Ohio Department of Transportation. Conflict of Interest Waiver Process Guidance Concerning Review of Conflict of Interest Waiver Requests

Size: px
Start display at page:

Download "Ohio Department of Transportation. Conflict of Interest Waiver Process Guidance Concerning Review of Conflict of Interest Waiver Requests"

Transcription

1 June 26, 2017 (rev. 9/29/2017) Ohio Department of Transportation Conflict of Interest Waiver Process Guidance Concerning Review of Conflict of Interest Waiver Requests Purpose The purpose of this document is ensure consistent application of the Department s consultant conflict of interest rules and policy in processing requests for waiver of the rules. General The Department s Specifications for Consulting Services 2016 Edition serves as the terms and conditions for all ODOT consultant contract. Sections 2.15 through 2.18 of the Specifications define conflicts of interest and require consultants to identify potential conflicts. The requirements vary from broad institutional conflicts to specific prohibitions related services provided on a project. Each Specification section includes a provision that allows the Department to waive the requirement under appropriate circumstances. In order to standardize the waiver request process and ensure that required information is submitted by consultants, the Department has developed a standard Conflict of Interest Waiver Request form that must be used by consultants. The Specification sections are included below along with guidance for approving or denying waiver requests submitted by consultants. In addition to the Specifications, the Department s Manual of Procedures for Locally Administered Transportation Projects also includes provisions that are applied to ODOT held contracts. These provisions generally prohibit design consultants and subconsultants from providing construction inspection and administration services on projects in which the firm participated in design of the project. Requirements and guidance are included below. The Department s Conflict of Interest Waiver Review Committee, as appointed by the Director, reviews all waiver requests and either approves or denies the waiver. 1

2 Requirements and Guidance Document: Specifications for Consulting Services 2016 Edition Conflicts of Interest Prior to submitting a letter of interest in response to an ODOT project notification, the Consultant shall identify and evaluate potential organizational conflicts of interest or develop recommended actions for known organizational conflicts of interest. Consultants are directed to FAR 2.101, 9.504(a), OAC , 23 CFR (a)(1), and 40 CFR (c) (as amended) for guidance as to when a conflict of interest arises. If the Consultant determines that a potential organizational conflict of interest exists, the Consultant shall, before submitting its letter of interest, submit to the Department a Notice of Potential Conflict of Interest explaining the circumstances of the potential conflict and any remedial action proposed by the Consultant. The Department may meet with the Consultant to discuss any potential conflicts after receipt of such notice. If a waiver of potential conflicts of interest is needed, the Department may approve or deny the request for a waiver, and any decision to deny by the Department is final. If, as a condition of award, the Consultant s eligibility for future prime Consultant or Subconsultant awards will be restricted or the Consultant must agree to some other restraint due to the conflict, then the letter of interest shall contain a proposed clause that specifies both the nature and duration of the proposed restraint. The Department shall include the clause in the Agreement, first negotiating the clause s final terms with the successful Consultant if it is appropriate to do so. The restraint imposed by a clause shall be limited to a fixed term of reasonable duration, sufficient to avoid the circumstance of unfair competitive advantage or potential bias. This period varies. It might end, for example, when the first production contract using the Consultant s specifications or work statement is awarded, or it might extend through the entire life of a system for which the Consultant has performed systems engineering and technical direction. In every case, the restriction shall specify Termination by a specific date or upon the occurrence of an identifiable event. The Consultant warrants it has no public or private interest, and shall not acquire directly or indirectly any such interest, that would conflict in any manner with the performance of the Services under the Agreement. The Consultant shall not employ any person currently employed by the Department for any Services included under the provisions of the Agreement. The Consultant may have other contracts with other clients (e.g., utility companies, other units of government, or abutting land owners) whose interests may be in conflict with the objectives of a particular Department- 2

3 initiated Project. It is the Consultant s responsibility to avoid conflicts of interest in these circumstances and to disclose them as soon as they arise. Section 2.15 addresses organizational conflicts of interest and few if any waiver requests have been received concerning these rules. Any waiver requests received will be evaluated on a case by case basis. Document: Specifications for Consulting Services 2016 Edition NEPA Disclosure Statement By entering into any Agreement with the Department or accepting any subsequent assignment of work under that Agreement, the Consultant hereby certifies that, in accordance with 40 CFR , that it is has no financial or other interest in the execution or outcome of the Ohio Department of Transportation Project. Section 2.15 addresses organizational conflicts of interest and few if any waiver requests have been received concerning these rules. Any waiver requests received will be evaluated on a case by case basis. Document: Specifications for Consulting Services 2016 Edition Restrictions on Participation in Construction Contracts It is understood that the Services performed by the Consultant under any Agreement with the Department may result in a highway construction Project initiated by the Department or an entity affiliated with the Department. The Consultant, and any of its Subconsultants that have provided Services to the Department that have been directly utilized in preparation of construction contract documents, will NOT be eligible to provide Services to the construction contractor for that Project, either as a prime Consultant or as a Subconsultant. However, the Department may determine that there is not an organizational conflict of interest for a Consultant or Subconsultant under the provisions of Section 2.15, and grant a waiver on that basis. Moreover, in regard to ORC Chapter , the Consultant agrees that, as a limited agent of 3

4 the Department, it will not perform any work for a contractor or subcontractor for said highway construction Project that would facilitate the contractor s or subcontractor s pursuit of a Value Engineering Change Proposal. This requirement is based on OAC which prohibits engineering consultants from accepting compensation, financial or otherwise, from more than one party for services on the same project, or for services pertaining to the same project, unless the circumstances are fully disclosed to, and agreed to, by all interested parties or their duly authorized agents. ODOT included this rule in the Specifications to keep consultants on ODOT s side of the fence during construction to provide ongoing services and advice concerning design questions or contractor claims, and not working for the contractor simultaneously. The basic determinant in evaluating waiver requests under Section 2.17 is whether, in working for a contractor on a project in which the consultant provided services to the Department, a waiver would potentially place the consultant on both sides of the fence. The Department expects that consultants that prepared construction contract plans or other documents used in a construction contract will not be working for the construction contractor and providing advice to ODOT concerning their work at the same time. This concern is not restricted to the specific type of services provided by the consultant but applies to any services proposed to be provided to the contractor, even if different from the services provided to ODOT, either as prime consultant or subconsultant. However, in certain circumstances there is a very low risk (not zero risk) to the Department in approving a waiver of these requirements, and waivers are typically approved based on the following: 1. The services provided were testing or information gathering in nature and did not include engineering or surveying services. For example, if a subconsultant provided a geotechnical investigation but not engineering analysis or recommendations, a waiver would be approved in most cases. An exception could be a very complex geotechnical situation in which the sampling and testing information could be a significant factor during construction. 2. In instances (borrowing from FHWA design-build rule 23 CFR (a)(1)) where the role of the consultant or sub-consultant was limited to provision of preliminary design, reports, or similar low-level documents and all documents and reports delivered to the agency by the consultant or sub-consultant are made available to all offerors. Examples of this provision would be planning or environmental work performed by a subconsultant under the design contract or under an IDIQ contract that are unlikely to be the subject of a question or dispute, and/or the prime design consultant can assume responsibility for answering questions. It may be advisable to ask the design consultant if they believe the services of the subconsultant may be needed during construction. 4

