1 CAL SCAFFOLD USER GUIDELINES COURSE SUMMARY The following guide is an aid intended for students who have completed the ClickSafety training course or module associated with Scaffold Safety. This guide is a resource of basic occupational safety and health information and is not a substitute for standards issued and enforced by California s Division of Occupational Safety and Health (Cal/OSHA) or the U S Department of Labor s Occupational Safety and Health Administration (OSHA) or its state equivalents. This course is also not a substitute for the kind of intensive, site-specific, hands-on training and information that is necessary to ensure a safe and healthful workplace. This guide is not to be reproduced or used without the express permission of ClickSafety. References Title 8 California Code of Regulations (CCR), Sections Introduction Benefits and Hazards Provide ease of access for many trades Speed and efficiency Serious hazards when using mobile scaffolds For all scaffolds: uncorrected hazards lead to injury ACCIDENT CAUSES: Rolling Scaffolds Incorrect Use Improper setup Failure to lock/secure wheels Moving the scaffold Instability Inadequate platforms Supported Scaffolds Incorrect Use Improper setup Inadequate platforms Failure to replace system components Failure to secure to structure ROLLING SCAFFOLDS: Tube & Coupler Systems Follow manufacturer instructions for: Cross bracing Horizontal Frame Requirements Diagonal Bracing Maintain scaffold plumb and level Provide guardrails and midrails at 7 ½ or other level (e.g. 6 feet, 10 feet) depending on scaffold configuration and requirements 10 feet as required Install toe boards, screens and mesh as necessary System Rolling Scaffolds FIRE PREVENTION CLICKSAFETY.COM, INC. PAGE 1 OF 5

2 Cross brace per manufacturer s instructions Provide diagonal bracing to stop twisting Secure all pin connections Plumb and level Guardrails, midrails, and toe boards at 7 ½ or other level (e.g. 6 feet, 10 feet) depending on scaffold configuration and requirements 10 feet as required Tubular Welded Frame Select undamaged frames Provide cross bracing Diagonal bracing a must Keep scaffold plumb and level Guardrails/Midrails at 7 ½ or other level (e.g. 6 feet, 10 feet) depending on scaffold configuration and requirements Consider toe boards always Locks and pins on Wheels Inspect for: Positive wheel locks Proper operation of locks and swivels Security of castor and wheel stems in scaffold legs Fabricated Platforms Description Part of a complete manufactured system Never mix parts from different manufacturers Must fit appropriately per manufacturer s instructions Full planking required Minimum Standards for Rolling Scaffolds Base to height ratio no greater than 3 to 1 Outrigger frames on both sides of the scaffold Some state standards more stringent Movement by hand Guidelines Level surfaces required No holes, damage, or obstacles on the rolling surface Force no higher than 5 feet from base Observe these precautions: No riders if scaffold exceeds 2 to 1 base-to-height ratio No workers on cantilever section while moving Watch for electrical hazards, fire sprinklers, holes in the deck, personnel on ground Powered Movement Slow and steady Speed no greater than 1 foot per second No employees on cantilever Provide smooth, level surface Inform employees of movement Establish controls at shafts and perimeter FIRE PREVENTION CLICKSAFETY.COM, INC. PAGE 2 OF 5

3 Scissor Lifts Level surface or slope tolerance Use outriggers/stabilizers as intended Install guardrails, or fall protection as required Distributed loads evenly Never overload unit Platform extensions per manufacturer s instructions Safe distances from overhead power lines It jammed or snagged, workers should leave lift before attempting to dislodge Supported Scaffolds Standard Planking (All Scaffolds) Graded and marked as scaffold planking Minimum platform 18 wide No openings except for brackets or connectors Minimum Standards Scaffolds must be: Plumb and Level Undamaged frames Security to structure Proper platforms Proper Access Locks and pins on Supported Frames Check for: Leg bases secured to sills Uplift pins between sections Function of guardrails pins and keepers Plumb and Level For System, Tube & Coupler, Tubular Welded Frames: Plumb and level maintained for all components Ensure safety of workers Loading of materials Frame Damage Scaffolds provide: support for you support for your materials evenly distributed loads no failure if undamaged Stability Narrow scaffolds If taller than 3 times base dimension. Secure to structure or to deadmen: Every 26 feet vertically At top corners Every 30 feet horizontally Scaffold not tied? -- don t use it. FIRE PREVENTION CLICKSAFETY.COM, INC. PAGE 3 OF 5

4 Security to Structure: Further Guidelines Tie Points Tie material: Tie points every 26 vertically. Tie points every 30 horizontally. Follow mfg. Instructions. Ties recommended as two loops of #12 or one loop of #10 iron wire. Local conditions, such as wind loads may require more. SPECIAL CONSIDERATIONS Qualified Person Inspection Requirements (All Scaffolds): During Scaffolds Erection, Daily before use, After any alterations, Correct hazards before use Hazard Recognition Users must be informed of Electrical Hazards, Fall hazards, Load capacities Retraining (all scaffolds) Must be provided when: Hazards or Working Conditions Change Employees display a lack of awareness Rolling Scaffolds are used improperly Scaffolds: Summing Up Benefits of Scaffolds Improved Efficiency Reasonable Access Movement and speed Dangers/Precautions Scaffolds are dangerous unless: Erected properly Adequate, stable access provided Solid, fully planked platform installed No overloading/used properly on a solid level surface Summary o For more detailed requirements, please consult Title 8 CCR and other appropriate local standards and safety orders. o You should also get hands on and site specific training as required. FIRE PREVENTION CLICKSAFETY.COM, INC. PAGE 4 OF 5

