1 Request for Bids At The Greenville-Spartanburg International Airport Addendum No. 2 June 27, 2011 All Bidders shall include with their bid submittal a signed statement indicating they have reviewed and accepted Addendum #1, dated June 23, 2011 and Addendum #2, dated June 27, 2011 as part of the bid documents. Item 1. Questions received to date: Question No. 1 On page 47 of the bid package, the words at the top of the page state that there are SIX (6) FIXED GROUND POWER UNITS. The previous page lists requirements for seven (7) GPU s. The description of work on page 11 also indicates there are seven GPU s required. Please clarify in the addendum. Answer No. 1 Remove Attachment B Bid Form and Replace with attached revised Attachment B Bid Form. There are total of nine (9) aircraft preconditioned air systems, nine (9) fixed ground power units and the retrofit of five (5) existing bridges for bridge pre-cool/pre-conditioning. *Please note additional scope of work at Gates A3 and A4. Question No. 2 In the specification, section 2.0. A 9 it states that Each DX unit shall be provided with required hardware, software, databases and any required site licenses to provide remote monitoring and control features as specified herein. The JetAire PCA units are equipped with a PLC controller that has the capabilities to communicate via a number of protocols including ModBus TCP/IP. Communication via this protocol requires no proprietary software, databases, and site licenses to provide for remote monitoring. Please confirm that ModBus TCP/IP communication protocol is acceptable. Answer No. 2 Approved. This is acceptable. Question No. 3 Table 3-1 and 2.0 B 1 thru 6 define the required performance parameters of the PCA unit to be bid. Based on the aircraft curves with 100 percent passenger loads, electrical loads, and solar loads the PCA size should be at least 60 Tons due the presence of the B and A These two aircraft drive the unit to a typical 60T size. This size of PCA unit requires a 175 amp service. Additionally, the presence of the MD-80 with 100 percent passenger loads, electrical Page 1 of 11

2 loads, and solar loads drive the PCA size to a 45 50T unit. This size of PCA unit requires a 150 amp service. All other aircraft in the mix drive the unit size to a 30T unit size. Please confirm that it was the intent of the airport to drive the unit sizes based on the aircraft mix and the 100 percent sizing requirements. Answer No. 3 Correct. The PCA contractor is responsible for sizing the PCA appropriately to ensure the equipment is capable of providing all heating, cooling, ventilation and control requirements as specified for occupation of each deign aircraft as indicated in Table 3-1 on design day conditions as further described in the specifications. Each unit shall be rated for the worst case/largest type aircraft indicated in Table 3-1. Question No B 12 States that the interface for the dry contacts or approved digital I/O signal shall be wired from the PAS back to the rotunda pedestal and terminated inside a contractor provided exterior duty junction box. Please confirm that the wiring shall be the responsibility of the PBB supplier because typical wiring down a telescoping bridge requires use of the PBB manufacturer s cable management system. Due to the unknown variables associated with a potential unknown PBB manufacture it is difficult for the PAS supplier to determine the scope of work to provide for this wiring. Answer No. 4 This interface wiring is the responsibility of the PCA contractor and the PCA contractor will coordinate with the PBB contractor. Question No B 13 States that the interface for an enable or shall be wired from the PAS back to the rotunda pedestal and terminated inside a contractor provided exterior duty junction box. Please confirm that the wiring shall be the responsibility of the PBB supplier because typical wiring down a telescoping bridge requires use of the PBB manufacturer s cable management system. Due to the unknown variables associated with a potential unknown PBB manufacture it is difficult for the PAS supplier to determine the scope of work to provide for this wiring. Answer No. 5 This interface wiring is the responsibility of the PCA contractor and the PCA contractor will coordinate with the PBB contractor during installation. Question No C 1. States that Power will be available at the base of the PBB with an exterior rated disconnect. This bidder shall extend service to the PAS units are required. Please confirm that the power wire extension shall be the responsibility of the PBB supplier because typical wiring down a telescoping bridge requires use of the PBB manufacturer s cable management system. Due to the unknown variables associated with a PBB manufacturer it is difficult for the PAS supplier to determine the scope of work to provide for this wiring. Page 2 of 11

3 Answer No. 6 Section 2.0, C.1 Delete: This bidder shall extend the service to the PAS units as required. Reference General Description of Work and Tasks, subpart D. The PBB Contractor shall include in their bid running the required electrical down the bridge for the PC Air and Fixed Ground Power. Question No C 1. States that Power will be available at the base of the PBB with an exterior rated disconnect. How much power is available and what size is the power disconnect? Answer No. 7 Power will be made available and the proper disconnects will be provided by the Owner under separate contract. Sizing of the electrical, including disconnects, will be based upon information provided during the submittal/shop drawing phase by the PCA contractor. Question No B States that air flow modulation is required to be done by an inlet air damper and a discharge air damper shall not be used as the means to modulate air flow. The JetAire DX PCA units utilize a discharge air damper to modulate air flow and to facilitate bridge pre-cool. By using a discharge air damper for air flow modulation, the JetAire unit contains one less damper actuator than a unit with an inlet damper and therefore has increased reliability due to having fewer components. Please allow a discharge air damper for air flow modulation. Answer No. 8 Approved. This is acceptable. Question No C States that all components used in the DX unit shall be UL or CSA listed or recognized. The JetAire DX units are listed per UL Please accept the entire unit listing as fulfilling this requirement. Answer No. 9 Approved. This is acceptable. Question No D. 2 f 1 states that the shaft bearings shall have a median life of 200,000 hours. This statement is typical to systems with belt and pulley driven fan systems. The JetAire DX units utilize premium efficient direct drive fan assemblies with standard grease able L10 bearings. Please accept the industry standard direct drive ratings. Answer No. 10 Approved. This is acceptable. Page 3 of 11

