User Manual. IWB Internally Wired Bar. Version 12/10.

Size: px
Start display at page:

Download "User Manual. IWB Internally Wired Bar. Version 12/10."

Transcription

1 User Manual IWB Internally Wired Bar Version 12/10

2 Purpose Purpose Title To support and power items of equipment used within the entertainment industry (TV, Film, and Theatre) such as specialist luminaires, fog machines, audio equipment etc. Cautions 1. IWBs ARE FOR INDOOR USE ONLY 2. Fixings should only be made to a safe structure, using proprietary products and should never be further than 2m apart. 3. This product should be installed by competent persons only, and in such a way as to conform to any local regulations which may prevail. 4. The Safe Working Load must be adhered to: 39Kg per linear meter evenly distributed or 19.5Kg point load, between any two fixing points at 2m spacing grater loads are acceptable with closer fixings, see BS for further information. 5. This product MUST be adequately earthed and the socket outlets must be protected with a protective over current device, e.g. RCD, fuse, etc. 6. It is the responsibility of the installer to ensure the product and the cabling it is connected to meets or exceeds the electrical safety standards which prevail in the territory in which it is fitted. 7. The product should be installed/rigged in such a way as to ensure it is secure and not likely to be a safety hazard. 8. Ensure no flammable items are placed close to or over the bar or any equipment rigged from it; particular cautions should be exercised when using drapes. 9. Ensure the weight load is evenly distributed along the length of the IWB. 10. An inspection of the bar, associated rigging and electrical connections should be regularly made by a suitably qualified person. 11. Maximum current rating must not be exceeded under any circumstance: NUMBER OF OUTLETS OVERALL MAXIMUM CURRENT 3 45Amps 4+ 60Amps See rating plate for further details. 12. Electrical phases not to be mixed on IWBs Single Phase only - Do Not Cross Patch. 13. Caution should be exercised in relation to working at height, risk of electric shock and any other factors which may present a hazard. 14. Items connected to this equipment should be firmly secured by appropriately rated proprietary clamps and always protected by a secondary safety bond with a suitable safe working load. 15. Items should not be plugged or unplugged while the power is connected. 16. Disconnection of Mains power may take place remotely from the bar and may be via the buildings electrical infrastructure ensure you know where this is, how it is operated and that it can not be inadvertently re-connected while you are Rigging. 17. Ensure the rigging clamp is fully tightened to the IWB and the item being rigged. 18. Ensure that if extension leads are used from other bars these are on the same phase as the IWB.

3 Installation Installation 1. Fixing type will depend upon building structure but should always be secure and adequately specified to take the weight of the bar as well as any load to be placed on it, consider allowing a safety factor. The safe working load of the bar will be dependent upon its fixings and the structure they are attached to, if in doubt consult a structural engineer, Doughty Engineering Ltd will not accept responsibility for ascertaining the safe working load of its products that are dependant upon factors outside of its control. 2. Doughty Engineering Ltd recommends the bar is rigged using M12 threaded rod or quality wire rope and associated fittings. Various primary fixing methods are available dependant upon the structure being fitted to. 3. Ensure safety issues are observed and risk assessment/method statements are undertaken. KNOW THE RISKS 4. Fixings should be arranged to equally distribute the load along the bar and superstructure. 5. Lay the bar out to check fixing positions and orientation of sockets etc. 6. If the Bar is made in two sections, take care not to damage internal cable when securing the joiner. Ensure the Joiner M6 earthing screw is tightened through the Bar Joiner and into the tapped receiver in the adjoining Bar. This will serve to earth Bar Joiner and to locate the adjoining Bar in the Bar Joiner. Ensure that both sections of bar are close together and that the tube joiner is centered across the two bars, thus fixing to equal lengths of tube. 7. When drilling the cable entry point in the termination box, take care to ensure the electrical components and cable insulation are not damaged by the hole-saw, hot swarf, etc. 8. Fixings should be between 1.5 and 2.0 meters apart, if necessary add additional fixings to ensure compliance. See Figure 1 below. 9. Fit primary fixings to building structure in accordance with manufacturer s instructions. If using a chemical anchor ensures that it has fully cured before applying a load, ensure any bolts or nuts are tightened to require torque setting. 10. Load test fixing points to ensure they are capable of taking the specified load - including safety factor. 11. Attach threaded rod or Wire rope to primary fixing point, fit universal clamps or wire rope hanging clamps as appropriate and tighten. 12. The bar should now be lifted into place and offered to the fixings, if possible temporarily tie the bar off whilst fixings are fitted around the aluminium tubing. 13. Do not slide or twist bar through clamps as this may damage the finish. 14. If applicable bring the cable into the termination box via the hole and appropriate gland and terminate in accordance with local wiring or electrical regulations, taking care to ensure the bar is Earthed. 15. Perform appropriate Electrical and load Tests Ensure Earth Bolt Is Fully Tightened Ino Adjoining Bar EARTH DO NOT REMOVE

4 Service & Maintenance Title The bar should be inspected by appropriately qualified personnel for both electrical and mechanical integrity at least once a year, more frequently if local regulations require. Before a load test, all fixing fasteners should be checked to ensure they are free from damage and are tight. Load tests should be carried out under the constraints of any local regulations which prevail, e.g. Lifting Operations and Lifting Equipment Regulations 1998 in the UK. The bar should be kept dry and free from excessive dust build up disconnect from mains and clean with a dry cloth or brush do not use water or solvents. Sockets and covers should not be interfered with by unqualified personnel. If the bar requires replacement parts or servicing please contact Doughty Engineering Ltd for the details of an approved service agent. If the IWB requires dismantling and folding (7 meters or greater) e.g. If re locating, ensure any exposed cables are adequately protected.

