1 PAN PAC PULPMILL TREATMENT TANK B. PENG 1, M. ROMANES 2, P. GABY 1 1 Holmes Consulting Group 2 Concrete Structures (NZ) Ltd ABSTRACT The recently completed MBBR and AS tank is part of a multi-million dollar major development project for Pan Pac Forest Products Ltd, at Whirinaki, Napier. The tank was a sub-contract in a larger design-build contract. Concrete Structures Ltd was the constructor of the tank and Holmes Consulting Group and McManus Geotech Ltd were the design team. This paper describes the development of the unique design of this precast concrete tank and the construction methodology innovations required to complete this project in a tight program. Excellent collaboration between the contractor and designer delivered an innovative and quick-to-build design that was completed leak free and ahead of schedule. INTRODUCTION The MBBR and AS tank is part of a multi-million dollar major development project to upgrade existing pulp mill capacity for Pan Pac Forest Products Ltd, at Whirinaki, Napier. This project was a design-build contract with the main contractor Ovivo Ltd which includes the construction of a new pulp plant facility and three effluent treatment tanks; namely a circular Balance tank, a rectangular MBBR and AS tank and a circular Clarifier tank. The MBBR and AS tank was a design-build subcontract to Concrete Structures Ltd with the involvement of Holmes Consulting Group and McManus Geotech Ltd after Concrete Structures won the contract. The MBBR and AS tank is approximately 9m tall, 85m long and 30m wide which comprises four chambers separated by internal concrete walls. The tank walls are supported on concrete foundation beams incorporating post-tension tendons. The floor slab is reinforced concrete with added post tensioning. The precast walls are cantilevered off the foundation beams and tied transversely at the top of the wall at 7.3m centres with 310UC97 steel sections. The walls and cap beams were cast in 2.4m wide segments and stitched together onsite with cast-in-situ joints. The cap beams were post-tensioned to tie the top of the structure together.
2 Figure 1 below shows the general layout of the tank. MBBR AS MBBR AS (a) Plan Steel Tie 310UC97 MBBR AS (b) Longitudinal Section Post-tension tendons Figure 1. General Layout of the Tank PROJECT REQUIREMENTS The design brief for the project is outlined below: Tank to be designed for a 25 years design working life. 4 isolated chambers in the tank (2 MBBR and 2 AS s). The MBBR has an inner dimension of 13.4m by 19.7m by 9.3m high which can hold up to 2,455 cubic meters of liquid each. The AS is 63.9m by 13.4m by 8.5m high internally which can hold a maximum of 7,280 cubic meter of liquid each. The water level in each tank may be different. One could be empty while others are full. All possible loading cases need to be considered. Tank to be designed and built in a 9 months program. Tank to be leak free under Serviceability Limit State conditions. DESIGN METHODOLOGY The design loading was determined in accordance with NZS3106:2009 Design of Concrete Structures for the Storage of Liquids; noting that water level in each tank may be different at any one time as specified in the design brief. The seismic induced hydrodynamic pressure comprises two components: (i) the impulsive mass representing the portion of the contents accelerating with the tank and (ii) the convective mass representing the portion of the contents oscillating in the tank. Background on these actions is provided in NZSEE Seismic Design of Storage Tanks (2009). A 3D grillage model, as shown in Figure 2 below, was set up in Microstran to determine the maximum member design actions under various Ultimate Limit State (ULS) and Serviceability Limit State (SLS) load cases. Non-linear Winker soil springs were modelled underneath the foundation beams to limit maximum soil bearing pressure and to allow for
3 foundation uplift. Geotechnical information was provided by McManus Geotech Ltd. The transverse/horizontal grillage member properties of wall were calculated based on (Hambly 1991) assuming wall acts like a multi-cellular deck. Allowances for the reduction in member stiffness, due to the effect of concrete cracking at ULS, were included by adopting effective moment of inertia values as per the requirements of NZS3101:2006 Concrete Structures Standard. Figure 2. 3D Grillage Model in Microstran The analysis results show that in general the foundation beams and precast concrete walls were governed by ULS load combination with earthquake effect. However, the horizontal design actions in walls and in post tensioned cap beams were governed by SLS load combination with temperature effect. It was observed that the temperature effect is more prominent closer to the corners of the tank. This is because the level of restraint increases closer to the joints and therefore these locations attract larger secondary moments. INNOVATIVE DESIGN AND CONSTRUCTION SOLUTION The design and construction was completed 6 weeks ahead of a tight program. This was achieved by delivering the design on a week by week basis which enabled work to commence prior to the design being finalised. Excellent communication and strong collaboration between the contractor and designer were maintained throughout the design process to eliminate any surprises or complications which may otherwise arise. Structural Form Fully cast-in-situ cantilevered reinforced concrete walls were anticipated in the original tender document. It was apparent from the conceptual design stage that precast sections offered a better quality, more cost effective and quicker to build solution compared to a castin-situ system. Several precast wall alternatives, including double and triple tees, and double and triple hollow core sections, were considered during the preliminary design phase. Each design alternative was assessed by the contractor considering the criteria listed below to provide the optimal solution. Weight and size of individual precast units. By keeping each unit to 24 tonnes or less meant that no special transportation measures would be required. Quantity of reinforcing and concrete. Deeper sections mean less reinforcement. Void concrete sections results in less concrete. Less material means lower cost. Constructability. An easy quick build results in time and cost saving.
