1 Part I General A. This information is to be used as a guideline in construction a dynamic aggregate base and drainage system. Project conditions may vary based on overall scope of work and location. Any variations shall be approved by SportsTurf Systems and/or Architect of Record prior to execution. B. This section includes the following: 1. Excavation 2. Aggregate Base Course 3. Drainage 4. Testing C. Scope Narrative - The work inclusive of this section is to be completed per the Contract Documents and is to include all labor, materials, equipment, supervision and all other incidentals necessary for a complete professional finished product. All local guidelines and applicable laws must be adhered to throughout the duration of the project. Remove and legally dispose of all unnecessary materials to achieve subgrade. Place aggregate, drainage and geotextile material as directed to achieve final grade. (Note: Geotechnical evaluation to be provided by Owner) D. Submittals The following submittals are required for approval prior to installation: 1. Permeable geotextile fabric product data 2. Permeable geotextile fabric test reports 3. Collector piping and accessories product data 4. Flat drain product data 5. Collector drain backfill material sieve analysis 6. Aggregate base course sieve analysis 7. Aggregate finish course sieve analysis 8. Supplier list 9. Aggregate material certifications Aggregate supplier must certify that all material delivered to site meets requirements as specified herein.

2 Part II Products A. Geotextile Fabric 1. Description The proposed fabric must consist of woven long-chain polymeric yarns. The yarns must be fabricated of 95% propylene or ester polymers. 2. Acceptable Manufacturers a. Mirafi b. Amoco c. Approved equal 3. Required Test Criteria The fabric must meet the following test parameters: Minimum Unit of Test Description Requirement Measurement Reference Wide Width Tensile Strength 175 lbs./in. ASTM D-4595 Grab Tensile Strength 315 lbs. ASTM D-4632 Grab Tensile Elongation 15 percent (%) ASTM D-4632 Trapezoid Tear Strength 120 lbs. ASTM D-4533 Mullen Burst Strength 600 psi ASTM D-3786 Puncture Strength 145 lbs. ASTM D-4833 Percent Open Area 1 percent (%) COE Apparent Opening Size mm ASTM D-4751 Permittivity 0.05 sec -1 ASTM D-4491 Flow Rate 163 gal/min/ft 2 ASTM D-4491 UV Resistance (at 500 hours) 70 % strength retained ASTM D-4355 B. Collector Piping 1. Description HDPE (High Density Polyethylene) corrugated piping. Perforated, smooth wall tubular style and required fittings. Size requirements are to be indicated in Contract Documents. Pipe to meet ASTM D3350 and AASHTO M252. a. Acceptable ManufacturersADS N-12 b. Hancor c. Approved equal

3 C. Flat Drain Piping 1. Description Perforated plastic core pipe with a 12 inch wide 1.5 inch tall profile. Flat drain to be wrapped in geotextile fabric. 2. Acceptable Manufacturers a. ADS AdvanEDGE b. Enkaturf Drain as manufactured by Colbond c. Approved equal D. Trench Backfill Aggregate 1. Description Angular, washed free draining stone with a uniform ¾" diameter. Other products native to region may be utilized in this application only. E. Aggregate Base Course 1. Description Angular, unwashed aggregate consisting of crushed limestone that must be placed and compacted in a uniform manner. Rounded stone is not permitted for this application. Aggregate must be tested by an independent party prior to delivery to site and must meet and/or exceed the specifications as provided herein. Please see Part III for correct application. Other products of similar consistency native to region of project may be considered and approved by SportsTurf Systems. 2. Design Criteria a. Sieve Analysis Sieve Dimension % Passing by Weight 1.5" " ¾" ½" # # b. Permeability - > 50 in./hr. c. Sulfate Soundness (C-88) - < 12% loss