5 Illustrations Fixings should be no further than 2m apart, this provides Max UDL = 39 Kg between any two fixings Max point load = 19.5 Kg in any meter see Cautions on Page 2.

6 Declaration of Conformity Title Doughty Engineering Limited CROW ARCH LANE, RINGWOOD, HANTS, BH24 1NZ. ENGLAND Telephone: +44 (0) Fax: +44 (0) EC DECLARATION OF CONFORMITY Doughty Engineering Limited hereby certify that the equipment stated below has been designed to comply with all relevant sections of the specifications referenced below and complies with all the applicable Essential Requirements of the EC Directives and amendments and the National Laws and Regulations adopting these Directives. Description: Lighting Bar Model/s: All Doughty Engineering IWB s within the parameters shown in the table below 15a Outlets 1.5 to 12 metres 3 to 12 mains sockets With or Without Data Sockets Silver or Black 16a Outlets 1.5 to 12 metres 3 to 12 mains sockets With or Without Data Sockets Silver or Black 15a & 16a Outlets 1.5 to 12 metres 3 to 12 mains sockets With or Without Data Sockets Silver or Black are in conformity with the provision of the following EC Directives: 2006/95EC: Low Voltage Directive - as implemented into English Law under Statutory Instrument 1994 No The Electrical (Safety) Regulations Harmonised Standards applied: BS EN 60059: Electric Current, Rated Current, Electrical equipment, Electrical power systems, measuring instruments, electronically operated devices. EN 69965: Audio, Video and similar electronic apparatus - Safety Requirements BS EN : Section 3 - Ratings. National Technical Standards & Specifications applied: BS EN ISO 9001:1994 Signed: Date: Name: Nigel Curtis Position: Technical Director Being the responsible person appointed by the manufacturer. DEQ 083 Rev 4 Company Registration No. London Registered Office: Crow Arch Lane, Ringwood, Hants, BH24 1NZ Directors: M.B.Lister. J.C.G. Chiverton. N.D. Curtis. S.C. Wright

7 Contact Doughty Engineering Ltd Crow Arch Lane Ringwood, Hampshire, BH24 1NZ Tel: +44 (0) Fax: +44 (0) Web: Note: Whilst every effort has been made to ensure that the information contained within this manual is correct, Doughty Engineering does not accept any liability for errors or omissions. Specifications and technical data are intended for guidance purposes only and may vary.

Z5033 E3 Ball joint adapter Mounting instructions

Z5033 E3 Ball joint adapter Mounting instructions Z5033 E3 Ball joint adapter Mounting instructions Z5033 E3 Ball joint adapter References in the manual This refers to a potentially dangerous situation which may lead to personal injury. This refers to

More information

Z5043 MAX Horizontal bracket Mounting instructions

Z5043 MAX Horizontal bracket Mounting instructions Z5043 MAX Horizontal bracket Mounting instructions Z5043 MAX Horizontal bracket References in the manual This refers to a potentially dangerous situation which may lead to personal injury. This refers

More information

Z5378 E6 Horizontal bracket Mounting instructions (1.0 EN)

Z5378 E6 Horizontal bracket Mounting instructions (1.0 EN) Z5378 E6 Horizontal bracket Mounting instructions (1.0 EN) Contents 1. Product description and scope of supply...3 2. Intended use...4 3. Safety precautions...4 4. Assembly...4 5. Maintenance and care...5

More information

Z5010 (Version 2) TV spigot with fixing plate Mounting instructions

Z5010 (Version 2) TV spigot with fixing plate Mounting instructions Z5010 (Version 2) TV spigot with fixing plate Mounting instructions Z5010 (Version 2) TV spigot with fixing plate References in the manual CAUTION! IMPORTANT! Symbols on the equipment This refers to a

More information

Installation & User Manual

Installation & User Manual Desktop UHF Radio Paging System Installation & User Manual Scope Communications UK Ltd, Quantum House, Steamer Quay, Totnes, Devon TQ9 5AL Tel: +44 1803 860700 Fax: +44 1803 863716 Email: sales@scope-uk.com

More information

Z5377 E6 Swivel bracket Mounting instructions (1.2 EN)

Z5377 E6 Swivel bracket Mounting instructions (1.2 EN) Z5377 E6 Swivel bracket Mounting instructions (1.2 EN) Contents 1. Product description and scope of supply...3 2. Intended use...3 3. Safety precautions...4 4. Assembly...4 5. Operation...4 6. Maintenance

More information

Installation, Inspection and Maintenance of Dry Type Transformers

Installation, Inspection and Maintenance of Dry Type Transformers Dry Type TX 1 of 8 Installation, Inspection and Maintenance of Dry Type Page 1 of 8 Dry Type TX 2 of 8 Table Of Contents Page Number 1. General... 3 2. Installation... 3 3. Safety Inspections... 4 4. Safety