5 COURSE NOTES: FIRE PREVENTION CLICKSAFETY.COM, INC. PAGE 5 OF 5

Introduction. Estimated length: 30 minutes Audience: construction workers

Introduction. Estimated length: 30 minutes Audience: construction workers Introduction Scaffold User Training Welcome! The purpose of this Click Safety course is to provide instruction for basic safety provisions when using scaffolds in construction activities. Estimated length:

More information

Reliant Holdings Ltd Safety Management System

Reliant Holdings Ltd Safety Management System Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 7 Purpose The purpose of this program is to prevent injuries due to falls from elevated work areas and ensure employees

More information

Citations in brackets are from Title 8 of the California Administrative Code.

Citations in brackets are from Title 8 of the California Administrative Code. SAFETY WALKAROUND CHECKLIST SCAFFOLDS 2001 Date Prepared: Project Name/No: By: Location: Check the box if the statement is true. Fill in the blanks where the appears. Citations in brackets are from Title

More information

Sample Written Program. For. Scaffolds

Sample Written Program. For. Scaffolds Sample Written Program For Scaffolds 1 Scaffold Safety Program (COMPANY NAME) Purpose The purpose of this safety policy and procedure is to establish guidelines for the protection of {COMPANY} employees

More information

Scaffolds. OSHA Office of Training & Education 1

Scaffolds. OSHA Office of Training & Education 1 Scaffolds OSHA Office of Training & Education 1 What Is A Scaffold? An elevated, temporary work platform Three basic types: Supported scaffolds -- platforms supported by rigid, load bearing members, such

More information

OSHA Rules for Scaffolding

OSHA Rules for Scaffolding OSHA Rules for Scaffolding A) Objectives: 1. 2. 3. Don t let the scaffold fall. Don t fall off the scaffold. Don t let the material fall off the scaffold. Name of Competent Person: Name of Qualified Person:

More information

SCAFFOLDING PROCEDURE

SCAFFOLDING PROCEDURE SCAFFOLDING PROCEDURE 1 Table of Contents 1 PURPOSE... 3 2 PROGRAM COMPLIANCE... 3 3 SCOPE... 3 4 DEFINITIONS... 3 5 RESPONSIBILITES... 4 6 SCAFFOLD INSPECTION... 5 7 SCAFFOLD USE... 5 8 SCAFFOLD REQUIREMENTS...

More information

STANDARD PRACTICE INSTRUCTION

STANDARD PRACTICE INSTRUCTION STANDARD PRACTICE INSTRUCTION DATE: March 1, 2001 SUBJECT: Scaffolding Safety Program. REGULATORY STANDARDS: 29 CFR 1910.28 Safety Requirements For Scaffolding. 29 CFR 1910.29 Manually Propelled Mobile

More information

Scaffolding. Safety Guide. STOP! Before you climb

Scaffolding. Safety Guide. STOP! Before you climb Scaffolding Safety Guide Printed FEB 2015 rebr. AUG 2016 Contents Safety Guide Disclaimer... 1 Safety Guide Objectives... 2 Roles & Responsibilities of Workplace Parties Employers, Supervisors, Workers...

More information

Universal Panels & Accessories

Universal Panels & Accessories Universal Panels & Accessories Erection Procedures INTRODUCTION Use common sense when working with Scaffold Your Safety is our #1 Concern Universal Scaffolds are designed with your safety in mind every

More information

Multi-Purpose Scaffolding Instruction Manual

Multi-Purpose Scaffolding Instruction Manual Limited Warranty World Factory, Inc. World Factory, Inc. (Seller) warrants to the original Buyer only, that each YellowStone Product will be free from defects in material and workmanship for a period of

More information

SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS

SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS PERSONNEL DIVISION Revised 2002 CONTENTS Page 1 INTRODUCTION 1 2 APPLICATION 1 3 ERECTION AND INSPECTION 1 4 ERECTION 1 4.1 Before erection of tower

More information

Systems Scaffold Tubular Scaffold Access Unit Installation Instructions

Systems Scaffold Tubular Scaffold Access Unit Installation Instructions Systems Scaffold Tubular Scaffold Access Unit Installation Instructions 2 Tubular Scaffold Access Unit Installation Instructions LTUB7 Galvanized: 24.1 lb Label 7112A0003 NOTICE Please read and follow

More information

Elevated Work Safety Meeting

Elevated Work Safety Meeting Elevated Work Safety Meeting 1 Elevated Work There are many jobs that require working at heights This requires the use of walking working surfaces such as ladders, scaffolds and stairways Safety in elevated

