1 Part I General A. This information is to be used as a guideline in construction a dynamic aggregate base and drainage system. Project conditions may vary based on overall scope of work and location. Any variations shall be approved by SportsTurf Systems and/or Architect of Record prior to execution. B. This section includes the following: 1. Excavation 2. Aggregate Base Course 3. Drainage 4. Testing C. Scope Narrative - The work inclusive of this section is to be completed per the Contract Documents and is to include all labor, materials, equipment, supervision and all other incidentals necessary for a complete professional finished product. All local guidelines and applicable laws must be adhered to throughout the duration of the project. Remove and legally dispose of all unnecessary materials to achieve subgrade. Place aggregate, drainage and geotextile material as directed to achieve final grade. (Note: Geotechnical evaluation to be provided by Owner) D. Submittals The following submittals are required for approval prior to installation: 1. Permeable geotextile fabric product data 2. Permeable geotextile fabric test reports 3. Collector piping and accessories product data 4. Flat drain product data 5. Collector drain backfill material sieve analysis 6. Aggregate base course sieve analysis 7. Aggregate finish course sieve analysis 8. Supplier list 9. Aggregate material certifications Aggregate supplier must certify that all material delivered to site meets requirements as specified herein.
2 Part II Products A. Geotextile Fabric 1. Description The proposed fabric must consist of woven long-chain polymeric yarns. The yarns must be fabricated of 95% propylene or ester polymers. 2. Acceptable Manufacturers a. Mirafi b. Amoco c. Approved equal 3. Required Test Criteria The fabric must meet the following test parameters: Minimum Unit of Test Description Requirement Measurement Reference Wide Width Tensile Strength 175 lbs./in. ASTM D-4595 Grab Tensile Strength 315 lbs. ASTM D-4632 Grab Tensile Elongation 15 percent (%) ASTM D-4632 Trapezoid Tear Strength 120 lbs. ASTM D-4533 Mullen Burst Strength 600 psi ASTM D-3786 Puncture Strength 145 lbs. ASTM D-4833 Percent Open Area 1 percent (%) COE Apparent Opening Size mm ASTM D-4751 Permittivity 0.05 sec -1 ASTM D-4491 Flow Rate 163 gal/min/ft 2 ASTM D-4491 UV Resistance (at 500 hours) 70 % strength retained ASTM D-4355 B. Collector Piping 1. Description HDPE (High Density Polyethylene) corrugated piping. Perforated, smooth wall tubular style and required fittings. Size requirements are to be indicated in Contract Documents. Pipe to meet ASTM D3350 and AASHTO M252. a. Acceptable ManufacturersADS N-12 b. Hancor c. Approved equal
3 C. Flat Drain Piping 1. Description Perforated plastic core pipe with a 12 inch wide 1.5 inch tall profile. Flat drain to be wrapped in geotextile fabric. 2. Acceptable Manufacturers a. ADS AdvanEDGE b. Enkaturf Drain as manufactured by Colbond c. Approved equal D. Trench Backfill Aggregate 1. Description Angular, washed free draining stone with a uniform ¾" diameter. Other products native to region may be utilized in this application only. E. Aggregate Base Course 1. Description Angular, unwashed aggregate consisting of crushed limestone that must be placed and compacted in a uniform manner. Rounded stone is not permitted for this application. Aggregate must be tested by an independent party prior to delivery to site and must meet and/or exceed the specifications as provided herein. Please see Part III for correct application. Other products of similar consistency native to region of project may be considered and approved by SportsTurf Systems. 2. Design Criteria a. Sieve Analysis Sieve Dimension % Passing by Weight 1.5" " ¾" ½" # # b. Permeability - > 50 in./hr. c. Sulfate Soundness (C-88) - < 12% loss