More information

Aegis Heavy Capacity 20K Floor Scale. MODEL: 6200 Series. Installation Manual

Aegis Heavy Capacity 20K Floor Scale. MODEL: 6200 Series. Installation Manual Installation Manual Aegis Heavy Capacity 20K Floor Scale MODEL: 6200 Series Copyright 1997-2014 Fairbanks Scales, Inc. Revision 3 50637 All Rights Reserved 07/14 Aegis Heavy Capacity 20K Floor Scale Model:

More information

Z5352 E12 Flying bracket Mounting instructions (1.0 EN)

Z5352 E12 Flying bracket Mounting instructions (1.0 EN) Z5352 E12 Flying bracket Mounting instructions (1.0 EN) Contents 1. Product description and scope of supply...3 2. Intended use...3 3. Safety precautions...4 4. Assembly...4 5. Operation...4 6. Maintenance

More information

ELECTRONIC EARTHING EQUIPMENT SERIES GRD 4200

ELECTRONIC EARTHING EQUIPMENT SERIES GRD 4200 ELECTRONIC EARTHING EQUIPMENT SERIES GRD 4200 The GRD 4200 is an electronic earthing equipment for tankers during loading and unloading operations of flammable liquids in places with danger of explosion.

More information

SEMPEO SQA Unit Code FP3G 04 Forming and assembling electrical cable enclosure and support systems

SEMPEO SQA Unit Code FP3G 04 Forming and assembling electrical cable enclosure and support systems Forming and assembling electrical cable enclosure and support Overview This standard covers a broad range of basic competences that you need to form and assemble electrical cable enclosure and support

More information

Platform stair lift PLG7

Platform stair lift PLG7 Platform stair lift PLG7 ORIGINAL-user manual Part 2: Assembly Instruction English Version 2.00 ASCENDOR GMBH Drautendorf 48 4174 Niederwaldkirchen Austria Tel.: +43 7231 40040 Fax: +43 7231 40040-590

More information

Z5028 E3/Ci80 Horizontal bracket Mounting instructions

Z5028 E3/Ci80 Horizontal bracket Mounting instructions Z5028 E3/Ci80 Horizontal bracket Mounting instructions Z5028 E3/Ci80 Horizontal bracket References in the manual CAUTION! IMPORTANT! Symbols on the equipment This refers to a potentially dangerous situation

More information

2-Finger-Parallel-Gripper RH

2-Finger-Parallel-Gripper RH Translation of the original manual 2-Finger-Parallel-Gripper RH 901-940 Assembly and Operating Manual Superior Clamping and Gripping Imprint Imprint Copyright: This manual remains the copyrighted property

More information

Shackles. Applications. Range. Design. CAD drawings. Finish

Shackles. Applications. Range. Design. CAD drawings. Finish Applications Shackles are used in lifting and static systems as removable links to connect (steel) wire rope, chain and other fittings. Screw pin shackles are used mainly for non-permanent applications.

More information

SECURE. UNIVERSAL. MOUNTING. Tilt Kit Installation Manual

SECURE. UNIVERSAL. MOUNTING. Tilt Kit Installation Manual SECURE. UNIVERSAL. MOUNTING Tilt Kit Installation Manual 1.0 INTRODUCTION... 3 2.0 KITS / PRODUCT RANGE... 4 2.1 Leg Kits... 4 2.2 Rail Kits... 4 3.0 PREPARATION FOR INSTALLATION... 5 3.1 Applications...

More information

Protective Capony RTC-16

Protective Capony RTC-16 Protective Capony RTC-16 ASSEMBLY AND OPERATION MANUAL Protective Canopy RTC-16 Assembly and Operation Manual CONTENT: 1 APPLICATION...3 2 OPERATION CONDITIONS...3 3 TECHNICAL SPECIFICATIONS...3 4 DELIVERY

More information

Good Husband Brand Remote Lighting Lifter

Good Husband Brand Remote Lighting Lifter Good Husband Brand Remote Lighting Lifter National Patent Number:200520069085.5 200520075680.X 200520075677.8 200520075679.7 International Patent Number: PCT/CN2006/000409 Product Standard: Q/QABC002-2009

More information

NPS/001/024 Technical Specification for Low Voltage Aerial Bundled Conductor Fittings

NPS/001/024 Technical Specification for Low Voltage Aerial Bundled Conductor Fittings Version:- 5.0 Date of Issue:- July 2017 Page 1 of 12 NPS/001/024 Technical Specification for Low Voltage Aerial Bundled Conductor Fittings 1. Purpose The purpose of this document is to outline the technical

More information

Same As Client Address SPECIMEN. operational limitations. of the inspection and. agreed with):

Same As Client Address SPECIMEN. operational limitations. of the inspection and. agreed with): DOMESTIC ELECTRICAL INSTALLATION CONDITION REPORT Issued in accordance with British Standard BS 7671 - Requirements for Electrical Installations Certificate Reference: DEICR000021652 1 DETAILS OF THE CLIENT

More information

Safety Barrier Solutions

Safety Barrier Solutions S E P A R A T I N G P E O P L E F R O M H A Z A R D S Safety Barrier Solutions SOLUTIONS TO YOUR BARRIER NEEDS SIMPLE TO DESIGN AND SPECIFY UNRIVALLED TECHNICAL SUPPORT WORLDWIDE AVAILABILITY The Kee Safety

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

Allround Scaffolding. Layher Allround Bridging System Instructions for Assembly and Use. Modular truss system for wide spans

Allround Scaffolding. Layher Allround Bridging System Instructions for Assembly and Use. Modular truss system for wide spans Layher Allround Bridging System Instructions for Assembly and Use Modular truss system for wide spans Certification according to DIN ISO 9001/EN 29 001 by TÜV-CERT Allround Scaffolding } CONTENT 1. Introduction...3

More information

Adjustable Pallet Racking Installation Guide

Adjustable Pallet Racking Installation Guide Adjustable Pallet Racking Installation Guide Read this Guide thoroughly before commencing assembly and retain for future reference. Installation plans and design drawings should be strictly adhered to.

