1 CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505) IMMEDIATE ATTENTION Grading and Drainage Construction for Cottonwood Substation, BID # R ADDENDUM FOUR December 28, 2016 Notice to Bidders: The above referenced bid is hereby amended as follows: ADD: Geocomposite Foundation Drainage, Section (see attached) REPLACE: Bid Proposal, AF-3 Form Replace pages with the attached form The following questions or requests for clarification were received regarding this project. Following each question or request for clarification is the response. Q1) Does City want this project completed by a certain date? If so, when is the drop-dead end date for the 120 day period of performance? A1) The completion of work would be 120 calendar days from the date of "notice to proceed. Q2) Regarding Item 4 (Culvert), the bid schedule calls for 30 CMP, however, the drawings call for 30 ADS N-12 Pipe. Should we bid CMP or ADS N-12 Pipe? Should we also include the cost of the flared end sections and rip rap at the inlet and outlet in the Culvert line item? A2) The culvert will be 30 CMP, not ADS N-12. Yes, the flared end sections and rip rap should be included in the culvert line item. Q3) Regarding Item 6, please will you verify the Rip Rap Placement quantity and unit of measure? The bid schedule says 1,225 SF. However, the rip rap channel is about 1,000 feet in length based upon the road stationing and 10 feet wide per the road section detail; which results in 9,500 square feet. Could the unit of measure in the bid schedule be incorrect, e.g. should it be in square-yards? A3) The unit should be square yards (SY), not SF. Q4) Regarding Item 7 Retaining Wall, is structural fill required below the footings? If so, what are the minimum required dimensions and type of structural fill? Is rip rap required at the outlet of each of the weep holes? It appears the surface runoff from the pad will be routed towards the northerly and southerly walls where it will be intercepted by the free-draining wall PURCHASING

2 backfill and enter the perforated pipes at the bottom of wall and exit the weep holes. General note 4 on sheet 24 defers to the Geotech report for excavation, backfill and compaction of the retaining wall. However, the Geotech study(ies) do not appear to specifically address construction of the cast-in-place retaining walls, specifically with respect to the footing and the backfill. Please will you advise? Is a geo-fabric, like 170N, required between the free-draining gravel wall backfill and the native backfill? A4) Fill will be needed in areas where the existing grade is lower than the proposed grade for the footers. In those cases, the fill will need to be compacted to 95% (ASTM D698) per the geotechnical report for fill beneath footings. Rip-Rap is not required at the outlet for the weep holes. Geo-fabric (such as Mirafi 170N) will need to be placed between the backfill and the gravel. Q5) Will the City provide construction surveying for this project at their own cost? A5) The contractor should provide/pay for their own construction surveying. FEUS will then confirm final grades and quantities of materials moved at the completion of work by the contractor. Receipt of this addendum shall be noted on Form AF-1 (a) in Tab I Bidding Requirements for the above referenced bid. If your bid has already been submitted to this office, and this addendum will affect your bid quote, please contact this office and we will return your bid. Any bids that have been received, and are not requested to be returned will remain in this office unopened until January 4, 2017 at 2:00 p.m. /s/ Emily Milne Emily Milne Buyer ll Phone: (505) Fax: (505) emilne@fmtn.org PURCHASING

3 SECTION GEOCOMPOSITE FOUNDATION DRAINAGE PART 1 - GENERAL 1.01 SCOPE A. Section includes: Sub-drainage system material at vertical cast-in-place retaining wall as complete designed working drainage system channeling liquid water to a drainage piping system specified elsewhere QUALITY ASSURANCE A. Application of product shall be performed by an experienced and manufacturer approved method in strict accordance with manufacturer s recommendations SUBMITTALS A. Contractor shall submit to the Engineer for his approval, manufacturer s data sheets for installation requirements, and installation procedures. Upon approval of the Engineer, manufacturer s specifications do thereby become a part of this specification and shall be used as the basis for approval or rejection of work carried out in this Section SYSTEM DESCRIPTION A. Performance Requirements: a. Geotextile: i. UV resistance: 70% or more when tested in accordance with ASTM D4355 ii. Permittivity: 140 gal/min/ft 2 when tested in accordance with ASTM D4491 iii. Core Compressive Strength: 11,000 psf or more when tested in accordance with ASTM D1621 B. Keep material protected from the elements and in original unopened containers to prevent degradation of product before use. PART 2 - PRODUCTS 2.01 MATERIALS A. Geotextile Drainage Core: normal duty, impermeable polymeric sheet to form a high flow, dimpled drainage core. The core is bonded to a layer of non-woven filter fabric to retain soil and sand particles and facilitate the drainage of water. a. Type: J-Drain 200 series B. Acceptable manufacturers: a. Products specified as standard of quality are manufactured by: JDR Enterprises, Inc. 292 South Main Street Suite 200 Alpharetta, Georgia Geo-Composite Drainage December 2016