4 The selected precast section is shown in Figure 3 below. Each unit is approximately 2.4m wide, 9.3m long and 0.8m deep and weigh about 23 tonnes. The proposed section is thick but hollow with 160mm flange thickness which provides superior strength to weight ratio. The size and weight of the precast unit was carefully configured such that it can be transported using standard truck. The units could also be picked up and placed at 50m radius by Concrete Structures 450 tonne tracked crane which came free at the right time for this scheme. The precast wall units complete with cap beam and wall-foundation joint were cast together in one piece at Concrete Structure s Hastings precast factory. Three custom made re-usable steel moulds were fabricated for this task which reduced formwork cost and turnover time. The ends of precast unit were grooved to provide support for formwork of cast-in-situ joints and hence cut down material cost. Voids at the bottom of precast unit allowed foundation reinforcement to pass through and foundation beam to be cast onsite. (b) Section of Precast Cap Beam (c) Section of Precast Wall (d) Section of Precast Foundation (a) Elevation of Typical Precast Wall (e) Cast-in-situ Wall Joint Figure 3. Precast Wall Panel Unit
5 Tied Cantilever Walls A value engineering analysis was carried out during the preliminary design phase to examine the cost savings associated with providing steel ties at the top of cantilevered walls. The advantage of tied cantilever walls over the pure cantilever walls is that the maximum moment demand at the base of the wall reduces and the moment along the height of the wall is more evenly distributed. Significant efficiencies resulted. Post Tensioned Cap Beams As discussed previously, SLS temperature effect governs the design actions of cap beams. The maximum design actions occur at the intersection of 4 s. To minimise the size of cap beams and the reinforcing content, post-tension tendons were utilised. Each cap beam has six 7 number 12.7mm strand tendons. The need for a wider cap beam (as would have been required with a conventionally reinforced cap) was eliminated because of the efficiency of the post-tensioning. The net result was a constant depth precast element which was simpler and cheaper to make. Prestressed loss due to friction, creep and relaxation along the length was considered. Spread of prestressed force into the concrete walls along the length was also considered. The cap beams were designed in accordance with prestressed concrete requirements in NZS3101:2006 and NZS3106:2009 ensuring allowable stress fluctuation in prestressed tendon, crack widths and maximum stress in non-prestressed reinforcement were kept within the allowable limits. Post tensioned tendons were also incorporated into the foundation beams and slab on grade to minimise cracking and tie the base together under SLS hydrostatic loading. The post tensioning also reduces the amount of normal reinforcement required in the foundation resulted with a net cost saving. CONSTRUCTION SEQUENCE The main construction sequence is outlined below. 1. The foundation beams and slabs were excavated and prepared. Site concrete was poured on the exposed ground under the foundation beams and on compacted granular material under the slabs. The 150mm thick slab with 662 mesh was then cast in place (see Figure 4 below). Control joints with waterstop were added every 7.2m along the slab to permit shrinkage movements. Figure 4. Concrete Slab Ready to Pour 2. Precast walls were fabricated in the precast yards (see Figure 5 below). A total of 138 precast units were completed in less than 7 weeks.
6 (a) Top View (b) Side View Figure 5. Precast Unit Ready to Pour 3. The units were transported to site and lifted into position using a Manitowac 450 tonne crane which has a 25 tonne lifting capacity at a 50m operating radius. Units were propped with purpose made shoring anchored to the new slab. Reinforcement in the precast wall joints, the corner columns and foundation beams was tied subsequently (see Figure 6 below). Figure 6. Precast Walls Tilted Up and Foundation Reinforcement in Place 4. Once all the precast wall units were lifted in place and steel beams installed, the foundation beams were poured followed by the precast joints and the corner columns. 5. Post-tension tendons in the foundation and cap beams were stressed up. 6. Water tightness test was carried out prior to installation of mechanical services. An aerial shot of the completed tank is shown in Figure 7.
7 Figure 7. Completed Tank SUMMARY The MBBR and AS tank was completed in October 2011, 6 weeks ahead of schedule. Excellent collaboration between contractor and engineer meant that construction was able to proceed while the design was carrying out. The choice of design solution (precast tied cantilever wall with post-tension beam system), proposed jointly by the contractor and the designer, proved to be the best solution with considerable cost and time savings. REFERENCES Hambly, E.C., (1991), Bridge Deck Behaviour, Second Edition, E & FN Spon. NZSEE, (2009), Seismic Design of Storage Tanks: Recommendations of a NZSEE Study Group on Seismic Design of Storage Tanks, New Zealand Society of Earthquake Engineering. SNZ, (2006), NZS3101:2006 Concrete Structures Standard, Standards New Zealand. SNZ, (2009), NZS3106:2009 Design of Concrete Structures for the Storage of Liquids, Standards New Zealand.