5 Document: Specifications for Consulting Services 2016 Edition Restrictions on Participation in Design-Build Contracts The Consultant, and any of its Subconsultants that have provided Services to the Department that have been directly utilized in the preparation of design-build contract documents or a Scope of Services document, will NOT be eligible to participate in the design-build contract for that Project, either as a prime Consultant or as a Subconsultant. However, the Department may determine that there is not an organizational conflict of interest for a Consultant or Subconsultant under the provisions of Section 2.15, and grant a waiver on that basis. The waiver guidance for Specification Section 2.18 is similar to Section 2.17 and includes the text of 23 CFR (a)(1) which is included below for reference. In the case of design-build contracts ODOT s consultant prepares a scope of services document and provisions that require the Design-Build Contractor s consultant to prepare the design. But ODOT s interests remain the same in requiring consultants that contributed to preparation of the design-build scope of services (RFP document) to remain on ODOT s side of the fence during construction to provide ongoing services and provide advice concerning scope of services questions or contractor claims, and not working for the design-build contractor simultaneously. However, in certain circumstances (similar to the guidance provided above for Section 2.17) there is a very low risk (not zero risk) to the Department in approving a waiver of these requirements, and waivers are typically approved based on the following: 1. The services provided were testing or information gathering in nature and did not include engineering or surveying services. For example, if a subconsultant provided a geotechnical investigation but not engineering analysis or recommendations, a waiver would be approved in most cases. An exception could be a very complex geotechnical situation in which the sampling and testing information could be a significant factor during construction. 2. In instances (per FHWA rule 23 CFR (a)(1)) where the role of the consultant or sub-consultant was limited to provision of preliminary design, reports, or similar low-level documents and all documents and reports delivered to the agency by the consultant or sub-consultant are made available to all offerors. Examples of this provision would be planning or environmental work performed by a subconsultant under the design contract or under an IDIQ contract that are unlikely to be the subject of a question or dispute, and/or the prime design consultant can assume responsibility for answering questions. It may be advisable to ask the design consultant if they believe 5

6 the services of the subconsultant may be needed during construction. 23 CFR (a)(1) (1) Consultants and/or sub-consultants who assist the owner in the preparation of a RFP document will not be allowed to participate as an offeror or join a team submitting a proposal in response to the RFP. However, a contracting agency may determine there is not an organizational conflict of interest for a consultant or sub-consultant where: (i) The role of the consultant or sub-consultant was limited to provision of preliminary design, reports, or similar low-level documents that will be incorporated into the RFP, and did not include assistance in development of instructions to offerors or evaluation criteria, or (ii) Where all documents and reports delivered to the agency by the consultant or subconsultant are made available to all offerors. With design-build projects there is also a question concerning the type of services that a consultant or subconsultant that assisted in the preparation of an RFP document/scope of services may provide to the Department during the construction phase of a project. Such consultants may provide services to the Department through an Ongoing Services phase of the scope preparation agreement, or a new selection to provide inspection and/or contract administration services for the design-build construction contract. Document: ODOT Locally Administered Transportation Projects Manual of Procedures POLICIES CONCERNING THE USE OF CONSULTANTS Every LPA must provide a full-time public employee to be in responsible charge of the project. For those LPAs who utilize the services of consultants, the following policies shall apply: 1. Only consultants that are pre-qualified by ODOT will be eligible to provide services on projects that include services defined in ODOT s Consultant Prequalification Requirements and Procedures Manual. For projects that do not include such services, pre-qualification will not be required, but the LPA is still responsible to select a qualified consultant in accordance with the qualifications based selection procedures required by the Ohio Revised Code and Federal requirements if applicable. 2. For any single project, a consulting firm or sole proprietor retained by an LPA may act as design engineer for the preparation of construction contract plans, or perform construction contract administration including construction inspection services, but cannot perform both. 3. A consulting firm that designed a project (prime consultant) and any subconsultant firms involved in that design cannot administer a construction contract or provide 6

7 construction inspection services. Firms that are subsidiary to or have common ownership with the prime consultant or subconsultants are similarly prevented from administering a construction contract and providing construction inspection services. A waiver may be granted by ODOT for a project which involves specialty engineering expertise. However, the consultant may provide on-going construction phase services as an extension of the design effort for the purpose of advising the LPA concerning interpretations of the plans and specifications prepared by the consultant, conferring with the LPA as to any changed or unanticipated field conditions that will impact the work, and participating in a formal Partnering process, if applicable. The consultant shall not have any formal ongoing duties in administration of the construction contract or inspection and testing of the project. The consultant s personnel assigned to this phase of the work should be the same personnel that designed the project and prepared the plans. Typical on-going services activities include: a) Assist the LPA in answering pre-bid questions and attend the pre-bid meeting. b) Attend meetings including the preconstruction meeting, job progress meetings, partnering meetings if applicable, and other meetings as requested. c) In conjunction with job progress meetings or as requested, visit the job site at appropriate intervals to monitor critical areas of the work and advise the LPA of any conditions that would affect the work. d) Respond to questions and visit the job site on an as needed basis. e) Assist the LPA in review of contractor shop drawings, and in evaluation of change orders or claims. Although the Specifications for Consulting Services does not restrict consultants from providing construction inspection/administration services on projects in which they provided design or related services, the Department follows the policy set out in the ODOT Locally Administered Transportation Projects Manual of Procedures. In this document (relevant text included above) a consulting firm that designed a project (prime consultant) and any subconsultant firms involved in that design cannot administer a construction contract or provide construction inspection services. However, in certain circumstances (similar to the guidance provided above for Section 2.17) there is a very low risk (not zero risk) to the Department in approving a waiver of these requirements, and waivers are typically approved based on the following: 7

