

MACHINE-LAY Installation Manual

MACHINE-LAY Installation Manual MACHINE-LAY Installation Manual PaveDrain Installation Manual Table of Contents Section 1: Base Preparation (pages 3 6) Section 2: Machine-Lay PaveDrain Blocks (pages 8 11) Section 3: Edge Restraints (pages

More information

Section 401. PIPE CULVERTS

Section 401. PIPE CULVERTS 401.02 Section 401. PIPE CULVERTS 401.01. Description. This work consists of constructing pipe culverts of the size and class required, including excavation and backfill. 401.02. Materials. Provide materials

More information

ACO Bathroom Drainage Linear shower drains

ACO Bathroom Drainage Linear shower drains ACO Bathroom Drainage Linear shower drains Installation uide Technical & planning considerations Accumulation and slopes ASME A112.6.3-2001 requires a 2 outlet for shower applications. QuARTz by ACO channels

More information

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge Assembly Manual 8x9 PATENTS ARE PENDING Approximate Size 7640303 Storage Area Building Dimensions Exterior Dimensions Roof Edge to Roof Edge Interior Dimensions Wall to Wall Sq. Ft. Cu. Ft. Width Depth

More information

Paver and Ground lights - Anchor Plate

Paver and Ground lights - Anchor Plate Paver and Ground lights - Anchor Plate Meteor Ground and Paver lights come equipped with anti-theft Anchor Plate (Models: SH-130, SH-170, SH-180, SH-190, SH-220, SH-260, SH-270) or a set of anti-theft

More information

INDUSTRIAL PIPE FITTINGS, LLC

INDUSTRIAL PIPE FITTINGS, LLC Page 1 of 9 SPIROLITE MUNICIPAL AND INDUSTRIAL ODOR CONTROL PIPING Municipal wastewater treatment plants, industrial processes and composting facilities can be assured of trouble free transport of foul

More information

Reinforced concrete slot channel

Reinforced concrete slot channel Applicable Bodies of Rules: DIN EN 1433»Drainage channels for vehicular and pedestrian areas«din 19580»Drainage channels for vehicular and pedestrian areas«the following laying instructions are general

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

Fabrication and Installation Table of Contents

Fabrication and Installation Table of Contents Fabrication and Installation Table of Contents HDPE AQUASHIELD PRODUCTS 2 Fabrication and Installation 2 System Fabrication 3 Aqua-Swirl Installation 4 Step 1 Excavation and Bedding 4 Step 2 Pipe Connection

More information

Installation Instructions for SuperFast Hurricane

Installation Instructions for SuperFast Hurricane SuperFast Hurricane Installation Instructions for SuperFast Hurricane I. Before You Start / Preparations Please read all the instructions before you begin the installation. Improper installation will void

More information

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure ArchCast Bridge 3-Sided Precast Concrete Bridge Structure Installation Manual Salem Location: 749 West Commercial Ave. Salem, IL 62881 (618) 548-1190 countymaterials.com Email: info@countymaterials.com

More information

FS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm)

FS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm) Wastewater Flow Distributor Technical Data Submittal Special Precautions Specifications Installation 24½" (62.2 cm) 12½" (31.8 cm) 24½" (62.2 cm) (30.5 cm) SUBMITTAL STANDARD: 4" plain end inlet/outlet

More information

SECTION POROUS PAVEMENT SYSTEM

SECTION POROUS PAVEMENT SYSTEM SECTION 02795 POROUS PAVEMENT SYSTEM PART 1 GENERAL 1.1 SECTION INCLUDES A. Porous grass paving grid system. 1.2 RELATED SECTIONS A. Section 02300 - Earthwork. B. Section 02620 Sub-Drainage System. C.

More information

BIO-AQUIFER STORM SYSTEM

BIO-AQUIFER STORM SYSTEM BIO-AQUIFER STORM SYSTEM Specifications for Construction PART 1 GENERAL 1.01 SECTION INCLUDES A. Providing labor, materials, tools and equipment to furnish and install a permeable concrete paving stone

More information

Construction Specification for Concrete Unit Pavers

Construction Specification for Concrete Unit Pavers Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS

More information

VALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE

VALLECITOS WATER DISTRICT SECTION POLYVINYL CHLORIDE (PVC) PRESSURE PIPE PART 1 - GENERAL 1.1 DESCRIPTION A. This section designates the requirements for the manufacture and installation of polyvinyl chloride, abbreviated PVC, pressure pipe. 1.2 RELATED WORK SPECIFIED ELSEWHERE

More information

Semstone Construction Details

Semstone Construction Details Semstone Construction Details SP01-94 Treatment for Expansion Joints, Control Joints, and Structural Cracks, Vertical and Horizontal, for Non-Vehicular Traffic 1. Maintain joint/crack through coating.