4 d. Compaction 92-95% of maximum density as determined by ASTM D e. Optimum moisture content - > 90% F. Aggregate Finish Course 1. Description Angular, unwashed aggregate consisting of crushed limestone that must be placed and compacted in a uniform manner. Rounded stone is not permitted for this application. Compacted depth not to exceed 1". Aggregate must be tested by an independent party prior to delivery to site and must meet and/or exceed the specifications as provided herein. Please see Part III for correct application. Other products of similar consistency native to region of project may be considered and approved by SportsTurf Systems. 2. Design Criteria a. Sieve Analysis Sieve Dimension % Passing by Weight ¼" # # # # b. Permeability - > 12 in./hr. c. Sulfate Soundness (C-88) - < 12% loss d. LA Abrasion (ASTM C131) - < 40 e. Compaction 92-95% of maximum density as determined by ASTM D f. Optimum moisture content - > 90% Part III Execution A. General All activities are to be sequenced properly and completed in a timely fashion. All measures must be taken to ensure a safe jobsite per all applicable guidelines. All existing conditions and/or new work in place within the job limits

5 must be maintained at all times. Any damage to said materials will be the sole responsibility of the site work contractor. B. Excavation 1. Survey Solicit the services of a licensed surveyor to establish grade and control points necessary to complete the scope of work. Maintain such markings throughout the duration of the project. (Note: This may be provided by Owner. Please reference Contract Documents for verification) 2. Identify and mark all underground utilities prior to commencement or work. Utilize the services of a utility locating company if available. 3. Track Bridging If an existing track is in place proper track bridging must be in place prior to removal. Method of track bridging to be approved by SportsTurf Systems and Owner prior to commencement. 4. Removal a. Saw cut edge of existing track, if applicable, to achieve a uniform perimeter. b. Remove all trees, shrubs, plant material and all natural vegetation and legally dispose of. If an existing structure is present within the job limits, disconnect all utilities and relocate or completely demolish as indicated in the Contract Documents. c. Remove soils to a depth as indicated in the Contract Documents and legally dispose of or spoil on site in a location determined by Owner. Grade and shape subgrade to a 0.5% pitch from the centerline of the field (longitudinal) to the proposed edge of the excavation. Subgrade must be free of all roots, debris, etc. d. Any additional excavation, without the written direction of the Owner, will be the sole responsibility of this contractor. Do not proceed with additional

6 e. excavation unless authorized. If additional excavation is approved, engineered fill will be required in place of unsuitable soils. f. Any necessary dewatering will be the responsibility of this contractor. g. If contaminated soils, or potentially contaminated soils, are exposed during the excavation all work is to stop immediately and the condition is to be communicated to the Owner. 5. Laser Grading Laser guided machinery will be required to achieve the subgrade elevation as indicated on the Contract Documents. Subgrade must be achieved by laser grading to a ½" tolerance over a twenty-five foot continuous span. The subgrade must be compacted to achieve 95% of the maximum density as determined by ASTM D 698. Subgrade must have the required planarity to mirror that of the finished aggregate. 6. Testing a. This contractor will be required to conduct a proof roll of the subgrade prior to approval. This is to be witnessed by an independent soils engineer (by Owner) and the Architect. If an area is determined to be unsuitable, at the direction of the Owner, remove the unsuitable soil to a depth determined acceptable by the soils engineer. Engineered fill will be required in place of the unsuitable soil. Proof roll area again in the presence of the soils engineer and architect. b. Soils Engineer is to test for compaction prior to proceeding. C. Geotextile Fabric a. Geotextile fabric must be delivered to site in manufacturer's wrapping and must stay wrapped until placement. b. Do not commence installation unless subgrade has been approved c. Geotextile fabric must be overlapped per the manufacturer's recommendations. d. If geotextile fabric becomes damaged during installation remove, replace and/or patch per manufacturer's recommendations. e. Do not leave geotextile fabric exposed to the elements for more than fourteen days. Aggregate is to be placed within that time frame.