8 1. The services provided were testing or information gathering in nature and did not include engineering or surveying services. For example, if a subconsultant provided a geotechnical investigation but not engineering analysis or recommendations, a waiver would be approved in most cases. An exception could be a very complex geotechnical situation in which the sampling and testing information could be a significant factor during construction. 2. In instances (per FHWA rule 23 CFR (a)(1)) where the role of the consultant or sub-consultant was limited to provision of preliminary design, reports, or similar low-level documents and all documents and reports delivered to the agency by the consultant or sub-consultant are made available to all offerors. Examples of this provision would be planning or environmental work performed by a subconsultant under the design contract or under an IDIQ contract that are unlikely to be the subject of a question or dispute, and/or the prime design consultant can assume responsibility for answering questions. It may be advisable to ask the design consultant if they believe the services of the subconsultant may be needed during construction. In review of waiver requests submitted by consultants on Locally Administered Transportation Projects, either local let or ODOT let, waivers should be approved only if the local government (LPA) recommends approval. Services not Considered to be a Conflict of Interest Plan Review Services The Department frequently uses the services of Consultants to assist in review of construction contract plans, design build scope documents, or other documents related to project development, either through contracts for this specific purpose or other IDIQ contracts. In these instances the review consultant does not have a contractual relationship with the design consultant, and all comments provided must be reviewed by the Department prior to transmittal to the design consultant by the Department. The design consultant remains legally responsible for the final deliverable. The Department does not consider plan review services to be a conflict of interest and consultants that provide these services are eligible to provide services to either the Department or contractors on the projects for which they provided services. A waiver is not required. 8

Conflict of Interest Language

Conflict of Interest Language Project Development - Design Services The Consultant and subconsultants shall disclose in the Transmittal Letters that accompany the Statement of Qualifications (SOQ), all contracts or projects for which

More information

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES Section I Application (These procedures do not apply to Design-Build Contracts.)

More information

FINAL INSPECTION OF CONSTRUCTION PROJECTS

FINAL INSPECTION OF CONSTRUCTION PROJECTS Approved: Standard Procedure No.: 510-007(SP) Effective Date: January 19, 2010 Responsible Division: Construction Management Supersedes procedure dated June 1, 2009 William H. Lindenbaum, P.E., P.S., Deputy

More information

OCI Mitigation Plan SAMPLE for IDIQ contract

OCI Mitigation Plan SAMPLE for IDIQ contract OCI Mitigation Plan SAMPLE for IDIQ contract Company (Authorized Signatory) Company Vice President (or equivalent level) i TABLE OF CONTENTS Section Description Page I. Organizational Conflict of Interest

More information

Ohio Department of Transportation DBE/EDGE Consultant Contracting Procedures Implementation of Contract Specific Development Goal Procedures

Ohio Department of Transportation DBE/EDGE Consultant Contracting Procedures Implementation of Contract Specific Development Goal Procedures Rev. August 28, 2017 Ohio Department of Transportation DBE/EDGE Consultant Contracting Procedures Implementation of Contract Specific Development Goal Procedures In order to foster DBE and EDGE participation

More information

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Task Contract Design Services

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Task Contract Design Services Request for Qualifications Information Architectural / Engineering Task Contract Design Services At Ronald Reagan Washington National Airport Washington Dulles International Airport Dulles Toll Road System

More information

FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS. June 1, 2013

FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS. June 1, 2013 FREQUENTLY ASKED QUESTION FOR VDOT DESIGN-BUILD PROJECTS June 1, 2013 For general guidance the following information is provided as an aid to those preparing submittals in response to Design-Build solicitations.

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

CONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE

CONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE CONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE AZUSA UNIFIED SCHOOL DISTRICT 1 TABLE OF CONTENTS Filing of PreQualifications Submittals 3 PREQUALIFICATION QUESTIONNAIRE 6 Page Part I:

More information

27.1 Purpose and Overview

27.1 Purpose and Overview Page: 1 of 10 SUB 27.1 Purpose and Overview 27.2 Definitions 27.3 Forms 27.4 Roles and Responsibilities 27.5 Contractor Performance Evaluation Form 27.6 Interim Evaluations 27.7 Procedure Pre-Qualification

More information

Transit Return on Investment (ROI) Study Request for Proposals (RFP)

Transit Return on Investment (ROI) Study Request for Proposals (RFP) Transit Return on Investment (ROI) Study Request for Proposals (RFP) Table of Contents 1. Introduction... 1 2. Scope of Services... 1 3. Project Schedule... 5 4. Evaluation Criteria... 5 5. Submission

More information

REQUEST FOR PROPOSAL (RFP) LEGAL SERVICES. Submission Date: November 28, :00 p.m.

REQUEST FOR PROPOSAL (RFP) LEGAL SERVICES. Submission Date: November 28, :00 p.m. COLTS NECK TOWNSHIP BOARD OF EDUCATION 70 CONOVER ROAD, COLTS NECK, NJ 07722 REQUEST FOR PROPOSAL (RFP) LEGAL SERVICES Submission Date: November 28, 2017 4:00 p.m. The Colts Neck Township School District

More information

REQUEST FOR PROPOSALS: CEO COMPENSATION AND EVALUATION SERVICES. Issue Date: April 30, Due Date: June 6, 2014

REQUEST FOR PROPOSALS: CEO COMPENSATION AND EVALUATION SERVICES. Issue Date: April 30, Due Date: June 6, 2014 REQUEST FOR PROPOSALS: CEO COMPENSATION AND EVALUATION SERVICES Issue Date: April 30, 2014 Due Date: June 6, 2014 In order to be considered, proposals must be signed and returned via email to rwhitmore@wested.org

More information

Government of Saskatchewan. Procurement Standards Involving Conflict of Interest

Government of Saskatchewan. Procurement Standards Involving Conflict of Interest Government of Saskatchewan Procurement Standards Involving Conflict of Interest October 14, 2015 Contents Introduction... 2 Definitions... 2 Application... 2 Other Forms of Prohibited Vendor Conduct...

