1 ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA Tel: Fax: March 3, 2016 Mr. Jeff Hoover, Principal Tappe Architects, 6 Edgerly Place Boston, MA Reference: Part I: Seekonk Human Services Building & School, 320 Pleasant St, Seekonk, MA Part II: Seekonk Library, 410 Newman St, Seekonk, MA Dear Jeff: This letter reports our finding regarding the structural existing conditions and a renovation feasibility study for the above referenced buildings. Our review is based on our on-site structural field observations, and 1977 construction documents in the case of the existing Seekonk Library. Field observations were limited to visual surface observations of architectural exposed finishes, no holes were cut into the building finishes to verify hidden structure. Testing has not been performed to determine the structure s material condition. We understand the potential primary structural features of these building to be addressed in this investigation consist of the following(as may be applicable to either building): 1. The implications of the existing conditions, including damage, for use as a library. 2. Change of Use of the existing building for use as a library, with Stack Room live loads. 3. A Horizontal Addition involving an increase in the existing building footprint. 4. A Vertical Addition involving an additional story over the existing roof. 5. Structural implications of a general renovation affecting partitions & systems. PART I - Address: 320 Pleasant St, Seekonk, MA A. Existing structure & conditions: The structure is a two story brick building previously understood to be a school, see Photo 1. The Upper Floor is wood framed and is supported on brick bearing walls along the exterior and central corridor walls, and supported on steel posts along two interior grid lines. Steel beams span along these intermediate gridlines. The roof structure is heavy timber trusses. The lateral force resisting system is existing unreinforced masonry walls, and interior cross-wall partitions. There is no elevator, however one of the stairways has a rail-chair-lift-system. The Upper Floor has /- clear headroom, portions of the lower level vary from 7-3 to 7-6, beam soffits were observed as low as 7-0 clear headroom.
2 ROOME & GUARRACINO, LLC Page 2 Photo 1: Existing school and offices at 320 Pleasant St, Seekonk, MA Photo 2: Irregular crack location along sidewalk curb may indicate cracking in the foundations. Foundation cracks are susceptible to leaking into the half-basement. Leaks were not mentioned by tenants, but irregular cracking between control joints of the sidewalk curb may be indicative of foundation cracks. See Photo 2.
3 ROOME & GUARRACINO, LLC Page 3 B. Implications of a library renovation: Roof: Potentially no roof work scope. Existing conditions may remain as is except where damage is discovered, which shall be repaired. Prior repairs were observed, and are assumed to have been designed according to building codes at the time of repair, in which case no further investigation would be required. Roof Scope which may trigger an investigation would be reroofing, addition of RTUs, solar panels, creation of attic storage areas, or creation of areas below the roof where a public assembly occupant load exceeds 300 people. Except reroofing, other type of work cited is likely to trigger structural work scope. Upper Floor: The past design live loads ranged from psf. The proposed Library live loads is 150 psf (library stack rooms). The total floor cavity is estimated as 11, which allowing for the thickness of finishes (flooring, sub-floor, plaster ceiling, & strapping) results in a an estimate of about 8 ½ for structure. The existing floor framing is expected to be significantly overstressed for library stack room use. Based on the column spacing and estimated joist depth, typical reinforcing is expected such as new LVL joists, and replaced or reinforced steel beams, throughout the Upper Floor. Lower Floor headroom might be reduced by this potentially deeper floor framing. The structural work of reinforcing the existing floor for library use will trigger a full IEBC Wind & Seismic analysis of the existing structure, resulting in upgrades noted in the Lateral System discussion, below. Lower Floor: Large concentrated loads within stack rooms may crack the existing slab-ongrade if void spaces/pockets have developed due to insufficient soil compaction, or settlement of soil over the lifetime of the building. This is an owner assumed risk, which could be mitigated if the existing slab on grade is removed, soil compacted, and new reinforced slab on grade is installed per geotechnical engineer s recommendations intended for 150 psf library stack rooms. Lateral System & Seismic upgrades: All exterior unreinforced masonry (brick) walls which are not already adequately mechanically anchored to the floor and roof diaphragms per IEBC guidelines, shall be fastened at a spacing approximately 4 to 6 O.C. The existing structure will require an IEBC Wind & Seismic analysis due to the Substantial Alteration of reinforcing the Upper Floor framing for library use, which may result in requiring new reinforced CMU or concrete shear walls or new steel braced frames. The extent of this scope involving new frames will be increased if existing interior partitions are removed or if new penetrations are made in existing brick walls. Any potential horizontal additions to the existing building would be strongly recommended to be separated from the existing building with continuous seismic expansion joint, as this may otherwise further increase the demands on the existing building. A vertical addition is likely cost prohibitive as it would require new foundations, columns, removal & replacement of the heavy timber roof trusses, and an entirely new lateral system. Full demo and rebuild would likely be considerably less costly than a vertical addition.