7 D. Drainage a. Collector Drain 1. Collector drain is to be 8 inches, or as indicated on the Contract Documents. 2. Pipe to be installed at 0.5% to allow for drainage. Location of outlet structure must be determined prior to installation. The point closest to the outlet structure will be the low point of the pipe within the excavation perimeter. 3. The trench for the collector drain must be lined independently with geotextile fabric allowing on overlap from the field. 4. Free draining stone must be placed and compacted properly around the collector pipe to the elevation of the subgrade. 5. All connections are to be made with the manufacturer's recommendations 6. Damaged piping is not be utilized and will be removed from site. 7. Photo documentation of this process will be required. b. Flat Drain 1. Flat drains are to be placed flat at a 45 degree angle at 25' O.C. over geotextile fabric. This is a "herringbone" layout. 2. In order to protect the flat drains, cover with aggregate as soon as possible. 3. Mechanical connection to collector drain is not required. Flat drains must be placed adjacent to collector drain per detail. 5. Aggregate Base Course a. Place only approved aggregate to a depth as indicated in the Contract Documents. b. Do not drive equipment over geotextile fabric in place. c. Do not stockpile material in a central location and move to perimeter. Material shall not be moved more than 50 feet from final location. Failure to do so will result in a separation of the gradations and a general lack of uniformity in the base.

8 d. Laser guided machinery will be required to achieve the subgrade elevation as indicated on the Contract Documents. Laser grade to a ¼" tolerance over a twenty five foot continuous span. A 0.5% slope from centerline of field to nailer must be maintained. The subgrade must be compacted to achieve 95% of the maximum density as determined by ASTM D 698. Subgrade must have the required planarity to mirror that of the finish course. e. Compaction is to be achieved by using a vibratory roller. 7. Aggregate Finish Course a. Place only approved aggregate to a depth of no more than 1" once compacted. b. A broadcast method is preferred for this application. c. Compaction is to be achieved by using a vibratory roller. Aggregate shall be wetted during the compaction process. The finished course shall be free of all impressions, roller marks, etc. d. Laser grade to achieve the desired elevation to a tolerance of 1/8" over a 25 foot continuous span. Failure to achieve such requirements will result in regrading the unacceptable areas of the base. e. Solicit the services of a licensed surveyor to verify elevations and planarity. Results shall be made available to SportsTurf Systems. f. Prior to demobilization, SportsTurf Systems must approve the finish course. Site contractor may leave no more than ½ yard of finish course aggregate for repairs.

CITY OF FARGO SPECIFICATIONS GEOTEXTILES AND GEOGRIDS

CITY OF FARGO SPECIFICATIONS GEOTEXTILES AND GEOGRIDS GEOTEXTILES AND GEOGRIDS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, accessories, and equipment necessary

More information

SECTION SUBDRAINAGE

SECTION SUBDRAINAGE SECTION 33 46 00 SUBDRAINAGE PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall furnish all labor, tools, and equipment and perform all Work necessary for, or incidental to, the supply and installation

More information

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating

More information

Installation Dash. plae.us

Installation Dash. plae.us Installation Dash These specifications are intended for GUIDELINE purposes only, for the design and construction of a Dynamic Base used in conjunction with Dash. All architect s specifications and drawings

More information

A. This section includes the furnishing and installation of a foundation drainage system.

A. This section includes the furnishing and installation of a foundation drainage system. PAGE 334613-1 SECTION 334613 SPECIFIER: This Section is written to specify a drainage system for buildings, which normally includes a drain installed around the perimeter of a building or basement, but

More information

Nantasket Beach Revetment Design

Nantasket Beach Revetment Design Nantasket Beach Revetment Design A design concept for a stone revetment was developed for the conditions reported in the 20 May 2008 Draft Nantasket Beach Coastal Engineering Appendix. This revetment design

More information

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS SECTION 13100 MECHANICALLY STABILIZED EARTH RETAINING WALLS PART 1 -- GENERAL 1.01 THE REQUIREMENT A. Includes all labor, material, equipment, testing and submittals required to design and complete construction

