EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS

Size: px
Start display at page:

Download "EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS"

Transcription

1 BILLS OF QUANTITIES - Name of Project CONSULTANT: Name of Office DATE:APR External Works EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS page 1

2 BILLS OF QUANTITIES - Name of Project CONSULTANT: Name of Office DATE:APR BILL NO. 1 EXCAVATION AND BACK FILLING ITEM RATE AMOUNT DESCRIPTION UNIT QUANTITY NO. US$ CENT US$ CENT Excavation, Back filling and Site Works. 1.1 Site Leveling. (Excavation in the streets and where required). Cut in any kind of soil, rock, concrete, or asphalt; to the required Levels (reduced Level bottom of base coarse under ground slab ). 1.2 The price to include back filling with excavated suitable materials, or imported approved materials, removal of extra soil, debris, and organic materials to a suitable place approved by the engineer. Back filling material shall be applied on layers, 20cm thick, watered and compacted to min 95% to comply with modified AASHTO Density Test (T-80) Import and fill with selected Imported Approved Fill; to the required levels and where directed by the Engineer, only for the quantities that are extra and above the quantities included in item 1.1 M.C 270 Filling shall be on layers not to exceed 200 mm. thick. Price to include leveling, watering and compacting to 100 % field density. Complying with Modified AASHTO Density Test T-80. M.C 3,700 Contingency CARRIED TO SUMMARY page 2

3 BILLS OF QUANTITIES - CONSULTANT: DATE: APR.2008 SUMMARY Bill No. Title Amount USA $ CENT 1 Excavation, Backfilling And Site Works 2 Concrete Works 3 Plastering Works 4 External Tiles and Flooring 5 Steel Works 6 Main Gate Works 7 Asphalt Works 8 External Electrical works 9 External Mechanical Works Grand Total Percentage % Discount or Addition Net Grand Total All Prices exclude taxes of any kind except income Taxes. The Sum of : and USA($) Cent Signed and Sealed: Authorized : Title: Signature: Date: Page 13

4 BILL No. (9) Item Rate Total DESCRIPTION Unit Quantity NO. USD CENT USD CENT EXTERNAL MECHANICAL WORKS Preamble. 9.1 Supply, installation, testing and commissioning Galvanized steel main water pipes, according to specifications (Bs1387) and outer insulation with three layers (AWWA C214), price to include all necessary fittings, e.g elbow, T, union, reducers.etc all of approved quality, price also to include trenches excavation in all type of soil (earth or rock), leveling bottom of trenches manually, backfilling using suitable sand 10cm under, above and around the pipes, and completing the backfilling with basecorse layers not exceeding 20cm, watering and compacting these layers. price also to include testing, cleaning and all what is required to complete the work acording to drawings, specifications and engineers approval and also according to Municipality requirements. a) 3" pipes, wall thickness 4mm, includes trench excavation 70cm depth and 50cm wide and backfilling as mentioned above b) 2", wall thickness 3.6 mm, includes trench excavation 60cm depth and 40 cm wide and backfilling as mentioned above M.R 100 M.R 115 c) 1 1/2", wall thickness 3.2 mm, includes trench excavation 40cm depth and 30 cm wide and backfilling as mentioned above M.R 215 d) 1 1/4", wall thickness 3.2 mm, includes trench excavation 40cm depth and 30 cm wide M.R Supply and install manhole for water valves to be constructed of reinforced concrete 100X100X100 cm, and C.I cover 25 Ton, Price shall include for concrete, steel, plastering, excavating, backfilling and disposal of surplus excavated materials. Excavation shall be in any type of soil or rock. and according to Municipality requirements. Mechanical Works N.O 1 CARRIED TO NEXT PAGE Page 11

5 BILL No. (9) Mechanical Works Item Rate Total NO. DESCRIPTION Unit Quantity USD CENT USD CENT (SECTION NO. 6) MECHANICAL WORKS FORWARDED 9.3 Supply and install valves inside manhole or water meter boxes, price to include unions, complements and what is required to complete the work according to drawings, specifications and engineers approval and also according to Municipality reqiurements a) 3" N.O 1 b) 1 1/2" N.O 12 c) 1 1/4" N.O Septic Tank works: supply and install heavy duty cast iron cover, vent siphones and vent pipes to the nearest wall and what is required to complete the work according to drawings, specifications and engineers approval (Construction works including excavations, reinforced concrete,...etc is considered in concrete work) L.S Supply and install concrete water culvert 40cm diameter, price to include two gully gutters (grates) to collect rain water from streets of size 835mmX335mmX50mm with proper frame, price to include casting in the site reinforced concrete manhole of internal diameter 34cmX84cm, reinforced concrete base 15cm thick, and walls 10cm thick. the price also includes concrete pipes 40cm diameter, and what is required for proper pipes jointing and a precast circular manhole 100X100X100 cm, includes excavation, backfilling, manhole base, cast iron cover 25 ton, connceting to reinforced concrete pipes to transfer rain water to the nearest lands, also price to include excavations in any type of soil or rock for pipes and manholes, also backfilling with sand under, above and around the pipes 20cm thick, and completing the backfilling with compacted basecorse layers and what is required to complete the work according to specifications and engineers approval and according to municipality requirements. 9.6 Supply and install steel fire fighting outlets 2", price to include complements, painting, fixing, galvanized steel pipes and what is required to complete the work according to specifications, engineers approval and municipality requirements. L.S 1 No. 5 Page 12