More information

2016 V1 SERAPHIM ECLIPSE PHOTOVOLTAIC MODULE JIANGSU SERAPHIM PHOTOVOLTAIC SYSTEM CO. LTD. ADDRESS: JIANGSU CITY OF CHANGZHOU PROVINCE WANG ZHEN HENG

2016 V1 SERAPHIM ECLIPSE PHOTOVOLTAIC MODULE JIANGSU SERAPHIM PHOTOVOLTAIC SYSTEM CO. LTD. ADDRESS: JIANGSU CITY OF CHANGZHOU PROVINCE WANG ZHEN HENG 016 V1 SERAPHIM ECLIPSE JIANGSU SERAPHIM PHOTOVOLTAIC SYSTEM CO. LTD. ADDRESS: JIANGSU CITY OF CHANGZHOU PROVINCE WANG ZHEN HENG ROAD NO. 1-. TELEPHONE: +86-519-8877608 FAX: +86-519-88786181 MAILBOX: info@seraphim-energy.com

More information

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466 BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein

More information

SCAFFOLDING RUNWAY SYSTEM

SCAFFOLDING RUNWAY SYSTEM SCAFFOLDING RUNWAY SYSTEM HANDBOOK 07/2017.3 i) Further information and detailed component information can be found in the: C1 Conveyor Systems Technical Catalogue. ii) Call or e-mail Niko Ltd for any

More information

CLIMA AGR. Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE

CLIMA AGR. Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE CLIMA AGR Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE Contents Safety First Safety Checklist Quantity Schedules Assembly and Dismantling Procedure Toe Boards

More information

INSTALLATION INSTRUCTIONS FOR ELECTRICAL CONTRACTORS

INSTALLATION INSTRUCTIONS FOR ELECTRICAL CONTRACTORS INSTALLATION INSTRUCTIONS FOR ELECTRICAL CONTRACTORS Rev. 1.5 1.10.13 Toll free (800) 288-6000 or www.hubbell-wiring.com P a g e 0 IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS WARNING- When using

More information

All panels can be supplied in a range of styles, to suit the applications pictured below.

All panels can be supplied in a range of styles, to suit the applications pictured below. Evolution Radiant panel system LPHW up to 90 C Suspended ceiling grid or soffit mounting Vertical wall surface mounting Standard widths 150mm to 900mm 1 Description Introduction Evolution by Dunham-Bush

More information

PART 7 Technical Specification for Overhead and Underground Service Connection works for the Year

PART 7 Technical Specification for Overhead and Underground Service Connection works for the Year PART 7 Technical Specification for Overhead and Underground Service Connection works for the Year 2016-17 Technical Specification for Overhead and Underground Service Connection works for the Year 2016-17

More information

FreeStyle Linear Drain with Full Mortar Bed Adapter Kit

FreeStyle Linear Drain with Full Mortar Bed Adapter Kit FreeStyle Linear Drain with Full Mortar Bed Adapter Kit U.S. Patent No. 8,474,068 Patents Pending: Canada & EP Publication No. 2354339 Discard Linear Drain installation instructions and refer to these

More information

Detailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content

Detailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content Detailed Requirements Document (DRD) Rail Engineering Advanced Technician Level 4 Electrification Knowledge & Skills Content Purpose The purpose of this Detailed Requirements Document (DRD) is to provide

More information

At last! Construction bracing made easy...

At last! Construction bracing made easy... At last! Construction bracing made easy...... a fast, smart and simple system with a range of applications THE SMART BRACING SYSTEM There are many situations in building with a need for the bracing of

More information

Installation plan. Washer-extractor PW 6107 EL. en - GB M.-Nr / 01

Installation plan. Washer-extractor PW 6107 EL. en - GB M.-Nr / 01 Installation plan Washer-extractor PW 6107 EL en - GB 10.11 M.-Nr. 09 270 450 / 01 M.-Nr. 09 270 450 / 01 2 Technical Datasheet Washer-extractor: Heating: PW 6107 Electric (EL) Legend: Solid circle

More information

Fixings, bonds and clamps

Fixings, bonds and clamps Square tape clamp Material 25 x 3mm Copper 0.12kg CT105-H 25 x 6mm Copper 0.30kg CT110-H 50 x 6mm Copper 0.60kg CT115-H Manufactured from high quality copper and aluminium alloys. Simple to install, providing

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ADVANCE WORLD LIMITED Lalkha Shair Char, Fatullah, Narayanganj, Dhaka, Bangladesh Factory List: 1.. Inspected by: Sherub Tenzin & Md. Moin Hasan Report Generated by:

More information

Air flue duct for use with ecotec boilers

Air flue duct for use with ecotec boilers For the installer Flue installation instructions Air flue duct for use with ecotec boilers Concentric System Ø 80/5 (Galvanized steel air duct/plastic flue duct) GB Contents Notes on the documentation

More information

Service Entrance Cable Fittings

Service Entrance Cable Fittings Suggested Specifications for Service Entrance Fittings All service fittings shall be approved for the purpose by a nationally recognized testing laboratory, inspection agency or product evaluation organization.