4 ROOME & GUARRACINO, LLC Page 4 C. Adjacent Gymnasium structure Existing Structure: The structure is a one story open gymnasium with wood framed roof decking supported on clear spanning timber beam-column arches, without any tie rods/beams. The lateral force resisting system is existing unreinforced masonry walls. The headroom is visually estimated to vary from 14 to 21 at the low and high points of the ceiling. There is visible roof deflection, assumed to be due to creep of the arching roof structure. See Photo 3. Existing Floor: Large concentrated loads within stack rooms may crack the existing slab-ongrade if void spaces/pockets developed due to settlement of soil over the lifetime of the building. This is an owner assumed risk, which could be mitigated if the existing slab on grade is removed, soil compacted, and new reinforced slab on grade is installed per geotechnical engineer s recommendations intended for 150 psf library stack rooms. Loft: If a loft were added within the current building it would trigger lateral system upgrades similar to the main building. Regardless, similar roof to wall mechanical anchorage is required. Photo 3: Open Gymnasium with an arching roof structure
5 ROOME & GUARRACINO, LLC Page 5 PART II- Address: 410 Newman St, Seekonk, MA A. Existing structure & conditions: The existing structure is a one story steel beam and column bar joist structure with metal roof deck. The foundations are spread footings and strip footings. The lateral system is a steel K- brace / knee brace system. It currently serves as a library. See Photo 4. The north, west and south foundation walls have several frequently spaced cracks. There is evidence of prior foundation repairs and/or patching in the south west corner of the building. While significant settlement is noted to have occurred in the past (and assumed fixed), neither interior floors or exterior walls currently exhibit perceptible differential settlement. None of these conditions appear to require structural repair at this time. Further patching to minimize water intrusion may be beneficial. Photo 4: Existing Library at 410 Newman St, Seekonk, MA There were a few isolated locations where water has minimally damaged existing structure. Such as surface rust near the edges of roof beam flanges, and small portions of single isolated deck flutes rusted through. At this time this damage is considered cosmetic, however any existing leaks should be eliminated. B. Implications of an adjacent horizontal library addition: Gravity System: If the adjacent addition is taller than the existing building this will result in drifting snow and will require re-tapering of existing roof drainage where it currently slopes toward scuppers to be obstructed by the new addition. Both of these alterations will design weight to the existing roof, which may be partially offset by the reduction in Seekonk design snow load to 30 psf which occurred in 2014.
6 ROOME & GUARRACINO, LLC Page 6 Lateral System & Seismic upgrades: Any potential horizontal additions to the existing building would be strongly recommended to be separated from the existing building with continuous seismic expansion joint. Otherwise, it will likely trigger an upgrade of the existing lateral force resisting system, such as the introduction of reinforcing columns and beams and converting them to moment frames, or addition of diagonally braced steel frames, which may interfere with existing windows and floor layout. C. Implications of converting the roof to a 2nd Floor vertical library addition: The roof is not suitable for conversion to a 2nd Floor. Which results in two options to add a floor above, either: Option 1: For gravity purposes, the steel girders and columns could be reinforced to support a second floor, the bar joist which span between the girders are not easily reinforced and would essentially be abandoned and replaced, The existing roof deck would be removed and replaced in the process of installing new joists, and pending geotechnical review it is expected that all existing foundations will require reinforcement or underpinning and replacement. Lateral System & Seismic upgrades: A vertical addition to the existing library will require a full IBC Wind & Seismic analysis of the existing structure, resulting in a full upgrade of the existing lateral force resisting system, such as the introduction of reinforcing columns and beams and converting them to moment frames, or addition of diagonally braced steel frames, which may interfere with existing windows and floor layout Option 2: For gravity purposes, the existing roof is abandoned/ignored, and a new 2nd Floor is constructed above the existing roof with a minimal crawl space between them. The new 2nd Floor is an entirely independent new building effectively built on column stilts through the existing building s roof and floor layout below. New columns and foundations would be installed at locations away from the existing foundations, this would effectively reduce the current open 30 x 30 column grid to closer to 15 x 30. Lateral System & Seismic upgrades: An independent vertical addition to the existing library may not trigger an upgrade of the existing lateral force resisting system, however the new addition will require the columns which penetrate thru the existing building below to have either moment frames, or preferably diagonally braced steel frames if such braced frames can be coordinated with existing windows and floor layout. PART III - Summary This letter report addresses only those structural conditions referred to above. Structural problems may be concealed below grade, hidden behind finishes or not indicated on existing drawings. Although care has been taken in the preparation of this structural existing conditions and renovation feasibility study, no representation regarding latent or concealed defects, which may exist, is made, and authority on code requirements and interpretation rests with the building official.
