1 CI/SfB (.9) n7 (M) March 01 ScreedBoard The Ultimate Floor Board for Sound and Underfloor Heating obust detail Acoustic Treatment E-FT-5 & E-FT-6 Excellent acoustic performance on all floor types Maximises the efficiency of underfloor heating systems obust detail E-FT-5, E-FT-6 & FFT4 Compliant Cellecta I N N O V A T I O N I N I N S U L A T I O N E V D I D F I BBA A E T D A THE CODE FO SUSTAINABLE HOMES NHBC Accepted NO SCEWS PAT E Solution

2 Cellecta I N N O V A T I O N I N I N S U L A T I O N ScreedBoard The ultimate floor board... Videos News New Build efurb More Cellecta ScreedBoard The ultimate overlay board for acoustic and underfloor heating applications ScreedBoard s are manufactured from recycled calcium sulphate and reinforced with cellulose fibres. The boards have a very high density, high impact resistance, hard wearing surface and interlocking edges making them ideal for acoustic and underfloor heating applications. ScreedBoard8 ScreedBoard 8 is the ultimate single layer acoustic overlay treatment, featuring interlocking edges for installation convenience. Its high density and unique resilient layer provides unrivalled acoustic performance. ScreedBoard 8 is the only single layer system to carry obust detail status ( E-FT-5 & 6). ScreedBoard 8 Applications Mat 1 Pol 1 Hea 1 Mat 1 Pol 1 Hea 1 Pol 1 Hea 1 Timber I-Joist Separating Floors obust detail E-FT-5 Metal-Web Separating Floors obust detail E-FT-6 Metal Joist Separating Floors PCT Solution PHYSICAL POPETIES Properties esilient layer / slab composition Type and thickness of facing/batten esilient layer thickness Overall thickness Board size / roll size / slab size Weight Long term water absorption (esilient layer) Unit - - mm mm m kg/m kg/ roll/board %_ vol. ScreedBoard 0 N/A 0mm HD Gypsum N/A x ecycled PES fibre board 0mm HD Gypsum x Benefits of ScreedBoard 8 (1) (1) High acoustic performance: Airborne 51dB and Impact 55dB obust detail system E-FT-5 & 6 and FFT4 compliant Code credits available: Mat 1, Pol 1 & Hea Only 8mm thick Doesn't contract or expand like chipboard when exposed to water High impact resistance Interconnecting edge detail - no screws required educes the number of brick courses required Quick and easy to install Can be cut with a hand or skill saw Accepts ceramic tiles Weighs only 18.7kg per sheet (1) Typical performance of E-FT-5. *Code credits are subject to appropriate weighting. NO SCEWS Global warming potential (GWP) 0 0 (1) Note Percentage of water absorption after 8 days fully E V I F I BBA E D A D D A T obust detail Acoustic Treatment Cellecta App

3 ScreedBoard 0 ScreedBoard 0 Applications Pol 1 1 Mat 1 Hea Cellecta ScreedBoard 0is the ideal product for floors featuring an underfloor heating system due to its low thermal resistance and rapid heat transfer characteristics. ScreedBoard 0is also suitable for acoustic flooring applications incorporating an underfloor heating system, when combined with FIBEfon 8. Pol 1 Hea 1 Pol 1 Hea 1 Timber Joist Separating Floors with Under Floor Heating System obust detail E-FT-5 & 6 Benefits of ScreedBoard 0 Low thermal resistance (0.05m /kw) Metal Joist Separating Floors with Under Floor Heating system Ideal for underfloor heating systems () (1) (1) High acoustic performance : Airborne 51dB and Impact 55dB obust detail treatment - E-FT-5 & 6 (when used with FIBEfon8) Code credits available: Mat 1, Pol 1 & Hea Only 0mm thick Doesn't contract or expand like chipboard when exposed to water High impact resistance Interconnecting edge detail - no screws required Quick and easy to install Accepts ceramic tiles Weighs only 18.00kg per sheet (1) () Typical performance of E-FT-5. When used in conjunction with FIBEfon8 resilient sheets. NO SCEWS Ground Floors with Under Floor Heating System THEMAL ESISTANCE ScreedBoard 0 has the lowest thermal resistance when compared to the most commonly used floor finishes, allowing ground water heat pumps and heat recovery systems to work at maximum efficiency. Intensity of heat flow obust detail FFT1 m /kw 0.7 ScreedBoard 0 m /kw mm Chipboard m /kw 0.18 ScreedBoard 0 m /kw mm Screed m /kw Thermal and acoustic applcations Thermal applications

4 Videos News New Build efurb More Design & installation details - Cellecta ScreedBoard 8 The acoustic performance of the floor structure will be compromised if the ScreedBoard s are not completely isolated from the timber sub-floor, soil pipes, door frames, surrounding walls and their treatments. To address this risk, each potential problem area needs to be detailed accordingly Cellecta I N N O V A T I O N I N I N S U L A T I O N ScreedBoard The ultimate floor board... Installation video on the Cellecta app 5 4 YELOfon FS strip MUST be placed around floor perimeter, including around all walls that are built off the structural floor 1 9 Stairwell/ communal area A D B C E E Fixing tools A. Club hammer B. Hand or skill saw C. ScreedBoard Pull bar D. ScreedBoard Fixing batten E. ScreedBoard SB adhesive Packing shims (not shown) 1 Door threshold Metal frame partition built off the floor treatment Timber stud partition built off the floor treatment Stairwell/ communal area rd w + C tr = 14dB Leave a 5-10mm expansion gap between the habitable area and the communal area ScreedBoards. rd w+ C tr = 14dB Non-load bearing metal frame or timber stud walls can be built directly off the ScreedBoard 8. Care should be taken to ensure screws DO NOT penetrate the resilient layer. 4 Baths, shower trays and sanitary ware built off floor treatment. 5 6 Baths, shower trays and sanitary ware built off the structural floor Metal frame partition built off the structural floor Baths, shower trays and sanitary ware can be built directly off the ScreedBoard 8. Under no circumstance should screws penetrate the resilient layer. Baths. shower trays and sanitary ware built off the structural floor should be isolated from the ScreedBoard 8 and any floor finished. Lightweight partition walls built off the structural floor MUST be isolated from the ScreedBoard with YELOfon FS50 strip. 7 Wall treatment installed before the ScreedBoard Wall treatment installed after the ScreedBoard 8 Timber stud partition built off the structural floor 4 Wall treatments MUST be isolated from the ScreedBoard 8 with YELOfon FS50 strip. Wall treatments MUST be isolated from the ScreedBoard 8 with YELOfon FS50 strip. Lightweight Internal walls built off the structural floor MUST be isolated from the ScreedBoard with YELOfon FS strip.

5 Timber Separating Floors Introduction By nature, timber floors are low in mass, making them more susceptible to poor acoustic performance and therefore more challenging to ensure compliance. ScreedBoard will add mass and dramatically reduce impact sound transmission at source. The addition of plasterboards, a dry screed board or proprietary screed will add further mass. esilient ceiling bars will de-couple the ceiling and a fibrous slab or quilt will absorb sound in the ceiling void. When correctly installed with a perimeter flanking strip the system will exceed the legislative acoustic standards. Cellecta efurbishment & Conversion Projects Existing timber floors typically have a low mass and sometimes unknown construction details, making them inherently difficult to achieve the prescribed acoustic values without addressing a number of areas. The floor s mass can be increased by the introduction of additional plasterboard layers. Cellecta FIBEfon Micro 50 or mineral wool placed in the ceiling void will defuse airborne sound. esilient bars will de-couple the ceiling, and ScreedBoard can reduce the impact sound at source. Historical Buildings With some historical buildings undergoing a material change of use, it may not be practical to achieve the prescribed sound values. In these cases, Building Control bodies should be satisfied that everything reasonable has been done to improve the sound performance of the structure. Pre-completion tests are normally required and the results submitted accordingly. FEATUED POJECT POJECT NAME Apartments, Caddington oad, Luton PODUCT INSTALLED ScreedBoard 8 POJECT SIZE 5,500m² TYPE OF CONSTUCTION Timber Frame obust Detail E-FT-5 POJECT COMPLETION July 01 d Compliant Treatment E-FT-5 For other projects please visit 5

6 Structural separating floor - Timber obust detail E-FT-5 Cellecta ScreedBoard 8 laid on timber sub-floor Timber I-joists Use with timber frame walls only Floating floor treatment Floor decking Joists Absorbing material Ceiling (1) 18mm(min) required for obust detail applications Cellecta ScreedBoard 8 (See Table TF4 for full details) (1) 15 mm thick (min) wood based board, density 600kg/m (min) 40mm (min) timber I-joists 100mm (min) quilt insulation (10-6kg/m ) between joists See Table TF4 for ceiling treatment Fig. TF4 FASTACKCAD ACHITECTUAL CAD DATABASES Table TF4 obust detail Detail E-FT-5 E-FT-1 floating compliant floor floating treatment floor treatment Perimeter resilient flanking strip required Ceiling treatment ScreedBoard 8 High density composite resilient overlay treatment Additional layers required to complete treatment Mineral wool quilt laid between joists - 100mm (min) 10-kg/m No need for screws Interlocking edges glued together with Cellecta SB joint adhesive Product information Board dimensions: 8mm x 600mm x 100mm Edge profile: Interlocking tongue & groove Weight: 6.00kg/m / 18.7kg per board Cellecta SB joint adhesive: 1L to every m of boards obust Detail mean performance D nt,w + C tr = 51dB L nt,w = 55dB Typical PCT () performance D nt,w + C tr = 51dB L nt,w = 55dB Benefits of ScreedBoard 8 over an acoustic batten system (FFT1) Grey dry screed finish Only 8mm thick educes number of brick courses required Able to accept ceramic tiles Only one component to install (+ edge strip) Interlocking edge detail - no screws req d Weighs only 18.7kg per board (0.7m ) Weighs less per/m than FFT1 treatment No need to employ a specialist contractor Quick and easy to install Pol 1 1 Mat 1 107mm 8mm Hea YELOfon FS50 Pre-formed polyethylene foam flanking angle: 6 mm x 50mm x 0mm x m installed around the perimeter of the flooring board to isolate floor from walls and skirting. 40mm (min) Ceiling board fixings must not penetrate or touch the floor joists 16mm (min) metal resilient bars mounted at right angles to the joist at 400mm centres. Primary ceiling: CT1-Two layers of gypsum-based board, composed of 19mm (nominal 1.5kg/m ) fixed with mm screws and 1.5mm (nominal 10kg/m ) fixed with 4mm screws, with all joists staggered. CT -Two layers of gypsum-based board, composed of 15mm (nominal 1.5kg/m ) fixed with 5mm screws and a second layer of 15mm (nominal 1.5kg/m ) fixed with 4mm screws, with all joists staggered. Sacrificial ceiling: Metal ceiling system with a 150mm (min) void fixed to underside of primary ceiling. One layer of nominal 8kg/m gypsum based board. 150mm (min) Service void Construction notes Services must not puncture primary ceiling lining (except cables, which should be sealed with flexible sealant) * Code for Sustainable Homes (CSH) credits quoted are typical. Mat 1 value taken from the BE Green Guide. Pol 1 credit is only awarded if all the other insulation products used have a GWP of <5. Hea credits are based on the floor being pre-completetion tested and the separating wall performing to at least the same acoustic standard. Credits subject to relevant category weighted value. See page 5 for further information. Acoustic values () Values quoted are typical, based on the treatment being installed correctly and pre-completion tested. Airborne performance tested in accordance with BS EN ISO 140-4:1998 Impact performance tested in accordance with BS EN ISO 140-7:

7 Structural separating floor - Timber Joists Absorbing material Ceiling (1) 18mm(min) required for obust detail applications obust detail E-FT-5 Cellecta ScreedBoard 0 laid on underfloor heating system Cellecta FIBEfon 8 acoustic layer laid on timber sub-deck Timber I-joists and timber frame walls only Floating floor treatment UFH thermal insulation Acoustic layer Floor decking Cellecta ScreedBoard0 (See Table TF5 for full details) 1mm (min) routed extruded or routed/moulded expanded polystyrene insulation Cellecta FIBEfon 8 (1) 15 mm thick (min) wood based board, density 600kg/m (min) 40mm (min) timber I-joists 100mm (min) quilt insulation (10-6kg/m ) between joists See Table TF5 for ceiling treatment Fig. TF5 Table TF5 obust detail Detail E-FT-5 E-FT-1 floating compliant floor floating treatment floor treatment FASTACKCAD ACHITECTUAL CAD DATABASES Perimeter resilient flanking strip required Ceiling treatment ScreedBoard 0 High density thermally conductive floor board Option 1: Underfloor heating thermal board XFLOO 50 High performance extruded polystyrene boards Option : outed or moulded expanded polystyrene (EPS) panel FIBE fon 8 ecycled resilient layer NO SCEWS YELOfon FS50 Pre-formed polyethylene foam flanking angle: 6 mm x 50mm x 0mm x m installed around the perimeter of the flooring board to isolate floor from walls and skirting. Ceiling board fixings must not penetrate or touch the floor joists 16mm (min) metal resilient bars mounted at right angles to the joist at 400mm centres. Primary ceiling: CT1-Two layers of gypsum-based board, composed of 19mm (nominal 1.5kg/m ) fixed with mm screws and 1.5mm (nominal 10kg/m ) fixed with 4mm screws, with all joists staggered. CT-Two layers of gypsum-based board, composed of 15mm (nominal 1.5kg/m ) fixed with 5mm screws and a second layer of 15mm (nominal 1.5kg/m ) fixed with 4mm screws, with all joists staggered. Additional layers required to complete treatment Mineral wool quilt laid between joists - 100mm (min) 10-kg/m Sacrificial ceiling: Metal ceiling system with a 100mm (min) void fixed to underside of primary ceiling. One layer of nominal 8kg/m gypsum based board. Product information ScreedBoard 0 Board dimensions: 0mm x 600mm x 100mm Edge profile: Interlocking tongue & groove Weight: 5.00kg/m / 18.00kg per board Thermal resistance: 0.40m K/W FIBEfon 8 acoustic fleece; 8mm x 600mm x 100mm Cellecta SB joint adhesive: 1L for every m of boards obust Detail mean performance D nt,w + C tr = 51dB L nt,w = 55dB Typical PCT () performance D nt,w + C tr = 51dB L nt,w = 55dB Pol 1 1 Mat 1 Hea 40mm (min) 150mm (min) Service void Construction notes Materials must be installed in accordance with manufacturers instructions to achieve stated acoustic values. Wall treatments MUST be isolated from the floating floor with YELOfon FS50 flanking strip. Ensure services do not bridge the resilient layer. Services must not puncture primary ceiling lining (except cables, which should be sealed with flexible sealant). * Code for Sustainable Homes (CSH) credits quoted are typical. Mat 1 value taken from the BE Green Guide. Pol 1 credit is only awarded if all the other insulation products used have a GWP of <5. Hea credits are based on the floor being pre-completetion tested and the separating wall performing to at least the same acoustic standard. Credits subject to relevant category weighted value. Acoustic values () Values quoted are typical, based on the treatment being installed correctly and pre-completion tested. Airborne performance tested in accordance with BS EN ISO 140-4:1998 Impact performance tested in accordance with BS EN ISO 140-7:

8 Structural separating floor - Timber obust detail E-FT-6 Cellecta ScreedBoard 8 laid on timber sub-floor MiTeK Posi-Joist, Prestaplan Presweb metal web joists Use with timber frame walls only Floating floor treatment Floor decking Cell ecta ScreedBoard 8 (See Table TF6 for full details) (1) 15 mm thick (min) wood based board, density 600kg/m (min) Joists Absorbing material Ceiling 5mm (min) Posi-Joist, PresWeb () metal web joists 100mm (min) quilt insulation (10-6kg/m ) between joists See Table TF6 for ceiling treatment (1) 18mm(min) required for obust detail applications ( ) Alternative joist may be used but will be subject to pre-completion testing Fig. TF6 FASTACKCAD ACHITECTUAL CAD DATABASES Table TF6 obust detail E-FT-6 floating floor treatment Perimeter resilient flanking strip required Ceiling treatment ScreedBoard 8 High density composite resilient overlay treatment Additional layers required to complete treatment Mineral wool quilt laid between joists - 100mm (min) 10-kg/m No need for screws Interlocking edges glued together with Cellecta SB joint adhesive Product information Board dimensions: 8mm x 600mm x 100mm Edge profile: Interlocking tongue & groove Weight: 6.00kg/m / 18.7kg per board Cellecta SB joint adhesive: 1L for every m of boards obust Detail mean performance D nt,w + C tr = 5dB L nt,w = 55dB Typical PCT () performance D nt,w + C tr = 5dB L nt,w = 55dB Benefits of ScreedBoard 8 over an acoustic batten system (FFT1) Grey dry screed finish Only 8mm thick educes number of brick courses required Able to accept ceramic tiles Only one component to install (+ edge strip) Interconnecting edge detail - no screws req d Weighs only 18.7kg per board (0.7m ) Same weight/m as FFT1 treatment No need to employ a specialist contractor Quick and easy to install Pol 1 1 Mat 1 107mm 8mm Hea YELOfon FS50 Pre-formed polyethylene foam flanking angle: 6mm x 50mm x 0mm x m placed around the perimeter of the flooring board to isolate floor from walls and skirting. 5mm (min) Ceiling board fixings must not penetrate or touch the floor joists 16mm (min) metal resilient bars mounted at right angles to the joist at 400mm centres. Primary ceiling: CT1-Two layers of gypsum-based board, composed of 19mm (nominal 1.5kg/m ) fixed with mm screws and 1.5mm (nominal 10kg/m ) fixed with 4mm screws, with all joists staggered. CT -Two layers of gypsum-based board, composed of 15mm (nominal 1.5kg/m ) fixed with 5mm screws and a second layer of 15mm (nominal 1.5kg/m ) fixed with 4mm screws, with all joists staggered. Sacrificial ceiling: Metal ceiling system with a 150mm (min) void fixed to underside of primary ceiling. One layer of nominal 8kg/m gypsum based board. 100mm (min) Service void Construction notes Services must not puncture primary ceiling lining (except cables, which should be sealed with flexible sealant). * Code for Sustainable Homes (CSH) credits quoted are typical. Mat 1 value taken from the BE Green Guide. Pol 1 credit is only awarded if all the other insulation products used have a GWP of <5. Hea credits are based on the floor being pre-completetion tested and the separating wall performing to at least the same acoustic standard. Credits subject to relevant category weighted value. See page 5 for further information. Acoustic values () Values quoted are typical, based on the treatment being installed correctly and pre-completion tested. Airborne performance tested in accordance with BS EN ISO 140-4:1998 Impact performance tested in accordance with BS EN ISO 140-7:

9 Structural separating floor - Timber Cell ecta ScreedBoard 0 laid on underfloor heating system Cell ecta FIBEfon 8 laid acoustic layer laid on timber sub-deck MiTeK Posi-Joist, Prestaplan Presweb metal-web joists and timber frame walls only Floating floor treatment Floor decking Joists Absorbing material Ceiling obust detail E-FT-6 Cellecta ScreedBoard 0 (See Table TF7 for full details) Under floor heating 1mm (min) routed extruded or thermal insulation routed/moulded expanded polystyrene insulation Acoustic layer Cellecta FIBEfon 8 (1) 15 mm thick (min) wood based board, density 600kg/m (min) 5mm (min) Posi-Joist, PresWeb () metal web joists 100mm (min) quilt insulation (10-6kg/m ) between joists See Table TF7 for ceiling treatment (1) 18mm(min) required for obust detail applications ( ) Alternative joist may be used but will be subject to pre-completion testing Fig. TF7 Table TF7 obust detail Detail E-FT-6 E-FT-1 floating compliant floor floating treatment floor treatment Perimeter resilient flanking strip required Ceiling treatment ScreedBoard 0 High density thermally conductive floor board Option 1: Underfloor heating thermal board Cellecta XFLOO 50 Option : outed or moulded expanded polystyrene (EPS) panel FIBE fon 8 ecycled resilient layer High performance extruded polystyrene boards NO SCEWS YELOfon FS50 Pre-formed polyethylene foam flanking angle: 6 mm x 50mm x 0mm x m installed around the perimeter of the flooring board to isolate floor from walls and skirting. Ceiling board fixings must not penetrate or touch the floor joists 16mm (min) metal resilient bars mounted at right angles to the joist at 400mm centres. Primary ceiling: CT1-Two layers of gypsum-based board, composed of 19mm (nominal 1.5kg/m ) fixed with mm screws and 1.5mm (nominal 10kg/m ) fixed with 4mm screws, with all joists staggered. CT -Two layers of gypsum-based board, composed of 15mm (nominal 1.5kg/m ) fixed with 5mm screws and a second layer of 15mm (nominal 1.5kg/m ) fixed with 4mm screws, with all joists staggered. Additional layers required to complete treatment Mineral wool quilt laid between joists - 100mm (min) 10-kg/m ScreedBoards interlocking edges glued together with Cellecta SB adhesive Sacrificial ceiling: Metal ceiling system with a 150mm (min) void fixed to underside of primary ceiling. One layer of nominal 8kg/m gypsum based board. Product information ScreedBoard 0 Board dimensions: 0mm x 600mm x 100mm Edge profile: Interlocking tongue & groove Weight: 5.00kg/m / 18.00kg per board Thermal resistance: 0.40m K/W FIBEfon 8 acoustic fleece; 8mm x 600mm x 100mm Cellecta SB joint adhesive: 1L for every m of boards obust Detail mean performance D nt,w + C tr = 5dB L nt,w = 55dB Typical PCT () performance Pol 1 1 Mat 1 Hea 5mm (min) D nt,w + C tr = 5dB L nt,w = 55dB 100mm (min) Service void Construction notes Materials must be installed in accordance with manufacturers instructions to achieve stated acoustic values. Wall treatments MUST be isolated from the floating floor with YELOfon FS50 flanking strip. Ensure services do not bridge the resilient layer. Services must not puncture primary ceiling lining (except cables, which should be sealed with flexible sealant). * Code for Sustainable Homes (CSH) credits quoted are typical. Mat 1 value taken from the BE Green Guide. Pol 1 credit is only awarded if all the other insulation products used have a GWP of <5. Hea credits are based on the floor being pre-completetion tested and the separating wall performing to at least the same acoustic standard. Credits subject to relevant category weighted value. Acoustic values () Values quoted are typical, based on the treatment being installed correctly and pre-completion tested. Airborne performance tested in accordance with BS EN ISO 140-4:1998 Impact performance tested in accordance with BS EN ISO 140-7:

10 Structural separating floor - Timber PCT solution Cellecta ScreedBoard 8 laid on timber sub-floor Solid timber joists Use with timber frame walls only Floating floor treatment Floor decking Joists Absorbing material Ceiling Cellecta ScreedBoard 8 (See Table TF8 for full details) 15mm thick (min) OSB 0mm (min) solid timber joists 100mm (min) quilt insulation (10-6kg/m ) between joists See Table TF8 for ceiling treatment Fig. TF8 FASTACKCAD ACHITECTUAL CAD DATABASES Table TF8 PCT obust floating Detail floor E-FT-1 treatment compliant floating floor treatment Perimeter resilient flanking strip required Ceiling treatment ScreedBoard 8 High density composite resilient overlay treatment Additional layers required to complete treatment Mineral wool quilt laid between joists - 100mm (min) 10-kg/m No need for screws Interlocking edges glued together with Cellecta SB joint adhesive Product information Board dimensions: 8mm) x 600mm x 100mm Edge profile: Interlocking tongue & groove Weight: 6.00kg/m / 18.7kg per board Cellecta SB joint adhesive: 1L for every m of boards Typical PCT () performance D nt,w + C tr = 50dB L nt,w = 50dB Benefits of ScreedBoard 8 over an acoustic batten system (FFT1) Grey dry screed finish Only 8mm thick educes number of brick courses required Able to accept ceramic tiles Only one component to install (+ edge strip) Interconnecting edge detail - no screws req d Weighs only 18.7kg per board (0.7m ) Same weight/m as FFT1 treatment No need to employ a specialist contractor Quick and easy to install 107mm 8mm Pol 1 1 Mat 1 Hea YELOfon FS50 Pre-formed polyethylene foam flanking angle: 6mm x 50mm x 0mm x m placed around the perimeter of the flooring board to isolate floor from walls and skirting. 0mm (min) Ceiling board fixings must not penetrate or touch the floor joists 16mm (min) metal resilient bars mounted at right angles to the joist at 400mm centres. Primary ceiling: CT1-Two layers of gypsum-based board, composed of 19mm (nominal 1.5kg/m ) fixed with mm screws and 1.5mm (nominal 10kg/m ) fixed with 4mm screws, with all joists staggered. CT-Two layers of gypsum-based board, composed of 15mm (nominal 1.5kg/m ) fixed with 5mm screws and a second layer of 15mm (nominal 1.5kg/m ) fixed with 4mm screws, with all joists staggered. Sacrificial ceiling: Metal ceiling system with a 100mm (min) void fixed to underside of primary ceiling. One layer of nominal 8kg/m gypsum based board. 100mm (min) Service void * Code for Sustainable Homes (CSH) credits quoted are typical. Mat 1 value taken from the BE Green Guide. Pol 1 credit is only awarded if all the other insulation products used have a GWP of <5. Hea credits are based on the floor being pre-completetion tested and the separating wall performing to at least the same acoustic standard. Credits subject to relevant category weighted value. See page 5 for further information. Acoustic values () Values quoted are typical, based on the treatment being installed correctly and pre-completion tested. Airborne performance tested in accordance with BS EN ISO 140-4:1998 Impact performance tested in accordance with BS EN ISO 140-7:

11 Structural separating floor - Timber PCT solution Cellecta ScreedBoard 0 laid on underfloor heating system Solid timber joists Use with timber frame walls only Floor finish Under floor heating thermal insulation Acoustic layer Floor decking Joists Absorbing material Ceiling Cellecta ScreedBoard 0 (See Table TF9 for full details) 1mm (min) routed extruded or routed/moulded expanded polystyrene insulation bonded to Cellecta FIBEfon 8 resilient layer 15mm thick (min) OSB 0mm (min) solid timber joist 100mm (min) quilt insulation (10-6kg/m ) between joists See Table TF9 for ceiling treatment Fig. TF9 FASTACKCAD ACHITECTUAL CAD DATABASES Table TF9 PCT obust floating Detail floor E-FT-1 treatment compliant floating floor treatment Perimeter resilient flanking strip required Ceiling treatment options ScreedBoard 0 High density low resistance floor board Option 1: Underfloor heating thermal board XFLOO 50 High performance extruded polystyrene boards Option : outed or moulded expanded polystyrene (EPS) panel FIBE fon 8 ecycled resilient layer NO SCEWS YELOfon ES5/10 Polyethylene foam flanking strip: 5mm x 10mm x 50m installed around the perimeter of the flooring board to isolate floor from walls and skirting. Ceiling board fixings must not penetrate or touch the floor joists 16mm (min) metal resilient bars mounted at right angles to the joist at 400mm centres. Primary ceiling: CT1-Two layers of gypsum-based board, composed of 19mm (nominal 1.5kg/m ) fixed with mm screws and 1.5mm (nominal 10kg/m ) fixed with 4mm screws, with all joists staggered. CT-Two layers of gypsum-based board, composed of 15mm (nominal 1.5kg/m ) fixed with 5mm screws and a second layer of 15mm (nominal 1.5kg/m ) fixed with 4mm screws, with all joists staggered. Additional layers required to complete treatment Mineral wool quilt laid between joists - 100mm (min) 10-kg/m ScreedBoards glued together with Cellecta SB joint adhesive Sacrificial ceiling: Metal ceiling system with a 100mm (min) void fixed to underside of primary ceiling. One layer of nominal 8kg/m gypsum based board. Product information ScreedBoard 0 Board dimensions: 0mm x 600mm x 100mm Edge profile: Interlocking tongue & groove Weight: 5.00kg/m / 18.00kg per board Thermal resistance: 0.0m K/W FIBEfon 8 acoustic fleece; 8mm Cellecta SB joint adhesive: 1L for every m of boards XFLOO 50: see page 60 for further information EPS: refer to manufacturers technical data obust Detail mean performance D nt,w + C tr = 51dB L nt,w = 55dB Typical PCT () performance D nt,w + C tr = 51dB L nt,w = 55dB Pol 1 1 Mat 1 Hea 0mm (min) 100mm (min) Service void Construction notes Materials must be installed in accordance with manufacturers instructions to achieve stated acoustic values. Wall treatments MUST be isolated from the floating floor with YELOfon ES5/10 flanking strip. Ensure services do not bridge the resilient layer. Services must not puncture primary ceiling lining (except cables, which should be sealed with flexible sealant). * Code for Sustainable Homes (CSH) credits quoted are typical. Mat 1 value taken from the BE Green Guide. Pol 1 credit is only awarded if all the other insulation products used have a GWP of <5. Hea credits are based on the floor being pre-completetion tested and the separating wall performing to at least the same acoustic standard. Credits subject to relevant category weighted value. See page 5 for further information. Acoustic values () Values quoted are typical, based on the treatment being installed correctly and pre-completion tested. Airborne performance tested in accordance with BS EN ISO 140-4:1998 Impact performance tested in accordance with BS EN ISO 140-7:

12 Structural separating floor - Timber PCT solution Cell ecta ScreedBoard 8 laid on timber sub-floor Timber I-joists, solid timber, metal web or timber web joists Use with timber frame walls only Floating floor treatment Floor decking Joists Absorbing material esilient bar Ceiling Cellecta ScreedBoard 8 (See Table TF10 for full details) 15mm thick (min) wood based board, density 600kg/m (min) 0mm (min) solid timber joist 40mm (min) timber I-joists 5mm (min) metal web joists 54mm (min) timber web joists 100mm (min) quilt insulation (10-6kg/m ) between joists Cellecta HP0 deep resilient bar fixed to timber joists at 600mm (max) centres (See Table TF10 for full details). Table TF10 PCT obust floating Detail floor E-FT-1 treatment compliant floating floor treatment FASTACKCAD ACHITECTUAL CAD DATABASES Perimeter resilient flanking strip required Ceiling treatment options ScreedBoard 8 High density composite resilient overlay treatment Additional layers required to complete treatment Mineral wool quilt laid between joists - 100mm (min) 10-kg/m No need for screws Interlocking edges glued together with Cellecta SB joint adhesive YELOfon FS50 Pre-formed polyethylene foam flanking angle: 6 mm x 50mm x 0mm x m installed around the perimeter of the flooring board to isolate floor from walls and skirting. Ceiling board fixings must not penetrate or touch the floor joists 0mm Cellecta HP0 esilient Bars mounted at right angles to the joist at 600mm (max) centres. CT1-Two layers of gypsum-based board, composed of 19mm (nominal 1.5kg/m ) fixed with mm screws and 1.5mm (nominal 10kg/m ) fixed with 4mm screws, with all joists staggered. CT-Two layers of gypsum-based board, composed of 15mm (nominal 1.5kg/m ) fixed with 5mm screws and a second layer of 15mm (nominal 1.5kg/m ) fixed with 4mm screws, with all joists staggered. Product information Board dimensions: 8mm x 600mm x 100mm Edge profile: Interlocking tongue & groove Weight: 6.00kg/m / 18.7kg per board Cellecta SB joint adhesive: 1L to every m of boards 0mm (min) Typical PCT () performance D nt,w + C tr = 50dB L nt,w = 57dB Pol 1 1 Mat 1 Hea 0mm Construction notes Materials must be installed in accordance with manufacturers instructions to achieve stated acoustic values. Wall treatments MUST be isolated from the floating floor with YELOfon FS50 flanking strip. Ensure services do not bridge the resilient layer. Services must not puncture primary ceiling lining (except cables, which should be sealed with flexible sealant). * Code for Sustainable Homes (CSH) credits quoted are typical. Mat 1 value taken from the BE Green Guide. Pol 1 credit is only awarded if all the other insulation products used have a GWP of <5. Hea credits are based on the floor being pre-completetion tested and the separating wall performing to at least the same acoustic standard. Credits subject to relevant category weighted value. See page 5 for further information. Acoustic values () Values quoted are typical, based on the treatment being installed correctly and pre-completion tested. Airborne performance tested in accordance with BS EN ISO 140-4:1998 Impact performance tested in accordance with BS EN ISO 140-7:

13 Structural separating floor - Timber (existing) PCT solution Existing timber joists Acoustic treatment laid on sub-floor Ceiling on resilient boards Floating floor treatment options Cellecta ScreedBoard 8 (See Table TF15 for full details) Floor decking Joists Absorbing material Ceiling 15mm thick (min) OSB or existing floor boards (with all gaps sealed with suitable flexible mastic) Solid timber joists 50mm Cellecta FIBEfon Micro mm (min) mineral wool insulation (45kg/m ) between joists See Table TF15 for ceiling treatment Fig. TF15 FASTACKCAD ACHITECTUAL CAD DATABASES Table TF15 PCT floating floor treatment options Perimeter resilient flanking strip required Ceiling treatment ScreedBoard 8 High density composite resilient overlay treatment No need for screws Interlocking edges glued together with Cellecta SB joint adhesive Typical PCT () performance w + C tr = 5dB L n,w = 54dB YELOfon FS50 Pre-formed polyethylene foam flanking angle: 6mm x 50mm x 0mm x m installed around the perimeter of the flooring board to isolate floor from walls and skirting. Ceiling boards must not penetrate or touch the floor joists 16mm (min) metal resilient bars mounted at right angles to the joist at 400mm centres. Ceiling treatment Two layers of gypsum-based board, composed of 15mm (nominal 1.5kg/m ) fixed with 5mm screws and a second layer of 15mm (nominal 1.5kg/m ) fixed with 4mm screws, with all joists staggered. Product information Board dimensions: 8mm x 600mm x 100mm Edge profile: Interlocking tongue & groove Weight: 6.00kg/m / 18.7kg per board Cellecta SB joint adhesive: 1L (to suit m board coverage) Underfloor heating below floating floor treatment (option 1) oute XFLOO 50 High performance extruded polystyrene boards (option ) outed or moulded expanded polystyrene (EPS) panel Typical Typical PCT PCT performance () () performance w + C tr = 5dB L n,w = 54dB () YELOfon ES5/100 Polyethylene foam flanking strip: 5mm x 100mm x 50m installed around the perimeter of the flooring board to isolate floor from walls and skirting. Construction note Services must not puncture ceiling linings (except cables, which should be sealed with flexible sealant). Construction notes Materials must be installed in accordance with manufacturers instructions to achieve stated acoustic values. Wall treatments MUST be isolated from the floor treatment with YELOfon FS50 or ES5/100 flanking strip. Ensure services do not come into contact with the floor treatment. Acoustic values () Test data quoted was conducted in a UKAS accredited laboratory in accordance with Approved Document E: Annex B: Procedures for sound insulation testing. Airborne results tested in accordance with BS EN ISO 140-:1995 Impact results tested in accordance with BS EN ISO 140-6:

14 Masonry separating wall with timber separating floor Patent Pending Cellecta composite acoustic wall lining system Suitable for aircrete and aggregate block cavity walls Cellecta ScreedBoard 8 laid on timber sub-floor Masonry wall (Inside skin) Wall Floating treatment finish floor Treatment Absorbing material Floor decking Floor treatment Masonry wall Joists Floor decking Joists Absorbing material PCT solution 100mm (min) aircrete block kg/m 100mm (min) aggregate block kg/m Cellecta FIBEfon FFT1 - DECKfon Hi FIBEfon GYP Batten fixed Baffle 70to 16mm strips stuck resilient (See Table horizontally bars 11 set for at full at 600mm details) the head (max) and centres base of (See the Table wall, MW1 and vertically for treatment 600mm options) (max) centres 15mm FIBEfon MICO SLAB 15 Cellecta fitted in resilient FIBEfon bar void HiGYP 0TM fixed through the Baffle strips, to the wall with Cellecta AF10 fixings 11mm thick (min) OSB or Walker Cellecta perforated deck ScreedBoard system 8 (See Table TM1 for full details) 15mm thick (min) OSB 40mm (min) timber I-joists 5mm (min) metal web joists 100mm (min) quilt insulation (10-6kg/m ) in ceiling cavity Ceiling See Table TM1 for ceiling treatment Fig. TM1 FASTACKCAD ACHITECTUAL CAD DATABASES Proposed obust detail o Application N 181 & 18 Table TM1 PCT flanking wall, floating floor and ceiling treatment ScreedBoard 8 YELOfon FS50 High density composite resilient overlay treatment Preformed flanking angle FIBEfon HiGYP 0TM High performance composite acoustic wall lining FIBEfon Baffle Strips High performance sound absorption strips Additional layers required to complete treatment Mineral wool quilt placed in ceiling cavity - 100mm (min) 10-kg/m Typical PCT (4) performance D nt,w + C tr = 5dB L nt,w = 5dB No need for screws Interlocking edges glued together with Cellecta SB joint adhesive Code credits Pol 1 Hea 1 Construction notes Materials must be installed in accordance with manufacturers instructions to achieve stated acoustic values. Wall treatments MUST be isolated from the floating floor with YELOfon FS strip. Ensure services do not come into direct contact with the floor treatment. Acoustic values () Values quoted are typical, based on the treatments being installed correctly and pre-completion tested. Airborne performance tested in accordance with BS EN ISO 140-4:1998 Impact performance tested in accordance with BS EN ISO 140-7: 1998 Ceiling board fixings must not penetrate or touch the floor joists 0mm Cellecta HP esilient bars resilient bars mounted at right angles to the joist at 600mm (max) centres. Primary ceiling: CT1-Two layers of gypsum-based board, composed of 19mm (nominal 1.5kg/m ) fixed with mm screws and 1.5mm (nominal 10kg/m ) fixed with 4mm screws, with all joists staggered. CT-Two layers of gypsum-based board, composed of 15mm (nominal 1.5kg/m ) fixed with 5mm screws and a second layer of 15mm (nominal 1.5kg/m ) fixed with 4mm screws, with all joists staggered. Optional sacrificial ceiling: Metal ceiling system with a 100mm (min) void can be fixed to the underside of primary ceiling. One layer of nominal 8kg/m gypsumbased board. 14

15 Masonry flanking wall with timber separating floor Patent Pending Absorbing material PCT solution Cellecta composite acoustic wall lining system Suitable for aircrete and aggregate block cavity walls Cellecta ScreedBoard 8 laid on timber sub-floor Masonry wall (Inside skin) Floating Wall finish treatment floor Treatment Absorbing material Floor decking Floor treatment Masonry wall Joists Floor decking Joists 100mm (min) aircrete block kg/m 100mm (min) aggregate block kg/m Cellecta FIBEfon FFT1 - DECKfon Hi FIBEfon GYP Batten fixed Baffle 70to 16mm strips stuck resilient (See Table horizontally bars 11 set for at full at 600mm details) the head (max) and centres base of (See the Table wall, MW1 and vertically for treatment 600mm options) (max) centres 15mm FIBEfon MICO SLAB 15 Cellecta fitted in resilient FIBEfon bar void HiGYP 0TM fixed through the Baffle strips, to the wall with Cellecta AF10 fixings 11mm thick (min) OSB or Walker Cellecta perforated deck ScreedBoard system 8 (See Table TM1 for full details) 15mm thick (min) OSB 40mm (min) timber I-joists 5mm (min) metal web joists 100mm (min) quilt insulation (10-6g/m ) in ceiling cavity Fig. TM Ceiling Cavity insulation See Table TM for ceiling treatment 75mm (min) full fill mineral wool to address thermal bypass effect (10-6kg/m ) FASTACKCAD ACHITECTUAL CAD DATABASES Table TM Proposed obust detail o Application N 181 & 18 PCT separating wall, floating floor and ceiling treatment ScreedBoard 8 YELOfon FS50 High density composite resilient overlay treatment Preformed flanking angle FIBEfon HiGYP 0TM High performance composite acoustic wall lining FIBEfon Baffle Strips High performance sound absorption strips Additional layers required to complete treatment Mineral wool quilt placed in ceiling cavity - 100mm (min) 10-kg/m Product information ScreedBoard 8: 8mm x 600mm x 100mm YELOfon FS50: 50mm x 0mm x 000m HiGYP 0TM: 0mm x 100mm x 400mm Thermal resistance: 0.51m K/W Baffle Strips: 15mm x 75mm x 100mm AF10 fixings: 10mm x 8mm Typical PCT (4) performance D nt,w + C tr = 5dB L nt,w = 5dB Code credits Pol 1 Hea 1 Construction notes Materials must be installed in accordance with manufacturers instructions to achieve stated acoustic values. Wall treatments MUST be isolated from the floating floor with YELOfon FS strip. Ensure services do not come into direct contact with the floor treatment. Acoustic values () Values quoted are typical, based on the treatments being installed correctly and pre-completion tested. Airborne performance tested in accordance with BS EN ISO 140-4:1998 Impact performance tested in accordance with BS EN ISO 140-7: 1998 Ceiling board fixings must not penetrate or touch the floor joists 0mm Cellecta HP esilient bars resilient bars mounted at right angles to the joist at 600mm (max) centres. Primary ceiling: CT1-Two layers of gypsum-based board, composed of 19mm (nominal 1.5kg/m ) fixed with mm screws and 1.5mm (nominal 10kg/m ) fixed with 4mm screws, with all joists staggered. CT-Two layers of gypsum-based board, composed of 15mm (nominal 1.5kg/m ) fixed with 5mm screws and a second layer of 15mm (nominal 1.5kg/m ) fixed with 4mm screws, with all joists staggered. Optional sacrificial ceiling: Metal ceiling system with a 100mm (min) void can be fixed to the underside of primary ceiling. One layer of nominal 8kg/m gypsumbased board. 15

16 Cellecta I N N O V A T I O N I N I N S U L A T I O N ScreedBoard The ultimate floor board... Videos News New Build efurb More Cellecta Concrete and Steel Separating Floors Introduction In most cases, the mass of a concrete based floor accounts for the airborne sound that needs to be eliminated to conform with the required acoustic values, which leaves impact sound to be resolved. This can be addressed with ScreedBoard or one of Cellecta s extensive range of acoustic treatments, which have been specifically designed to suit each application. Each treatment combines a high performance resilient layer and perimeter flanking strip that, when installed correctly, will exceed the acoustic standards of Approved Document E of the 00 edition of the Building egulations, with the majority also being obust detail compliant. Key Benefits of Cellecta Acoustic Floor Insulation Excellent acoustic performance Cost effective, proven constructions Wide range of obust details and Pre-completion solutions BBA verified data Code for Sustainable Homes Pol.1 compliant Environmentally friendly Cellecta App E V D I F I BBA D A T E D A obust detail Acoustic Treatment FEATUED POJECT POJECT NAME Shenley Wood Care Village Milton Keynes PODUCT INSTALLED ScreedBoard 8 POJECT SIZE 17,000m² TYPE OF CONSTUCTION LGS Steel Frame POJECT COMPLETION June 01 For other projects please visit 16

17 Separating floor - Steel-concrete composite obust detail E-FS-1 In-situ concrete slab supported by profiled metal deck Floor Treatment Cellecta ScreedBoard 8 Cellecta ScreedBoard 0 + routed or mouled UFH insulation panel and Cellecta FIBEfon8 resilient layer Fig. SF shows ScreedBoard 8 and FS50 pre-formed flanking strip Structural floor Ceiling In-situ concrete slab supported by profiled metal decking: Shallow or deep profiled metal decking Overall distance from top surface of concrete to underside of ceiling treatment 00mm (min) Concrete thickness 80mm (min) at shallowest point and 10mm at deepest point Concrete density 00kg/m (min) See Table SF1a for ceiling treatment options Table SF1a FASTACKCAD ACHITECTUAL CAD DATABASES Ceiling treatment options for E-FS-1 (can be used with any FFT detailed in Table FS1b) Any ceiling system One layer of nominal 8kg/m gypsum-based board 00mm (min) Construction notes Materials must be installed in accordance with manufacturers and obust detail instructions to achieve required acoustic performance values. Wall treatments MUST be isolated from the floating floor with YELOfon ES or FS flanking strip. 17

18 Separating floor - Concrete obust detail E-FC-1 Pre-cast concrete plank with fully bonded screed Floating Floor Treatment floor Cellecta ScreedBoard 8 treatment options Cellecta ScreedBoard 0 + routed or mouled UFH insulation panel and Cellecta FIBEfon8 resilient layer Screed Structural floor Ceiling 40mm (min) screed directly applied to plank Sand: cement or proprietary screed 80kg/m (min) mass per unit area 150mm (min) precast concrete floor plank slab 00kg/m (min) mass per unit area See Table CF1a for ceiling treatment options Fig. CF1 shows FIBEfon 8C and FS0 pre-formed flanking strip FASTACKCAD ACHITECTUAL CAD DATABASES Table CF1a Ceiling treatment options for E-FC-1 (can be used with any FFT detailed in Table CF1b) CT1- Metal ceiling - 100mm void 100mm (min) One layer of nominal 8kg/m gypsum-based board CT-Timber batten & counter battens One layer of nominal 8kg/m gypsum-based board 100mm (min) CT- Metal ceiling - 75mm void 75mm (min) One layer of nominal 10kg/m gypsum-based board CT4-Timber batten & metal resilient bars 65mm (min) One layer of nominal 10kg/m gypsum-based board Construction notes Materials must be installed in accordance with manufacturers and obust detail instructions to achieve required acoustic performance values. Wall treatments MUST be isolated from the floating floor with YELOfon ES or FS flanking strip. 18

19 Separating floor - Concrete obust detail E-FC- In-situ concrete slab Only use with reinforced concrete frame construction Floating Floor Treatment floor Cellecta ScreedBoard 8 treatment options Cellecta ScreedBoard 0 + routed or mouled UFH insulation panel and Cellecta FIBEfon8 resilient layer Structural floor Ceiling 50mm (min) in-situ concrete slab, 400kg/m density without screed 00mm (min) in-situ concrete slab 400kg/m density with screed: 40mm sand & cement screed or 80kg/m (min) proprietary screed directly applied to slab See Table CFa for ceiling treatment options FASTACKCAD ACHITECTUAL CAD DATABASES Table CFa Ceiling treatment options for E-FC- (can be used with any FFT detailed in Table CFb) Any ceiling system - 75mm void 75mm (min) One layer of nominal 10kg/m gypsum-based board Any ceiling system - 100mm void 100mm (min) One layer of nominal 8kg/m gypsum-based board Construction notes Materials must be installed in accordance with manufacturers and obust detail instructions to achieve required acoustic performance values. Wall treatments MUST be isolated from the floating floor with YELOfon ES or FS flanking strip. 19