More information

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2)

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2) Installation Manual Orion TL-3 Steel Barrier VHD (v2) 300914 Table of Contents Orion Introduction.......... 3 Limitations & Warnings. 4 Before Installation..... 3 System Design & Design Considerations

More information

Installation plan. Tumble dryer. PT 8807 EL (Electrically heated) en - US Mat. NR / 02

Installation plan. Tumble dryer. PT 8807 EL (Electrically heated) en - US Mat. NR / 02 Installation plan Tumble dryer PT 8807 EL (Electrically heated) 38.15 en - US Mat. NR. 09 883 210 / 02 U.S.A. Miele, Inc. National Headquarters 9 Independence Way Princeton, NJ 08540 Phone: Fax: 800-991-9380

More information

TESTING PTE EARTHING

TESTING PTE EARTHING 1 SCOPE This section of the Power Systems Live Working Manual details the procedures to be followed to achieve Safety from the System when carrying out examination, testing and remedial work on PTE (Pole

More information

2-finger angular gripper SGB 32-50

2-finger angular gripper SGB 32-50 www.comoso.com Translation of the original manual 2-finger angular gripper SGB 32-50 Assembly and Operating Manual Superior Clamping and Gripping Imprint www.comoso.com Imprint Copyright: This manual remains

More information

Electric Service Handbook

Electric Service Handbook Electric Service Handbook Revised August 2017 Contact Information Telephone (253): Electrical Inspection Office 502-8277 7:30 am - 4:30 pm Electrical Inspectors Area Map on Website 7:30 am - 8:30 am Automated

More information

SoliTek PV Modules INSTALLATION MANUAL

SoliTek PV Modules INSTALLATION MANUAL SoliTek PV Modules INSTALLATION MANUAL Version: 16 10 14 According to: IEC 61215 IEC 61730 For: SOLID PRO 300-310 W p SOLID PRO 250-260 W p SOLID PRO 150-160 W p Thank you for choosing SoliTek panels.

More information

AP5K-C Precision AC Double-Pulse Spot Welding Machine User s Manual Shenzhen Will-Best Electronics Co., Ltd

AP5K-C Precision AC Double-Pulse Spot Welding Machine User s Manual Shenzhen Will-Best Electronics Co., Ltd AP5K-C Precision AC Double-Pulse Spot Welding Machine User s Manual Shenzhen Will-Best Electronics Co., Ltd 1 Content 1. Introduction...3 1.1 Functions...3 1.2 Units of AP5K-C...4 2. The Initial Installation

More information

REV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms

REV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms REV. 9/08 Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms SKYTRON MOUNTING STRUCTURES for Ceiling Mounted Equipment Foreword Skytron s objective is to provide a program and guideline to assist

More information

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING

More information

SEMPEO SQA Unit Code FP2D 04 Producing aircraft detail assemblies

SEMPEO SQA Unit Code FP2D 04 Producing aircraft detail assemblies Overview This standard covers a broad range of basic competences that you need to assemble components to produce aircraft detail assemblies, and which will prepare you for entry into the engineering or

More information

ST XX28 Stainless Steel Thermostatically Controlled Electric Model

ST XX28 Stainless Steel Thermostatically Controlled Electric Model DIXONS SURGICAL INSTRUMENTS LTD, 1 ROMAN COURT HURRICANE WAY, WICKFORD BUSINESS PARK WICKFORD, ESSEX, SS11 8YB, UK TEL: +44 (0)1268 764614 - FAX: +44 (0)1268 764615 EMAIL: info@dixons-uk.com - WEB: http://www.dixons-uk.com

More information

Bulk Bag Lifting Frame

Bulk Bag Lifting Frame User Guide Bulk Bag Lifting Frame Introduction The Conquip Bulk Bag Lifting Frame is designed for the safe and easy movement of tonne bags and other bulk bags of materials or waste around site. The frame

More information

Axiom. SURFACE MOUNTED ARRAY Patient Headwall. Installation Guidelines. Installation Instructions.

Axiom. SURFACE MOUNTED ARRAY Patient Headwall. Installation Guidelines. Installation Instructions. Axiom www.hsiheadwalls.com SURFACE MOUNTED ARRAY Patient Headwall Installation Instructions Installation Guidelines Tel: 925.427.7800 Fax: 925.427.0800 support@hsiheadwalls.com Hospital Systems Inc. 750

More information

t This publication is issued to provide outline information only and unless specifically agreed to the contrary by WEALD ELECTRONICS LTD. in writing, is not to form part of any order or contract or be

More information

USER S MANUAL release 1.0

USER S MANUAL release 1.0 MINI SUB LED rgb IP68 LED colour changer USER S MANUAL release 1.0 This manual must be considered an integral part of the projector. BEFORE CONNECTING AND USING THE PROJECTOR, IT IS IMPORTANT TO READ CAREFULLY

More information

SEMPEO SQA Unit Code H Assembling mechanical components

SEMPEO SQA Unit Code H Assembling mechanical components Overview This standard covers a range of basic mechanical assembly competences that will prepare you for entry into the engineering or manufacturing sector, creating a progression between education and

More information

Industrial flue gas probes. Instruction manual

Industrial flue gas probes. Instruction manual Industrial flue gas probes Instruction manual 2 1 Contents 1 Contents 1 Contents... 3 2 Safety and the environment... 4 2.1. About this document... 4 2.2. Ensure safety... 4 2.3. Protecting the environment...