7 ROOME & GUARRACINO, LLC Page 7 In general, our findings indicate the existing structures to be in relatively good condition, and suitable to undergo a renovation and/or addition project. However, vertical additions are not recommended due to concern with economical viability. A horizontal addition separated from the existing structure by seismic expansions joints would be more economical. The potential conversion of the existing school structure to library use would result in the Substantial Alteration of reinforcing the existing typical floor framing & foundations, thereby triggering an IEBC Wind & Seismic analysis of the existing structure comparable to that required for new construction, and resulting in lateral system upgrades. Should you have any questions or require further assistance, please feel free to call me. Very Truly Yours, ROOME & GUARRACINO, LLC Siegmar Knebl Jr., P.E. Senior Engineer
Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi
STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel
More informationEast Lyme Middle School EAST LYME MIDDLE SCHOOL
Description: N EAST LYME MIDDLE SCHOOL The school consists of a multi story building with lower, main and upper level floors. The typical floor framing for the main and upper levels is wide flange steel
More informationStructural Inspection
General: Background: An inspection and structural analysis have been performed for the purpose of evaluating the buildings structural systems and components. A full set of structural drawings was utilized
More informationSEATTLE CENTRAL COLLEGE BROADWAY PERFORMANCE HALL SEATTLE, WASHINGTON STRUCTURAL EVALUATION FOR PREPARED BY PCS STRUCTURAL SOLUTIONS
STRUCTURAL EVALUATION FOR SEATTLE CENTRAL COLLEGE BROADWAY PERFORMANCE HALL SEATTLE, WASHINGTON PREPARED BY PCS STRUCTURAL SOLUTIONS NOVEMBER 1, 2017 17-733 TABLE OF CONTENTS Page I. PREFACE ii II. EXECUTIVE
More informationStructural Redesign Gravity System
Redesign Gravity System Design Considerations A composite floor system was used for this design to maximize the efficiency of the material being used. This type of system requires less material and provides
More information05/16/2016 1:36:13 PM
1223 Mineral Spring Avenue North Providence, RI 02904 STRUCTURAL EXISTING CONDITIONS REPORT Prepared for: Jonathan Levi Architects 266 Beacon Street Boston, Massachusetts, 02116 May 16, 2016Draft WESTPORT,
More informationProject Seismic Vulnerability Assessment For SFCC District Building 33 Gough Street San Francisco, California 94103
Project For SFCC District Building 33 Gough Street San Francisco, California 94103 Prepared For San Francisco Community College District 33 Gough Street San Francisco, California 94103 Prepared By Thornton
More informationProject. San Jose City College Physical Education Building. Prepared For. Prepared By PLACE IMAGE HERE. Ken Bauer, AIA Principal
Project San Jose City College Physical Education Building PLACE IMAGE HERE Prepared For Ken Bauer, AIA Principal LPAS 2484 Natomas Park Drive Sacramento, CA 95833 916.443.0335 Prepared By Steve Ratchye,
More informationPre-schematic Considerations. Who. What. Where
Who What Where Who, What & Where Who are the users? Church School Manufacturers Researchers Who, What & Where What is the purpose? Fellowship Teaching Manufacturing Production Who, What & Where Location,
More informationThe designer shall also submit additional information required by the University as described and underlined below.
I. Structural Engineering Submissions The designer shall submit all information required by the State Construction Office (SCO) as described in the State Construction Manual Chapter 300 - Project Design
More informationKORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No
000130 1 PURPOSE: Professional Engineering Consultants, P.A. (PEC) was engaged by University of Kansas Design & Construction Management to perform an assessment of Stouffer Place Apartment Building 20
More informationStructural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity
System Codes and Criteria Design Codes and Standards The design code used is the Wisconsin Administrative Code along with the State of Wisconsin Department of Commerce-Safety & Buildings Chapters Comm
More informationShaft Wall Solutions for Wood-Frame Structures. Ricky McLain, PE, SE WoodWorks Wood Products Council Boston & Waltham Workshops, December 6 & 7, 2017
Shaft Wall Solutions for Wood-Frame Structures Ricky McLain, PE, SE WoodWorks Wood Products Council Boston & Waltham Workshops, December 6 & 7, 2017 Shaft Walls Shaft Walls Form Shaft Enclosures The purpose