20 Separating floor - Metal Joists PCT solution Cellecta ScreedBoard 8 laid on sub-floor Metal joists C-section joists Use with lightweight metal frame walls only Floating floor treatment Floor decking Joists Absorbing material Ceiling Cellecta ScreedBoard8 (See Table SF for full details) 0mm thick (min) wood based board, density 600kg/m (mm) 54mm (min) deep metal C-section joists 100mm (min) mineral wool quilt insulation (10-6g/m ) between joists See Table SF for ceiling treatment options Fig. SF FASTACKCAD ACHITECTUAL CAD DATABASES Table SF PCT floating floor treatment Perimeter resilient flanking strip required Ceiling treatment options ScreedBoard 8 High density acoustic composite overlay board Ceiling board fixings must not penetrate or touch the floor joists Additional layers required to complete treatment Mineral wool quilt laid between joists - 100mm (min) 10-kg/m No need for screws, interlocking edges glued together with Cellecta SB joint adhesive YELOfon FS50 Pre-formed polyethylene foam flanking angle: 6 mm (t) x 50mm (w) x 0mm (h) x m(l) placed around the perimeter of the flooring board to isolate floor from walls and skirting. 5mm (min) 16mm (min) metal resilient bars mounted at right angles to the joist: Two layers of gypsum-based board, composed of 19mm (nominal 1.5kg/m ) fixed with mm screws and 1.5mm (nominal 10kg/m ) fixed with 4mm screws, with all joists staggered. Product information Board dimensions: 8mm (t) x 600mm x 100mm Edge profile: Interlocking tongue & groove Weight: 6.00kg/m / 18.7kg per board Cellecta SB joint adhesive: 1L to every m of boards Typical PCT () performance D nt,w + C tr = 51dB L nt,w = 56dB Pol 1 Hea 1 Two layers of gypsum-based board, composed of 15mm (nominal 1.5kg/m ) fixed with 5mm screws and a second layer of 15mm (nominal 1.5kg/m ) fixed with 4mm screws, with all joists staggered. 5mm (min) metal resilient bars mounted at right angles to the joist: Two layers of gypsum-based board, composed of 10mm (nominal 1kg/m ) fixed with 0mm screws and a second layer of 10mm (nominal 10kg/m ) fixed with 0mm screws, with all joists staggered. Construction notes Materials must be installed in accordance with manufacturers instructions to achieve required acoustic performance values. Wall treatments MUST be isolated from the floating floor with YELOfon ES50 perimeter flanking strip. * Code for Sustainable Homes (CSH) credits quoted are typical. Mat 1 value taken from the BE Green Guide. Pol 1 credit is only awarded if all the other insulation products used have a GWP of <5. Hea credits are based on the floor being pre-completetion tested and the separating wall performing to at least the same acoustic standard. Credits subject to relevant category weighted value. See page 5 for further information. Acoustic values () Values quoted are typical, based on the treatment being installed correctly and pre-completion tested. Airborne performance tested in accordance with BS EN ISO 140-4:1998 Impact performance tested in accordance with BS EN ISO 140-7:

21 Ceiling Treatments Introduction The resistance to airborne sound depends mainly on the mass per unit area of the structural floor and partly on the ceiling s construction. It is therefore important to choose a ceiling treatment that complements the performance of the chosen structural floor, to produce an overall structure that exceeds the required db values. De-coupling the ceiling from the structural floor is an effective way of reducing the contact path that impact sound can follow. Adding mass in the way of plasterboard to the floor structure and filling the ceiling void with a mineral wool will also improve the acoustic performance of the structure. Listed below are three types of ceiling treatments available in order of performance. Ceiling Treatment A: Independent ceiling Ceiling Treatment B: Plasterboard on proprietary resilient bars with absorbing material 1. Proprietary resilient bars fixed to timber battens Cavity filled with 50mm Cellecta FIBEfon Micro 50 or 100mm mineral wool (10kg/m ). Up to 450mm centres Cellecta. Cellecta HP0 resilient bars fixed to timber Cavity filled with 50mm Cellecta FIBEfon Micro 50 or 100mm mineral wool (10kg/m ). 1) Independent joists Cavity filled with 50mm Cellecta FIBEfon Micro 50 or 100mm mineral wool (10kg/m ). Up to 600mm centres (A). Proprietary metal frame suspended ceiling system (A) ) Proprietary metal frame suspended ceiling system Cavity filled with 50mm Cellecta FIBEfon Micro 50 or 100mm mineral wool (10kg/m ). Ceiling Treatment C: Plasterboard on timber battens or proprietary resilient channels with absorbing material Cavity filled with 50mm Cellecta FIBEfon Micro 50 or 100mm mineral wool (10kg/m ). 1. Timber battens (A) ) Proprietary metal frame suspended ceiling system Cavity filled with 50mm Cellecta FIBEfon Micro 50 or 100mm mineral wool (10kg/m ).. Proprietary resilient channels Notes (A) The use of a better performing ceiling is permitted provided there is no significant flanking transmission. Professional advice should be sort to ensure the overall floor construction complies with current fire regulations. Further guidance is given in Approved Document E, Section 5 of the Scottish Building Standards and the obust details handbook. The manufacturer of the proposed ceiling system should also be consulted. 1

22 Cellecta I N N O V A T I O N I N I N S U L A T I O N ScreedBoard The ultimate floor board... Videos News New Build efurb More Cellecta Under Floor Heating Introduction In applications such as concrete ground floors where acoustic performance is not essential but an underfloor heating system is to be installed, ScreedBoard 0 is the ideal solution. ScreedBoard 0 features very low thermal resistance properties (0.05W/mk) which allows underfloor heating systems to work at their optimum efficiency. Typically this equates to a 0% increase in the efficiency of the heat pump over using timber based flooring products (i.e chipboard), giving the home owner greatly reduced running cost for the duration of the buildings life. Key Benefits ScreedBoard 0 Low thermal resistance (0.05m /kw) Doesn't contract or expand when exposed to water High impact resistance Interconnecting edge detail - no screws required Quick and easy to install Accepts ceramic tiles FASTACKCAD ACHITECTUAL CAD DATABASES Cellecta App Thermal esistance of Typical Overlay Floor Treatments Scree db oard ScreedBoard 0 outperforms other overlay floor treatments traditionally used in underfloor heating applications

23 Under Floor Heating In-situ concrete slab Floating Floor Treatment floor Cellecta ScreedBoard 0 + routed treatment options or moulded UFH insulation panel Structural floor Concrete or timber base structural sub floor with a levelness in line with the S standard (+/- mm over m straight edge) Pol 1 Hea 1 FASTACKCAD ACHITECTUAL CAD DATABASES Floating Floor Treatment floor Cellecta ScreedBoard 0 + routed treatment options or moulded XFLOO 50 UFH insulation panel Structural floor Concrete or timber base structural sub floor with a levelness in line with the S standard (+/- mm over m straight edge) Pol 1 Hea 1 FASTACKCAD ACHITECTUAL CAD DATABASES THEMAL ESISTANCE ScreedBoard 0 has the lowest thermal resistance when compared to the most commonly used floor finishes, allowing ground water heat pumps and heat recovery systems to work at maximum efficiency. Intensity of heat flow obust detail FFT1 m /kw 0.7 ScreedBoard 0 m /kw mm Chipboard m /kw 0.18 ScreedBoard 0 m /kw mm Screed m /kw Thermal and acoustic applcations Thermal applications

24 Cellecta Eliminating Acoustic Flanking The acoustic efficiency of the floor or wall will be adversely affected should acoustic bridging between the acoustictreatment and the surrounding structures occur (known as flanking transmission). All floor finishes must be isolated from the surrounding walls (including plaster finish and skirting boards), door linings, services and other structural elements. To address acoustic flanking, Cellecta manufactures an extensive range of flexible extruded polyethylene edge strips to suit each specific treatment. DO NOT secure the floating floor treatment to the sub-deck or floor joists. DO NOT sit the skirting board or allow the plaster or plasterboard to make direct contact with the floor treatment. Ensure the acoustic floor treatment is free floating and not fixed to the sub-structure. Use YELOfon flanking strip to isolate the floating floor treatment from the wall and its finishes. Acoustic treatment Flanking strip required Flanking strip dimensions ScreedB oard 0 ScreedB oard 8 YELOfon FS50 (Profiled flanking strip) 6mm (t) x 50mm (w) x 0m (h) x 000mm (L) Note. All Cellecta edge strips have a global warming potential (GWP) of <5 and are Green Guide Pol 1 compliant.! Caution Failure to install a perimeter flanking strip correctly will result in acoustic failure 4

25 Cellecta Tools & Accessories ScreedBoard Fixing Batten ScreedBoard Pull Bar SB Adhesive - 1 litre bottle Coverage: m/ltr of ScreedBoard ScreedBoard Primer - 5 litre bottle Use to seal the Screedboards prior to adhering ceramic tiles Cellecta HP0 Deep esilient Bar Size: 0mm deep x 000mm long Spacing: > 600mm centres Cellecta fon Adhesive - 1 litre bottle Coverage: m/ltr of acoustic boards Further Information 5

26 Videos News New Build efurb More Cellecta obust detail ScreedBoard Specification Clauses Architects, designers and specifiers can quickly and easily insert one of Cellecta s acoustic treatments into their specification document, either by copying one of the specifications listed below, download the NBS clause from Cellecta s websire or by contacting Cellecta s technical team who will the specific product s specification clause in a Word file. esilient overlay platform floor system (obust detail FFT4, E-FT-5, E-FT-6) The acoustic treatment shall be ScreedBoard 8 (obust detail FFT4, E-FT-5, E-FT-6 ) Sheet thickness: 8 Sheet size: 600mm x 100mm Perimeter edge strip: YELOfon FS50 strip Manufactured by: Cellecta Limited, Unit D Norman Close, Medway Valley Park, ochester, Kent. ME JU Tel technical@cellecta.co.uk Fit in accordance with manufacturer s instructions. esilient overlay platform floor system (obust detail FFT4, E-FT-5, E-FT-6) The acoustic treatment shall be a combination of ScreedBoard 0, UFH thermal insulation board and FIBEfon 8 (obust detail FFT4, E-FT-5, E-FT-6) Sheet thickness: ScreedBoard 0-0mm. FIBEfon 8-8mm Sheet size: ScreedBoard 0 & FIBEfon 8-600mm x 100mm Perimeter edge strip: YELOfon FS50 strip Manufactured by: Cellecta Limited, Unit D Norman Close, Medway Valley Park, ochester, Kent. ME JU Tel technical@cellecta.co.uk Fit in accordance with manufacturer s instructions. FASTACKCAD ACHITECTUAL CAD DATABASES ScreedBoard Installation Videos Installing ScreedBoard has never been easier, thanks to Cellecta s new installation videos. Featuring in-depth information on laying the boards, interlocking, adhesives and acoustic flanking the videos provide the best way to learn more about the ScreedBoard systems. Videos for both ScreedBoard 8 and ScreedBoard 8 have been developed for acoustic and under floor heating applications and are available to view at, via the Cellecta app or request a DVD. Cellecta I N N O V A T I O N I N I N S U L A T I O N ScreedBoard The ultimate floor board... 6

Part E robustdetails. robustdetails. January 2017 Update Pack. Dear Colleague,

Part E robustdetails. robustdetails. January 2017 Update Pack. Dear Colleague, Part E Pack Dear Colleague, This is the first 2017 update to the Part E Robust Details Handbook. In this update pack, we have focussed on clarifying the situation on incorporating underfloor heating (UFH)

More information

Acoustic Cradle Levelling System

Acoustic Cradle Levelling System Acoustic Cradle Levelling System CONCRETE FLOOR CRADLE & BATTEN Datasheet 52 01 18mm t&g chipboard @ 400mm centres 02 40mm min directly applied sand & cement or proprietary screed (min 80kg/m 2 ) 03 03

More information

Part E robustdetails. robustdetails. January 2018 Update Pack

Part E robustdetails. robustdetails. January 2018 Update Pack Part E Pack Dear Colleague, The first Update Pack of the year, and the first welcome from me as Chief Executive. Although new to the role, I have been with the company for nine years with responsibility

More information

September Saddle Flooring Systems

September Saddle Flooring Systems September 2011 Saddle Flooring Systems Saddle Flooring Systems Saddle System Principles CMS Danskin Saddle Flooring Systems are dry floating floors which provide an easily levelled understructure for supporting

More information

ROCKWOOL FLEXI Insulation Application Guide

ROCKWOOL FLEXI Insulation Application Guide ROCKWOOL FLEXI Insulation Application Guide Pitched roof Rafters Intermediate Floors Internal Partitions Separating Floors Separating Walls ROCKWOOL FLEXI One product, many applications Choosing ROCKWOOL

More information

ACOUSTIC SUPPLIES. For Acoustic Solutions you can SHOUT about

ACOUSTIC SUPPLIES. For Acoustic Solutions you can SHOUT about ACOUSTIC SUPPLIES For Acoustic Solutions you can SHOUT about Soundproofing and Sound Absorption Products for all types of Residential and Commercial Projects Whatever your acoustic problem, we have a solution.