4 Item 2. Question No D. 2 g and h states that motor bearings are to be permanently lubricated. Please accept grease able bearing motors as their rated life (with PM greasing) is significantly longer than permanently lubricated bearing motors Answer No. 11 Approved. This is acceptable. There have been several inquiries regarding the bridge pre-cool/pre-conditioning scope of work. Clarification. The PCA contractor is responsible all work including bridge modifications on the existing bridges to accommodate bridge conditioning/pre-cool functions. This includes, but is not limited to: wiring, bridge cut out and plenum for the PCAir, and cut out and supply of the rotunda exhaust fan. Bridge modifications/provisions on the new bridges will be by the PBB contractor. Add attached specification PASSENGER BOARDING BRIDGE CONDITIONING. For work on the the existing bridges, the name PBB contractor should be substituted with PCA contractor. All work on the existing bridges to accommodate bridge pre-conditioning is the responsibility of the PCA contractor and should be included in their bid. [This Area Intentionally Left Blank] Page 4 of 11

5 PASSENGER BOARDING BRIDGE CONDITIONING *On all new bridges, the PBB contractor shall provide and be responsible for bridge modifications, including the plenum, outlet and exhaust fan to accommodate bridge preconditioning. *On all existing bridges, the PCA contractor shall be responsible for any modifications to the existing bridges, including wiring, plenum, outlet, exhaust fan, etc. to accommodate bridge pre-conditioning. 1.0 The PBB shall include the following bridge conditioning equipment, controls and provisions for the addition of bridge conditioning equipment to be provided under separate contract. The PBB manufacturer shall coordinate with the aircraft pre-conditioned air system (PCA contractor) supplier for the complete integration of bridge conditioning equipment on the PBB. A. Bridge Air Outlet: The PBB manufacturer shall provide two stacked bridge air cut out in the sidewall of the outer tunnel for connection of bridge air ducting by the PCA contractor. The cutouts shall be 7 3/4 W x 35 3/4 H in a single inner channel of the sidewall corrugation, with a 2 1/2 space between the two openings. The cutouts will begin one foot below the furnished ceiling on a 3 tunnel bridge and 6 below the finished ceiling on a 2 tunnel bridge. The cutout will be located on the right side of the bridge between the lift column and stair landing. The interior of the cutout shall be finished with a 10 x 38 deflection supply register one set vertical, 3/4 louver spacing with color to match interior of bridge. B. Bridge Air Plenum: PPB manufacturer shall provide an insulated bridge air plenum on the side of the outer tunnel from the inlet to the bottom of the bridge using the inner pan of the side-wall corrugation as one side of the plenum. The bottom of the plenum shall provide for a 10 diameter collar for connection of the bridge air flexible air hose from the pre-conditioned air system PCA unit by the PCA contractor. C. Exhaust Fan: The PPB manufacturer shall supply and install a bridge exhaust fan to provide for minimum 1400 CFM ventilation rate. The fan shall be located to exhaust air from the top of the tunnel section near the rotunda and in such a manner to minimize bridge retraction limitation. Page 5 of 11

6 Each exhaust fan shall be controlled by a combination starter to be supplied and installed with all required connections, cable and conduit on the rotunda column by the bridge manufacturer. The fan shall operate from 480V, 3 phase, 3 wire power from the bridge electrical feeder. The fan, starter, and starter enclosure shall be NEMA 4 rated, and provide by PBB manufacturer. The starter controls shall be arranged such that a remote N.O. contact (provided by the PCA contractor) shall operate the fan. AN isolated fan status contact shall be provided for monitoring of the fan by the PCA contractor. D. Bridge Air Controls: The PBB manufacturer shall provide a Bridge Air ON lighted push-button and a non-lighted Bridge Air OFF push-button. The push buttons shall be located on the bridge control console (or when required by spec) and wired to terminal blocks within the console for field connections by the PCA contractor. Each pushbutton shall provide a set of N.O. & N.C. contacts. The ON light shall be suitable for operation at 28V AC/DC. E. Bridge Operation Interlock. The PCA manufacturer shall supply a set of isolated normally open or normally closed (determined by PBB manufacturer) contacts located in the PCA control cabinet. These contacts to be wired to the PBB controls in order to prohibit any horizontal bridge operation while the PCA is in operation. The PCA must be off in order for the bridge to resume normal operation. F. Bridge Wiring: The PBB manufacturer shall provide control wiring from the control console to the exhaust fan starter on the rotunda column. The wiring shall consist of two, # 18 AWG minimum wire pairs for control of the exhaust fan. The wires shall be routed in such a manner to provide for NEC Class II wiring and terminated at terminal blocks within the bridge control console for field extension to the PAS controls by the PCA contractor. G. Submittals: The PBB manufacturer shall provide the following submittals for the bridge exhaust fan: 1. Complete electrical power and control diagrams of the exhaust fan system. 2. Control termination diagrams for interface with PCA contractor. 3. Exhaust fan OEM catalog cuts. 4. Exhaust fan mounting details indicating, as a minimum, weather sealing provisions, mounting location, mounting details, techniques employed to minimize bridge retraction and any flexible exhaust air boots or hoses used. Page 6 of 11