More informationBuilding Division Informational Handout
CITY OF SAN JOSÉ, CALIFORNIA Building Division Informational Handout Conventional Light Frame Construction Design Provisions 2007 CBC Handout No. 2-21 Published: 1/1/08 Page 1 of 3 This document summarizes
More informationTable of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8
WISCONSIN PLACE RESIDENTIAL TECHNICAL ASSIGNMENT 2 OCTOBER 29, 2007 KURT KRASAVAGE THE PENNSYLVANIA STATE UNIVERSITY STRUCTURAL OPTION FACULTY ADVISOR: DR. ALI MEMARI 1 Table of Contents Table of Contents.2
More informationThe Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee
The Structural Redesign of Boyds Bear Country and its Related Systems Included in this Presentation: Background and Existing System Proposal Problem / Solution Structural System Redesigns Pre-cast Concrete
More informationAttachment A. USG Minimum Design and Construction Requirements for Wood Framed Structures
Attachment A USG Minimum Design and Construction Requirements for Wood Framed Structures 1. General Design Criteria 1.1. Per Adopted Georgia State Minimum Standard Building Code 1.2. Minimum Live Loads
More informationTHE FLORIDA BUILDING CODE
THE FLORIDA BUILDING CODE 1. According to the Florida Building Code, spiral stairway treads must all be identical and rise must be sufficient enough to provide a headroom of minimum. A. 6'- 4" B. 6'- 6"
More informationOn Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866)
TECHNICAL NOTE On Cold-Formed Steel Construction $5.00 Light Gauge Steel Engineers Association Washington, D.C. 20005 Toll Free (866) 465-4732 www.lgsea.com DESIGN OF BY-PASS SLIP CONNECTORS IN COLD-FORMED
More informationOF THREE NEW BUILDINGS BEING CONSTRUCTED TO REPLACE THE EXISTING COMPLEX. THE FLOOR SYSTEM OF GEORGE READ HALL IS A HAMBRO COMPOSITE SYSTEM
EXECUTIVE SUMMARY: GEORGE READ HALL IS A FIVE STORY DORMITORY ON THE UNIVERSITY OF DELAWARE S CAMPUS. EMCOMPASSING 129,000 SQUARE FEET, IT IS THE LARGEST OF THREE NEW BUILDINGS BEING CONSTRUCTED TO REPLACE
More informationADDENDA #9- RFP Sylvania CC building Re-Roof Progressive Design Build for Sylvania Campus CC Building Re-Roof Services
ADDENDA #9- RFP Sylvania CC building Re-Roof Progressive Design Build for Sylvania Campus CC Building Re-Roof Services Addenda Dated: 01/25/2019 PURPOSE: The purpose of this Addenda #9 is to provide a
More informationStructural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report
1 THE ODYSSEY ARLINGTON, VA Aaron Snyder Structural Option Advisor: M. Kevin Parfitt, PE Structural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report Executive
More informationStructural Design Engineers 120 Montgomery Street, Suite 1410 San Francisco, California / Fax 415/
120 Montgomery Street, Suite 1410 San Francisco, California 94104 415/781-1505 Fax 415/781-2718 sde@sdesf.com Rajendra Sahai, SE Principal John W. Laws, SE Principal Steven Lepisto, SE Principal STRUCTURAL
More informationTechnical Report #2. Matthew R Peyton
Technical Report #2 This Document is Technical Report #2 for 5th year senior thesis in the Architectural Engineering Departments at The Pennsylvania State University. This Report is to prepare a study
More informationLetter of Transmittal
Letter of Transmittal November 17, 2014 Ali Said Structural Thesis Advisor The Pennsylvania State University aus59@psu.edu Dear Doctor Said, The following technical report fulfills the fourth Technical
More informationRe.: Dollar Tree D10236 Startown Crossing, Newton, NC Structural Report on Findings, Site Visit (September 21, 2016)
508 Baylor Court Suite C Chesapeake, VA 23320 757.436.0610 phone 757.436.2070 fax Mr. Steven McMahon Manager of Architectural Services Dollar Tree Stores, Inc. 500 Volvo Parkway Chesapeake, VA 23320 Re.:
More informationThesis Proposal Structural Redesign / Cost, Schedule and Coordination Analysis / Architectural Impact
Thesis Proposal Structural Redesign / Cost, Schedule and Coordination Analysis / Architectural Impact Executive Summary:, located in Pigeon Forge, Tennessee, is designed as a multifunctional space and
More informationBROCHURE # 108 CONSTRUCTION PLAN COMPONENTS
BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS Please note: This construction plan component list is to be used as a guide to assist you with your project. There may be elements unique to your project not
More informationRutgers University Law School Building Addition and Renovation Camden, NJ
Building Addition and Renovation Camden, NJ Technical Assignment 1 October 5, 2007 Nathan E. Reynolds Structural Option Senior Thesis The Pennsylvania State University Faculty Consultant: Professor M.