More information

Scaffolding Safety. Scaffolding

Scaffolding Safety. Scaffolding Scaffolding Safety Scaffolding 1926.450 - Scope, Application Covers all scaffolds used in workplaces Does not apply to crane or derrick suspended personnel platforms, which are covered by 1926.550(g) Aerial

More information

CLIMA AGR. Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE

CLIMA AGR. Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE CLIMA AGR Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE Contents Safety First Safety Checklist Quantity Schedules Assembly and Dismantling Procedure Toe Boards

More information

Scaffolding Procedures

Scaffolding Procedures Procedures Purpose It is the purpose of this company in issuing these procedures to further ensure a safe workplace based on the following formal, written procedures for scaffold work. Application This

More information

Big Ox Energy Siouxland, LLC. Safety Management System. Authority: President

Big Ox Energy Siouxland, LLC. Safety Management System. Authority: President Issuing Dept: Safety Page: Page 1 of 5 Purpose The purpose of this program is to provide guidelines to Big Ox Energy - Siouxland LLC employees in the safe use of scaffolding, and to reduce the risk of

More information

DEPAUL UNIVERSITY. Scaffolding Program. Environmental Health & Safety. April 2017

DEPAUL UNIVERSITY. Scaffolding Program. Environmental Health & Safety. April 2017 DEPAUL UNIVERSITY Scaffolding Program Environmental Health & Safety April 2017 1 TABLE OF CONTENTS SECTION PAGE NO. 1.0 PURPOSE 2 2.0 SCOPE 2 3.0 SCAFFOLDING ERECTOR 2 4.0 GENERAL 2 5.0 WOOD SCAFFOLDING

More information

BASIC SCAFFOLDING KNOWLEDGE QUESTIONS

BASIC SCAFFOLDING KNOWLEDGE QUESTIONS Garnsworthy Square 46, 62 & 64 Garnsworthy St Springvale rth Victoria 3171 Updated on 22/02/08 STC105 Name BASIC SCAFFOLDING KNOWLEDGE QUESTIONS THE PROFESSIONAL Scaffold Tools Scaffold Belts Couplers

More information

Scaffold Inspection Procedures for the Competent Person. Merle Errthum

Scaffold Inspection Procedures for the Competent Person. Merle Errthum Scaffold Inspection Procedures for the Competent Person Merle Errthum 2014 an elevated work platform. What is a Scaffold? What Is A Scaffold? An elevated, temporary work platform Three basic types: Supported

More information

Copies of the written program may be obtained at Where are copies of this written plan kept? (Insert building/room, etc.).

Copies of the written program may be obtained at Where are copies of this written plan kept? (Insert building/room, etc.). Scaffolding Safety Procedures for Construction Purpose It is this company's purpose in issuing these procedures to further ensure a safe workplace based on the following formal, written procedures for

More information

The original WACO RED premium frame scaffolding and shoring systems.

The original WACO RED premium frame scaffolding and shoring systems. The original WACO RED premium frame scaffolding and shoring systems. 2 WACO Premium Frame Scaffolding and Shoring System Used by thousands of the industry s top contractors and professionals, Waco Red

More information

BP OIL -- TOLEDO REFINERY

BP OIL -- TOLEDO REFINERY BP OIL -- TOLEDO REFINERY Document Type: Procedure Refinery Wide Procedure No.: SAF 076 Effective Date: 3/31/17 Scaffold Procedure Revision No.: 8 Owner: E. Stewart / N. Weber Authorized By: Chris Conley

More information

Safety Requirements for Scaffolding: OSHA Standard

Safety Requirements for Scaffolding: OSHA Standard ABE178 Safety Requirements for Scaffolding: OSHA Standard 1910.28 1 Carol J. Lehtola, William J. Becker and Chris Eversole 2 The Impact of Safety on Florida Agriculture Florida agriculture, including forestry

More information

Safety on Heights: Our Policy

Safety on Heights: Our Policy 11/17/14 Safety on Heights: Our Policy Only volunteers over the age of 18 are allowed to work on heights of more than six feet off the ground. This includes all work on scaffolds. Only volunteers who are

More information

SCAFFOLDS Revision No: 3

SCAFFOLDS Revision No: 3 PAGE 1 OF 6 1.0 PURPOSE/ SCOPE To communicate the safety requirements for the erection, inspection and safe use of scaffolds. Compliance with these requirements will assure employee safety while working

More information

Chapter 17 - Ladders and Scaffolds

Chapter 17 - Ladders and Scaffolds Chapter 17 Ladders and Scaffolds Chapter 17 - Ladders and Scaffolds Ladders Ladders must be in good condition, made of suitable material, of proper length, and of the correct type for the use intended.