4 Telephone: or Fax: Website: C. Products of other manufacturers similar in type and quality are acceptable, subject to approval of the Engineer. PART 3 - EXECUTION 3.01 INSTALLATION A. Install sub-drainage system material vertically in accordance with manufacturer s installation instructions with core material facing the retaining wall. B. Lap geo-textile fabric joints in accordance with the manufacturer s installation instructions. C. Tie sub-drainage material into the foundation drainage pipe material and maintain positive drainage directly to the foundation pipe. D. Secure the sub-drainage system material to the wall at grade in accordance with the manufacturer s installation instructions CLEANUP AND PROTECTION A. During process of work, remove discarded materials at end of each workday. END OF SECTION Geo-Composite Drainage December 2016

5 CITY OF FARMINGTON, NEW MEXICO BID PROPOSAL, FORM AF-3 Grading and Drainage Construction for Cottonwood Substation PROJECT #ELENG BID # R BID OPENING January 4, 2017, 2:00 PM ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTALS 1 Moblization LS 2 Clearing & Grubbing LS 3 Site Grading (Site Grading, roadway grading) CY 37,323 $ $ 4 Culvert (30" CMP, CIP) LF 96 $ $ 5 Access Road (subgrade prep, basecoarse, CIP) LS 6 Rip-Rap Placement SY 7 Retaining Wall (CIP) LS 1,225 $ $ 8 Guard Rail (1-1/4" Pipe, Two Rail, 42" Tall, CIP) LF 1,156 $ $ 9 SWPPP LS 10 Conduit & Grounding Items (CIP) LS 11 Site & Construction Surveying LS 12 Anti-Graffiti Sealer LS CONSTRUCTION TOTAL $ CITY OF FARMINGTON FORM AF-3

6 CITY OF FARMINGTON, NEW MEXICO BID PROPOSAL, FORM AF-3 TOTAL OF ITEMS 1 THROUGH 12 INCLUSIVE IN WORDS: THE SUM OF DOLLARS AND CENTS. CITY OF FARMINGTON FORM AF-3

Master Specification SECTION 02621

Master Specification SECTION 02621 Master Specification 02621-1 PART 1 - GENERAL 1.01 SUMMARY SECTION 02621 FOUNDATION DRAINAGE SYSTEMS Date: 07/01/99 A. Section includes: Subdrainage system material at vertical ** waterproofed walls **

More information

CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505)

CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505) CITY OF FARMINGTON 800 Municipal Drive Farmington, NM 87401-2663 (505) 599-1373 Fax (505) 599-1377 http://www.fmtn.org IMMEDIATE ATTENTION Grading and Drainage Construction for Cottonwood Substation, BID

More information

BID FORM (LUMP SUM CONTRACT)

BID FORM (LUMP SUM CONTRACT) BID FORM (LUMP SUM CONTRACT) Place County of El Paso Purchasing Department Date Project No. 11-016 Proposal of (hereinafter called Bidder), a corporation organized under the laws of the State of /a partnership/an

More information

ADDENDUM #1 BL Construction of Club Drive Park: Phase II

ADDENDUM #1 BL Construction of Club Drive Park: Phase II October 25, 2017 ADDENDUM #1 BL094-17 Construction of Club Drive Park: Phase II 1389 Peachtree Street, NE Suite 200 Atlanta, GA 30309 Phone: 404.873.6730 www.tsw-design.com Principals: William Tunnell

More information

Forsyth County Procurement

Forsyth County Procurement August 1, 2017 Forsyth County Procurement Donna Kukarola, CPPO, CPPB, Procurement Director ADDENDUM #2 Bid 17-72-3340 For: Providing all materials, equipment and labor for the Jot em Down Road Water Tank

More information

The Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged.

The Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged. 1700 East Iron Ave. Salina, KS 67401 785-827-0433 phone 785-827-5949 fax 6 March 2018 Arizona California Colorado Kansas Louisiana Missouri Nebraska New Mexico Texas Utah ADDENDUM NO. 2 RE: City of Kingman,

More information

4.8. Subsurface Infiltration

4.8. Subsurface Infiltration 4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of stormwater as it infiltrates into the ground. Dry wells, infiltration

More information

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form.