More informationShaft Wall Solutions for Wood-Frame Structures. Ricky McLain, PE, SE WoodWorks Wood Products Council Charlotte WSF, November 2, 2017
Shaft Wall Solutions for Wood-Frame Structures Ricky McLain, PE, SE WoodWorks Wood Products Council Charlotte WSF, November 2, 2017 Course Description It is fairly common for light wood-frame commercial
More informationSTRUCTURAL EVALUATION OF DOVER ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD)
STRUCTURAL EVALUATION OF DOVER ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD) For WLC Architects Kaiser Building 1300 Potrero Avenue Richmond, CA 94804 By DASSE Design, Inc. 33 New
More information2003 International Residential Building Code
2003 International Residential Building Code Section R305 Ceiling Height Habitable rooms, hallways, corridors, bathrooms, toilet rooms, laundry rooms and basements shall have a ceiling height of not less
More informationSubject: Amphitheater School District Reroofing Projects Amphi High School, Building 900 Roof Evaluation SCI Project Number:
27 June 2016 Mr. Shane Chism, AIA Breckenridge Group 4625 E. Fort Lowell Road Tucson, Arizona 85712 Subject: Amphitheater School District Reroofing Projects Amphi High School, Building 900 Roof Evaluation
More informationCarroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage
Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage The following list of code requirements is intended to assist you in complying with the Code of Public
More informationApril 10, Mr. Steven McMahon Manager of Architectural Services East Dollar Tree Stores, Inc. 500 Volvo Parkway Chesapeake, VA 23320
508 Baylor Court Suite C Chesapeake, VA 23320 757.436.2070 ph 757.436.0610 fx Mr. Steven McMahon Manager of Architectural Services East Dollar Tree Stores, Inc. 500 Volvo Parkway Chesapeake, VA 23320 Re.:
More informationWOOD I-JOIST AWARENESS GUIDE
WOOD I-JOIST AWARENESS GUIDE American Wood Council Flange Web Flange American Forest & Paper Association WOOD I-JOIST AWARENESS GUIDE The American Wood Council is part of the wood products group of the
More information1.0 Structural Systems
1.0 Structural Systems 1.1 Code and Loading Requirements While all new construction will be in compliance with the 2006 International Building Code, existing portions of the building that are to remain
More informationBrent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan
Brief Building Overview: 200 Minuteman Park stands as a 200,000 square foot Class A office building in Andover, Massachusetts, worth roughly $15,000,000. Although the building has a large square footage,
More informationRESIDENTIAL SEISMIC RETROFITS
RESIDENTIAL Barry H. Welliver Structural Engineer BHW Engineers SEAU 6th Annual Education Conference Davis Conference Center - Layton, Utah February 21st, 2018 TOPICS Introduction to Seismic Retrofits
More informationMOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS
MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS PARKERSBURG, WEST VIRGINIA DOMINIC MANNO STRUCTURAL OPTION FACULTY CONSULTANT: DR. ANDRES LEPAGE Technical Report 3 11-21-08 TABLE OF CONTENTS TABLE OF
More informationSTRUCTURAL CONDITION ASSESSMENT
STRUCTURAL CONDITION ASSESSMENT ALLEN JAY ROCK GYM 1201 FAIRFIELD ROAD HIGH POINT, NC Prepared for: Prepared by: Guilford County Schools 617 West Market Street Greensboro, NC Adrian S. Durham, PE, SE,
More informationSupplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2011 LARC)
Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2011 LARC) Plan Check Submittal Date: Plan Check #: Permit App.# Job Address: Applicant: Phone: ( ) P.C. Engineer: Phone:
More informationStructural Conditions Assessment of Current Lapeer District Schools Administration Building 250 Second Street, Lapeer, Michigan
November 2, 2015 Melissa A. Malcolm Library Director Lapeer District Library 201 Village West Dr S Lapeer, MI 48446 RE: Structural Conditions Assessment of Current Lapeer District Schools Administration
More informationSupplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2014 LARC)
Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2014 LARC) Plan Check Submittal Date: Plan Check #: Permit App.# Job Address: Applicant: Phone: ( ) Plan Check Engineer:
More informationSTRUCTURAL ISSUES IN RESIDENTIAL CONSTRUCTION. Presented by: Susan L. Lasecki P.E., S.E.
STRUCTURAL ISSUES IN RESIDENTIAL CONSTRUCTION Presented by: Susan L. Lasecki P.E., S.E. Presentation Outline Gravity Design Load Paths from Roof to Foundation Roof Framing Floor Framing Wall Framing Lateral
More informationVOLUNTARY - EARTHQUAKE HAZARD REDUCTION IN EXISTING HILLSIDE BUILDINGS (Division 94 Added by Ord. No. 171,258, Eff. 8/30/96.)