More information

700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION

700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION Section 14.01: Definitions 14.02: Application for Prequalification of Contractors 14.03: Aggregate Bonding Capacity and Single

More information

INFRASTRUCTURE ONTARIO VENDOR PERFORMANCE PROGRAM

INFRASTRUCTURE ONTARIO VENDOR PERFORMANCE PROGRAM INFRASTRUCTURE ONTARIO VENDOR PERFORMANCE PROGRAM TABLE OF CONTENTS Preamble... 1 1. Definitions... 1 2. Purpose... 2 3. Evaluation of Vendor Performance... 3 3.1 Vendor Performance Scorecard... 3 3.2

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

Standard Form of Agreement Between Owner and Architect with Standard Form of Architect s Services

Standard Form of Agreement Between Owner and Architect with Standard Form of Architect s Services B-Series B- S E R I E S The documents in the B Series relate to various forms of agreement between an owner and an architect for professional services. B141 Standard Form of Agreement Between Owner and

More information

IRVINE UNIFIED SCHOOL DISTRICT CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20

IRVINE UNIFIED SCHOOL DISTRICT CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 The Irvine Unified School District ( District ) has determined that bidders on an annual basis must be prequalified prior to submitting a bid on a project

More information

Subject: Statement of Qualifications for Public Safety Building Design

Subject: Statement of Qualifications for Public Safety Building Design March 5, 2010 Subject: Statement of Qualifications for Public Safety Building Design The City of Porterville seeks Statements of Qualification (SOQ) from qualified architectural and engineering firms for

More information

REGISTRATION FOR SUPPLY, DELIVERY, INSTALLATION, REPAIR AND MAINTENANCE OF AIR CONDITIONERS SERVICE PROVIDERS

REGISTRATION FOR SUPPLY, DELIVERY, INSTALLATION, REPAIR AND MAINTENANCE OF AIR CONDITIONERS SERVICE PROVIDERS UNIVERSITY OF EMBU REGISTRATION FOR SUPPLY, DELIVERY, INSTALLATION, REPAIR AND MAINTENANCE OF AIR CONDITIONERS SERVICE PROVIDERS UoEm/04/2017-2019 CLOSING DATE: APRIL 18TH 2017 AT 11.00 AM Table of Contents

More information

SOUTH DAKOTA BOARD OF REGENTS. Policy Manual

SOUTH DAKOTA BOARD OF REGENTS. Policy Manual SUBJECT: Conflict of Interest NUMBER: 4:35 SOUTH DAKOTA BOARD OF REGENTS Policy Manual 1. Persons employed full-time by the South Dakota Board of Regents in professional capacities, whether as faculty

More information

ABCANN GLOBAL CORPORATION CORPORATE GOVERNANCE POLICIES AND PROCEDURES

ABCANN GLOBAL CORPORATION CORPORATE GOVERNANCE POLICIES AND PROCEDURES ABCANN GLOBAL CORPORATION CORPORATE GOVERNANCE POLICIES AND PROCEDURES OCTOBER 12, 2017 LIST OF SCHEDULES A. Board Mandate B. Audit Committee Charter C. Compensation Committee Charter D. Nominating and

More information

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE ROOF AND HVAC REPLACEMENT PROJECT PW1320

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE ROOF AND HVAC REPLACEMENT PROJECT PW1320 REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE 2015 2016 ROOF AND HVAC REPLACEMENT PROJECT PW1320 Issued by: City of Stockton Public Works Department 22 E. Weber Avenue, Room 301 Stockton, CA 95202

More information

AMENDED AND RESTATED ON SEMICONDUCTOR CORPORATION CORPORATE GOVERNANCE PRINCIPLES

AMENDED AND RESTATED ON SEMICONDUCTOR CORPORATION CORPORATE GOVERNANCE PRINCIPLES AMENDED AND RESTATED ON SEMICONDUCTOR CORPORATION CORPORATE GOVERNANCE PRINCIPLES (Amended and Restated as of January 1, 2018) The following principles have been approved by the Board of Directors (the

More information

BOARD GUIDELINES ON SIGNIFICANT CORPORATE GOVERNANCE ISSUES

BOARD GUIDELINES ON SIGNIFICANT CORPORATE GOVERNANCE ISSUES BOARD GUIDELINES ON SIGNIFICANT CORPORATE GOVERNANCE ISSUES Management and the Board of Directors ( Board ) of Nabors Industries Ltd. (the Company ) are committed to conducting business consistent with

More information

CSA Group Products, Processes and Services Scheme

CSA Group Products, Processes and Services Scheme 1. CONTACT CSA CSA Group Products, Processes and Services Scheme 1.1 Getting started is easy. There are three ways to contact us: Call 866 797 4272 Email client.services@csagroup.org Complete a request

More information

Survey Services Rev. 0 Bid # Scope of Work

Survey Services Rev. 0 Bid # Scope of Work Scope of Work I. Scope of Solicitation II. Instructions to Offerors III. Scope of Work / Specifications IV. Terms and Conditions - Special V. Appendices to Scope of Work (if required) VI. Bidding Schedule

More information

Workforce Investment Board Of Southeast Missouri

Workforce Investment Board Of Southeast Missouri Workforce Investment Board Of Southeast Missouri Request for Proposals For Consultant Sector Strategies and Workforce Development Planning Services to be Delivered August 1, 2015 August 1, 2016 RFP Issue

More information

Kenya Integrated Water, Sanitation and Hygiene (KIWASH) Project. Invitation for Bid (IFB) DISP-KIWASH

Kenya Integrated Water, Sanitation and Hygiene (KIWASH) Project. Invitation for Bid (IFB) DISP-KIWASH Kenya Integrated Water, Sanitation and Hygiene (KIWASH) Project Invitation for Bid (IFB) DISP-KIWASH-2018-001 DISPOSAL OF USED PROJECT VEHICLE (Toyota Prado TX) Issue Date: January 19, 2018 WARNING: Prospective

More information

Department of Public Works Division of Engineering. Nassau County, New York

Department of Public Works Division of Engineering. Nassau County, New York TOWN OF OYSTER BAY Department of Public Works Division of Engineering Nassau County, New York REQUEST FOR PROPOSALS FOR CONSULTANT SERVICES SOLICITATION NO. 2017-12 NOTES: 1. ISSUANCE DATE: Thursday, October

More information

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO. Request for Proposals (RFP) Information Technology Independent Verification and Validation ADDENDUM NO. 2 Questions and Answers RFP Amendments September 2015 Contained herein are the responses to the questions

More information

Request for Qualifications (RFQ) #HM-R6-RFQ1 2018/2019 Highway Maintenance Agreements Prequalification RESPONSES TO RESPONDENT QUESTIONS SUMMARY #1

Request for Qualifications (RFQ) #HM-R6-RFQ1 2018/2019 Highway Maintenance Agreements Prequalification RESPONSES TO RESPONDENT QUESTIONS SUMMARY #1 RESPONSES TO RESPONDENT QUESTIONS SUMMARY #1 NOMINATED WORK EXAMPLES Question 1.01: When providing Nominated Work Examples, is it permitted for the Respondent Team to use Nominated Work Examples specific

More information

Commonwealth of Virginia

Commonwealth of Virginia Commonwealth of Virginia Alternative Project Delivery Division April 2017 Virginia Department of Transportation TABLE OF CONTENTS INTRODUCTION... 2 1.0 DEFINITIONS... 3 2.0 PRELIMINARY PROJECT SELECTION...