More information

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use Mobile access and working towers in accordance with: HD 1004; DIN 4422, Part 1 (Version 8/92) Working platform 2.8 x 2.8 m and 2.8 x 1.95 m Max. working height: in closed rooms 13.95 m, outdoors 10.0 m

More information

BoSS Climalite Camera and lighting tower

BoSS Climalite Camera and lighting tower Contents Safety First Safety First Quantity Schedules Toeboard 2 9 13 33 INTRODUCTION Please read this guide carefully. Please note that diagrams are for illustrative purposes only. User guides are also

More information

Document Number: HSE Created: February 21, 2013 SCAFFOLDING. Author: A Holland

Document Number: HSE Created: February 21, 2013 SCAFFOLDING. Author: A Holland Document Number: HSE33-001 Created: February 21, 2013 SCAFFOLDING Author: A Holland MAPP Construction - Corporate 344 Third Street Baton Rouge, LA 70801 (225) 757-0111 MAPP Construction - Houston 11511

More information

Safety Policy and Procedure

Safety Policy and Procedure Safety Policy and Procedure Policy Number: 026 Authorized By: The Cianbro Companies Alan Burton Title: Scaffold Safety is Everyone s Responsibility Effective Date: 06/01/97 Page 1 of 17 1 Status 1.1 Update

More information

DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS

DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS DUQUESNE UNIVERSITY SAFETY PROGRAM FOR WORKING AT ELEVATED HEIGHTS Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Purpose 1 Scope 1 Responsibilities 1 Scaffolding 2 Ladders

More information

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 7

BP U.S. Pipelines and Logistics (USPL) Safety Manual Page 1 of 7 Safety Manual Page 1 of 7 Scaffolds 1. Purpose This policy establishes the basic safety requirements and safe work practices for the erection, use, inspection, movement, and dismantling of scaffolding.

More information

SCAFFOLDING - Part 2 SELF INSPECTION CHECKLIST

SCAFFOLDING - Part 2 SELF INSPECTION CHECKLIST OPTIONAL INFORMATION Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: SCAFFOLDING - Part 2 Instructions: This checklist covers some of the regulations issued

More information

Preventing Electrocutions:

Preventing Electrocutions: SAFETY CORNER Preventing Electrocutions: While Working with Scaffolds Near Overhead Power Lines Warning! Workers may be electrocuted when erecting, moving, or working from metal or conductive scaffolds

More information

OCCUPATIONAL HEALTH AND SAFETY ACT SCAFFOLDING REGULATIONS

OCCUPATIONAL HEALTH AND SAFETY ACT SCAFFOLDING REGULATIONS c t OCCUPATIONAL HEALTH AND SAFETY ACT SCAFFOLDING REGULATIONS PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to October 28,

More information

Scissor Lift Safety. Supervisor Manual 29 CFR , 451, 452, 454. Page 0

Scissor Lift Safety. Supervisor Manual 29 CFR , 451, 452, 454. Page 0 Scissor Lift Safety 29 CFR.1926.450, 451, 452, 454 Supervisor Manual Page 0 Table of Contents Purpose... 2 Program Responsibilities... 2 Management... 2 Supervisors... 2 Employees... 2 Definitions... 3

More information

TAMPA ELECTRIC COMPANY ENERGY SUPPLY SCAFFOLD PROGRAM

TAMPA ELECTRIC COMPANY ENERGY SUPPLY SCAFFOLD PROGRAM TABLE OF CONTENTS TITLE PAGE # PURPOSE / INTRODUCTION 1 RESPONSIBILITY 2 EMPLOYEE TRAINING AND DOCUMENTATION 3-4 PERIODIC PROGRAM EVALUATION 4 GENERAL SCAFFOLD ERECTING/DISASSEMBLING REQUIREMENTS 5-7 SCAFFOLDING

More information

EXCEL MODULAR STANDARD SCAFFOLD COMPONENT TECHNICAL MANUAL

EXCEL MODULAR STANDARD SCAFFOLD COMPONENT TECHNICAL MANUAL EXCEL MODULAR STANDARD SCAFFOLD COMPONENT TECHNICAL MANUAL EMSLC-TSM-1001 Engineering Approval: Lance Smith Manual Release Date: 04/25/2017 Release Authorization: ECN EMSLC-0191 Revision: AK TABLE OF

More information

Span 300 Instruction Manual

Span 300 Instruction Manual Span 300 Instruction Manual DESIGNATION SPAN300 Double Width EN 1004 3 8/12 XXCD SPAN 300 Single Width EN 1004 3 8/8 XXCD CEN designation of this instruction manual EN 1298 IM en Rev-00 WARNING NEVER STAND

More information

References. EM , Sections 22 OSHA 29CFR (Subpart L ) UFGS [Latest] ANSI A

References. EM , Sections 22 OSHA 29CFR (Subpart L ) UFGS [Latest] ANSI A References EM385-1-1, Sections 22 OSHA 29CFR 1926.450 (Subpart L ) UFGS-01 35 29[Latest] ANSI A10.8-1988 What Is A Scaffold? An elevated, temporary work platform Three basic types: Supported scaffolds

More information

As a scaffold user, Mr Scaffold recommends Method 1, but both options are suitable.