DIVISION 94 VOLUNTARY - EARTHQUAKE HAZARD REDUCTION IN EXISTING HILLSIDE BUILDINGS (Division 94 Added by Ord. No. 171,258, Eff. 8/30/96.) SEC. 91.9401. PURPOSE. (Amended by Ord. No. 172,592, Eff. 6/28/99,
More informationSUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:
IRC CODE UPDATES TO: RESIDENTIAL BUILDING CONTRACTORS FROM: GARY STABER, BUILDING OFFICIAL SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE: 6/1/2003 INTERNATIONAL RESIDENTIAL CODE (IRC) APPLICABILITY:
More informationSFR SUBMITTAL REQUIREMENTS
A. FEES DUE AT TIME OF PERMIT APPLICATION The following non-refundable fees will be collected at the time of application for all residential projects. 1. Building Plan Check Fee B. CODES The City of Oak
More informationStructural Inspection Report
Revision: Issue 2 Date: 23 rd June 2014 Cherry Pvt. Ltd. Florence Fashions Ltd. Ultimate Ltd. Chandand Fashion Ltd. Joy Fashion Ltd. Structural Inspection Report Authors: Adrian Ryan, Cathal Mac an tsearraigh
More informationStructural Condition Assessment
108 6 th Street, Garland, Texas Engineering Report Date: September 29, 2016 RLG No. : 16729 Prepared for: Mr. Jeff D. Bulls III AIA 3030 LBJ Freeway, Suite 1220 Dallas, TX 75234 PM: Harold F. Phillips
More informationTECHNICAL REPORT III. University Academic Center. Eastern USA. Alexander Altemose. Structural Option. Advisor: Thomas E. Boothby
TECHNICAL REPORT III University Academic Center Eastern USA Alexander Altemose Structural Option Advisor: Thomas E. Boothby November 12, 2012 Table of Contents Executive Summary 3 Introduction 4 Structural
More informationMoonlight Architecture, Inc. Architecture Interior Design Site Planning
Moonlight Architecture, Inc. Architecture Interior Design Site Planning 22 May 2018 18057 Mr. Michael J. Petit de Mange, County Administrator Kent County Levy Court 555 Bay Road Dover, DE 19901 RE: Facilities
More informationHOTEL NORTHEAST U.S. JORDAN RUTHERFORD STRUCTURAL OPTION FACULTY ADVISOR DR. THOMAS BOOTHBY AE SENIOR THESIS APRIL 8, 2013
HOTEL NORTHEAST U.S. JORDAN RUTHERFORD STRUCTURAL OPTION FACULTY ADVISOR DR. THOMAS BOOTHBY AE SENIOR THESIS APRIL 8, 2013 HOTEL N.E.U.S. BUILDING INFORMATION SITE Located in the Northeast United States
More informationStructural Assessment Report 2118 Milvia Street Berkeley, California
2118 Milvia Street Berkeley, California REPORT PREPARED FOR: PERALTA COMMUNITY COLLEGE DISTRICT REPORT PREPARED BY: KPW STRUCTURAL ENGINEERS, INC KPW PROJECT NO. 14C199.00 19 JUNE 2014 Table of Contents
More informationEMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire
EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire Additional Instructions and Clarifications 1. Please review ARC 4496 before beginning the project identification
More informationOffice Building-G. Thesis Proposal. Carl Hubben. Structural Option. Advisor: Dr. Ali Memari
Office Building-G Thesis Proposal Structural Option December 10, 2010 Table of Contents Executive Summary... 3 Introduction... 4 Gravity System...4 Lateral System:...6 Foundation System:...6 Problem Statement...
More informationStructural Comparison between Pan Joist Concrete and Steel Frame Systems for UMCP Student Housing Building B
Structural Comparison between Pan Joist Concrete and Steel Frame Systems for UMCP Student Housing Executive Summary The proposed thesis will include an investigation of two different alternative structural
More informationCODE ANALYSIS REPORT SECOND FLOOR
CODE ANALYSIS REPORT SECOND FLOOR 384 DWIGHT STREET HOLYOKE, MA Prepared by Dietz & Company Architects, Inc. 17 Hampden Street Springfield, MA March 2014 INTRODUCTION The following report is a preliminary
More informationMarch 30, 2017 MKM File #
MKM File # 170161 Paul Jeschke 77 Starbuck Drive Muir Beach, CA Re: Muir Beach Community Building 19 Seacape Drive Muir Beach, CA Dear Paul, At your request, MKM & Associates visited the above referenced
More informationModular Wood Framing Goes Vertical
Modular Wood Framing Goes Vertical By: Troy Bean, P.E., S.E. DCI Engineers January 2013 The Wood Products Council is a Registered Provider with. Credit(s) earned on completion of this program will be reported
More informationTable of Contents 2. Structural Systems.4 Foundations.4 Floor System...4 Columns..5 Lateral System...5
WISCONSIN PLACE RESIDENTIAL TECHNICAL ASSIGNMENT 1 OCTOBER 5, 2007 KURT KRASAVAGE THE PENNSYLVANIA STATE UNIVERSITY STRUCTURAL OPTION FACULTY ADVISOR: DR. ALI MEMARI Table of Contents Table of Contents
More informationPractice Points NUMBER
Practice Points NUMBER 17 BUILDING CODES A Road Map to Structural Alterations in the International Existing Building Code LORI FERRISS AND MICHAEL J. AUREN In a climate of constantly evolving building
More informationCSE Engineering, Inc.
CSE Engineering, Inc. Consulting Structural Engineers December 3, 2012 Mr. Joel Heenan Plans Examiner City of Albany Building Department 333 Broadalbin Street Albany, OR 97321 Re: : Old Church Building
More informationSTRUCTURAL EVALUATION OF WASHINGTON ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD)
STRUCTURAL EVALUATION OF WASHINGTON ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD) For WLC Architects Kaiser Building 1300 Potrero Avenue Richmond, CA 94804 By DASSE Design, Inc.