6 CARRIED TO SUMMARY Page 13

7 BILL No. (8) EXTERNAL WORKS Item DESCRIPTION Unit Quantity Rate Total NO. USD CENT USD CENT ELECTRICAL WORKS Preamble: Supply, install and commissioning, connect and test all external works: poles, manholes, overhead lines, excavations, backfilling,ducts, pipes cables and what is required to complete the work according to to drawings, specifications, engineers approval and according to Municipality and Electrical company and Paltel requirements. 8.1 Supply, install 9m galvanized steel low tension pole, price to include anchoring clamps, stays, excavation in any type of soil (1X1X1.3)m,fixing and what is required to complete the work according to specifications and Municipality and electrical company requirements No Supply, Install and Connect APC(aerial bundle cables), price to include galvanized anchoring clamps, suspension clamps,screws, plastic straps, fixing, calibration of cables and any other accessories required to complete installing the cables according to specifications and engineers approval and electrical company requirements. a) 4X95+2X25mm2 M.R 220 b) 4X50+2X25mm2 M.R Supply and install complete street lighting unit suitable to be connected on the poles, price to include the shell and (100W) lamp Gaash or equal and the internal parts starters,...etc type Hashofet or equal, fixing and testing and what is required to complete the work according to specifications and engineers approval and also according to electrical company and municipality requirements. NO 14 CARRIED TO NEXT PAGE Page 9

8 Item NO. DESCRIPTION Unit Quantity (SECTION NO. ' 5 ) Rate Total USD CENT USD CENT ELECTRICAL WORKS FORWARDED 8.4 Supply and install lighting panel consists of main switch 3X63A moller or equal, magnetic switch 3X50A, three branch switches 25A capacity and a photocell and what is required to complete the work and according to engineers approval and electrical company requirements No supply and install (100X100X100)cm electrical manholes, price to include, excavation, medium duty cast iron cover and all what is required according to engineers approval and electrical company requirements. No a) supply and install (80X80X80)cm telephone manhole, price to include excavation, 8ton cast iron cover and all what is required according to specifications,engineers approval and paltel company requirements. No. 6 b) Ditto but 25 ton cast iron cover No Supply and install XLPE cables to buildings and where required from the pole to the main distribution boards of buildings price to include 4" pvc pipes, excavation, backfilling, 6m steel pipes and what is required to complete the work according to drawings specifications and engineers approval and also according to electrical company requirements. a) 3X35+1X16+16mm2 XLPE cable M.R 350 b) 3X25+1X16+16mm2 XLPE cable M.R a) Supply and install 4" PVC pipes for telephone main feeders, price to include excavation, backfilling and what is required to complete the work according to drawings, specifications and engineers approval and according to PALTEL requirements. M.R 470 b) Ditto but 2" PVC pipes M.R Supply and install telephone cables 10Pair Teldor or equal M.R 1 CARRIED TO SUMMARY Page 10

9 BILL No. 3 PLASTERING ITEM RATE AMOUNT DESCRIPTION UNIT QUANTITY NO. US$ CENT US$ CENT PLASTERING. PREAMBLE. 3.1 Four Coats of Cement and Sand Plaster over one slurry coat for external walls and Wherever Required, The fourth coat is troweled (shabriz) Topping. Price to include waterproof additives. where required including galvanized metal Lath, angle beads, plaster stops and all required as per Specifications and Drawings. The price shall include all narrow widths, for taking out joints on block walls or backing concrete face for key, M.S 500 CARRIED TO SUMMARY Page 4

10 BILL NO. 4 EXTERNAL TILES AND FLOORING ITEM NO. DESCRIPTION UNIT QUANTITY RATE AMOUNT US$ CENT US$ CENT EXTERNAL TILES AND FLOORING 4.1 supply and spread agricultural soil brought from outside the site and from the upper layers of ground, price to include spread the soil in a smooth levels in gardens 50cm thick. Price also to include excavation and cleaning under the spread soil 4.2 Supply and install cement tiles (Interlock), grade A colored, 4cm thick for pavements and where required. Price to include curbs stone, sand layer and grouting and what is rrquired to complete the work according to drawings, specifications and engineers approval M.S 1200 M.S 1300 CARRIED TO SUMMARY Page 5

11 BILL No. 5 STEEL WORKS ITEM NO. DESCRIPTION UNIT QUANTITY RATE AMOUNT US$ CENT US$ CENT STEEL WORKS 5.1 Supply and Install Protection Steel Grilles(85cm)height measured in meter run. As detailed in the site plan drawings including fixation, accessories, welding, grinding, smoothening, Ironmongery, oil painting three coats in addition to two primer coats Special primer coats for galvanized steel,price also to include (30X30X100)cm stone columns each 4m spacing ( Site Detail no. 2) 5.2 M.R 24 Supply and install steel chain between two columns as in drawings (Site detail no. 3) No. 3 CARRIED TO SUMMARY Page 6