7 PRE-CONDITIONED AIR SPECIFICATION 1.0 Bridge Preconditioning Each gate system shall provide the necessary controls, equipment and hardware to provide passenger bridge pre-conditioning bridge prior to aircraft arrival. This will serve to precondition the bridge from possible soaked conditions to enhance de-planing passenger comfort. A. Function: Bridge Pre-conditioning shall function to operate the PCA unit in a reduced operating mode to automatically heat or cool the passenger bridge when the Bridge Air push-button is activated at the bridge control console. B. Passenger Boarding Bridge Interface: The PBB manufacturer shall supply and install the following components at each new bridge for interface with the bridge pre-conditioning equipment and PCA unit: 1. Bridge exhaust fan capable of providing a minimum of 1400 CFM ventilation from the roof of the bridge tunnel closest to the rotunda. 2. Exhaust fan starter with all required input power and control interface provisions for the PCA unit controller. 3. Bridge air control push buttons, ON & OFF, located on the bridge control console. Each button will contain a N.O. & N.C. contacts and will be terminated at a terminal block within the console. 4. Control wiring from a control console terminal block to the exhaust fan starter for PCA unit automatic control and status monitoring. 5. Bridge air side wall cutouts in the right side of the outer tunnel between the lift column and stair landing, one foot below the bridge tunnel finished ceiling. The cutouts provided will be 7 3/4 W x 35 3/4 H and include interior air grills. 6. Bridge air plenum on the side wall of the outer tunnel from the inlet to the bottom of the bridge with an 10 diameter collar at the bottom for connection of bridge air hose from the PCA unit s bridge air damper. 7. Bridge interlock to prohibit bridge horizontal operation when PCA is in operation. 8. Provisions at bridge rotunda for mounting of PCA electrical disconnect box. C. Bridge Air Components: The following bridge air components shall be supplied and installed by the PCA contractor: Page 7 of 11

8 1. Bridge Air Damper: A bridge air damper shall provided to divert PCA unit outlet air from the aircraft air delivery hose to the bridge air ducting. The damper shall be under the control of the PCA unit controller. The damper will be rated for the air delivery pressure of the PCA unit during aircraft air operations. 2. The control damper actuator shall electronic direct coupled type which require no crank arm and linkage. 3. Bridge Air Flexible Ducting: Flexible, insulated air duct shall be extended from bridge air damper to the fixed bridge air plenum provided by the bridge manufacturer on the side of the bridge. a. The flexible air ducting shall be factory insulated. Insulation shall achieve a minimum thermal conductance rating of k = 0.5 and must be completely shielded from the airstream at all times. Where the flexible duct joins the fixed ductwork install with duct sealer and worm screw drive adjustable bands to make joint secure and airtight. b. The flexible air duct shall be routed and supported under the bridge in such a manner to prevent excessive drooping or sagging and to prevent interference with bridge operating mechanisms. D. Bridge Air Sequence of Operation If the PCA unit is off, bridge preconditioning shall be activated by pressing the Bridge Air ON push-button at the bridge control console and/or in the side of entry of the PBB rotunda. This action shall start the PCA unit in a pre-set reduce operating mode, open the bridge air damper to divert supply air to the bridge tunnel and start the bridge exhaust fan. The PCA unit reduce operating mode shall be such that the aircraft air delivery hose is maintained in it s storage basket while still providing approximately 1400 CFM supply air to the bridge. Bridge air will circulate through the bridge to the bridge exhaust fan and continue until the following occurs: The Bridge Air OFF button is depressed (PBB will not move horizontally until OFF button depressed). An automatic 0-30 (software adjustable) minute timer elapses its preset time. The timer shall be under the control of the PCA unit ddc controller. Page 8 of 11

9 Exhaust fan status and bridge air or aircraft air ON status of the PCA unit will be available for remote display on the remote monitoring system via the PCA unit ddc controller. -END SECTION- [This Area Intentionally Left Blank] Page 9 of 11

10 GREENVILLE-SPARTANBURG INTERNATIONAL AIRPORT REQUEST FOR BIDS ATTACHMENT B - BID FORM BID ITEM DESCRIPTION & UNIT PRICE BID TOTAL AMT ITEM IN WORDS UNIT QTY PER ITEM 1 Gate A1, PCA & Fixed Ground Power (new PBB by PBB contractor) 2 Gate A2, PCA & Fixed Ground Power (new PBB by PBB contractor) 3 Gate A3, Fixed Ground Power (new PBB by PBB contractor) 4 Gate A4, Fixed Ground Power (new PBB by PBB contractor) 5 Gate A5, PCA & Retrofit PBB for Bridge Pre-Cool (existing PBB) 6 Gate A6, PCA, Fixed Ground Power & Retrofit PBB for Bridge Pre-Cool (existing PBB) 7 Gate A7, PCA & Retrofit PBB for Bridge Pre-Cool (existing PBB) 8 Gate A8, Retrofit PBB for Bridge Pre-Cool (existing PCA & existing PBB) 9 Gate A9, Retrofit PBB for Bridge Pre-Cool (existing PCA & existing PBB) Page 10 of 11

11 10 Gate B1, PCA & Fixed Ground Power (new PBB by PBB contractor) 11 Gate B2, PCA & Fixed Ground Power (new PBB by PBB contractor) 12 Gate B3, PCA & Fixed Ground Power (new PBB by PBB contractor) 13 Gate B4, PCA & Fixed Ground Power (new PBB by PBB contractor) TOTAL BID FOR PROCURMENT AND INSTALLATION OF NINE (9) AIRCRAFT PRECONDITIONED AIR SYSTEMS, NINE (9) FIXED GROUND POWER UNITS, & THE RETROFIT OF FIVE (5) EXISTING BRIDGES FOR BRDIGE PRE-COOL/PRE- CONDITIONING: (Amount in Words): (Amount in Numbers): $ Signature: Officer of Company Print Name: Title: [This Area Intentionally Left Blank] Page 11 of 11

Request for Bids. At The Greenville-Spartanburg International Airport

Request for Bids. At The Greenville-Spartanburg International Airport Request for Bids At The Greenville-Spartanburg International Airport Addendum No. 1 June 21, 2011 All Bidders shall include with their bid submittal a signed statement indicating they have reviewed and

More information

F-SERIES: F SPECIFICATIONS Four-Fold Door Systems

F-SERIES: F SPECIFICATIONS Four-Fold Door Systems Version 5.22.13 F-SERIES: F100-600 SPECIFICATIONS Four-Fold Door Systems OPTIONS ARE IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT. CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS.