More information

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating

More information

REGIONAL CONSTRUCTION STANDARDS

REGIONAL CONSTRUCTION STANDARDS REGIONAL CONSTRUCTION STANDARDS SIXTH EDITION Publication Update 6.5 (Full Committee Approved Proposed Revision 6.5 Storm Sewer Joint Wrap - Section 302 As Publication Update 6.5) March 27, 2018 Copyright

More information

BMP 6.4.4: Infiltration Trench

BMP 6.4.4: Infiltration Trench BMP 6.4.4: Infiltration Trench An Infiltration Trench is a leaky pipe in a stone filled trench with a level bottom. An Infiltration Trench may be used as part of a larger storm sewer system, such as a

More information

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM

SECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM SECTION 32 32 23 SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM PART 1: GENERAL 1.01 Scope Work includes furnishing all materials, labor, equipment, and supervision to install a Stonebridge segmental

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

SECTION ASPHALT CONCRETE

SECTION ASPHALT CONCRETE SECTION 02740 ASPHALT CONCRETE PART 1. GENERAL 1.01 SECTION INCLUDES A. Work includes but is not limited to the following: 1.02 RELATED SECTIONS 1. Provide all material, labor, and equipment to prepare

More information

Reinforced Soil Slopes (RSS)

Reinforced Soil Slopes (RSS) Supplemental Technical Specification for Reinforced Soil Slopes (RSS) SCDOT Designation: SC-M-206-1 (4/16) 1.0 DESCRIPTION 1.1 Construct a reinforced soil slope in accordance with these specifications,

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form

REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form Proposed Revision To: REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form General Provisions (Division 1) Technical Specifications (Divisions 2-8) Standard Details Change No. Hampton Roads Planning

More information

MagnumStone Specifications Gravity

MagnumStone Specifications Gravity MagnumStone Specifications Gravity SPECIFICATION FOR MAGNUMSTONE GRAVITY MECHANICALLY STABILIZED EARTH SYSTEM PART 1: GENERAL.01Description The work consists of supplying and installing all aspects of

More information

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS SECTION 32 16 13 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required

More information

Section (1997 Section 02795) PERMEABLE, FLEXIBLE and PLANTABLE CONCRETE EROSION CONTROL SYSTEM

Section (1997 Section 02795) PERMEABLE, FLEXIBLE and PLANTABLE CONCRETE EROSION CONTROL SYSTEM PART 1: Section 32 12 43 (1997 Section 02795) PERMEABLE, FLEXIBLE and PLANTABLE CONCRETE EROSION CONTROL SYSTEM GENERAL 1.01 Description A. Work shall consist of furnishing all material, labor, services

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING Section Number Title 301 GENERAL 302 MATERIALS SPECIFICATIONS 303 CLEARING

More information

Appendix B.2. Construction Specifications for Infiltration Practices

Appendix B.2. Construction Specifications for Infiltration Practices Appendix B.2 Construction Specifications for Infiltration Practices B.2.A Infiltration Trench General Notes and Specifications An infiltration trench may not receive run-off until the entire contributing

More information

ITEM 706 PIPE SLOPE DRAIN

ITEM 706 PIPE SLOPE DRAIN AFTER NOVEMBER 1, 2008 ITEM 706 PIPE SLOPE DRAIN 706.1 Description. This work shall consist of the installation of temporary erosion protection and sediment control pipe slope drains, utilized during construction

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18) Page 1 of 8 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

SECTION EROSION CONTROLS

SECTION EROSION CONTROLS SECTION 31 25 13 EROSION CONTROLS PART 1 GENERAL 1.1 SUMMARY A. Section Includes installing, maintaining and removing: 1. Silt Fence. 2. Temporary Construction Entrances. 3. Diversion Channels. 4. Sediment

More information

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements. SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction

More information

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating

More information

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage. DELTA -DRAIN 6200 Section 07 10 00 Dampproofing and Waterproofing PART 1 GENERAL 1.1 SECTION INCLUDES A. Below grade waterproofing. B. Below grade drainage sheets. C. Plaza deck and planter drainage sheets.