12 BILL No. 6 MAIN GATE WORKS ITEM NO. DESCRIPTION UNIT QUANTITY RATE AMOUNT US$ CENT US$ CENT MAIN GATE WORKS 6.1 Supply and install the project gate as in the drawings (Site Detail no. 1) the price to include excavations, reinforced concrete, stone, block, finishing and writing on the stone, and special boxes or points for lighting fixtures and what is required to complete the work as in the drawings, details and engineers approval L.S 1 CARRIED TO SUMMARY Page 7

13 ITEM NO. BILL No.7 DESCRIPTION UNIT Asphalt Works RATE AMOUNT QUANTITY US$ CENT US$ CENT Asphalt Work 7.1 Supply and Well Compact Base Coarse, average 20 cm thick plus 50 cm offset all around streets and where required according to drawings and where directed by the engineer. basecoarse shall be applied on layers, 20cm thick, watered and compacted to 100% to comply with modified AASHTO F.D.T (T-80).Price includes watering, leveling and compacting of ground (sub-base) under base coarse to min 100% according to Field Density Test. 7.2 Supply and apply 7cm asphalt layer, price to include liquid asphalt prime coat (MC-70) 1.2Kg. Per square meter, and spread them in amooth and dry surface using finisher, price also to include the mixture, compacting, mixture testing and what is required according to drawings, specifications and engineers approval CARRIED TO SUMMARY M.S 2,800 M.S 2,500 Page 8

14 BILL NO. 2 CONCRETE WORKS ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT NO. US$ CENT US$ CENT CONCRETE WORKS. 2.1 Supply and Cast Reinforced Concrete Grade 'B280 With a minimum cement content of 325 Kg. per cubic meter. Price to include for painting with two coats of hot bitumen (75/25) (for the buried parts). or cold applied rubberized bitumen emulsion protective coating with fiber reinforcement for Foundations of reinforced concrete walls M.C Ditto but Reinforced concrete walls with two coats of hot bitumen (75/25) (for the buried parts) and insulation boards M.C construct Reinforced concrete for septic tank (6X7X4)m (see septic tank detail) price to include all construction and finishing work and what is required to comlete the work according to specifications, drawings and engineers approval L.S 1.0 CARRIED TO SUMMARY Page 3

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. Beit Hanoun Emergency Water Supply Project "Beit Hanoun Emergency Water Supply Project" " Rehabilitation and Construction of Beit Hanoun Water Network " BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE Bill of Quantities PREAMBLE TO

More information

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES

More information

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL.

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL. Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities for SIX CHAMBER VIP LATRINE FACILITY LOCATED AT PRIMARY & SECONDARY SCHOOL YEI RIVER COUNTY South Sudan JUN,

More information

Bill No.1: Preliminaries

Bill No.1: Preliminaries Bill No.1: Preliminaries Item No. Description of Works Qty. 1 Mobilization 1.1 This item should include site office for the use of the Engineer's and Employer's staffs with the necessary facilities, furniture,

More information

SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR

SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR FINANCIAL BID Item DSR Item Description Qty Units No No. Total 1.1.1 Excavating trenches of

More information

Estimate FOR THE SEPTIC TANK

Estimate FOR THE SEPTIC TANK Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks

More information

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M.

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M. Bill of Quantities Nature of work : Construction of Health Center with 8 rooms (Clinics, Pharmacy, Labs, Fence & Latrines) Location: Shakreen- El Fasher Town- North Darfur State No. Description Qty Unit

More information

Rehabilitation of Electricity Power Distribution Network in three areas in the Gaza strip (GS) PAL Bill of Quantity : Package2 - Lot 3

Rehabilitation of Electricity Power Distribution Network in three areas in the Gaza strip (GS) PAL Bill of Quantity : Package2 - Lot 3 ITB 2016-279 Rehabilitation of Electricity Power Distribution Network in three areas in the Gaza strip (GS) PAL-10-00098764 Bill of Quantity : Package2 - Lot 3 Package 2 Lot1- Installation, Connection

More information

July Bill No.1: Preliminaries

July Bill No.1: Preliminaries Bill No.1: Preliminaries 1 Mobilization 1.1 This item should include site office for the use of the Engineer's and Employer's staffs with the necessary facilities, furniture, computers, printers, photocopier,

More information

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI. Item Description Unit Quantity Rate Amount

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI. Item Description Unit Quantity Rate Amount EXTERNAL WORKS DEMOLITION AND ALTERATIONS EXTERNALLY Pulling down to ground level; removing debris from Site a 200 mm thick masonry wall finished both sides with plaster and paint; net total area 158 square

More information

SECTION STORM DRAINAGE

SECTION STORM DRAINAGE SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) United Nation Development Programme Construction Salah El Deen Road Median From Al Zawaida entrance to Al Maghazi Northern entrance PAL 10-00071488 Bill of Quantity (BOQ) PREAMBLE TO BILL OF QUANTITY (BOQ)

More information

Construction works for Establishment of School in Al-Najaf M 2 2,600 M 2 750

Construction works for Establishment of School in Al-Najaf M 2 2,600 M 2 750 1 Preparation of a 18-Classroom School BoQ for constructing a 18-Classroom School - Najaf Site Preparation:Works for leveling the site and remove the garbage to authorized location according to supervisor

More information

Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill No Description Unit Qty

Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill No Description Unit Qty Attil Hospital Project Bill of Quantities Table(1) Excavation and Backfill Us$ Cent Us$ Cent Notes s for excavation works shall include: Removal of site obstacles, rocks, trees and small concrete of store