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form. ADDENDUM #2 JUNE 30, 2017 APRON REHABILITATION PHASE 3 HENRY E. ROHLSEN AIRPORT ST. CROIX, U.S. VIRGIN ISLANDS FAA AIP No.: 3-78-0002-037-2017 This addendum modifies or interprets the proposal documents

More information

4.8. Subsurface Infiltration

4.8. Subsurface Infiltration 4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of storm water as it infiltrates into the ground. Dry wells, infiltration

More information

ADDENDUM 3 Contractor Questions Essex County Courthouse Square Drainage Improvements IFB Responses Issued March 30, 2016

ADDENDUM 3 Contractor Questions Essex County Courthouse Square Drainage Improvements IFB Responses Issued March 30, 2016 ADDENDUM 3 Contractor Questions IFB 2016-154-01 Responses Issued March 30, 2016 Sealed Bids are due no later than 3:00 PM, April 4, 2016 at the Essex County Purchasing Office, 202 S. Church Lane, Tappahannock,

More information

ODOT Design & Construction Requirements for MSE Walls

ODOT Design & Construction Requirements for MSE Walls ODOT Design & Construction Requirements for MSE Walls Peter Narsavage, P.E. Foundation Engineering Coordinator Ohio Department of Transportation Office of Structural Engineering 2006 Ohio Transportation

More information

ADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA

ADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA ADDENDUM NO. 1 FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA Bids to be received until 2:00 p.m., local time, July 9, 2012 SPECIFICATIONS Delete Section 00 41 53 Bid Unit Price in

More information

BUREAU Joe Iuviene, AIA January 20, 2017

BUREAU Joe Iuviene, AIA January 20, 2017 architectural BUREAU Joe Iuviene, AIA January 20, 2017 Alterations & Additions NEW TOWN HALL for TOWN OF AUSTERLITZ 816 State Route 203, Spencertown, New York 12165 ADDENDUM NO. 1 This addendum amends

More information

10:00 AM, Wednesday, April 8, 2015

10:00 AM, Wednesday, April 8, 2015 NOTICE OF MANDATORY PRE-BID CONFERENCE WILL BE HELD AT 10:00 AM, Wednesday, April 8, 2015 IN ROOM 16, CITY HALL BUILDING, 101 NORTH MAIN STREET WINSTON-SALEM, NORTH CAROLINA The purpose of this conference

More information

BMP 6.4.4: Infiltration Trench

BMP 6.4.4: Infiltration Trench BMP 6.4.4: Infiltration Trench An Infiltration Trench is a leaky pipe in a stone filled trench with a level bottom. An Infiltration Trench may be used as part of a larger storm sewer system, such as a

More information

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013 ADDENDUM NO. 1 for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA Posting Date: June 20, 2013 BIDDERS SHALL CONFORM TO THE FOLLOWING CHANGES AS A PART OF THE BID DOCUMENTS, WHICH SHALL BECOME

More information

Bid Form. To the Texas Department of Transportation hereinafter called the Agent.

Bid Form. To the Texas Department of Transportation hereinafter called the Agent. Bid Form TxDOT CSJ No. 1809HILLS Project: 2017 Airport Improvements Project Description: Schedule 1 Base Bid: Rehabilitate and mark RW 16-34, partial parallel TW, stub TWs including run-up areas, terminal

More information

AVM Drain Board 2000/2020

AVM Drain Board 2000/2020 TECH DATA SHEET Sections - 334600 / 334613 / 334616 / 334619 / 334633 AVM Drain Board 2000/2020 Sections 334600 / 334613 / 334616 / 334619 / 334633 Product Name AVM Drain Board 2000 / 2020 Manufactured

More information

**BID OPENING DATE CHANGE Bid Open Date: Thursday, March 29, 2018 at 11:00 AM

**BID OPENING DATE CHANGE Bid Open Date: Thursday, March 29, 2018 at 11:00 AM WESLIE Engineering Group PROJECT: Douglas County Stateline Flowage Dam Reconstruction Project Addendum #1 Date: Tuesday, March 20, 2018 To: Prospective Bidders **BID OPENING DATE CHANGE Bid Open Date:

More information

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1 ADDENDUM No. 6 ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1 Due: June 9, 2016 at 2:00 p.m. (local time) The following changes, additions, and/or deletions

More information

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1 DATE: May 18, 2016 TO: FROM: All Bidders/Proposers Willie Velez, CPPB Procurement Administrator City of Casselberry Purchasing Division SUBJECT: ITB-2016-0023, Oxford Road Complete Street Improvements

More information

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number) EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY

More information

JUDD STREET LIFT STATION DEWATERING CONTRACT

JUDD STREET LIFT STATION DEWATERING CONTRACT JUDD STREET LIFT STATION DEWATERING CONTRACT MONTCALM COUNTY, MICHIGAN MAY 23, 2018 CITY OF GREENVILLE JOB NO. 401-590-975.281 PREPARED BY: CITY OF GREENVILLE ENGINEERING DEPARTMENT 411 S. LAFAYETTE GREENVILLE,