4 d. Compaction 92-95% of maximum density as determined by ASTM D e. Optimum moisture content - > 90% F. Aggregate Finish Course 1. Description Angular, unwashed aggregate consisting of crushed limestone that must be placed and compacted in a uniform manner. Rounded stone is not permitted for this application. Compacted depth not to exceed 1". Aggregate must be tested by an independent party prior to delivery to site and must meet and/or exceed the specifications as provided herein. Please see Part III for correct application. Other products of similar consistency native to region of project may be considered and approved by SportsTurf Systems. 2. Design Criteria a. Sieve Analysis Sieve Dimension % Passing by Weight ¼" # # # # b. Permeability - > 12 in./hr. c. Sulfate Soundness (C-88) - < 12% loss d. LA Abrasion (ASTM C131) - < 40 e. Compaction 92-95% of maximum density as determined by ASTM D f. Optimum moisture content - > 90% Part III Execution A. General All activities are to be sequenced properly and completed in a timely fashion. All measures must be taken to ensure a safe jobsite per all applicable guidelines. All existing conditions and/or new work in place within the job limits
5 must be maintained at all times. Any damage to said materials will be the sole responsibility of the site work contractor. B. Excavation 1. Survey Solicit the services of a licensed surveyor to establish grade and control points necessary to complete the scope of work. Maintain such markings throughout the duration of the project. (Note: This may be provided by Owner. Please reference Contract Documents for verification) 2. Identify and mark all underground utilities prior to commencement or work. Utilize the services of a utility locating company if available. 3. Track Bridging If an existing track is in place proper track bridging must be in place prior to removal. Method of track bridging to be approved by SportsTurf Systems and Owner prior to commencement. 4. Removal a. Saw cut edge of existing track, if applicable, to achieve a uniform perimeter. b. Remove all trees, shrubs, plant material and all natural vegetation and legally dispose of. If an existing structure is present within the job limits, disconnect all utilities and relocate or completely demolish as indicated in the Contract Documents. c. Remove soils to a depth as indicated in the Contract Documents and legally dispose of or spoil on site in a location determined by Owner. Grade and shape subgrade to a 0.5% pitch from the centerline of the field (longitudinal) to the proposed edge of the excavation. Subgrade must be free of all roots, debris, etc. d. Any additional excavation, without the written direction of the Owner, will be the sole responsibility of this contractor. Do not proceed with additional
6 e. excavation unless authorized. If additional excavation is approved, engineered fill will be required in place of unsuitable soils. f. Any necessary dewatering will be the responsibility of this contractor. g. If contaminated soils, or potentially contaminated soils, are exposed during the excavation all work is to stop immediately and the condition is to be communicated to the Owner. 5. Laser Grading Laser guided machinery will be required to achieve the subgrade elevation as indicated on the Contract Documents. Subgrade must be achieved by laser grading to a ½" tolerance over a twenty-five foot continuous span. The subgrade must be compacted to achieve 95% of the maximum density as determined by ASTM D 698. Subgrade must have the required planarity to mirror that of the finished aggregate. 6. Testing a. This contractor will be required to conduct a proof roll of the subgrade prior to approval. This is to be witnessed by an independent soils engineer (by Owner) and the Architect. If an area is determined to be unsuitable, at the direction of the Owner, remove the unsuitable soil to a depth determined acceptable by the soils engineer. Engineered fill will be required in place of the unsuitable soil. Proof roll area again in the presence of the soils engineer and architect. b. Soils Engineer is to test for compaction prior to proceeding. C. Geotextile Fabric a. Geotextile fabric must be delivered to site in manufacturer's wrapping and must stay wrapped until placement. b. Do not commence installation unless subgrade has been approved c. Geotextile fabric must be overlapped per the manufacturer's recommendations. d. If geotextile fabric becomes damaged during installation remove, replace and/or patch per manufacturer's recommendations. e. Do not leave geotextile fabric exposed to the elements for more than fourteen days. Aggregate is to be placed within that time frame.