More information

Construction works for Establishment of School in Al-Latifiyah. Al-Latifiyah BoQ for constructing a 6-pre-fab Classroom School

Construction works for Establishment of School in Al-Latifiyah. Al-Latifiyah BoQ for constructing a 6-pre-fab Classroom School 1 Al-Latifiyah BoQ for constructing a 6-pre-fab Classroom School Preparation of a 6-Classroom School Site Preparation:Works for leveling the site and remove the garbage to authorized location according

More information

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES RFP/GRC/LSV/2017-003: RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES 1/7 The Contractor shall consider in his price all costs or expenses of all requirements stipulated

More information

BOQ for Plumbing, Sanitary Works

BOQ for Plumbing, Sanitary Works BOQ for Plumbing, Sanitary Works Page of 6 Sr.No Item Description Quantity Unit Rate Amount (Rs.) SANITARY FIXTURES a Providing & Fixing star white colour vitreous china wall mounted wc with heavy duty

More information

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00 Description Page No Summary Amount Summary 1/7 230,694.60 22,019.25 22,642.65 2/6 96,801.30 80,150.60 114,056.00 Total Per Unit (MYR) 327,495.90 102,169.85 136,698.65 Total Unit(s) X 1 2 2 Total Per Type

More information

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): 01 Providing and Fixing of CPVC pipes confirming to ASTM standard including all CPVC fittings like tees, elbows, bends, unions, coupling, reducer

More information

SCHEDULE OF RATES. WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT

SCHEDULE OF RATES. WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT WORK : External Waterproofing for Basement at Dena Bank, Kandivali Branch SCHEDULE OF RATES SR NO PARTICULARS UNIT QUANTITY RATE AMOUNT 1 Excavation for foundation in earth all types of soils like clay,

More information

A Provide for Contractor's Office, Store etc. Sum

A Provide for Contractor's Office, Store etc. Sum BILL NO.1 - PRELIMINARIES AND GENERAL CONDITIONS A Provide for Contractor's Office, Store etc. Sum B C Provide for Insurance in accordance with the Conditions of the Contract. Allow for the provision of

More information

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 MARCH 1993 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER 602.01 SCOPE 602.02 REFERENCES 602.05 MATERIALS TABLE OF CONTENTS

More information

Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2

Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2 Employment Intensive Infrastructure Program (EIIP) in Lebanon ANNEX 2 PARTICULAR SPECIFICATIONS FOR THE CONSTRUCITON OF STORM WATER DRAINAGE NETWORK March 2018 BUREAU TECHNIQUE POUR LE DEVELOPPEMENT P.O.B

More information

Description Unit Quantity Rate Kshs. Amount Kshs.

Description Unit Quantity Rate Kshs. Amount Kshs. BILL No.1 40m3 MASONRY STORAGE TANK No. Description Unit Quantity Rate Kshs. Amount Kshs. 1 SETTING OUT AND EARTH WORKS 1.1 General site clearance and setting out 1.2 Excavate over site 200mm to remove

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) United Nation Development Programme Rehabilitation of Tunis & Omer Bin Abdel Aziz Sidewalks PAL 10-71488 : UXOs and Rubble Removal From Gaza Strip Bill of Quantity (BOQ) PREAMBLE TO BILL OF QUANTITY (BOQ)

More information

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01026 PART 1 GENERAL 1.1 SECTION INCLUDES A. Explanation and Definitions B. Measurement C. Payment D. Schedule of Values E. Application for Payment 1.2 EXPLANATION AND DEFINITIONS A. The following

More information

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT GOVERNORATE : DISTRICT : LOCATION : Anbar Ramadi Raja School GO code : IRAKGENASSENG0 TITLE : Raja / School / Rehabilitation SO n : SO 01 WPA n : BAG 17

More information

PND Training Hall Conex Building, Kabul ABSTRACT OF COST

PND Training Hall Conex Building, Kabul ABSTRACT OF COST PND Training Hall Conex Building, Kabul ABSTRACT OF COST A Civil Works All work items shall be carried as per drawing, specification and instruction of the Engineer. 1 Sub-structure Works Earthwork in

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 602 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS TABLE OF CONTENTS 602.01 SCOPE 602.02 REFERENCES 602.03 DEFINITIONS

More information

Islamic Republic of Afghanistan Ministry of Interior Affairs Central Prison Directorate

Islamic Republic of Afghanistan Ministry of Interior Affairs Central Prison Directorate Islamic Republic of Afghanistan Ministry of Interior Affairs Central Prison Directorate Appendix II: Bill of Quantity for the construction of Boundary wall,guard towers, Check point,guard house, Access

More information

TITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY

TITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY D DEMOLITION & SITE CLEARANCE D1 GENERAL CLEARANCE 6-D152 Open bush and thicket in and around ha 0.02 the ponds. Locally disposed. D2 REMOVAL OF TREES AND STUMPS 6-D212 Trees of girth: 150 mm - 500 mm

More information

SCHEDULE OF ITEMS & QUANTITIES FOR CIVIL WORKS OF PROPOSED GIRLS/ BOYS TOILET BLOCK

SCHEDULE OF ITEMS & QUANTITIES FOR CIVIL WORKS OF PROPOSED GIRLS/ BOYS TOILET BLOCK Schedule-I: Civil Works EARTH WORK Section-A : DSR Items 1 2.8 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in