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

Bid Form. Schedule 2 Alternate Bid No. 4: Install gutters and downspouts. (100% Local Funded)

Bid Form. Schedule 2 Alternate Bid No. 4: Install gutters and downspouts. (100% Local Funded) Bid Form TxDOT CSJ No. 17HGRCKPT Project: Aransas County Airport - 2017 Hangar Project Project Description: Schedule 1A Base Bid: Construct TxDOT 360 concrete apron pavement for box hangar. Schedule 1A

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

Pulaski County, Virginia

Pulaski County, Virginia Pulaski County, Virginia Typical Retaining Wall Details Based on the 2009 International Residential Code CONTENTS Timber Retaining Wall... 2 General Requirements... 2 Wall Construction... 2 Deadmen...

More information

SUQUAMISH WAY NE SHOULDER AND SIDEWALK IMPROVEMENT PROJECT

SUQUAMISH WAY NE SHOULDER AND SIDEWALK IMPROVEMENT PROJECT KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO. 1589 SUQUAMISH WAY NE SHOULDER AND SIDEWALK IMPROVEMENT PROJECT ADDENDUM #3 Date of Addendum February 23, 2018 1. The Contract Provisions

More information

Department of Transportation Pierre Region Office 104 S. Garfield Bldg. A Pierre, South Dakota / FAX: 605/

Department of Transportation Pierre Region Office 104 S. Garfield Bldg. A Pierre, South Dakota / FAX: 605/ Connecting South Dakota and the Nation Department of Transportation Pierre Region Office 104 S. Garfield Bldg. A Pierre, South Dakota 57501-5405 605/773-3464 FAX: 605/773-6215 May 6, 2011 RE: 0009-391

More information

Table of Contents for Guide Specifications

Table of Contents for Guide Specifications Table of Contents for Guide Specifications 01270A Measurement and Payment 01355A Environmental Protection 01356A Storm Water Pollution Prevention Measures 01421 Basic Storm Water Pollution Prevention Plan

More information

Division 1. Form of Tender

Division 1. Form of Tender Division 1 Form of Tender Essex-Windsor Solid Waste Authority Page 1 ESSEX-WINDSOR SOLID WASTE AUTHORITY TENDER FOR CONTRACT NO. 8 TENDER CLOSING DATE April 20, 2018 at 12:00 noon (Local Time) TENDER FOR

More information

CHARLES COUNTY GOVERNMENT. ITB NO National Pollutant Discharge Elimination System (NPDES) Acton Lane

CHARLES COUNTY GOVERNMENT. ITB NO National Pollutant Discharge Elimination System (NPDES) Acton Lane CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 December 11, 2013 ITB NO. 14-02 National Pollutant Discharge Elimination System (NPDES)

More information

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of

More information

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM SECTION 32 32 23 SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM PART 1: GENERAL 1.01 Scope Work includes furnishing all materials, labor, equipment, and supervision to install a Stonebridge segmental

More information

Addendum # 1 Perdue Stadium Seating Bowl Improvements Date of Addendum: 09/07/16

Addendum # 1 Perdue Stadium Seating Bowl Improvements Date of Addendum: 09/07/16 Wicomico County Purchasing 125 N. Division St. Room B-3 Salisbury, MD 21801 Ph. 410-548-4805 Fax 410-334-3130 Email: purchasing@wicomicocounty.org Addendum # 1 Perdue Stadium Seating Bowl Improvements

More information

All Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford

All Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford Seymour Road Replacement Bridge Addendum #1 April 27, 2015 To: From: Cc: All Bidders of Record Stephen Diglio, P.E., KAS Inc. Nanette Rogers, Brent Meacham, Town of Westford RE: Construction Bid Information

More information

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS April 1, 2009 CITY OF PORTSMOUTH Public Works Department Bid #54-09 2009 Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS This Addendum forms part of the original document marked Bid #54-09 2009

More information

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

ADDENDUM NO. 1. Description of BID 7664: Fossil Creek Trail Underpass at Trilby Road

ADDENDUM NO. 1. Description of BID 7664: Fossil Creek Trail Underpass at Trilby Road Financial Services Purchasing Division 215 N. Mason St. 2 nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing ADDENDUM NO. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS

More information

ADDENDUM #1. The following sheets have been revised and are being reissued as part of this addendum:

ADDENDUM #1. The following sheets have been revised and are being reissued as part of this addendum: ADDENDUM #1 AIRFIELD IMPROVEMENTS EXTEND, MARK, AND LIGHT RUNWAY 6-24 AND TAXIWAY ALPHA REHABILITATE RUNWAY 6-24 at the LAKE WALES MUNICIPAL AIRPORT FAA AIP NO: TBD FDOT FM NO: TBD BID NO: 16-412 5/11/16

More information

SOLICITATION ADDENDUM NO. 1 RFP THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED.