More information

Geosynthetic Materials for Separation and Stabilization

Geosynthetic Materials for Separation and Stabilization Supplemental Technical Specification for Geosynthetic Materials for Separation and Stabilization SCDOT Designation: SC-M-203-1 (4/16) 1.0 DESCRIPTION 1.1 The requirements of this specification consist

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 2-10 Issue date: July 2012 1. General SYNTHETIC TURF SYSTEM This Directive outlines the Fund s recommended requirements for the design and installation of Synthetic Turf Systems. 2. Design Criteria

More information

SECTION LIMESTONE SEGMENTAL RETAINING WALLS

SECTION LIMESTONE SEGMENTAL RETAINING WALLS (Specifier Notes: The purpose of this guide specification is to assist the specifier in correctly specifying segmental retaining walls and their installation. The specifier needs to edit this guide specification

More information

GEOSYTHETIC SLOPE SPEC-V0704rev.doc STANDARD SPECIAL PROVISION FOR GEOSYNTHETIC REINFORCED SLOPE CONSTRUCTION

GEOSYTHETIC SLOPE SPEC-V0704rev.doc STANDARD SPECIAL PROVISION FOR GEOSYNTHETIC REINFORCED SLOPE CONSTRUCTION GEOSYTHETIC SLOPE SPEC-V0704rev.doc STANDARD SPECIAL PROVISION FOR GEOSYNTHETIC REINFORCED SLOPE CONSTRUCTION I. DESCRIPTION - This work consists of furnishing the required materials and construction of

More information

TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma

TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma 10-2-2017 October 2, 2017 ADDENDUM NO. 1, Project: Owner: Architect: TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma Moore

More information

Section SYNTHETIC GRASS SURFACING. ADDENDUM 2 January 17, 2019

Section SYNTHETIC GRASS SURFACING. ADDENDUM 2 January 17, 2019 Section 32 18 13 ADDENDUM 2 January 17, 2019 The following specification sections have been modified: 1.4 QUALITY ASSURANCE 2.1 MATERIALS AND PRODUCTS PART 1 - GENERAL 1.1 SUMMARY A. Furnish all labor,

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

4.8. Subsurface Infiltration

4.8. Subsurface Infiltration 4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of storm water as it infiltrates into the ground. Dry wells, infiltration

More information

SPECIFICATION FOR CORNERSTONE GEOGRID REINFORCED SEGMENTAL RETAINING WALL SYSTEM

SPECIFICATION FOR CORNERSTONE GEOGRID REINFORCED SEGMENTAL RETAINING WALL SYSTEM CornerStone Specifications Geogrid Reinforced SPECIFICATION FOR CORNERSTONE GEOGRID REINFORCED SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL 1.01 Description The work consists of supplying and installing

More information

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete

More information

4.8. Subsurface Infiltration

4.8. Subsurface Infiltration 4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of stormwater as it infiltrates into the ground. Dry wells, infiltration

More information

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 1. Description This work shall consist of the design, manufacture and construction of a T-WALL structure

More information

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM SECTION 02832 CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1.: GENERAL 1.01 WORK INCLUDED A. This section includes the following: The Specifications on furnishing the design, materials and labor required

More information

SECTION UNDERDRAINS. 1. Protection of the environment; Section Trench excavation, backfill, and compaction; Section

SECTION UNDERDRAINS. 1. Protection of the environment; Section Trench excavation, backfill, and compaction; Section 02510-1 of 7 SECTION 02510 UNDERDRAINS 02510.01 GENERAL A. Description Underdrain installation shall include, but not necessarily be limited to, constructing underdrains using pipe, filter fabric, and

More information

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8, Classic 6 and Legend unit segmental