More information

Annex II- Lot 2. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 6 Admin Units in localities of Sinar State

Annex II- Lot 2. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 6 Admin Units in localities of Sinar State Annex II- Lot 2 Bills of Quantities for Civil Works of septic tanks and soak-away wells in 6 Admin Units in localities of Sinar State Lot: 2 Site 2-1: Allakandie All Prices of items shall include Supplying,

More information

COUNTY GOVERNMENT OF SIAYA: PROPOSED ECD BLOCK

COUNTY GOVERNMENT OF SIAYA: PROPOSED ECD BLOCK PROPOSED ECD BLOCK ELEMENT NO. 1 SUBSTRUCTURES (ALL PROVISIONAL) A B C D Site clearance Clear the site off grass, shrubs and all vegetation; cart away as directed Excavate vegetable soil average 200mm

More information

0.75 " transparent hose w/ valve for head measurements fixed to screws 20 MIL PVC liner. 6" gate valve

0.75  transparent hose w/ valve for head measurements fixed to screws 20 MIL PVC liner. 6 gate valve 0.75 " transparent hose w/ valve for head measurements fixed to screws 250x1000 RC beam 6" gate valve Foundation preparation in accordance with technical specifications and as approved by engineer 25 cm

More information

Annex III- Lot 3. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 8 Admin Units in localities of Sinar State

Annex III- Lot 3. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 8 Admin Units in localities of Sinar State Annex III- Lot 3 Bills of Quantities for Civil Works of septic tanks and soak-away wells in 8 Admin Units in localities of Sinar State Lot: 3 Site 3-1: Sinja city All Prices of items shall include Supplying,

More information

Annex I- Lot 1. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 7 Admin Units in localities of Sinar State

Annex I- Lot 1. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 7 Admin Units in localities of Sinar State Annex I- Lot 1 Bills of Quantities for Civil Works of septic tanks and soak-away wells in 7 Admin Units in localities of Sinar State Lot: 1 Site 1-1: Sinnar city All Prices of items shall include Supplying,

More information

Subject: Quotation for Erection of Pre fabricated Buildings in Turbat and Gawadar for UNODC Country Office Pakistan,

Subject: Quotation for Erection of Pre fabricated Buildings in Turbat and Gawadar for UNODC Country Office Pakistan, REQUEST FOR QUOTATION (RFQ) FACSIMILE/EMAIL Company/Individual Name: Business address: Telephone Fax Email Subject: Quotation for Erection of Pre fabricated Buildings in Turbat and Gawadar for UNODC Country

More information

SECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete.

SECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete. SECTION 02720 STORM DRAINAGE SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02221 - Excavating, Backfilling, and Compaction for Utilities. 2. 03300 - Cast-in-place Concrete. 1.02 REFERENCES

More information

ONE PIPE LENGTH MAX (REFER TO 1/4"/FT SLOPE (MIN) 5'-0" (MIN) OR 4" LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4"x6" REFER TO TYPICAL EXCAVATION,

ONE PIPE LENGTH MAX (REFER TO 1/4/FT SLOPE (MIN) 5'-0 (MIN) OR 4 LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4x6 REFER TO TYPICAL EXCAVATION, VENT CAP (MUSHROOM TYPE) SOLID CAP EXIST GRADE MIN BUILDING REFER TO NOTE #4 MIN CONCRETE SIDEWALK CURB OR EDGE OF SIDEWALK STREET CLEANOUT (REFER TO NOTE #3) VENT PIPE 4" PVC 6" PVC CLEANOUT CONCRETE

More information

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT GOVERNORATE : DISTRICT : LOCATION : Salah al Din Shirqat Markiz Shirqat GO code : IRAK DPL ASSENG0 TITLE : Mosul Response (2017) Shirqat Unified / WTP /

More information

Amendments to the January 2016 Design Criteria Manual & Supplementary Master Municipal Construction Documents

Amendments to the January 2016 Design Criteria Manual & Supplementary Master Municipal Construction Documents General Figure 2.3.1 16 Revise Revised Figure 2.3.1: New Development Areas where Secondary Suites Apply to include two new areas (#4 and 5). Water 3.3.2 Watermains 31 Add Added wording in Section 3.3.2.3

More information

SINAR AHS BILL OF QUANTITIES Cost code Description Unit Qty 1 SINAR AHS Contractors General Conditions Site Works Setting out works: Rates

SINAR AHS BILL OF QUANTITIES Cost code Description Unit Qty 1 SINAR AHS Contractors General Conditions Site Works Setting out works: Rates SINAR AHS BILL OF QUANTITIES Cost code Description Unit Qty 1 SINAR AHS 01000 Contractors General Conditions 02000 Site Works Setting out works: Rates shall include but not limited to all necessary equipments,

More information

CATCHMENT STRUCTURE 13M X 15M

CATCHMENT STRUCTURE 13M X 15M BILL OF QUANTITIES AND SPECIFICATIONS CONSTRUCTION OF 100M3 DJABIA ITEM No. DESCRIPTION UNIT QUANTITY RATE AMOUNT KSHS CATCHMENT STRUCTURE 13M X 15M 1.1 Clear catchment site of all bushes, scrubs, undergrowth,