More information

Electrical safety Dwellings

Electrical safety Dwellings The Electrical safety Dwellings APPROVED DOCUMENT P1 P Design and installation of electrical installations 2013 edition for use in England* Main changes in the 2013 edition This approved document supports

More information

Manual Rotary Heat Sealers. Type: F108TX. List of content : Introduction 2. General description 3. Application 4. Safety precautions 5

Manual Rotary Heat Sealers. Type: F108TX. List of content : Introduction 2. General description 3. Application 4. Safety precautions 5 Manual Rotary Heat Sealers Type: F108TX List of content : Page: Introduction 2 General description 3 Application 4 Safety precautions 5 Transport and storage 6 Installation 7 First Set-up 8 Connection

More information

Water Level Meter User Manual

Water Level Meter User Manual Man 054 Water Level Meter User Manual Soil Instruments Limited has an ongoing policy of design review and reserves the right to amend these specifications without notice. Man054 - Water Level Meter - MN1114

More information

HELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION

HELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION HELIOSTAR 252, 218 HORIZONTAL, FREE INSTALLATION INSTALLATION INSTRUCTIONS ENERGY AND SANITARY SYSTEMS Installation requirements General requirements The free-standing installation set is to be used for

More information

DJ Switch 10F V2 ORDERCODE 50365

DJ Switch 10F V2 ORDERCODE 50365 DJ Switch 10F V2 ORDERCODE 5035 Congratulations! You have bought a great, innovative product from Showtec. The Showtec DJ Switch brings excitement to any venue. Whether you want simple plug-&-play action

More information

Universal Tilting TV Mount 32" to 60" Installation Instructions

Universal Tilting TV Mount 32 to 60 Installation Instructions Universal Tilting TV Mount 32" to 60" Installation Instructions Tiltable LCD / TFT TV Wall Mount Material: 2.0mm Cold Rolled Steel Plate TV size: 32" - 60" Tilt angle: 0-15 degrees Max load capacity: 165

More information

Producing mechanical assemblies

Producing mechanical assemblies Unit 006 Producing mechanical assemblies Level: 2 Credit value: 15 NDAQ number: 500/9514/6 Unit aim This unit covers the skills and knowledge needed to prove the competences required to cover a broad range

More information

SECTION OUTLET, PULL, AND JUNCTION BOXES

SECTION OUTLET, PULL, AND JUNCTION BOXES SECTION 16131 OUTLET, PULL, AND JUNCTION BOXES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16112 - Raceways and Conduits. 1.02 SYSTEM DESCRIPTION A. Performance Requirements:

More information

UNIVERSITY OF SHEFFIELD IN-SERVICE INSPECTION AND TESTING OF ELECTRICAL EQUIPMENT POLICY AND GUIDANCE

UNIVERSITY OF SHEFFIELD IN-SERVICE INSPECTION AND TESTING OF ELECTRICAL EQUIPMENT POLICY AND GUIDANCE UNIVERSITY OF SHEFFIELD IN-SERVICE INSPECTION AND TESTING OF ELECTRICAL EQUIPMENT POLICY AND GUIDANCE 1.0 INTRODUCTION 1.1 The Electricity at Work Regulations 1989 came into force on 1 April 1990. The

More information

BIRSTA 1P N2 WORKING DESCRIPTION INSTALLATION, REPAIRS AND MAINTENANCE. Doc. No.: Birsta 1P N2 - Rev. 0

BIRSTA 1P N2 WORKING DESCRIPTION INSTALLATION, REPAIRS AND MAINTENANCE. Doc. No.: Birsta 1P N2 - Rev. 0 BIRSTA 1P N2 WORKING DESCRIPTION INSTALLATION, REPAIRS AND MAINTENANCE Doc. No.: Birsta 1P N2 - Rev. 0 Working Description Prepared by: Fredrik Sangö Doc. no.: Birsta 1P N2 Introduction/data: Birsta 1P

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

FEATURES APPLICATIONS. Technical data sheet SSW - STEEL STRONG-WALL FOR TIMBER FRAME RACKING RESISTANCE.

FEATURES APPLICATIONS. Technical data sheet SSW - STEEL STRONG-WALL FOR TIMBER FRAME RACKING RESISTANCE. The Steel Strong-Wall is a corrugated steel panel which is designed to be fixed directly to the concrete foundations of a building, within the external or internal wall, via a bolted connection. FEATURES

More information

KENYA STANDARD KS 574:2017. Steel fabric for reinforcement of concrete Specification

KENYA STANDARD KS 574:2017. Steel fabric for reinforcement of concrete Specification KENYA STANDARD KS 574:2017 Steel fabric for reinforcement of concrete Specification KEBS 2017 FifthEdition 2017 KS 574:2017 TECHNICAL COMMITTEE REPRESENTATION The following organizations were represented

More information

ST 19 Aluminium Manually Controlled Electric Model

ST 19 Aluminium Manually Controlled Electric Model ST 19 Aluminium Manually Controlled Electric Model Operators Manual Issue 5 For correct operation of this autoclave it is essential that the chamber be filled with water up to the height of the studs before