Principal Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE
Design of continuity slabs and the 020 Gajanan Chaudhari Principal Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE Anand Panpate Senior Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE
More informationST7008 PRESTRESSED CONCRETE
ST7008 PRESTRESSED CONCRETE QUESTION BANK UNIT-I PRINCIPLES OF PRESTRESSING PART-A 1. Define modular ratio. 2. What is meant by creep coefficient? 3. Is the deflection control essential? Discuss. 4. Give
More informationBonner Bridge Replacement Update:
Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner
More informationConcrete Bridge Design and Construction series
www.thestructuralengineer.org 41 CBDC series July 2014 Concrete Bridge Design and Construction series This series is authored by the Concrete Bridge Development Group (CBDG). The group aims to promote
More informationConcrete Bridge Design and Construction series
40 Concrete Bridge Design and Construction series This series is authored by the Concrete Bridge Development Group (CBDG). The group aims to promote excellence in the design, construction and management
More informationTHE DESIGN AND CONSTRUCTION OF THE ROTOTUNA RESERVOIR POST TENSIONED FLOOR SLAB ON GRADE. Senior Site Manager, Hawkins 2
THE DESIGN AND CONSTRUCTION OF THE ROTOTUNA RESERVOIR POST TENSIONED FLOOR SLAB ON GRADE DAVE GODFREY 1 ; TIM PETERS 2 ; DAVID SHARP 3 1 Senior Site Manager, Hawkins 2 Chairman, EDGE Consulting Engineers
More informationVIADUCTS BY PUSHING: INCREMENTALLY LAUNCHED BRIDGES
Istanbul Bridge Conference August 11-13, 2014 Istanbul, Turkey VIADUCTS BY PUSHING: INCREMENTALLY LAUNCHED BRIDGES J. E. Erdoğan 1 and Ö. Özkul 2 ABSTRACT Despite its widespread use around the world, constructing
More informationCANTERBURY DISTRICT HEALTH BOARD STAFF CARPARK BUILDING.
CANTERBURY DISTRICT HEALTH BOARD STAFF CARPARK BUILDING. Graeme D. Earl 1 SUMMARY In 2002 Mainzeal were selected by the Canterbury District Health Board (CDHB) as one of three tenderers for the design
More informationWARWICK TRIANGLE VIADUCT: OUTBOUND COMMENDATION Technical Excellence category Submitted by the SAICE Durban Branch
Warwick Triangle Viaduct: Outbound INTRODUCTION The Warwick Triangle Precinct in Durban is one of the busiest trading and transport hubs in Africa. Major traffic conflict resulted from the movement of
More informationComputer-aided design and analysis of multiple Tee-beam bridges
Computer-aided design and analysis of multiple Tee-beam bridges Georg Pircher, Martin Pircher Centre for Construction Technology and Research University of Western Sydney SYNOPSIS Bridge girders consisting
More informationModelling of RC moment resisting frames with precast-prestressed flooring system
Modelling of RC moment resisting frames with precast-prestressed flooring system B.H.H. Peng, R.P. Dhakal, R.C. Fenwick & A.J. Carr Department of Civil Engineering, University of Canterbury, Christchurch.
More informationThis paper will also report on the methodology of various strengthening concepts that were developed and tested using these models.
Computer Models Developed for the Strengthening of the Approach Viaducts of the Westgate Bridge Grahme, Bridge Engineer, Sinclair Knight Merz Martin Pircher, Technical Director, ABES Pty Ltd Craig Allen,
More informationSINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT. Srdjan Brasic, M.Sc., P.Eng.
SINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT Srdjan Brasic, M.Sc., P.Eng. UMA Engineering Ltd. Paper prepared for presentation at the Technical
More information4.1 VSL REPORT SERIES POST-TENSIONED IN BUILDINGS PUBLISHED BY VSL INTERNATIONAL LTD.
POST-TENSIONED IN BUILDINGS General Objectives in Building Design Applications of Post-Tensioning in Building Structures The VSL Hardware for Use in Buildings Details and Layouts Improving the Constructability
More informationw w w. d u t c h l a n d i n c. c o m
RECTANGULAR TANKS TYPICAL INSTALLATION Precast concrete elements are manufactured at a Precast/ Prestressed Concrete Institute (PCI) certified facility. Precast concrete elements are set on a poured-in-place
More informationCrossroads at Westfields Building II
Crossroads at Westfields Building II Chantilly, Va STEPHEN LUMPP Structural option Faculty Consultant: Dr. Andres Lepage Technical Report 2 EXECUTIVE SUMMARY This report is a study of alternate floor systems
More informationBridge articulation No. 1.04
Bridge articulation Scope This Guidance Note gives advice on the selection of the articulation arrangements, the choice of bearing types and dispositions of bearings, for bridges where relative movement
More informationExperimental study on the seismic performance of RC moment resisting frames with precast-prestressed floor units.