More information

REQUEST FOR QUALIFICATIONS CAMP HALL RAILROAD BUILD-IN DESIGN-BUILD PROJECT

REQUEST FOR QUALIFICATIONS CAMP HALL RAILROAD BUILD-IN DESIGN-BUILD PROJECT REQUEST FOR QUALIFICATIONS CAMP HALL RAILROAD BUILD-IN DESIGN-BUILD PROJECT Camp Hall Commerce Park (Camp Hall) Ridgeville, South Carolina March 2, 2018 Addendum 2 March 29, 2018 Comment Sheet 1 of 5 Sheets

More information

INVITATION TO TENDER

INVITATION TO TENDER EUROPEAN COMMISSION OFFICE FOR THE ADMINISTRATION AND PAYMENT OF INDIVIDUAL ENTITLEMENTS Sickness and Accident Insurance Brussels, PMO3/LP/LC D(2008) 12478 INVITATION TO TENDER Dear Sir/Madam, Subject:

More information

ORGANIZATIONAL CONFLICTS OF INTEREST

ORGANIZATIONAL CONFLICTS OF INTEREST 2012 Presentation to the Goddard Contractors Association ORGANIZATIONAL CONFLICTS OF INTEREST Presented by: Sumara M. Thompson-King, Acting Deputy General Counsel Based on Presentation by: Eve Lyon, Office

More information

DISCLOSURE OF OUTSIDE ACTIVITIES AND FINANCIAL INTERESTS FORM

DISCLOSURE OF OUTSIDE ACTIVITIES AND FINANCIAL INTERESTS FORM General Remarks DISCLOSURE OF OUTSIDE ACTIVITIES AND FINANCIAL INTERESTS FORM University of Florida Instructions for Completing the Disclosure of Outside Activities and Financial Interests Form University

More information

3. I have worked as a STC for the World Bank for less than 150 days in this Fiscal Year. I would like my company to become a World Bank Group vendor.

3. I have worked as a STC for the World Bank for less than 150 days in this Fiscal Year. I would like my company to become a World Bank Group vendor. The World Bank Group s Corporate Procurement Policies and Procedures contain the following policy regarding vendor eligibility of entities affiliated with current and former World Bank Group staff: Current

More information

DBE/EDGE Contract Development Goal Update

DBE/EDGE Contract Development Goal Update DBE/EDGE Contract Development Goal Update Lyle Flower, Administrator Office of Consultant Services Deborah Green, Administrator Office of Small & Disadvantaged Business Enterprise John R. Kasich, Ohio

More information

AT&T INC. CORPORATE GOVERNANCE GUIDELINES

AT&T INC. CORPORATE GOVERNANCE GUIDELINES AT&T INC. CORPORATE GOVERNANCE GUIDELINES The Board of Directors of AT&T Inc. ("AT&T") acting on the recommendation of its Corporate Governance and Nominating Committee, has developed and adopted the following

More information

Ohio Public Employees Retirement System. Request for Proposal

Ohio Public Employees Retirement System. Request for Proposal Ohio Public Employees Retirement System For: Consulting Services for Development of the Business Intelligence & Analytics Office Date: 9/11/2017 Project Name: Business Intelligence & Analytics Program

More information

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Document B101 TM. Standard Form of Agreement Between Owner and Architect Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Architect s client identified

More information

1. an Employee's private interests interfere, or even appear to interfere, with the interests of the Company;

1. an Employee's private interests interfere, or even appear to interfere, with the interests of the Company; I. INTRODUCTION CBRE, ( the Company ) is firmly committed to conducting business with the highest integrity and in compliance with the letter and spirit of the law. Our Standards of Business Conduct requires

More information

Manager, Sourcing Supply and Contracts, Grid Projects Approved By:

Manager, Sourcing Supply and Contracts, Grid Projects Approved By: Procurement Policy ISSUE DETAILS Effective Date: 1 Policy Owner: Chief Executive Officer Written By: Manager, Sourcing Supply and Contracts, Grid Projects Approved By: Transpower Board of Directors Minute

More information

PRE-QUALIFICATION FOR PROVISION OF TEAM BUILDING CONSULTANCY SERVICES TENDER NO. KPPF /HRA-B/1-A/22/17-18

PRE-QUALIFICATION FOR PROVISION OF TEAM BUILDING CONSULTANCY SERVICES TENDER NO. KPPF /HRA-B/1-A/22/17-18 PRE-QUALIFICATION FOR PROVISION OF TEAM BUILDING CONSULTANCY SERVICES TENDER NO. KPPF /HRA-B/1-A/22/17-18 (JAN 2017 DEC 2018) PRE QUALIFICATION DOCUMENT Stima Plaza, Kolobot Road, P.O. Box 1548-00600 Nairobi,

More information

New Castle County Ethics Commission GOVERNMENT ETHICS NEW CASTLE COUNTY

New Castle County Ethics Commission GOVERNMENT ETHICS NEW CASTLE COUNTY New Castle County Ethics Commission GOVERNMENT ETHICS IN NEW CASTLE COUNTY A GUIDE FOR NEW CASTLE COUNTY OFFICIALS AND EMPLOYEES New Castle County Ethics Commission TABLE OF CONTENTS INTRODUCTION...1 Who

More information

Metropolitan Washington Airports Authority. Request for Qualifications Information (RFQI) RFQI No C084. for

Metropolitan Washington Airports Authority. Request for Qualifications Information (RFQI) RFQI No C084. for Request for Qualifications Information (RFQI) RFQI No. for Project Controls Task Contract for Project Support & Management at Washington Dulles International Airport and Ronald Reagan Washington National

More information

CRESCENT CAPITAL BDC, INC. AUDIT COMMITTEE CHARTER

CRESCENT CAPITAL BDC, INC. AUDIT COMMITTEE CHARTER CRESCENT CAPITAL BDC, INC. AUDIT COMMITTEE CHARTER I. Purpose The audit committee (the Audit Committee ) of Crescent Capital BDC, Inc., a Delaware corporation (the Company ), is appointed by the board

More information

NEW ORLEANS CITY COUNCIL REQUEST FOR QUALIFICATIONS STATEMENTS (RFQ), CABLE, TELECOMMUNICATIONS AND TECHNOLOGY CONSULTING SERVICES ISSUED MAY 18, 2015