More information

COMPILED BY APPROVED BY FUNCTIONAL RESP AUTHORISED BY V SINGH. Date: 16/03/2009. Date: 16/03/2009. Date: 19/03/2009 Date: 26/03/2009

COMPILED BY APPROVED BY FUNCTIONAL RESP AUTHORISED BY V SINGH. Date: 16/03/2009. Date: 16/03/2009. Date: 19/03/2009 Date: 26/03/2009 SPECIFICATION Document Classification: Controlled Disclosure Title: Distribution Specification: Part 8 Unique Identifier: 34-434 COMMON BASE AND STANDARD Document Type: PASSIVE UNITS FOR SINGLE- PHASE

More information

Turbocharger / TPL-C Original assembly instructions English

Turbocharger / TPL-C Original assembly instructions English Assembly Instructions Turbocharger / TPL-C Original assembly instructions English This document is valid for the TPL-C series: TPL79-C Purpose The assembly instructions explain how the ABB turbocharger

More information

ST 19 T Aluminium Thermostatically Controlled Electric Model

ST 19 T Aluminium Thermostatically Controlled Electric Model ST 19 T Aluminium Thermostatically Controlled Electric Model Operators Manual Issue 5 For correct operation of this autoclave it is essential that the chamber be filled with water up to the height of the

More information

PE45 AMAZON MONKEY BARS OWNER'S MANUAL

PE45 AMAZON MONKEY BARS OWNER'S MANUAL PE45 AMAZON MONKEY BARS OWNER'S MANUAL WARNING! The disassembled product may contain small parts which pose a choking hazard to children under 3. IMPORTANT: This product may contain sharp points and small

More information

Span 300 Instruction Manual

Span 300 Instruction Manual Span 300 Instruction Manual DESIGNATION SPAN300 Double Width EN 1004 3 8/12 XXCD SPAN 300 Single Width EN 1004 3 8/8 XXCD CEN designation of this instruction manual EN 1298 IM en Rev-00 WARNING NEVER STAND

More information

Electric Service Standards

Electric Service Standards V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are

More information

HELIOSTAR 252, 218 VERTICAL, FREE INSTALLATION

HELIOSTAR 252, 218 VERTICAL, FREE INSTALLATION HELIOSTAR 252, 218 VERTICAL, FREE INSTALLATION INSTRUCTION MANUAL ENERGY AND SANITARY SYSTEMS Installation requirements General requirements The free-standing installation set is to be used or installing

More information

UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL

UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL 8.01 GENERAL This material is not intended to cover service from OPPD s network in the downtown Omaha area. See Chapter 12 for details

More information

Assembling, wiring and testing electrical panels/components mounted in enclosures

Assembling, wiring and testing electrical panels/components mounted in enclosures Unit 035 Assembling, wiring and testing electrical Level: 2 Credit value: 14 NDAQ number: 500/9514/6 Unit aim This unit covers the skills and knowledge needed to prove the competences required to assemble,

More information

INSTALLATION INSTRUCTION (U.S.A) FOR LUMI-O DRY NICHE INGROUND LIGHT.

INSTALLATION INSTRUCTION (U.S.A) FOR LUMI-O DRY NICHE INGROUND LIGHT. www.lumi-o.com INSTALLATION INSTRUCTION (U.S.A) FOR LUMI-O DRY NICHE INGROUND LIGHT. STANDARD & L.E.D. Lumi-O Industries Inc. 370 Lajeunesse O. St-Jerome QC J7Y 4E5 tel (450)565-5544 * 1-866-99LUMI-O (450)565-5958

More information

5505L FLANGE BOLT DISCS

5505L FLANGE BOLT DISCS MECHANICAL PACKING INSTALLATION INSTRUCTIONS 0L FLANGE BOLT DISCS PREPARATION Ensure stud threads are long enough to allow nuts to make contact with metal faces. Precaution: Good bolting practice requires

More information

nual k Excella E-1 Open Air Shaker N) manual New Brunswick Excella E-1 Open Air Shaker Operating manual

nual k Excella E-1 Open Air Shaker N) manual New Brunswick Excella E-1 Open Air Shaker Operating manual nual k Excella E-1 Open Air Shaker N) manual New Brunswick Excella E-1 Open Air Shaker Operating manual Copyright 2014 Eppendorf AG, Germany. No part of this publication may be reproduced without the prior

More information

Tower Site Inspection Procedures

Tower Site Inspection Procedures Engineering, Manufacturing, Construction & Erection Specializing in Radio & TV Communication Towers 6037 S. Industrial Rd. 918-789-9020 Office 918-789-9922 Fax www.belltowercorp.com bob@belltowercorp.com

More information

SYSTEM S7-RHOMBOS INSTALLATION MANUAL

SYSTEM S7-RHOMBOS INSTALLATION MANUAL SYSTEM S7-RHOMBOS INSTALLATION MANUAL GENERAL INFORMATION GENERAL INFORMATION This assembly manual addresses all metal ceilings manufactured by durlum. The different sections describe the related/relevant

More information

MOUNTING SYSTEM FOR PITCHED ROOF WITH TILES. mounting system for pitched roof with tiles for solar panels in landscape setup. Rev