Experimental study on the seismic performance of RC moment resisting frames with precast-prestressed floor units. B.H.H. Peng, R.C. Fenwick, R.P. Dhakal & D.K. Bull Department of Civil and Natural Resources
More informationBS EN :2004 EN :2004 (E)
Contents List 1. General 1.1 Scope 1.1.1 Scope of Eurocode 2 1.1.2 Scope of Part 1-1 of Eurocode 2 1.2 Normative references 1.2.1 General reference standards 1.2.2 Other reference standards 1.3 Assumptions
More informationOXFORD ENGINEERING COLLEGE (NAAC Accredited with B Grade) Department of Civil Engineering LIST OF QUESTIONS
OXFORD ENGINEERING COLLEGE (NAAC Accredited with B Grade) Department of Civil Engineering LIST OF QUESTIONS Year/ Sem. : IV / VII Staff Name : S.LUMINA JUDITH Subject Code : CE 6702 Sub. Name : PRE STRESSED
More informationIn-plane testing of precast concrete wall panels with grouted sleeve
In-plane testing of precast concrete wall panels with grouted sleeve P. Seifi, R.S. Henry & J.M. Ingham Department of Civil Engineering, University of Auckland, Auckland. 2017 NZSEE Conference ABSTRACT:
More information2016 ACEC/PA ANNUAL MEETING
2016 ACEC/PA ANNUAL MEETING z I-49 North, Segment K (I-220 to Martin Luther King Drive) Interchange Project Durk Krone, P.E., TRC Engineers Inc., Baton Rouge, La 1 I-49 North Segment K Project 2 AGENDA
More informationCADS A3D MAX. How to model shear walls
CADS A3D MAX How to model shear walls Modelling shear walls in A3D MAX Introduction and synopsis This paper explains how to model shear walls in A3D MAX using the `wide column rigid arm sub-frame described
More informationIntermountain Section AWWA Conference - 2.0MG Layton Water Tank. Jake O Brien
Intermountain Section AWWA Conference - 2.0MG Layton Water Tank Jake O Brien Presentation Outline Layton City s decision process Tank Design/Construction Tendon Tanks - don t shed the good stuff Layton
More informationEXPERIMENTAL INVESTIGATION ON THE INTERACTION OF REINFORCED CONCRETE FRAMES WITH PRECAST-PRESTRESSED CONCRETE FLOOR SYSTEMS
EXPERIMENTAL INVESTIGATION ON THE INTERACTION OF REINFORCED CONCRETE FRAMES WITH PRECAST-PRESTRESSED CONCRETE FLOOR SYSTEMS B.H.H. Peng 1, R.P. Dhakal 2, R.C. Fenwick 3, A.J. Carr 4 and D.K. Bull 5 1 PhD
More informationThe Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1
Department of Civil Engineering Lecture 2.1 Methods of Prestressing Advantages of Prestressing Section remains uncracked under service loads Reduction of steel corrosion (increase durability) Full section
More informationNew Pumarejo Bridge over the river Magdalena in Barranquilla. Colombia.
New Pumarejo Bridge over the river Magdalena in Barranquilla. Colombia. J. Manterola S. Fernández S. Fuente J. Muñoz-Rojas J. A. Navarro ABSTRACT The overall length of the new bridge over the River Magdalena
More informationConcrete Prestressed Concrete Pretensioned Concrete Posttensioned Concrete Typical Tendon Layout
Concrete 45 1.13.0 Prestressed Concrete Concrete in which internal stresses (forces) are induced by means of prestressing steel tendons such that tensile stresses resulting from loads are counteracted
More informationConstruction and design features of the Bridge over the Danube River. Bulgaria
Construction and design features of the Bridge over the Danube River. Bulgaria Javier MANTEROLA Pr. Dr. jmanterola@cfcsl.com Antonio MARTÍNEZ Dr. amartinez@cfcsl.com Juan Antonio NAVARRO janavarro@cfcsl.com
More informationCHAPTER 3 BEHAVIOUR OF FERROCEMENT HOLLOW SLABS
30 CHAPTER 3 BEHAVIOUR OF FERROCEMENT HOLLOW SLABS 3.1 INTRODUCTION There are numerous similarities between ferrocement and reinforced concrete. Both use similar matrix and reinforcement materials. They
More informationDesign and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.
Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on
More informationConstruction Measurement III SBQ3314. Precast Pre stressed Concrete Works. Dr. Sarajul Fikri Mohamed
Construction Measurement III SBQ3314 Precast Pre stressed Concrete Works Dr. Sarajul Fikri Mohamed Table of Contents 1. Pre stressed concrete in bridgeworks: technological aspects 2. SMM2 measurement rules
More informationConcrete Design Guide
Number 7 38 TheStructuralEngineer Technical July 2015 Post-tensioned slabs Concrete Design Guide No. 7: Design of post-tensioned slabs This series is produced by The Concrete Centre to enable designers
More informationTHE FORENSIC MEDICAL CENTER
THE FORENSIC MEDICAL CENTER Image courtesy of Gaudreau, Inc. TECHNICAL REPORT #2 OCTOBER 26, 2007 KEENAN YOHE STRUCTURAL OPTION DR. MEMARI FACULTY ADVISOR EXECUTIVE SUMMARY Image courtesy of Gaudreau,
More informationNATIONAL HARBOR BUILDING M
NATIONAL HARBOR BUILDING M 120 Waterfront St. Oxon Hill, Maryland Ryan Sarazen Structural Option Senior Thesis Presentation Spring 2008 Faculty Consultant Dr. Lepage BUILDING LOCATION BUILDING M SITE PLAN
More informationContents. Foreword 1 Introduction 1
Contents Notation x Foreword xiii 1 Introduction 1 1.1 Aims of the Manual 1 1.2 Eurocode system 1 1.3 Scope of the Manual 3 1.4 Contents of the Manual 4 1.5 Notation and terminology 4 2 General principles
More information3.4.2 DESIGN CONSIDERATIONS
3.4.2 DESIGN CONSIDERATIONS Formwork Where Flatdeck sheet is used as formwork, the profile provides resistance to wet concrete (G) and construction loads (Q). Maximum formwork spans given in Section 3.4.4.1
More informationPRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION
PRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION An overview of costing strategies for wood framed construction elements CREATING A PROJECT ENDLESS POSSIBILITIES COMPATORS LIST A FLOOR Cast in Place
More informationInteraction between ductile RC perimeter frames and floor slabs containing precast units
Interaction between ductile RC perimeter frames and floor slabs containing precast units R. C Fenwick,. J. Davidson and D.. N. Lau Department of Civil and Environmental Engineering, University of uckland.
More informationCABLE STAYED FOOTBRIDGE MADE OF UHPC
CABLE STAYED FOOTBRIDGE MADE OF UHPC J.L. Vitek (1), M. Kalný (2) and R. Coufal (3) (1) Metrostav a.s. and CTU Prague, Prague, Czech Republic (2) PONTEX, Ltd., Prague, Czech Republic (3) TBG Metrostav,
More informationDetailed Seismic Assessment Report. Islington Substation August 2011
Detailed Seismic Assessment Report August 2011 Prepared for: Transpower New Zealand Prepared by: Opus International Consultants Reference: 5-C1929.01 Date: 8 th August 2011 Status: Draft 1 Report prepared
More informationChapter 2 Notation and Terminology
Reorganized 318 Chapter Titles Chapter 1 General 1.1 Scope 1.2 Purpose 1.3 Interpretation 1.4 Drawings and Specifications 1.5 Testing and Inspection 1.6 Administatration and Enforcement 1.6.1 Retention
More informationCONCRETE TECHNOLOGY CORPORATION
PRECAST, PRESTRESSED HOLLOW CORE SLABS DESIGN CRITERIA & SPAN-LOAD CHARTS Introduction 2 Design Criteria for Development of the Span-Load Charts 2 Related Publications 3 Manufacturing Tolerances 4 8" Bare
More informationThe bridge over the Georges River at Alfords Point has been duplicated with a new incrementally launched bridge.
The Design and Construction of Alfords Point Bridge Mark Bennett, Senior Bridge Engineer (New Design) RTA Harry Cheung, Project Engineer, RTA Trung Doan Project Engineer, RTA Synopsis The bridge over the
More informationECHO PRESTRESS DURBAN (PTY) LTD HOLLOW-CORE CONCRETE FLOORING A NAME TRULY CAST IN CONCRETE
ECHO PRESTRESS DURBAN (PTY) LTD HOLLOW-CORE CONCRETE FLOORING A NAME TRULY CAST IN CONCRETE INTRODUCTION TO ECHO PRESTRESS In today s world of innovation and fast tracking, the Echo Prestress hollow-core
More informationDESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc.
DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc. Paper prepared for presentation at the Bridges in a Climate of Change
More informationTHE PERFORMANCE OF CONCRETE GROUND FLOOR SLAB REINFORCEMENT TO CONTROL SHRINKAGE CRACKING. D H Chisholm 1
THE PERFORMANCE OF CONCRETE GROUND FLOOR SLAB REINFORCEMENT TO CONTROL SHRINKAGE CRACKING D H Chisholm 1 ABSTRACT In a typical residential concrete floor slab, the cast in strip footings on the slab perimeter
More informationINTEGRAL BRIDGES USING PRECAST SUPER TEE BEAMS A CASE STUDY OF SH1 INTERCHANGE BRIDGE AT HOROTIU
INTEGRAL BRIDGES USING PRECAST SUPER TEE BEAMS A CASE STUDY OF SH1 INTERCHANGE BRIDGE AT HOROTIU PETER ROUTLEDGE, MICHAEL CHAN, PETER WILES Opus International Consultants SUMMARY Integral bridges are recognised
More informationSRT351 - ASSIGNMENT 1 PART A Jessica Chapman, Darcy Dunn, Harrison Jess, Lyndall Morris