NEW ORLEANS CITY COUNCIL REQUEST FOR QUALIFICATIONS STATEMENTS (RFQ), CABLE, TELECOMMUNICATIONS AND TECHNOLOGY CONSULTING SERVICES ISSUED MAY 18, 2015 Cable, Telecommunications and Technology Consulting Service Page 1 NEW ORLEANS CITY COUNCIL REQUEST FOR QUALIFICATIONS STATEMENTS (RFQ), CABLE, TELECOMMUNICATIONS AND TECHNOLOGY CONSULTING SERVICES ISSUED

More information

Federal Buildings Initiative Qualification Requirements

Federal Buildings Initiative Qualification Requirements Federal Buildings Initiative Qualification Requirements Important Note: Companies who wish to be qualified under the Federal Buildings Initiative (FBI) and who wish to bid on a project for which a Request

More information

GUIDELINES FOR THE BOARD OF DIRECTORS

GUIDELINES FOR THE BOARD OF DIRECTORS I. INTRODUCTION 1. The Board of Directors (Board) of Finning International Inc. (Corporation) believes that the principal objective of the Corporation is to generate long-term shareholder value. The Board

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS International Republican Institute 1225 Eye St. NW, Suite 700 Washington, DC 20005 (202) 408-9450 (202) 408-9462 fax www.iri.org @IRIGlobal Procurement Number: GOV2017HDP02o Open

More information

CDK GLOBAL, INC. AUDIT COMMITTEE CHARTER Effective January 20, 2016

CDK GLOBAL, INC. AUDIT COMMITTEE CHARTER Effective January 20, 2016 CDK GLOBAL, INC. AUDIT COMMITTEE CHARTER Effective January 20, 2016 I. Purpose The Audit Committee (the Committee ) of the Board of Directors (the Board ) of CDK Global, Inc., a Delaware corporation (the

More information

CHARTER OF THE BOARD OF DIRECTORS

CHARTER OF THE BOARD OF DIRECTORS SUN LIFE FINANCIAL INC. CHARTER OF THE BOARD OF DIRECTORS This Charter sets out: 1. The duties and responsibilities of the Board of Directors (the Board ); 2. The position description for Directors; 3.

More information

TITLE: Contracting Process. POLICY DESCRIPTION: Contracting Process for New Supplier Contracts, and Supplier Contract Renewals

TITLE: Contracting Process. POLICY DESCRIPTION: Contracting Process for New Supplier Contracts, and Supplier Contract Renewals PAGE: 1 of 7 SCOPE: All HealthTrust colleagues, but specifically for the colleagues involved in strategic sourcing (referred to herein as the Contracting Group, as well as the Advisory Boards and Supply

More information

United Nations Development Programme (UNDP) FOR THE

United Nations Development Programme (UNDP) FOR THE United Nations Development Programme (UNDP) CALL FOR EXPRESSIONS OF INTEREST AND PREQUALIFICATION FOR THE CONSTRUCTION AND REHABILITATION OF IRRIGATION SYSTEMS IN LEBANON UNDP Lebanon invites interested

More information

Casework Technical Support (Social Welfare - Project Management)

Casework Technical Support (Social Welfare - Project Management) Casework Technical Support (Social Welfare - Project Management) Request for Tenders for Services to MABS NATIONAL DEVELOPMENT The latest date for receipt of tenders is 09 June 2017 Commercial House Westend

More information

Subcontract Management Certification Program (ScMCP ) SUBCONTRACT MANAGEMENT TECHNICAL COMPETENCIES. SUBCONTRACT MANAGER (ScM)

Subcontract Management Certification Program (ScMCP ) SUBCONTRACT MANAGEMENT TECHNICAL COMPETENCIES. SUBCONTRACT MANAGER (ScM) Competency 1. Determination of How Best to Satisfy Requirements for the Mission Area a. Provide proactive business advice on requirements documentation based on analysis of requirements and performance-based

More information

AIA Group Limited. Terms of Reference for the Remuneration Committee

AIA Group Limited. Terms of Reference for the Remuneration Committee AIA Group Limited Terms of Reference for the Remuneration Committee AIA Restricted and Proprietary Information Issued by : Board of AIA Group Limited Date : 15 November 2013 Version : 4.0 Definitions 1.

More information

EUROPEAN SPACE AGENCY ESA EXPRESS PROCUREMENT PROCEDURE EXPRO / EXPRO+ TENDERING CONDITIONS ( EXPRO/TC ) NOTE

EUROPEAN SPACE AGENCY ESA EXPRESS PROCUREMENT PROCEDURE EXPRO / EXPRO+ TENDERING CONDITIONS ( EXPRO/TC ) NOTE P a g e 1 EUROPEAN SPACE AGENCY ESA EXPRESS PROCUREMENT PROCEDURE EXPRO / EXPRO+ TENDERING CONDITIONS ( EXPRO/TC ) NOTE For the purposes of EXPRO and EXPRO+ categories of Requests for Proposal (RFP) and

More information

SOURCE SELECTION PLAN. {Insert if Phase I or Phase II} {Insert Project Name} {Insert Project Acronym} SOLICITATION XXXXXX-xx-R-xxxx

SOURCE SELECTION PLAN. {Insert if Phase I or Phase II} {Insert Project Name} {Insert Project Acronym} SOLICITATION XXXXXX-xx-R-xxxx SOURCE SELECTION PLAN {Insert if Phase I or Phase II} {Insert Project Name} {Insert Project Acronym} SOLICITATION XXXXXX-xx-R-xxxx {INSERT MONTH & YEAR} COORDINATION: Contracting Officer Date IPT Leader

More information

WHO Prequalification of In Vitro Diagnostics Programme

WHO Prequalification of In Vitro Diagnostics Programme P r e q u a l i f i c a t i o n T e a m - D i a g n o s t i c s Information for Manufacturers on the Manufacturing Site(s) Inspection (Assessment of the Quality Management System) WHO Prequalification

More information

1. Number. Except as otherwise permitted by the applicable NASDAQ rules, the Audit Committee shall consist of at least three members of the Board.