As a scaffold user, Mr Scaffold recommends Method 1, but both options are suitable. 20 EASYSCAF t TM The Next Level 1300 MR SCAFFOLD (1300 677 223) 12 Lagana Place Wetherill Park NSW 2164 Fax: (02)9725 5214 ABN: 65 088 652 144 Re: Workcover Update Feb 2011 Thankyou for purchasing your

More information

Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT

Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT IMPORTANT SAFETY INFORMATION FOR USERS OF THE REECHCRAFT, BRACING SYSTEM PLEASE READ BEFORE USE Panel Jack Pro System BRACING, ALIGNMENT AND SCAFFOLDING EQUIPMENT UK Edition 1.3 26/11/2012 1 TABLE OF CONTENTS

More information

Introduction to the Trade

Introduction to the Trade Lesson Plans for Module 31101-15 Introduction to the Trade Module 31101-15 introduces the scaffolding trade and its associated trade math, regulations, and standards; identifies commonly used scaffolding

More information

Course 804. Scaffold Erection and Inspection

Course 804. Scaffold Erection and Inspection Scaffold Erection and Inspection This page intentionally blank OSHAcademy Study Guide Safe Scaffold Erection and Inspection No portion of this text may be reprinted for other than personal use. Any commercial

More information

NEBOSH International Certificate in Construction Safety and Health Unit ICC1 MANAGING AND CONTROLLING HAZARDS IN INTERNATINAL CONSTRUCTION ACTIVITIES

NEBOSH International Certificate in Construction Safety and Health Unit ICC1 MANAGING AND CONTROLLING HAZARDS IN INTERNATINAL CONSTRUCTION ACTIVITIES NEBOSH International Certificate in Construction Safety and Health Unit ICC1 MANAGING AND CONTROLLING HAZARDS IN INTERNATINAL CONSTRUCTION ACTIVITIES element 10: WORKING AT HEIGHT - HAZARDS AND RISK CONTROL

More information

CHAPTER 21 SCAFFOLDS 21 SCAFFOLDS. Hazards. Climbing Up and Down. Planks Sliding Off or Breaking. Improper Loading or Overloading

CHAPTER 21 SCAFFOLDS 21 SCAFFOLDS. Hazards. Climbing Up and Down. Planks Sliding Off or Breaking. Improper Loading or Overloading CHAPTER 21 SCAFFOLDS 21 SCAFFOLDS More than half of scaffold incidents in Ontario construction are falls. Several fatalities are also related to scaffolds each year. The number and severity of injuries

More information

Scaffolding Practice

Scaffolding Practice Health & Safety Scaffolding Practice Content Owner Custodian H&S Discipline Program COMS Document Number Manager, H&S Programs H&S Programs & Projects Health & Safety Scaffolding See COMS Standards CEN-EHS9552

More information

TRENCHING AND EXCAVATION

TRENCHING AND EXCAVATION TRENCHING AND EXCAVATION The following guide is an aid intended for students who have completed the ClickSafety training course or module associated with Trenching and Excavation. This guide is a resource

More information

Span 400 Instruction Manual

Span 400 Instruction Manual Span 400 Instruction Manual DESIGNATION SPAN 400 Double Width EN 004 3 8/2 XXCD SPAN 400 Single Width EN 004 3 8/8 XXCD CEN designation of this instruction manual EN 298 IM en Rev-00 WARNING NEVER STAND

More information

BILJAX SCAFFOLDING. Scaffold and Accessories

BILJAX SCAFFOLDING. Scaffold and Accessories P R O V I D I N G A C C E S S S O L U T I O N S T O T H E W O R L D BILJAX SCAFFOLDING Scaffold and Accessories KNOW YOUR SCAFFOLD Haulotte Group BilJax, manufacturer of THE ORIGINAL YELLOW SCAFFOLD. For

More information

LEGAL SUPPLEMENT 43. to the Government Gazette of Mauritius No. 13 of 8 February 2014

LEGAL SUPPLEMENT 43. to the Government Gazette of Mauritius No. 13 of 8 February 2014 LEGAL SUPPLEMENT 43 to the Government Gazette of Mauritius No. 13 of 8 February 2014 Government Notice No. 16 of 2014 THE OCCUPATIONAL SAFETY AND HEALTH ACT Regulations made by the Minister under section

More information

BOOM-SUPPORTED ELEVATING WORK PLATFORM PROGRAM

BOOM-SUPPORTED ELEVATING WORK PLATFORM PROGRAM Page: 1 of 7 1.0 PURPOSE and APPLICABILITY 1.1 It is the policy of the University of Pennsylvania in coordination with the Office of Environmental Health and Radiation Safety to provide the University

More information

Sales Hire Erections

Sales Hire Erections LTD www.scafhire.ie Sales Hire Erections Scaffolding Specialists Company History Since its modest inception in 1980 Scafhire Ltd has progressed to a position of very high prominecnce and respectability

More information

A-0312 ASSEMBLY GUIDE

A-0312 ASSEMBLY GUIDE 760265-A-0312 ASSEMBLY GUIDE 1 Contents Section Contents Introduction Know Your MiTOWER Know Your MiTOWER s Components Know Your Kit List and Specifications Know Your Storage and Transport Pack Safety