INTRODUCTION This report will examine the effect of different structural methods; steel composite construction and concrete construction, on a high rise floor plan. The design of the floor plan will be
More informationSPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit
2004 Specifications CSJ: 0028-09-111 SPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit 1. Description. Construct cast-in-place segmental concrete box girder superstructure according to the plans,
More informationCHAPTER 17 - SPECIALIST CONSTRUCTION SYSTEMS
CHAPTER 17 - SPECIALIST CONSTRUCTION SYSTEMS WJ Martin 17.1 SCOPE Specialist construction systems refer to the construction systems falling outside of the normal reinforced and prestressed bridges that
More informationSUMMARY SHEETS OF INTEGRAL CONNECTIONS
APPENDIX F SUMMARY SHEETS OF INTEGRAL CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix F F-1 APPENDIX F SUMMARY SHEETS OF INTEGRAL CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix F F-2
More informationManagement of Half Joints in RTA Bridges Amie Nicholas, Project Engineer, NSW Roads and Traffic Authority
Management of Half Joints in RTA Bridges Amie Nicholas, Project Engineer, NSW Roads and Traffic Authority SYNOPSIS In recent years, there has been heightened concern over the performance of half joints
More informationThe New Incremental Launching Construction Technology of Jiubao Bridge Long-span Hybrid Arch-girder Structure
The New Incremental Launching Construction Technology of Jiubao Bridge Long-span Hybrid Arch-girder Structure C.Y. Shao Shanghai Municipal Engineering Design & Research General Institute (Group) Co. Ltd.,
More informationComparative Study on Post - Tensioned and Reinforced Concrete flat Slab Systems for a Multistory Building
Comparative Study on Post - Tensioned and Reinforced Concrete flat Slab Systems for a Multistory Building Thayapraba M Civil Department, NIT Trichy, (India) ABSTRACT Designers have a huge number of choices
More informationMarina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle
Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle Overall Information Location: Singapore Date of Completion: 2010 Cost: $5.7 billion Architect: Moshe Safdie Executive Architect: Aedas, Pte
More informationDr. NAGY GYÖRGY Tamás Professor
Dr. NAGY GYÖRGY Tamás Professor E mail: tamas.nagy gyorgy@upt.ro Tel: +40 256 403 935 Web: http://www.ct.upt.ro/users/tamasnagygyorgy/index.htm Office: A219 Dr.ing. Nagy György T. Faculty of Civil Engineering
More informationTechnical Report #2 10/26/06
Photo courtesy of OTO Development, http://www.otodevelopment.com/ Dr. Memari Thesis Advisor Technical Report #2 10/26/06 Executive Summary Systems Overview Hollow Core Plank (precast) Solid Flat Slab (precast)
More informationThe Waterview Connection Great North Road Interchange Bridges
The Waterview Connection Great North Road Interchange Bridges Terry Cheng 1, Adam Stilges 2, Andrew Dickson 3, Lawrence Blackmore 4 and Will Dobson 5 1 Senior Structural Engineer, Beca Ltd & Senior Bridge
More informationNEWMARKET VIADUCT REPLACEMENT PROJECT END OF AN ERA TED POLLEY *, PETER ELCOCK **
NEWMARKET VIADUCT REPLACEMENT PROJECT END OF AN ERA TED POLLEY *, PETER ELCOCK ** * BEng (Hons), Designer/Design Manager NGA Newmarket Alliance, Beca Infrastrucutre Ltd ** BSc. C.Eng. MICE, Designer (Deconstruction)
More informationMATERIAL QUANTITIES FOR BALANCED CANTILEVER BRIDGES. FANI ANTONIOU Egnatia Odos A.E., 6th km Thessaloniki - Thermi, GREECE
MATERIAL QUANTITIES FOR BALANCED CANTILEVER BRIDGES DIMITRIOS KONSTANTINIDIS Department of Civil Infrastructure Engineering, Alexander Technical Institute of Thessaloniki, 574, GREECE FANI ANTONIOU Egnatia
More informationAnchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi
STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel
More informationOVERVIEW OF ADAPT PRODUCTS
PR116. Consulting Company Member POST-TENSIONING INSTITUTE SOFTWARE SYSTEM FOR STRUCTURAL CONCRETE ADAPT_products_1004 041022 OVERVIEW OF ADAPT PRODUCTS The following is a short overview of ADAPT s programs
More informationStatement of Special Inspection Requirements
Statement of Special Inspection Requirements California Building Code Chapter 17 Construction plans shall include a statement of special inspection in accordance with CBC chapter 17. The statement of special
More informationStructural Technical Report #2 Pro/Con Study of Alternate Floor Systems
Christopher McCune Structural Option Eight Tower Bridge Faculty Advisor: Dr. Hanagan October 31 st, 2005 Structural Technical Report #2 Pro/Con Study of Alternate Floor Systems Executive Summary This technical
More informationLocrete Building System: the Technology Handbook
Locrete Building System: the Technology Handbook 1 3... Introduction 4... Characteristics 6... Locrete Production 8... Locrete Testing 12... Building with Locrete 16... Shuttering System 13... External
More informationCSU GUIDELINES. April 27, 2018 FOR POST-TENSIONED CONCRETE STRUCTURES.