7 D. Drainage a. Collector Drain 1. Collector drain is to be 8 inches, or as indicated on the Contract Documents. 2. Pipe to be installed at 0.5% to allow for drainage. Location of outlet structure must be determined prior to installation. The point closest to the outlet structure will be the low point of the pipe within the excavation perimeter. 3. The trench for the collector drain must be lined independently with geotextile fabric allowing on overlap from the field. 4. Free draining stone must be placed and compacted properly around the collector pipe to the elevation of the subgrade. 5. All connections are to be made with the manufacturer's recommendations 6. Damaged piping is not be utilized and will be removed from site. 7. Photo documentation of this process will be required. b. Flat Drain 1. Flat drains are to be placed flat at a 45 degree angle at 25' O.C. over geotextile fabric. This is a "herringbone" layout. 2. In order to protect the flat drains, cover with aggregate as soon as possible. 3. Mechanical connection to collector drain is not required. Flat drains must be placed adjacent to collector drain per detail. 5. Aggregate Base Course a. Place only approved aggregate to a depth as indicated in the Contract Documents. b. Do not drive equipment over geotextile fabric in place. c. Do not stockpile material in a central location and move to perimeter. Material shall not be moved more than 50 feet from final location. Failure to do so will result in a separation of the gradations and a general lack of uniformity in the base.
8 d. Laser guided machinery will be required to achieve the subgrade elevation as indicated on the Contract Documents. Laser grade to a ¼" tolerance over a twenty five foot continuous span. A 0.5% slope from centerline of field to nailer must be maintained. The subgrade must be compacted to achieve 95% of the maximum density as determined by ASTM D 698. Subgrade must have the required planarity to mirror that of the finish course. e. Compaction is to be achieved by using a vibratory roller. 7. Aggregate Finish Course a. Place only approved aggregate to a depth of no more than 1" once compacted. b. A broadcast method is preferred for this application. c. Compaction is to be achieved by using a vibratory roller. Aggregate shall be wetted during the compaction process. The finished course shall be free of all impressions, roller marks, etc. d. Laser grade to achieve the desired elevation to a tolerance of 1/8" over a 25 foot continuous span. Failure to achieve such requirements will result in regrading the unacceptable areas of the base. e. Solicit the services of a licensed surveyor to verify elevations and planarity. Results shall be made available to SportsTurf Systems. f. Prior to demobilization, SportsTurf Systems must approve the finish course. Site contractor may leave no more than ½ yard of finish course aggregate for repairs.
CITY OF FARGO SPECIFICATIONS GEOTEXTILES AND GEOGRIDS
GEOTEXTILES AND GEOGRIDS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, accessories, and equipment necessary
More informationSECTION SUBDRAINAGE
SECTION 33 46 00 SUBDRAINAGE PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish all labor, tools, and equipment and perform all Work necessary for, or incidental to, the supply and installation
More informationSECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT
SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating
More informationInstallation Dash. plae.us
Installation Dash These specifications are intended for GUIDELINE purposes only, for the design and construction of a Dynamic Base used in conjunction with Dash. All architect s specifications and drawings
More informationA. This section includes the furnishing and installation of a foundation drainage system.
PAGE 334613-1 SECTION 334613 SPECIFIER: This Section is written to specify a drainage system for buildings, which normally includes a drain installed around the perimeter of a building or basement, but
More informationNantasket Beach Revetment Design
Nantasket Beach Revetment Design A design concept for a stone revetment was developed for the conditions reported in the 20 May 2008 Draft Nantasket Beach Coastal Engineering Appendix. This revetment design
More informationSECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS
SECTION 13100 MECHANICALLY STABILIZED EARTH RETAINING WALLS PART 1 -- GENERAL 1.01 THE REQUIREMENT A. Includes all labor, material, equipment, testing and submittals required to design and complete construction
More informationSECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT
SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating
More informationREGIONAL CONSTRUCTION STANDARDS
REGIONAL CONSTRUCTION STANDARDS SIXTH EDITION Publication Update 6.5 (Full Committee Approved Proposed Revision 6.5 Storm Sewer Joint Wrap - Section 302 As Publication Update 6.5) March 27, 2018 Copyright
More informationBMP 6.4.4: Infiltration Trench
BMP 6.4.4: Infiltration Trench An Infiltration Trench is a leaky pipe in a stone filled trench with a level bottom. An Infiltration Trench may be used as part of a larger storm sewer system, such as a
More informationSECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM
SECTION 32 32 23 SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM PART 1: GENERAL 1.01 Scope Work includes furnishing all materials, labor, equipment, and supervision to install a Stonebridge segmental
More informationSECTION TRENCHING
SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.