More information

B. Fiberglass for construction in back lot easements placed on cast-in-place base.

B. Fiberglass for construction in back lot easements placed on cast-in-place base. Section 02083 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Fiberglass manholes for unpaved areas placed on top of a precast base to form a manhole. B. Fiberglass for construction in back lot easements

More information

***************************************************************************************************************

*************************************************************************************************************** 02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************

More information

UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES PROJECT BOQ. Original Issue Bamyan MAC Site Services - Phase 1 Bamyan, Bamyan, Afghanistan

UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES PROJECT BOQ. Original Issue Bamyan MAC Site Services - Phase 1 Bamyan, Bamyan, Afghanistan UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES PROJECT BOQ Original Issue Bamyan MAC Site Services Phase Bamyan, Bamyan, Afghanistan Project Components:. Site Services Phase NOTICE TO ALL BIDDERS COMPLETE

More information

Jericho Agro Industrial Park

Jericho Agro Industrial Park Bill. 1 Excavation Earth Works and Embankment Work 1 Description Unit QTY Price/ Unit Total USD The Contractor shall when pricing the rates of this bill, take into consideration including and allow for

More information

CONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION

CONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 407 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR NEW MAINTENANCE HOLE, CATCH BASIN, DITCH INLET, AND VALVE CHAMBER INSTALLATION TABLE OF CONTENTS 407.01

More information

1. Division 01 Section General Requirements - Temporary Facilities and Controls. 2. Division 31 Section Earthwork.

1. Division 01 Section General Requirements - Temporary Facilities and Controls. 2. Division 31 Section Earthwork. PAGE 334000-1 SECTION 334000 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) Item Description Qty Unit Rate Total

OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) Item Description Qty Unit Rate Total BILL OF QUANTITY Proposed Market Shed OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) ELEMENT NO. 1: - SUBSTRUCTURE (ALL PROVISIONAL): - Excavations and Earthworks: - A Clear site of all bush and grass and

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS TABLE OF CONTENTS 602.01 SCOPE 602.02 REFERENCES 602.03 DEFINITIONS

More information

CW 3235 RENEWAL OF EXISTING MISCELLANEOUS CONCRETE SLABS TABLE OF CONTENTS

CW 3235 RENEWAL OF EXISTING MISCELLANEOUS CONCRETE SLABS TABLE OF CONTENTS December 2011 CW 3235 RENEWAL OF EXISTING MISCELLANEOUS CONCRETE SLABS TABLE OF CONTENTS 1. DESCRIPTION...1 1.1 General...1 1.2 Definitions...1 1.3 Referenced Standard Construction Specifications...1 1.4

More information

UNDP / PAPP OFFICE BUILDING RAMALLAH HVAC WORKS

UNDP / PAPP OFFICE BUILDING RAMALLAH HVAC WORKS UNDP / PAPP OFFICE BUILDING RAMALLAH WORKS Bill of Quantities July 2008 ENGINEERING UNIT Project: system The contractor shall, when pricing the rates of this bill take into consideration including and

More information

TABLE OF CONTENTS

TABLE OF CONTENTS DIVISION 33: SEWER AND SEPTIC SYSTEMS 33 3633 UTILITY SEPTIC TANK DRAINAGE FIELD TABLE OF CONTENTS 33 0000-1 SECTION 33 3633-- UTILITY SEPTIC TANK DRAINAGE FIELD PART 1 - GENERAL 1.1 SUMMARY A. Includes

More information

PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER

PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER COMMUNICATIONS LIGHTING Street Lighting Plan 710 Riser... 287 730 Collar for street light pole... 289 731 Pull box... 291 732 Trench for street light

More information

The International Committee of the Red Cross

The International Committee of the Red Cross The International Committee of the Red Cross WATER & HABITAT DEPARTMENT Rozhawa / Hospital / Rehabiliation Phase II Rozhawa Hospital / Erbil City / Erbil 25 - February - 217 Rozhawa / Hospital / Rehabiliation

More information

DRAFT. Draft Bill of Quantities. Drainage

DRAFT. Draft Bill of Quantities. Drainage Draft Bill of Quantities September 2015 STORM DRAINAGE INFORMATION Measurement notes Drawings used : WYG (80) 140 Rev T1, D-(80) 001 Rev T1, D-(80) 002 Rev T1, D-(80) 003 Rev T1 and D-(80) 004 Rev T1 All

More information

ITEM 432 TUNNEL CONSTRUCTION

ITEM 432 TUNNEL CONSTRUCTION AFTER MARCH 1, 2012 ITEM 432 TUNNEL CONSTRUCTION 432.1 Description. This Item shall govern for tunnel lines under railroads, state highways, and concrete paved streets or other obstructions indicated.

More information

BILLS OF QUANTITIES FOR CONSTRUCTION OF MODEL DISPENSARY BLOCK AT MGUNGANI / SALAITA

BILLS OF QUANTITIES FOR CONSTRUCTION OF MODEL DISPENSARY BLOCK AT MGUNGANI / SALAITA BILLS OF QUANTITIES FOR CONSTRUCTION OF MODEL DISPENSARY BLOCK AT MGUNGANI / SALAITA CONSTRUCTION OF MODEL DISPENSARY BLOCK Item DESCRIPTION QTY UNIT RATE TOTAL(KS ELEMENT : SUBSTRUCTURE (ALL PROVISIONAL):

More information

Extension of Water Network to Service Jericho Souther Area Mainly the Future Jericho Agro-Industrial Park (JIAP) Elevated Water Tank.