1. Number. Except as otherwise permitted by the applicable NASDAQ rules, the Audit Committee shall consist of at least three members of the Board. SELECTA BIOSCIENCES, INC. AUDIT COMMITTEE CHARTER A. PURPOSE The purpose of the Audit Committee of the Board of Directors (the Board ) of Selecta Biosciences, Inc. (the Company ) is to assist the Board

More information

CHAPTER 12: LABOR STANDARDS

CHAPTER 12: LABOR STANDARDS CHAPTER 12: LABOR STANDARDS CHAPTER PURPOSE & CONTENTS This chapter provides states with general information on labor standards as these requirements apply to CDBG-funded construction work. The following

More information

REQUEST FOR PROPOSAL. HRIS Human Resources Information Software Fort Morgan, Colorado

REQUEST FOR PROPOSAL. HRIS Human Resources Information Software Fort Morgan, Colorado REQUEST FOR PROPOSAL HRIS Human Resources Information Software Fort Morgan, Colorado October 7, 2014 Michael Boyer Director, Human Resources and Risk Management CITY OF FORT MORGAN P.O. BOX 100 FORT MORGAN,

More information

Invitation to Negotiate

Invitation to Negotiate Invitation to Negotiate Programming, Design, and Consulting Services Lisa Daws 4/3/2012 CLERKS OF COURT OPERATIONS CORPORATION Table of Contents Agency Background... 3 Statement of Purpose... 3 Scope of

More information

Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS

Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS RFQ Term: 1/1/2016 1/1/2020 Denver Water Capital Projects Contractor Prequalification REQUEST FOR QUALIFICATIONS Denver Water (DW), in an effort to improve the administration and efficiency, has initiated

More information

Auditing of Swedish Enterprises and Organisations

Auditing of Swedish Enterprises and Organisations Auditing of Swedish Enterprises and Organisations March 1st 2018 version 2018:1 1 General Application 1.1 These General Terms govern the relationship between the auditor ( the Auditor ) and the client

More information

Supply of Office Furniture, Fittings, Furnishings & other Equipments.

Supply of Office Furniture, Fittings, Furnishings & other Equipments. The Kenya Power & Lighting Co. Ltd. The Kenya Power & Lighting Co. Ltd. Central Office P.O. Box 30099 Nairobi, Kenya Telephone 254-02-3201 000/3201 323 Fax No. 254-02-310336 or 3753833 Website: www.kplc.co.ke

More information

AUTODESK, INC. CORPORATE GOVERNANCE GUIDELINES. Adopted December 15, Most Recently Amended December 15, 2016

AUTODESK, INC. CORPORATE GOVERNANCE GUIDELINES. Adopted December 15, Most Recently Amended December 15, 2016 AUTODESK, INC. CORPORATE GOVERNANCE GUIDELINES Adopted December 15, 1995 Most Recently Amended December 15, 2016 These guidelines and principles have been adopted by the Board of Directors (the Board )

More information

EMPLOYMENT AGREEMENT. EMPLOYMENT AGREEMENT by and between (the Employer" or the "Company" or " ") and (the "Employee").

EMPLOYMENT AGREEMENT. EMPLOYMENT AGREEMENT by and between (the Employer or the Company or  ) and (the Employee). by and between (the Employer" or the "Company" or " ") and (the "Employee"). 1. Employment Subject to the terms and conditions set forth in this Agreement, Employer hereby employs Employee, and Employee

More information

Corporate Policy Statement

Corporate Policy Statement Corporate Policy Statement SUBJECT 1.0 PURPOSE -- 1.1 To set forth the Consolidated Edison, Inc. ( CEI ) commitment to comply with the provisions of the Federal Energy Regulatory Commission ( FERC ) Standards

More information

REQUEST FOR EXPRESSIONS OF INTEREST 5006 EOI DETERRENT PROGRAM FOR SNOW GEESE CONTROL

REQUEST FOR EXPRESSIONS OF INTEREST 5006 EOI DETERRENT PROGRAM FOR SNOW GEESE CONTROL 5006 EOI REQUEST FOR EXPRESSIONS OF INTEREST 5006 EOI DETERRENT PROGRAM FOR SNOW GEESE CONTROL Responses to this Request for Expressions of Interest will be received at the Information Counter, Main Floor,

More information

Office of Federal Contract Compliance Programs (OFCCP)

Office of Federal Contract Compliance Programs (OFCCP) Page 1 of 9 Office of Federal Contract Compliance Programs (OFCCP) TRANSMITTAL U.S. DEPARTMENT OF LABOR Office of Federal Contract Compliance Programs Number: Date: OFCCP Order No. ADM Notice/Functional

More information

FARMER BROS. CO. CORPORATE GOVERNANCE GUIDELINES (Adopted February 1, 2017)

FARMER BROS. CO. CORPORATE GOVERNANCE GUIDELINES (Adopted February 1, 2017) FARMER BROS. CO. CORPORATE GOVERNANCE GUIDELINES (Adopted February 1, 2017) The Board of Directors (the Board ) of Farmer Bros. Co. (the Company ) has adopted these Corporate Governance Guidelines (these

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES OCTOBER 09, 2014 EAST BAY REGIONAL PARK DISTRICT Atlas Road Extension Improvements POINT PINOLE REGIONAL SHORELINE PROPOSALS DUE: 2:00PM, NOVEMBER

More information

KERIO VALLEY DEVELOPMENT AUTHORITY

KERIO VALLEY DEVELOPMENT AUTHORITY KERIO VALLEY DEVELOPMENT AUTHORITY PREQUALIFICATION/REGISTRATION FOR AIR TICKETING, TOUR & TRAVEL SERVICES TENDER N0.: KVDA/PQ/18/2017-2018/19 RECEIPT NO. TENDER REG. NO. CLOSING DATE :THURSDAY 22 ND JUNE,

More information

Request for Proposal RFP # National Data Consultant, India - Equal Measures FY18

Request for Proposal RFP # National Data Consultant, India - Equal Measures FY18 Request for Proposal RFP # National Data Consultant, India - Equal Measures 2030 - FY18 Equal Measures 2030 invites you to submit a proposal for consultancy services; using data and evidence to support

More information

Citizens Financial Group, Inc. Corporate Governance Guidelines

Citizens Financial Group, Inc. Corporate Governance Guidelines Citizens Financial Group, Inc. Corporate Governance Guidelines Adopted February 16, 2018 Citizens Financial Group, Inc. (the Company ) is committed to the highest standards of corporate governance, business

More information

Audit Committee Charter

Audit Committee Charter Audit Committee Charter Purpose The purpose of the Audit Committee (the "Committee") shall be as follows: 1. To oversee the accounting and financial reporting processes of the Company and audits of the

More information

BOROUGH OF BERLIN. Municipal Planning Board Engineer. Term: January 1, 2018 to December 31, 2018.