MOUNTING SYSTEM FOR PITCHED ROOF WITH TILES. mounting system for pitched roof with tiles for solar panels in landscape setup. Rev MANUAL EN MOUNTING SYSTEM FOR PITCHED ROOF WITH TILES mounting system for pitched roof with tiles for solar panels in landscape setup ESDEC BV 2016 TABLE OF CONTENT 1. Introduction 1 2. General installation

More information

High Strength Epoxy Tested in Accordance with ICC-ES AC308

High Strength Epoxy Tested in Accordance with ICC-ES AC308 ADHESIVE ANCHORING SPECIALISTS DESCRIPTION/SUGGESTED SPECIFICATIONS* The 100% epoxy resin and hardener are completely mixed as they are dispensed from the dual cartridge through a static mixing nozzle,

More information

801-MORD Mordred FIXING: Ground. ORDER No: CUSTOMER: Complied by Date AB 30/06/15 ISSUE ECN DATE SIGN /07/15 AB

801-MORD Mordred FIXING: Ground. ORDER No: CUSTOMER: Complied by Date AB 30/06/15 ISSUE ECN DATE SIGN /07/15 AB CUSTOMER: 0-MORD Mordred ORDER No: FIXING: Ground Complied by Date 0/0/5 ISSUE ECN DATE SIGN 0 7 0/07/5 CUSTOMER: 0-MORD Mordred ORDER No: FIXING: Ground Low tower.m single slide Low scramble net High

More information

K364. Fitting Kit. Fitting Instructions for Basic Carrier. x 6 x 1 x 1 x 2. x 6 x 2 x 2 x 2. x 1 x 1. Revision No: 5C 1

K364. Fitting Kit. Fitting Instructions for Basic Carrier. x 6 x 1 x 1 x 2. x 6 x 2 x 2 x 2. x 1 x 1. Revision No: 5C 1 Fitting Kit Fitting Instructions for Basic Carrier x 6 x 1 x 1 x 2 x 6 x 2 x 2 x 2 x 1 x 1 Revision No: 5C 1 MAX kgs (lbs) W/P WHD Mitsubishi Montero, 5dr SUV 99-06 EU 75 kgs (165 lbs) 75 kgs (165 lbs)

More information

GroundTrac. Installation Manual

GroundTrac. Installation Manual APPLICATION: The GroundTrac system is designed with a minimum amount of installed footings at greatly reduced labor. The system integrates with ordinary 1-1/2 schedule #40 galvanized water pipe. This ground

More information

Installer Guide. Item

Installer Guide. Item Installer Guide Item 17392-01 Required tools and fixings Electric drill (non-impact setting) T-30 Torq bit (wedge type) 8mm hex socket Pozi head drill bit Tape measure Pencil/pen Hammer Tin snips Angle

More information

Agilent 16047D Test Fixture

Agilent 16047D Test Fixture Agilent 16047D Test Fixture Operation and Service Manual Third Edition Agilent Technologies Japan, Ltd. Agilent PN 16047-90300 May 2000 Printed in Japan Notices The information contained in this document

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

P.V.C. INSULATED ALUMINIUM SERVICE MAIN WIRE-FINISHED PRODUCT

P.V.C. INSULATED ALUMINIUM SERVICE MAIN WIRE-FINISHED PRODUCT CEB SPECIFICATION 005-1: 2012 P.V.C. INSULATED ALUMINIUM SERVICE MAIN WIRE-FINISHED PRODUCT CEYLON ELECTRICITY BOARD SRI LANKA Telephone: +94 11 232 0953 Fax: +94 11 232 3935 CONTENTS PAGE 1. Scope 03

More information

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems. NORTH MARIN WATER DISTRICT STANDARD SPECIFICATIONS SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS PART 1 GENERAL 1.01 DESCRIPTION This section includes materials and installation of ductile-iron pipe and

More information

SERVICE LEVEL PROCEDURE

SERVICE LEVEL PROCEDURE SERVICE LEVEL PROCEDURE METERING PROVIDER SERVICES PREPARED BY: AEMO MARKETS VERSION: 1.3 EFFECTIVE DATE: 01 DECEMBER 2017 STATUS: FINAL Approved for distribution and use by: APPROVED BY: PETER GEERS TITLE:

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Electrical Metallic Tubing (EMT) Fittings

Electrical Metallic Tubing (EMT) Fittings Suggested Specifications for Electrical Metallic Tubing (EMT) Fittings Series 2 Insulated EMT Connector (Raintight) (Compression Type) Series 20 EMT Coupling (Raintight) (Compression Type) Series 0 Pipe

More information

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 541 NOVEMBER 2005 CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE TABLE OF CONTENTS 541.01 SCOPE 541.02 REFERENCES 541.03 DEFINITIONS 541.04 SUBMISSION

More information

SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS

SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS PERSONNEL DIVISION Revised 2002 CONTENTS Page 1 INTRODUCTION 1 2 APPLICATION 1 3 ERECTION AND INSPECTION 1 4 ERECTION 1 4.1 Before erection of tower

More information

Ordering Information. Conductive Level Controller 61F-GP-N2. Accessories (Order Separately) Selection Guide for Electrode Holders and Separators

Ordering Information. Conductive Level Controller 61F-GP-N2. Accessories (Order Separately) Selection Guide for Electrode Holders and Separators Conductive Level Controller CSM DS_E_1_ Automatic Water Supply and Drainage Control Ideal for level control of any conductive liquid. Compact plug-in controller for single- or two-point control of conductive

More information