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

1.02 Related Sections A. Section Heating, Ventilation and Air Conditioning (HVAC). C. Section Pneumatic and Electric Control HVAC.

1.02 Related Sections A. Section Heating, Ventilation and Air Conditioning (HVAC). C. Section Pneumatic and Electric Control HVAC. PART 1: GENERAL 1.01 Section Includes A. Dual duct terminal units. B. Variable volume regulators. C. Integral damper motor operators. D. Integral controls. 1.02 Related Sections A. Section 23 00 00 Heating,

More information

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT SPARTANBURG COUNTY BUILDING CODES DEPARTMENT PLAN REVIEW CHECK LIST REQUIREMENTS FOR COMMERCIAL BUILDING PERMITS Plan Review Coordinator Kris Brannon 864-596-3180 366 N. Church St Room 500 Spartanburg,

More information

N-SERIES: NTH3500 SPECIFICATIONS Hollow Metal Sliding Door System

N-SERIES: NTH3500 SPECIFICATIONS Hollow Metal Sliding Door System Version 5.22.13 N-SERIES: NTH3500 SPECIFICATIONS Hollow Metal Sliding Door System OPTIONS ARE LISTED IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT CONSULT MANUFACTURER FOR ADDITONAL

More information

MSC Guidelines for Review of Ventilation System Plans

MSC Guidelines for Review of Ventilation System Plans K. B. FERRIE, CDR, Chief, Hull Division Purpose: This Plan Review Guideline (PRG) explains the requirements for seeking plan approval of ventilation systems from the Marine Safety Center (MSC) for most

More information

SECTION BASIC ELECTRICAL REQUIREMENTS

SECTION BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions, apply to work of this section. 1.2 SUMMARY A. This section specifies

More information

Robert E. McMains Date Robert E. McMains Date

Robert E. McMains Date Robert E. McMains Date DESIGN AND CONSTRUCTION STANDARDS Title: Section 230923 Direct-Digital Control System for HVAC & Mechanical Author: Author: Date Active Version Distribution: Date Approved By: Approved By: Robert E. McMains

More information

LTH3700, HOLLOW METAL SLIDING FIRE DOOR

LTH3700, HOLLOW METAL SLIDING FIRE DOOR LTH3700, HOLLOW METAL SLIDING FIRE DOOR Consult Manufacturer for additional options or modifications PART 1-GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

2012 Fiscal Impact International Mechanical Code

2012 Fiscal Impact International Mechanical Code 2012 Section No. 306.5 Item 2 2012 Code Information - bold text = new text found in 2012 strike out = text deleted and not found in the 2012 Equipment and appliances on roofs or elevated structures: Item

More information

FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR

FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR Section 083713- Four Fold Doors- With Single Overhead Mounted Operator Part 1-General 1.1 Related Document: A. Drawing and general provisions of contract,

More information

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466 BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein

More information

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7

DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 DESIGN GUIDELINES WIRING AND CONDUITS PAGE 1 of 7 1.1. REFERENCE STANDARDS 1.1.1. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification

More information

Fayetteville Regional Airport Airline Terminal Improvements Part 1; APN 1515

Fayetteville Regional Airport Airline Terminal Improvements Part 1; APN 1515 6-16-2017 ADDENDUM #2: DATE: June 16, 2017 JOB: OWNER: ARCHITECT: Fayetteville Regional Airport Airline Terminal Improvements Part 1; APN 1515 City of Fayetteville Gordon Johnson Architecture The following

More information

SECTION AIR DUCT CLEANING

SECTION AIR DUCT CLEANING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and

More information

Design Standard Conduit for Electrical Systems

Design Standard Conduit for Electrical Systems Design Standard Purpose: This design standard has the purpose of creating a consistent application for the installation of conduits throughout the East Side Union High School District, therefore achieving

More information

SECTION HEAT TRACING FOR PLUMBING PIPING

SECTION HEAT TRACING FOR PLUMBING PIPING SECTION 22 05 33 HEAT TRACING FOR PLUMBING PIPING PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph not

More information

SECTION COOLING TOWER

SECTION COOLING TOWER PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue

More information

Price Single Duct Terminal Units

Price Single Duct Terminal Units Price Single Duct Terminal Units Division 23 Heating, Ventilating, and Air Conditioning Section 23 36 00 Air Terminal Units The following specification is for a defined application. Price would be pleased

More information

A. This Section includes ceiling- and wall-mounted diffusers, registers, grilles and louvers.

A. This Section includes ceiling- and wall-mounted diffusers, registers, grilles and louvers. SECTION 23 37 13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

B. ASHRAE 1991 HVAC Applications Handbook: Chapter 34--Testing, Adjusting and Balancing.

B. ASHRAE 1991 HVAC Applications Handbook: Chapter 34--Testing, Adjusting and Balancing. PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 230593 TESTING, ADJUSTING, AND BALANCING A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Wilo MC Self Priming, Horizontal Multi-Stage, High Pressure Pumps. Engineering Specification

Wilo MC Self Priming, Horizontal Multi-Stage, High Pressure Pumps. Engineering Specification Wilo MC Self Priming, Horizontal Multi-Stage, High Pressure Pumps Engineering Specification PART 1 - GENERAL 1.1 SUMMARY A. Furnish and install horizontal multi-stage, high pressure, self priming pressure