More information

Management Plan for Walking/Working Surfaces & Fall Protection (29 CFR , 23, 66 App.C; 29 CFR ) ISD #535

Management Plan for Walking/Working Surfaces & Fall Protection (29 CFR , 23, 66 App.C; 29 CFR ) ISD #535 Management Plan for Walking/Working Surfaces & Fall Protection (29 CFR 1910.22, 23, 66 App.C; 29 CFR 1926.502) ISD #535 Health & Safety Office Maintenance Service Building 10 SE 9½ Street Rochester, MN

More information

Supported Scaffold Inspections

Supported Scaffold Inspections Supported Scaffold Inspections May 2016 Inspect scaffolds and scaffold parts daily, before each work shift, and after any event that may have caused damage. Check to see if power lines near scaffolds are

More information

FrameSAFE Site-Specific Fall Protection Plan Template. Instructions for Use DO NOT INCLUDE THIS PAGE IN YOUR MANUAL SAMPLE

FrameSAFE Site-Specific Fall Protection Plan Template. Instructions for Use DO NOT INCLUDE THIS PAGE IN YOUR MANUAL SAMPLE FrameSAFE Site-Specific Fall Protection Plan Template Instructions for Use DO NOT INCLUDE THIS PAGE IN YOUR MANUAL Step 1: Complete Site-Specific Form Enter the site-specific information in the form on

More information

British Columbia Carpenter Apprenticeship Program

British Columbia Carpenter Apprenticeship Program British Columbia Carpenter Apprenticeship Program Level 2 Line E Competency E-1 Use Ladders and Scaffolds 7960003552 Ordering Crown Publications, Queen s Printer PO Box 9452 Stn Prov Govt 563 Superior

More information

BECx Construction Phase Safety

BECx Construction Phase Safety BECx Construction Phase Safety What is the Number One Priority in Construction? Building Enclosure Commissioning: Train the Trainer Iowa State University, Ames Iowa May 10 12, 2016 Presented by William

More information

Smarter. Safer. Leaner.

Smarter. Safer. Leaner. Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter

More information

APPLICATION GUIDE PERFORM WITH PRECISION

APPLICATION GUIDE PERFORM WITH PRECISION APPLICATION GUIDE PERFORM WITH PRECISION APPLICATION GUIDE TABLE OF CONTENTS A Word about Safety...1 General Shoring Safety Rules... 2 Single and Independent Post Shore System Safety Rules... 4 General

More information

WARNING. *All Tele-Tower manuals are available free from Telpro Inc. Call Customer Service at or if you need a copy.

WARNING. *All Tele-Tower manuals are available free from Telpro Inc. Call Customer Service at or if you need a copy. Adjustable Wor k Platfor m M O D E L 11 7 7 E X T E N S I O N O P E R A T O R S M A N U A L WARNING Read and follow these warnings and the instructions that follow. Failure to do so may result in serious

More information

Configuration. User Guide. Version: Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES

Configuration. User Guide. Version: Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES Configuration User Guide Version: 2018.0 Copyright 2017 Computer and Design Services Ltd GLOBAL CONSTRUCTION SOFTWARE AND SERVICES Contents Introduction... 1 Create a new project... 2 Open the configuration...

More information

ADVANCED SCAFFOLDING COURSE { STI, USA APPROVED }

ADVANCED SCAFFOLDING COURSE { STI, USA APPROVED } ADVANCED SCAFFOLDING COURSE { STI, USA APPROVED } [An international course with a duration of 2 days, which provides the in depth knowledge on scaffolding, method of erection, inspection] JD INSTITUTE

More information

FACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY AERIAL WORK PLATFORM POLICY 09/06/17 Last Revision

FACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY AERIAL WORK PLATFORM POLICY 09/06/17 Last Revision FACILITIES MANAGEMENT OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY AERIAL WORK PLATFORM POLICY 09/06/17 Last Revision 1. Intent This program has been developed to reduce the risk of physical injury or property

More information

Aerial and Scissor Lift

Aerial and Scissor Lift This document is intended to provide basic safety guidelines for the Physical Plant Department at Community College of Allegheny County. The information provided in this guide may vary by site. Version

More information

STEEL STORAGE RACK SAFETY MANUAL

STEEL STORAGE RACK SAFETY MANUAL SAFETY GUIDELINES FOR LAYOUTS A well-designed racking system optimizes the efficiency of your operation providing many years of reliable service. Please review our rack selection and specification manual

More information

"SUPPORTED SCAFFOLDING SAFETY IN CONSTRUCTION ENVIRONMENTS"

SUPPORTED SCAFFOLDING SAFETY IN CONSTRUCTION ENVIRONMENTS PRESENTER'S GUIDE "SUPPORTED SCAFFOLDING SAFETY IN CONSTRUCTION ENVIRONMENTS" Part of the "CONSTRUCTION SAFETY KIT" Series "Quality Safety and Health Products, for Today...and Tomorrow" OUTLINE OF MAJOR