SOLICITATION ADDENDUM NO. 1 RFP THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED. Beaverton School District Capital Program Purchasing 16550 SW Merlo Road, Beaverton, OR 97006 Phone: 503-591-4539 SOLICITATION ADDENDUM NO. 1 RFP 15-0013 THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION

More information

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION

ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION NEW CASTLE COUNTY DEPARTMENT OF LAND USE ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION For Permanent Structures, pursuant to Delaware Pond Code 378 and Delaware Sediment and

More information

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT December 7, 2017 Please find the following addendum to the below mentioned BID. Addendum No.: 3 Bid#: 622-95-17-61-2 Project Name: Bedico Timberlane

More information

Construction Specification for Concrete Unit Pavers

Construction Specification for Concrete Unit Pavers Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS

More information

PROJECT NAME: NAVAJO TRIBAL UTILITY AUTHORITY WASTEWATER TREATMENT PLANT UPGRADES

PROJECT NAME: NAVAJO TRIBAL UTILITY AUTHORITY WASTEWATER TREATMENT PLANT UPGRADES Solutions for Today Vision for Tomorrow ADDENDUM 5 DATE: June 16, 2016 PROJECT NAME: NAVAJO TRIBAL UTILITY AUTHORITY WASTEWATER TREATMENT PLANT UPGRADES PROJECT NO. 115111 TO: ALL PLAN HOLDERS OF RECORD

More information

SEGMENTAL BLOCK RETAINING WALLS. Comply with Division 1 - General Provisions and Covenants, as well as the following:

SEGMENTAL BLOCK RETAINING WALLS. Comply with Division 1 - General Provisions and Covenants, as well as the following: SEGMENTAL BLOCK RETAINING WALLS PART 1 - GENERAL 1.01 SECTION INCLUDES Segmental Block Retaining Walls 1.02 DESCRIPTION OF WORK Constructing segmental block retaining walls. 1.03 SUBMITTALS Comply with

More information

Providing proper drainage system

Providing proper drainage system Environment Friendly and Cost Effective Alternative to Conventional Graded Filters Providing proper drainage system for structures such as earth retaining structures, pavements, water front structures,

More information

Invitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $

Invitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $ Addendum No. 1 TOWNSHIP ROAD 510 RECONSTRUCTION Invitation to Tender No. T170523EN Amendment 1. Bidders shall note the following: a) Revised Section 3.3.2 Unit Price Table : REVISED Schedule A : Invitation

More information

Fabrication and Installation Table of Contents

Fabrication and Installation Table of Contents Fabrication and Installation Table of Contents HDPE AQUASHIELD PRODUCTS 2 Fabrication and Installation 2 System Fabrication 3 Aqua-Swirl Installation 4 Step 1 Excavation and Bedding 4 Step 2 Pipe Connection

More information

Design Manual: Gravity Wall. Section 1

Design Manual: Gravity Wall. Section 1 Design Manual: Gravity Wall Section 1 A Design Manual: Gravity Wall General Information Company Information Verti-Block is the latest innovative forming system from Verti-Crete, LLC. Recognized worldwide

More information

ADDENDUM NO. 4 CITY OF FREDERICK PURCHASING DEPARTMENT 111 Airport Drive East Frederick, MD (301)

ADDENDUM NO. 4 CITY OF FREDERICK PURCHASING DEPARTMENT 111 Airport Drive East Frederick, MD (301) April 4, 2018 ADDENDUM NO. 4 To: All Potential Bidders Re: ITB 18-12 Christopher s Crossing (Sanner) Roadway Construction Consisting of: Sign-in Sheet, Meeting Minutes, CAD File, Dry Utility Relocate,

More information

A NEW GYMNASIUM AND RENOVATED FINE ARTS FOR MONTGOMERY CATHOLIC PREPARATORY SCHOOL MONTGOMERY, ALABAMA

A NEW GYMNASIUM AND RENOVATED FINE ARTS FOR MONTGOMERY CATHOLIC PREPARATORY SCHOOL MONTGOMERY, ALABAMA McKee and Associates Architecture and Interior Design Addendum No. SEVEN Date: 07.11.17 Project: A NEW GYMNASIUM AND RENOVATED FINE ARTS FOR MONTGOMERY CATHOLIC PREPARATORY SCHOOL MONTGOMERY, ALABAMA A7.1