More information

VPL-3200B Residential Vertical Platform Lift Technical Specifications

VPL-3200B Residential Vertical Platform Lift Technical Specifications Page 1 of 5 VPL-3200B Residential Vertical Platform Lift Technical Specifications MODEL NUMBER: VPL-3200B Series: Models VPL-3210B, VPL-3212B and VPL-3214B (DC-powered units) U.S. F.D.A. CLASSIFICATION:

More information

SECTION HVAC INSTRUMENTATION AND CONTROLS INSTALLATION. (Applicable to IUPUI Only)

SECTION HVAC INSTRUMENTATION AND CONTROLS INSTALLATION. (Applicable to IUPUI Only) SECTION 15957 (Applicable to IUPUI Only) I. GENERAL A. NOTES 1. The University has a pre-purchase agreement (PPA) with Johnson Controls (JCI) and Siemens Building Technologies (SBT). The University will

More information

Section SECTIONAL INSULATED STEEL DOORS

Section SECTIONAL INSULATED STEEL DOORS 1 GENERAL 1.1 GENERAL REQUIREMENTS General Conditions and Division 01 apply to this section. 1.2 RELATED WORK Section 05500: Miscellaneous Metal Fabrication Section 07900: Joint Sealers Section 09900:

More information

YORK UNITIZED ENERGY RECOVERY VENTILATOR (ERV) Superior air-flow 300 6,200 CFM

YORK UNITIZED ENERGY RECOVERY VENTILATOR (ERV) Superior air-flow 300 6,200 CFM YORK UNITIZED ENERGY RECOVERY VENTILATOR (ERV) Superior air-flow 300 6,200 CFM YORK UNITIZED ENERGY RECOVERY VENTILATORS Regardless of building type or rating system, today s building must be as energy

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. AFC Cable Systems, Inc. Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519.13 METAL CLAD CABLE-MC

More information

Outdoor + Switchgear, Walk-in Equipment Buildings Low & Medium Voltage NEMA 3R

Outdoor + Switchgear, Walk-in Equipment Buildings Low & Medium Voltage NEMA 3R Outdoor + Switchgear, Walk-in Equipment Buildings Low & Medium Voltage NEMA 3R Product Brochure www.apt-power.com 433 N. 36 th Street PROVIDING A COMPREHENSIVE Lafayette, IN 47905 www.apt-power.com 433

More information

Series Sump and Sewage Systems

Series Sump and Sewage Systems Series 000 Sump and Sewage Systems file no: 0. date: may 17, 13 supersedes: 0. date: march 29, 13 Series 000 Sump Series 0 & 2 Armstrong offers a complete range of high performance, easily maintained Column

More information

CITY OF LOS ANGELES LARUCP PLUMBING/MECHANICAL PLAN CHECK LIST

CITY OF LOS ANGELES LARUCP PLUMBING/MECHANICAL PLAN CHECK LIST CITY OF LOS ANGELES LARUCP PLUMBING/MECHANICAL PLAN CHECK LIST Plan Check No. Plan Check Expiration Date Job Address: Square Footage Use Zone Fire Zone Occ. Group Type of Construction No. of Stories Applicant

More information

Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control

Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control 1. DESCRIPTION 2. MATERIALS Furnish, install, relocate, or remove radar vehicle detection systems (RVDS) of

More information

TYP. SINGLE PLY ROOFING ROOF SHEETING BROAN VENT CAP #10 x 1" GASKETED SMS TYP. 4 SIDES 8" FRAMED CURB HVAC SYSTEMS "BASIS OF DESIGN" ROOF INSULATION R-19 WALL INSULATION R-13 LIGHTING EFFIECNCY PER STANDARDS

More information

RFB Waco City Hall Chiller Replacement. Date: 3/20/2018 RFP No: Commodity: Waco City Hall Chiller Replacement

RFB Waco City Hall Chiller Replacement. Date: 3/20/2018 RFP No: Commodity: Waco City Hall Chiller Replacement CITY OF WACO RFB 18-022 Waco City Hall Chiller Replacement Purchasing Services Post Office Box 20 Waco, Texas 602-20 Phone: 2 / 0-80 Fax: 2 / 0-8063 kaseyg@wacotx.gov www.waco-texas.com Date: 3//18 RFP

More information

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 February 27, 2014 ITB NO. 14-33 WAKEFIELD PUMPING STATION UPGRADE ADDENDUM NUMBER

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information

Evaluation of Underfloor Air Distribution

Evaluation of Underfloor Air Distribution McCarran International Airport Terminal 3 L as Vegas, NV Evaluation of Underfloor Air Distribution and Displacement Ventilation Systems The Pennsylvania State University AESenior ThesisPresentation, Spring

More information

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less)

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less) SECTION 260523 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less) PART 1 - GENERAL 1.1 SUMMARY A. Related Documents: 1. Drawings and general provisions of the Subcontract apply

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 12 2113 - LOUVER BLINDS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SPECIFICATIONS Adjustable Louvered Roofs (10530) Patio Covers and Pergola Awnings Section

SPECIFICATIONS Adjustable Louvered Roofs (10530) Patio Covers and Pergola Awnings Section SPECIFICATIONS Adjustable Louvered Roofs (10530) Patio Covers and Pergola Awnings Section 107313 Specifications for Louvered Pergola Awnings by SUNAIR : PART 1 - GENERAL P.O. Box 1068 7785 Rt. 175, Jessup,