More information

SOUND SOLUTIONS TO MEET THE APPROVED DOCUMENT E (2003 EDITION) August 2008

SOUND SOLUTIONS TO MEET THE APPROVED DOCUMENT E (2003 EDITION) August 2008 SOUND SOLUTIONS TO MEET THE APPROVED DOCUMENT E (2003 EDITION) August 2008 PART E AT A GLANCE The New Approved Document E, (2003 Edition) was implemented on 1st July 2003. This applies to houses, flats,

More information

Most products will act differently when installed over an UFH system than when installed on a standard unheated subfloor.

Most products will act differently when installed over an UFH system than when installed on a standard unheated subfloor. Guidance Note on Underfloor Heating DRAFT FOR COMMENT Overview Underfloor heating (UFH) is now an established and appealing and potentially cost effective source of heating, hence its increased popularity

More information

E-Cousti Solutions Guide

E-Cousti Solutions Guide Uniclass L9:N372 CI/SfB Y epic Y45 (P2) A NEW GENERATION of ACOUSTIC SOLUTIONS E-Cousti Solutions Guide 3rd Edition E-Cousti Solutions Leading the way in Acoustic Innovation Award winning concept in sound

More information

Underfloor Heating System

Underfloor Heating System More than just an Underfloor Heating System including More than just an Underfloor Heating System underfloor heating + acoustic flooring + integrated control technology Performance Technology Integrated

More information

Jabfloor 70, 100, 150, 200, 250

Jabfloor 70, 100, 150, 200, 250 Jabfloor 70, 100, 150, 200, 250 Floor insulation over slab with chipboard finish Jabfloor is a closed cell expanded polystyrene (EPS) insulation board for use in all floor constructions. A range of compressive

More information

FIRE PROTECTION. GTEC Shaftwall systems 244 GTEC Shaftwall Stairwell systems 248 GTEC Horizontal Shaftwall systems 249 GTEC Encasement systems 250

FIRE PROTECTION. GTEC Shaftwall systems 244 GTEC Shaftwall Stairwell systems 248 GTEC Horizontal Shaftwall systems 249 GTEC Encasement systems 250 FIRE PROTECTION GTEC Shaftwall range uses a specially designed system to protect voids and shafts in buildings. It resists pressure changes and enables installation from one side of the shaft only. GTEC

More information

Garage Conversion - Between and Under Joist Applications

Garage Conversion - Between and Under Joist Applications Issue 1, August 2013 CI/SfB (2 -) Rn7 (M2) Garage Conversion - Between and Under Joist Applications Flat Roof Insulation Introduction Celotex is the brand leading manufacturer of PIR insulation boards,

More information

Specialists in Acoustic Flooring and House to Flat Conversions

Specialists in Acoustic Flooring and House to Flat Conversions Sound Solution Consultants Ltd Po Box 755 Capel St Mary Ipswich Suffolk IP9 2WF Tel No: 0845 5212096 Fax No: 0845 5212097 Email: mpconsultservice@aol.com Specialists in Acoustic Flooring and House to Flat

More information

June Residential Refurbishment Exposed soffit floors

June Residential Refurbishment Exposed soffit floors June 2010 Residential Refurbishment 3.4.2 Exposed soffit floors Residential refurbishment 3.0 Residential Refurbishment Exposed Soffit Floor Contents Introduction find online page Solution optimiser and

More information

June Residential Refurbishment Separating walls

June Residential Refurbishment Separating walls June 2010 Residential Refurbishment 3.6.1 Separating walls Residential refurbishment 3.0 Residential Refurbishment Separating Walls Contents Introduction find online page Solution optimiser and pathfinder

More information

Floating Floor Constructions

Floating Floor Constructions Floating Floor Constructions DESCRIPTION Floating floor UFH installations are generally achieved by laying pre-formed high density polystyrene onto either an existing floor system or a new construction.

More information

Loadbearing timber joist floors

Loadbearing timber joist floors C06 Floors and ceilings Internal and separating floor systems Timber joists are widely used within internal floor and separating floor construction, both in residential and coercial applications. Our range

More information

GypLyner. GypLyner. Metal framed wall lining system. All our systems are covered by SpecSure when using genuine Gyproc and Isover products.

GypLyner. GypLyner. Metal framed wall lining system. All our systems are covered by SpecSure when using genuine Gyproc and Isover products. GypLyner GypLyner Metal framed wall lining system All our systems are covered by SpecSure when using genuine Gyproc and Isover products Linings GypLyner GypLyner is a cost-effective, virtually independent

More information

SOUND INSULATION TESTING IN DWELLINGS

SOUND INSULATION TESTING IN DWELLINGS SOUND INSULATION TESTING IN DWELLINGS Chris Dilworth, AWN Consulting This Presentation Discusses the standards by which we judge sound insulation performance. Presents the results of sound insulation tests

More information

URSA MINERAL WOOL URSA Acoustic Roll

URSA MINERAL WOOL URSA Acoustic Roll - 073_Layout 1 02/10/2017 10:19 Page 1 URSA UK LTD Crest House 102-104 Church Road Teddington, Middlesex TW11 8PY United Kingdom Tel : 020 8977 96 97 Fax : 020 8977 94 56 Web : www.ursa-uk.co.uk E-mail

More information

An introduction to Part L U-values

An introduction to Part L U-values December 2010 An introduction to Part L This document provides a wide selection of building fabric constructions with their associated. It has been produced a support to our publication An introduction

More information

GypLyner UNIVERSAL Metal framed wall lining system

GypLyner UNIVERSAL Metal framed wall lining system Metal framed wall lining system! This section includes updated information, added since it was first published in July 009. Please see the WHITE BOOK update document for details. Last updated 0/0/00 Cadbury

More information

GypLyner UNIVERSAL Metal framed wall lining system

GypLyner UNIVERSAL Metal framed wall lining system Metal framed wall lining system Pizza Express, York 30 Metal framed wall lining system wall lining system is a cost-effective, virtually independent metal frame drylining. It is a general purpose system

More information

The extra strong, extra durable, sound resistant system that you can direct fix to

The extra strong, extra durable, sound resistant system that you can direct fix to C0 Partitions The extra strong, extra durable, sound resistant system that you can direct fix to All our systems are covered by SpecSure when using genuine Gyproc and Isover products gyproc.ie Utilising

More information

C05. S03. P02 P08 FireWall

C05. S03. P02 P08 FireWall ! This section includes updated information, added since it was first published in December 2015. Last updated 16/12/2016 C05. S03. P02 P08 Including C05. S01. P02 Specialist partitions introduction C05

More information

F L O O R S A N D C E I L I N G S

F L O O R S A N D C E I L I N G S INTRODUCTION Contents Performance Tables 163 Lafarge plasterboard direct to timber ceilings 179 Cormet Dryliner to timber joist floors 187 Cormet Dryliner to concrete floors 193 Cormet Suspended Metal

More information

C04. S05. P02 P14 GypWall quiet sf

C04. S05. P02 P14 GypWall quiet sf ! This section includes updated information, added since it was first published in December 0. Last updated 0//07 C0. S0. P0 P Including C0. S0. P0 P8 Partitions introduction C0 Partitions Single frame

More information

This page was. intentionally. left blank

This page was. intentionally. left blank CONSTRUCTION Measurement of Airborne Sound Insulation of 8 Wall Assemblies Measurement of Airborne and Impact Sound Insulation of 29 Floor Assemblies Nordic Engineered Wood Report No. A1-006070.10 July

More information

Staggered stud acoustic partition system

Staggered stud acoustic partition system C0 Partitions Staggered stud acoustic partition system All our systems are covered by SpecSure when using genuine Gyproc and Isover products is a non-loadbearing stud partition incorporating a single framework

More information

Part E robustdetails. robustdetails. April 2017 Update Pack. Dear Colleague,

Part E robustdetails. robustdetails. April 2017 Update Pack. Dear Colleague, Part E Pack Dear Colleague, Following on from the two new Details already issued this year, this update sees the URSA PARTY WALL ROLL added as a further option in the cavity masonry wall E-WM-22. This

More information

Xtratherm Thin-R Thermal Liner (XT/TL Grade)

Xtratherm Thin-R Thermal Liner (XT/TL Grade) CERTIFICATE NO. 03/0183 DETAIL SHEET 4 Xtratherm Thin-R Thermal Liner (XT/TL Grade) PRODUCT DESCRIPTION: This Detail Sheet relates to Xtratherm Thin-R Thermal Liner, as defined in NSAI Agrément Certificate

More information

Thermal Laminate Board.

Thermal Laminate Board. Thermal Laminate Board www.speedlinedrywall.co.uk The Dry Lining and Thermal Insulation Solution The Dry Lining and Thermal Insulation Solution Around a third of all heat lost within un-insulated or poorly

More information

Acoustic Detailing For Steel Construction

Acoustic Detailing For Steel Construction SCI PUBLICATION P372 Acoustic Detailing For Steel Construction A G J Way MEng CEng MICE G H Couchman MA PhD CEng MICE Published by: The Steel Construction Institute Silwood Park Ascot Berkshire SL5 7QN

More information

The Passive Fire Protection Handbook

The Passive Fire Protection Handbook The Passive Fire Protection Handbook The UK s comprehensive guide to passive fire protection Chapter Ceilings, Floors and Roofs AUGUST 0 The Passive Fire Protection Handbook Contents Chapter : Introduction

More information

MONARFLOOR ACOUSTIC SYSTEMS MONAFLOOR 9, 18 AND 22 ACOUSTIC DECK SYSTEMS

MONARFLOOR ACOUSTIC SYSTEMS MONAFLOOR 9, 18 AND 22 ACOUSTIC DECK SYSTEMS Icopal Ltd Barton Dock Road Stretford Manchester M32 0YL Tel: 0161-854 4444 Fax: 0161-864 2616 e-mail: acoustics.technical.uk@icopal.com website: www.monarfloor.co.uk APPROVAL INSPECTION TESTING CERTIFICATION

More information

SECTION D Masonry Wall Systems. Contents. Introduction. Design Considerations. Installation. Components. System Specifications.