More information

Concrete Formwork Systems

Concrete Formwork Systems Concrete Formwork Systems Victory Bear is proud to introduce K-FORM North America Proven by a decade of use in the United Kingdom, K-FORM is an all-in-one screed rail and concrete forming system. Simple

More information

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2)

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2) Installation Manual Orion TL-3 Steel Barrier VHD (v2) 300914 Table of Contents Orion Introduction.......... 3 Limitations & Warnings. 4 Before Installation..... 3 System Design & Design Considerations

More information

BITUMEN-SET PRECAST CONCRETE PAVING SLABS

BITUMEN-SET PRECAST CONCRETE PAVING SLABS SECTION 32 14 13.16 BITUMEN-SET PRECAST CONCRETE PAVING SLABS (1995 MasterFormat Section 02784) NOTE: This guide specification is the U.S. for concrete paving slabs adhered with a neoprene mastic to a

More information

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course. SECTION 02750 RIGID PAVEMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Portland Cement Concrete (PCC) pavement. B. Related Sections: 1.2 REFERENCES 1. Section 02315 Excavation. 2. Section 02721

More information

INSTALLATION INSTRUCTIONS B-407-RB SERIES SINGLEWALL RETROFIT TANK SUMP

INSTALLATION INSTRUCTIONS B-407-RB SERIES SINGLEWALL RETROFIT TANK SUMP INSTALLATION INSTRUCTIONS B-407-RB SERIES SINGLEWALL RETROFIT TANK SUMP NEW! SNAP-LOCK cover with high-pressure water-right vertical o-ring seal Pour-in Place channel joint sealed by new Epoxy Slurry mix

More information

CULTEC STORMWATER CHAMBER SYSTEMS

CULTEC STORMWATER CHAMBER SYSTEMS DRAINAGE SOLUTIONS SINCE 1908 CULTEC STORMWATER CHAMBER SYSTEMS RETENTION / DETENTION / INFILTRATION ENVIRONMENTAL PROTECTION COST-EFFECTIVE LAND USE EASY TO INSTALL ARMTEC.COM CULTEC STORMWATER MANAGEMENT

More information

COMPOSITE (WPC) ENGINEERED VINYL FLOORING INSTALLATION

COMPOSITE (WPC) ENGINEERED VINYL FLOORING INSTALLATION COMPOSITE (WPC) ENGINEERED VINYL FLOORING INSTALLATION PLEASE READ ALL INSTRUCTIONS CAREFULLY BEFORE YOU BEGIN INSTALLATION! IMPROPER INSTALLATION WILL VOID WARRANTY. STOP! WPC Engineered Vinyl Flooring

More information

Water Pollution Control for Work in Sensitive Areas

Water Pollution Control for Work in Sensitive Areas Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed

More information

A Design Review of Waterproofing Codes

A Design Review of Waterproofing Codes A Design Review of Waterproofing Codes Section 1807 of Chapter 18 of the International Building Code addresses waterproofing under the section title of Dampproofing and Waterproofing. The section defines

More information

FIVE STAR PRODUCTS, INC. (800)

FIVE STAR PRODUCTS, INC.  (800) FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 Page 1 of 11 DESIGN-A-SPEC GUIDELINES FIVE STAR RS ANCHOR GEL CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS PART

More information

Underground Piping for Private Hydrants & Sprinkler Supply Line

Underground Piping for Private Hydrants & Sprinkler Supply Line City of Brea Brea Fire Department Fire Prevention 1 Civic Center Circle Phone: (714) 990-7655 Underground Piping for Private Hydrants & Sprinkler Supply Line PURPOSE The provision of adequate water supplies

More information

New Fulton State Hospital Energy Control Center and Services Building (ECC/SVC) Project Number: M

New Fulton State Hospital Energy Control Center and Services Building (ECC/SVC) Project Number: M SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 811 CONDUIT AND DRAINAGE STRUCTURES

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 811 CONDUIT AND DRAINAGE STRUCTURES STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 811 CONDUIT AND DRAINAGE STRUCTURES January 18, 2013 811.01 Conduit Description 811.02 Conduit Materials 811.03 Conduit Definitions

More information

Polymer Concrete Drainage Channels and Grates

Polymer Concrete Drainage Channels and Grates Polymer Concrete Drainage Channels and Grates www.aquadrain.com.au 2 INDEX Index...2 Ductile Iron Series Polymer Channels and Grates...3 Ductile Iron Series Polymer Channel Profiles...5 Ductile Iron Series

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain

More information

h Installation Manual

h Installation Manual h Installation Manual 1 General Information The installation of HOBAS GRP Pipes is subject to applicable standards and guidelines such as EN 1610 and ISO/ TS 10465-1. Correct installation always requires

More information

CHAPTER 6. Sanitary Sewer

CHAPTER 6. Sanitary Sewer CHAPTER 6 Sanitary Sewer A. Introduction All proposed developments, subdivisions, and buildings must have a properly designed and constructed sanitary sewer collection system. The system shall provide

More information

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY Section Includes: 1. Pipe and fittings. 2. Drain Basin. 3. De-chlorination tablet feeder. 4. Non-pressure transition couplings.