More informationSECTION ASPHALT CONCRETE
SECTION 02740 ASPHALT CONCRETE PART 1. GENERAL 1.01 SECTION INCLUDES A. Work includes but is not limited to the following: 1.02 RELATED SECTIONS 1. Provide all material, labor, and equipment to prepare
More informationReinforced Soil Slopes (RSS)
Supplemental Technical Specification for Reinforced Soil Slopes (RSS) SCDOT Designation: SC-M-206-1 (4/16) 1.0 DESCRIPTION 1.1 Construct a reinforced soil slope in accordance with these specifications,
More information1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods
SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include
More informationSPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular
More informationREGIONAL CONSTRUCTION STANDARDS Proposed Revision Form
Proposed Revision To: REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form General Provisions (Division 1) Technical Specifications (Divisions 2-8) Standard Details Change No. Hampton Roads Planning
More informationMagnumStone Specifications Gravity
MagnumStone Specifications Gravity SPECIFICATION FOR MAGNUMSTONE GRAVITY MECHANICALLY STABILIZED EARTH SYSTEM PART 1: GENERAL.01Description The work consists of supplying and installing all aspects of
More informationSECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS
SECTION 32 16 13 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required
More informationSection (1997 Section 02795) PERMEABLE, FLEXIBLE and PLANTABLE CONCRETE EROSION CONTROL SYSTEM
PART 1: Section 32 12 43 (1997 Section 02795) PERMEABLE, FLEXIBLE and PLANTABLE CONCRETE EROSION CONTROL SYSTEM GENERAL 1.01 Description A. Work shall consist of furnishing all material, labor, services
More informationSTANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING Section Number Title 301 GENERAL 302 MATERIALS SPECIFICATIONS 303 CLEARING
More informationAppendix B.2. Construction Specifications for Infiltration Practices
Appendix B.2 Construction Specifications for Infiltration Practices B.2.A Infiltration Trench General Notes and Specifications An infiltration trench may not receive run-off until the entire contributing
More informationITEM 706 PIPE SLOPE DRAIN
AFTER NOVEMBER 1, 2008 ITEM 706 PIPE SLOPE DRAIN 706.1 Description. This work shall consist of the installation of temporary erosion protection and sediment control pipe slope drains, utilized during construction
More informationSPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18)
Page 1 of 8 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks
More informationSECTION EROSION CONTROLS
SECTION 31 25 13 EROSION CONTROLS PART 1 GENERAL 1.1 SUMMARY A. Section Includes installing, maintaining and removing: 1. Silt Fence. 2. Temporary Construction Entrances. 3. Diversion Channels. 4. Sediment
More informationSECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.
SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction
More informationSECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating
More informationE. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.
DELTA -DRAIN 6200 Section 07 10 00 Dampproofing and Waterproofing PART 1 GENERAL 1.1 SECTION INCLUDES A. Below grade waterproofing. B. Below grade drainage sheets. C. Plaza deck and planter drainage sheets.