SECTION D Masonry Wall Systems. Contents. Introduction. Design Considerations. Installation. Components. System Specifications. SECTION D Wall Systems. Contents. SUBJECT Introduction Design Considerations Installation Components PAGE D2 D2 D4 D5 System Specifications Stud One Side Stud Both Sides Stud and Furring Channel Resilient

More information

Floors Walls Roofs. Jabfloor Premium board Jablite Premium board Jabfloor board Jablite board. APPLICATION: Basements PRODUCTS: Vencel Resil Limited

Floors Walls Roofs. Jabfloor Premium board Jablite Premium board Jabfloor board Jablite board. APPLICATION: Basements PRODUCTS: Vencel Resil Limited Floors Walls Roofs APPLICATION: Basements PRODUCTS: Jabfloor Premium board Jablite Premium board Jabfloor board Jablite board Vencel Resil Limited Head Office: Infinity House, Anderson Way, Belvedere,

More information

URSA MINERAL WOOL URSA Timber Frame Roll & URSA Timber Frame Slab

URSA MINERAL WOOL URSA Timber Frame Roll & URSA Timber Frame Slab URSA TF Roll (Tim & Met) - 073_Layout 1 02/10/2017 10:21 Page 1 URSA UK LTD Crest House 102-104 Church Road Teddington, Middlesex TW11 8PY United Kingdom Tel : 020 8977 96 97 Fax : 020 8977 94 56 Web :

More information

Floors Walls Roofs. Jabroll. APPLICATION: Flat and Curved Roofs PRODUCTS: Vencel Resil Limited

Floors Walls Roofs. Jabroll. APPLICATION: Flat and Curved Roofs PRODUCTS: Vencel Resil Limited Floors Walls Roofs Flat and Curved Roofs PRODUCTS: Vencel Resil Limited Head Office: Infinity House, Anderson Way, Belvedere, Kent DA17 6BG Tel: 020 8320 9100 Fax: 020 8320 9110 Technical Services: Tel:

More information

June Non - Residential Refurbishment Internal lining walls

June Non - Residential Refurbishment Internal lining walls June 2010 Non - Residential Refurbishment 5.3.4 Internal lining walls Non-residential refurbishment 5.0 Non-residential Refurbishment Internal Lining Walls Contents Introduction find online page Solution

More information

Section 11 FIRE STOPPING

Section 11 FIRE STOPPING Section 11 This section highlights the key points relating to Fire Stopping. It is imperative that sites teams understand the importance of fire stopping and check it is completed correctly. It is to be

More information

Bavaria. PowerFloor. PhoneStar. SYSTEM SOLUT ions FOR TIMBER FRAME HOUSES AND REFURBISHMENTS DRY SCREED UNDERFLOOR HEATING SOUND INSULATION

Bavaria. PowerFloor. PhoneStar. SYSTEM SOLUT ions FOR TIMBER FRAME HOUSES AND REFURBISHMENTS DRY SCREED UNDERFLOOR HEATING SOUND INSULATION Bavaria PhoneStar PowerFloor SYSTEM SOLUT ions FOR TIMBER FRAME HOUSES AND REFURBISHMENTS DRY SCREED UNDERFLOOR HEATING SOUND INSULATION Index Sound insulation in timber frame houses 3 Modern dry screed

More information

TILING SPECIFICATIONS

TILING SPECIFICATIONS TILING SPECIFICATIONS SPECIFICATION NUMBER: NR204-16 PREPARED BY: Mike Cubley PREPARED FOR: Porcelain Plus ATTENTION: Kirk Pollock INSTALLATION: 712 Turner Floor and Wall Tiling Specification. M40 STONE/

More information

The ultimate free-flowing floor screed

The ultimate free-flowing floor screed The ultimate free-flowing floor screed READYMIX CONCRETE It s a common problem; time is short yet the project requirements are long. You need a flooring solution that is both fast and flexible, one that

More information

GenieMat FF. Floating Floor Systems for Airborne & Impact Sound and Vibration Isolation. It s not magic, it s engineering. Impact Sound Control

GenieMat FF. Floating Floor Systems for Airborne & Impact Sound and Vibration Isolation. It s not magic, it s engineering. Impact Sound Control It s not magic, it s engineering. Impact Sound Control GenieMat FF Floating Floor Systems for Airborne & Impact Sound and Vibration Isolation Patents: US 8240430, US8556029, CA 2500956, CA 2503420 GenieMat

More information

BBA 001 Documents included under the scope of BBA s ISO UKAS accreditation

BBA 001 Documents included under the scope of BBA s ISO UKAS accreditation BBA 001 Documents included under the scope of BBA s ISO 17065 UKAS accreditation Product Standard Building Systems and Kits BBA Technical Specification 001 Ceiling Products BBA Technical Specification

More information

EcoHome-Insulation.com. Aluminium Foil Bubble Insulation. General Purpose Insulation. Dry Lining. Cavity Wall. Insulation System.

EcoHome-Insulation.com. Aluminium Foil Bubble Insulation. General Purpose Insulation. Dry Lining. Cavity Wall. Insulation System. Suspended Timber Floor Applications Can be used with Floorboards or Tongue & Groove floor paneling Aluminium Foil Bubble Insulation Joist end Fitting General Purpose Insulation Dry Lining Insulation System

More information

CI/SfB (23) Suspended Timber Floor Applications Can be used with Floorboards or Tongue & Groove floor paneling Joist end Fitting Aluminium Foil Bubble Insulation General Purpose Insulation Dry Lining Insulation

More information

June Residential Refurbishment Basements

June Residential Refurbishment Basements June 2010 Residential Refurbishment 3.5.1 Basements Residential refurbishment 3.0 Residential Refurbishment Basements Contents Introduction find online page Solution optimiser and pathfinder 293 Design

More information

Part E robustdetails. robustdetails. September 2017 Update Pack. Dear Colleague,

Part E robustdetails. robustdetails. September 2017 Update Pack. Dear Colleague, Part E Pack Dear Colleague, 207 has been very busy for us, with this one being the fifth update to the Handbook in one year the first time this has ever happened. In this update pack, we are pleased to

More information

OS Thermal System Installation Guide

OS Thermal System Installation Guide OS Thermal System Installation Guide cube6.co.uk 2 A thermal resistance many times greater than aerated concrete blocks It s more than just insulation CUBE6 Oversheet Thermal Floor System (OS) is the innovative,

More information

Suspended Timber Floor Applications Can be used with Floorboards or Tongue & Groove floor paneling Aluminium Foil Bubble Insulation Joist end Fitting General Purpose Insulation Dry Lining Insulation System

More information

SINTEF Building and Infrastructure confirms that. Separating floors with Hunton Silencio 36 / Hunton Silencio Thermo

SINTEF Building and Infrastructure confirms that. Separating floors with Hunton Silencio 36 / Hunton Silencio Thermo SINTEF Certification No. 2330 Issued t: 18.02.2002 Revised: 17.06.2013 Valid until: 01.07.2018 Page: 1 of 5 SINTEF Building and Infrastructure confirms that Separating floors with Hunton Silencio 36 /

More information

FIRESTOP JOINT SPRAY CFS-SP WB. 2mm (0.079") WET FILM ± 7.5 ± 5

FIRESTOP JOINT SPRAY CFS-SP WB. 2mm (0.079) WET FILM ± 7.5 ± 5 Design No. CEJ 27 P (HI/JS 20-05) Table. CONCRETE FLOOR ASSEMBLY: Max. two-hour rated concrete floor assembly made from either lightweight or normal weight concrete with a density of 00-50 pcf, with a

More information

SoundPro CDM-ISO-LAT. Acoustic solution for floating isolated floors

SoundPro CDM-ISO-LAT. Acoustic solution for floating isolated floors Jun 21 WILHAMS INSULATION FAR EAST SDN BHD SoundPro Acoustic solution for floating isolated floors Battens are designed to optimise sound insulation and impact isolation of floor constructions. They are

More information

Cavity fire barriers. Cavity fire barriers. Fire separation within concealed spaces. C06 Floors and ceilings

Cavity fire barriers. Cavity fire barriers. Fire separation within concealed spaces. C06 Floors and ceilings Fire separation within concealed spaces Regulatory requirements demand that cavities and concealed spaces, in the structure or fabric of a building, are sub-divided or sealed by means of cavity barriers

More information

BEAM & BLOCK SYSTEM. 108mm. 175mm Deep (160mm) Wide Beam. 160mm

BEAM & BLOCK SYSTEM. 108mm. 175mm Deep (160mm) Wide Beam. 160mm RH F RACKHAM HOUSEFLOORS BEAM & BLOCK SYSTEM BEAM & BLOCK SYSTEM 1. THE BEAMS 60mm 108mm 90mm 75mm 75mm 100mm 175mm 100mm 175mm 125mm 100mm 175mm Deep Beam 175mm Deep (160mm) Wide Beam 225mm Deep Beam

More information

June Residential New Build Timber Frame Walls

June Residential New Build Timber Frame Walls June 2010 Residential New Build 2.5.2 Timber Frame Walls Residential new build 2.0 Residential New Build Timber Frame Walls Contents Introduction find online page Solution optimiser and pathfinder 186

More information

Benefits.

Benefits. PARTITIONING Systems Stud & Track An economical friction-fit system to assemble frames for strong, compact, lightweight non load-bearing partitions. The metal stud partitioning is ideal for use in domestic

More information

T-Barrier System. Masonry Applications. Satisfying Fire, Thermal and Acoustic Requirements at the Combined Party Wall and Pitched Roof Junction

T-Barrier System. Masonry Applications. Satisfying Fire, Thermal and Acoustic Requirements at the Combined Party Wall and Pitched Roof Junction T-Barrier System Masonry Applications Satisfying Fire, Thermal and Acoustic Requirements at the Combined Party Wall and Pitched Roof Junction The Problem: Thermal Bypass Without effective edge sealing,

More information

CERTIFICATE OF APPROVAL No CF 517 FSI LIMITED

CERTIFICATE OF APPROVAL No CF 517 FSI LIMITED CERTIFICATE OF APPROVAL No CF 517 This is to certify that, in accordance with TS00 General Requirements for Certification of Fire Protection Products The undermentioned products of Westminster Industrial

More information

CasoLine MF Concealed grid MF suspended ceiling system

CasoLine MF Concealed grid MF suspended ceiling system Concealed grid MF suspended ceiling system! This section includes updated information, added since it was first published in July 009. Please see the WHITE BOOK update document for details. Last updated

More information

Section Sound Control

Section Sound Control Ministry of Municipal Affairs PROPOSED CHANGE TO THE 2012 BUILDING CODE O. REG. 332/12 AS AMENDED CHANGE NUMBER: SOURCE: B-09-11-01 Ontario-NBC CODE REFERENCE: Division B / 9.11. DESCRIPTION OF THE PROPOSED

More information

Tiling Tiling Finishes C08

Tiling Tiling Finishes C08 C08 Finishes In rooms subject to high or intermittent moisture conditions, the range of boards available for tiling offers flexibility of design and peace of mind when installed in both wall linings, lightweight

More information

Separating walls. Countryside Properties, Lock 38, Stoke-on-Trent

Separating walls. Countryside Properties, Lock 38, Stoke-on-Trent Separating walls Countryside Properties, ock 8, Stoke-on-Trent Separating Masonry walls Walls Separating Masonry wallswalls Approved Document E 200 Clause E Approved Document 200 - Requirements Walls >>

More information

Construction Technology Revision Guide

Construction Technology Revision Guide Construction Technology Revision Guide Sub structures and Super structures Super structure (Wall, floors roof) Sub structure (Foundations) 2 Thermal Insulation Thermal insulation helps to prevent heat

More information

CasoLine MF Concealed grid MF suspended ceiling system

CasoLine MF Concealed grid MF suspended ceiling system Concealed grid MF suspended ceiling system! This section includes updated information, added since it was first published in July 009. Please see the WHITE BOOK update document for details. Last updated

More information

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing Schluter -KERDI-BOARD The universal substrate for tiles Flat. Level. Plumb. Square. No matter the quality, cost, or extravagance of

More information

Civil Engineering Construction Chapter 5

Civil Engineering Construction Chapter 5 Civil Engineering Construction Chapter 5 Introduction to Floor Dr Mohamad Syazli Fathi Department of Civil Engineering UTM RAZAK School of Engineering & Advanced Technology UTM International Campus August

More information

Dow Building Solutions Insulating lightweight inverted roofs with STYROFOAM Solutions