More information

SECTION EROSION CONTROL DEVICES

SECTION EROSION CONTROL DEVICES SECTION 02374 PART 1 GENERAL EROSION CONTROL DEVICES 1.1 SUMMARY A. Section Includes: 1. Diversion Channels. 2. Rock Energy Dissipator. 3. Paved Energy Dissipator. 4. Rock Basin. 5. Rock Barriers. 6. Sediment

More information

SECTION FILL AND BACKFILL

SECTION FILL AND BACKFILL PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling

More information

CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION

CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 220 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION TABLE OF CONTENTS 220.01 SCOPE 220.02 REFERENCES 220.03 DEFINITIONS 220.04

More information

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

CONCRETE TILE PAVERS

CONCRETE TILE PAVERS Section 32 14 13 CONCRETE TILE PAVERS (1995 MasterFormat Section 02780) Note: This guide specification for the U.S. is for the installation of concrete tile paving units whose thickness are less than the

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

SECTION FOUNDATION DRAINAGE

SECTION FOUNDATION DRAINAGE SECTION 33 41 13 SPEC WRITER NOTES: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

SECTION RIPRAP, BOULDERS, AND BEDDING

SECTION RIPRAP, BOULDERS, AND BEDDING SECTION 31 37 00 RIPRAP, BOULDERS, AND BEDDING PART 1 GENERAL 1.01 SECTION INCLUDES A. The WORK includes excavation, grading, and installation of riprap, boulders, soil riprap, void-filled riprap, and

More information

CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION

CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 220 NOVEMBER 2012 CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION TABLE OF CONTENTS 220.01 SCOPE 220.02 REFERENCES 220.03 DEFINITIONS 220.04

More information

SECTION SUBSURFACE DRAINAGE (Vertical applications)

SECTION SUBSURFACE DRAINAGE (Vertical applications) SECTION 02620 SUBSURFACE DRAINAGE (Vertical applications) PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Prefabricated Sheet Drainage System as a hydrostatic water relief system {NOTE TO SPECIFIER: Edit

More information

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY 31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed

More information

CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION

CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 220 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION TABLE OF CONTENTS 220.01 SCOPE 220.02 REFERENCES 220.03 DEFINITIONS 220.04

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION 18 - EARTHWORK TABLE OF CONTENTS SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL... 18-2 18-2 ROADWAY EXCAVATION... 18-2 18-2.01 General... 18-2 18-2.02 Unsuitable Roadway Excavation and Backfill... 18-2 18-2.03 Surplus

More information

CYPRESS Stone Geogrid Reinforced Retaining Wall Installation Specification SECTION CONCRETE SEGMENTAL RETAINING WALL PART 1 GENERAL

CYPRESS Stone Geogrid Reinforced Retaining Wall Installation Specification SECTION CONCRETE SEGMENTAL RETAINING WALL PART 1 GENERAL CYPRESS Stone Geogrid Reinforced Retaining Wall Installation Specification SECTION 02832- CONCRETE SEGMENTAL RETAINING WALL PART 1 GENERAL 1.01 Description A) The work covered by this section includes

More information

CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION

CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 220 NOVEMBER 2007 CONSTRUCTION SPECIFICATION FOR WICK DRAIN INSTALLATION TABLE OF CONTENTS 220.01 SCOPE 220.02 REFERENCES 220.03 DEFINITIONS 220.04

More information

A. Backfill: Soil material or controlled low-strength material used to fill an excavation.

A. Backfill: Soil material or controlled low-strength material used to fill an excavation. GSA Project No.: GS-P-03-14-AZ-5044 SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Preparing subgrades for walks. 2. Excavating and backfilling for structures. 3. Subbase

More information

SECTION EXCAVATION, BACKFILLING AND COMPACTING

SECTION EXCAVATION, BACKFILLING AND COMPACTING PART 1 GENERAL 1.01 SCOPE Work of this Section shall include all labor, materials, equipment, plant and incidentals required to complete all excavation, backfilling and compacting as indicated on the Drawings