More information

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

1. Vertical reciprocating conveyor, Hydraulic straddle VRC. PART 1: GENERAL 1.01 Section Includes: 1. Vertical reciprocating conveyor, Hydraulic straddle VRC. a. Machine, controller, platform, structural steel hoist frame. b. Wire mesh enclosure and gates. Related

More information

SECTION AUTOMATIC TRANSFER SWITCH

SECTION AUTOMATIC TRANSFER SWITCH SECTION 26 36 23 AUTOMATIC TRANSFER SWITCH PART 1: GENERAL 1.01 SCOPE A. Furnish all labor, materials, equipment and appurtenances, install and test electrically operated, automatic transfer switch (ATS)

More information

2. Water Pressure Booster Systems. 3. Duplex Pedestal Type Sump Pumps.

2. Water Pressure Booster Systems. 3. Duplex Pedestal Type Sump Pumps. PART 1: GENERAL 1.01 Purpose: A. The design guidelines contained herein includes the requirements for pumps utilized for plumbing systems at Texas State University. It is the intention of this document

More information

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International

More information

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING 2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING E3305.3: now reads The space equal to the width and depth of the panelboard and extending

More information

SECTION PACKAGE BOOSTER PUMP STATIONS

SECTION PACKAGE BOOSTER PUMP STATIONS SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to

More information

TELECOMMUNICATIONS ROOMS. Table of Contents PART 1 GENERAL 2 A. LOCATION: 2 B. SIZE 2 C. STRUCTURAL 3 D. ENVIRONMENTAL 3 E. ELECTRICAL AND LIGHTING 3

TELECOMMUNICATIONS ROOMS. Table of Contents PART 1 GENERAL 2 A. LOCATION: 2 B. SIZE 2 C. STRUCTURAL 3 D. ENVIRONMENTAL 3 E. ELECTRICAL AND LIGHTING 3 UNIVERSITY CONTACT: Network Services (302) 831-3722 TELECOMMUNICATIONS ROOMS Table of Contents PART 1 GENERAL 2 A. LOCATION: 2 B. SIZE 2 C. STRUCTURAL 3 D. ENVIRONMENTAL 3 E. ELECTRICAL AND LIGHTING 3

More information

ASHRAE 62.2: What s New in 2016

ASHRAE 62.2: What s New in 2016 ASHRAE 62.2: What s New in 2016 Rick Karg 2016 Residential Energy Dynamics, LLC What We Will Talk About Overview of mechanics of 62.2-2016. Logic behind the Standard. Sizing local ventilation (exhaust-only).

More information

BID PACKAGES 3-21, Addendum No. 03

BID PACKAGES 3-21, Addendum No. 03 WEBER MURPHY FOX Addendum Date: January 23, 2018 Bid Due Date: January 26, 2018 BID PACKAGES 3-21, Addendum No. 03 to the Plans and Specifications for Cuyahoga Community College West Science and IT Labs

More information

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists SECTION 412213- BRIDGE CRANES Part 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

City of High Point Airport Overlay District Noise Level Reduction Design Standards

City of High Point Airport Overlay District Noise Level Reduction Design Standards City of High Point Airport Overlay District Noise Level Reduction Design Standards Part A. Residential Design Standards for Zone 3 I. NOISE LEVEL REDUCTION (NLR) REQUIREMENT FOR ZONE 3. The City of High

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 11241 - Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S PART 1 - GENERAL... 1 1.01 Scope... 1 1.02 Scope of Work... 1 1.03

More information

INSOMNIAC 900 Contractor's Guide

INSOMNIAC 900 Contractor's Guide 1.5 INSOMNIAC 900 Contractor's Guide OpenTech Alliance, Inc. 150-090408-E-EU Contact Us 2501 West Dunlap Avenue Suite 255 Phoenix, Arizona 85021 Phone, Fax & Email Technical Support (602) 773-1700 support@opentechalliance.com

More information

HIGH MAST CAMERA POLE ASSEMBLY GENERAL

HIGH MAST CAMERA POLE ASSEMBLY GENERAL 10-3.24 HIGH MAST CAMERA POLE ASSEMBLY GENERAL The Contractor must furnish and install the following equipment for high mast camera pole assembly as described herein and as shown on the plans: 1. Camera

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

ARRANGEMENT AND WORKING OF MULTIPORT FLOW SELECTOR VALVE IN PRODUCTION MANIFOLD:

ARRANGEMENT AND WORKING OF MULTIPORT FLOW SELECTOR VALVE IN PRODUCTION MANIFOLD: GENERAL DESCRIPTION Crude oil well test manifold to be provide as Multiport Flow Selector (MPFS) technology. It provides a cost effective method for selecting and diverting well fluids from an individual

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. GORBEL PRODUCT SPECIFICATIONS 2010 Gorbel, Inc., P.O., Box 593, Fisher, New York 14453-0593 PHONE: 800-821-0086, FAX: 585-924-6273; WEBSITE: www.gorbel.com November SECTION 41 22 31PRIVATE FREE STANDING

More information

NOTICE OF ADDENDUM ADDENDUM 2 CONTRACT NO PROJECT NO UNIT WELL 31 WATER TREATMENT PLANT

NOTICE OF ADDENDUM ADDENDUM 2 CONTRACT NO PROJECT NO UNIT WELL 31 WATER TREATMENT PLANT February 20, 2017 NOTICE OF ADDENDUM ADDENDUM 2 CONTRACT NO. 7500 PROJECT NO. 10434 UNIT WELL 31 WATER TREATMENT PLANT Revise and amend the contract document(s) for the above project as stated in this

More information

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202 Procurement Department Bid Office Customer Center 1 st Floor, Room 002 21 W. Church Street Jacksonville, Florida 32202 October 26, 2017 ADDENDUM NUMBER: ONE (1) TITLE: Arc-Resistant Metal-Clad Switchgear