More information

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems Anchorplex retaining wall construction guide Building Anchorplex Retaining Wall Systems Table of Contents and ow to Use This Guide table of contents ow to Use This Guide. 2 About the Anchorplex System.

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt

More information

Instructions for 12 IGT system

Instructions for 12 IGT system Instructions for 12 IGT system Step 1: IGT Site Preparation Site Location Several factors must be considered when choosing the site for your new In-Ground Trampoline (IGT) system. Since local soil and

More information

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings

Stanford University Facilities Design Guidelines SECTION SEAL COATS. C. Section : Traffic Striping and Pavement Markings SECTION 32 12 36 SEAL COATS PART 1 GENERAL 1.1 RELATED WORK A. Section 31 10 00: Site Preparation B. Section 32 12 00: Flexible Paving C. Section 32 17 23 01: Traffic Striping and Pavement Markings 1.2

More information

CONSTRUCTION MANUAL 5-0 x 7-6 UNITS

CONSTRUCTION MANUAL 5-0 x 7-6 UNITS CONSTRUCTION MANUAL 5-0 x 7-6 UNITS www.neelco.com 8328-D Traford Lane, Springfield, VA 22152 703 913 7858 NOTE TO THE READER This manual has been prepared as a guide to building T-WALL Retaining Wall

More information

Pittsburgh Corning ProVantage Glass Block Installation System Assembly Instructions

Pittsburgh Corning ProVantage Glass Block Installation System Assembly Instructions Pittsburgh Corning ProVantage Glass Block Installation System Assembly Instructions Introduction: The ProVantage Glass Block Installation System is the easiest way to install Pittsburgh Corning Premiere

More information

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to the customer s satisfaction.

More information

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION NEW CASTLE COUNTY DEPARTMENT OF LAND USE ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION For Permanent Structures, pursuant to Delaware Pond Code 378 and Delaware Sediment and

More information

CHAPTER 11 CONDUITS AND FITTINGS

CHAPTER 11 CONDUITS AND FITTINGS CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1

More information

GGI-750. Gravity Grease Interceptor Technical Data. Submittal Special Precautions Specifications Installation

GGI-750. Gravity Grease Interceptor Technical Data. Submittal Special Precautions Specifications Installation Gravity Grease Technical Data Submittal Special Precautions Specifications Installation 75" 81" (205.7 (94.0 cm) 19½" 20" (50.8 (49.5 cm) 21½" 20" (50.8 (54.6 cm) 76½" (194.3 cm) 56½" 57" (144.8 (143.5

More information

Pre-Sloped Drain System

Pre-Sloped Drain System SportsEdge PolyDrain Pre-Sloped Drain System www.sportsedge.com Quality. Safety. Versatility. Aesthetics. 2 PolyDrain FORMULA www.sportsedge.com ABT, Inc. manufactures PolyDrain trench drains; the standard

More information

***************************************************************************************************************

*************************************************************************************************************** 02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************

More information

MASTERFLEX 900-FUKO Injection System

MASTERFLEX 900-FUKO Injection System MASTERFLEX 900-FUKO Injection System Injection Hose Waterstop System for Construction and Cold Joints in Concrete Function and use The Masterflex 900 hose system is replacing PVC-Waterbars in construction

More information

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe.

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe. AFTER MARCH 1, 2012 ITEM 460 REINFORCED CONCRETE PIPE 460.1 Description. This Item shall govern for the furnishing of reinforced concrete pipe. 460.2 Materials. A. Except as modified herein, materials,

More information

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems. NORTH MARIN WATER DISTRICT STANDARD SPECIFICATIONS SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS PART 1 GENERAL 1.01 DESCRIPTION This section includes materials and installation of ductile-iron pipe and

More information

SEM EXPANSION JOINTS.

SEM EXPANSION JOINTS. SE EXPANSION JOINTS www.arsankaucuk.com.tr 1 PROPERTIES ridge expansion joints are designed to permit the longitudinal, vertical movements and small rotation presented on bridge decks due to changes in

More information

ROLLING RACK. Simple Security

ROLLING RACK. Simple Security Simple Security The graceful design and high security of the Rolling Rack has made this type of bike rack a standard for many schools and communities. The Rolling Rack can be used as a single-sided or

More information

PolyDrain. Pre-Engineered Surface Drainage. Installation Guide

PolyDrain. Pre-Engineered Surface Drainage. Installation Guide PolyDrain Pre-Engineered Surface Drainage Installation Guide P.O. Box 837-259 Murdock Road - routman, NC 28166 el (704) 528-9806 - Fax (704) 528-5478 - www.abtdrains.com oll free in the USA, Canada, and

More information

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with