More information90% Design Submittal Structural Calculations Parking Garage CDRL
NORTH METRO RAIL LINE PROJECT Thornton Crossroads at 104 th Avenue Station 90% Design Submittal Structural Calculations Parking Garage CDRL 03-037.11.06 June 2, 2017 Prepared by: Regional Rail Partners
More informationCONTRACT NO. DOL-ETA-16-C-0043
CONTRACT NO. DOL-ETA-16-C-0043 EXTERIOR FAÇADE WALL BRACING GULFPORT JOB CORPS CENTER GULFPORT, MISSISSIPPI SEPTEMBER 2016 PREPARED FOR: U.S. DEPARTMENT OF LABOR PREPARED BY: September 30, 2016 Maria J.
More informationMITRE 3 Building McLean VA
Executive Summary: The MITRE 3 building is an eight story office building. Its current frame is composed of A992 wide flange shapes. The lateral resisting system is a moment frame. This moment frame consists
More informationChapter 4 Test. Directions: Write the correct letter on the blank before each question.
Chapter 4 Test Name: Date: Directions: Write the correct letter on the blank before each question. Objective 1: Describe the impact of fire on common building materials. 1. Which of the following is the
More informationStone and Masonry Veneer
Stone and Masonry Veneer R703.7 Stone and masonry veneer, general. Stone and masonry veneer shall be installed in accordance with this chapter, Table R703.4 and Figure R703.7. These veneers installed over
More informationShaft Wall Solutions for Wood-Frame Structures. Ricky McLain, PE, SE WoodWorks Wood Products Council Atlanta WSF, April 25, 2018
Shaft Wall Solutions for Wood-Frame Structures Ricky McLain, PE, SE WoodWorks Wood Products Council Atlanta WSF, April 25, 2018 Course Description It is fairly common for light wood-frame commercial and
More informationMandatory Wood Frame Soft-story Retrofit Program STRUCTURAL DESIGN GUIDELINES
INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC Division 93 Effective: 11/22/15 DOCUMENT NO.: P/BC 2014-137 Revised: 06/07/16 Previously Issued As: N/A Mandatory Wood Frame Soft-story
More informationPoint Pleasant Apartments Point Pleasant, NJ Ryan P. Flynn Structural Option Faculty Consultant: Dr. Hanagan
Point Pleasant Apartments Point Pleasant, NJ Ryan P. Flynn Structural Option Faculty Technical Report #3: Lateral System Analysis and Confirmation Design Table of Contents Introduction... 3 Executive Summary...
More informationECMC Skilled Nursing Facility Architectural Engineering Senior Thesis AE 481W Thesis Proposal Dr. Ali Memari December 12 th, 2011
ECMC Skilled Nursing Facility Architectural Engineering Senior Thesis 2011 Class: Subject: Faculty Consultant: Submitted: AE 481W Thesis Proposal Dr. Ali Memari December 12 th, 2011 Table of Contents Executive
More informationFraming Methods Structural Components
Framing Methods Structural Components Balloon Framing *Balloon framing or Eastern framing the exterior studs run from the top of the foundation to the top of the highest level. Benefits of this type of
More informationBiobehavioral Health Building
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor Heather Sustersic Location: The Pennsylvania State University University Park, PA Project Size: 5
More informationStructural Option Indiana Regional Medical Center Indiana, PA
West View of IRMC Southeast View of IRMC Structural Option Indiana Regional Medical Center Indiana, PA West View of IRMC Southeast View of IRMC Arial View of IRMC Project Information N Location: Occupancy
More informationLIFE SCIENCES BUILDING STRUCTURAL CONCEPTS AND EXISTING CONDITIONS
Structural Technical Report 1 LIFE SCIENCES BUILDING STRUCTURAL CONCEPTS AND EXISTING CONDITIONS Prepared for: Dr. Aly M. Said Dr. Thomas Boothby Professor Kevin Parfitt Dr. Charles D. Cox Prepared by:
More informationThesis Proposal. La Jolla Commons Phase II Office Tower San Diego, California. December 13, 2013
Thesis Proposal December 13, 2013 La Jolla Commons Phase II Office Tower San Diego, California Alyssa Stangl Structural Option Advisor: Dr. Linda Hanagan Table of Contents Executive Summary... 3 Purpose
More informationU.S. EDITION RESIDENTIAL CONSTRUCTION DETAILS SAMPLE. A visual guide to construction detailing. Emma Walshaw
RESIDENTIAL CONSTRUCTION DETAILS U.S. EDITION A visual guide to construction detailing Emma Walshaw Contents INTRODUCTION 4 PRINCIPLES OF CONSTRUCTION DETAILING 6 FOUNDATIONS 9 PRINCIPLES OF FOUNDATION
More informationSponsored by The Boston Association of Structural Engineers and the Structural Engineers Association of Massachusetts
Commonwealth of Massachusetts State Building Code 780-CMR 9 th Edition Renovation of Existing Buildings Using The International Existing Building Code IEBC 2015 with Massachusetts Amendments Sponsored
More informationCorporate Headquarters
Great Lakes Region, USA AE Senior Thesis April 13 th, 2015 Mary Julia Haverty Structural Option Advisor H. Sustersic Image Courtesy: RTKL Building Height: 83.33 Cost: Withheld at owner s request Project
More informationLimited Exterior Masonry Assessment Roosevelt Elementary School
Limited Exterior Volume 2 of 2 November 29. 2007 Produced for: Medford Public Schools Medford, Oregon In Consultation with: 710 NE 21 st Avenue, Suite 200, Portland, Oregon 97232 P: 503.517.0283 F: 503.517.0285
More informationUCC Permit Application Procedures
How do I apply for a permit? UCC Permit Application Procedures 1. Please complete the CodeMaster Pan Review Application 2. Please provide the scope of work description and/or construction documents/plans.