Dow Building Solutions Insulating lightweight inverted roofs with STYROFOAM Solutions Dow Building Solutions Insulating lightweight inverted roofs with STYROFOAM Solutions Design considerations Introduction Lightweight inverted roofs are suitable for use with a wide range of waterproofing

More information

Tehnical Data Sheet Astro Intu Mastic. UIC of product-type: INTUM CPR-JA5015

Tehnical Data Sheet Astro Intu Mastic. UIC of product-type: INTUM CPR-JA5015 1121 Astroflame Fireseals Ltd Unit 8 The I O Centre 14 1121-CPR-JA5015 ETA-14/0049 ETA-14/0050 ETAG 026-Part 1 ETAG 026-Part 2 ETAG 026-Part 3 MASTIC see ETA-14/0049 & ETA- 14/0050 for relevant characteristics

More information

THERMAL LAMINATES. for roofs, walls, floors and soffits

THERMAL LAMINATES. for roofs, walls, floors and soffits THERMAL LAMINATES for roofs, walls, floors and soffits THERMAL INSULATION CONDENSATION CONTROL GROUND GAS PROTECTION ACOUSTIC FLOOR SOLUTIONS TIMBER CLADDING THE KNOWLEDGE TO PRODUCE SOLUTIONS The Problem

More information

energy saving for the future

energy saving for the future CI/SfB (.) Rn (M) July 00 energy saving for the future Polyisocyanurate insulation board Introduction Ballytherm Insulation This brochure describes the use of Ballytherm Polyisocyanurate insulation to

More information

Ceiling Attenuation Class Systems SYSTEMS 280

Ceiling Attenuation Class Systems SYSTEMS 280 SYSTEMS 280 Ceiling Attenuation Class Ceiling Attenuation Class (CAC) ceiling systems display resistance to sound passing up and over a wall. The sound insulation rating given for the ceiling system indicates

More information

Acoustic Testing of CLT and Glulam Floor Assemblies Nordic Engineered Wood Report No. A August 2016 CONSTRUCTION

Acoustic Testing of CLT and Glulam Floor Assemblies Nordic Engineered Wood Report No. A August 2016 CONSTRUCTION CONSTRUCTION Acoustic Testing of CLT and Glulam Floor Assemblies Nordic Engineered Wood Report No. A1-008253.1 19 August 2016 The results in this report only apply to the specimen that was tested Page

More information

Day Night Day Night Day Night Residential site and amphitheatre Green Non residential site boundary Red

Day Night Day Night Day Night Residential site and amphitheatre Green Non residential site boundary Red Plant Areas External plant must meet the following noise suppression requirement as adopted by the Landlord: 1. Air handling units 45db measured at 3metres from source. 2. Heat rejection plant 45db measured

More information

Floors Walls Roofs. Jablite Premium board Jablite board. APPLICATION: Internally Lined Pitched Roof PRODUCTS: Vencel Resil Limited

Floors Walls Roofs. Jablite Premium board Jablite board. APPLICATION: Internally Lined Pitched Roof PRODUCTS: Vencel Resil Limited Floors Walls Roofs APPLICATION: Internally Lined Pitched Roof PRODUCTS: Jablite Premium board Jablite board Vencel Resil Limited Head Office: Infinity House, Anderson Way, Belvedere, Kent DA17 6BG Tel:

More information

SUBSTRATES FOR WOOD FLOOR SETTING

SUBSTRATES FOR WOOD FLOOR SETTING SUBSTRATES FOR WOOD FLOOR SETTING UNDER- & SUBFLOORS FROM CONCRETE TO SCREEDS First: Concrete Slab Typical thickness: 20 cm (housing) Long drying times required (months) Shrinking during whole drying period

More information

FIRE PROTECTION AND PERFORMANCE DRY LINING BOARD THE ULTIMATE IN FIRE PROTECTION! 91 mins fire integrity and 86 mins fire insulation on 9mm board

FIRE PROTECTION AND PERFORMANCE DRY LINING BOARD THE ULTIMATE IN FIRE PROTECTION! 91 mins fire integrity and 86 mins fire insulation on 9mm board THE ULTIMATE IN FIRE PROTECTION! 91 mins fire integrity and 86 mins fire insulation on 9mm board + Euroclass A1 Non-combustible FIRE PROTECTION AND PERFORMANCE DRY LINING BOARD Magply Fire PASSIVE FIRE

More information

SECTION E Ceiling Systems. Contents. Introduction. Design Considerations. Installation. Components. System Specifications. Floor/Ceiling Systems

SECTION E Ceiling Systems. Contents. Introduction. Design Considerations. Installation. Components. System Specifications. Floor/Ceiling Systems SECTION E Ceiling Systems. Contents. SUBJECT Introduction Design Considerations Installation Components PAGE E2 E2 E4 E4 System Specifications Floor/Ceiling Systems Roof/Ceiling Systems E6 E12 Floor or

More information

TW50. Insulation STANDARD DETAILS FOR 50 MM INSULATION BOARD IN A 100 MM CAVITY. Low Energy Low Carbon Buildings. Wall lining. Inner leaf blockwork

TW50. Insulation STANDARD DETAILS FOR 50 MM INSULATION BOARD IN A 100 MM CAVITY. Low Energy Low Carbon Buildings. Wall lining. Inner leaf blockwork Insulation CI/SfB (21.9) Rn7 M2 First Issue May 2017 e with retaining clip TW50 STANDARD DETAILS FOR 50 MM INSULATION BOARD IN A 100 MM CAVITY 25 mm / 50 mm residual cavity Kingspan Thermawall TW50 Outer

More information

URSA MINERAL WOOL URSA Cavity Batts

URSA MINERAL WOOL URSA Cavity Batts s 073_Layout 1 02/10/2017 10:18 Page 1 UK LTD Crest House 102-104 Church Road Teddington, Middlesex TW11 8PY United Kingdom Tel : 020 8977 96 97 Fax : 020 8977 94 56 Web : www.ursa-uk.co.uk E-mail : ursauk@ursa.com

More information

External Steel Stud and Top Hat Walls. Details SYSTEMS 176 NON-FIRE RATED SYSTEMS 176 FIRE RATED SYSTEMS 178 BRICK VENEER SYSTEMS 183 INSTALLATION 185

External Steel Stud and Top Hat Walls. Details SYSTEMS 176 NON-FIRE RATED SYSTEMS 176 FIRE RATED SYSTEMS 178 BRICK VENEER SYSTEMS 183 INSTALLATION 185 Details SYSTEMS 176 NON-FIRE RATED SYSTEMS 176 FIRE RATED SYSTEMS 178 BRICK VENEER SYSTEMS 183 INSTALLATION 185 GENERAL REQUIREMENTS 185 FRAMING 185 PLASTERBOARD LAYOUT 189 PLASTERBOARD FIXING 190 EXTERIOR

More information

PLYWOOD FLOATING FLOOR

PLYWOOD FLOATING FLOOR PLYWOOD FLOATING FLOOR Read First These suggestions represent generally accepted procedures for successful installation of Enka Building Products. These instructions may be followed, modified, or rejected

More information

Aircrete blocks product guide

Aircrete blocks product guide Hanson Building Products Aircrete blocks Customer Services: T: 08705 626500 F: 08705 626550 E: thermalitesales@hanson.com W: www.hanson.com/uk/thermalite Hanson Building Products 6 Pembroke Road Sevenoaks

More information

Structural Products. Multideck 50-V3 Galvanised Steel Floor Decking System

Structural Products. Multideck 50-V3 Galvanised Steel Floor Decking System Structural Products & Systems Multideck Multideck 50-V3 Galvanised Steel Floor Decking System Meadowhall Extension, Sheffield UK. Image courtesy of MSW (UK) Ltd. 2 Introduction Structural Products & Systems,

More information

C05. S02. P02 P30 ShaftWall

C05. S02. P02 P30 ShaftWall ! This section includes updated information, added since it was first published in December 0. Last updated 0//0 C0. S0. P0 P0 Including C0. S0. P0 Specialist partitions introduction C0 Specialist partitions

More information

04 ENCLOSURE 0472p CSR BRADFORD in acoustic insulation

04 ENCLOSURE 0472p CSR BRADFORD in acoustic insulation 0472P CSR BRADFORD IN ACOUSTIC INSULATION Branded worksection This branded worksection Template has been developed by NATSPEC in conjunction with CSR Bradford and may be used whilst the Product Partner

More information

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes System Components.

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes System Components. 84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes 90 System Components installation/ SYSTEM COMPONENTS INSTALLATION ADVICE LAPPING and JOINTING

More information

DIVISION: FINISHES SECTION: ACOUSTIC TREATMENT REPORT HOLDER: ECORE INTERNATIONAL, INC.

DIVISION: FINISHES SECTION: ACOUSTIC TREATMENT REPORT HOLDER: ECORE INTERNATIONAL, INC. 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 1522 Reissued 09/2016 This report is subject to renewal 09/2018. DIVISION: 09 00

More information

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs November 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements....................................

More information

HOLLOW CORE FLOORS SPEED AND STRENGTH

HOLLOW CORE FLOORS SPEED AND STRENGTH HOLLOW CORE FLOORS SPEED AND STRENGTH CONTENTS 2 3 4 5 7 8 9 10 12 13 14 INTRODUCTION PRECAST CONCRETE FLOORS T HE A DVANTAGES BISON HOLLOW CORE FLOORS BEARINGS FALSE CEILINGS AND SOFFIT FIXINGS BISON

More information

Technical Data Sheet. Astro HPE Sealant. UIC of product-type: AFHPE

Technical Data Sheet. Astro HPE Sealant. UIC of product-type: AFHPE Technical Data Sheet Astro HPE Sealant UIC of product-type: AFHPE Revision 2 - July 2016 Astroflame (Fireseals) LTD : Unit 8, I.O Centre Stephenson Road : Segensworth : Fareham : PO15 5RU Tel - 01329 844500

More information

1. The subfloor must be structurally sound and able to withstand live and dead loads with a deflection limitation of L/360.

1. The subfloor must be structurally sound and able to withstand live and dead loads with a deflection limitation of L/360. HARDWOOD FLOOR Read First These suggestions represent generally accepted procedures for successful installation of Maxxon Products. These instructions may be followed, modified or rejected by the owner,

More information

BISON PRECAST FLOORING SPECIFICATION

BISON PRECAST FLOORING SPECIFICATION BISON PRECAST FLOORING SPECIFICATION 1.0 SCOPE OF THE SPECIFICATION 1.01 Relates to: This specification covers the design, manufacture and associated site work of the following types of floors:- Hollowcore

More information

FIRESTOP AND FIRE PROTECTION

FIRESTOP AND FIRE PROTECTION FIRESTOP AND FIRE PROTECTION 170 Firestop Sealants, Sprays High-performance intumescent firestop sealant FS-ONE MAX Page 172 Flexible firestop sealant CP 606 Page 172 Elastomeric silicone sealant CP 601S

More information

Promat PROMASEAL Fire Barrier

Promat PROMASEAL Fire Barrier Promat PROMASEAL Fire Barrier PRODUCT DESCRIPTION Promat PROMASEAL Fire Barriers are slabs of high density rock wool with a white endothermic, ablative coating. APPLICATION Promat PROMASEAL Fire Barriers

More information

Thermablok Aerogel Isolation Strips Thermablok Aerogel Isolation Strips

Thermablok Aerogel Isolation Strips Thermablok Aerogel Isolation Strips Uniclass 68152 Ultra Thin Internal Solid Wall, Ceiling & Floor Insulation Systems for New Build & Refurbishment Unique insulation with the lowest Thermal Conductivity of any insulation product 0.014W/m²K.

More information

HP Partial Fill. Robust, long-lasting protection

HP Partial Fill. Robust, long-lasting protection 1 CONSTRUCTION TYPE: cavity walls HP Partial Fill Cavity Walls Robust, long-lasting protection HP Partial Fill slabs have a robust outer surface, designed to withstand on-site rigours and maintain a clearly

More information