More information

Residential fall protection. Presented by Minnesota OSHA

Residential fall protection. Presented by Minnesota OSHA Residential fall protection Presented by Minnesota OSHA Fall protection 29 CFR 1926 Subpart M 1926.501(b)(13) Residential construction policy changes effective June 16, 2011 Residential construction policy

More information

Scaffold Instruction Manual

Scaffold Instruction Manual Scaffold Instruction Manual This booklet contains information on how to erect, stabilize, dismantle and maintain your MultiScaff aluminium scaffolding. Manufactured by: August 2014 Index Page Number Safety

More information

Assembly and usage instructions. Z600 brace-free mobile scaffold

Assembly and usage instructions.  Z600 brace-free mobile scaffold Assembly and usage instructions www.zarges.de brace-free mobile scaffold towers Assembly and usage instructions 3 Table of contents 1. General information 4 1.1. Introduction 4 1.2. Manufacturer 4 1.3.

More information

END LINKED TOWER SCAFFOLD. 3T Method - Through The Trapdoor USER GUIDE

END LINKED TOWER SCAFFOLD. 3T Method - Through The Trapdoor USER GUIDE ND LINKD TOWR SCAFFOLD 3T Method - Through The Trapdoor USR GUID Contents Safety First Component Diagram Component Quantity & Safety Data Schedule Build Method Pre-use Safety Inspection Checklist 2 7 8

More information

1 Man Mobile Aluminium Tower System

1 Man Mobile Aluminium Tower System 1 Man Mobile Aluminium Tower System Euro one, quick assembly, one person aluminum mobile tower Easy to erect and dismantle by one person with the base unit forming a trolley for fast storage and transportation.

More information

Adjustable Pallet Racking Installation Guide

Adjustable Pallet Racking Installation Guide Adjustable Pallet Racking Installation Guide Read this Guide thoroughly before commencing assembly and retain for future reference. Installation plans and design drawings should be strictly adhered to.

More information

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories. SECTION 02830 CHAIN LINK FENCES AND GATES (GALVANIZED) 1.0 GENERAL 1.1 Section Includes A. Fence framework, fabric, gates, and accessories. B. Excavation for post bases; concrete footing for posts. C.

More information

Erection manual. Tube-Lock Concept. van Thiel United b.v Page: 1 of 15

Erection manual. Tube-Lock Concept. van Thiel United b.v Page: 1 of 15 Erection manual Tube-Lock Concept 2013-02 Page: 1 of 15 Contents Subject Page Illustration of Tube-Lock Concept 3 Parts of Tube-Lock concept 4 Legislation 5 Erecting a Tube-Lock Concept scaffold 6 Technical

More information

WORKING AT HEIGHT PROCEDURE

WORKING AT HEIGHT PROCEDURE Page 1 of 8 AL-Yamama Engineering Company HSSE Department (s) WORKING AT HEIGHT PROCEDURE Page 1 of 8 Page 2 of 8 Introduction Work at height is any work activity that is performed where the work is to

More information

the P.R. Skate, LLC Pallet Rack Moving System Product Manual

the P.R. Skate, LLC Pallet Rack Moving System Product Manual the P.R. Skate, LLC Pallet Rack Moving System Product Manual the P.R. Skate, LLC Product Manual In this manual we will cover both normal operation of the P.R. Skate moving system and safety issues that

More information

PRO-TEC SENTRY BUILDING PONY WALL 90' WIDTH FOUNDATION MANUAL

PRO-TEC SENTRY BUILDING PONY WALL 90' WIDTH FOUNDATION MANUAL MANUAL NO. 192035 KAG 2010- REV A PRO-TEC SENTRY BUILDING PONY WALL 90' WIDTH FOUNDATION MANUAL IMPORTANT - TO THE DEALER OR ERECTOR: RETURN THIS MANUAL TO THE OWNER FOR THEIR FUTURE REFERENCE SIOUX STEEL

More information

Date Issued: June 2010 Revision Date: February 2013 Review Date: February 2016 Revision #

Date Issued: June 2010 Revision Date: February 2013 Review Date: February 2016 Revision # SUNCOR ENERGY PRODUCTS DISTRIBUTION TERMINAL OPERATING MANUAL STANDARD OPERATING PROCEDURE SAFEWORK PRACTICES Date Issued: June 2010 Revision Date: February 2013 Review Date: February 2016 Revision # 2013-01

More information

Ironworker Safety Director Training Course. Steve Rank Executive Director of Safety and Health

Ironworker Safety Director Training Course. Steve Rank Executive Director of Safety and Health Ironworker Safety Director Training Course Steve Rank Executive Director of Safety and Health Providing Opportunities for Ironworkers and Company Safety Personnel to Learn New Skills-Sets and Manage Comprehensive

More information

A Guide to Safe Scaffolding

A Guide to Safe Scaffolding A Guide to Safe Scaffolding Bobby R. Davis Series Editor Division of Occupational Safety and Health N.C. Department of Labor 4 W. Edenton St. Raleigh, NC 27601-1092 Cherie K. Berry Commissioner of Labor

More information

4. Stationary scaffolds over 125 ft. in height and rolling towers over 60 ft. in height must be designed by a professional engineer.