More informationFEMA P-593 STEP-BY STEP PRESCRIPTIVE RETROFIT FOR CRIPPLE WALL BRACING & ANCHORAGE TO FOUNDATION
INTRODUCTION Objective of provisions: The provisions of IEBC Appendix Chapter A3 are intended to reduce hazard of earthquake-induced damage (IEBC A301.1). These provisions are not intended to eliminate
More informationR CODE CHANGE PROPOSAL FORM (See instructions on page 2)
CODE CHANGE PROPOSAL FORM (See instructions on page 2) Code: IRC 12/13 Sections 301.2.2.2.1 Proponent: Charles S. Bajnai, Chesterfield County, VA, ICC Building Code Action Committee 1. Delete as shown
More informationECMC Skilled Nursing Facility Architectural Engineering Senior Thesis AE 481W Thesis Proposal Dr. Ali Memari January 13 th, 2012
ECMC Skilled Nursing Facility Architectural Engineering Senior Thesis 2011 Class: Subject: Faculty Consultant: Submitted: AE 481W Thesis Proposal Dr. Ali Memari January 13 th, 2012 Table of Contents Executive
More informationHOLDOWN & STRAP SCHEDULE
SHEAR WALL SCHEDULE STRUCTURAL DESIGN CRITERIA GOVERNING CODE SOIL BEARING PRESSURE HOLDOWN & STRAP SCHEDULE MARK SHEATHING SHEATH BOTH SIDES NAILS EDGE SPACING NOTES MARK SW 7/" OSB NO 8d " OC - A SW
More informationSECTION NON-STRUCTURAL METAL FRAMING
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 22 16 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable
More informationJackson Crossing Located in Alexandria, VA. Technical Report 1 Michael Bologna
Jackson Crossing Located in Alexandria, VA Technical Report 1 Michael Bologna Structural Option Advisor: Dr. Linda Hanagan September 11, 2015 Table of Contents Executive Summary.3 Introduction 4 Purpose..4
More informationAdministrative Changes
Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings
More informationCity of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax
City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA 94596 (925) 943-5834 phone (925) 256-3500 fax Issued July 22, 2010 Information Bulletin No. IB-016 DOCUMENT SUBMITTAL
More informationCORPORATE HEADQUARTERS
TECHNICAL REPORT 1 REVISIONS `` Image Courtesy RTKL CORPORATE HEADQUARTERS Great Lakes Region, U.S.A. M. JULIA HAVERTY STRUCTURAL OPTION ADVISOR: H. SUSTERSIC 12 DECEMBER 2014 Contents Executive Summary...
More information* RESIDENTIAL PLAN REVIEW *
CITY OF DES MOINES, IOWA COMMUNITY DEVELOPMENT DEPARTMENT PERMIT AND DEVELOPMENT CENTER 602 Robert D. Ray Drive DES MOINES, IOWA 50309 Phone: 515.283.4200 Facsimile: 515.283.4270 Based on the scope of
More informationProject Address: Name of Person Completing Form:
Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties
More informationALTERNATE DESIGN METHODOLOGY FOR UNREINFORCED MASONRY BUILDINGS
INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LABC 8808 Effective: 01-01-2011 DOCUMENT NO. P/BC 2011-053 Revised: Previously Issued As: P/BC 2008-053 I. GENERAL ALTERNATE DESIGN METHODOLOGY
More informationStatement of Special Inspections
Statement of Special Inspections SUCF Project No: Project Title: Registered Design Professionals in Responsible Charge: (Name) (Address) Architect: Structural Engineer: Mechanical Engineer: Identification
More informationBy Thomas Taylor, PE, Datum Engineers Inc.
Project Profile: Irving Convention Center The Art of Structure By Thomas Taylor, PE, Datum Engineers Inc. The 275,000 sq ft Irving Convention Center, in Irving, TX is recognized for its unique architecture
More informationTemecula Medical Center Temecula, CA
Temecula Medical Center Temecula, CA Technical Assignment #2 Sean F. Beville The Pennsylvania State University Architectural Engineering Structural Option Senior Thesis Project Student Advisor: Thomas
More informationNOTE: For construction other than new commercial or additions (renovations), only those areas below describing the scope of work will be applicable.
Applicant s Name: New Commercial - Commercial Additions Renovations Permit Plan Submittal Check List Applicant s Phone Number (s): Project Address: Project Type: _New Commercial or Commercial Addition
More information