More information

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION 18 - EARTHWORK TABLE OF CONTENTS SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL... 18.1 18-2 ROADWAY EXCAVATION... 18.1 18-2.01 General... 18.1 18-2.02 Unsuitable Roadway Excavation and Backfill... 18.1 18-2.03 Surplus

More information

SAMPLE CONSTRUCTION AND MATERIAL SPECIFICATIONS FOR THE ULTRABLOCK GRAVITY WALL SYSTEM

SAMPLE CONSTRUCTION AND MATERIAL SPECIFICATIONS FOR THE ULTRABLOCK GRAVITY WALL SYSTEM SAMPLE CONSTRUCTION AND MATERIAL SPECIFICATIONS FOR THE ULTRABLOCK GRAVITY WALL SYSTEM The following paragraphs provide general guidelines on developing construction and material specifications for specific

More information

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....

More information

SPECIFICATIONS FOR DRAINTUBE DRAINAGE GEOCOMPOSITES

SPECIFICATIONS FOR DRAINTUBE DRAINAGE GEOCOMPOSITES SPECIFICATIONS FOR DRAINTUBE DRAINAGE GEOCOMPOSITES The following sample specification provides guidance for preparing site-specific specifications for using Draintube as a drainage geocomposite. This

More information

C. Submit samples of coarse aggregates, non-woven geotextile, and porous bituminous asphalt for review and approval by the Engineer.

C. Submit samples of coarse aggregates, non-woven geotextile, and porous bituminous asphalt for review and approval by the Engineer. DATE Page 1 PART 1 GENERAL 1.1 SUMMARY A. The work of this Section includes subgrade preparation, and reservoir base course, choker base course, and porous bituminous paving. 1.2 SUBMITTALS A. Submit a

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 02222 - EXCAVATION, BACKFILL, AND COMPACTION FOR UTILITIES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Excavating trenches for the installation of utilities and stormwater detention facilities. B.

More information

Stanford University Facilities Design Guidelines SECTION STONE FINES PAVING. American Society for Testing and Materials.

Stanford University Facilities Design Guidelines SECTION STONE FINES PAVING. American Society for Testing and Materials. SECTION 32 15 40 STONE FINES PAVING PART 1 GENERAL 1.1 RELATED WORK Section 32 11 00: Base Courses 1.2 QUALITY ASSURANCE A. Applicable Standards: Any reference shall mean the current or latest editions

More information

SECTION AGGREGATES

SECTION AGGREGATES SECTION 32 05 00 AGGREGATES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Aggregate base 2. Engineered fill 3. Backfill 4. Fine filter aggregate (non-frost susceptible fill) 5. Riprap 6. Recreational

More information

ITEM 750 ROCK FILTER DAMS

ITEM 750 ROCK FILTER DAMS AFTER MARCH 1, 2012 ITEM 750 ROCK FILTER DAMS 750.1 Description. This work shall consist of the installation of temporary erosion protection and sediment control rock filter dams utilized during construction

More information

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving. SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.

More information

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.

E. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage. DELTA -DRAIN Section 07 10 00 Dampproofing and Waterproofing PART 1 GENERAL 1.1 SECTION INCLUDES A. Below grade drainage sheets. B. Plaza deck and planter drainage sheets. 1.2 RELATED SECTIONS A. Section

More information

APPENDIX E Contract Guide Specifications October 22, 2004 GUIDE CONTRACT SPECIFICATIONS PART I - EARTHWORK PREFACE These specifications are intended as a guide for the earthwork performed at the subject

More information

SECTION 02215BP TRENCHING AND BACKFILLING

SECTION 02215BP TRENCHING AND BACKFILLING SECTION 02215BP TRENCHING AND BACKFILLING This page is intentionally left blank. Fluor-B&W Portsmouth, LLC (FBP) SITE PREPARATION INFRASTRUCTURE PHASE 1 SPECIFICATION COVER SHEET Client: U.S. Department