More information

NEC 2014 Code Changes

NEC 2014 Code Changes NEC 2014 Code Changes Articles 280.21-300.50 CHANGES FROM 2011 TO 2014 CODE ARE IN RED Chapter 2 - Wiring and Protection ARTICLE 280 Surge Arresters, Over 1000 volts II. Instillation III. Connecting Surge

More information

Place & Connect Pumping Stations

Place & Connect Pumping Stations Place & Connect Pumping Stations Flo-Pak Integrated Municipal Pumping Systems www.pattersonpumps.com When Quality Matters Flo-Pak Municipal Packaged Pumping Systems Setting the Bar for Packaged Systems

More information

PIP PCEPA003 Process Analyzer System Field Installation Guidelines

PIP PCEPA003 Process Analyzer System Field Installation Guidelines January 2016 Process Control PIP PCEPA003 Process Analyzer System Field Installation Guidelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,

More information

SOUTHERN NEVADA AMENDMENTS TO THE 2012 UNIFORM MECHANICAL CODE

SOUTHERN NEVADA AMENDMENTS TO THE 2012 UNIFORM MECHANICAL CODE SOUTHERN NEVADA AMENDMENTS TO THE 2012 UNIFORM MECHANICAL CODE Page 1 of 9 PREFACE This document was developed by the Southern Nevada Building Officials UPC/ UMC Committee and presents recommended amendments

More information

CONSTRUCTION REQUIREMENTS

CONSTRUCTION REQUIREMENTS CONSTRUCTION REQUIREMENTS Note: The buildings on the UCCS campus are divided into two categories: General Fund and Auxiliaries. General Fund Buildings include academic and administrative functions. Auxiliary

More information

SECTION (FORMERLY 11610)

SECTION (FORMERLY 11610) SECTION 11 53 13 (FORMERLY 11610) LABORATORY FUME HOODS PART 1 GENERAL Summary: This Specification identifies the minimum material and construction standards that are required to deliver a quality installation

More information

ELECTRIC METERING GENERAL

ELECTRIC METERING GENERAL 1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 EQUIPMENT 5.0 METER REQUIREMENTS 6.0 METER FACILITIES 7.0 ELECTRICAL CONNECTIONS 2.0 SCOPE This guide covers general requirements and codes for

More information

SECTION LUMINAIRES AND ACCESSORIES

SECTION LUMINAIRES AND ACCESSORIES SECTION 16500 LUMINAIRES AND ACCESSORIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. The general provisions of the contract including General and Special Conditions and General Requirements shall apply to

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 9 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 REFERENCES

More information

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO. 2017-26R Stone Group Architects Project No. 1731 ADDENDUM DATE: September 14, 2017 BID DATE: September 18, 2017 2:00 P.M. C.S.T. SCOPE OF THIS ADDENDUM:

More information

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION SECTION 74 AIRPORT OBSTRUCTION LIGHTS (FAA L-119) 74-1 GENERAL The Contractor shall perform all work required by the plans and specifications for construction of obstruction lights in accordance with the

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519 METAL CLAD CABLE - MC-PLUS Neutral

More information

Section BUILDINGS, SHELTERS, ENCLOSURES

Section BUILDINGS, SHELTERS, ENCLOSURES Section 13121 BUILDINGS, SHELTERS, ENCLOSURES Part 1 GENERAL 1.1 SECTION INCLUDES 1.2 A. Pre-engineered buildings. B. Pre-engineered shelters. C. Pre-engineered enclosures. D. Electrical wiring and devices

More information

University of Houston Master Construction Specifications Insert Project Name SECTION AIR DISTRIBUTION DEVICES PART 1 - GENERAL

University of Houston Master Construction Specifications Insert Project Name SECTION AIR DISTRIBUTION DEVICES PART 1 - GENERAL SECTION 23 37 13 - AIR DISTRIBUTION DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section 23 01

More information

ACBC Floor Mounted Active Beam

ACBC Floor Mounted Active Beam Floor Mounted Active Beam The Price Floor Mounted Active Beam,, is designed for occupant comfort. It provides high cooling and heating capacities while simultaneously supplying ventilation air from a DOAS

More information

Square and Rectangular Directional Diffusers

Square and Rectangular Directional Diffusers Square and Rectangular Directional Diffusers Product Overview Price offers a complete line of square and rectangular directional diffusers for a velocity of. Models SMD / AMD This series of louvered face

More information

HUP. Performance Data. Wholesale Products Page: Section: Performance Data Dated: January RPM: 1550 Discharge: 1" Solids: 1/8" GPM: TDH:

HUP. Performance Data. Wholesale Products Page: Section: Performance Data Dated: January RPM: 1550 Discharge: 1 Solids: 1/8 GPM: TDH: Performance RPM: 1550 Discharge: 1" Solids: 1/8" Wholesale Products Page: 6660-1 Section: Performance The curves reflect maximum performance characteristics without exceeding full load (Nameplate) horsepower.