More information

MOA Project # Golden View Drive Intersection & Safety Upgrades

MOA Project # Golden View Drive Intersection & Safety Upgrades Appropriate transitions can include extending the insulation beyond the roadway improvements, reducing the insulation thickness, or angling the insulation downward. Use of a frost tolerant section, an

More information

SECTION STORM DRAINAGE AND STORMWATER MANAGEMENT

SECTION STORM DRAINAGE AND STORMWATER MANAGEMENT SECTION 322 - STORM DRAINAGE AND STORMWATER MANAGEMENT 322.01 DESCRIPTION Work includes all labor, material and equipment to construct storm drain systems and stormwater management facilities, including

More information

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems

Anchorplex retaining wall construction guide. Building. Anchorplex. Retaining Wall Systems Anchorplex retaining wall construction guide Building Anchorplex Retaining Wall Systems Table of Contents and ow to Use This Guide table of contents ow to Use This Guide. 2 About the Anchorplex System.

More information

ADDENDUM NO. 1 APRIL 24, 2017

ADDENDUM NO. 1 APRIL 24, 2017 DERBY DESTINATION DEVELOPMENT PUBLIC PROJECT NO. 1 EAST FREEDOM STREET PUBLIC PROJECT NO. 2 WEST FREEDOM STREET PUBLIC PROJECT NO. 3 WATERLINE IMPROVEMENTS PUBLIC PROJECT NO. 4 SANITARY SEWER IMPROVEMENTS

More information

GWINNETT COUNTY STORM SEWER PIPE STANDARDS

GWINNETT COUNTY STORM SEWER PIPE STANDARDS 1.0 Standard Specifications GWINNETT COUNTY STORM SEWER PIPE STANDARDS 1.1 Unless otherwise specifically set forth herein or in the Gwinnett County Standard Drawings, all of the materials, methods of the

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE 1.0 DEFINITIONS The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. The term Designee

More information

Redi Rock Specification and Installation Manual

Redi Rock Specification and Installation Manual Redi Rock Specification and Installation Manual 1.0 General Scope This Specification covers the Design, Materials and Installation of Redi Rock modular block Retaining and Freestanding Wall systems as

More information

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS UTAH COUNTY HEALTH DEPARTMENT Div. of Environmental Health 151 South University Avenue, Provo 84601 (801) 851-7525 FAX 851-7521 GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS This is intended to

More information

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation SECTION 33 40 00 STORM DRAINAGE UTILITIES 1. PART 1 GENERAL 1.1 RELATED WORK A. Section 31 23 00: Excavation and Fill B. Section 32 00 01: Site Restoration and Rehabilitation C. Special Conditions for

More information

LANDSCAPE RETAINING WALLS

LANDSCAPE RETAINING WALLS SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9070 - Landscape Retaining Walls LANDSCAPE RETAINING WALLS PART - GENERAL.0 SECTION INCLUDES A. Modular Block Retaining Walls

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

Uwall UNIVERSAL CONSTRUCTION MANUAL

Uwall UNIVERSAL CONSTRUCTION MANUAL Uwall UNIVERSAL Retaining Wall System CONSTRUCTION MANUAL TM President s Letter CSI is a leader in its industry supplying precast infrastructure products throughout New England and beyond since 1972, developing

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

ADDENDUM #3. STATE ROUTE 60 AT POTRERO BOULEVARD INTERCHANGE PHASE I AND IA City Project No ; Federal Project No.

ADDENDUM #3. STATE ROUTE 60 AT POTRERO BOULEVARD INTERCHANGE PHASE I AND IA City Project No ; Federal Project No. ADDENDUM #3 STATE ROUTE 60 AT POTRERO BOULEVARD INTERCHANGE PHASE I AND IA City Project No. 2016-003; Federal Project No. DEM10L-5209(008) November 9, 2017 Addendum for: AND IA STATE ROUTE 60 AT POTRERO

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CS 3-01 GENERAL: A. The foundation, bedding and backfill for all trenches shall conform with the requirements of the City Standard

More information

A. This Section includes subdrainage systems for foundations and underslab areas. A. Product Data: For each type of drainage panel indicated.

A. This Section includes subdrainage systems for foundations and underslab areas. A. Product Data: For each type of drainage panel indicated. ZGF Partnership Page 1 of 7 SECTION 33 46 00 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes subdrainage systems for foundations and underslab areas. 1.2 SUBMITTALS A. Product Data: For each type

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19-1 19-1.01 Exploratory Excavation... 19-1 19-1.02 Trench... 19-1 19-1.02.AStorm Drain Pipe...