Extension of Water Network to Service Jericho Souther Area Mainly the Future Jericho Agro-Industrial Park (JIAP) Elevated Water Tank. Extension of Water Network to Service Jericho Souther Area Mainly the Future Jericho Agro-Industrial Park (JIAP) Elevated Water Tank Sections 1-6 SECTION (1) EXCAVATION BACKFILLING AND SITE WORKS BILL

More information

PRICED BILL OF QUANTITIES

PRICED BILL OF QUANTITIES Engineering Projects (dia) Limited (A Govt of dia Enterprise) Words 1 EARTH WORK 1.1 Earth work in excavation by mechanical means (Hydraulic Excavator) / Manual means over areas (exceeding 30 cm in depth,

More information

SECTION PUBLIC WATER SERVICE CONNECTIONS

SECTION PUBLIC WATER SERVICE CONNECTIONS SECTION 33 14 14 PUBLIC WATER SERVICE CONNECTIONS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe and fittings for water service connections to small commercial, light industrial, and residential

More information

TYPE "A" CATCH BASIN

TYPE A CATCH BASIN 27" 1.67' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3250-BV OR APPROVED EQUAL. "INFI SHIELD" SEAL OR APPROVED EQUAL RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR). PLASTER OUTSIDE,

More information

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows. 403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage

More information

Section 403. DRAINAGE STRUCTURES

Section 403. DRAINAGE STRUCTURES 403.01 Section 403. DRAINAGE STRUCTURES 403.01. Description. This work consists of adjusting, constructing, or temporarily lowering drainage structures and cleaning existing drainage structures and leads

More information

SCHEDULE OF QUANTITIES CPUT BELLVILLE JOB NO: SECTION 1 : PRELIMINARY AND GENERAL ITEM PAYMENT DESCRIPTION UNIT QTY RATE AMOUNT

SCHEDULE OF QUANTITIES CPUT BELLVILLE JOB NO: SECTION 1 : PRELIMINARY AND GENERAL ITEM PAYMENT DESCRIPTION UNIT QTY RATE AMOUNT SECTION 1 : PRELIMINARY AND GENERAL ITEM PAYMENT DESCRIPTION UNIT QTY RATE A SECTION 1 : PRELIMINARY AND GENERAL A.1 8.3 FIXED-CHARGE ITEMS A.1.1 8.3.1 Contractual Requirements A.1.2 8.3.2.1 Facilities

More information

UNITED NATIONS DEVELOPMENT PROGRAMME ITB

UNITED NATIONS DEVELOPMENT PROGRAMME ITB UNITED NATIONS DEVELOPMENT PROGRAMME ITB 2017-078 Bill of Quantities Project name: Package 2: External Lighting PAL10-00099398 / Rehabilitate GIE Infrastructure General *All installation works must be

More information

PERMANENT PAVEMENT REPAIR NO SCALE

PERMANENT PAVEMENT REPAIR NO SCALE SAWCUT EXISTING PAVEMENT 2" BITUMINOUS CONCRETE SURFACE COURSE, CLASS 2 (MIN) CLEAN EDGE PRIOR TO PAVING AND PAINT WITH LIQUID BITUMEN. INSTALL SEALANT OVER JOINT UPON COMPLETION 2" BITUMINOUS CONCRETE

More information

2.1.2 Minimum wall thickness shall be 90 mm Frames and covers shall be bitumen coated by dipping.

2.1.2 Minimum wall thickness shall be 90 mm Frames and covers shall be bitumen coated by dipping. 1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 The work shall consist of the construction, renovation or the adjustment of manholes and/or catchbasins as detailed on the plans or where designated by the Engineer

More information

AMENDMENTS TO OPSS 408 (OCT 89) CONSTRUCTION SPECIFICATION FOR ADJUSTING OR REBUILDING MANHOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS

AMENDMENTS TO OPSS 408 (OCT 89) CONSTRUCTION SPECIFICATION FOR ADJUSTING OR REBUILDING MANHOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS Works and Emergency Services CITY OF TORONTO WATER AND WASTEWATER SERVICES STANDARD CONSTRUCTION SPECIFICATIONS TS 408 November 2010 AMENDMENTS TO OPSS 408 (OCT 89) CONSTRUCTION SPECIFICATION FOR ADJUSTING

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

Ice Rink Renovation & New Clubhouse

Ice Rink Renovation & New Clubhouse SECTION 331213 - WATER SERVICE CONNECTIONS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe and fittings for domestic water service connections to buildings. 2. Corporation stop assembly. 3. Curb

More information

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt:

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt: Amendment -1 Date: 17.02.2017 NIT No. RECPDCL/CSR/CWC/2016-17/3368 dt: 20.01.2017 Notice Inviting Tender (Bid Invited through e Tendering mode only) From Implementing Agencies for Turnkey execution of

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

Additional/ Rehabilitation works for Beit Jala secondary girls school (Chile School) Description Unit Quantity Unit Rate Amount

Additional/ Rehabilitation works for Beit Jala secondary girls school (Chile School) Description Unit Quantity Unit Rate Amount Civil Works 1 Carpentry Works 1.1 Supply & Install lower kitchen wooden cabinets. Top surface shall be granite 30mm thick. Cabinet s sides, front boards, partitions, shelves, and drawer s shall be 18 mm

More information

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.)

PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.) PROPOSED ROAD No. 5(A) FROM GHANTAGHAR TO BADI OMTI JABALPUR (M.P.) Based on. I to IV w.e.f. 10 May 2012 Length of the Road =250 m, ROW 18 m Abstract Estimate S.No. Description of Item SOR Item Cost 1

More information

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Electrical Work. NOV Embankments Over Swamps and Compressible Soils GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification

More information

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC).

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC). SECTION 16111 CONDUITS PART 1 - GENERAL 1.01 DESCRIPTION A. General: Provide conduits, complete, as shown, specified or required per Contract Documents. Principal items include: 1. Rigid aluminum conduit.

More information

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. SECTION 33 05 13 MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. B. Related Sections: 1. Section 03 20 00 - Concrete

More information

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND

CONSTRUCTION AND REHABILITATION OF FENCE AT GPL'S VERSAILLES COMPOUND BILL Nr1 - PRELIMINARIES 1.0 PRELIMINARY PARTICULARS 1.1 Funding The funding shall be provided by the Guyana Power & light Inc., of 40 Main street, North Cummingsburg, Georgetown. 1.2 Engineer The Engineer

More information

SECTION RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL PART 2 - MATERIALS AND METHODS

SECTION RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL PART 2 - MATERIALS AND METHODS SECTION 01200 RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL 1.01 SCOPE This specification covers the work within the street right-of-way (property line) for the repair of that area which is disturbed during

More information

1.02 RELATED WORK: Refer to the following sections for related work:

1.02 RELATED WORK: Refer to the following sections for related work: SECTION 4200 - CONCRETE STRUCTURES PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of header curb, retaining walls, energy dissipation structures for drainage channels, reinforced concrete

More information

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE 3.33' 3.0' 2.0' 4.33' 4.0' 3.0' 1.00' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3067-V OR AS NOTED ON PLANS. "INFA-SHIELD" SEAL OR EQUAL. RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR).

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

SECTION FACILITY SANITARY SEWERS

SECTION FACILITY SANITARY SEWERS SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

1. Remove worn-out old plaster (or any other finishing).

1. Remove worn-out old plaster (or any other finishing). Annexure A SCOPE OF WORK The work should be implemented by contractor under the supervision of Norwegian Refugee Co BoQ s and below instructions. NRC reserves the right to provide further clarifications/drawings

More information

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS PART 1 - GENERAL 01.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this Section.

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 02630 - STORM DRAINAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Summary of the 2011 Changes

Summary of the 2011 Changes The following is a list of amendments to the Residential Site Improvement s, N.J.A.C. 5:21, adopted in 2011. The Notice of Adoption of these changes appeared in the New Jersey Register on May 16, 2011.

More information

BID FORM (LUMP SUM CONTRACT)

BID FORM (LUMP SUM CONTRACT) BID FORM (LUMP SUM CONTRACT) Place County of El Paso Purchasing Department Date Project No. 11-016 Proposal of (hereinafter called Bidder), a corporation organized under the laws of the State of /a partnership/an

More information

PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT]

PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT] PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT] A. - General. B. - Streets. C. - Stormwater drainage system. D. - Water

More information

CONSTRUCTION WORK AT THE AU MEDICAL CENTER

CONSTRUCTION WORK AT THE AU MEDICAL CENTER CONSTRUCTION WORK AT THE AU MEDICAL CENTER No Description of works Unit Quantity RENDER THE FOLLOWING TO THE AUC, Medical Center.01. Laboratory 1.0 Dismantling Works; 1.1 Remove carefully the existing

More information

Storm Drainage

Storm Drainage University of New Hampshire University of New Hampshire Scholars' Repository Division 33 Utilities Chapter 5 Technical Construction and Renovation Standards 4-23-2015 334100 - Storm Drainage Sandra Hickey

More information

ARCHITECTURAL DRAWINGS

ARCHITECTURAL DRAWINGS PROJECT DETAILS Implementation Partner: Project title: Grant No.: KIS062 Content : ARCHITECTURAL DRAWINGS SHEET NO. REHABILITATION OF GRANT NO.: - KIS062 COVER SHEET INDEX SHEET CONTENTS 01 02 03 04 05

More information

SCALE BAR 1:2500 RM OF WOODLANDS OVERALL PLAN - LOW PRESSURE SEWER MAIN. Certificate of Authorization JESSICA MANNESS ENGINEERING, INC. No.

SCALE BAR 1:2500 RM OF WOODLANDS OVERALL PLAN - LOW PRESSURE SEWER MAIN. Certificate of Authorization JESSICA MANNESS ENGINEERING, INC. No. OF SURVEY OVERALL PLAN - LOW PRESSURE SEWER MAIN 0 50 100 SCALE BAR 1:2500 200 500 THIS IS NOT A LEGAL PLAN - CONCEPT ONLY OF SURVEY PLAN - LOW PRESSURE SEWER MAIN 0 50 100 SCALE BAR 1:2500 200 500 THIS

More information

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and

More information