More informationGeosynthetic Materials for Separation and Stabilization
Supplemental Technical Specification for Geosynthetic Materials for Separation and Stabilization SCDOT Designation: SC-M-203-1 (4/16) 1.0 DESCRIPTION 1.1 The requirements of this specification consist
More informationSTATE UNIVERSITY CONSTRUCTION FUND
DIRECTIVE 2-10 Issue date: July 2012 1. General SYNTHETIC TURF SYSTEM This Directive outlines the Fund s recommended requirements for the design and installation of Synthetic Turf Systems. 2. Design Criteria
More informationSECTION LIMESTONE SEGMENTAL RETAINING WALLS
(Specifier Notes: The purpose of this guide specification is to assist the specifier in correctly specifying segmental retaining walls and their installation. The specifier needs to edit this guide specification
More informationGEOSYTHETIC SLOPE SPEC-V0704rev.doc STANDARD SPECIAL PROVISION FOR GEOSYNTHETIC REINFORCED SLOPE CONSTRUCTION
GEOSYTHETIC SLOPE SPEC-V0704rev.doc STANDARD SPECIAL PROVISION FOR GEOSYNTHETIC REINFORCED SLOPE CONSTRUCTION I. DESCRIPTION - This work consists of furnishing the required materials and construction of
More informationTECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma
10-2-2017 October 2, 2017 ADDENDUM NO. 1, Project: Owner: Architect: TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma Moore
More informationSection SYNTHETIC GRASS SURFACING. ADDENDUM 2 January 17, 2019
Section 32 18 13 ADDENDUM 2 January 17, 2019 The following specification sections have been modified: 1.4 QUALITY ASSURANCE 2.1 MATERIALS AND PRODUCTS PART 1 - GENERAL 1.1 SUMMARY A. Furnish all labor,
More informationSECTION UNCLASSIFIED EXCAVATION AND GRADING
SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on
More information4.8. Subsurface Infiltration
4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of storm water as it infiltrates into the ground. Dry wells, infiltration
More informationSPECIFICATION FOR CORNERSTONE GEOGRID REINFORCED SEGMENTAL RETAINING WALL SYSTEM
CornerStone Specifications Geogrid Reinforced SPECIFICATION FOR CORNERSTONE GEOGRID REINFORCED SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL 1.01 Description The work consists of supplying and installing
More informationSECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete
More information4.8. Subsurface Infiltration
4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of stormwater as it infiltrates into the ground. Dry wells, infiltration
More informationUPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04
UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 1. Description This work shall consist of the design, manufacture and construction of a T-WALL structure
More informationSECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM
SECTION 02832 CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1.: GENERAL 1.01 WORK INCLUDED A. This section includes the following: The Specifications on furnishing the design, materials and labor required
More informationSECTION UNDERDRAINS. 1. Protection of the environment; Section Trench excavation, backfill, and compaction; Section
02510-1 of 7 SECTION 02510 UNDERDRAINS 02510.01 GENERAL A. Description Underdrain installation shall include, but not necessarily be limited to, constructing underdrains using pipe, filter fabric, and
More informationCONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8, Classic 6 and Legend unit segmental
More informationSECTION EROSION CONTROL DEVICES
SECTION 02374 PART 1 GENERAL EROSION CONTROL DEVICES 1.1 SUMMARY A. Section Includes: 1. Diversion Channels. 2. Rock Energy Dissipator. 3. Paved Energy Dissipator. 4. Rock Basin. 5. Rock Barriers. 6. Sediment
More informationSECTION FILL AND BACKFILL
PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling
More informationCONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 220 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION TABLE OF CONTENTS 220.01 SCOPE 220.02 REFERENCES 220.03 DEFINITIONS 220.04
More informationEXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.
CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain
More informationCONCRETE TILE PAVERS
Section 32 14 13 CONCRETE TILE PAVERS (1995 MasterFormat Section 02780) Note: This guide specification for the U.S. is for the installation of concrete tile paving units whose thickness are less than the
More informationC. Foundation stabilization for pipe and utility structures.
PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization
More information2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
More informationSECTION FOUNDATION DRAINAGE
SECTION 33 41 13 SPEC WRITER NOTES: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section
More informationSECTION RIPRAP, BOULDERS, AND BEDDING
SECTION 31 37 00 RIPRAP, BOULDERS, AND BEDDING PART 1 GENERAL 1.01 SECTION INCLUDES A. The WORK includes excavation, grading, and installation of riprap, boulders, soil riprap, void-filled riprap, and
More informationCONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 220 NOVEMBER 2012 CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION TABLE OF CONTENTS 220.01 SCOPE 220.02 REFERENCES 220.03 DEFINITIONS 220.04
More informationSECTION SUBSURFACE DRAINAGE (Vertical applications)
SECTION 02620 SUBSURFACE DRAINAGE (Vertical applications) PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Prefabricated Sheet Drainage System as a hydrostatic water relief system {NOTE TO SPECIFIER: Edit
More informationEROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY
31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed
More informationCONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 220 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION TABLE OF CONTENTS 220.01 SCOPE 220.02 REFERENCES 220.03 DEFINITIONS 220.04
More informationSECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.
PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and
More informationSECTION 18 - EARTHWORK TABLE OF CONTENTS
SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL... 18-2 18-2 ROADWAY EXCAVATION... 18-2 18-2.01 General... 18-2 18-2.02 Unsuitable Roadway Excavation and Backfill... 18-2 18-2.03 Surplus
More informationCYPRESS Stone Geogrid Reinforced Retaining Wall Installation Specification SECTION CONCRETE SEGMENTAL RETAINING WALL PART 1 GENERAL
CYPRESS Stone Geogrid Reinforced Retaining Wall Installation Specification SECTION 02832- CONCRETE SEGMENTAL RETAINING WALL PART 1 GENERAL 1.01 Description A) The work covered by this section includes
More informationCONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 220 NOVEMBER 2007 CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION TABLE OF CONTENTS 220.01 SCOPE 220.02 REFERENCES 220.03 DEFINITIONS 220.04
More informationA. Backfill: Soil material or controlled low-strength material used to fill an excavation.
GSA Project No.: GS-P-03-14-AZ-5044 SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Preparing subgrades for walks. 2. Excavating and backfilling for structures. 3. Subbase
More informationSECTION EXCAVATION, BACKFILLING AND COMPACTING
PART 1 GENERAL 1.01 SCOPE Work of this Section shall include all labor, materials, equipment, plant and incidentals required to complete all excavation, backfilling and compacting as indicated on the Drawings
More informationSECTION 18 - EARTHWORK TABLE OF CONTENTS
SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL... 18.1 18-2 ROADWAY EXCAVATION... 18.1 18-2.01 General... 18.1 18-2.02 Unsuitable Roadway Excavation and Backfill... 18.1 18-2.03 Surplus
More informationSAMPLE CONSTRUCTION AND MATERIAL SPECIFICATIONS FOR THE ULTRABLOCK GRAVITY WALL SYSTEM
SAMPLE CONSTRUCTION AND MATERIAL SPECIFICATIONS FOR THE ULTRABLOCK GRAVITY WALL SYSTEM The following paragraphs provide general guidelines on developing construction and material specifications for specific
More informationGeotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS
Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....
More informationSPECIFICATIONS FOR DRAINTUBE DRAINAGE GEOCOMPOSITES
SPECIFICATIONS FOR DRAINTUBE DRAINAGE GEOCOMPOSITES The following sample specification provides guidance for preparing site-specific specifications for using Draintube as a drainage geocomposite. This
More informationC. Submit samples of coarse aggregates, non-woven geotextile, and porous bituminous asphalt for review and approval by the Engineer.
DATE Page 1 PART 1 GENERAL 1.1 SUMMARY A. The work of this Section includes subgrade preparation, and reservoir base course, choker base course, and porous bituminous paving. 1.2 SUBMITTALS A. Submit a
More informationSECTION A1 EXCAVATION AND BACKFILL GENERAL
SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such
More informationUnion County Vocational - Technical Schools Scotch Plains, New Jersey
SECTION 02222 - EXCAVATION, BACKFILL, AND COMPACTION FOR UTILITIES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Excavating trenches for the installation of utilities and stormwater detention facilities. B.
More informationStanford University Facilities Design Guidelines SECTION STONE FINES PAVING. American Society for Testing and Materials.
SECTION 32 15 40 STONE FINES PAVING PART 1 GENERAL 1.1 RELATED WORK Section 32 11 00: Base Courses 1.2 QUALITY ASSURANCE A. Applicable Standards: Any reference shall mean the current or latest editions
More informationSECTION AGGREGATES
SECTION 32 05 00 AGGREGATES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Aggregate base 2. Engineered fill 3. Backfill 4. Fine filter aggregate (non-frost susceptible fill) 5. Riprap 6. Recreational
More informationITEM 750 ROCK FILTER DAMS
AFTER MARCH 1, 2012 ITEM 750 ROCK FILTER DAMS 750.1 Description. This work shall consist of the installation of temporary erosion protection and sediment control rock filter dams utilized during construction
More informationB. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.
SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.
More informationE. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.