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

PROPOSED STOCK PILE YARD PHASE 1 SITE: MYRA FALLS MINE

PROPOSED STOCK PILE YARD PHASE 1 SITE: MYRA FALLS MINE SITE NOT TO SCALE 635-8-STOCKPILEPHGA- 00 SHEET: OF DRAWING INDEX: SHEET 2 OF 0 - NOTES SHEET 3 OF 0 - PLAN VIEW :000 SHEET 4 OF 0 - PLAN VIEW :000 WITH REFERENCE SHEET 5 OF 0 - PLAN VIEW :500 SHEET 6

More information

Bid # CHILD CARE CENTER PLAYGROUND SURFACE and EQUIPMENT INSTALLATION 2016 SECTION "C" TECHNICAL SPECIFICATIONS OWNER

Bid # CHILD CARE CENTER PLAYGROUND SURFACE and EQUIPMENT INSTALLATION 2016 SECTION C TECHNICAL SPECIFICATIONS OWNER Bid # 16-44 CHILD CARE CENTER PLAYGROUND SURFACE and EQUIPMENT INSTALLATION 2016 SECTION "C" TECHNICAL SPECIFICATIONS OWNER Board of Trustees Middlesex County College 2600 Woodbridge Avenue P.O. Box 3050

More information

VERTI-BLOCK - DESIGN MANUAL

VERTI-BLOCK - DESIGN MANUAL Company Information General Information Verti-Block is the latest innovative forming system from Verti-Crete, LLC. Recognized worldwide for outstanding aesthetics and performance, Verti-Crete s proprietary

More information

DRAFT TECHNICAL SPECIFICATIONS FOR

DRAFT TECHNICAL SPECIFICATIONS FOR DRAFT TECHNICAL SPECIFICATIONS FOR DETROIT RIVER AOC STONY ISLAND HABITAT RESTORATION PROJECT THE DETROIT RIVER, WAYNE COUNTY, MICHIGAN FOR INFORMATION JANUARY, 2016 Prepared for: FRIENDS OF THE DETROIT

More information

Addendum No. 1 Page 1 of 2

Addendum No. 1 Page 1 of 2 Addendum No. 1 Page 1 of 2 DATE: March 14, 2016 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Bidders SUBJECT: Addendum No. 1 PROJECT NAME: Parking Lot S7 Improvements JJC PROJECT

More information

UTILITY UNDERGROUNDING GRAUWYLER IRVING HEIGHTS DRIVE ITB# 116D-15F ADDENDUM #2 March 24 th, 2015 PAGE 1 OF 2

UTILITY UNDERGROUNDING GRAUWYLER IRVING HEIGHTS DRIVE ITB# 116D-15F ADDENDUM #2 March 24 th, 2015 PAGE 1 OF 2 UTILITY UNDERGROUNDING GRAUWYLER ROAD @ IRVING HEIGHTS DRIVE ITB# 116D-15F ADDENDUM #2 March 24 th, 2015 PAGE 1 OF 2 1. THIS ADDENDUM IS HEREBY MADE AS PART OF THIS CONTRACT SPECIFICATION. ADDENDUM IS

More information

Section 1I-3 - Bioswales

Section 1I-3 - Bioswales BIOSWALES (Numbering pending) These specifications compliment the bioswale design portion of the Iowa Stormwater Management Manual in Chapter 2, Section 2I-3. Sections of the following documents, as referenced

More information

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE 3.33' 3.0' 2.0' 4.33' 4.0' 3.0' 1.00' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3067-V OR AS NOTED ON PLANS. "INFA-SHIELD" SEAL OR EQUAL. RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR).

More information

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage. DELTA -DRAIN Section 07 10 00 Dampproofing and Waterproofing PART 1 GENERAL 1.1 SECTION INCLUDES A. Below grade drainage sheets. B. Plaza deck and planter drainage sheets. 1.2 RELATED SECTIONS A. Section

More information

2014 ARTICLE III IMPROVEMENTS IN THE CITY OF EL CENTRO ADDENDUM NO. 02

2014 ARTICLE III IMPROVEMENTS IN THE CITY OF EL CENTRO ADDENDUM NO. 02 2014 ARTICLE III IMPROVEMENTS IN THE CITY OF EL CENTRO ADDENDUM NO. 02 Date: March 3, 2015 To: Prospective Contractors From: Jack Fleming, PE City of El Centro 1275 W. Main St. El Centro, CA 92243 Telephone:

More information

DOCUMENT ADDENDUM No. 2

DOCUMENT ADDENDUM No. 2 DOCUMENT ADDENDUM No. 2 PART 1 GENERAL 1.1 DOCUMENT INCLUDES A. Clarifications 1.2 CONSTRUCTION CONTRACT A. The Construction Contract is known as SU095 9 th Street and SU096 Downs Drive Storm Drain Projects.