More information

Zoned Comfort Control

Zoned Comfort Control Product Guide Zoned Comfort Control The complete line-up of whole-home residential zoning products; designed for simpler installation, durable operation and more profitable jobs. YOUR PARTNERS IN COMFORT

More information

SECTION HVAC INSTRUMENTATION AND CONTROLS INSTALLATION

SECTION HVAC INSTRUMENTATION AND CONTROLS INSTALLATION I. GENERAL A. NOTES SECTION 15957 (Applicable to IUPUI Only) 1. The University has a pre-purchase agreement (PPA) with Johnson Controls (JCI) and Siemens Building Technologies (SBT). The University will

More information

TS 804 CABLES TABLE OF CONTENTS TRAFFIC SIGNAL EQUIPMENT POLE WIRING DIAGRAM LOCATIONS WITH CENTRE MEDIANS

TS 804 CABLES TABLE OF CONTENTS TRAFFIC SIGNAL EQUIPMENT POLE WIRING DIAGRAM LOCATIONS WITH CENTRE MEDIANS TORONTO TRANSPORTATION January 2012 TS 804 CABLES TABLE OF CONTENTS 1. DRAWINGS TTD 804.001 TTD 804.002 TTD 804.003 TTD 804.005 TTD 804.006 TTD 804.007 TTD 804.010 TTD 804.015 TTD 804.020 TTD 804.025 TTD

More information

SECTION ACTIVE VEHICLE BARRIERS

SECTION ACTIVE VEHICLE BARRIERS SECTION 34 71 13.19 ACTIVE VEHICLE BARRIERS PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within

More information

Series - 1

Series - 1 SECTION 08360 SECTIONAL OVERHEAD DOORS 591 SERIES THERMACORE INSULATED STEEL DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word click

More information

Element D Services Heating, Ventilating, and Air Conditioning

Element D Services Heating, Ventilating, and Air Conditioning Building Automation PART 1 - GENERAL 1.01 OVERVIEW A. Provide a building temperature control/building automation system (BAS) for the space temperature control and monitoring of defined environmental conditions.

More information

1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information:

1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information: SECTION 260500 - GENERAL REQUIREMENTS FOR ELECTRICAL 1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information: A. Codes, Laws,

More information

Introduction. Disclaimer. Table of contents

Introduction. Disclaimer. Table of contents Updated July 18, 2012 Introduction The Cambridge Elevating Limited-Use / Limited-Application Elevator is designed to service schools, libraries, low rise, low occupancy commercial buildings, churches and

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Specification for MRL Passenger Elevators

Specification for MRL Passenger Elevators Specification for MRL Passenger Elevators Part 1 General 1.1 Description A. This specification is intended to cover the complete furnishing and installing of one MRL passenger elevator as manufactured

More information

Advanced Ventilation for Residential applications FBC Res 2010.

Advanced Ventilation for Residential applications FBC Res 2010. Advanced Ventilation for Residential applications FBC Res 2010. Course Description Review of the Residential Ventilation requirements in the Florida Building Code, Residential 2010. I. Introduction Dean

More information

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES... DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General Requirements

More information

SEMINOLE TRIBE OF FLORIDA

SEMINOLE TRIBE OF FLORIDA SEMINOLE TRIBE OF FLORIDA Denise DeCarolis Carpenter Purchasing Department Director 6300 STIRLING ROAD HOLLYWOOD, FLORIDA 33024 PHONE (954) 966-6300 x11170 FAX (954) 967-3478 E-MAIL: dcarpenter@semtribe.com

More information

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Contract Documents Review Package. Provide a written explanation for any omissions. The following items,

More information

B. System Design and Performance Requirements

B. System Design and Performance Requirements 15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes

More information

Communications Page 1 of 9

Communications Page 1 of 9 Page 1 of 9 Last Update: April 23 rd, 2014 Introduction Design In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a

More information

EFFECTIVE DATE: July 1, 2008, unless a later date is cited at the end of a section. [ NMAC - Rp,

EFFECTIVE DATE: July 1, 2008, unless a later date is cited at the end of a section. [ NMAC - Rp, TITLE 14 CHAPTER 10 PART 4 HOUSING AND CONSTRUCTION ELECTRICAL CODES 2008 NEW MEXICO ELECTRICAL CODE 14.10.4.1 ISSUING AGENCY: The Construction Industries Division of the Regulation and Licensing Department.

More information

Telecommunication Spaces

Telecommunication Spaces Telecommunication Spaces October 19, 2016 Page 1 Revision History Telecommunication Spaces Standard Effective Date Email Version Contact Phone OIT-TS strevena@csustan.edu 1.0 Stan Trevena 209.667.3137

More information

MARBLEHEAD FIRE DEPARTMENT Standard Operating Guideline Draft for Photovoltaic/Solar Installations

MARBLEHEAD FIRE DEPARTMENT Standard Operating Guideline Draft for Photovoltaic/Solar Installations TOWN OF MARBLEHEAD FIRE DEPARTMENT Marblehead Fire Department Installation Guidelines for Photovoltaic/Solar installations July 1, 2015 Updated December 2015 MARBLEHEAD FIRE DEPARTMENT Standard Operating

More information

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how?

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how? SECTION 08360 SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Glazed Aluminum

More information

OPERATING PROCEDURE NO. 310

OPERATING PROCEDURE NO. 310 OPERATING PROCEDURE NO. 310 Related Operating Procedures: 310A; 310B; 310C; 310D SUBJECT: Conditions of Service Issued: February 10, 2014 Revised: March 28, 2016 OBJECTIVE: To establish the rules, regulations

More information

SECTION Manufactured Metal Casework FLEXIBLE LABORATORY FURNITURE SYSTEM (OPTIMA) USA VERSION

SECTION Manufactured Metal Casework FLEXIBLE LABORATORY FURNITURE SYSTEM (OPTIMA) USA VERSION SECTION 12 31 00.4 Manufactured Metal Casework FLEXIBLE LABORATORY FURNITURE SYSTEM (OPTIMA) USA VERSION PART 1 GENERAL Summary: This Specification identifies the minimum material and construction standards

More information

SECTION FIELD ERECTED INDUCED DRAFT COOLING TOWER

SECTION FIELD ERECTED INDUCED DRAFT COOLING TOWER PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract including general and supplementary conditions and specifications section apply to this section. B. Related Sections:

More information