CSU GUIDELINES FOR POST-TENSIONED CONCRETE STRUCTURES April 27, 2018 http://www.calstate.edu/cpdc/ae California State University Seismic Review Board Technical Guidelines January 9, 2018 The CSU Seismic
More informationModjeski and Masters, Inc. Consulting Engineers 04/18/06 St. Croix River Bridge 3D Analysis Report Introduction
Introduction This memo presents a summary of a three dimensional (3D) analysis of the Organic concept for the proposed St. Croix River bridge project. The Organic concept has several attributes that are
More informationDimensionamento Estrutural de uma Ponte Canal. Structural Design of a Canal Bridge. Francisco Barbosa Alves de Moura. Introduction
Dimensionamento Estrutural de uma Ponte Canal Structural Design of a Canal Bridge Francisco Barbosa Alves de Moura IST, Technical University of Lisbon, Portugal Key Words: Structural Design, Canal Bridge,
More information1. Cast-in-place concrete is specified in Section
SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record
More informationSeismic Performance of Hollow-core Flooring: the Significance of Negative Bending Moments
Seismic Performance of Hollow-core Flooring: the Significance of Negative Bending Moments L.J. Woods University of Canterbury and Holmes Consulting Group, New Zealand. R.C. Fenwick University of Canterbury,
More informationBridges on the Northern Gateway Motorway
Bridges on the Northern Gateway Motorway Peter Lipscombe: Principal URS New Zealand Limited and Structures Team Leader for Northern Gateway Alliance. Synopsis The challenge on this project was to develop
More informationTopic Outline. Two Stage Analysis Procedure: Podium Design. Part 2: Rigid Lower Portion Philip Miller, S.E. 2/8/2018
Two Stage Analysis Procedure: Podium Design Part 2: Rigid Lower Portion Philip Miller, S.E. Topic Outline Types of Podium Construction Example Buildings PT Basics PT Analysis Modeling Tips Load Balancing
More informationBuilding Construction
Building Construction Shallow Foundations Module-III Introduction The foundation can be classified broadly into two types: Shallow foundations Deep foundations Shallow foundations Shallow Foundations When
More informationSTANDARDIZED CONCRETE BRIDGES IN TEXAS. John Holt, PE, Texas Department of Transportation Ronald Medlock, PE, Texas Department of Transportation
STANDARDIZED CONCRETE BRIDGES IN TEXAS John Holt, PE, Texas Department of Transportation Ronald Medlock, PE, Texas Department of Transportation ABSTRACT Standardized concrete bridge plans are used extensively
More information2016 DESIGN AND DRAWING OF REINFORCED CONCRETE STRUCTURES
R13 SET - 1 DESIGN AND DRAWING OF REINFCED CONCRETE STRUCTURES 1 Design a simply supported rectangular beam to carry 30kN/m superimposed load over a span of 6m on 460mm wide supports. Use M20 grade concrete
More informationPro-Con Structural Study of Alternate Floor Systems
Andrew Covely Structural Dr. Linda Hanagan The Helena New York City, NY October 27, 2004 Pictures courtesy of Fox & Fowle Architects Pro-Con Structural Study of Alternate Floor Systems Executive Summary
More informationRESILIENT INFRASTRUCTURE June 1 4, 2016
RESILIENT INFRASTRUCTURE June 1 4, 2016 WESTMINSTER DRIVE UNDERPASS ACCELERATED BRIDGE CONSTRUCTION USING GIGO (GET IN-GET OUT) BRIDGE CONCEPT Mark D Andrea, M.Sc., P.Eng. Stantec Consulting Ltd., Canada
More informationBEHAVIOUR AND DESIGN OF ANCHORS FOR LIFTING AND HANDLING IN PRECAST CONCRETE ELEMENTS
BEHAVIOUR AND DESIGN O ANCHORS OR LITING AND HANDLING IN PRECAST CONCRETE ELEMENTS Dieter Lotze Halfen GmbH & Co. KG, Wiernsheim, Germany Abstract Lifting anchors are widely used in the precast concrete
More informationCCTV HEADQUARTERS. ARCH 631 Spring 2018 Daniel Edith Mckenzie Rafael
CCTV HEADQUARTERS ARCH 631 Spring 2018 Daniel Edith Mckenzie Rafael CCTV HEADQUARTERS Introduction Architect: OMA Rem Koolhaas Main Structural Engineer: Arup Structural Engineer: Architecture Design Institute
More informationDesign and Construction of the Nan-Tien Pedestrian Bridge, a Continuous Super-T Bridge over Princes Motorway.