DELTA -DRAIN Section 07 10 00 Dampproofing and Waterproofing PART 1 GENERAL 1.1 SECTION INCLUDES A. Below grade drainage sheets. B. Plaza deck and planter drainage sheets. 1.2 RELATED SECTIONS A. Section
More informationAPPENDIX E Contract Guide Specifications October 22, 2004 GUIDE CONTRACT SPECIFICATIONS PART I - EARTHWORK PREFACE These specifications are intended as a guide for the earthwork performed at the subject
More informationSECTION 02215BP TRENCHING AND BACKFILLING
SECTION 02215BP TRENCHING AND BACKFILLING This page is intentionally left blank. Fluor-B&W Portsmouth, LLC (FBP) SITE PREPARATION INFRASTRUCTURE PHASE 1 SPECIFICATION COVER SHEET Client: U.S. Department
More informationConstruction Specification for Concrete Unit Pavers
Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS
More informationINS T A LLA T I O N G U I D E
INS T A LLA T I O N G U I D E TENSAR GEOGRIDS The System is a costeffective and easy-to-install alternative for projects with grade changes. The System owes its long-term performance and durability to
More informationCITY OF FARGO SPECIFICATIONS AGGREGATE BASES
AGGREGATE BASES PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, accessories, and equipment necessary
More informationSECTION UTILITY BACKFILL MATERIALS
SECTION 31 23 23 UTILITY BACKFILL MATERIALS PART 1: GENERAL 1.01 SECTION INCLUDES A. Material Classifications B. : 1. Concrete sand 2. Gem sand 3. Pea gravel 4. Crushed stone 5. Crushed concrete 6. Bank
More informationSPECIAL SPECIFICATION 3153 Geosynthetic Clay Liner
2004 Specifications CSJ 0215-02-029, etc. SPECIAL SPECIFICATION 3153 Geosynthetic Clay Liner 1. Description. Install a Geosynthetic Clay Liner (GCL) in accordance with this specification and as shown on
More informationSECTION EARTHWORK
SECTION 310000 PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and perform all excavation, backfill, fill and grading required to complete the work
More informationSECTION EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 310000 - EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Modification to General Conditions and Division 01 Specification
More informationTECHNICAL SPECIFICATION
TECHNICAL SPECIFICATION ITEM 04821 TEMPORARY VEHICLE AND EQUIPMENT FUELING AREA PART 1 - GENERAL 1.01 Description Installation of erosion and sediment control for a temporary vehicle and equipment fueling
More informationSection (02830) MODULAR CONCRETE RETAINING WALL
Section 323223 (02830) MODULAR CONCRETE RETAINING WALL PART 1: GENERAL 1.01 Description A. Work shall consist of furnishing and constructing a VERDURA Retaining Wall System (or approved equal) in accordance
More informationDIVISION 4100 SITEWORK
DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES
More informationMSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS
219-1.1 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION This item consists of a base course composed of crushed recycled concrete aggregate, crushed to meet a particular gradation,
More informationStormTech Construction Guide
A division of StormTech solid end caps and pre-cored end caps StormTech chambers StormTech manifolds and fittings Acceptable fill materials per Table 1 Woven and non-woven geotextiles 80-7 DC REQUIRED
More informationDRIVABLE GRASS GUIDELINE FOR NON PLANTED DRY INFILL INSTALLATIONS
DRIVABLE GRASS GUIDELINE FOR NON PLANTED DRY INFILL INSTALLATIONS Please read through this instruction completely before beginning your installation. Be sure the proper equipment, and safety precautions
More informationPERMEABLE INTERLOCKING PAVERS
PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement
More informationCurlex High Velocity EROSION CONTROL BLANKET SPECIFICATION
Curlex High Velocity EROSION CONTROL BLANKET SPECIFICATION PART I - GENERAL 1.01 Summary A. The erosion control blanket contains excelsior wood fiber for the purpose of erosion control and revegetation
More informationLantz-Boggio Architects, P.C LBA Project No
SECTION 313430- PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all equipment, material, labor and supervision to design and install Engineered Aggregate Piers for the soil reinforcement. Design shall rely
More information