More information

2.1 Backfill - General

2.1 Backfill - General 2.1 Backfill - General Excavations are made for the purpose of constructing bridge substructure elements, and consequently requiring competent backfill material. The backfill material must be adequately

More information

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014 Sunnyside Valley Irrigation District Addendum No. 1 Enclosed Lateral Improvements Projects 2010-2011 Issued: 8/30/2010 Contract 10-003: Regions 011, 013 & 014 Page 1 of 7 Sunnyside Valley Irrigation District

More information

ADDENDUM NO. 1 FOR CITY OF CUMMING 900-HP RAW WATER INTAKE PUMP. ADDENDUM DATE: February 10, BID DATE: February 15, 2017, 11:30 a.m.

ADDENDUM NO. 1 FOR CITY OF CUMMING 900-HP RAW WATER INTAKE PUMP. ADDENDUM DATE: February 10, BID DATE: February 15, 2017, 11:30 a.m. ADDENDUM NO. 1 FOR CITY OF CUMMING 900-HP RAW WATER INTAKE PUMP ADDENDUM DATE: February 10, 2017 BID DATE: February 15, 2017, 11:30 a.m. This ADDENDUM is issued to institute the included changes and/or

More information

***************************************************************************************************************

*************************************************************************************************************** 02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain

More information

STORMCAPTURE. Installation Manual

STORMCAPTURE. Installation Manual STORMCAPTURE Installation Manual Introduction Site Preparation Delivery & Installation LinkSlabs Backfill Introduction StormCapture (shown in Figure 1) is a total stormwater management system. The highly-configurable

More information

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8, Classic 6 and Legend unit segmental

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following:

MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following: MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL EFFECTIVE DATE: OCTOBER 14, 2011 200.07 Contractor Quality Control - is replaced with the following: (a) (b) (c) Scope: These requirements

More information

Alternative No. 1 Total Cost DRAFT

Alternative No. 1 Total Cost DRAFT OPINION OF PROBABLE PROJECT COSTS SUMMARY OF ALL THREE ALTERNATIVE ALIGNMENTS Item Description Alternative No. 1 Total Cost Alternative No. 2 Total Cost Alternative No. 3 Total Cost Design Phase 1. Preliminary

More information

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS. SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract

More information

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.

More information

COMPACTED CLAY LINERS

COMPACTED CLAY LINERS Technical Reference Document for Liquid Manure Storage Structures COMPACTED CLAY LINERS Table of Contents SECTION 1 - PURPOSE AND SCOPE 1.1. Purpose of the Technical Reference Document 1.2. Requirement

More information

DESIGN CONSIDERATIONS FOR NSWS NATURAL STONE RETAINING AND FREE-STANDING WALL SYSTEMS

DESIGN CONSIDERATIONS FOR NSWS NATURAL STONE RETAINING AND FREE-STANDING WALL SYSTEMS DESIGN CONSIDERATIONS FOR NSWS NATURAL STONE RETAINING AND FREE-STANDING WALL SYSTEMS Natural Stone Wall Solutions, Inc (NSWS ) 2352 Main Street, Suite 103 Concord, MA 01742 (978) 461-1777 Concept and

More information

GILA RIVER INDIAN COMMUNITY GEORGE WEBB VILLAGE SUBDIVISION INFRASTRUCTURE IFB # ADDENDUM NO. 2 September 14, 2011

GILA RIVER INDIAN COMMUNITY GEORGE WEBB VILLAGE SUBDIVISION INFRASTRUCTURE IFB # ADDENDUM NO. 2 September 14, 2011 TO: All Bidders From: Gila River Indian Community, Property and Supply Department The following addendum to the George Webb Village Subdivision Infrastructure construction project is made. Acknowledgment

More information

BIG O HDPE TUBING HDPE CORRUGATED TUBING FOR AGRICULTURAL, RESIDENTIAL AND HIGHWAY DRAINAGE INCREASE CROP YIELDS LOWER PRODUCTION COSTS

BIG O HDPE TUBING HDPE CORRUGATED TUBING FOR AGRICULTURAL, RESIDENTIAL AND HIGHWAY DRAINAGE INCREASE CROP YIELDS LOWER PRODUCTION COSTS DRAINAGE SOLUTIONS SINCE 1908 BIG O HDPE TUBING HDPE CORRUGATED TUBING FOR AGRICULTURAL, RESIDENTIAL AND HIGHWAY DRAINAGE INCREASE CROP YIELDS LOWER PRODUCTION COSTS PROTECT FOUNDATIONS IMPROVE HIGHWAY

More information