BOROUGH OF BERLIN. Municipal Planning Board Engineer. Term: January 1, 2018 to December 31, 2018. BOROUGH OF BERLIN REQUEST FOR QUALIFICATIONS FOR MUNICIPAL ATTORNEY, MUNICIPAL AUDITOR, MUNICIPAL BOND COUNSEL, MUNICIPAL ENGINEER, MUNICIPAL WATER & SEWER ENGINEER, MUNICIPAL PROSECUTOR, MUNICIPAL PUBLIC

More information

Invitation to tender. Provision of External Audit Services

Invitation to tender. Provision of External Audit Services Invitation to tender for the Provision of External Audit Services Tender return date: 10.00 am on 2 nd May 2017 Return to: Enquiries to: Address: Clerk to the Corporation Alison Rowland (arowland@sussexcoast.ac.uk)

More information

PRE-QUALIFICATION OF SUPPLIERS PROVISION OF FUMIGATION, SANITATION AND SANITAL DISPOSAL SERVICES TENDER NO.KPLC1/5BC/9A/PT-ST/113/2010

PRE-QUALIFICATION OF SUPPLIERS PROVISION OF FUMIGATION, SANITATION AND SANITAL DISPOSAL SERVICES TENDER NO.KPLC1/5BC/9A/PT-ST/113/2010 The Kenya Power & Lighting Co. Ltd. The Kenya Power & Lighting Co. Ltd. Central Office P.O. Box 30099 Nairobi, Kenya Telephone 254-02-3201 000/3201 323 Fax No. 254-02-310336 or 3753833 Website: www.kplc.co.ke

More information

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk

More information

REQUEST FOR PROPOSAL (RFP)

REQUEST FOR PROPOSAL (RFP) Missouri State Employees Retirement System REQUEST FOR PROPOSAL (RFP) for Executive Search Firm To fill the position of Executive Director Project Manager: Lisa Verslues, Human Resources Coordinator Phone:

More information

Statewide On-Call Bridge Design. Request for Proposal

Statewide On-Call Bridge Design. Request for Proposal Statewide On-Call Bridge Design Request for Proposal Iowa Department of Transportation Introduction The Office of Bridge and Structures of the Iowa Department of Transportation (the Department) is interested

More information

SUNEDISON, INC. AUDIT COMMITTEE CHARTER (Adopted October 29, 2008)

SUNEDISON, INC. AUDIT COMMITTEE CHARTER (Adopted October 29, 2008) SUNEDISON, INC. AUDIT COMMITTEE CHARTER (Adopted October 29, 2008) I. Purpose The primary purpose of the Audit Committee of the Board of Directors (the Committee ) is to assist the Board of Directors in

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS International Republican Institute 1225 Eye St. NW, Suite 800 Washington, DC 20005 (202) 408-9450 (202) 408-9462 fax www.iri.org @IRIGlobal Procurement Number: ASIA2017BRM03o Open

More information

Employee Records I A S B. Illinois Personnel Records Review Act. Understanding requirements of the

Employee Records I A S B. Illinois Personnel Records Review Act. Understanding requirements of the I A S B Employee Records Understanding requirements of the Illinois Personnel Records Review Act by Terrence M. Barnicle Attorney with Klein, Thorpe and Jenkins, Ltd. Chicago 2921 Baker Drive One Imperial

More information

SPECIFICATION NO. TxDOT * REVISED: AUGUST 2017 CRIMINAL BACKGROUND CHECKS

SPECIFICATION NO. TxDOT * REVISED: AUGUST 2017 CRIMINAL BACKGROUND CHECKS SPECIFICATION NO. TxDOT 961-30-16 * REVISED: AUGUST 2017 CRIMINAL BACKGROUND CHECKS PUBLICATION This specification is a product of the Texas Department of Transportation (TxDOT). This specification may

More information

REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING PROFESSIONAL SERVICES VILLAGE OF BARTLETT COUNTRY CREEK LIFT STATION PROJECT

REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING PROFESSIONAL SERVICES VILLAGE OF BARTLETT COUNTRY CREEK LIFT STATION PROJECT REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING PROFESSIONAL SERVICES VILLAGE OF BARTLETT COUNTRY CREEK LIFT STATION PROJECT DATED FEBRUARY 19, 2015 REQUEST FOR QUALIFICATIONS CIVIL ENGINEERING PROFESSIONAL

More information

AUDIT COMMITTEE TERMS OF REFERENCE

AUDIT COMMITTEE TERMS OF REFERENCE AUDIT COMMITTEE TERMS OF REFERENCE 1. Membership 1.1 The Audit Committee of (the Company ) acting as trustee-manager of HK Electric Investments (the Trust ) was established by resolution of the board (the

More information

EXPRESSION OF INTEREST (EOI) LONG FORM. Construction Contract Administration Services

EXPRESSION OF INTEREST (EOI) LONG FORM. Construction Contract Administration Services EXPRESSION OF INTEREST (EOI) LONG FORM Construction Contract Administration Services Generic Document for Request for Proposal (RFP) Assignments Ministry of Transportation of Ontario (MTO) December 2016

More information

In the Red Zone: What s In and What s Out Under Recent Regulatory Changes September 21, 2016

In the Red Zone: What s In and What s Out Under Recent Regulatory Changes September 21, 2016 In the Red Zone: What s In and What s Out Under Recent Regulatory Changes September 21, 2016 Terence Murphy (757) 624.3139 tmurphy@kaufcan.com Page 1 Important Note The contents of this presentation are

More information

Document B252TM 2007

Document B252TM 2007 Document B252TM 2007 Standard Form of Architect s Services: Architectural Interior Design for the following PROJECT: (Name and location or address) This document has important legal consequences. Consultation

More information

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION Subject to conditions prescribed by the University of California, San Diego, responses to the University's prequalification documents for a Design Build

More information

EXHIBIT D SPECIAL CONDITIONS REGARDING THE UTILIZATION OF MINORITY AND WOMEN OWNED BUSINESS ENTERPRISES

EXHIBIT D SPECIAL CONDITIONS REGARDING THE UTILIZATION OF MINORITY AND WOMEN OWNED BUSINESS ENTERPRISES EXHIBIT D SPECIAL CONDITIONS REGARDING THE UTILIZATION OF MINORITY AND WOMEN OWNED BUSINESS ENTERPRISES 1. Policy Statement a. It is the policy of the Commission to ensure competitive business opportunities

More information

Procurement Guidelines

Procurement Guidelines Reference 21 CM@Risk Procurement Guidelines Draft June 5, 2014 Purpose: These guidelines are intended to provide (1) assistance to those who may be responsible for implementation, processing and/or management