4. Stationary scaffolds over 125 ft. in height and rolling towers over 60 ft. in height must be designed by a professional engineer. Section C.16 University of South Carolina Safety Program Guide SCAFFOLDS Introduction University of South Carolina recognizes that the scaffold industry is considered "inherently dangerous". These guidelines

More information

SAFE WORK PROCEDURE: MOBILE ELEVATED WORK PLATFORMS (MEWP)

SAFE WORK PROCEDURE: MOBILE ELEVATED WORK PLATFORMS (MEWP) Rev: 01 Date: March 2017 Page: 1 of 8 SAFE WORK PROCEDURE: MOBILE ELEVATED WORK PLATFORMS (MEWP) A. OVERVIEW: Safe Work Procedures are crucial to preventing workplace injuries and accidents. Safe Work

More information

PERFORM WITH PRECISION BOX CULVERT TRAVELER CONCRETE CONSTRUCTION PRODUCTS APPLICATION GUIDE

PERFORM WITH PRECISION BOX CULVERT TRAVELER CONCRETE CONSTRUCTION PRODUCTS APPLICATION GUIDE PERFORM WITH PRECISION BOX CULVERT TRAVELER CONCRETE CONSTRUCTION PRODUCTS APPLICATION GUIDE A WORD ABOUT SAFETY High productivity depends on safety; even a minor accident causes job delays and inefficiency,

More information

Ring System Scaffolding φ60.2mm Instruction Manual

Ring System Scaffolding φ60.2mm Instruction Manual φ60.2mm Instruction Manual Superior Company of Taiwan SUCOOT CO., LTD TEL:(+886)4-2359-8338 FAX:(+886)4-2359-8480 E-Mail : info@sucoot.com Website: www.sucoot.com Address: No.1836, Sec.4, Taiwan Blvd.,

More information

SECTION CHAIN-LINK FENCES AND GATES 02821/1

SECTION CHAIN-LINK FENCES AND GATES 02821/1 SECTION 02821 - CHAIN-LINK FENCES AND GATES 02821/1 PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Chain-Link Fences: 2. Gates: horizontal slide or swing. 3. Fences installed where

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SWMS 002 Erect / Dismantle Single Bay Towers and/or Multiple Bay Towers Page of 9 ABN: 40 088 478 399 This SWMS has been prepared and authorised by OLDFIELDS ACCESS PTY LTD ACN: 088 478 399 Date: Issue

More information

WHAT IS CANTILEVER RACK?

WHAT IS CANTILEVER RACK? PRODUCT INFORMATION WHAT IS CANTILEVER RACK? 2946 Larimer St. Denver, CO 80205 303-295-1100 / 800-373-7693 FAX 303-295-2464 Email info@snyderequipment.com www.snyderequipment.com MODERN EQUIPMENT COMPANY,

More information

Fall Prevention Plan

Fall Prevention Plan Fall Prevention Plan April 10, 2018 i ii Table of Contents Review/Revision Summary... v Introduction... 1 Scope and Application... 1 Responsibilities... 1 Availability... 2 Annual Review... 2 Fall Prevention...

More information

SECTION CHAIN LINK FENCES AND GATES (PARK)

SECTION CHAIN LINK FENCES AND GATES (PARK) SECTION 02821 CHAIN LINK FENCES AND GATES (PARK) PART I GENERAL 1.1 SECTION INCLUDES A. Installation of chain link fences, and gate units provided by single source including erection accessories, fittings,

More information

Houston Community College 3200 Main Parking Garage November 15, 2010 Houston Community College

Houston Community College 3200 Main Parking Garage November 15, 2010 Houston Community College SECTION 323113 - CHAIN LINK FENCES AND GATES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Scaffolding Glossary of Terms A

Scaffolding Glossary of Terms A Scaffolding Glossary of Terms A ACCESS PLATFORM: A platform that gives access to and from places of work to persons, materials and equipment. ACCESSORY: A fitting that is able to be attached to a structural

More information

CUPLOK SGB CUPLOK SGB Group

CUPLOK SGB CUPLOK SGB Group CUPLOK USER S MANUAL CONTENTS Page Introduction 5 The CUPLOK locking procedure 6 CUPLOK safety information 7 General site safety 9 Core components 11 Scaffold system components 12 Ancillary components

More information

Walking-Working Surfaces

Walking-Working Surfaces Walking-Working Surfaces 29 CFR Part 1910 Subpart D Presented by: ETTA, OSH Division 919-807-2875 Objectives 29 CFR 1910, Subpart D In this course, we will discuss the following: Hazards Definitions General

More information

Workplaces must be kept clean, orderly, and sanitary. Workroom floors must be maintained as clean and dry as possible.

Workplaces must be kept clean, orderly, and sanitary. Workroom floors must be maintained as clean and dry as possible. Section C.19 University of South Carolina Safety Program Guide WALKING AND WORKING SURFACES Introduction Occupational Safety and Health Administration (OSHA) CFR 1910 Subpart D Walking and Working Surfaces