Design and Construction of the Nan-Tien Pedestrian Bridge, a Continuous Super-T Bridge over Princes Motorway. ABSTRACT James Nasr, Senior Bridge Engineer, Cardno The Nan-Tien Pedestrian Bridge project
More information1 Prepared By:Mr.A.Sathiyamoorthy, M.E., AP/Civil
UNIVERSITY QUESTIONS PART A UNIT 1: INTRODUCTION THEORY AND BEHAVIOUR 1. List the loss of prestress. 2. Define axial prestressing. 3. What is the need for the use of high strength concrete and tensile
More information9.6 Circular Prestressing
9.6 Circular Prestressing This section covers the following topics. Introduction General Analysis and Design Prestressed Concrete Pipes Liquid Storage Tanks Ring Beams Conclusion 9.6.1 Introduction When
More informationA seismic engineer s note book
A seismic engineer s note book G.R. Houston, A.S. Beer, G.L. Cole & R.D. Jury Beca Ltd, New Zealand. 2014 NZSEE Conference ABSTRACT: The interest in seismic retrofit of buildings stimulated by the Canterbury
More informationPrestressed Concrete Girder Continuity Connection
Report No: Title: Developing Organization: Precast/Prestressed Concrete Institute Technical Committee Phone - 888-700-5670 Email contact@pcine.org Website- www.pcine.org Report Date: Revision Date: Status
More informationA case study for base isolation design: Spark data centre facility Auckland
A case study for base isolation design: Spark data centre facility Auckland S. Javadian Senior Structural Engineer, CPEng, MIPENZ C.D. Treleaven Technical Director, CPEng, MIPENZ, AECOM New Zealand Ltd
More informationSection G1. Design of Cast-In-Place Box Conduits
G1-1 Economy of Design 1. Height to Width Ratio Section G1 Design of Cast-In-Place Box Conduits Careful economic studies should be made to determine the greatest economy of the entire storm drain. As an
More informationINTERNSHIP REPORT GOUTHAM.J
INTERNSHIP REPORT GOUTHAM.J M.E Structural Engineering SNS College of Technology, Coimbatore Mail : tcegoutham@gmail.com TEEMAGE PRECAST IN College Road, 1st Cross Street, Tirupur 641602. TamilNadu, India.
More informationcornish concrete products Structural precast
cornish concrete products Structural precast / Ground and edge beams / Retaining Walls / crosswall construction / concrete frames / Staircases and Floors / seating and terracing / Loading Bays / Lift shafts
More informationEFFECT OF ASPECT RATIO ON FIRE RESISTANCE OF HOLLOW CORE CONCRETE FLOORS
EFFECT OF ASPECT RATIO ON FIRE RESISTANCE OF HOLLOW CORE CONCRETE FLOORS JEREMY CHANG 1, PETER J. MOSS 2, RAJESH P. DHAKAL 3 and ANDREW H. BUCHANAN 4 ABSTRACT Previous studies have shown that the fire
More informationThe Aizhai Suspension Bridge is
INTERNATIONAL DESIGN & CONSTRUCTION: BRIDGES Mountain grown Hilly terrain contributes mightily to China bridge By Yinbo Liu, Ph.D., P.E., Guoping Chen, Shulong He and Yongjian Zhang, Ph.D. Contributing
More informationSession 5: Precast Concrete Floors. Rick Henry Courtesy of University of Auckland, Faculty of Engineering
Session 5: Precast Concrete Floors Rick Henry Courtesy of University of Auckland, Faculty of Engineering Background Precast concrete floors widespread in NZ Many advantages with precast units Connections
More information151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University
November 16 th, 2007 William J. Buchko AE 481w Senior Thesis The Pennsylvania State University Thesis Advisor: Kevin Parfitt Table of Contents Executive Summary... 3 Structural System Overview Foundation...
More informationRequirements for Measuring and Pricing of Structural Concrete
Requirements for Measuring and Pricing of Structural Concrete October 2016 TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS About TII Transport Infrastructure Ireland (TII) is responsible for managing
More informationEARTHQUAKES AND WATER STORAGE RESERVOIR DESIGN
EARTHQUAKES AND WATER STORAGE RESERVOIR DESIGN April 29, 2015 AGENDA Background - Seismic Sloshing Codes and Load Development Implication to a Project Impact of Shape on Seismic Loads Foundation Alternatives
More informationBALANCED CANTILEVER GIRDER BRIDGE OVER THE DANUBE-BLACK SEA CHANNEL
DOI: 10.1515/rjti-2015-0017 BALANCED CANTILEVER GIRDER BRIDGE OVER THE DANUBE-BLACK SEA CHANNEL Aldo Giordano, PH.D. Professor of Structural Engineering, ITALROM Inginerie Internationala, e-mail: a.giordano@italrominginerie.com
More informationSeismic response of a cast-in-place steel fibre concrete joint connecting precast beams and columns
Seismic response of a cast-in-place steel fibre concrete joint connecting precast beams and columns L. Tuleasca & J. M. Ingham Department of Civil and Environmental Engineering, The University of Auckland,
More informationTHE SEISMIC PERFORMANCE OF FLOORING SYSTEMS EXECUTIVE SUMMARY. Dene Cook 1
THE SEISMIC PERFORMANCE OF FLOORING SYSTEMS EXECUTIVE SUMMARY Dene Cook 1 This report has been prepared by the Technical advisory group on precast flooring systems. The group includes representatives from:
More informationKicking Horse Cantilever Structure. Bruce Hamersley, P.Eng., Klohn Crippen Berger Ltd. Keith Mitchell, P.Eng., Klohn Crippen Berger Ltd.
Kicking Horse Cantilever Structure Bruce Hamersley, P.Eng., Klohn Crippen Berger Ltd. Keith Mitchell, P.Eng., Klohn Crippen Berger Ltd. Brian Borton, P. Eng., Klohn Crippen Berger Ltd. Paper prepared for
More informationPOST TENSIONED SLABS. Imagineering the possibilities
POST TENSIONED SLABS Imagineering the possibilities imagineering... CCL post - tensioned slab solutions represent continuous development through involvement in building structures worldwide. CCL systems
More information