More information

Construction Specification for Concrete Unit Pavers

Construction Specification for Concrete Unit Pavers Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS

More information

INS T A LLA T I O N G U I D E

INS T A LLA T I O N G U I D E INS T A LLA T I O N G U I D E TENSAR GEOGRIDS The System is a costeffective and easy-to-install alternative for projects with grade changes. The System owes its long-term performance and durability to

More information

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES

CITY OF FARGO SPECIFICATIONS AGGREGATE BASES AGGREGATE BASES PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, accessories, and equipment necessary

More information

SECTION UTILITY BACKFILL MATERIALS

SECTION UTILITY BACKFILL MATERIALS SECTION 31 23 23 UTILITY BACKFILL MATERIALS PART 1: GENERAL 1.01 SECTION INCLUDES A. Material Classifications B. : 1. Concrete sand 2. Gem sand 3. Pea gravel 4. Crushed stone 5. Crushed concrete 6. Bank

More information

SPECIAL SPECIFICATION 3153 Geosynthetic Clay Liner

SPECIAL SPECIFICATION 3153 Geosynthetic Clay Liner 2004 Specifications CSJ 0215-02-029, etc. SPECIAL SPECIFICATION 3153 Geosynthetic Clay Liner 1. Description. Install a Geosynthetic Clay Liner (GCL) in accordance with this specification and as shown on

More information

SECTION EARTHWORK

SECTION EARTHWORK SECTION 310000 PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and perform all excavation, backfill, fill and grading required to complete the work

More information

SECTION EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 310000 - EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Modification to General Conditions and Division 01 Specification

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 04821 TEMPORARY VEHICLE AND EQUIPMENT FUELING AREA PART 1 - GENERAL 1.01 Description Installation of erosion and sediment control for a temporary vehicle and equipment fueling

More information

Section (02830) MODULAR CONCRETE RETAINING WALL

Section (02830) MODULAR CONCRETE RETAINING WALL Section 323223 (02830) MODULAR CONCRETE RETAINING WALL PART 1: GENERAL 1.01 Description A. Work shall consist of furnishing and constructing a VERDURA Retaining Wall System (or approved equal) in accordance

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS 219-1.1 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION This item consists of a base course composed of crushed recycled concrete aggregate, crushed to meet a particular gradation,

More information

StormTech Construction Guide

StormTech Construction Guide A division of StormTech solid end caps and pre-cored end caps StormTech chambers StormTech manifolds and fittings Acceptable fill materials per Table 1 Woven and non-woven geotextiles 80-7 DC REQUIRED

More information

DRIVABLE GRASS GUIDELINE FOR NON PLANTED DRY INFILL INSTALLATIONS

DRIVABLE GRASS GUIDELINE FOR NON PLANTED DRY INFILL INSTALLATIONS DRIVABLE GRASS GUIDELINE FOR NON PLANTED DRY INFILL INSTALLATIONS Please read through this instruction completely before beginning your installation. Be sure the proper equipment, and safety precautions

More information

PERMEABLE INTERLOCKING PAVERS

PERMEABLE INTERLOCKING PAVERS PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement

More information

Curlex High Velocity EROSION CONTROL BLANKET SPECIFICATION

Curlex High Velocity EROSION CONTROL BLANKET SPECIFICATION Curlex High Velocity EROSION CONTROL BLANKET SPECIFICATION PART I - GENERAL 1.01 Summary A. The erosion control blanket contains excelsior wood fiber for the purpose of erosion control and revegetation

More information

Lantz-Boggio Architects, P.C LBA Project No

Lantz-Boggio Architects, P.C LBA Project No SECTION 313430- PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all equipment, material, labor and supervision to design and install Engineered Aggregate Piers for the soil reinforcement. Design shall rely

More information